HomeMy WebLinkAbout#03 - CSAH 13 ProjectSTAFF REPORT DATE: June 9, 2020 DISCUSSION AGENDA ITEM: County State Aid Highway (CSAH) 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator ISSUE BEFORE COUNCIL: Does the council prefer the Concept 2 preliminary design using turn lanes and potentially future signalized intersections, or the Concept 3 preliminary design with construction of roundabouts at the two major intersections on the corridor? Should staff bring this issue before a future council meeting with recommendations for adopting a Resolution of Municipal Support? BACKGROUND: Washington County is leading a project to identify and construct road improvements on County Highway 13. This second phase of the project is part of a larger project to improve the pavement and safety of Ideal Avenue/Olson Lake Trail between Stillwater Boulevard and 50th Street. The first phase of the project was constructed in 2017. Lake Elmo collaborated with the City of Oakdale on the first phase to extend sanitary sewer to Lake Elmo properties along Olson Lake. This second phase of the project is planned for construction in 2022. A large single and multi-family housing development is moving forward in the City of Oakdale immediately adjacent to the project corridor and the timing of this project has been scheduled to coordinate with the development. The proposed improvements have considered this future growth in traffic volumes together with access and intersection needs for this proposed development. A third phase is planned for construction in 2023 to include the segment south of CSAH 14. PROPOSAL DETAILS/ANALYSIS: The County has been working on the preliminary design for the CSAH 13 Phase 2 Improvements and has conducted monthly Project Management Team (PMT) meetings with the City of Oakdale, the Oakdale developer, and the City of Lake Elmo. Preliminary design work has been completed for the Phase 2 Improvements and 2 separate concepts have been developed for consideration; a design using turn lanes and potentially future signalized intersections, or the construction of roundabouts at the two major intersections on the corridor. Washington County is asking each community for input on a preferred alternative and is seeking a Resolution of Municipal Support from both Oakdale and Lake Elmo so that the project may proceed forward into the final design and property acquisition phase of the Project. OPTIONS: 1) Direct staff to bring this issue before a future council meeting with recommendations for adopting a Resolution of Municipal Support for Concept ______ (2 or 3). 2) Direct staff to bring this issue before a future council meeting with recommendations for adopting a Resolution of Municipal Support for Concept ______ (2 or 3), with conditions as directed and outlined by council. 3) Direct staff to take no action and to schedule future workshop for additional and continuation of council discussion. ATTACHMENTS: • Project Informational Boards used for the March 18, 2020 online Open House. • Online Survey Result Summary. • Washington County Preferred Alternative Memo. • Project Cost-Share Breakdown. • Layout Concept 2 – Turn Lanes at Intersections. • Layout Concept 3 – Roundabouts at Intersections. WELCOME Open House County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Please Sign In Design Speed (MPH)50 50 40*40* Concept Turn Lanes Roundabouts Turn Lanes Roundabouts Planning Meets Project Purpose and Need ●●●●●●●●●●●● Reconstructs Pavement ●●●●●●●●●●●● Considers Future Growth ●●●●●●●●●●●● Provides Trail Connection ●●●●●●●●●●●● Safety Improves Sightlines ●●●●●●●●●●●● Improves Intersection Safety ●●●●●●●●●● Improves Access Safety ●●●●●●●●●● Emergency Response Time / Travel Time ●●●●●●●●●● Improves Corridor Safety ●●●●●●●●●● Improves Ped / Bike Crossings ●●●●●●●●●● Ensures Speed Control ●●●●●●●●●● Provides Increased Shoulder Width ●●●●●●●●●●●● Provides Turn Lanes ●●●●●●●●●●●● Standards / Operation Improves Roadway to Current Standards ●●●●●●●●●●●● Level of Service ●●●●●●●●●●●● Right of Way Acres Affected ●●●●●● Number of Parcels Affected ●●●●●● Impacts to Affected Parcels ●●●●●● Private Utility Relocations ●●●●●●●● Public Utility Relocations ●●●●●●●● Environment Protects Natural Resources ●●●●●● Storm Water Treatment ●●●●●● Tree Impacts ●●●●●● Pebble Park Impacts ●●●●●● Light Pollution ●●●●●●●●●● Intersection Noise ●●●●●●●●●● Costs Overall Design & Construction ●●●●●● Local Design & Construction ●●●●●●●● Utilities ●●●●●●●● Right of Way ●●●●●● Notes: Design Speed (40 mph vs 50 mph): 40 mph design speed meets project purpose and need, along with State standards, while minimizing impacts Roundabout concepts allow for improved safety and pedestrian access due to reduced conflict points and reduced speeds Roundabout concepts allow for speed control Turn Lane concepts allow for the potential of improved emergency response time Turn Lane concepts do not require lighting at intersections; therefore, light pollution is reduced County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project * 40 MPH design speed does not change posted speed limit Stormwater Best Management Practices Why is the County constructing stormwater best management practices (BMP)? • Public benefits from protecting and preserving water resources • All projects are required by the governing water management organizations to improve surface waters and groundwater systems How do they work? • Pretreatment and additional pollutant removal occurs in upstream roadside ditches • Runoff percolates down through inplace soils and/or filtration media to clean runoff and keep pollutants from entering downstream surface waters • Infiltration is planned in areas where underlying soils are conducive - runoff is maintained on-site and promotes groundwater recharge • Filtration may be planned in areas with poor underlying soils and/or shallow bed rock What will they look like? • Mowed inslopes (Washington County mows twice a year) • Taller grasses and wildflowers in the