Loading...
HomeMy WebLinkAbout#13 - Change Order No. 1 for the 31st Street-Stillwater Blvd Watermain Improvements STAFF REPORT DATE: September 15, 2020 CONSENT AGENDA ITEM: Approve Change Order No. 1 for the 31st Street & Stillwater Boulevard Watermain Improvements SUBMITTED BY: Mark Scholle, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 1 for the 31st Street & Stillwater Boulevard Watermain Improvements? BACKGROUND: On May 5th, 2020, the City Council awarded a construction contract for the 31st Street & Stillwater Boulevard Watermain Improvements. The project extends the public watermain to serve six homes located east of 31st Street North, and south of County State Aid Highway 14 (Stillwater Blvd.) and the Union Pacific Railroad (UPRR). The City of Lake Elmo was approved to receive grant funding from the Minnesota Pollution Control Agency (MPCA) under the 2018 3M Settlement Agreement as an expedited project to extend municipal water and connect each of the six homes. The grant is in the amended not to exceed amount of $549,100. The terms of the grant are outlined in the Grant Agreement between the City of Lake Elmo and the MPCA dated October 2, 2019. The properties reside in an area where per- and polyfluoroalkyl substances (PFAS) contamination exceeds Health Based Values (HBVs) and well advisories have been issued. Plans for the improvements were approved by the City on March 17, 2020. The project design connected to the public watermain on the north side of County State Aid Highway 14 (Stillwater Boulevard) and extended south, having to jack and case the watermain under both Stillwater Blvd and the UPRR. At the August 4, 2020 council meeting, the council approved the Union Pacific Railroad agreements and permits that were required by the railroad for crossing their right-of-way. These permits required the city to retain the services of Rail Pros for construction observation during the construction process, costing an estimated additional $52,000. PROPOSAL DETAILS/ANALYSIS: Due to the added railroad crossing construction and inspection costs, staff conducted a value engineering investigation to determine a lower cost watermain alignment. This value engineering exercise resulted in staff recommending that the watermain be routed differently to reduce overall project costs and to provide a better long-term location for the public watermain. In order to make this change, staff completed a redesign for a portion of the project, negotiated contract pricing with the contractor, identified and cleared permitting requirements, and negotiated four additional permanent drainage and utility easements over the revised alignment. Once the change order is approved by the city council, the four property owners will have until September 18, 2020 to provide signed and notarized easement agreements as prepared by the City Attorney’s office for the redesign to move forward. Miller Excavating, Inc. has submitted a change order to amend the contract at the direction of the City. This change order revises the watermain alignment to