HomeMy WebLinkAbout#07 - Pay Request No. 3 for Well No. 5 STAFF REPORT DATE: September 15, 2020 CONSENT AGENDA ITEM: Production Well No. 5 – Pay Request No. 3 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 3 for Production Well #5? BACKGROUND: Traut Companies was awarded a construction contract on January 21, 2020 to complete the Production Well No. 5. Construction of the well is substantially complete, pending final well logs and testing results. PROPOSAL DETAILS/ANALYSIS: Traut Companies has submitted Partial Pay Request No. 3 in the amount of $81,747.50. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $12,991.85. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 3 for Production Well #5. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 3 to Traut Companies in the amount of $81,747.50 for the Production Well #5 project”. ATTACHMENTS: 1. Partial Pay Estimate No. 3. PARTIAL PAY ESTIMATE NO. 3 PRODUCTION WELL NO. 5 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2019.114 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $31,300.00 $31,300.00 0.25 $7,825.00 0.75 $23,475.00 2 SY 200 $2.00 $400.00 0.00 $0.00 46.00 $92.00 3 TN 150 $75.00 $11,250.00 0.00 $0.00 54.00 $4,050.00 4 LF 145 $200.00 $29,000.00 0.00 $0.00 146.00 $29,200.00 5 LF 145 $145.00 $21,025.00 0.00 $0.00 139.00 $20,155.00 6 CY 10 $95.00 $950.00 0.00 $0.00 16.00 $1,520.00 7 LF 204 $95.00 $19,380.00 0.00 $0.00 188.00 $17,860.00 8 CY 20 $650.00 $13,000.00 0.00 $0.00 21.50 $13,975.00 9 LS 1 $4,800.00 $4,800.00 0.50 $2,400.00 1.00 $4,800.00 10 HRS 125 $390.00 $48,750.00 94.00 $36,660.00 200.00 $78,000.00 11 LBS 100 $35.00 $3,500.00 0.00 $0.00 360.00 $12,600.00 12 CY 400 $90.00 $36,000.00 258.00 $23,220.00 358.00 $32,220.00 13 CY 400 $14.00 $5,600.00 0.00 $0.00 0.00 $0.00 14 LS 1 $500.00 $500.00 0.00 $0.00 1.00 $500.00 15 LS 1 $6,500.00 $6,500.00 1.00 $6,500.00 1.00 $6,500.00 16 HRS 10 $180.00 $1,800.00 10.00 $1,800.00 10.00 $1,800.00 17 LS 1 $1,850.00 $1,850.00 0.00 $0.00 0.00 $0.00 18 HRS 36 $180.00 $6,480.00 24.00 $4,320.00 24.00 $4,320.00 19 LS 1 $3,000.00 $3,000.00 0.00 $0.00 0.00 $0.00 20 LS 1 $1,400.00 $1,400.00 1.00 $1,400.00 2.00 $2,800.00 21 LS 1 $1,800.00 $1,800.00 1.00 $1,800.00 1.00 $1,800.00 22 LS 1 $93,500.00 $93,500.00 0.00 $0.00 0.00 $0.00 23 LS 1 $275.00 $275.00 0.00 $0.00 0.00 $0.00 24 LS 1 $125.00 $125.00 1.00 $125.00 1.00 $125.00 25 LS 1 $1,600.00 $1,600.00 0.00 $0.00 0.00 $0.00 26 LS 1 $1,275.00 $1,275.00 0.00 $0.00 0.00 $0.00 $345,060.00 $86,050.00 $255,792.00 DIVISION 2 ‐ SEALING AND ABANDONMENT OF TEST WELL NO. 5 1 LS 1 $875.00 $875.00 0.00 $0.00 1.00 $875.00 2 CY 5 $450.00 $2,250.00 0.00 $0.00 3.50 $1,575.00 3 EA 1 $95.00 $95.00 0.00 $0.00 1.00 $95.00 4 LS 1 $1,500.00 $1,500.00 0.00 $0.00 1.00 $1,500.00 SUBTOTAL ‐ DIVISION 2 $4,720.00 $0.00 $4,045.00 TOTALS ‐ BASE CONTRACT $349,780.00 $86,050.00 $259,837.00 Site Restoration Coordination with Well House Contractor for Well Pump Installation,  Piping and Electrical Connection and Start‐Up Drill and Drive 24” Dia. Casing Drill 23” Dia. (Nominal) Open Hole Furnish and Install 18” Dia. Casing Backfill 23” Open Hole Up To 204 ft with Pea Gravel Dynamite (If Needed) Step Testing Videotaping Gamma Log Furnish and Install 150 HP Line Shaft Turbine Pump, 1250 gpm at 380 ft  TDH, 204 ft. Below FF Furnish and Install Submersible Well Drawdown Sensor as Specified Well Disinfection Test Pumping Bailing of Sand Plumb and Alignment Test and Report ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 ‐ PRODUCTION WELL NO. 5 Mobil. & Demobil., Clean Up Site, Erosion Control & Permit Fees Furnish and Install grout between 24” and 18” Casings Furnish, Install & Remove Well Development Equipment Well Development  Geotextile Fabric, MnDOT Type 5 for Driveway 1”‐2” Washed Rock for Construction Entrance Furnish, Install and Remove Test Pump Lower Adjacent Residential Well Pump 80 feet Hauling/Disposal of Sand Water Analysis STD Menu with Radionuclides, VOC’s and PFAS Neat Cement Grout or Cement‐Sand Grout SUBTOTAL ‐ DIVISION 1 MDH Sealing Notification Labor and Grout/Cement Pump Mobil. & Demobil., Clean Up Site, Erosion Control & Permit Fees COMPLETED ITEMS BY PAY PERIODPRODUCTION WELL NO. 5CITY OF LAKE ELMO, MINNESOTAPROJECT NO. 2019.114QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNTDIVISION 1 - PRODUCTION WELL NO. 51LS$31,300.00 0.50 $15,650.00 $0.00 0.25 7825.00 0.00 $0.00 $0.00 $0.00 $0.00 1 $23,475.002SY$2.00 46.00$92.