HomeMy WebLinkAbout#03 - April 2020 Monthly PW ReportMAYOR AND COUNCIL COMMUNICATION
DATE 5/18/2020
CONSENT
AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities
that have taken place in the Public Works Department in the month of April, 2020.
PROPOSAL DETAILS/ANALYSIS:
PARKS
• Weekly garbage collection continues
• Replace park basketball nets and install volley ball nets
• Work with Friends of Lake Elmo Sunfish Park on the buckthorn removal grant
• Work with volunteers to update & improve trail signage for the Sunfish Park trails
• The proposed Sunfish Lake Park bike trails have been flagged for installation, the
contractor is scheduled for more work on the trails in June
• Spring cleanup of parks (trash, branches, leaves, etc)
• Request and open proposals for the future Inwood Development Park
• Improve Park ball fields by completing weed control and dragging the infields
• Seasonal Lawn care began
• Firefly Park - Removed the erosion control devices and touched up the landscaping
• Pebble Park - Landscape and seed last fall’s electric lighting improvement trenches
and additional security lights, replace nets and paint soccer goals along with add
mulch rings around trees
SURFACE WATER
• Continue to provide sand and sandbag for resident’s with flooding issues
• Repair several failing surface water asphalt swales
• Haul out street sweepings stock pile
• Suck out several catch basin to locate and re-install storm grates that were
vandalized on 5th St
• Began working on MS4 annual report
• Tana Ridge residents volunteered to paint “No Waste-Drains to Lake” next to storm
gates in that development
City Council Meeting Date Consent/Regular Agenda Item #__
Page 2
STREETS
• Staff have been concentrated on filling potholes on City streets that will be crack
filled and seal coated soon
• Attended to a minor icing and snow drifting winter event Easter week end
• Continue street sign replacement program
• Placed radar trailer on Ideal Ave and Lake Elmo Ave for one week each
• Continue ongoing maintenance on trucks and equipment including removing
several plows/sanders and flushing the pre-wet systems for the season
• Continue tree trimming in ROWs
• Completed spring street sweeping
• Complete plow damage lawn repair
• Begin working on 2021 CIP budget
• Complete annual hoist/crane inspections
• Rebuilt wore out skid steer bucket
• Assist in walkthroughs for NorthPort, Legacy & Hammes phase 3
• Clean up dumped trash in ditches
• Investigate and rate streets for five year maintenance plan
• Finish repairing/replacing plow damaged mail boxes
• Remove all spring weight restriction signs
• Clean up flower gardens in old village along Lake Elmo Ave
• Took delivery of the new tandem axle MAC and traded in the 2000 Sterling
• Submitted reimbursement form to South Washington Watershed District for cost
sharing of the pre-wet deicing system on the tandem
SEWER
• Continue daily rounds for preventive measures, compare pump run times and
resolve alarms
• Continue Weekly Proactive Pump downs of all Lift stations & Monthly Float
Cleaning
• Complete annual generator inspections and maintenance
City Council Meeting Date Consent/Regular Agenda Item #__
Page 3
WATER
• Public Works staff paused the meter replacement program mid-month due to the
pandemic
• Complete monthly MDH bacteria and fluoride sampling & reports
• Complete Monthly Generator and Safety Inspections of Equipment and Facilities
• Continue daily rounds, chlorine/fluoride sampling and locates
• Complete and submit MDH nitrate sampling
• Submit well water draw down reports to DNR
• Repaired broken curb stop box on 32nd st n
• Changed process for installing new construction meters to reduce errors
• Investigative and resolve missing water meter locations
• Install and turn on water for many seasonal irrigation meters
• Fabricate brackets to mount radio reads on irrigation meters
• Complete spring hydrant flushing, identifying a number of needed hydrant repairs
• Well 5 pre-con meeting
• Black dirt and seed winter water leak repairs
FACILITIES
• Complete city facility roof inspections and continue to make repairs.
• Trim bushes and trees at city hall
• Replace PW shop generator radiator
PANDEMIC PREPARDNESS
• The Public Works crew continues to work in two teams out of two locations
minimizing the sharing of equipment and tools
• Additional cleaning supplies, rubber gloves and face masks have been provided
• Play grounds and parks are open
• All staff trainings are postponed
• Topped off all water supply chemicals as a preventive measure
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the April 2020 Public
Works Report.