HomeMy WebLinkAboutOct. 27th 2009 council packet CITY nF
L�'K t
Ib����
'I ' of Lake651/777-5510
' 3800 Laverne Avenue North / Lake Elmo, MN 55042
City of Lake Elmo
City Council Workshop
3 800 Laverne Avenue North
Lake Elmo, MN 55042
October 27, 2009
6:30 — 8:30 p.m. (`?)
1. Agenda
2. Concept Plan of Senior Living Facility/Farm School
— Tammy Malmquist
3. Wireless Telecommunication Ordinance —Planning Director
4. Discussion on Proposed General Fund Budget and Proposed
Enterprise Fund Budgets — City Administrator/Finance Director
5. November 4, 2009 (Wed.) City Council Meeting—Meeting date
change due to November 3rd election day
6. Adjourn
14,
%J ;hinted on recycled paper
City Council
Date: 10/27/09
WORKSHOP
Item: 2
INFORMATION:
AGENDA ITEM: Requested Concept-Level Review of Proposed Development
SUBMITTED BY: Tammy Malmquist,Resident&Proposed Developer
THROUGH: Bruce A Messelt,City Administratol
REVIEWED BY: Dave Snyder, City Attorney
SUMMARY AND ACTION REQUESTED:
This item has been scheduled at the request of a potential applicant for a new development.
Council is being asked to allow a brief"Concept-level"presentation by the potential applicant
and then direct the applicant to continue work with City staff on all subsequent formal proposal,
application, .review and final decision-making process steps.
Ms. Tammy Malmquist, the Potential Developer, has requested time to present to the City
Council a concept-level layout of a proposed co-operative development comprised of age-based
housing and a "farm based pre-school." Attached for Council review is Ms. Malmquist's letter
of introduction and concept-level layout.
STAFF REPORT:
Your City Attorney and City Administrator believe such concept-level presentations to the City
Council and Planning Commission are valid and an important part of the initial vetting process
for certain development proposals. Many cities allow such presentations, with specific
guidelines as to threshold (type of development proposed) for such presentations, length of
presentation and discussion period, and limitations and clear understandings by both the
presenter and Governing/Advisory Body that such activities are neither binding nor in lieu of(or
a required addition to) the regular application, review and decision-making process established
by state law and City ordinance,policies and procedures.
Such concept-level presentations do not replace the normal, legal process established for
application, review and final approval/denial. As such, the City Council and/or Planning
Commission should not, as a body or via individual members, snake any comments or
suggestions or establish conditions that could be construed as a binding commitment or
obligation,
--page 1 --
City Council Workshop Requested Concept-Level Review of Proposed Development
October 27t',2009 Agenda Item#2
k
I
I
ADDITIONAL INFORMATION:
With respect to the City's overall approach to allowing such concept-level presentations, it is
recommended that the following guidelines be followed tonight (and accepted as acceptable
procedures for future presentations):
• Threshold for Allowable Concept-level Presentations: Those proposals requiring
Comprehensive Plan Amendments, major changes in Zoning or the Zoning Code, or
major City involvement or participation, especially with respect to infrastructure or
financial contributions. Of note: Proposed platted subdivisions already come before the
City Council and Planning Commission as part of their formal application process;
• Length of Presentation: It is recommended that the Potential Developer/Applicant be
afforded no more than 10 minutes for presentation, plus no more than an additional 5
minutes for Council questions and/or discussion. Any longer period of time and such
presentations will be consumptive of valuable time and get into details and issues that
should be addressed during the formal application, review and decision-making process.
• Limitations on Type and Scope of Discussion: It is recommended that the City
Attorney (or City Staff/Chair at the Planning Commission) begin each and every such
presentation with an oral explanation of the purpose and scope of the Agenda Item and
the limitations to which any discussion and/or comments can be interpreted by the
Presenter/Applicant and/or City Council or Planning Commission (or its individual
members) as binding or formal in nature.
o The Presenter/Applicant should be asked to acknowledge this orally on the
record;
o The City Council and Planning Commission should refrain from providing
specific direction and, rather, keep their comments and questions general, open-
ended, inquisitive or suggestive in nature;
o The Mayor and City Attorney should closely monitor all discussion, reiterate the
non-binding, non-committal nature of the presentation, and refer the
Presenter/Applicant to City staff for any further follow-up or formal application.
Of note: The Presenter is in relationship with a current City Employee. The City Attorney and
City Administrator have determined that there is no current conflict of interest (actual), though
the perception of one may exist. As a result, Council is hereby duly informed of this and advised
that the City employee will play no role in the application, review or decision-making process for
this proposed development, should it proceed, If necessary, alternative arrangements will be
made to ensure critical review that would normally be provided by this employee.
--page 2--
City Council Workshop Requested Concept-Level Review of Proposed Development
October 27t,2009 Agenda Item#2
ATTACHMENTS:
Material provided by Mr. Malmquist.
ORDER OF BUSINESS:
- Introduction..................................................Bruce Messelt, City Administrator
- Ground Rules..........................................................Dave Snyder, City Attorney
- Presentation(10 minutes max).............................................Presenter/Applicant
- Questions &Discussion (5 minutes max)...............Mayor& Council Members
- Thanks and Closing Reiteration.....................................Mayor&City Attorney
--page 3 --
October 1, 2009
Mr. Mayor and Council Members,
Attached please find a concept layout showing a co-op comprised of housing for clients ages 55+along
with a farm based preschool. This concept focuses on the benefits of children aqd seniors working.
together.Side by side,residents and children will share farming experiences while fostering an
appreciation of intergenerational experiences.
Throughout the design process, I have worked hard to preserve natural beauty of the site, which
includes several farm buildings and an Oak Savannah.Thconcept also maintains the rural feel of Lake
Elmo with community farms,front porches and buildings,sto as a one room schoolhouse,that have a
small town feel,As this is a multi-use concept,and it appears as though a PUD or RAD2 may work, I am
looking for Input from the Council before moving forwar4:
As a long time resident of Lake Elmo, I appreciate the uniqueness of our town. I recognize that we
currently have no life cycle housing options to offer our life long residents. I believe my concept will
provide an opportunity for these residents to not only remain in our community,but to have an
engaged,active environment that will promote lifelong learning. i look forward to your assistance In
making my concept become yet another unique part of Lake Elmo that we can all be proud of.
Sincerely,
Tammy Malmquist
j'FRIEMEWED
OCT ~ 19
CITY OF LAKE ELMo
• • • Folz, Freeman, Erickson, Inc.
Farm School & Senior Living UNDPLANNING • SURVEYING • ENGINEERING
H 12445 55TH STREET NORTH
Lake Elmo, Minnesota p s STII,LWATERIMINNx(651) 55081
9 Phone(651)439.8633 Fax(651)430.9331
Concept Layout
N
W O E
--------------------------------
- ORIGINAL SCALE
INCH=E0 FEET
0 40 BIG 150
SCALE IN FEET
' `/ r r `•
a
r
3 2 1 --- —,r
H I EIGHTS - r
1 _f
r 3 .�
6
- -,►�,- 3a -;jam �� -
V,A4pNo.09—I05 TAMMY MALMQUIST-LAKE ELMO,MINNESOTA-09/28/09 EXHMIT C
City Council
Date: 10/27/09
WORKSHOP
Item: 3
INFORMATION:
AGENDA ITEM: Proposed Revisions to the Wireless Communications Ordinance
SUBMITTED BY: Planning Commission
THROUGH: Bruce A Messelt, City Administrator�pa�
REVIEWED BY: Kyle Klatt, Planning Director
Dave Snyder, City Attorney
SUMMARY AND ACTION REQUESTED:
The Planning Commission, after a lengthy drafting and review process, has completed its review
of the proposed wireless communications ordinance update and has recommended approval of
the ordinance as revised and drafted. Prior to formal action by the Council on this ordinance,the
Council is being asked to review the draft document as part of its workshop on October 27, 2009
and provide direction, as appropriate, on preparation of theffinal ordinance revisions.
Garret Lysiak of Owl Engineering, the project consultant who was hired to assist with the
ordinance amendment,will be in attendance at the workshop to provide feedback and answer any
questions from the Council.
The following is a brief summary of the actions taken to date as it relates to the drafting of a
revised wireless communications ordinance:
• Jan 2009— 12 month moratorium adopted by the City Council
• 4/7/09—Selection of project consultant
• 6/10/09—Public Open House
7/13/09—Planning Commission update and review
• 7/14/09—City Council workshop and discussion
• 8/10/09—Planning Commission review
• 9/17/09—Review with wireless industry representatives
• 9/17/09—Second Public Open House
• 9/28/09—Public Hearing
• 10/14/09— Second Public Hearing
The Council is being provided with two versions of the ordinance: the first is a redlined draft
with all changes from the current ordinance marked, the second is a clean copy with all revision
formatting removed.
--page 1 --
4
City Council Workshop Proposed Revisions to the Wireless Communications Ordinance
October 27b,2009 Agenda Item#3
PLANNING COMMISSION REPORT:
The Planning Commission, in making its recommending, wanted to inform the Council that one
of its objectives in drafting the proposed ordinance was to increase opportunities for the City to
consider new tower proposals that could provide expanded coverage in areas that met the City's
preferred siting objectives. While the proposed ordinance does increase the number of potential
tower sites within the community, it also strives to clearly rank the City's preferred locations for
such facilities, require proper documentation that the need for a tower exists, and limit the
proliferation of towers by allowing the City to consider taller structures and to steer towers
towards locations with potentially lower impacts on residents. In cases where there is a
demonstrated need for service but limited options for concealing or minimizing the impact of a
tower, the City will be able to reject proposals on private property when a public site is available
within the proposed service area.
ADDITIONAL INFORMATION:
The most recent report that was submitted to the Planning Commission summarizing the contents
of the draft ordinance is attached for consideration by the City Council.
ATTACHMENTS:
1. Planning Commission Report—9/28/09
2. Wireless Communications Ordinance—Marked Version
3. Wireless Communications Ordinance—Clean Version
ORDER OF BUSINESS:
- Introduction..................................................Bruce Messelt, City Administrator
- Report/Presentation..............................................Kyle Klatt, Planning Director
- Questions&Direction from the Council................Mayor& Council Members
--page 2 --
City of Lake Elmo Planning Department
Wireless Communications Ordinance Amendment
To: Planning Commission
From: Kyle Klatt, Planning Director
Meeting Date: 9/28/09
IntroductoryIn ormation
Objective: The Planning Commission is being asked to review and hold a public hearing on
proposed revisions to the Wireless Communications Ordinance. The Commission
previously reviewed an earlier daft of the ordinance at its August 10, 2009 meeting,
and since this time, staff has completed the following:
• Incorporating comments from the Planning Commission, City Attorney, and
project consultant into the draft document.