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.0046 $92.003TN$75.00 54.00$4,050.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.0054 $4,050.004LF$200.00 146.00$29,200.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00146 $29,200.005LF$145.00 139.00$20,155.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00139 $20,155.006CY$95.00 16.00$1,520.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.0016 $1,520.007LF$95.00 188.00$17,860.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00188 $17,860.008CY$650.00$0.0021.50$13,975.00 0.00 0.00 $0.00 $0.00 $0.00 $0.0022 $13,975.009LS$4,800.00$0.000.50$2,400.000.502400.00 0.00 $0.00 $0.00 $0.00 $0.001 $4,800.0010HRS$390.00$0.00106.00$41,340.0094.0036660.00 0.00 $0.00 $0.00 $0.00 $0.00200 $78,000.0011LBS$35.00$0.00360.00$12,600.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00360 $12,600.0012CY$90.00$0.00100.00$9,000.00258.0023220.00 0.00 $0.00 $0.00 $0.00 $0.00358 $32,220.0013CY$14.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0014LS$500.00 1.00$500.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.001 $500.0015LS$6,500.00$0.00 $0.001.006500.00 0.00 $0.00 $0.00 $0.00 $0.001 $6,500.0016HRS$180.00$0.00 $0.0010.001800.00 0.00 $0.00 $0.00 $0.00 $0.0010 $1,800.0017LS$1,850.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0018HRS$180.00$0.00 $0.0024.004320.00 0.00 $0.00 $0.00 $0.00 $0.0024 $4,320.0019LS$3,000.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0020LS$1,400.00$0.001.00$1,400.001.001400.00 0.00 $0.00 $0.00 $0.00 $0.002 $2,800.0021LS$1,800.00$0.00 $0.001.001800.00 0.00 $0.00 $0.00 $0.00 $0.001 $1,800.0022LS$93,500.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0023LS$275.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0024LS$125.00$0.00 $0.001.00125.00 0.00 $0.00 $0.00 $0.00 $0.001 $125.0025LS$1,600.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.0026LS$1,275.00$0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.000 $0.00$89,027.00 $80,715.00 86050.00 0.00 $0.00 $0.00 $0.00 $0.00 $255,792.00DIVISION 2 - SEALING AND ABANDONMENT OF TEST WELL NO. 51LS$875.00 $0.00 1.00 $875.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 1 $875.002CY$450.00 $0.00 3.50 $1,575.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 4 $1,575.003EA$95.00 $0.00 1.00 $95.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 1 $95.004LS$1,500.00 $0.00 1.00 $1,500.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 1 $1,500.00$0.00 $4,045.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $4,045.00TOTALS - BASE CONTRACT$89,027.00 $84,760.00 $86,050.00 $0.00 $0.00 $0.00 $0.00 $0.00 $259,837.00Mobil. & Demobil., Clean Up Site, Erosion Control & Permit FeesMDH Sealing NotificationLabor and Grout/Cement PumpSUBTOTAL - DIVISION 2SUBTOTAL - DIVISION 1Neat Cement Grout or Cement-Sand GroutGeotextile Fabric, MnDOT Type 5 for Driveway1”-2” Washed Rock for Construction EntranceDrill and Drive 24” Dia. CasingPARTIAL PAY ESTIMATE 6 PARTIAL PAY ESTIMATE 7Mobil. & Demobil., Clean Up Site, Erosion Control & Permit FeesITEM DESCRIPTION OF PAY ITEMUNITPARTIAL PAY ESTIMATE 1TOTAL TO DATEUNIT PRICEPARTIAL PAY ESTIMATE 2 PARTIAL PAY ESTIMATE 3 PARTIAL PAY ESTIMATE 4 PARTIAL PAY ESTIMATE 5PARTIAL PAY ESTIMATE 8Drill 23” Dia. (Nominal) Open HoleStep TestingLower Adjacent Residential Well Pump 80 feetTest PumpingWell Development Dynamite (If Needed)Bailing of SandHauling/Disposal of SandPlumb and Alignment Test and ReportBackfill 23” Open Hole Up To 204 ft with Pea GravelFurnish and Install 18” Dia. CasingFurnish and Install grout between 24” and 18” CasingsFurnish, Install & Remove Well Development EquipmentFurnish, Install and Remove Test PumpWell DisinfectionSite RestorationCoordination with Well House Contractor for Well Pump Installation, Piping and Electrical Connection and Start-UpWater Analysis STD Menu with Radionuclides, VOC’s and PFASVideotapingGamma LogFurnish and Install 150 HP Line Shaft Turbine Pump, 1250 gpm at 380 ft TDH, 204 ft. Below FFFurnish and Install Submersible Well Drawdown Sensor as Specified