HomeMy WebLinkAbout#11 - Pay Request No. 1 for the Well No. 5 Connecting Watermain STAFF REPORT DATE: September 15, 2020 CONSENT AGENDA ITEM: Well No. 5 Connecting Watermain Improvements – Pay Request No. 1 SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the Well No. 5 Connecting Watermain Improvements? BACKGROUND: Miller Excavating, Inc. was awarded a construction contract on July 16, 2020 to complete the Well No. 5 Connecting Watermain Improvements. Work remains in progress with a substantial completion date of October 9, 2020 and final completion date of November 13, 2020. PROPOSAL DETAILS/ANALYSIS: Miller Excavating, Inc. has submitted Partial Pay Request No. 1 in the amount of $287,038.81. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $15,107.31. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 for the Well No. 5 Connecting Watermain Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 to Miller Excavating, Inc. in the amount of $287,038.81 for the Well No. 5 Connecting Watermain Improvements”. ATTACHMENTS: 1. Partial Pay Estimate No. 1 PARTIAL PAY ESTIMATE NO. 1 WELL NO. 5 CONNECTING WATERMAIN CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2019.128 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $19,787.87 $19,787.87 0.50 $9,893.94 0.50 $9,893.94 2 LS 1 $58,165.81 $58,165.81 0.50 $29,082.91 0.50 $29,082.91 3 EA 10 $355.19 $3,551.90 6.00 $2,131.14 6.00 $2,131.14 4 EA 10 $581.66 $5,816.60 13.00 $7,561.58 13.00 $7,561.58 5 EA 10 $581.66 $5,816.60 12.00 $6,979.92 12.00 $6,979.92 6 EA 2 $1,275.62 $2,551.24 1.00 $1,275.62 1.00 $1,275.62 7 EA 1 $1,287.43 $1,287.43 0.00 $0.00 0.00 $0.00 8 LF 90 $77.08 $6,937.20 34.00 $2,620.72 34.00 $2,620.72 9 LF 160 $106.41 $17,025.60 39.00 $4,149.99 39.00 $4,149.99 10 LF 2325 $68.92 $160,239.00 2,336.00 $160,997.12 2,336.00 $160,997.12 11 EA 6 $1,778.31 $10,669.86 4.00 $7,113.24 4.00 $7,113.24 12 EA 5 $3,547.90 $17,739.50 3.00 $10,643.70 3.00 $10,643.70 13 EA 1 $281.23 $281.23 0.00 $0.00 0.00 $0.00 14 LF 5 $130.21 $651.05 0.00 $0.00 0.00 $0.00 15 EA 6 $4,793.00 $28,758.00 4.00 $19,172.00 4.00 $19,172.00 16 LF 3 $431.62 $1,294.86 0.00 $0.00 0.00 $0.00 17 LF 35 $71.82 $2,513.70 0.00 $0.00 0.00 $0.00 18 LF 130 $87.74 $11,406.20 112.00 $9,826.88 112.00 $9,826.88 19 LF 100 $74.04 $7,404.00 0.00 $0.00 0.00 $0.00 20 LF 85 $89.97 $7,647.45 84.00 $7,557.48 84.00 $7,557.48 21 EA 4 $891.79 $3,567.16 0.00 $0.00 0.00 $0.00 22 EA 6 $1,026.06 $6,156.36 0.00 $0.00 0.00 $0.00 23 EA 4 $527.14 $2,108.56 0.00 $0.00 0.00 $0.00 24 EA 6 $697.72 $4,186.32 0.00 $0.00 0.00 $0.00 25 EA 2 $55.95 $111.90 0.00 $0.00 0.00 $0.00 26 LB 1150 $6.03 $6,934.50 1,130.00 $6,813.90 1,130.00 $6,813.90 27 EA 16 $1,036.49 $16,583.84 15.00 $15,547.35 15.00 $15,547.35 28 SY 450 $75.30 $33,885.00 0.00 $0.00 0.00 $0.00 29 LF 320 $41.50 $13,280.00 0.00 $0.00 0.00 $0.00 30 LF 612 $0.47 $287.64 0.00 $0.00 0.00 $0.00 31 LF 2340 $0.47 $1,099.80 0.00 $0.00 0.00 $0.00 32 CY 300 $74.19 $22,257.00 0.00 $0.00 0.00 $0.00 33 SY 2000 $2.38 $4,760.00 0.00 $0.00 0.00 $0.00 34 SY 675 $17.51 $11,819.25 0.00 $0.00 0.00 $0.00 35 LF 940 $2.13 $2,002.20 0.00 $0.00 0.00 $0.00 36 HR 10 $141.57 $1,415.70 5.50 $778.64 5.50 $778.64 $500,000.33 $302,146.12 $302,146.12 TOTALS ‐ BASE CONTRACT $500,000.33 $302,146.12 $302,146.12 ADJUST EXISTING VALVE BOX VALVE BOX EXTENSION HYDRANT HYDRANT EXTENSION 1" TYPE "K" COPPER WATER SERVICE BASE BID MOBILIZATION 14" HDPE WATERMAIN, DIRECTIONAL DRILL 6" GATE VALVE AND BOX 12" GATE VALVE AND BOX TRAFFIC CONTROL INLET PROTECTION CLEARING GRUBBING CONNECT TO EXISTING 12" WATERMAIN CUT TEE INTO EXISTING 12" WATERMAIN 6" DIP, CL. 52 WATERMAIN, INCL POLY WRAP 12" DIP, CL. 52 WATERMAIN, INCL POLY WRAP ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE REMOVE AND PATCH BITUMINOUS STREET REMOVE AND REPLACE CONCRETE CURB AND GUTTER 4" SOLID LINE YELLOW MULTI‐COMP 4" BROKEN LINE YELLOW MULTI‐COMP BASE BID TOPSOIL BORROW (LV) SEED & EROSION CONTROL BLANKET SOD SILT FENCE, MACHINE SLICED STREET SWEEPER WITH PICK UP BROOM 1" CURB STOP & BOX 1.5" CURB STOP & BOX OFF ROAD STRUCTURE MARKER DUCTILE IRON FITTINGS 14" HDPE 12" DIP TRANSITION FITTING 1" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL 1.5" TYPE "K" COPPER WATER SERVICE 1.5" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL 1" CORPORATION STOP W/ SADDLE 1.5" CORPORATION STOP W/ SADDLE