connect to existing watermain at 31st Street North in lieu of crossing County State Aid Highway 14 (Stillwater Blvd) and the Union Pacific Railroad (see attached exhibit). This change order also revises the substantial completion date for the project from September 25, 2020 to October 31, 2020. The final completion date of November 13, 2020, remains unchanged. FISCAL IMPACT: This change order will decrease the construction contract with Miller Excavating, Inc. in the amount of $56,919.12, bringing the revised construction contract to $275,374.21. Overall, the total project costs are estimated to be reduced by $88,700 as follows: • Construction costs: -$56,919.12 • Railroad crossing costs: -$52,000.00 • Easement Acquisition costs: +$20,161.00 RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for the 31st Street & Stillwater Boulevard Watermain Improvements, contingent upon receipt, by end of day September 18, 2020 of all four fully executed additional drainage and utility easements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the 31st Street & Stillwater Boulevard Watermain Improvements, thereby decreasing the contract amount by $56,919.12, contingent upon receipt, by end of day September 18, 2020 of all four fully executed additional drainage and utility easements”. ATTACHMENTS: 1. Exhibit for Watermain Redesign. 2. Change Order No. 1. IVB C B C P C P P C G-BG-BG-BG-BG-BG-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BOEOEOEOEOEOEOEOEOEOEOEOEOEOEG-B C-B C-B C-B C-B G-B G-B G-B C-B C-B C-B C-B C-B C-B EG-B G-B G-B G-BG-BG-BG-BG-BG-BG-B G-BXXC-B C-B C-BC-BC-BC-BC-BF-B F-B G-BG-BG-BG-BG-BG-BG-BG-B>> >>OEOEOEOEOE llllllOEOEOEOEOEOEOE>>F-D F-D F-D F-D G Gl OE OE OE G-D G-D G-D C-D C-D C-D IVB C B C P C P P C G-BG-BG-BG-BG-BG-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BOEOEOEOEOEOEOEOEOEOEOEOEOEOEG-B C-B C-B C-B C-B G-B G-B G-B C-B C-B C-B C-B C-B C-B EG-B G-B G-B G-BG-BG-BG-BG-BG-BG-B G-BXXC-B C-B C-BC-BC-BC-BC-BF-B F-B G-BG-BG-BG-BG-BG-BG-BG-B>> >>OEOEOEOEOE llllllOEOEOEOEOEOEOE>>F-D F-D F-D F-D G Gl OE OE OE G-D G-D G-D C-D C-D C-D 9523 9447 9419 9517 Shared Private DrivewayStillwater Blvd (CSAH 14) UP Railroad 31st Str e e t N Johquil Ave Nlllllllllllllllllllllllllllllllll15'PROPOSED 10" WATERMAIN ALTERNATE ROUTE 9345 9343 PROPOSED 10" WATERMAIN l l l l l ll l ll ll l l l l l l l l l l l l l l l l l l l 15'30'PROPOSED PERMANENT EASEMENT l llll l 10'5'15'H:\LKELMN\N17119981\CAD\C3D\FIGR-119981 Water Connection3.dwg 8/3/2020 9:21:55 AMR 31st Street-Stillwater Blvd Watermain Extension - Alternate Route City of Lake Elmo Figure 1C August 2020 R FEETSCALE 0 50 100 HORZ. 9-9-2020 CHANGE ORDER NO. 1 31ST STREET ‐ STILLWATER BLVD WATERMAIN EXTENSION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2019.124 QUANTITY UNIT PRICE AMOUNT CO1‐1 EA 1 $4,938.27 $4,938.27 CO1‐2 EA 1 $1,823.25 $1,823.25 CO1‐3 EA 1 $4,614.58 $4,614.58 CO1‐4 EA 1 $388.54 $388.54 CO1‐5 LF 13 $63.75 $828.75 CO1‐6 LF ‐20 $134.44 ‐$2,688.80 CO1‐7 LF 75 $134.44 $10,083.00 CO1‐8 LF 930 $61.80 $57,474.00 CO1‐9 LS ‐1 $24,163.60 ‐$24,163.60 