• Meeting with wireless communications industry representatives and
incorporating revisions where appropriate into the draft ordinance based on
comments from this meeting.
• Conducting a second public open house to review the draft ordinance.
• Finalizing the draft ordinance for consideration at a public hearing.
Attached to this report are two versions of the draft ordinance,one of which
represents a fully-marked version with tracking of the various changes that have been
made, and a second which is a clean version of the proposed ordinance without any
tracking changes. A key is provided for the marked version to clarify when updates
were made.
Early this year,the Lake Elmo City Council adopted a moratorium on the
construction of new telecommunications towers within the City, and has previously
directed the Planning Department to work on an update to the existing wireless
communication tower ordinance during the moratorium period. The moratorium was
established until the end of 2009; however, the work plan that was approved by the
Council for the update project anticipated that the new ordinance would be adopted
well before the end of the year.
After the Planning Commission completes the public hearing process and makes a
recommendation on the proposed ordinance,next step will likely be a workshop
session with the City Council to review the final draft.
Open House I An open house related to the wireless communications ordinance update project was
Meetings: conducted on June 10, 2009 and was attended by six citizens and a representative
141irc,less C-oaarnuraicutiorls Ordinance Ainenclrf ent
Planning C�cn nmi.sion Report; 9-28-09
from the Minnesota Wireless Communications Association. The comments received
at this meeting can be summarized in general as follow:
• Residents spoke about the lack of coverage in certain portions of the City,
especially in the Tri-Lakes area,
• There was support for providing expanded service in Lake Elmo, even if it
means the construction of new towers.
• The citizens present expressed a preference for towers that support co-location
to help expand the options for service in the City.
• There was no specific preference stated for where towers should be located,
whether on public or private property.
• The residents in attendance did not express concern over the appearance of
new towers, and did not see a significant benefit to using techniques to
camouflage new towers.
Garret Lysiak of Owl Engineer was present at the open house to answer questions
from the public and will also be available at the Planning Commission meeting to
further discuss the drafting of a revised ordinance.
A second open house was conducted on September 17, 2009 and attended by three
residents in addition to the project consultant. In addition to a general discussion
concerning the proposed ordinance, a request was made to incorporate a reference in
the code back to the City's property maintenance standards. It was noted that under
the proposed ordinance, T-Mobile could submit a new application in the same area
and would be required to consider the fire station property as a priority site since it is
located on public land.
Prior to the public open house, staff 1-net with a group of wireless industry
representatives to consider feedback from the perspective of the wireless carriers. In
addition to suggesting some language changes,the Real Estate Manager for T-Mobile
submitted a letter documenting various concerns with the ordinance as written.
Where staff deemed it appropriate, changes to the ordinance were made as noted in
the marked version,
StafReview and Analysis
Ordinance The primary issue that the proposed ordinance tries to rectify from the current
Summary: ordinance is to establish a clear process for determining the need to new towers in the
community, This review would be conducted by an outside RF consultant working
on behalf of the City, and would help verify that a new facility would indeed be
necessary to provide adequate coverage in Lake Elmo. Other major changes can be
summarized as follows:
• Definitions have been added to clarify the terms used throughout the
ordinance.
Page 2
Gf%JreJess(:'or�ununicratanns(.:?F•�,Jirlart�c=Amenclnrc�nl
Planning Commission Repo . 9-28-09
• New towers are regulated as a Conditional Use Permit, while installations on
existing structures or in a similar low-impact situation can be approved with
only an administrative review.
• A list of all zoning districts is provided along with tower height and parcel
size requirements. New towers would now be permitted in commercial
zoning districts.
• A detailed ranking of preferred tower sites is provided, and new facilities can
only be approved when higher-ranked sites are considered first.
• Additional standards have been added related to the effects of towers on
surrounding property.
• A list of minimum conditions of approval for a new facility is provided and is
intended to clarify the expectations of the City while allowing some flexibility
to deal with site-specific issues.
The general structure of the ordinance has not changed much since the last Planning
Commission review, although a few sections have undergone modest revisions based
on the feedback that has been received to date. A new section pertaining to expert
review has been added as noted below. A quick summary of each section is noted as
follows:
o Purpose and Intent. This section has been modified by including some
additional language to clarify the overall purpose of the ordinance.
o Definitions. Since the terms used in the Wireless Communications Ordinance
do not show up in other section of the City Code, Staff is recommending that
they be included in this section instead of with the general City Code
definitions. A definition for"utility pole"is now included.
o Permit Requirements. This section breaks down the review process into two
separate actions, one of which requires a Conditional Use Permit(the
construction of a new tower) while the other can be reviewed and approved
administratively (co-location or construction on existing structures). The goal
of this two-tiered system is to encourage co-Iocation and reduce the demand
for new towers by making is much easier to locate facilities on existing
structures.
o Proof of Need. This new section requires that a wireless carrier provide
adequate documentation that a new tower site is needed before it can be
approved by the City. Under the proposed provisions,the City would obtain
much more information than was required under the previous ordinance in
order to establish need.
o Location Requirements and Site Ranking Analysis. This section provides clear
Pcs »
I�
E
kyhvless Conw acn alion Ordinance,4)nendinent k
PlanningC:omnission Report 9-28--09
I
rankings for each type of facility and requires that an analysis be submitted
that documents why one of the City's preferred locations is not feasible. Co-
location and existing structures are at the top of the rankings, with public
lands also preferred over private property.
o Co-location requirements. Minor changes from existing language that
requires co-location if there are suitable existing structures for a wireless
communications facility within the applicant's search area.
o Prohibited Areas. Identifies locations where towers may not be located in the
community. The Planning Commission has previously recommended
reducing the minimum acreage requirements in order to allow sites closer to
residential service areas to be evaluated.
a Zoning Requirements. Specifies the zoning districts and maximum heights
allowed in each district while exempting public land from these requirements.
The Planning Commission has previously recommended allowing towers in
certain instances in residential zones.
o Application and Review Procedures. Outlines the submission requirements
for new wireless communications facilities; very similar to the previous
ordinance language but this section could be modified if the Commission
believes that additional information is necessary for the review of a permit.
o Expert Review. A new section has been added since the last Planning
Commission meeting that describes the process by which the City will be able
to hire on outside expert to assist with the review process.
o Construction Permits. Requires compliance with the Building Code.
o Tower Standards. This section has been modified to provide additional
evaluation of the potential effects on neighboring properties and to clarify the
height and setback requirements. Several sections have been merged so that
all standards are found in one place in the code. Specific landscape
requirements have been added to this section. This section also now includes
a reference to the City's general property maintenance standards.
o Wireless Communications Agreement. The bulk of this language is found in
the current code; however, an applicant will now be required to post a
financial guarantee to ensure that the tower is removed should it be
abandoned.
o Abandonment and Removal. Provides additional clarification concerning the
City's ability to enforce provisions related to the abandonment of a facility.
o Minimum Conditions. Offer a list of conditions that should be considered by
the City with the review of each wireless communications application. The
Page 4
Wireless Communications O Iffiance Amendment
Planning Commission Report; 9-28-09
intent of this section is to clearly identify the expectations of the City while
providing some flexibility to add or subtract from this list with each unique
case.
PIease note that staff has reviewed model codes that contain additional provisions that
could be considered by the Planning Commission,but at this time,have not been
incorporated into the draft document. Some examples of alternative sections include
the following:
• A requirement that towers maintain a specific separate distance from other
towers in order to avoid a clustering of facilities in one location.
• Stricter design standards that would provide additional requirements
concerning the City's preferences for color, design,and style (i.e. whether a
tower should be camouflaged or limited to a specific height above adjacent
structures or trees). The current code leaves much of the decision making
concerning a proposed tower design to be decided during the review process.
• The identification and preservation of scenic views throughout the
community.
• Additional protections for residential properties to limit views of tower
facilities.
Staff is recommending that the Planning Commission conduct the public hearing to
receive public comments and make a decision at this time if any sections of the
ordinance need further review or clarification.
Conclusion and Reeommencdation.
The Planning Commission is being asked to conduct a public hearing to consider
public testimony regarding the draft wireless communications ordinance. Staff is
recommending that the Commission recommend approval of the ordinance to the City
Council.
Commission The Plamung Commission has the following options:
Options: A) Recommend approval of the proposed revisions to the wireless
communications ordinance;
B) Recommend staff make changes to the proposed ordinance or additional
revisions to the document;
,Page 5
Wireless Cornmunications Ordinance Arnendrnent
Planning Connnission Report; 9-28-09
C) Table the item for further study.
As this is a city driven process, there is no 60-day deadline.
Page 6
Wireless Communications Ordinance Draft
City Council Workshop Draft— 10/27/09
KEY:
Redline—New/Deleted Text
i
WIRELESS TcL ECnAMIUA4G4T ON TOWER DED""COMMUNICATIONS
FACILITIES
§ 150.110 PURPOSE AND INTENT.
The wireless teleee....... niea ion tower-pefmit r-egulatiens are intended .
The purpose of this ordinance is to allow for and regulate the design location placement
construction, maintenance, and removal of Wireless Communications Towers and antennae and
to:
(A) Reasonably accommodate the provision of wireless telecommunication services to the
general public;
(B) Provide safety/emergency service through the use of wireless communications facilities;
(Cl9) Minimize adverse visual effects of wireless telecommunication towers, antennae, or
accessory equipment through careful design and siting standards;
(D) Strictly control the location and design of wireless communications facilities so that
allowed facilities will not be obtrusive or visually unpleasant and in particular, to protect
residential property and neighborhoods from visually intrusive tower installations where
reasonably possible.
(E) Provide clear standards governing all aspects of such facilities;
(FF) Avoid potential damage to adjacent properties from tower failures through
structural standards and setback requirements; ai+1
(GD) Maximize the use of existing and approved towers, structures, and/or buildings for
the location of new wireless telecommunication towers in order to reduce the number of the
structures needed to accommodate wireless telecommunication services; and.-
(H) Allow new facilities only when a documented proof of need satisfactory to the City can
be shown.
