Loading...
HomeMy WebLinkAbout#14 - Pay Request No. 1 for the Hamlet on Sunfish Lake Sanitary Sewer Extension STAFF REPORT DATE: September 15, 2020 CONSENT AGENDA ITEM: Approve Pay Request No. 1 for the Hamlet on Sunfish Lake Sanitary Sewer Extension SUBMITTED BY: Mark Scholle, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the Hamlet on Sunfish Lake Sanitary Sewer Extension? BACKGROUND: A-1 Excavating, Inc. was awarded a construction contract on July 7, 2020 to complete the Hamlet on Sunfish Lake Sanitary Sewer Extension. Work remains in progress with a substantial completion date of October 9, 2020 and final completion date of November 20, 2020. The contractor has successfully met the interim milestone deadline to have the neighborhood connected to city sanitary sewer by August 31, 2020. Work remaining includes the private wastewater treatment system decommissioning and restoration. PROPOSAL DETAILS/ANALYSIS: A-1 Excavating, Inc. has submitted Partial Pay Request No. 1 in the amount of $115,011.75. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $6,053.25. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 for the Hamlet on Sunfish Lake Sanitary Sewer Extension. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 to A-1 Excavating, Inc. in the amount of $115,011.75 for the Hamlet on Sunfish Lake Sanitary Sewer Extension”. ATTACHMENTS: 1. Partial Pay Estimate No. 1 9-8-2020 PARTIAL PAY ESTIMATE NO. 1 HAMLET ON SUNFISH LAKE SANITARY SEWER EXTENSION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2018.128 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $24,500.00 $24,500.00 0.75 $18,375.00 0.75 $18,375.00 2 LS 1 $1,500.00 $1,500.00 0.00 $0.00 0.00 $0.00 3 LF 656 $3.00 $1,968.00 0.00 $0.00 0.00 $0.00 4 EA 1 $140.00 $140.00 0.00 $0.00 0.00 $0.00 5 EA 1 $700.00 $700.00 0.00 $0.00 0.00 $0.00 6 LS 1 $3,500.00 $3,500.00 1.00 $3,500.00 1.00 $3,500.00 7 LF 20 $5.00 $100.00 32.00 $160.00 32.00 $160.00 8 SY 33 $10.00 $330.00 37.00 $370.00 37.00 $370.00 9 TN 20 $35.00 $700.00 0.00 $0.00 0.00 $0.00 10 TN 10 $300.00 $3,000.00 0.00 $0.00 0.00 $0.00 11 EA 2 $6,350.00 $12,700.00 2.00 $12,700.00 2.00 $12,700.00 12 LF 280 $72.00 $20,160.00 280.00 $20,160.00 280.00 $20,160.00 13 LF 130 $110.00 $14,300.00 95.00 $10,450.00 95.00 $10,450.00 14 EA 3 $7,600.00 $22,800.00 3.00 $22,800.00 3.00 $22,800.00 15 EA 2 $400.00 $800.00 2.00 $800.00 2.00 $800.00 16 EA 3 $200.00 $600.00 3.00 $600.00 3.00 $600.00 17 HR 5 $325.00 $1,625.00 2.00 $650.00 2.00 $650.00 18 LS 1 $3,500.00 $3,500.00 0.00 $0.00 0.00 $0.00 19 LF 410 $3.00 $1,230.00 0.00 $0.00 0.00 $0.00 20 SY 2349 $3.00 $7,047.00 0.00 $0.00 0.00 $0.00 21 SY 2349 $1.00 $2,349.00 0.00 $0.00 0.00 $0.00 22 SY 2349 $2.00 $4,698.00 0.00 $0.00 0.00 $0.00 23 LS 1 $2,000.00 $2,000.00 1.00 $2,000.00 1.00 $2,000.00 24 LS 1 $1,500.00 $1,500.00 1.00 $1,500.00 1.00 $1,500.00 25 EA 12 $1,000.00 $12,000.00 6.00 $6,000.00 6.00 $6,000.00 26 LS 1 $6,200.00 $6,200.00 1.00 $6,200.00 1.00 $6,200.00 27 EA 5 $2,500.00 $12,500.00 4.00 $10,000.00 4.00 $10,000.00 28 EA 8 $600.00 $4,800.00 8.00 $4,800.00 8.00 $4,800.00 $167,247.00 $121,065.00 $121,065.00 29 LF -280 $72.00 -$20,160.00 0.00 $0.00 0.00 $0.00 30 LF 280 $60.00 $16,800.00 0.00 $0.00 0.00 $0.00 31 LF 470 $3.00 $1,410.00 0.00 $0.00 0.00 $0.00 32 SY 850 $1.00 $850.00 0.00 $0.00 0.00 $0.00 33 SY 425 $2.00 $850.00 0.00 $0.00 0.00 $0.00 -$250.00 $0.00 $0.00 TOTALS - BASE CONTRACT $167,247.00 $121,065.00 $121,065.00 SANITARY SEWER PUMPING WETLAND TREATMENT POND TELEVISING SALVAGE AND RE-SPREAD TOPSOIL SEEDING, FERTILIZER, MULCH EROSION CONTROL BLANKET DISCONNECT, REMOVE & SALVAGE ALL CONTROL PANELS AND EQUIPMENT TO HOA SALVAGE PUMPS, TABLET CHLORINATOR & USEABLE APPURTENANCES TO HOA DISCONNECT, REMOVE PIPE, CAP BULKHEAD END OF PIPE REMOVE, SALVAGE AND REPLACE FENCE ABANDON SEPTIC STRUCTURES PER STATUTE 7080.2500 REMOVE PVC STANDPIPES & PERFORATE POND LINER SEWER ALTERNATE 1 SCHEDULE A (DELETE SCH-A ITEM 11) 12" HDPE SANITARY SEWER, DR11, HDD 10" PVC SANITARY SEWER, PVC SDR 35, 0-20' DEPTH, OPEN CUT SILT FENCE SEEDING, FERTILIZER, MULCH EROSION CONTROL BLANKET SEWER ALTERNATE 1 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE SCHEDULE A MOBILIZATION TYPE SP 9.5 BITUMINOUS WEARING COURSE (SPWEA230C) CONNECT TO EXISTING SANITARY SEWER 12" HDPE SANITARY SEWER, DR11, HDD TRAFFIC CONTROL SILT FENCE BIOROLL DITCH CHECK TEMPORARY ROCK CONSTRUCTION ENTRANCE CLEARING, GRUBBING, TREE REMOVAL SAWCUT PAVEMENT (ALL TYPES) REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT CLASS 6, AGGREGATE BASE, 100% CRUSHED LIMESTONE 10" PVC SANITARY SEWER, SDR 35, 0-20' DEPTH 4' DIAMETER SANITARY SEWER MANHOLE (ALL DEPTHS) 10" 45 DEGREE BEND SDR 35 PVC TRACER WIRE SNAKE PITS (OFF ROAD STRUCTURES) EXPLORATORY DIGGING