ditch basin bottom • Dry bottom (infiltration/filtration areas are designed to drain down within 48 hours) • Best Management Practices will be contained within county right-of-way. Some easement acquisition will be required to provide the required facilities. What do residents need to do? • Stay off the infiltration/filtration areas with vehicle traffic and mowers • Stormwater Best Management Practices will be maintained by Washington County. No maintenance responsibilities for the adjacent property owner. County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Project Goals Washington County Goals 1. Reconstruct Pavement 2. Improve Safety a. Intersections/Turn Lanes b. Shoulder Widths c. Ped. and Bike Facilities d. Sightlines 3. Access Management 4. Consider Future Growth & Development 5. Drainage – Capture and Treat 6. Community Engagement – Public, City, and County Support 7. Streamline Coordination of Improvements Shared Goals of the County & Cities 1. Reduce Impacts to Private Property 2. Reduce City Costs 3. Increase Shoulder Width 4. Fill in Gaps in Trail Network 5. Utilize Existing Storm Water BMP to Minimize Costs and Impacts 6. Receive Public and Council Support 7. Protect Olson Lake City of Lake Elmo Goals City of Oakdale Goals 1. Add Street Stub at 36th Street 2. Avoid Impacts to Pebble Park 1. Coordination with Development a. Maintain Interconnected Green Space b. Reduce Impacts to City Site Plan and Impacts to Units c. Subdivision Financially Viable County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Frequently Asked Questions Will the speed limit be increased or decreased? Speed limits are determined by Minnesota state laws and the state Commissioner of Transportation, not by city or county officials. • Drivers choose speeds based on their available sightlines and abilities to react to potential hazards. • Posting a higher or lower speed limit has not been shown to significantly affect driving speeds in areas where it has been tested. • Changes or improvements to infrastructure have been shown to have a greater impact on safety and will be studied for the corridor to improve conditions for pedestrians and bicyclists. It is standard Washington County practice to request a new speed study after any major project is complete to ensure that the posted speed limit is appropriate for the new conditions. What is the existing speed limit? SPEED LIMIT40 County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project SPEED LIMIT50 North of Hidden Bay Trail South of Hidden Bay Trail Frequently Asked Questions Private Property Will Washington County need to acquire private property for additional road right of way? • Yes, the county will need to acquire permanent and temporary easements as a part of this project. • All impacted property owners will be contacted by the Washington County Property Acquisition Manager once preliminary design is complete. Prescriptive Easement What is a prescriptive easement? • One of the ways that a road authority, such as Washington County, can acquire a highway easement is by documented long-term use, which is called a prescriptive easement. • Ideal Avenue (County Highway 13) has been in use for over a century. When a road has been in use for six or more years, the law gives the road authority a road right of way and from that point on, the road authority has a prescriptive easement. • The prescriptive easement exists for the actual “width of use” of the road which includes the driving lanes, shoulders, slopes, drainage ditches, areas where utilities are located, snow storage, and other related areas. • The private property that is in the prescriptive easement is still owned by the property owner who can continue to use the land for purposes that do not interfere with the road easement. Acquisition Process What is the process if the county needs to acquire private property? • In cases where private property beyond the existing right of way is required, the county will go through the process of property acquisition. • The county will contact impacted property owners to review existing property conditions. • An independent appraiser will be hired to determine the value of the property. • The county will make an offer to purchase the necessary easements for the amount determined in the appraisal. County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Frequently Asked Questions Do the future traffic volumes include proposed development along the corridor? Yes and both concepts accommodate this anticpated traffic. Will there be any assessments to my property? The County does not assess properties for roadway improvement projects. The Cities involved may have their own assessment policies, depending on the outcome of the project. Will roads remain open during construction? Access to residents immediately adjacent to the roadway will have their access maintained throughout the project; however, there may be intermittent closures and/or access in one direction only. A pre- construction open house meeting will be held prior to the start of construction to provide additional details. Gather input, consider stakeholder comments, and inform the community on decision made Public and Agency Participation Approach Cities Open House Meetings Project Management Team Neighborhood Meetings Project Website Business and Property Owner Meetings Agency Meetings Community Board Meetings County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Schedule A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M Data Collection (Traffic Collection, Wetland Delineation, Prelim Hydraulics Evaluation, SEE Analysis) 2019 2020 2021 2022 Preliminary Design: April 2019 - July 2020 Public / Agency Engagement Property Acquisition Spring 2021 - Spring 2022 Final Design July 2020 - May 2021 County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Preferred Alternative: April/ May 2020 Open House: March 2020 Lake Elmo Municipal Consent Oakdale Municipal Consent June/July 2020 Construction: 2022 