HomeMy WebLinkAbout#11 - 5th Street Median Update STAFF REPORT
DATE: 5/19/2020
REGULAR
ITEM #:
MOTION
TO: City Council
FROM: Ken Roberts, Planning Director
AGENDA ITEM: 5th Street Median Improvements – Next Steps
REVIEWED BY: Kristina Handt, City Administrator
Marty Powers, Public Works Director
BACKGROUND:
In 2019, the City Council had a series of meetings and discussion about the landscaping in the medians in
5th Street. These meetings were facilitated by Lucius Jonett, of Wenck Associates, Inc. and included
reviewing the history and types of approved plantings, the condition of the existing plantings in the
medians and a review of design options for the medians going forward.
On December 10, 2019, during the most recent Council meeting with discussion about the 5th Street
medians, the City Council reviewed a proposed several step implementation plan from Wenck to roll out
the new design to replace the current plantings in the 5th Street median. The City Council is now at
decision point for selecting and approving a replanting of one or two of the small existing medians as
suggested by the implementation plan. (Please see the April 29, 2020 memo from Lucius Jonett that
provides more details about the options for this project.)
ISSUES BEFORE CITY COUNCIL:
Does the City Council wish to direct staff to budget in 2021 for improving two 5th street median planting
improvements. If so which option does the City Council approve? Replanting of Median 1 and/or Median
2 (as shown in the attached memo)? If so, does the City Council want to use Option 1 (with a contractor
doing all the work), Option 2 (with a contractor and volunteers) or Option 3 (with City staff) for the planting
of each of these medians?
PROPOSAL DETAILS/ANALYSIS:
The April 29, 2020 memo from Wenck identifies two medians at the intersection of 5th Street and Junco
Road as the best candidates for the first planting/replanting with the new City design standards and
materials. They selected these two median areas because of their relatively small size and their location
near each other at an intersection. When completed with the new plantings, having these two medians
across from each other should ensure visibility for traffic at the intersection is maintained while having a
demonstration area for the new design and plant materials.
The Wenck memo goes on to outline the estimated costs for planting each median and breaks that out by
having a contractor doing all the work (Option 1) or by using a combination of a contractor and volunteers
to complete the project (Option 2).
The total estimated cost to have a contractor do all the work (Option 1) is:
Median 1 $17,100 plus Median 2 $32,800 for a total estimated cost of $49,900.
For Option 2, they estimate the costs at:
Median 1 $8,900 plus Median 2 $15,500 for a total estimated of $24,400.
Page 2
City staff is looking for direction from the City Council of how they want to the City to move forward with
the 5th Street median plantings. Does the City Council:
1. Support the plan to start implementing the new design standards for the 5th Street medians?
2. Want to proceed with the improvements and planting to one or both of the medians as identified by
Wenck in their memo dated April 29, 2020?
3. If the Council wants to proceed with the improvements, does the Council want to budget and have
the work completed in 2021?
4. If the Council wants to proceed with the new plantings in one or both of medians, which Option
should staff pursue to complete the work? Option 1 would require the City to put the work for bids
from contractors that would be responsible for the entire project. Option 2, with the use of
volunteers, coordination and planning by the City will be needed to ensure there would be enough
volunteers on several days to ensure all the planting are completed correctly and in a timely manner
after a contractor prepares the medians. City staff also would need to set up traffic control and
provide safety gear. The use of volunteers may involve work after business hours and/or on
weekends and would need supervision and leadership to keep the project on track, done correctly
and safely. The safety of the volunteers is a concern as the work would be occurring in and near
medians along a busy City street.
5. A third Option would be for a contractor do the traffic control, removal, site prep and irrigation
corrections. Public Works could then use staff to do the plantings in 2021. This option would
likely have a total cost just over $30,000 in contractor cost, plants, public works labor and
equipment fuel along with taking a number of public works staff and equipment away from other
priority projects for several days.
FISCAL IMPACT:
At this time, the City has not budgeted for this improvement. An option would be to direct staff to budget
up to $50,000 in 2021 for the two 5th Street median planting improvements.
OPTIONS:
1) Direct staff to budget and pursue Option 1 for the planting of the two 5th Street medians using a contractor
in a 2021.
2) Direct staff to budget and pursue Option 2 for the planting of the two 5th Street medians with a contractor
and volunteer assistance for 2021.