CO1‐10 LF ‐216 $36.81 ‐$7,950.96 CO1‐11 LF ‐216 $563.02 ‐$121,612.32 CO1‐12 LS 1 $9,105.00 $9,105.00 CO1‐13 EA ‐2 $2,931.17 ‐$5,862.34 CO1‐14 LBS 350 $10.64 $3,724.00 CO1‐15 EA 2 $342.16 $684.32 CO1‐16 EA ‐1 $198.61 ‐$198.61 CO1‐17 SY 50 $15.23 $761.50 CO1‐18 SY 120 $4.00 $480.00 CO1‐19 CY 40 $16.75 $670.00 CO1‐20 TN 80 $31.55 $2,524.00 CO1‐21 TN 30 $208.20 $6,246.00 CO1‐22 GAL 10 $2.00 $20.00 CO1‐23 CY 10 $54.73 $547.30 CO1‐24 SY 50 $3.52 $176.00 CO1‐25 LF 100 $4.69 $469.00 TOTAL ‐ CHANGE ORDER NO. 1 ‐$56,919.12 HYDRANT 6" GATE VALVE & BOX 12" GATE VALVE & BOX VALVE BOX EXTENSION Revise watermain alignment to connect to existing watermain at 31st  Street in lieu of crossing CSAH 14 (Stillwater Blvd) and the Union Pacific  Railroad. DUCTILE IRON FITTINGS 6" DIP, CL. 52 WATER MAIN 12" DIP, CL. 52 WATER MAIN 12" DIP, CL. 52 WATER MAIN 10" HDPE WATERMAIN, DIRECTIONAL DRILL BORING PITS TUNNEL OBSTRUCTION 8" DIP, CL. 52 WATERMAIN (IN CASING) 30" MIN. STEEL CASING (TRENCHLESS) 30" STEEL CASING RESTOCKING FEE 10" HDPE TO 8" DIP TRANSITION FITTING DESCRIPTION / JUSTIFICATIONITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER SALVAGE AND REINSTALL MAILBOX REMOVE AND REPLACE GRAVEL STREET REMOVE BITUMINOUS PAVEMENT ‐ STREET PATCH COMMON EXCAVATION (EV) ‐ STREET PATCH AGGREGATE BASE CLASS 6 ‐ STREET PATCH BITUMINOUS PAVEMENT SPWEB340B ‐ STREET PATCH BITUMINOUS TACK COAT TOPSOIL BORROW (CV) SEED & EROSION CONTROL BLANKET SILT FENCE, MACHINE SLICED 9517 Shared Private Driveway UP RailroadBCCPPCG-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B OE OE OE OE OE OE OE OE OE OE OE OE OE OE G-BG-BC-BC-BC-BC-BC-BC-BG-BG-BG-BG-BG-BG-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BC-BEEEG-BG-BG-BG-BG-BG-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-BG-BC-BC-BC-BC-B C-B C-B C-B C-B C-B C-B C- B C- B C-B F-BF-BF-BF-BF-BG-B G-B G-B G-B >>>>>>OEOEOEOEOEllllllOE OE OE OE OE OE OE OE OE OE OE OE OE OE >>>>F-DF-DF-DF-DF-DF-DF-DGGRAILROAD TRACKSl lOEOEOEOEOEOEG-DG-DG-DG-DG-DG-DC-DC-DC-DC-DC-DC-D1+50 2+00 3+00 4+00 5+00 l l l l l l ll l l l l l l l l l l l l lllllll29+0029+99.70Stillwater Blvd. (CSAH 14)EX 12" DIP WMNEDGE OF FIELD (TYP.) EXISTING GRAVEL DRIVEWAY. MAINTAIN MINIMUM ONE LANE OF TRAFFIC AT ALL TIMES UP RAILROAD TRACKS 8" X 8" TEE 8" GV & BOX (SOUTH) 8" X 6" REDUCER (EAST) 7' - 6" DIP 6" GV & BOX HYD @ ELEV 927.5 10" HDPE TO 8" DIP TRANSITION FITTING (2) PROPOSED 30' UTILITY EASEMENT SB-1 SB-1A SB-2 SB-2A SB-3A SB-3 100' UPRR R/W 44' NO CONSTRUCTION ALLOWED WITHIN RAILROAD R/W 919.4921.61+50 927.8925.22+00 924.9917.07924.82+50 916.29924.1915.49923.83+00 914.69922.6913.89920.93+50 913.09920.3912.31919.74+00 911.49919.0910.72918.24+50 910.54918.3910.58918.15+00 910.75918.4911.20918.65+50 911.89919.45 9 31 18 27 5 15 CL SM SP 'N'B-3A 50/.5 6 5 4 SP 'N'B-2 14 12 35 41 'N'B-3 EXISTING GROUND EXISTING PROFILE OVER PIPE PROPOSED TOP OF WATERMAIN DIRECTION A L D R I L L 1 0 " H D P E D I P S D R 1 1 W A T E R M A I N UP RAILROAD TRACKS 7.5' MIN. 100' UP RR ROW 895 900 905 910 915 920 925 930 935 940 895 900 905 910 915 920 925 