(1997 Code, § 1390.01) (Ord. 97-24, passed 1-21-1998)
150.111 DEFINITIONS (to be moved to section 11.01 of City Code)
City Council Workshop Drgft - 1 - 10/22/2009 94-
f
Antenna. A device placed outdoors on a building or structure and used to transmit and/or
receive radio or electromagnetic waves, excluding: satellite dishes, ten 0 0) feet or shorter
whip antennas one inch or Iess in diameter, and television antennas having a total len tg`h of
not more than six feet which are located on a dwelling or other permitted building. (R)
Monopole. A freestanding, self-supporting tower that uses a single pole, does not use a
lattice design and has nogny wires. (N)
Public Land. Land owned or operated by a municipality, school district, county, state, or
other governmental unit. (N)
Satellite Dish or Satellite Earth Station Antenna. A round, conical, or cone-shaped
device more than 18 inches in diameter and placed outdoors on the ground or on a structure
and used to transmit and/or receive radio or electromagnetic waves. (N)
Wireless Communication Facility. Cables, wires, lines, wave guides, antennas, and any
other equipment or facilities associated with the transmission or reception of
communications located or installed on or near a tower or antenna support structure but not
including a satellite earth station antenna (satellite dish) 7 feet or less in diameter. (R)
Wireless Communications Tower. A self-supporting monopole, poles, or lattice structure
constructed at normal grade and extending into the air at least 20 feet and used to sport
wireless communications facilities. (R)
Tower Height. The vertical distance from the average grade at the base of a tower to the
highest point of a tower or to the highest point of the highest wireless communications
facilities on a tower, whichever is higher. (N)
Utility Pole. A structure which is owned by a governmental agency or utility company and
which is used to support illumination devices or lines and other equipment carrying
electricity or communications. (N)
§ 150.112-I PERMIT REQUIREMENTSI).
(A) All new wireless communications facilities shall require a Conditional Use Permit in
accordance with the Zoning District requirements specified in Section 150.XXX of this Chapter
with the exception of those facilities that are exempt from review under this Chapter or that may
be approved administratively with a Wireless Communications Permit.
(1) A public hearing fora new wireless communications facility that requires a
Conditional Use Permit shall be preceded by 10-days mailed notice to the record owners of
property located with 1,000 feet of the parcel on which the tower will be located.
Ne per-seti shall install a wir-eless tejeeemmuiiieatien faeilit� � - ,ion thereof, at a height
greater-thaii is allowed for-stfuettir-es in the ufided)ing zeni distrips--itLeut first being issued -a
City Council Workshop Draft - 2 - 1012212009"9'� '%9
iWireless teleeemmuRie emit.
(1997 Code, § 1390.03) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
(B) Exemptions. The following are exempt from review under this Chapter:
(1) Television antennas, satellite dishes one meter(39 inches) in diameter or less,•
(2) Satellite dishes used commercially and three (3) meters in diameter or less;
(3) Receive only antennas;
(4) Amateur radio facilities, subject to other City Code requirements;
(5) Mobile services providing_public information coverage of news events or of a
temporary or emergency nature.
(C) Administrative Review. The following shall be allowed as a permitted use subject to
the issuance of a Wireless Communications Permit in accordance with Section 150.XXX of this
chapter:
(1) Satellite dishes more than one meter(39 inches) in diameter;
(2) Ground mounted antennas not exceeding the maximum height allowed for
structures in the under] zoning oning district;
(3) Building mounted antennas not exceeding 25 feet above the highest part of the
building to which they are attached;
(4) Utility pole-mounted antennas not exceeding 25 feet above the highest part of the
utility pole to which they are attached;
(5) Antennas co-located on an existing wireless communications facility structure.
150.113 PROOF OF NEED
(A) As part of an application for a Conditional Use Permit or Wireless Communications
Permit an applicant shall demonstrate proof of need by providing a coverage/interference
analysis and capacity analysis, which indicates that the location and height of the tower or
antennas as proposed is necessary to meet the frequency plus other spacing needs of the "cellular
communication system" and/or to provide adequate portable radio coverage and capacity to areas
which cannot be adequately served by locating the tower/or antenna at another site. For-pu-pesos
of the amalysis, in buildin— not deemed to be as efifieal as outside . The proof
of need for the tower or antennae must be demonstrated to the satisfaction of the City by
providing the City an analysis from a qualified professional RF engineer with experience in radio
frequency analysis work, which is subject to acceptance by the City prior to commencing the
City Council Workshop Druft - 3 - 10/22/200944p0
work.
f
(B) The cost of the City's review, including an analysis of the proof of need is the
applicant's responsibility. An escrow shall be established in amount required by Council
resolution for this purpose.
(C) The analysis and the material provided by the engineer shall include at least the
following:
(1) Structural Capacity Analysis. Provide an analysis of the impact of the proposed
facility on the tower's carr iy_ng capacity of at least three (3) antenna arrays required (using a
typical maximum facility) under the co-location provision of this code.
(2) Coverage/Interference. Provide an analvsis for:
(a) City property and other public property with signal strength values (expressed
in dBuv) for on street level, in vehicle, and in building level with said interference analysis
indicating the protection afforded for all the frequencies in use or which could be in use by the
City or other public safety agencies.
(b) Private property with signal strength values (expressed in dBuv) for on street
level and in building level with said analysis indicating the protection afforded property within
one-half mile of the proposed facility and site.
(3) System Capacity Analysis. If the system coverage analysis does not show a
coverage need, provide a system capacity analysis.
(4) Radio Frequency Radiation Hazard Analysis. The analysis must address
compliance with the most current FCC Bulletin OET 65 radiation standard.
be submitted befi3r-a Peeember- 31 ef eaeb year- shewing the results of en site measurements at
the site. ,k Registered Pr-efessiefial Engineer- must sign these ffleaSUFeffiefitS afid fepeA.
(MOVED TO CONDITIONS AND REVISED)
(5) Map of Existing and Proposed Facilities. A map showing the location of all
existing and any proposed faeilities towers within two four--(24) miles of the site bein
considered. Telecommunications equipment and towers within this area shall be identified by
type, function, ownership/users, and height. The capacity of existing towers located within two
few-L24) miles (the study area)to carry additional facilities must be provided
(6) Map of Existing Buildings and Structures. A map showing the location of all
existing buildings, water towers and structures seventy-five (75) feet or more in height above the
ground and within two (2) miles of the site being considered. The potential and efforts
undertaken to use these buildings and structures as a supporting base for an antenna or
telecommunications facility purpose must be described and analyzed.
(7) Other Information. Any other information deemed necessary by the City in order
to demonstrate the need for a new wireless communications facility.
City Council Workshop Draft - 4 - 1012212009"'A'%9
(8) Exception. If the request is limited to adding an antenna array on an existingtwer
without increasing the height of the tower support structure or otherwise permitted after an
administrative review under Section 150.111, the City may waive some or all of the proof of
need requirements listed above.
§ 150.114 LOCATION REQUIREMENTS AND SITE RANKING ANALYSIS
(A) Location Requirements for New Facilities. If a new wireless communications facility
is needed based on the materials and studies submitted and reviewed by the City, the following
preferences, listed in ranked order, shall be followed and each preference shall be analyzed to
determine the most appropriate location:
l
(1) Use of Existing Towers. An existing tower may be used to support the proposed
facility. If no existing tower has additional capacity, a determination must be made to show if
and how towers in the study area can be modified to accommodate the proposed facility. The co-
location requirements specified in Section 150.112 shall be used to help determine whether or
not an existingi tower can be used to support a proposed facility,
(2) Use of Existing Structures. An existing structure over 35 feet high may be used
Preference shall be given to existing light poles, high voltage utility towers and water towers
(3) Use of Existing Buildings Four or More Stories in Height. Public and commercial
buildings or structures four or more stories high which can more likely accommodate facilities
without obstructing views or being obtrusive to scenic views shall be given preference over
shorter buildings.
(4) Within an existing easement that contains utility poles over 75 feet in height or
within 100 feet of said right-of-way.
(5) Public Land and Facilities. In situations in which one of the four options listed
above is not feasible, land owned by the City or other public property shall have preference to
private property.
(6) Private property within the City of Lake Elmo subject to the Location and Zoning
requirements of this chapter and the following criteria:
(a) Less restrictive zoning districts shall be given preference over more restrictive
zoning districts. For example, proposed sites in commercial or industrial districts will be given
preference over sites in residential, rural residential or agricultural zoning districts.
(b) Sites with the least visual impact on residential areas and which are the most
consistent with the community's rural character shall be given preference.
City Council Workshop Draft - 5 - 1012212009 AQ44 0
li
9
IJ
. I'1
(B) In cases where a lower ranked alternative is proposed the applicant shall file a written
analysis demonstrating that despite diligent efforts to adhere to the established hierarchy within
the potential service area, as determined by a qualified radio frequency engineer, higher ranked
options are not technologically feasible. An application for a lower-ranked site shall be
considered incomplete without this written documentation.
§ 150.1157- CO-LOCATION REQUIREMENTS.
In accordance with the location requirements and site
preferential rankings found in this Chapter, wireless
telecommunication services shall be located on existing towers or structures which exceed 7-5-35
feet in height and which are located within 1,14 -„i'e of the antenna the potential service area for
the site being proposed by the applicant. In the event that co-location is not possible, the
applicant must demonstrate that a good faith effort to co-locate on existing towers and structures
was made but an agreement could not be reached.
(1997 Code, § 1390.08) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
§ 150 1 18 EXCEPT-IONS TO GO LOCATION A TION R QUIR M TTC
� aov.iav uza�. ,
(A) Exceptions to Co-location Requirements. The City Council shall waive any or all of
the co-location requirements if it is determined that:
--A4- i 1 LThe antennae and/or tower accessory equipment would cause the structural
capacity of an existing or approved tower or building to be exceeded, as documented by a
qualified and licensed professional engineer, and the existing or approved tower or building
cannot be reinforced, modified, or replaced to accommodate the antennae or tower accessory
equipment at a reasonable cost;
( ) (2) The antennae and/or tower accessory equipment would cause interference
materially impacting the usability of existing antennae or tower accessory equipment as
documented by a qualified radio frequency engineer and the interference cannot be prevented at
a reasonable cost, or would otherwise prevent the use of existing antennae or related accessory
equipment and structures;
(C-)- (3) Existing or approved towers and buildings within the applicant's search radius
cannot or will not accommodate the antennae and/or tower accessory equipment at a height
necessary to function reasonably as documented by a qualified radio frequency engineer; and/or
--FBA (4) Other unforeseen reasons make it infeasible to locate the antennae and/or tower
accessory equipment upon an existing or approved tower or building.