3) Direct staff to budget and pursue Option 3 for improving the two medians using a contractor and city
staff in 2021.
4) Table the improvement/planting project for the 5th Street medians to a later time
5) End the project discussion and do nothing with the 5th Street medians (staff would not recommend this
option).
RECOMMENDATION:
“Motion to direct City staff to budget for Option _____ in 2021 to improve the plantings of 5th Street
Median One and Median 2 as outlined in the Wenck memo dated April 29, 2020 with a not to exceed
budget $50,000.”
ATTACHMENTS:
April 29, 2020 memo from Wenck and Associates
Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming
Toll Free 800-472-2232 Web wenck.com
To: Ken Roberts
From: Lucius Jonett, Wenck Associates, Inc.
Date: April 29, 2020
Subject: 5th Street Median Spring 2020 Implementation (Phase 1)
At the final Council design workshop on the new 5th Street Median design standard we
proposed a phased implementation plan to roll out the new design to replace current
plantings. The strategy to implement the new design along the entire 5th Street corridor is
working with current developments to plant and maintain new medians according to the
new standard and the City will convert individual existing medians as budget allows. Since
the workshop we have:
1. Updated the published 5th Street design standard (planting plan only, road
dimensions and details remain the same) and prepared a master planting plan for all
the 5th Street medians (Appendix A).
2. Directed the Southwind development to modify their proposed 5th Street median
planting alternative to follow the new design standard. Southwind revised their 5th
Street median landscape plan and we approved on April 22, 2020. The approved
plans are included for reference (Appendix B).
3. Shared the 5th Street design standard with the Savona Master HOA so if they do
plant replacements this summer, it will follow the standard.
The remaining steps to be completed for Phase 1 are:
1. Inspect Savona medians that are still under landscape warranty this spring as part of
our final landscape inspection and guide any replacement(s) required toward the new
planting plan. We will not ask them to redo anything established, but any barren
spots will be migrated to the new planting.
2. Council select and approve of replanting 1 or 2 of the small existing medians.
Demonstration Medians
Of the existing 5th Street medians, the smallest would be ideal to transition to the new
design standard as a demonstration. There would be no new work on the west end medians
near Inwood, in 2020/2021 due to potential disturbance from expected construction activity
from Kwik Trip in the area. We propose beginning with one of two medians at the Junco
Road entrance of the Savona development. The western median (Figure 7) is the smallest
and would have the lowest cost associated with updating to the new design standards. The
second median we propose to update is the eastern median at Junco Road (Figure 8).
Completing this median next would complete the intersection of 5th and Junco and resolve
any visibility issues that may be encountered with the current planting plan. Completing
these two medians would allow the new design standard to start from the center of 5th
Street and transition out toward Inwood Avenue and Keats Avenue over time, and as
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
2
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
budget allows. This transition would give time for Kwik Trip construction to be completed as
well as allow time for the barren spots of the remaining Savona medians to be replanted by
the Savona Master HOA and become established, before completing the update to the
associated medians of those developments.
Figure 7
Figure 8
Opinion of Probable Costs
To help Council understand the costs associated with the two proposed medians for
demonstration, we have broken them down by line item found in Appendix C. For quick
reference, we have identified two options for replanting the two proposed medians and have
prepared opinions of probable costs for each of those options.
Option 1: Complete Contractor Cost
This option provides the full cost of removal, traffic control, irrigation modification, plant
installation, and demobilization all to be done by a hired contractor. This ensures that all
construction is done within a given timeline from the city with construction oversite, as well
as onsite planting guidance.
Option 2: Plants Bought Wholesale by City, Planted by Volunteers
This option provides the full cost of removal, traffic control, irrigation modification, and
demobilization to be done by a hired contractor. The City would then be able to buy plants
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
3
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
and mulch wholesale and provide the opportunity volunteer hours to plant on a chosen day,
like Earth Day. This option ensures that all construction is done within a given timeline from
the city with construction oversite, but any planting will not be guided beyond city or
community volunteer guidance.