Pre-construction Open House Project Area County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Was hingto n C o u nt y, M N Feb ru ary 2 8 , 2 02 0 0 0.7 1.40.35 m i 0 1 20.5 km 1:3 2,00 0 Disclaim er: Ma p a nd par cel d ata ar e b elieve d t o b e ac cur ate, bu t acc ura cy is not gua ra nte ed. T his is no t a lega l do cum ent an d sh ould no t be su bstitu ted for a title s ear ch,a pp raisa l, su rve y, o r f or zonin g ve rifica tion . PHASE 2 PROJECT AREA PHASE 1 PROPOSED TRAIL Keats Ave N Turn Lanes at Intersections Eastside No. 2 Park Lake Olson LakeDeMontreville Lake Jane CrombiePond DeerPond Hedge'sPond LAKE ELMO OAKDALE 694 14 35 36TH ST 34TH ST IDEAL AVE40TH ST N 38TH ST N 39TH ST N Pebble Park 13 PROJECT AREA EXISTING TRAIL PROPOSED TRAIL Right & Left turn lanesLAKE J A N E TRLH I D D E N B AY TRL N 4 4 T H ST LAKE ELMO PUBLIC WORKS 4FRONT CAMPUS Right & Left turn lanes Intersection at 36th and Lake Elmo Public Works Driveway Right turn lanes Right turn lane Left turn lanes Extend median from 36th Street to Lake Jane Trail Re-align 40th Street to intersect Lake Jane Trail Mill & Overlay CSAH 14 to South of 36th Street Trail Right-in, Right-out Cut hill to improve sight lines Eastside No. 2 Park Lake Olson LakeDeMontreville Lake Jane CrombiePond DeerPond Hedge'sPond LAKE ELMO OAKDALE 694 14 35 36TH ST 34TH ST IDEAL AVE40TH ST N 38TH ST N 39TH ST N 13 PROJECT AREA EXISTING TRAIL PROPOSED TRAIL Single Lane RoundaboutLAKE J A N E TRLH I D D E N B AY TRL N 4 4 T H ST Right & Left turn lanes Right turn lanes Single Lane Roundabout LAKE ELMO PUBLIC WORKS 4FRONT CAMPUS Mill & Overlay CSAH 14 to South of 36th Street Extend median from 36th Street to Lake Jane Trail Trail Re-align 40th Street to intersect Lake Jane Trail Right-in, Right-out Intersection at 36th and Lake Elmo Public Works Driveway Cut hill to improve sight lines Roundabouts County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project County Highway 13 (Ideal Avenue) Phase II Pavement and Safety Improvement Project Design Modifications to Reduce Impacts Design Speed SPEED LIMIT50 SPEED LIMIT45 SPEED LIMIT40 (High Speed) (High Speed) (Low Speed) Through Lane and Turn Lane Widths 12’ 11’ 12 feet 11 feet Shoulder Width 10’ 8’ (6’/4’ select areas) 10 feet 8 feet 6 feet (select areas) 4 feet (select areas) Boulevard 10’ 6’ 10 feet 6 feet (Non-Trail Side) In-Slope 1:4 1:3 (1:2.5 select areas) 1:4 1:3 1:2.5 Page 1 of 3 County Highway 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project Survey Results 1. It is industry standard and Washington County’s standard practice to add lighting at intersections with roundabouts to improve safety. With the roundabout design concept, the intersections at Ideal Avenue with both 36th Street and Lake Jane Trail would be lit. We know that adding lighting, which adds to light pollution, is a concern to some residents. Please rate on a scale of 1 to 10, with 1 being uncomfortable, and 10 being comfortable, how comfortable you are with adding street lights to these intersections? • 65 responses • Average rating of 4.3 • 57% of responders rated their comfort level under a 5 • 43% of responders rated their comfort level at a 5 or higher 2. The intersections of 39th Street and Lake Jane Trail are too closely spaced to maintain full access to Ideal Avenue at both intersections. To improve safety, both design concepts limit access at 39th Street to “right-in, right-out”, meaning that no left turns can occur at the intersection. With the turn lane design concept, residents that wish to travel south on Ideal Avenue from the neighborhoods of 38th Street and 39th Street, will either have to exit from 38th Street or make a u-turn at the intersection of Lake Jane Trail. If you live in this neighborhood, how comfortable are you with either using the full access at 38th Street or making a u-turn at Lake Jane Trail? Rate on a scale of 1 to 10, with 1 being uncomfortable and 10 being comfortable. • 54 responses • Average rating of 4.7 • 50% of responders rated their comfort level under a 5 • 50% of responders rated their comfort level at a 5 or higher 3. With the roundabout design concept, residents that wish to travel south on Ideal Avenue from the neighborhoods of 38th Street and 39th Street, will also either have to exit from 38th Street or use the proposed roundabout at the intersection of Lake Jane Trail to make a “u-turn”. If you live in this neighborhood, how comfortable are you with either using the full access at 38th Street, or using the proposed roundabout to make a “u-turn” at Lake Jane Trail? Rate on a scale of 1 to 10, with 1 being uncomfortable and 10 being comfortable. • 54 responses • Average rating of 5.3 • 41% of responders rated their comfort level under a 5 • 59% of responders rated their comfort level at a 5 or higher Page 2 of 3 4. The roundabout design concept is better at reducing speeds at intersections with roundabouts versus the turn lane design concept. Please let us know your thoughts on this. • Most residents liked that the roundabout design concept helps reduce speeds at intersections with roundabouts. • Some residents felt that speeds on Ideal Avenue are not an issue today. • Some residents did not like the overall idea of roundabouts. 5. The roundabout design concept has larger impacts to private property at the intersection of Lake Jane Trail compared to the turn lane design concept. Please let us know your thoughts on this. • If the roundabout design concept is selected as the preferred concept, a number of residents suggested that the roundabout be shifted to the west. By shifting the roundabout to the west, it can help reduce impacts to private property. • Most people felt that impacts to private property should be reduced as much as practical, but there was mixed feelings about the necessity of these impacts to make improvements to Ideal Avenue. Some felt that impacts to private property is a necessary part of the project to ensure safety improvements are made to Ideal Avenue, while others felt that impacts to private property should be avoided, even if this limits the amount of improvements that are made to Ideal Avenue. 