(1997 Code, § 1390.09) (Ord. 97-24, passed 1-21-1998)
City Council Workshop Draft - 6 - 1012212009 OA244n0
§ 150.1162 PROHIBITED AREAS.
Wireless telecommunication towers shall not be allowed in the following areas:
(A) Residentially zoned parcels (R-1, R-2, R-3, R-4, and RE Zoning Districts) of less than
4-0--2.5 acres or Rural Residential parcels of less than 5 acres unless the wireless
telecommunication tower and ground facilities accessory thereto are located within 'nn7�,0 feet e
the right of way of a ptiblie utility tfansmission li an existing public utility power line right-of-
way or other public right-of-way that contains utility poles over 75 feet in height or within 100
feet of said right-of-way;
(B) Open space easements or conservation easements; and/or
(C) Airport impact zones without consent of the F.A.A.
(D) Open Space Preservation zoning districts.
(1997 Code, § 1390.03) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
§ 150.1173 ALLOWED TOWER SITESZONING REQUIREMENTS.
(A) On -1. exist...t' publie Utility Pewef line Suppeft Stndetufe' within an extsitng publie-
„tilit„pewef line fight of way, or-within 100 foot of the .fight of.
(G) On a0etiltur-ally or-r-esidentially zoned paf eels greater-than 10 aer-es.
't 1997 cede, § 1390.04) (,Ord. 97 24 passed 1 21 1 o�no.�, see § 10-9-9
(A) Wireless communications facilities that require a Conditional Use Pen-nit, including the
installation of a new tower, shall be permitted in the followingzoning oning districts and subject to the
following height restrictions provided they meet all other requirements of this ordinance:
Zoning District Maximum Height Minimum
Lin feetj Parcel Area
A - Agriculture 175 10
RR- Rural Residential Zoning 150 5
R-1, R-2, R-3, and R-4 Residential 150 2.5
OP - Open S ace Not Allowed
RE - Residential Estates 150 2
GB. LB, CB. HB - Business 150 5
City Council Workshop Draft - 7 - 101221200914L- {�09
BP — Business Park 175 5
PF— Public Facility l 75 None
(B) Regardless of zoning district new facilities may be allowed within an existing public
utility power line right-of-way or other public right-of-way that contains utility poles over 75 feet
in height or within 100 feet of said right-of-way.
(C) Public land exemption. A wireless communications facility may be located on any
parcel that is owned by the City or another public entity regardless of the zoning district or size
of the property.
§ 150.1184 APPLICATION AND REVIEW PROCEDURES.
(A) Wireless Communications Permit (Administrative Approval). An applicant seeking
approval of a facility that can be approved administratively with a wireless communications
permit shall follow all of the application requirements listed below for a Conditional Use Permit
but shall be exempt from those requirements found in section 154.018 of the City Code
including the public hearing requirements. An application found to comply with the provisions
of this Chapter may be approved by the Planning Director. Approval shall be in writing,
identifying the he specific facility approved, the location mounting height and other pertinent
information and any conditions of approval. If the requested facility is to be located on public
property, the agreement allowing the facility shall be approved by the City Council and executed
prior to issuing the permit.
Appheations for a wireless 4eleeommuaieati Fmit shall be submitted en forms
1......,.e..by the City a auiaiavi, whavaa ouuaT invruvc-crate. frollw.ving infeFfflatieil,
(B) Conditional Use Permit. Wireless communications facilities that require a Conditional
Use Permit are subject to the requirements specified in Section 154.018 of this Code in addition
to all requirements of Section 150.110 of the Code.. Applications shall be submitted on forms
provided by the City and shall include the following information:
(BA) A sketch site plan drawn to scale acceptable to the it Dl.., ier-and Gity
€figiReel=Planning Director which illustrates:
(1) The parcel on which the tower and accessory ground facilities will be located;
(2) The existing and proposed buildings and structures leeated and to be leeated on the
tower parcel;
(3) The buildings located within 4-W200 feet of the perimeter of the tower parcel; and
(4) Access easements as necessary to the tower parcel.
(B) A scaled drawing of the exterior of the proposed wireless communications facility,
clearly showing the method of fencing, coloration, materials and camouflage techniques being
City Council Workshop Draft - 8 - 101221200y'4"�0
used.
(C) Photo-simulated post construction renderings of the proposed wireless communications
facilities, equipment enclosures, and ancillary structures as they would look after construction
from locations at the periphery of the proposed site, which shall at a minimum include
renderings from the vantage point of any adjacent roadways and
�residential stmetu-osresidential neighborhoods. The renderings shall also include photo-
simulations of the antenna supporting structure after it has been fully developed with antenna
structures (the applicant may assume for the purpose of the simulation that other antenna
structures on the facility will resemble their proposed structure size and design). A minimum of
two such renderings shall be provided; additional renderings may by a required if the City
determines that additional views should be considered.
existing stmeWr-e on whieh the antenna will be leeated eompafed te stmetafes leeated within 100
visibility of the tewer-fr-em adjoining pafeels leeated within 100 feet of the per-imetef of th-e
demonstration ineluding fneek ups aa&oF phete mentages and plans for-painting the tower-;
(D) Exterior paint or finish samples of the colors to be used in the construction of the
wireless communications facility.
(DF) A report from a qualified and licensed professional engineer which:
(1) Describes the wireless telecommunication tower height and design including a
cross-section and elevation;
(2) Certifies the wireless telecommunication tower's compliance with structural and
electrical standards;
(3) Documents the height above grade for the mounting positions, which can be used
for co-location and the minimum separation distances between the co-location positions; and
(4) Describes the wireless telecommunication tower's capacity to support antennae,
including an example of the number and type of antennas that can be accommodated on the
wireless telecommunication tower.
(13E) In conjunction with the information required to demonstrate the proof of need for a
new facility under this Chapter, the applicant shall submit a A-5-year plan for wireless
telecommunication facilities to be located within the city shall be submitted by the ^~,.,hea t.
The city acknowledges that the plans are fluid and in all likelihood will change depending upon
market demands for the service. The city will maintain an inventory of all existing and
reasonably anticipated cell site installations. The applicant shall provide the following written
information in each 5-year plan and the plan must be updated with each submittal for a new
wireless telecommunication tower permit as necessary:
City Council Workshop Draft - 9 - 1012212009 4944200
(1) A description of the radio frequencies to be used for each technology;
(2) A list of all existing sites to be upgraded or replaced, and proposed cell sites within
the city for these services by the applicant; and
(3) A presentation size map of the city, which shows the 5-year plan for cell sites, or if
individual properties are not known, the geographic service areas of the cell sites.
(E) The eest of mailing addresses for-all pr-epefty owners of Y-eeerd laeated within 1,00
feet VZ-p]-1 l'Ien ubjeet pr-epefty to be eemplied by the y,
(F) An application fee in an amount prescribed from time to time by City Council
resolution as necessary to reimburse the city for costs incurred to process the wireless
telecommunication tower permit application along with an escrow payment as prescribed by the
City Council to cover the costs associated with the City's review of the permit;
(G) Confirmation that the applicant is properly licensed by the F.C.C., or is the authorized
representative of a wireless telecommunication provider properly licensed by the F.C.C.;
(H) Written authorization from the property owner describing the area which will be subject
to the tower lease.
unused or-abandefied for- 12 o
(I) Documentation of the steps to be taken by applicant to avoid causing destructive
interference to co-located previously established public safety communications facilities; and
(J) A detailed landscape plan, which indicates how tower accessory equipment will be
screened.
(1997 Code, § 1390.05) (Ord. 97-24, passed 1-21-1998)
150.119 EXPERT REVIEW
(A) Where due to the complexity of the methodology or analysis required to review an
application for a wireless communications facility, the Planning Director may require a technical
review by a third party expert. The costs of this review shall he borne by the applicant and shall
be in addition to applicable Conditional Use or Wireless Communications Permit and building
permit fees. The applicant shall submit an escrow deposit that may be applied towards the cost
of such technical review upon notification from the Director that a technical review is required,
and shall remit any outstanding balance to the city for such review prior to issuance of a building
permit. The maximum fee for such review and the required escrow deposit shall be in
accordance with the fee schedule adopted by the City Council.
(B) The expert review may address any or all of the following_
City Council Workshop Draft - 10 - 10/22/2009 04
(1) The accuracy and completeness of submissions;
(2) The applicability of analysis techniques and methodologies;
(3) The validity of conclusions reached:
(4) Whether the proposed wireless communications facility complies with the
applicable approval criteria set forth in these regulations,•
(5) Other matters deemed by the City to be relevant to determining whether a proposed
wireless communications facility complies with the provisions of these regulations.
(C) Based on the results of the expert review, the City require changes to the
applicant's application or submittals.
(D) The applicant shall reimburse the city within 15 working days of the date of receipt of
an invoice for expenses associated with the third party expert's review of the application. Failure
by the applicant to make reimbursement pursuant to this section shall abate the pending
application until paid in full.
§ 150.115 PLANNING COMMISSION REA71T,M
before the Planning Commission whieh shall be pr-eeeded by 10 days mailed fietiee to the feeE)fd
(B) The Planning Commission shall make feeaffimendations to the City Couneil fegar-din
followittg:
prepe ner-s�.1y(1997 Coded § 90.06) (04 97 24,passed 1 21 1998)
§ 150.1204-9 CONSTRUCTION PERMITS.
All wireless telecommunication towers erected, constructed, or located within the city, and
all wiring therefore, shall comply with the requirements set forth in the Uniform Building Code.
(1997 Code, § 1390.10) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
City Council Workshop Draft - l 1 - 10/22/2009 0A'—
a
§ 150.12120 TOWER STANDARDS.
(A) Wireless telecommunication towers shall comply with the following standards unless
the City Council grants a variance as necessary to reasonably accommodate the wireless
telecommunication tower. Variance procedures shall be processed according to the zoning code.
