HomeMy WebLinkAbout#16 - Inwood Park ImprovementsSTAFF REPORT DATE: 5/5/2020 REGULAR ITEM #: MOTION TO: City Council FROM: Marty Powers, Public Works Director AGENDA ITEM: Capital Improvements – Inwood Development Park REVIEWED BY: Kristina Handt, City Administrator Ben Prchal, City Planner, BACKGROUND: Based off the December 3rd, 2019’s council meeting, the Public Works Department and the Planning Department requested proposals to complete a variety of improvements to the Inwood Development Park. An RFP was sent out and advertised with a deadline of April 10th. Two proposals were received for the Pavilion and two were received for the remainder of the project. ISSUE BEFORE COUNCIL: Should the City Council approve the lowest responsible bids for the Inwood Development Park Improvement Project? PROPOSAL DETAILS/ANALYSIS: The city received bids for the park project which include site grading, two fenced in pickle ball courts with bench seating, a 20’x28' steel pavilion, concrete pads & footings, picnic tables, trash can, erosion control and seeding the disturbed area. FISCAL IMPACT: At this time, $150,000 is reserved to develop the park’s first phase. The cost of this park improvement phase shall not exceed the budgeted $150,000 and will be funded through the park dedication fund. After the December meeting an anonymous donor came forward and offered to pay for the pavilion. The cost of the pavilion, its site grading, and its concrete pad with footings is $43,751.26 Pavilion and installation Albrecht & St Croix Rec (Pavillion/installation) $33,212.12 Flagship Recreation (Pavillion/installation) $31,636.26 Remainder of Project Miller excavating $113,913.43 Albreck Company $114,265.00 OPTIONS: 1) Approve Miller Excavating’s and Flagship Recreation’s bids 2)Deny acceptance of bids 3)Table the project RECOMMENDATION: “Motion to approve the lowest responsible bids, Miller Excavating and Flagstaff Recreation and move forward with the first phase of the Inwood Development Park project not to exceed $150,000” ATTACHMENTS: Exhibit A Site Layout Exhibit B Pickle ball court Exhibit C Pavilion TEMP. SED. BASIN DRAINAGE AREA = 7.6 AC MIN. CONSTRUCTION VOL = 17788 CF 4GRADING, DEVELOPMENT & EROSION CONTROL PLAN M/I HOMES 941 NE Hillwind Rd., Suite 300 Fridley, MN 55432 of 248 Apollo Drive, Suite 100 Lino Lakes, MN 55014 Phone: (763) 489-7900 Fax: (763) 489-7959 www.carlsonmccain.com InWood Lake Elmo, Minnesota \\northstar.local\linolakes\public\jobs\5161 - 5180\5172 - lake elmo property\cad\engineer\final grading\5172_gr.dwgSave Date:05/03/17 environmental engineering surveying · · · Print Name: Signature: Date:License #: Drawn: Designed: Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota02/13/15 LC 02/13/15 Brian J. Krystofiak, P.E. 25063 BJK 13 Revisions: 1. 02/23/15 Update Bid Set Per City Comments 2. 03/23/15 Per Watershed Comments 3. 03/27/15 Per City Comments 4. 04/06/15 Per MPCA Comments 5. 04/10/15 Per City Comments 6. 04/16/15 Per City Comments 7. 05/13/15 Per City Comments 8. 2/26/16 Per City Comments EXHIBIT B Overhead View of Courts (Not to Scale) 7 ft. 7 ft. 7 ft. Bench Seating 7 ft. 7 ft. 7 ft. 7 ft. Bench Seating Key 6 ft. Bench Seating 6 ft. Fencing 4 ft. Gate 41 ft. 7 ft. .+0%1.0#8' *1..#0&/+   (: COPYRIGHT 2004, ICON SHELTER SYSTEMS, INC. DISTINCTIVE STEEL SHELTERS WWW.ICONSHELTERS.COM .+0%1.0#8' *1..#0&/+   (: COPYRIGHT 2004, ICON SHELTER SYSTEMS, INC. DISTINCTIVE STEEL SHELTERS WWW.ICONSHELTERS.COM .+0%1.0#8' *1..#0&/+   (: COPYRIGHT 2004, ICON SHELTER SYSTEMS, INC. DISTINCTIVE STEEL SHELTERS WWW.ICONSHELTERS.COM .+0%1.0#8' *1..#0&/+   (: COPYRIGHT 2004, ICON SHELTER SYSTEMS, INC. DISTINCTIVE STEEL SHELTERS WWW.ICONSHELTERS.COM