6. Both design concepts include a new trail on the west side of the Ideal Avenue. If residents that live on the east side of Ideal Avenue want to cross Ideal Avenue to access the new trail, the roundabout design concept would provide a marked crossing at the intersections of Lake Jane Trail and 36th Street. Studies have shown that marking a crossing at an intersection with turn lanes actually decreases safety; therefore, the turn lane design concept would not include a marked crossing. Let us know your thoughts on this. • Most residents felt that by providing a marked crossing with the roundabout concept, it would make this intersection safer for pedestrians. • There was also a high number of residents that felt comfortable crossing Ideal Avenue without a marked crossing. • Some residents felt a marked crossing should be incorporated with both design concepts being considered. 7. Overall, please rate on a scale of 1 to 10, with 1 being uncomfortable, and 10 being comfortable, how comfortable are you at with the roundabout design concept? • 65 responses • Average rating of 4.8 • 52% of responders rated their comfort level under a 5 • 48% of responders rated their comfort level at a 5 or higher Page 3 of 3 8. Overall, please rate on a scale of 1 to 10, with 1 being uncomfortable, and 10 being comfortable, how comfortable are you at with the turn lane design concept? • 65 responses • Average rating of 5.3 • 42% of responders rated their comfort level under a 5 • 58% of responders rated their comfort level at a 5 or higher 9. Any other comments? • Most residents asked the design team to continue to refine the concepts to reduce impacts to private property as much as practical. • A number of residents appreciated the design team for their efforts to share the design concepts and to ask for resident input into the design. • Some residents noted their excitement to see the trail extend. • Some residents did not like either concept, questioned necessity of the project, and are upset about the proposed residential development on the west side of Ideal Avenue. • Some residents are also against roundabouts as a whole, therefore did not feel comfortable with them being proposed on Ideal Avenue. A great place to live, work and play…today and tomorrow North Shop • 11660 Myeron Road North • Stillwater, MN 55082-9537 Telephone: 651-430-4300 • Fax: 651-430-4350 • TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer Public Works Donald J. Theisen, P.E., Director Wayne H. Sandberg, P.E., Deputy Director County Engineer County Highway 13 (Ideal Avenue) Phase 2 Pavement and Safety Improvement Project Washington County Preferred Concept Turn Lane and Roundabout Concepts Both concepts meet the goals of the project: Reconstruct Pavement; Improve Safety: intersections, shoulders, pedestrian/bicycle facilities, and sightlines; Access Management; Consider Future Growth; Accommodate Drainage; Minimize Impacts to the Environment and Adjacent Properties. Previous design speed of corridor was 50 mph. Design speeds of 40, 45 and 50 were evaluated and considered. A design speed of 40 mph meets the project purpose and need, along with State standards, while minimizing impacts. Both concepts are utilizing a 40 mph design speed. This allows for increased profile modifications to reduce impacts to adjacent properties and improve intersection sight lines. Please note that a 40 mph design speed does not guarantee a change in the posted speed limit. Design Modifications: Design modifications were considered throughout the development of both concepts. The following design modifications have been included in both concepts: - Design Speed reduced from 50 mph to 40 mph - All through lane and turn lane widths were reduced by 1-ft - Shoulder widths were reduced from 10-ft to 8-ft and further reduced to 4-ft and 6-ft in select areas - Boulevard widths were reduced from 10-ft to 6-ft on the east side and in select areas on the west - The in-slopes were reduced from 1:4 to 1:3 and further reduced to 1:2.5 in select areas Turn Lane Concept Pros: - Allows for the potential of improved emergency response time - Do not require lighting at intersections, unless lit intersections are requested from the cities; therefore, there is the potential to reduce light pollution - Reduced initial costs Roundabout Concept Pros: - Reduced speeds, shorter crossing distances, and median refuge improve pedestrian safety and reduce pedestrian delays - Helps reduce speeds at major intersections - Reduces future city costs if a traffic signal is installed at a later - Improves sight lines - Based on the public survey, allows for more comfortable u-turn movements Page 2 of 2 Washington County Preferred Concept Due to the benefits of the roundabout concept, this is the County’s preferred concept; however we understand that this concept is more expensive and has to be supported by the Cities as well. The turn lane concept, while not the County’s preferred concept, does meet the goals of the project and would make a significant improvement to County Highway 13. Therefore, the county would also support the turn lane concept, if the cities do not support the roundabout concept. Turn Lane Concept Construction Const. Admin. Right of Way Design Total Roundabout Concept Construction Const. Admin. Right of Way Design Total 64,795$ 73,447$ 640,314$ 5,860,560$ 765,074$ 1,007,360$ 7,632,994$ 502,072$ 56,364$ 491,384$ 157,000$ 29,000$ 173,000$ 359,000$ 385,295$ 49,724$ City of Lake Elmo Total 4,816,193$ 621,554$ 704,549$ 6,142,297$ 161,000$ 57,683$ 727,561$ Total 5,230,397$ 418,432$ 337,000$ 640,314$ 6,626,142$ 548,264$ 5,532,034$ 366,548$ 34,367$ 29,000$ Washington County City of Oakdale Washington County City of Oakdale City of Lake Elmo 4,478,490$ 358,279$ 147,000$ 22,458$ 280,723$ 471,183$ 37,695$ 013533-000_OPC_Concept-2.xls 1 