(B) Design.
(1) To blend into the surrounding environment through the use of color and
architectural treatment techniques *'�tsefie.zthat softens the visual impact of the wireless
communication tower on the surrounding environment.
(2) To be of a monopole design unless the City Council determines that an alternative
design would better blend into the surrounding environment;
(3) All proposed wireless telecommunication tower shall be designed, structurally,
electrically, and in all respects, to accommodate both the applicant's antennas and comparable
antennas for at least 2 additional users if the tower is over 100 feet in height or for at least I
additional user if the tower is between 75 feet and less than 100 feet in height;provided that this
standard may be waived or otherwise modified by the City Council as necessary to allow the
applicant to construct a wireless telecommunication tower that better blends into the surrounding
environment.
(4) Where possible,all proposed wireless telecommunication towers must be designed
to allow for future rearrangement of antennas upon the tower and to accept antennas mounted at
various heights.
(5) All facilities shall be designed to minimize the visual impact to the greatest extent
feasible by means of placement screening landscaping with native species whenever feasible
and camouflage, and to be compatible with existing architectural element building materials
and other site characteristics. The applicant shall use the least visible antennas possible to
accomplish the coverage objectives.
(C) Adverse effects on properties.
(1) New wireless communications facilities shall be configured and located in a
manner that shall minimize adverse effects including visual impacts on adjacent properties The
applicant shall demonstrate that alternative locations configurations and facility types have been
examined and shall address in narrative and graphic form the feasibility of any alternatives that
may have fewer adverse effects on adiacent properties than the facility, configuration and
location proposed.
(2) The following attributes shall be considered from vantage points at adiacent
properties, roadways, and occupied structures: height and location mass and scale materials and
color, existing and proposed vegetation and intervening structures.
(3) An applicant shall demonstrate through the photo-simulation requirements under
City Council Workshop Draft - 12 - 10/22/20091 L-44
Section 150.1 14 that the project design employs each of these attributes in a manner that
minimizes adverse effects to the greatest extent possible.
(4) All facilities that have the potential for high visibility shall be sited in such a
manner as to cause the least detriment to the view shed of adjoining properties.
(D) Setbacks .
(1) No communications tower shall be located in the required front, side, or rear yard
setback of any parcel.
(2) No freestanding communications tower shall be located he4eeated-closer than
1251/6 of the tower height from any lot lines with the following exceptions:
(a) Towers in a side or rear yard that are adjacent to parcels zoned commercial,
industrial, or public facility.
in all zening distr-iets, tevver-s may enefeaeh into the feaf of side 5,afd setbaek areas, pr-avided that
the feaf- or- side yafd pfepef4y line abuts a eefflfnefeial of business zefied pfepef4y and t
wifeless tel - ------ . tien tower-does not ener-eaeh upen any easements.
(a) in all fesidential zoning distiiets, wifeless teleeamniunieation tower-s shall be set baei( 1 feet
h t of tower-height plus 20 feet,
(3) Setbacks from buildings:
(a) In residential zoning districts, wireless communications towers shall be set
back a minimum of 100% of the tower height from a residential dwelling except for dwellings on
the subject property.
(b) In all other zoning districts, the minimum setback between structures as
required by the building code shall be observed.
buildiRgs pfevidea all athe o a ents of this e0de a of
(d) n feEluifed setbaek may be fedueed of its 1eeation ; of tion to a „hlie street
pewe
line aF4 do o r l;ghtsta„dafd. steeple,
(4) Use of existing light poles, lii hg voltage poles or towers, and other existing
structures are exempt from the setback requirements provided that such pole, tower, or structure
is not increased in height.
City Council Workshop Draft - 13 - 10122120091491,9009 j
Ili
(5) Wireless Communications Towers located within an existing public utility power
line right-of-way or other public right-of-way that contains utility poles over 75 feet in height or
within 100 feet of said right-of-way shall be exempt from the setbacks as herein required
(6) A required setback may be reduced or its location in relation to a public street
varied upon providing the city with a licensed professional engineer's certification that the
wireless telecommunication tower is designed to collapse or fail within a distance or zone shorter
than the required setback distance.
(E) Height.
(a) in all residential zening distfiets, the maximum height of any wir-ejeris
for-eaeh 1 feet the tewef is setbaek fr-em a residential dwelling unit up to of 195 feet
fer-pafeels of 40 aeres of more and 125 feet fef par-eels between 10 to 40
(b) in all non Fesidential zoning distfiets, wireless teleeemmunieation tower-and
antennae shall not exeeed 195 feet in height above gf�eund for-a fteestanding wifeless
setbaek fr-em a eenimen lot line shall be 2 feet for-eaeh 1 feet of tower-height.
(1) The maximum height of a wireless communications tower shall be determined
based on the underlying zoning district and will be the amount specified in Section 150.117.
§ 150 121 LIGHTING.
rr
(F) Lighting. At night, wireless telecommunication towers shall not be illuminated by
artificial means, unless otherwise required by the Federal Aviation Administration (FAA)
(1) White strobe lighting shall be prohibited.
(2) The applicant shall document the need for lighting as part of a new wireless
communications facilityapplication.
(3) A site that requires lighting shall only be accepted when no other suitable
alternative exists. A new tower may be rejected on the grounds that lighting will be a visual
nuisance to surrounding properties.
(G) Landscaping and Screeninje. All wireless communications towers and related building_
facilities shall be landscaped and screened with natural vegetation to lessen the visual impact
The natural vegetation on the site shall be documented on the site plans Suitable existing
vegetation shall be retained to the maximum extent possible based on an analysis of the site
City Council Workshop Draft - 14 - 1012.212009 494 9009
New landscaping shall be selected that includes coniferous and deciduous plants and trees that
are hardy for conditions on the site without the use of augmented water.
(1) Landscaping shall include ground cover, lower story, mid-story, and upper story
plants. Plant density shall be sufficient to provide 80 percent opacity year round from the Uound
up to a distance of 5 feet high for 60 percent or more of the site with the planting to be located
based on an analysis of the site in relation to the surrounding area. Greater or lesser amounts and
percentages may be required or allowed based on the City's review.
(1997 Code, § 1390.12) (Ord. 97-24,passed 1-21-1998) Penalty, see § 10.99
§ lcn 122 SIGNS AND ADVERTISING.
(H) Signs and Advertising The use of any portion of a wireless telecommunication tower
for signs other than warning or equipment information sign is prohibited.
(1997 Code, § 1390.13) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
§150.123 iNT-ERFERENC-E MII1Ti4 PUBLIC C A F TV TELECOMMUNICATION-.
(1) Interference with public safety communication. No wireless telecommunication facility
shall interfere with public safety telecommunications. All wireless telecommunication
towers/antennas shall comply with F.C.C. regulations and licensing requirements.
(1997 Code, § 1390.14) (Ord. 97-24,passed 1-21-1998) Penalty, see § 10.99
§ 150.124 PROHIBITED SUBDIVISIONS.
agr-ieulwfally zoned par-eel gfeatef than 10 aer-es, exeept when the faeility is-]A-Peattedd vviitthi
power- line > of within 100 feet of the easement,
the par-eels shall not be fuf4hef
1 997 Code .§ 1390.15) (1 d 97 �4 d 1 21 1999) Penalty, § 1 n on
1Tr'-' v�5-� r ��Fc�� �us�cv-r z--i- r»-cr�--rcTru'ra'��cc�-rv��
§ 150.125 A!"CESSO V iITii 7TV BUILDINGS.
0)AccessaZ utility buildings. All utility buildings and structures accessory to a tower shall
be architecturally designed to blend in with the surrounding environment and compatible with
adiacent buildings, and shall be pennitted in addition to the number of accessory buildings
otherwise allowed in each zoning district.
(1997 Code, § 1390.16) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
(1) Gantr-ol buildings. The eantfol buildings shall be designed to be ar-ehiteetur-ally
eampatible with the adjaeent buildings. The eentfal buildings shall not be plaeed in r-eElUir-ed
City Council Workshop Draft - 15 - 10/22/2009 AQ4,Q409 .
setbaVk areas 1V1 shall they a 1 lVµVh inte
-1rged 1.,.neap
(1) Ground mounted equipment. Ground mounted equipment shall not be visible from
beyond the boundaries of the site and shall be screened by a solid wall or fence and dense
landscaping materials described in paragraph G above.
(2) Accessory utility building shall observe the minimum setback requirements for
accessory buildings in the underlying zoning district as well as all other applicable zoning and
building requirements for accessory buildings.
(K)Maintenance. All buildings and structures on the premises of the wireless
communications facility shall observe the City's property maintenance standards of the City
Code.
§ 150.126 GROUND_MOUNT- t EQUIPMENT
trees,enelesed in a building with br-iek walls and have a dark eelefed standing seam metal r-eef and b
as detefmined
the
and shfubs to
,
substantially 1 ,
1 997 !''ode § 1390.17) (OM 97 74 passed 1 71 1 998) Defiah , see R 1 n nn
§ 150.12216 CITY COUNCIL RE47 WIRELESS COMMUNICATIONS TOWER
AGREEMENT.
(A)
r-eview until a date eef:tain, of deny the applieatiefl for-a wir-eless teleeeffiffitiflieation tow
pemiit.If the application is approved by the City-Geu*64, a wireless4elecommunications towe>
permit and a building permit shall be issued upon the execution of a wireless telecommunication
tower agreement.
(B) The agreement shall be signed by the applicant and property owner and the terms of the
agreement shall include the following:
(1) A list of the conditions of approval to the wireless telecommunication tower
permit;
(2) A statement indicating that failure to comply with the conditions of approval shall
result in the removal of the wireless telecommunication tower, antennae, or tower accessory
equipment;
(3) A statement indicating that the expenses incurred by the city to enforce the
provisions of the wireless telecommunication tower agreement shall be reimbursed by the
applicant;
(4) A statement, which requires the applicant to utilize the procedures established by
City Council Workshop Draft - 16 - 10122/2009 OA21A2 0
the F.C.C. to resolve any complaints received relating to interference allegedly caused by the
wireless telecommunication tower; and
(5) A statement indicating that a wireless telecommunication tower which has not been
used for 44-six 6 consecutive months shall be deemed abandoned and may be required to be
removed in the same manner-and pursuant te the saffle pfeeedur-es as fer-hazaMous and
substandaM accordance with Section 150.123 below. (M.S. §§ 463.15 through 463.261,
as they may be amended ffem time to To ensure compliance with this provision, the
applicant must submit a performance bond or letter of credit in an amount sufficient to cover the
removal or reduction costs.