930 935 940 SHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2020, All Rights ReservedcH:\LKELMN\N17119981\CAD\C3D\119981C401.dwg 9/9/2020 10:11:55 AMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 2035 COUNTY ROAD D EAST MAPLEWOOD, MINNESOTA 55109 Phone: (651) 704-9970 Email: Maplewood@bolton-menk.com www.bolton-menk.comMICHAEL R. WARNER 44693 04/01/2020 LAKE ELMO, MINNESOTA 31ST STREET - STILLWATER BLVD WATERMAIN EXTENSION MRW ICB MRW 2019.124 BID 04/01/2020 0 CON 06/04/2020 1 CO 1 09/09/2020 RWATERMAIN PLAN & PROFILE C4.01 WATERMAIN NOTES: 1.FINAL SERVICE LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE ENGINEER 2.CONTRACTOR SHALL MINIMIZE THE PIT DIMENSIONS AND THE AREA DISTURBED. 3.PITS FOR THE MAINLINE DRILLING SHALL BE PLACED AT LOCATIONS CORRESPONDING TO VALVE, HYDRANT, OR SERVICE LOCATIONS TO MINIMIZE THE NUMBER OF PITS AND DISTURBANCE AREA. 4.PROTECT TREES, UNLESS NOTED OTHERWISE. 5.PROTECT ROADWAY PAVEMENT AND DRIVEWAYS, UNLESS NOTED OTHERWISE. REMOVE AND REPLACE AGGREGATE SURFACING AT SERVICE CROSSINGS WITH AGGREGATE SURFACING, CL 2. 6.PROTECT CULVERTS, UNLESS NOTED OTHERWISE. 7.HYDRANT ELEVATIONS SHOWN ARE TO TOP NUT. 8.CONSTRUCT TRIVIEW TEST STATION MARKER AT ALL 10" VALVES. 9.WATERMAIN OVERDEPTH SHALL BE CONSIDERED INCIDENTAL SEE SHEETC4.02FEETSCALE 0 25 50 HORZ. FEETSCALE 0 5 10 VERT. SEE SHEET C4.05 9523 9521 9419 9517 CCIVBCBC-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-BOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE G-B G-B G-B G-B G-BG-BG-BG-BXXXXXXG-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-B G-BE-BE-BShared Private Driveway 6+00 7+00 8+00 9+00 9+47.53 10+0011+00lll l l lllllll ll l l l l l l l l l l l l l l l l l l l l l l l llllllll8"x6" TEE 6" GV & BOX 7' - 6" DIP HYD @ ELEV - 922.1 2 - 10" HDPE TO 8" DIP TRANSITION FITTINGS 39' - 1" COPPER WATER SERVICE 1" CORPORATION STOP W/ SADDLE 1" CURB STOP & BOX 30' - 1" COPPER WATER SERVICE 1" CORPORATION STOP W/ SADDLE 1" CURB STOP & BOX 40' - 1" COPPER WATER SERVICE 1" CORPORATION STOP (OFF 8" DIP) 1" CURB STOP & BOX 8" GV & BOX 8"x8" TEE 10" HDPE TO 8" DIP TRANSITION FITTING 10' - 8" DIP 8"x6" REDUCER 6" GV & BOX 5' - 6" DIP HYD @ ELEV - 932.5' 18' - 1" COPPER WATER SERVICE 1" CORPORATION STOP (OFF 8" DIP) 1" CURB STOP & BOX EXISTING GRAVEL DRIVEWAY. MAINTAIN MINIMUM ONE LANE OF TRAFFIC AT ALL TIMES. SALVAGE & REINSTALL FENCE (INCIDENTAL) 3 - 10" HDPE TO 8" DIP TRANSITION FITTING 4' - 8" DIP (NORTH) 4' - 8" DIP (SOUTH) 4' - 8" DIP (WEST) EDGE OF FIELD PROPOSED 30' UTILITY EASEMENT PROPOSED 30' UTILITY EASEMENT 911.89919.4912.73920.26+00 913.75921.3915.29922.86+50 917.06924.6918.61926.27+00 919.54927.1919.73927.27+50 919.87927.2920.28927.78+00 921.09928.6921.99930.08+50 922.24930.5922.26931.09+00 922.25930.49+50 8 5 12 4 SP ML SP 'N'B-4 DIRECTIONAL DRILL 10" HDPE DIPS DR 11 WATERMAIN EXISTING GROUND EXISTING PROFILE OVER PIPE 7.5' MIN. PROPOSED TOP OF WATERMAIN 895 900 905 910 915 920 925 930 935 895 900 905 910 915 920 925 930 935 940 SHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2020, All Rights