5/22/2020 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXNO ADDRESSPID: 1602921220001NO ADDRESS PID: 0902921320033 4290 OLSON LAKE TRL N PID: 0802921410005 4338 OLSON LAKE TRL N PID: 0802921410004 NO ADDRESS PID: 0902921320032 WASHINGTON COUNTY 8032 HIDDEN BAY TRL N PID: 0902921320013 8014 HIDDEN BAY TRL N PID: 0902921320014 8021 HIDDEN BAY TRL N PID: 0902921330006 8011 HIDDEN BAY TRL N PID: 0902921330007 NO ADDRESS PID: 0902921330004 CITY OF LAKE ELMO 4009 IDEAL AVE NPID: 09029213300028040 LAKE JANE TRL NPID: 16029212200028050 39TH ST N PID: 1602921220005 8001 39TH ST N PID: 1602921220032 8011 39TH ST N PID: 1602921220021 8030 38TH ST N PID: 1602921220018 3797 IDEAL AVE N PID: 1602921220017 3765 IDEAL AVE N PID: 1602921220016 3655 IDEAL AVE N PID: 1602921230003 CITY OF LAKE ELMO NO ADDRESS PID: 1602921240002 CITY OF LAKE ELMO NO ADDRESS PID: 1602921320001 CITY OF LAKE ELMO NO ADDRESS PID: 1702921410004 NO ADDRESS PID: 1702921140004 NO ADDRESS PID: 1702921140003 CITY OF OAKDALE NO ADDRESS PID: 1702921140007 CITY OF OAKDALE NO ADDRESSPID: 0802921410006NO ADDRESS PID: 0802921410007 PID: 08029211200064990 OLSON LAKE TRL NPID: 0802921120007NO ADDRESSPID: 08029211200624969 HILLVALE AVE NPID: 08029211200614984 HILLVALE AVE NPID: 08029211200604974 HILLVALE AVE NCITY OF OAKDALEPID: 0802921120008NO ADDRESSPID: 08029211200554997 HELMO AVE NASSUMED R/W 33 FT FROM SECTION LINE INP. SEPTIC MOUND AC AC AC AC AC AC AC AC AC AC AC AC AC AC ACACACACACACACACACACACACACACACACACAC AC ACAC ACACACACACACACACACACACACACACACACACACACACACACAC0 - 9'11'0 - 12'0 - 13' 17 55 3 7 T Lily 0.5 5 1315 17 21 23 25 27 33 35 4 .3 12 15 96 Pile Lake 36 17 12 9 122.7PINE SPRINGS Lost 244 N. N.CO. NG 6"24"NGCOMPANYCO16"15 4.1 Lake 1 11 3 Long Mud 694 35 35 OAKDALE 120 17 17 15 17 13 23 DownsLAKEELMO LAKE ELMO 15 13 6 21 6 17B 10 19 17B 94 12 25 35 10 33 10 3.4694 Armstrong Lake 694 206 71 W E S T 29 31 3 3 19 17 7 LAKE ELMO AIRPORT B A 14 31.1Lake OAK PARK HEIGHTS Pacific OI LCO 10" 13 COMINNESOTA16"CO2 4 "NORTHERN2"NGNATURALZe p h yr Minn. L. 51 52 1.2 2.3Union 55 Railroad 19 31 29 5 7 17 AL 15TH ST.N. 10TH ST.N.LAKEELMOAVE.N.AVE.dale Lake 57 8" NORTHERN NATURAL NG 17 17 GRANT 40TH 13 0.2 1.3 AVE.75TH ST.N.N.JAMACARD. DELLWOOD 0.3 0.3 4 5 shoe 14 12 168 aldMANNING64WARNERAVE.NEAL30TH ST.N.MANNINGAVE.VE.APOP. 27,378 POP. 8,069 POP. 4,339 POP. 408 POP. 507 POP. 4,096 29 29 4 3 Lake South winL. Lake McKusick STILLWATER LakeLong Lake Wood Masterman Lake Echo L. WhiteBear Lake Long Lake BIRCHWOOD VILLAGE 0.2 1.8 WILLERNIE L. G. Clear Lake Lake DeMontreville Olson 9 Lake 1.2 Lake Sunfish Lake Lake Elmo Lake REGIONAL PARK RESERVEEagle Point L. Lake Goose Lake 27 LANDFALL Tanners Lake A ME RI C A NMAHTOMEDI Sunny- brook 0.9 Jane Lake Mc- Clover- 244 MA H T O ME DIAVE. Horse- Don Cr. MargaretL. POP. 870 POP. 7,676 ryenFa ST. 15 14 14 14 MBMBMBMBMBMBMBMH Y MH MH MH MH MH MHLSVENT COCOCOCOCOCO0 - 6' 0.02 0.02 0.02 0.02 0.02 SHLD LTL LANE THRU/RTL THRU LANE 0 - 14' MEDIAN 0 - 8' 1:4 SLOPE 8' BLVDTRAIL MEDIAN 2'PI VARIES SHLD 6' BERM 0.02 0.04 0 - 8'12'0 - 12'0 - 14' LTL RTLTHRU LANE THRU LANE 0.02 0.02 0.02 0.02 CL SB CSAH 13 NB CSAH 13 CL B424B424B424B424 12'-14'6' - 18'12'-14' EX. GROUND 12'-14' STATION 89+85 TO 102+88 0.040.015 PROPOSED CSAH 13 EX. GROUND1:3 SLO PE8' BLVDTRAIL B424 B424 B424 1:3 SLOPE 6' BERM B424 RTL LTLTHRU LANE SHLDTHRU LANE 0 - 12' THRU LANESHLD 0 - 13'0 - 13'0-8' CL CL 10' 0.040.02 0.020.020.020.02 0.040.015 STATION 102+88 TO 112+18 PROPOSED CSAH 13 SB CSAH 13 NB CSAH 13 11' - 13'11' - 14' 0.02 0 - 13' RTL 0 - 13' LTL 2'PI 1:3 SLOPE EX. GROUND EX. GROUND 0.020.020.02 1:3 SLO PEMEDIAN 0 - 8'6' - 18' 2'PI 8' BLVDTRAIL 6' BERMSHLDRTLLTLLTLRTLSHLDTHRU LANE MEDIAN THRU LANE 0 - 13'0 - 13'0 - 13'0 - 13'0 - 8'10' B424 B424 B424 B424 CL SB CSAH 13 CL NB CSAH 13 STATION 112+18 TO 118+59 PROPOSED CSAH 13 11' - 13'11' - 13' 0.015 0.04 0.02 0.02 0.02 0.020.02 0.02 0.02 0.02 0.04 6' 1:3 SLOPE EX. GROUND 1:3 SLO PE1:3 SLOPE EX. GROUND 0 - 8' 6' BERMSHLDTHRU LANE 11'8' BLVDTRAIL SHLD 10' MEDIAN STATION 118+59 TO 140+49 PROPOSED CSAH 13 2'PI EX. GROUND 0.015 0.04 0.02 0.02 0.02 0.020.02 CL NB CSAH 13 CL SB CSAH 13 0.04 B424 B424 EX. GROUND 0 - 8'0 - 13' RTL 0.02 THRU LANELTL RTL 0 - 8' VARIES 1:3 - 1:2.5 V A RI ES 1:3 - 1:2.50.02 0.02 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXTEEETTTTMB974.20 975.86 978.00 981.65 986.67 992.01 995.61 997.03 996.40 993.63 988.88 974.73 VPI +37.00 EL. 977.98 +1.68%+ 5. 3 5 %240.00' V.C.K = 65ex = 1.10'VPI +94.00 EL. 997.08 + 5. 3 5 %+0.02%240.00' V.C.K = 45ex = -1.60'SSD = 322'VPI +38.00 EL. 997.13 +0.02%-5.07%225.00' V.C.K = 44ex = -1.43'SSD = 324'991.27 VPC +17.00 EL. 975.96 VPT +57.00 EL. 984.40 VPC +74.00 EL. 990.66 VPT +50.50 EL. 991.43 975.68 977.88 981.60 986.70 991.98 995.64 997.08 996.50 993.70 EL. 997.11 VPC +25.50 EL. 997.11 VPT +14.00 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 CL 38TH ST N CL 39TH ST N CL HIDDEN BAY TRAIL N 40TH ST LAKE JANE TRAIL N CL CL 36TH ST N DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 1,008.731,007.991,008.281,009.301,009.711,009.341,008.181,006.471,004.761,003.041,001.33999.62997.72995.15992.56989.98987.44985.64984.82984.98986.09987.10986.84985.24982.81981.19980.50980.73981.90983.99986.73989.49991.83993.26993.78993.41992.12989.93986.84982.93978.86974.79970.73966.66962.77960.07958.73958.76959.96960.921,001.571,005.151,008.271,010.241,011.131,010.471,008.731,007.921,008.451,009.321,009.691,009.381,008.501,006.741,004.851,003.081,001.43999.65998.09996.00994.73992.26989.99988.37987.15987.51988.18989.57989.30987.36985.02983.34982.41983.11984.00987.51991.48994.01995.67997.29998.41998.70997.95995.29991.38987.36983.09978.53973.77969.51965.46962.85961.61960.85960.70960.98961.46962.11962.54963.40964.021,010.20VPI +82.00EL. 1,007.00-1 .88%+1.06% 285.00' V.C. K = 97 ex = 1.05'VPI +56.00EL. 1,009.90+1.06%-0.38% 130.00' V.C. K = 90 ex = -0.23' SSD = 815'VPI +40.50EL. 1,009.20-0.38% -1 .71% 115.00' V.C. K = 86 ex = -0.19' SSD = 867'VPI +80.00EL. 998.25-1 .71%-2. 