(1997 Code, § 1390.07) (Ord. 97-24, passed 1-21-1998)
150.123 ABANDONMENT AND REMOVAL
(A) Towers and antennae shall be removed, at the owner's expense, within six (6) months
of cessation of use.
(B) An owner wishing to extend the time for removal or reactivation shall submit an
application stating the reason for such extension. The Planning Director may extend the time for
removal or reactivation up to 60 days upon showing of a good cause. If the tower or antennae is
not removed in a timely fashion, the City may give notice that it will contract for removal within
30 days following written notice to the owner. Thereafter, the City may cause removal and be
reimbursed for all costs associated with said removal by drawing on the funds provided with the
financial guarantee _
(C) Upon removal of the wireless communications facility, the site shall be returned to its
natural state and topography and vegetated consistent with the natural surroundings.
§ 150.124 MINIMUM CONDITIONS
(A) General conditions on a wireless communications permit may include, but not be
limited to the following:
(1) An agreement providing for co-location and six (6) month removal of unused
and/or obsolete towers shall be attached and become part of the permit.
(2) The tower shall be set back a distance equal to the tower height from all property
lines. All accessory structures shall be setback a minimum of twenty (20) feet from
all side ,yard and rear yard property lines
(3) Zoning Permits shall be applied for and issued before any construction is started.
(4) Prior to application for a conditional use permit, applicant must obtain FAA
approval and/or provide documentation that FAA approval is not needed.
(5) Applicant must obtain FCC licensure and approval as required for various
communications applications. No into f •-enee • ith leead and radio-
ill be allewed-.
City Council Workshop Draft - 17 - 1012212009 0 "09
I�
(6) Applicant must submit proof of liability and Worker's compensation Insurance
(7) Proof that towers and their antennas have been designed by, and following
completion of construction were inspected by a qualified and licensed professional
engineer (at the applicant's expenses) to conform to applicable state structural
building standards and all other applicable reviewing agencies and to conform with
accepted electrical engineering methods and practices as specified in applicable
provisions of the National Electrical Code.
(8) Metal towers shall be constructed of, or treated with corrosive resistant material
(9) The addition of antennas and associated equipment of an additional provider to an
existing_permitted tower shall be considered co-location and shall require a zoning
permit and site plan approval. An amendment to a conditional use permit shall
typically not be required
00)All towers shall be reasonably protected against unauthorized climbing. The area
around the base of the tower and guy wire anchors shall be enclosed by a fence
with a minimum height of six (6) feet with a locked gate.
(I I)All towers and their antennas shall utilize building materials colors textures
screening and landscaping that effectively blend the tower facilities within the
surrounding natural setting and built environmentally to the greatest extent
possible.
(12)No part of any antenna or tower, nor any lines cable equipment wires or braces
shall at any time extend across or over any part of the right of way, public street
highway, or sidewalk, without approval by the City through the zoning permit
approval process.
0 3)All obsolete or unused towers and accompanying accessory facilities shall be
removed within six (6) months of the cessation of operations at the site unless a
time extension is approved by the City. After the facilities are removed the site
shall be restored to its original or an improved state which includes removal of all
concrete to 6-feet below normal grade and surrounding area returned to normal
grading. Electronic equipment shall not be removed in advance of removal of
obsolete or unused towers. To ensure compliance the applicant must submit a
performance bond or letter of credit in an amount sufficient to cover all removal
costs as determined by the City prior to the issuance of a building permit for the
facility. Failure to remove the structure shall be cause for the City to remove the
tower and associated equipment and assess the cost against the required bonding or
letter of credit instrument.
(!)Yearly av pef4 showing vv „1;auvv: ;th DF Radiation Hazard et , , a
y v a 'u befidis ivalw aivcrzvbe reeeived
31 of eaeh year-.
(14)The City of Lake Elmo shall conduct a final inspection of the site to ensure that all
requirements of the City Code and all conditions of approval attached as part of the
wireless communications permit are met prior to the start of operation of the
facility.
(15)For installations of a facility in an area that could potentially be accessed by the
public (includingrooftop ooftopinstallations or other locations that would be considered
public verses occupational) a radio frequency hazard analysis and a yearly report
_must be submitted before December 31 of each year showing the results of on-site
measurements at the site. A Registered Professional Engineer hired by the provider
City Council Workshop Draft - 18 - 10/22/2009'�'�'� '%,o'9
must sign these measurements and report. At a minimum, the report must
document any changes to the site over the course of the previous yeai.. (MOVED
FROM "PROOF OF NEED"SECTION)
City Council Workshop Draft - 19 - 10/22/2009 0AMA t,'
WIRELESS COMMUNICATIONS FACILITIES
§ 150.110 PURPOSE AND INTENT.
The purpose of this ordinance is to allow for and regulate the design, location, placement,
construction, maintenance, and removal of Wireless Communications Towers and antennae and
to:
(A) Reasonably accommodate the provision of wireless telecommunication services to the
general public;
(B.) Provide safety/emergency service through the use of wireless communications facilities;
(C) Minimize adverse visual effects of wireless telecommunication towers, antennae, or
accessory equipment through careful design and siting standards;
(D) Strictly control the location and design of wireless communications facilities so that
allowed facilities will not be obtrusive or visually unpleasant, and in particular, to protect
residential property and neighborhoods from visually intrusive tower installations where
reasonably possible.
(E) Provide clear standards governing all aspects of such facilities;
(F) Avoid potential damage to adjacent properties from tower failures through structural
standards and setback requirements;
(G) Maximize the use of existing and approved towers, structures, and/or buildings for the
location of new wireless telecommunication towers in order to reduce the number of the
structures needed to accommodate wireless telecommunication services; and
(H) Allow new facilities only when a documented proof of need satisfactory to the City can
be shown.
§ 150.111 DEFPNITIONS (to be moved to section 11.01 of City Code)
Antenna. A device placed outdoors on a building or structure and used to transmit and/or
receive radio or electromagnetic waves, excluding: satellite dishes, ten (10) feet or shorter
whip antennas one inch or less in diameter, and television antennas having a total length of
not more than six feet which are located on a dwelling or other permitted building.
Monopole. A freestanding, self-supporting tower that uses a single pole, does not use a
lattice design and has no guy wires.
Public Land. Land owned or operated by a municipality, school district, county, state, or
other governmental unit.
City Council Workshop Draft- CLEAN - 1 - 1012212009
I
Satellite Dish or Satellite Earth Station Antenna. A round, conical, or cone-shaped
device more than 18 inches in diameter and placed outdoors on the ground or on a structure
and used to transmit and/or receive radio or electromagnetic waves.
Wireless Communication Facility. Cables, wires, lines, wave guides, antennas, and any
other equipment or facilities associated with the transmission or reception of
communications located or installed on or near a tower, or antenna support structure but not
including a satellite earth station antenna(satellite dish) 7 feet or less in diameter.
Wireless Communications Tower. A self-supporting monopole, poles, or lattice structure
constructed at normal grade and extending into the air at least 20 feet and used to support
wireless communications facilities.
Tower Height. The vertical distance from the average grade at the base of a tower to the
highest point of a tower or to the highest point of the highest wireless communications
facilities on a tower, whichever is higher.
Utility Pole. A structure which is owned by a governmental agency or utility company and
which is used to support illumination devices or lines and other equipment carrying
electricity or communications.
§ 150.112 PERMIT REQUIREMENTS.
(A) All new wireless communications facilities shall require a Conditional Use Permit in
accordance with the Zoning District requirements specified in Section 150.XXX of this Chapter
with the exception of those facilities that are exempt from review under this Chapter or that may
be approved administratively with a Wireless Communications Permit.
(1) A public hearing for a new wireless communications facility that requires a
Conditional Use Permit shall be preceded by 10-days mailed notice to the record owners of
property located with 1,000 feet of the parcel on which the tower will be located.
(B) Exemptions. The following are exempt from review under this Chapter:
(1) Television antennas, satellite dishes one meter (39 inches) in diameter or less;
(2) Satellite dishes used commercially and three (3) meters in diameter or less;
(3) Receive only antennas;
(4) Amateur radio facilities, subject to other City Code requirements;
(5) Mobile services providing public information coverage of news events or of a
temporary or emergency nature.
(C) Administrative Review. The following shall be allowed as a permitted use subject to
City Council Workshop Draft- CLEAN - 2 - 1012212009
the issuance of a Wireless Communications Permit in accordance with Section 150.XXX of this
chapter:
(1) Satellite dishes more than one meter(39 inches) in diameter;
(2) Ground mounted antennas not exceeding the maximum height allowed for
structures in the underlying zoning district;
(3) Building mounted antennas not exceeding 25 feet above the highest part of the
building to which they are attached;
(4) Utility pole-mounted antennas not exceeding 25 feet above the highest part of the
utility pole to which they are attached;
(5) Antennas co-located on an existing wireless communications facility structure.
150.113 PROOF OF NEED
(A) As part of an application for a Conditional Use Permit or Wireless Communications
Permit an applicant shall demonstrate proof of need by providing a coverage/interference
analysis and capacity analysis, which indicates that the location and height of the tower or
antennas as proposed is necessary to meet the frequency plus other spacing needs of the "cellular
communication system" and/or to provide adequate portable radio coverage and capacity to areas
which cannot be adequately served by locating the tower/or antenna at another site. The proof
of need for the tower or antennae must be demonstrated. to the satisfaction of the City by
providing the City an analysis from a qualified professional RF engineer with experience in radio
frequency analysis work, which is subject to acceptance by the City prior to commencing the
work.
(B) The cost of the City's review, including an analysis of the proof of need, is the
applicant's responsibility. An escrow shall be established in amount required by Council
resolution for this purpose.
(C) The analysis and the material provided by the engineer shall include at least the
following:.
(1) Structural Capacity Analysis. Provide an analysis of the impact of the proposed
facility on the tower's carrying capacity of at least three (3) antenna arrays required (using a
typical maximum facility)under the co-location provision of this code.