ReservedcH:\LKELMN\N17119981\CAD\C3D\119981C401.dwg 9/9/2020 10:12:52 AMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 2035 COUNTY ROAD D EAST MAPLEWOOD, MINNESOTA 55109 Phone: (651) 704-9970 Email: Maplewood@bolton-menk.com www.bolton-menk.comMICHAEL R. WARNER 44693 04/01/2020 LAKE ELMO, MINNESOTA 31ST STREET - STILLWATER BLVD WATERMAIN EXTENSION MRW ICB MRW 2019.124 BID 04/01/2020 0 CON 06/04/2020 1 CO 1 09/09/2020 RWATERMAIN PLAN & PROFILE C4.02 WATERMAINSEE SHEETC4.01SEE SHEET C4.03 FEETSCALE 0 25 50 HORZ. FEETSCALE 0 5 10 VERT. NOTES: 1.FINAL SERVICE LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE ENGINEER 2.CONTRACTOR SHALL MINIMIZE THE PIT DIMENSIONS AND THE AREA DISTURBED. 3.PITS FOR THE MAINLINE DRILLING SHALL BE PLACED AT LOCATIONS CORRESPONDING TO VALVE, HYDRANT, OR SERVICE LOCATIONS TO MINIMIZE THE NUMBER OF PITS AND DISTURBANCE AREA. 4.PROTECT TREES, UNLESS NOTED OTHERWISE. 5.PROTECT ROADWAY PAVEMENT AND DRIVEWAYS, UNLESS NOTED OTHERWISE. REMOVE AND REPLACE AGGREGATE SURFACING AT SERVICE CROSSINGS WITH AGGREGATE SURFACING, CL 2. 6.PROTECT CULVERTS, UNLESS NOTED OTHERWISE. 7.HYDRANT ELEVATIONS SHOWN ARE TO TOP NUT. 8.CONSTRUCT TRIVIEW TEST STATION MARKER AT ALL 10" VALVES. 9.WATERMAIN OVERDEPTH SHALL BE CONSIDERED INCIDENTAL CO CO COCO CO OE OE OE OE OE OUOUOUll ll l ll l l l llllOE OE OE OE OEOEOEOEOERAILROAD TRACKS l l l l l G-D G-Dlll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll19+5020+0021+00 22+00 23+00 24+00 25+00 26+00 CONNECT TO EXISTING 12" X 6" TEE 12" GV & BOX 12" - 45° BENDS 12" - 45° BEND 10' - 12" DIP (EAST) 12" X 10" REDUCER REMOVE AND PATCH BITUMINOUS PAVEMENT. MATCH EXISTING BITUMINOUS AND AGGREGATE BASE SECTION.100' UPRR R/WNO CONSTRUCTION ALLOWED BEYOND RAILROAD R/W NO CONSTRUCTION ALLOWED 31st Str e e t N UP Railroad 30' PERMANENTUTILITY EASEMENTEX 12" HDPE WATERMAIN PROTECT UTILITY POLE PROTECT SEPTIC SYSTEM. WATERMAIN TO BE CONSTRUCTED 10' (MIN.) FROM ABSORPTION AREA.10'15'19+50 916.16924.120+00 916.65925.4916.79926.520+50 916.69926.1916.57925.321+00 916.32925.1916.10924.821+50 915.70924.0914.79922.822+00 913.17920.8911.32918.822+50 909.95917.4908.5523+00 907.29906.0323+50 904.83904.1224+00 903.89903.8724+50 903.88903.8925+00 903.90903.9125+50 903.92EXISTING GROUND PROPOSED TOP OF WATERMAIN 7.5' MIN. DIRECTI O N A L D R I L L 1 0 " H D P E D I P S D R 1 1 W A T E R M A I N 12" DIP WM EXISTING PROFILE OVER PIPE EX 12" HDPE WM 890 895 900 905 910 915 920 925 930 935 890 895 900 905 910 915 920 925 930 935 SHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2020, All Rights ReservedcH:\LKELMN\N17119981\CAD\C3D\119981C401.dwg 9/9/2020 11:27:10 AMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 2035 COUNTY ROAD D EAST MAPLEWOOD, MINNESOTA 55109 Phone: (651) 704-9970 Email: Maplewood@bolton-menk.com www.bolton-menk.comMICHAEL R. WARNER 44693 04/01/2020 LAKE ELMO, MINNESOTA 31ST STREET - STILLWATER BLVD WATERMAIN EXTENSION MRW ICB MRW 2019.124 BID 04/01/2020 0 CON 06/04/2020 1 CO 1 09/09/2020 R WATERMAIN PLAN & PROFILE C4.04 WATERMAIN SEE SHEETC4.05FEETSCALE 0 25 50 HORZ. FEETSCALE 0 5 10 VERT. NOTES: 1.FINAL SERVICE LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE ENGINEER 2.CONTRACTOR SHALL MINIMIZE THE PIT DIMENSIONS AND THE AREA DISTURBED. 