5 8% 75.00' V.C. K = 86 ex = -0.08' SSD = 1274'VPI +70.00EL. 983.00-2.58%+1.34% 400.00' V.C. K = 102 ex = 1.96'VPI +80.00EL. 988.50+1.34%-2.67% 300.00' V.C. K = 75 ex = -1.50' SSD = 419'VPI +30.00EL. 976.50-2.67%+2.76% 585.00' V.C. K = 108 ex = 3.97'VPI +80.00EL. 1,000.00+2.76%-4.07%755.00' V.C. K = 111 ex = -6.45' SSD = 488'VPI +50.00EL. 956.50-4.07%+1.39% 400.00' V.C. K = 73 ex = 2.73'VPI +50.00EL. 960.68+1.39%+0.51% 150.00' V.C. K = 169 ex = -0.17' SSD = 1293'961.18VPC +39.50 EL. 1,009.68VPT +24.50 EL. 1,008.51VPC +91.00 EL. 1,009.21VPT +21.00 EL. 1,009.65VPC +83.00 EL. 1,009.42VPT +98.00 EL. 1,008.22VPC +42.50 EL. 998.89VPT +17.50 EL. 997.28VPC +70.00 EL. 988.17VPT +70.00 EL. 985.68VPC +30.00 EL. 986.49VPT +30.00 EL. 984.50VPC +37.50 EL. 984.30VPT +22.50 EL. 984.59VPC +02.50 EL. 989.56VPT +57.50 EL. 984.65VPC +50.00 EL. 964.63VPT +50.00 EL. 959.29VPC +75.00 EL. 959.63VPT +25.00 EL. 961.061,008.731,007.991,008.281,009.301,009.711,009.341,008.181,006.471,004.761,003.041,001.33999.62997.72995.15992.56989.98987.44985.64984.82984.98986.09987.10986.84985.24982.81981.19980.50980.73981.90983.99986.73989.49991.83993.26993.78993.41992.12989.93986.84982.93978.86974.79970.73966.66962.77960.07958.73958.76959.96960.92TOP OF PIPE=977.0852 STA 114+84.5518 PETROLEUM PIPELINE BP HIGH PRESSURE PROP. CLEARANCE 6.0628 FTPOT. 85+00.0085 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 PI 123 124 125 126 127 128 129 130 131 132 133 134 135 PI 136 137 138 139 140 141 142 PC. 142+76.05143 144 145 CURVE CSAH13_3 PI 122+02.73 X 471,357.188 Y 195,142.780 T 28.69' L 57.38' R 11,459.16' PC 121+74.04 PT 122+31.42 CURVE CSAH13_6 PI 135+12.91 X 471,349.142 Y 196,452.941 T 26.53' L 53.05' R 22,918.31' PC 134+86.39 PT 135+39.44PT. 135+39.44PC. 134+86.39PT. 122+31.42PC. 121+74.04XXXRECONSTRUCTION CSAH 13 ROADWAY PROJECT LOCATION COUNTY: METRODISTRICT: INDEX MAP 0 1 WASHINGTON WASHINGTON COUNTY Construction Limits Inplace ROW Prop ROW Driveway Concrete Curb & Gutter / Median Pond (Dead Pool) Turf Establishment Temporary Easement Shoulders Inplace Signal System Retaining Wall Wetland Delineation Proposed Signal System Legend Bridges Removals Roadway Future Construction Utility Easement Property Lines Permanent Easement 2 MILES SCALE Mill & Overlay Municipal Boundary 940 950 960 970 980 990 1,000 1,010 1,020 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 Calculations XPond (Live Pool) TURN LANES CONCEPT DRAFT 40 MPH DESIGN SPEED DATE: MAY 6, 2020 GEOMETRIC LAYOUT Concrete Walk Bituminous Trail Clear & Grub by Acre: 0.57 Acres Clear & Grub by Each: 57 Trees (Excludes New Development and BMP) Tree Removal: Acreage Outside of Inplace ROW: 0.928 Acres (Excludes New Development and BMP) Construction Limits: NOGAP 10 20020120220320420520620720820921040 MPH SIGHT LINE ASSUMPTIONS (RED). 1. FROM AASHTO GREEN BOOK 2011 SECTION 9.5.3 CASE B1 2. EQUATION 9-1(V)(T) - V=40 MPH - T=7.5 PASSENGER CAR T=9.5 SINGLE UNIT TRUCK T=11.5 COMBINATION TRUCK 3. ADJUSTMENT FACTOR FOR CROSSING 14' LTL AND 6' MEDIAN - 0.5 SEC FOR PASSENGER VEHICLE. 0.7 SEC FOR TRUCKS, FOR EACH ADDITIONAL LANE - THEREFORE TOTAL TIME (ASSUME 2 ADDITIONAL LANES) - PASSENGER CAR IS 8.5 SEC - SINGLE UNIT TRUCK IS 10.9 SEC - COMBINATION TRUCK IS 12.9 4. THEREFORE TOTAL SIGHT TIME - PASSENGER VEHICLE = 500 FT - SINGLE UNIT TRUCK = 645 FT - COMBINATION TRUCK = 760 FT 3.5 FT PASSENGER CAR EYE 7.5 FT TRUCK EYE 3.5 FT OBJECT 3.5 FT OBJECT SINGLE UNIT TRUCK SIGHT LINE COMBINATION TRUCK SIGHT LINE PASSENGER CAR SIGHT LINE MILL & OVERLAY CSAH 13 NB STA 102+07.22 MILL & OVERLAY CSAH 13 NB/SB STA 90+11.77 PHASE I PROFILE CSAH 13 STA 140+48.56 3.5 FT OBJECT MILL & OVERLAY CSAH 13 SB STA 102+79.80 FILE PATH:DATE:5/5/2020TARGET LAKE ELMO PUBLIC WORKS PROPOSED 3M FOUNDATION SITE PEBBLE PARK 9609709809901,000c:\users\afrosig\documents\projectwise\dms01913\013533-000_Layout_Concept-2.dgnBMP LOCATION STORMWATER POTENTIAL BMP LOCATION STORMWATER POTENTIAL INSET A DISCLAIMER No Responsibility Is Assumed For Plans Developed Based On This Layout Adjacent To The Roadway Should Be Confirmed By Contacting: This Plan Will Change Prior To Construction. Any Plans For Development Disclaimer: Location Project SCALE IN FEET 0 50 100 SCALE IN FEET 0 50 100 75' { OFFSET75' { OFFSET EXISTING RIGHT OF WAY WEST OF CSAH 13 FROM 40TH ST N TO 44TH ST N APPEARS TO BE PRESCRIPTIVE. RIGHT OF WAY ASSUMED TO BE 33 FT FROM SECTION LINE (APPROXIMATE { OF CSAH 13) FENCE TO BE LOCATED ALONG TRAIL FROM STA 129+50 TO STA 133+00 POT. 200+00.002 00201202203204205206207PI . 207+40.37 208PI . 208+02.11 209210POT. 210+12.60 1:15 1:15 1:15 1:15 8' SHLD 14' X 300' RTL 13' X 300' RTL 11' LANE 13' X 300' LTL 14' LANE 12' LANE 8' SHLD 8' BITUMINOUS TRAIL 12' LANE18' LANE11' LANE13.5' LANE6' SHLD5.5' SHLD1:15 1:15 1:30 13' LANE 13' X 150' LTL 11' LANE 13' X 100' RTL 13' LANE 8' SHLD 8' BITUMINOUS TRAIL 1:10 1:10 13' LANE 13' X 225' LTL 11' LANE 13' X 300' RTL 1:15 1:15 1:15 1:15 13' X 200' RTL 13' X 150' RTL 11' LANE 13' X 250' LTL 13' LANE 8' SHLD 8' BITUMINOUS TRAIL 12' LANE14' LANE13' X 300' RTL 11' LANE 12' X 300' LTL 11' LANE 8' SHLD 8' BITUMINOUS TRAIL 1:15 1:15 1:40 1:40 11' LANE 11' LANE 8' SHLD 8' SHLD 8' BITUMINOUS TRAIL 1:15 11' LANE 11' LANE 13' X 300' RTL 8' SHLD 8' BITUMINOUS TRAIL 44TH ST NHI DDE N B AY T R NLAKE JANE TR39TH ST NSTREET B38TH ST N36TH ST NSTREET ALAKE ELMO PUBL IC WORK S DRWYCSAH 14CSAH 1410' BLVD 10' BLVD 10' BLVD 10' BLVD 10' BLVD 6' BLVD 6' MEDIAN 65'R 60'R 60'R 50'R 35'R 6' MEDIAN 6' MEDIAN 40'R 40'R 40'R 40'R 6' MEDIAN 9' MEDIAN { CSAH 13 { CSAH 1340'R 40'R 40'R40'R 55'R 65'R 40'R 40'R 50'R 84' 22.5' 22'22'22' 33' 51' 24' 29' 8' SHLD 1:10EX. 11' LANE EX. 11' LANE 1:20EX. 12' LANE EX. 14' LANE EX. 14' X 300' LTL EX. 12' LANE EX. 12' LANE EX. 14' X 300' RTL EX. 12' LANE EX. 14' X 300' LTL EX.14' LANE EX. 12' LANE EX. 8' SHLD EX. 8' SHLD EX. 6' MEDIAN 1:109' MEDIAN 1:1022'18' LANE11' LANEEX. 8' SHLD 1:151:101:151:101:101:151:101:101:101:151:101:101: 1 5 EX. 8' SHLD BMP LOCATION STORMWATER POTENTIAL BMP LOCATION STORMWATER POTENTIALEX. 