(2) Coverage/Interference. Provide an analysis for:
(a) City property and other public property with signal strength values (expressed
in dBuv) for on street level, in vehicle, and in building level with said interference analysis
indicating the protection afforded for all the frequencies in use or which could be in use by the
City or other public safety agencies.
City Council Workshop Draft- CLEAN - 3 - 1012212009
i
(b) Private property with signal strength values (expressed in dBuv) for on street
level and in building level with said analysis indicating the protection afforded property within
one-half mile of the proposed facility and site.
(3) System Capacity Analysis. If the system coverage .analysis does not show a
coverage need,provide a system capacity analysis.
(4) Radio Frequency Radiation Hazard Analysis. The analysis must address
compliance with the most current FCC Bulletin OET 65 radiation standard.
(5) Map of Existing and Proposed Facilities. A map showing the location of all
existing and any proposed towers within two (2) miles of the site being considered.
Telecommunications equipment and towers within this area shall be identified by type, function,
ownership/users, and height. The capacity of existing towers located within two (2) miles (the
study area) to carry additional facilities must be provided..
(6) Map of Existing Buildings and Structures. A map showing the location of all
existing buildings, water towers and structures seventy-five (75) feet or more in height above the
ground and within two (2) miles of the site being considered. The potential and efforts
undertaken to use these buildings and structures as a supporting base for an antenna or
telecommunications facility purpose must be described and analyzed.
(7) Other Information. Any other information deemed necessary by the City in order
to demonstrate the need for a new wireless communications facility,
(8) Exception. If the request is limited to adding an antenna array on an existing tower
without increasing the height of the tower support structure or otherwise permitted after an
administrative review under Section 150.111, the City may waive some or all of the proof of
need requirements listed above.
§ 150.114 LOCATION REQUIREMENTS AND SITE RANKING ANALYSIS
(A) Location Requirements for New Facilities. If a new wireless communications facility
is needed based on the materials and studies submitted and reviewed by the City, the following
preferences, listed in ranked order, shall be followed and each preference shall be analyzed to
determine the most appropriate location:
(1) Use of Existing Towers. An existing tower may be used to support the proposed
facility. If no existing tower has additional capacity, a determination must be made to show if
and how towers in the study area can be modified to accommodate the proposed facility. The co-
location requirements specified in Section 150.112 shall be used to help determine whether or
not an existing tower can be used to support a proposed facility.
(2) Use of Existing Structures. An existing structure over 35 feet high may be used.
Preference shall be given to existing light poles, high voltage utility towers and water towers,
City Council Workshop Draft- CLEAN - 4 - 1012212009
(3) Use of Existing Buildings Four or More Stories in Height. Public and commercial
buildings or structures four or more stories high which can more likely accommodate facilities
without obstructing views or being obtrusive to scenic views shall be given preference over
shorter buildings.
(4) Within an existing easement that contains utility poles over 75 feet in height or
within 100 feet of said right-of-way.
(5) Public Land and Facilities. In situations in which one of the four options listed
above is not feasible, land owned by the City or other public property shall have preference to
private property.
(6) Private property within the City of Lake Elmo subject to the Location and Zoning
requirements of this chapter and the following criteria:
(a) Less restrictive zoning districts shall be given preference over more restrictive
zoning districts. For example, proposed sites in commercial or industrial districts will.be given
preference over sites in residential,rural residential or agricultural zoning districts.
(b) Sites with the least visual impact on residential areas and which are the most
consistent with the community's rural character shall be given preference.
(B) In cases where a lower ranked alternative is proposed, the applicant shall file a written
analysis demonstrating that despite diligent efforts to adhere to the established hierarchy within
the potential service area, as determined by a qualified radio frequency engineer, higher ranked
options are not technologically feasible. An application for a lower-ranked site shall be
considered incomplete without this written documentation.
§ 150.115 CO-LOCATION REQUIREMENTS.
In accordance with the location requirements and site preferential rankings found in this
Chapter, wireless communication services shall be located on existing towers or structures
which exceed 35 feet in height and which are located within the potential service area for the site
being proposed by the applicant. In the event that co-location is not possible,the applicant must
demonstrate that a good faith effort to co-locate on existing towers and structures was made but
an agreement could not be reached.
(A) Exceptions to Co4ocation Requirements. The City Council shall waive any or all of
the co-location requirements if it is determined that:
(1) The antennae and/or tower accessory equipment would cause the structural capacity of
an existing or approved tower or building to be exceeded, as documented by a qualified and.
licensed professional engineer,and the existing or approved tower or building cannot be
reinforced, modified, or replaced to accommodate the antennae or tower accessory equipment at
a reasonable cost;
City Council. Wor'lrshop Draft- CLEAN - 5 - 1012212009
(2) The antennae and/or tower accessory equipment would cause interference materially
impacting the usability of existing antennae or tower accessory equipment as documented by a
qualified radio frequency engineer and the interference cannot be prevented at a reasonable cost,
or would otherwise prevent the use of existing antennae or related accessory equipment and
structures;
(3) Existing or approved towers and buildings within the applicant's search radius cannot or
will not accommodate the antennae and/or tower accessory equipment at a height necessary to
function reasonably as documented by a qualified radio frequency engineer; and/or
(4) Other unforeseen reasons make it infeasible to locate the antennae and/or tower
accessory equipment upon an existing or approved tower or building.
§ 150.116 PROHIBITED AREAS.
Wireless telecommunication towers shall not be allowed in the following areas:
(A) Residentially zoned parcels (R-1, R-2, R-3, R-4, and RE Zoning Districts) of less than
2.5 acres or Rural Residential parcels of less than 5 acres unless the wireless telecommunication
tower and ground facilities accessory thereto are located within an existing public utility power
line right-of-way or other public right-of-way that contains.utility poles over 75 feet in height or
within 100 feet of said right-of-way;
(B) Open space easements or conservation easements; and/or
(C) Airport impact zones without consent of the F.A.A.
(D) Open Space Preservation zoning districts.
§ 150.117 ZONING REQUIREMENTS.
(A) Wireless communications facilities that require a Conditional Use Permit, including the
installation of a new tower, shall be permitted in the following zoning districts and subject to the
following height restrictions provided they meet all other requirements of this ordinance:
Zoning District Maximum Height Minimum
in feet) Parcel Area
A---Agriculture 175 10
RR—Rural Residential. Zoning 150 5
R-1, R-2, R-3, and R-4 Residential 150 2.5
OP—Open Space Not Allowed -
RE—Residential Estates 150 2.5
GB, LB, CB, HB—Business 150 5
City Council Workshop Draft- CLEAN - 6 - 1012212009
BP—Business Park 175 S
PF—Public Facility 175 None
(B) Regardless of zoning district, new facilities may be allowed within an existing public
utility power line right-of-way or other public right-of-way that contains utility poles over 75 feet
in height or within 100 feet of said right-of-way.
(C) Public land exemption. A wireless communications facility may be located on any
parcel that is owned by the City or another public entity regardless of the zoning district or size
of the property.
§ 150.118 APPLICATION AND REVIEW PROCEDURES.
(A)Wireless Communications Permit(Administrative Approval). An applicant seeking
approval of a facility that can be approved administratively with a wireless communications
permit shall follow all of the application requirements listed below for a Conditional Use Permit
but shall be exempt from those requirements found in section 154.018 of the City Code,
including the public hearing requirements. An application found to.comply with the provisions
of this Chapter may be approved by the Planning Director. Approval shall be in writing,
identifying the specific facility approved,the location,mounting height, and other pertinent
information and any conditions of approval. If the requested facility is to be located on public
property,the agreement allowing the facility shall be approved by the City Council and executed
prior to issuing the permit.
(B) Conditional Use Permit. Wireless communications facilities that require a Conditional
Use Permit arc subject to the requirements specified in Section 154.018 of this Code in addition
to all requirements of Section 150.110 of the Code.. Applications shall be submitted on forms
provided by the City and shall include the following information:
(C) A site plan drawn to scale acceptable to the Planning Director which illustrates;
(1) The parcel on which the tower and accessory ground facilities will be located;
(2) The existing and proposed buildings and structures on the tower parcel;
(3) The buildings located within 200 feet of the perimeter of the tower parcel; and
(4) Access easements as necessary to the tower parcel.
(D) A scaled drawing of the exterior of the proposed wireless communications facility,
clearly showing the method of fencing, coloration,materials,and camouflage techniques being
used.
(E) Photo-simulated post construction renderings of the proposed wireless communications
facilities, equipment enclosures, and ancillary structures as they would look after construction
from locations at the periphery of the proposed site,which shall, at a minimum,include
City Council Workshop Draft- CLEAN - 7 - 1012212009
renderings from the vantage point of any adjacent roadways and residential neighborhoods. The
renderings shall also include photo-simulations of the antenna supporting structure after it has
been fully developed with antenna structures (the applicant may assume for the purpose of the
simulation that other antenna structures on the facility will resemble their proposed structure size
and design). A minimum of two such renderings shall be provided; additional renderings may be
required if the City determines that additional views should be considered.
(F) Exterior paint or finish samples of the colors to be used in the construction of the
wireless communications facility.
(G) A report from a qualified and licensed professional engineer which:
(1) Describes the wireless telecommunication tower height and design including a
cross-section and elevation;
(2) Certifies the wireless telecommunication tower's compliance with structural and
electrical standards;
(3) Documents the height above grade for the mounting positions,which can be used
for co-location and the minimum separation distances between the co-location positions; and
(4) Describes the wireless telecommunication tower's capacity to support antennae,
including an example of the number and type of antennas that can be accommodated on the
wireless telecommunication tower.
(H) In conjunction with the information required to demonstrate the proof of need for a new
facility under this Chapter, the applicant shall submit a 5-year plan for wireless
telecommunication facilities to be located within the city. The city acknowledges that the plans
are fluid and in all likelihood will change depending upon market demands for the service. The
city will maintain an inventory of all existing and reasonably anticipated cell site installations.
The applicant shall provide the following written information in each 5-year plan and the plan
must be updated with each submittal for a new wireless telecommunication tower permit as
necessary,
(1) A description of the radio frequencies to be used for each technology;
(2) A list of all existing sites to be upgraded or replaced, and proposed cell sites within
the city for these services by the applicant; and
(3) A presentation size map of the city, which shows the 5-year plan for cell sites, or if
individual properties are not known, the geographic service areas of the cell sites.