Opinion of Probable Costs of Option 1 and Option 2 for both proposed medians:
Proposed Median 1 (Figure 7)
Total Cost Option 1 $ 17,100.00
Total Cost Option 2 $ 8,900.00
Proposed Median 2 (Figure 8)
Total Cost Option 1 $ 32,800.00
Total Cost Option 2 $ 15,500.00
To complete the 1st phase of converting the existing 5th Street median plantings to the new
design standard implemented at the Council workshop, an existing median will need to be
chosen based off the provided information of cost, transition benefits and consideration of
the community above. We have proposed replanting the two medians at the intersection of
5th Street and Junco Road. Total estimate cost for this phase ranges from $24,400 to
$49,900 depending on hiring a contractor to complete all work or utilizing volunteer hours
to plant materials purchased by the City. We are seeking Council approval to proceed with
final design, bidding and construction of these two proposed medians.
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
4
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
Appendix A: Design Plans
J
JJ
JJ
JInwood Ave N5th Street
Inwood Ave N5th Street
Inwood Ave N5th Street
Inwood Ave N5th Street
Inwood Ave N5th Street
Inwood Ave N5th Street
Inwood Ave N5th Street
30' - Typical 35'35'
LLM1HM2M1HM2
Figure 1
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Medium1
Medium2
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
40 0 40
Feet
¯
Median Length = 245 LF
JJ 5th Street5th Street5th Steet5th Street5th Street5th Steet5th Steet5th Street5th Street5th Steet5th Street5th Street
23' - Typi
c
a
l
M
L M H L
Figure 2
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Medium
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
40 0 40
Feet
¯
Median Length = 115 LF
JJJJJJ5th Street40' - Typical35'
35'
L1
L1
M
H1
M
L
M
H2
H1
M
L
M
H2
M
Figure 3
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Low1
Medium
High1
High2
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
60 0 60
Feet¯Median Length = 550 LF
J
J5th Street
40' - Typical
HL1M
L1
M
H
M
L1
M
H
M
L2
L1MHML2M
Figure 4
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low1
Low2
Medium
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
70 0 70
Feet ¯Median Length = 720 LF
J
J5th Street
40' - Typical
M L1LM2MMLHM1MHL1
Figure 5
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Low1
Medium
Medium1
Medium2
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
50 0 50
Feet
¯
Median Length = 480 LF
JJ
JJ
JJ5t
h
Str
e
et
40' -
T
y
p
i
c
a
l
50'
50'
L1
M
M
H
H
L1
M
L
M
L1MHML
M
H
M
L2
Figure 6
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Low1
Low2
Medium
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
70 0 70
Feet
¯
Median Length = 740 LF
JJ5t h St eet
20' - Ty
p
i
c
a
l
L
L
M
H
M
Figure 7
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Medium
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
40 0 40
Feet
¯
Median Length = 100 LF
JJ5t h St r eet
5t h St r eet
30' - T
y
pi
c
al
M
L
M
H
M
L
H
Figure 8
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Medium
High
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
40 0 40
Feet
¯
Median Length = 200 LF
JJ5th Street
5th Street Ln7th Street40' - T
y
pi
c
al
M
L1
M
H
M
L
M
H
M
L
M
H1 H2 M L M H M L M H L1
Figure 9
JAN 2020
5th Street Center Median Landscape Plan
CITY OF LAKE ELMO
Legend
Landscape Vegetation
Low
Low1
Medium
High
High1
High2
Goose
Lake
Jule p AveN4thSt N
NFrontageRd
5thSt NIslandTrl
Jad eTrlNKeatsAveNInwoodAveNHudsonRd
OakMarshGolf
Course
Woodbury
LakesOakbury
Path: C:\Users\KacHD0606\Documents\6443\0024\Pro\MyProject8\MyProject8.aprx
1/15/2020 3:27 PM KacHD0606 Layout: Site Detail Map
80 0 80
Feet
¯
Median Length = 880 LF
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
5
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
Appendix B: Southwind Development Median Landscape Plan
01-PLAN-117021-SHEET-LAND-MEDIAN ALTERNATIVE
M1
c
OF
Name
Reg. No.Date
Revisions Date
Designed
Drawn
Mendota Heights, MN 55120
2422 Enterprise Drive (651) 681-1914
Fax: 681-9488www.pioneereng.com
LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS
I hereby certify that this plan was prepared by
me or under my direct supervision and that I
am a duly Licensed Landscape Architect
under the laws of the State of Minnesota 44763
Jennifer L. Thompson 1
jlt
jlt
7-1-19 SOUTHWIND OF LAKE ELMO
LAKE ELMO, MINNESOTA
SOUTHWIND BUILDERS INC.