3.PITS FOR THE MAINLINE DRILLING SHALL BE PLACED AT LOCATIONS CORRESPONDING TO VALVE, HYDRANT, OR SERVICE LOCATIONS TO MINIMIZE THE NUMBER OF PITS AND DISTURBANCE AREA. 4.PROTECT TREES, UNLESS NOTED OTHERWISE. 5.PROTECT ROADWAY PAVEMENT AND DRIVEWAYS, UNLESS NOTED OTHERWISE. REMOVE AND REPLACE AGGREGATE SURFACING AT SERVICE CROSSINGS WITH AGGREGATE SURFACING, CL 2. 6.PROTECT CULVERTS, UNLESS NOTED OTHERWISE. 7.HYDRANT ELEVATIONS SHOWN ARE TO TOP NUT. 8.CONSTRUCT TRIVIEW TEST STATION MARKER AT ALL 10" VALVES. 9.WATERMAIN OVERDEPTH SHALL BE CONSIDERED INCIDENTAL UP Railroad P C G-BG-BG-BG-BG-BC-BC-BC-BC-BC-BC-BC-BC-BOEOEOEOEG-B G-B G-B G-B G-B G-B G-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B C-B EEEG-BG-BG-BG-BG-BG-BG-BG-B G-BC-BC-BC-BC-BC-BF-B F-B F-B F-B F-BOEOEOEOE OEOEOEOEOE>>>>F-D F-D F-D F-D F-D F-D F-D F-D G G RAILROAD TRACKS 1+502+003+00llllll ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l 25+00 26+00 27+00 28+00 29+00 29+99.70SB-2SB-3ASB-3100' UPRR R/WHYD @ ELEV 915.5 (FIELD VERIFY)30' PERMANENTUTILITY EASEMENTNO CONSTRUCTION ALLOWED BEYOND RAILROAD R/W 15'903.90903.9125+50 903.92903.9326+00 903.99904.0726+50 904.15904.3327+00 904.79905.2827+50 905.74906.2628+00 906.87908.1728+50 911.20914.40922.029+00 916.29924.0916.97924.629+50 917.17924.730+00 EXISTING GROUND PROPOSED TOP OF WATERMAIN 7.5' MIN. DIRECTIONAL DRILL 10" H D P E D I P S D R 1 1 W A T E R M A I N EXISTING PROFILE OVER PIPE 890 895 900 905 910 915 920 925 930 935 890 895 900 905 910 915 920 925 930 935 SHEET DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Bolton & Menk, Inc. 2020, All Rights ReservedcH:\LKELMN\N17119981\CAD\C3D\119981C401.dwg 9/9/2020 10:14:43 AMDESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO. R 2035 COUNTY ROAD D EAST MAPLEWOOD, MINNESOTA 55109 Phone: (651) 704-9970 Email: Maplewood@bolton-menk.com www.bolton-menk.comMICHAEL R. WARNER 44693 04/01/2020 LAKE ELMO, MINNESOTA 31ST STREET - STILLWATER BLVD WATERMAIN EXTENSION MRW ICB MRW 2019.124 BID 04/01/2020 0 CON 06/04/2020 1 CO 1 09/09/2020 R WATERMAIN PLAN & PROFILE C4.05 WATERMAINSEE SHEETC4.04FEETSCALE 0 25 50 HORZ. FEETSCALE 0 5 10 VERT. NOTES: 1.FINAL SERVICE LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE ENGINEER 2.CONTRACTOR SHALL MINIMIZE THE PIT DIMENSIONS AND THE AREA DISTURBED. 3.PITS FOR THE MAINLINE DRILLING SHALL BE PLACED AT LOCATIONS CORRESPONDING TO VALVE, HYDRANT, OR SERVICE LOCATIONS TO MINIMIZE THE NUMBER OF PITS AND DISTURBANCE AREA. 4.PROTECT TREES, UNLESS NOTED OTHERWISE. 5.PROTECT ROADWAY PAVEMENT AND DRIVEWAYS, UNLESS NOTED OTHERWISE. REMOVE AND REPLACE AGGREGATE SURFACING AT SERVICE CROSSINGS WITH AGGREGATE SURFACING, CL 2. 6.PROTECT CULVERTS, UNLESS NOTED OTHERWISE. 7.HYDRANT ELEVATIONS SHOWN ARE TO TOP NUT. 8.CONSTRUCT TRIVIEW TEST STATION MARKER AT ALL 10" VALVES. 9.WATERMAIN OVERDEPTH SHALL BE CONSIDERED INCIDENTALSEE SHEETC4.01