19.5' LANE12' LANE13' RTLEX. 8' SHLDCSAH 13 32ND ST NCITY OF OAKDALE CITY OF OAKDALE CITY OF OAKDALE CITY OF LAKE ELMO CITY OF LAKE ELMO CITY OF LAKE ELMO 11' LANE 11' LANE 4' SHLD 8' SHLD 10' BLVD POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED 8' SHLD EX. 4' SHLD EX. 6' BLVD 40'40TH ST NBUILT BY OTHERSCONNECTION TO BEPOND DEVELOPER PROPOSED WETLAND DEVELOPER PROPOSED WETLAND DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED 17'11' 34' 14'18' POTENTIAL STORMWATER BMP LOCATION FOR STORMWATER BMP POTENTIAL EXPANSION PHASE 1 POND CSAH 13 SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 SPEED EX MPH SPEED DESIGN MPH CSAH 13 4040 40 40 40 14' RTL8' BITUMINOUS TRAIL1:15CSAH 35HELMO AVE N CSAH 13 CITY OF OAKDALECITY OF LAKE ELMO4' BLVD8' BITUMINOUS TRAIL8' BITUMINOUS TRAIL2' CONC.2' CONC.CSAH 13 PHASE 1 TRAIL1:20 11' 17 55 3 7 T Lily 0.5 5 1315 17 21 23 25 27 33 35 4 .3 12 15 96 Pile Lake 36 17 12 9 122.7PINE SPRINGS Lost 244 N. N.CO. NG 6"24"NGCOMPANYCO16"15 4.1 Lake 1 11 3 Long Mud 694 35 35 OAKDALE 120 17 17 15 17 13 23 DownsLAKEELMO LAKE ELMO 15 13 6 21 6 17B 10 19 17B 94 12 25 35 10 33 10 3.4694 Armstrong Lake 694 206 71 W E S T 29 31 3 3 19 17 7 LAKE ELMO AIRPORT B A 14 31.1Lake OAK PARK HEIGHTS Pacific OI LCO 10" 13 COMINNESOTA16"CO2 4 "NORTHERN2"NGNATURALZe p h yr Minn. L. 51 52 1.2 2.3Union 55 Railroad 19 31 29 5 7 17 AL 15TH ST.N. 10TH ST.N.LAKEELMOAVE.N.AVE.dale Lake 57 8" NORTHERN NATURAL NG 17 17 GRANT 40TH 13 0.2 1.3 AVE.75TH ST.N.N.JAMACARD. DELLWOOD 0.3 0.3 4 5 shoe 14 12 168 aldMANNING64WARNERAVE.NEAL30TH ST.N.MANNINGAVE.VE.APOP. 27,378 POP. 8,069 POP. 4,339 POP. 408 POP. 507 POP. 4,096 29 29 4 3 Lake South winL. Lake McKusick STILLWATER LakeLong Lake Wood Masterman Lake Echo L. WhiteBear Lake Long Lake BIRCHWOOD VILLAGE 0.2 1.8 WILLERNIE L. G. Clear Lake Lake DeMontreville Olson 9 Lake 1.2 Lake Sunfish Lake Lake Elmo Lake REGIONAL PARK RESERVEEagle Point L. Lake Goose Lake 27 LANDFALL Tanners Lake A ME RI C A NMAHTOMEDI Sunny- brook 0.9 Jane Lake Mc- Clover- 244 MA H T O ME DIAVE. Horse- Don Cr. MargaretL. POP. 870 POP. 7,676 ryenFa ST. 15 14 14 14 MBMBMBMBMBMBMBMH Y MH MH MH MH MH MHLSVENT 0.02 0.02 0.02 0.02 0.02 SHLD LTL LANE THRU/RTL THRU LANE 0 - 14' MEDIAN SHLD 0 - 8'0 - 8' THRU LANE THRU LANE 0 - 12' 0.02 0.02 0 - 14' 1:4 SLOPE 8' BLVDTRAIL 6' BERM 0.04 0.02 0.04 MEDIAN 14 - 20'6 - 18'12 - 20'2'PI VARIES B424 B424 CL SB CSAH 13 CL NB CSAH 13 EX. GROUND 0-6' B424 STATION 89+85 TO 102+00 PROPOSED CSAH 13 B424 0.015 1:3 SLOPE EX. GROUND 1:3 SLO PEVAR. 11 - 20' THRU LANESHLDRTL MEDIAN SHLDRTL 0.020.020.04 0.02 0.02 0.04 LTL 11 - 20' THRU LANE 0 - 13'0 - 13' CL NB CSAH 13 CL SB CSAH 13 8' BLVDTRAIL 0.02 2'PI 0.02 6 - 18'10'0-8' EX. GROUND PROPOSED CSAH 13 B424 B424B424B424 LTL 0.02 0 - 13'6' BERM 0.04 STATION 103+55 TO 118+35 STATION 119+90 TO 135+80 0.015 0 - 13' 1:3 SLOPE EX. GROUND 0-6' VARIES 1:3 - 1:2.5 VARI ES 1:3 - 1:2.51:6 0.04 0.01 0.02 22'15'4'18' B624 B424 1:6 0.040.010.02 22'15'4'18' B624 B424 R424R424 PROPOSED CSAH 13 40TH ST N/LAKE JANE TRAIL N - ROUNDABOUT 39TH ST N - ROUNDABOUT CL NB CSAH 13 CL SB CSAH 13 34 - 36'MBTEEETTTT6' BERMSHLDTHRU LANE 11'8' BLVDTRAIL SHLD 6' STATION 135+80 TO 140+49 PROPOSED CSAH 13 2'PI 0.015 0.04 8' 0.02 0.020.02 CL NB CSAH 13SB CSAH 13 0.04 B424 B424 EX. GROUND THRU LANE 4' 1:3 SLOPE EX. GROUND 0.02 V A RI ES 1:3 - 1:2.5974.20 975.86 978.00 981.65 986.67 992.01 995.61 997.03 996.40 993.63 988.88 974.73 VPI +37.00 EL. 977.98 +1.68%+ 5. 3 5 %240.00' V.C.K = 65ex = 1.10'VPI +94.00 EL. 997.08 + 5. 3 5 %+0.02%240.00' V.C.K = 45ex = -1.60'SSD = 322'VPI +38.00 EL. 997.13 +0.02%-5.07%225.00' V.C.K = 44ex = -1.43'SSD = 324'991.27 VPC +17.00 EL. 975.96 VPT +57.00 EL. 984.40 VPC +74.00 EL. 990.66 VPT +50.50 EL. 991.43 975.68 977.88 981.60 986.70 991.98 995.64 997.08 996.50 993.70 EL. 997.11 VPC +25.50 EL. 997.11 VPT +14.00 NOGAP 10 100 960 19900.000000 CSAH35_TRAIL 200201202203204205206207208209210POT. 85+00.0085 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 PI 123 124 125 126 127 128 129 130 131 132 133 134 135 PI 136 137 138 139 140 141 142 PC. 142+76.05143 144 145 CURVE CSAH13_3 PI 122+02.73 X 471,357.188 Y 195,142.780 T 28.69' L 57.38' R 11,459.16' PC 121+74.04 PT 122+31.42 CURVE CSAH13_6 PI 135+12.91 X 471,349.142 Y 196,452.941 T 26.53' L 53.05' R 22,918.31' PC 134+86.39 PT 135+39.44PT. 135+39.44PC. 134+86.39PT. 122+31.42PC. 121+74.04POT. 200+00.002 00201202203204205206207PI . 207+40.37 208PI . 208+02.11 209210POT. 210+12.60 AC AC AC AC AC AC AC AC AC AC AC AC AC AC ACACACACACACACACACACACACACACACACACAC AC ACAC ACACACACACACACACACACACACACACACACACACACACACACAC20' LANE20' LANE20' LANE 20' LANE DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 CL 38TH ST N CL 39TH ST N CL HIDDEN BAY TRAIL N 40TH ST LAKE JANE TRAIL N CL CL 36TH ST N DESIGN SPEED 40 DESIGN SPEED 40 DESIGN SPEED 40 1,008.731,007.991,008.281,009.301,009.711,009.341,008.181,006.471,004.761,003.041,001.33999.62997.72995.15992.56989.98987.44985.64984.82984.98986.09987.10986.84985.24982.81981.19980.50980.73981.90983.99986.73989.49991.83993.26993.78993.41992.12989.93986.84982.93978.86974.79970.73966.66962.77960.07958.73958.76959.96960.921,001.571,005.151,008.271,010.241,011.131,010.471,008.731,007.921,008.451,009.321,009.691,009.381,008.501,006.741,004.851,003.081,001.43999.65998.09996.00994.73992.26989.99988.37987.15987.51988.18989.57989.30987.36985.02983.34982.41983.11984.00987.51991.48994.01995.67997.29998.41998.70997.95995.29991.38987.36983.09978.53973.77969.51965.46962.85961.61960.85960.70960.98961.46962.11962.54963.40964.021,010.20VPI +82.00EL. 1,007.00-1 .88%+1.06% 285.00' V.C. K = 97 ex = 1.05'VPI +56.00EL. 1,009.90+1.06%-0.38% 130.00' V.C. K = 90 ex = -0.23' SSD = 815'VPI +40.50EL. 1,009.20-0.38% -1 .71% 115.00' V.C. K = 86 ex = -0.19' SSD = 867'VPI +80.00EL. 998.25-1 .71%-2. 