2372 LEIBEL STREET
WHITE BEAR LAKE, MINNESOTA 55110
5TH STREET MEDIAN REVISION
4-22-2020
4-22-2020 CITY COMMENTS
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
6
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
Appendix C: Opinion of Probable Costs by Line Item
Figure 7 Median - Option 1; Complete Contractor Cost
No. Item Units Qty Unit Price Total
1 Mobilization/Demobilization LUMP SUM 1 $ 1,250.00 $ 1,250.00
2 Common Excavation CU YD 20 $ 20.00 $ 400.00
3 Traffic Control LUMP SUM 1 $ 500.00 $ 500.00
4 Perennials (#1 Cont.) EACH 621 $ 15.00 $ 9,315.00
5 Irrigation Modification LS 1 $ 1,200.00 $ 1,200.00
6 Double Shredded Hardwood Mulch CU YD 20 $ 75.00 $ 1,500.00
7 Street Sweeping HOUR 2 $ 150.00 $ 300.00
SUBTOTAL $ 13,215.00
20% CONTINGENCY $ 2,643.00
TOTAL $ 17,108.00
Figure 8 Median - Option 1; Complete Contractor Cost
No. Item Units Qty Unit Price Total
1 Mobilization/Demobilization LUMP SUM 1 $ 1,500.00 $ 1,500.00
2 Common Excavation CU YD 41 $ 20.00 $ 820.00
3 Traffic Control LUMP SUM 1 $ 500.00 $ 500.00
4 Perennials (#1 Cont.) EACH 1,243 $ 15.00 $ 18,645.00
5 Irrigation Modification LS 1 $ 2,600.00 $ 2,600.00
6 Double Shredded Hardwood Mulch CU YD 41 $ 75.00 $ 3,075.00
7 Salvage and Reinstall Signs EACH 1 $ 150.00 $ 150.00
8 Street Sweeping HOUR 2 $ 150.00 $ 300.00
SUBTOTAL $ 26,090.00
20% CONTINGENCY $ 5,218.00
TOTAL $ 32,808.00
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
7
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
Figure 7 Median - Option 2; Plants Bought Wholesale by
City
No. Item Units Qty Unit Price Total
Contractor Responsibility
1 Mobilization/Demobilization LUMP SUM 1 $ 1,250.00 $ 1,250.00
2 Common Excavation CU YD 20 $ 20.00 $ 400.00
3 Traffic Control LUMP SUM 1 $ 500.00 $ 500.00
4 Irrigation Modification LS 1 $ 1,200.00 $ 1,200.00
5 Street Sweeping HOUR 2 $ 150.00 $ 300.00
CONTRACTOR SUBTOTAL $ 2,400.00
CONTRACTOR 20% CONTINGENCY $ 480.00
CONTRACTOR TOTAL $ 4,130.00
City Responsibility
6 Perennials (#1 Cont.) EACH 621 $ 6.50 $ 4,039.55
7 Hardwood Mulch CU YD 20 $ 35.00 $ 700.00
CITY TOTAL $ 4,739.55
PROJECT TOTAL $ 8,869.55
Ken Roberts Planning Director City of Lake Elmo April 29, 2020
8
T:\6443 Lake Elmo\24 5th Street Design Standard\2020-04-27 Demonstration Medians\5th Street Demonstration Medians 2020-04-28.docx
Figure 8 Median - Option 2; Plants Bought Wholesale by City
No. Item Units Qty Unit Price Total
Contractor Responsibility
1 Mobilization/Demobilization LUMP SUM 1 $ 950.00 $ 950.00
2 Common Excavation CU YD 41 $ 20.00 $ 820.00
3 Traffic Control LUMP SUM 1 $ 250.00 $ 250.00
4 Irrigation Modification LS 1 $ 2,600.00 $ 2,600.00
5 Salvage and Reinstall Signs EACH 1 $ 150.00 $ 150.00
6 Street Sweeping HOUR 2 $ 150.00 $ 300.00
CONTRACTOR SUBTOTAL $ 4,120.00
CONTRACTOR 20% CONTINGENCY $ 824.00
CONTRACTOR TOTAL $ 5,894.00
City Responsibility
7 Perennials (#1 Cont.) EACH 1,243 $ 6.50 $ 8,079.10
8 Hardwood Mulch CU YD 41 $ 35.00 $ 1,435.00
CITY TOTAL $ 9,514.10
PROJECT TOTAL $ 15,408.10