5 8% 75.00' V.C. K = 86 ex = -0.08' SSD = 1274'VPI +70.00EL. 983.00-2.58%+1.34% 400.00' V.C. K = 102 ex = 1.96'VPI +80.00EL. 988.50+1.34%-2.67% 300.00' V.C. K = 75 ex = -1.50' SSD = 419'VPI +30.00EL. 976.50-2.67%+2.76% 585.00' V.C. K = 108 ex = 3.97'VPI +80.00EL. 1,000.00+2.76%-4.07%755.00' V.C. K = 111 ex = -6.45' SSD = 488'VPI +50.00EL. 956.50-4.07%+1.39% 400.00' V.C. K = 73 ex = 2.73'VPI +50.00EL. 960.68+1.39%+0.51% 150.00' V.C. K = 169 ex = -0.17' SSD = 1293'961.18VPC +39.50 EL. 1,009.68VPT +24.50 EL. 1,008.51VPC +91.00 EL. 1,009.21VPT +21.00 EL. 1,009.65VPC +83.00 EL. 1,009.42VPT +98.00 EL. 1,008.22VPC +42.50 EL. 998.89VPT +17.50 EL. 997.28VPC +70.00 EL. 988.17VPT +70.00 EL. 985.68VPC +30.00 EL. 986.49VPT +30.00 EL. 984.50VPC +37.50 EL. 984.30VPT +22.50 EL. 984.59VPC +02.50 EL. 989.56VPT +57.50 EL. 984.65VPC +50.00 EL. 964.63VPT +50.00 EL. 959.29VPC +75.00 EL. 959.63VPT +25.00 EL. 961.061,008.731,007.991,008.281,009.301,009.711,009.341,008.181,006.471,004.761,003.041,001.33999.62997.72995.15992.56989.98987.44985.64984.82984.98986.09987.10986.84985.24982.81981.19980.50980.73981.90983.99986.73989.49991.83993.26993.78993.41992.12989.93986.84982.93978.86974.79970.73966.66962.77960.07958.73958.76959.96960.92TOP OF PIPE=977.0852 STA 114+84.5518 PETROLEUM PIPELINE BP HIGH PRESSURE PROP. CLEARANCE 6.0628 FTXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXRECONSTRUCTION CSAH 13 ROADWAY PROJECT LOCATION COUNTY: METRODISTRICT: 0 1 2 MILES WASHINGTON WASHINGTON COUNTY Construction Limits Inplace ROW Prop ROW Driveway Concrete Curb & Gutter / Median Pond (Dead Pool) Turf Establishment Temporary Easement Shoulders Bituminous Trail Concrete Walk Inplace Signal System Retaining Wall Wetland Delineation Proposed Signal System Legend Bridges Removals Roadway Future Construction Inplace Easement Property Lines Permanent Easement SCALE INDEX MAP Mill & Overlay FILE PATH:DATE:Municipal Boundary 940 950 960 970 980 990 1,000 1,010 1,020 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 Calculations XPond (Live Pool) ROUNDABOUTS CONCEPT DRAFT 40 MPH DESIGN SPEED DATE: MAY 6, 2020 GEOMETRIC LAYOUT Clear & Grub by Acre: 0.727 Acres Clear & Grub by Each: 47 Trees (Excludes New Development and BMP) Tree Removal: Acreage Outside of Inplace ROW: 1.108 Acres (Excludes New Development and BMP) Construction Limits:5/5/2020c:\users\afrosig\documents\projectwise\dms01913\013533-000_Layout_Concept-3.dgn40 MPH SIGHT LINE ASSUMPTIONS (RED). 1. FROM AASHTO GREEN BOOK 2011 SECTION 9.5.3 CASE B1 2. EQUATION 9-1(V)(T) - V=40 MPH - T=7.5 PASSENGER CAR T=9.5 SINGLE UNIT TRUCK T=11.5 COMBINATION TRUCK 3. ADJUSTMENT FACTOR FOR CROSSING 14' LTL AND 6' MEDIAN - 0.5 SEC FOR PASSENGER VEHICLE. 0.7 SEC FOR TRUCKS, FOR EACH ADDITIONAL LANE - THEREFORE TOTAL TIME (ASSUME 2 ADDITIONAL LANES) - PASSENGER CAR IS 8.5 SEC - SINGLE UNIT TRUCK IS 10.9 SEC - COMBINATION TRUCK IS 12.9 4. THEREFORE TOTAL SIGHT TIME - PASSENGER VEHICLE = 500 FT - SINGLE UNIT TRUCK = 645 FT - COMBINATION TRUCK = 760 FT 3.5 FT PASSENGER CAR EYE 7.5 FT TRUCK EYE 3.5 FT OBJECT 3.5 FT OBJECT SINGLE UNIT TRUCK SIGHT LINE COMBINATION TRUCK SIGHT LINE PASSENGER CAR SIGHT LINE MILL & OVERLAY CSAH 13 NB STA 102+07.22 MILL & OVERLAY CSAH 13 NB/SB STA 90+11.77 PHASE I PROFILE CSAH 13 STA 140+48.56 3.5 FT OBJECT MILL & OVERLAY CSAH 13 SB STA 102+79.80 1:15 13'X 300' LTL 11' LANE 13' X 300' RTL 13' LANE 13' X 250' LTL 11' LANE 13' X 250' RTL 1:40 11' LANE 11' LANE 8' BITUMINOUS TRAIL 1:15 11' LANE 11' LANE 13' X 300' RTL 44TH ST NLAKE J ANE TR39TH ST NSTREET B38TH ST N36TH ST NSTREET ALAK E ELMO PUBL IC WORK S DRWYCSAH 14CSAH 1435'R 6' MEDIAN 40'R 40'R 40'R{ CSAH 13 { CSAH 13 { 40TH ST N 50'R 84' 22.5' 22' 22' 22' 35' 41' 24' EX. 12' LANE EX. 14' LANE EX. 14' X 300' RTL EX. 12' LANE EX. 14' X 300' LTL EX. 14' LANE EX. 12' LANE EX. 8' SHLD EX. 8' SHLD EX. 6' MEDIAN 1:1013' RTL18' LANE11' LANE1:15 40'R 1:15 8' BITUMINOUS TRAIL 10' BLVD 6' SHLD 1:15 10' BLVD8' SHLD 8' SHLD 20' LANE 20' LANE 20' LANE 20' LANE 15' LANE1:50 1:15 20' LANE 20' LANE 1:30 1:20 8' SHLD 10' BLVD 1:15 10' BLVD 8' SHLD8' BITUMINOUS TRAIL 13' LANE 2 0' LANE37'R 20' LANE20' LANE18' LANE20' LANE20' LANE1:10 40'R1:101:25EX. 22' LANEEX. 6' SHLDEX. 16' LANEEX. 8' SHLDEX. 6' MEDIAN EX. 1:15 1:15 40'R 15' 22' 154' 22' 15'1:101:151:151:101:101:101:10BMP LOCATION STORMWATER POTENTIAL BMP LOCATION STORMWATER POTENTIAL CSAH 13 32ND ST N1:101:1040'R 1:101:10TARGET LAKE ELMO PUBLIC WORKS CITY OF OAKDALE CITY OF LAKE ELMO CITY OF OAKDALE CITY OF LAKE ELMO POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED POND DEVELOPER PROPOSED 6 MEDIAN EX. 11' LANE EX. 11' LANE EX. 8' SHLD EX. 4' SHLD EX. 6' BLVD40TH ST NBUILT BY OTHERSCONNECTION TO BE26.4' WETLAND DEVELOPER PROPOSED WETLAND DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED BASIN INFILTRATION DEVELOPER PROPOSED POND DEVELOPER PROPOSED 8' BITUMINOUS TRAIL 6' BLVD4' SHLD 11' LANE 11' LANE 8' SHLD CITY OF OAKDALE CITY OF LAKE ELMO 40'R 40'R HI DDE N B AY T R N22' 1: 1 5 14' 18'34' 17'11' FOR STORMWATER BMP POTENTIAL EXPANSION PHASE 1 POND CSAH 13 144' 11' LANE 11' LANE ASSUMED R/W 33 FT FROM SECTION LINE 960970980990RIGHT OF WAY ASSUMED TO BE 33 FT FROM SECTION LINE (APPROXIMATE { OF CSAH 13) CITY OF OAKDALE 1:101:101:15SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 40 SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 SPEED EX MPH SPEED DESIGN MPH CSAH 13 4040 40 SPEED EX MPH SPEED DESIGN MPH CSAH 13 50 40 DISCLAIMER No Responsibility Is Assumed For Plans Developed Based On This Layout Adjacent To The Roadway Should Be Confirmed By Contacting: This Plan Will Change Prior To Construction. Any Plans For Development Disclaimer: SCALE IN FEET 0 25 50 INSET A Location Project POTENTIAL STORMWATER BMP LOCATION BMP LOCATION STORMWATER POTENTIAL INP. SEPTIC MOUND SCALE IN FEET 0 50 100 75' { OFFSET75' { OFFSET EXISTING RIGHT OF WAY FROM 40TH ST N TO 44TH ST N APPEARS TO BE PRESCRIPTIVE. FENCE TO BE LOCATED ALONG TRAIL FROM STA 129+50 TO STA 133+00 8' BITUMINOUS TRAIL1:15CSAH 35HELMO AVE N CSAH 13 CITY OF OAKDALECITY OF LAKE ELMO4' BLVD8' BITUMINOUS TRAIL8' BITUMINOUS TRAIL2' CONC.2' CONC.CSAH 13 PHASE 1 TRAIL1:20