(I) An application fee in an amount prescribed from time to time by City Council
resolution as necessary to reimburse the city for costs incurred to process the wireless
telecommunication tower permit application along with an escrow,payment as prescribed by the
City Council to cover the costs associated with the City's review of the permit;
City Council Workshop Draft- CLEAN - 8 - 1012212009
(J) Confirmation that the applicant is properly licensed by the F.C.C., or is the authorized
representative of a wireless telecommunication provider properly licensed by the F.C.C.;
(K) Written authorization from the property owner describing the area which will be subject
to the tower lease.
(L) Documentation of the steps to be taken by applicant to avoid causing destructive
interference to co-located previously established public safety communications facilities; and
(M)A detailed landscape plan, which indicates how tower accessory equipment will be
screened.
§ 150.119 EXPERT REVIEW
(A) Where due to the complexity of the methodology or analysis required to review an
application for a wireless communications facility, the Planning Director may require a technical
review by a third party expert. The costs of this review shall he borne by the applicant, and shall
be in addition to applicable Conditional Use or Wireless Communications Permit and building
permit fees. The applicant shall submit an escrow deposit that may be applied towards the cost
of such technical review upon notification from the Director that a technical review is required,
and shall remit any outstanding balance to the city for such review prior to issuance of a building
permit. The maximum fee for such review and the required escrow deposit shall be in
accordance with the fee schedule adopted by the City Council.
(B) The expert review may address any or all of the following:
(1) The accuracy and completeness of submissions;
(2) The applicability of analysis techniques and methodologies;
(3) The validity of conclusions reached;
(4) Whether the proposed wireless communications facility complies with the
applicable approval criteria set forth in these regulations;
(5) Other matters deemed by the City to be relevant to determining whether a proposed
wireless communications facility complies with the provisions of these regulations.
(C) Based on the results of the expert review, the City may require changes to the
applicant's application or submittals.
(D) The applicant shall reimburse the city within 15 working days of the date of receipt of
an invoice for expenses associated with the third party expert's review of the application. Failure
by the applicant to make reimbursement pursuant to this section shall abate the pending
application until paid in full.
Cite Council Workshop Draft- CLEAN - 9 - .1012212009
§ 150.120 CONSTRUCTION PERMITS.
All wireless telecommunication towers erected, constructed, or located within the city, and
all wiring therefore, shall comply with the requirements set forth in the Uniform Building Code.
§ 150.121 TOWER STANDARDS.
(A) Wireless telecommunication towers shall comply with the following standards unless
the City Council grants a variance as necessary to reasonably accommodate the wireless
telecommunication tower. Variance procedures shall be processed according to the zoning code.
(B) Design.
(1) To blend into the surrounding enviromment through the use of color and
architectural treatment techniques that softens the visual impact of the wireless communication
tower on the surrounding environment.
(2) To be of a monopole design unless the City Council determines that an alternative
design would better blend into the surrounding environment;
(3) All proposed wireless telecommunication tower shall be designed, structurally,
electrically, and in all respects, to accommodate both the applicant's antennas and comparable
antennas for at least 2 additional users if the tower is over 100 feet in height or for at least 1
additional user if the tower less than 100 feet in height;provided that this standard maybe
waived or otherwise modified by the City Council as necessary to allow the applicant to
construct a wireless communication tower that better blends into the surrounding environment.
(4) Where possible, all proposed wireless telecommunication towers must be designed
to allow for future rearrangement of antennas upon the tower and to accept antennas mounted at
various heights.
(5) All facilities shall be designed to minimize the visual impact to the greatest extent
feasible by means of placement, screening,landscaping with native species whenever feasible,
and camouflage, and to be compatible with existing architectural element,building materials,
and other site characteristics. The applicant shall use the least visible antennas possible to
accomplish the coverage objectives.
(C) Adverse effects on properties.
(1) New wireless communications facilities shall be configured and located in a
manner that shall minimize adverse effects,including visual impacts on adjacent properties. The
applicant shall demonstrate that alternative locations, configurations, and facility types have been
examined and shall address in narrative and graphic form the feasibility of any alternatives that
may have fewer adverse effects on adjacent properties than the facility, configuration, and
City Council Workshop Draft- CLEAN - 10 - 1012212009
location proposed.
(2) The following attributes shall be considered from vantage points at adjacent
properties,roadways, and occupied structures: height and location,mass and scale,materials and
color, existing and proposed vegetation and intervening structures.
(3) An applicant shall demonstrate through the photo-simulation requirements under
Section 150.114 that the project design employs each of these attributes in a manner that
minimizes adverse effects to the greatest extent possible.
(4) All facilities that have the potential for high visibility shall be sited in such a
manner as to cause the least detriment to the view shed of adjoining properties.
(D) Setbacks.
(1) No communications tower shall be located in the required front, side, or rear yard
setback of any parcel.
(2) No freestanding communications tower shall be located closer than 125% of the
tower height from any lot lines with the following exceptions:
(a) Towers in a side or rear yard that are adjacent to parcels zoned commercial,
-industrial, or public facility.
(3) Setbacks from buildings:
(a) In residential zoning districts, wireless communications towers shall be set
back a minimum of 100% of the tower height from a residential dwelling except for dwellings on
the subject property.
(b) In all other zoning districts,the minimum setback between structures as
required by the building code shall be observed.
(4) Use of existing light poles,high voltage poles or towers, and other existing
structures are exempt from the setback requirements provided that such pole,tower, or structure
is not increased in height.
(5) Wireless Communications Towers located within an existing public utility power
line right-of-way or other public right-of-way that contains utility poles over 75 feet in height or
within 100 feet of said right-of-way shall be exempt from the setbacks as herein required:.
(6) A required setback may be reduced or its location in relation to a public street
varied upon providing the city with a licensed professional engineer's certification that the
wireless telecommunication tower is designed to collapse or fail within a distance or zone shorter
than the required setback distance.
(E) Height.
Cite Council Workshop Draft- CLEAN 11 - 1012212009
(1) The maximum height of a wireless communications tower shall be determined
based on the underlying zoning district and will be the amount specified in Section 150.117.
(F) Lighting. At night, wireless telecommunication towers shall not be illuminated by
artificial means, unless otherwise required by the Federal Aviation Administration (FAA).
(1) White strobe lighting shall be prohibited.
(2) The applicant shall document the need for lighting as part of a new wireless
communications facility application.
(3) A site that requires lighting shall only be accepted when no other suitable
alternative exists. A new tower may be rejected on the grounds that lighting will be a visual
nuisance to surrounding properties.
(G) Landscaping and Screening. All wireless communications towers and related building
facilities shall be landscaped and screened with natural vegetation to lessen the visual impact.
The natural vegetation on the site shall be documented on the site plans. Suitable existing
vegetation shall be retained to the maximum extent possible based on an analysis of the site.
New landscaping shall be selected that includes coniferous and deciduous plants and trees that
are hardy for conditions on the site without the use of augmented water.
(1) Landscaping shall include ground cover, lower story, mid-story, and upper story
plants. Plant density shall be sufficient to provide 80 percent opacity year round from the ground
up to a distance of 5 feet high for 60 percent or more of the site with the planting to be located
based on an analysis of the site in relation to the surrounding area. Greater or lesser amounts and
percentages may be required or allowed based on the City's review.
(H) Signs and Advertising. The use of any portion of a wireless telecommunication tower
for signs other than warning or equipment information sign is prohibited.
(1) Interference with public safety communication. No wireless telecommunication facility
shall interfere with public safety telecommunications. All wireless telecommunication
towers/antennas shall comply with F.C.C. regulations and licensing requirements.
(1997 Code, § 1390.14) (Ord. 97-24, passed 1-21-1998) Penalty, see § 10.99
Q)Accessory utility buildings. All utility buildings and structures accessory to a tower shall
be architecturally designed to blend in with the surrounding environment and compatible with
adjacent buildings, and shall be permitted in addition to the number of accessory buildings
otherwise allowed in each zoning district.
(1) Ground mounted equipment. Ground mounted equipment shall not be visible from
beyond the boundaries of the site and shall be screened by a solid wall or fence and dense
landscaping materials described in paragraph G above.
(2) Accessory utility buildings shall observe the minimum setback requirements for
City Council Workshop Draft- CLEAN - 12 - 1012.212009
accessory buildings in the underlying zoning district as well as all other applicable zoning and
building requirements for accessory buildings.
(K)Maintenance. All buildings and structures on the premises of the wireless
communications facility shall observe the City's property maintenance standards of the City
Code.
§ 150.122 WIRELESS COMMUNICATIONS 'POWER AGREEMENT.
(A) If the application is approved by the City, a wirelesscommunications permit and a
building permit shall be issued upon the execution of a wireless communication tower
agreement.
. (B) The agreement shall be signed by the applicant and property owner and the terms of the
agreement shall include the following:
(1) A list of the conditions of approval to the wireless telecommunication tower
permit;
(2) A statement indicating that failure to comply with the conditions of approval shall
result in the removal of the wireless telecommunication tower, antennae, or tower accessory
equipment;
(3) A statement indicating that the expenses incurred by the city to enforce the
provisions.of the wireless telecommunication tower agreement shall be reimbursed by the
applicant;
(4) A statement, which requires the applicant to utilize the procedures established by
the F.C.C. to resolve any complaints received relating to interference allegedly caused by the
wireless telecommunication tower; and
(5) A statement indicating that a wireless telecommunication tower which has not been
used for six (6) consecutive months shall be deemed abandoned and may be required to be
removed in accordance with Section 150.123 below. To ensure compliance with this provision,
the applicant must submit a performance bond or letter of credit in an amount sufficient to cover
the removal or reduction costs.
150123 ABA1\DONn'lENT AND REMOVAL
(A) Towers and antennae shall be removed within six(6) months of cessation of use.
(B) An owner wishing to extend the time for removal or reactivation shall submit an
application stating the reason for such extension. The Planning Director may extend the time for
removal or reactivation up to 60 days upon showing of a good cause. If the tower or antennae is
not removed in a timely fashion,the City may give notice that it will contract for removal within
City Council Workshop Draft- CLEAN - 13 - 1012212009
30 days following written notice to the owner. Thereafter,the City may cause removal and be
reimbursed for all costs associated with said removal by drawing on the funds provided with the
financial guarantee.
(C) Upon removal of the wireless communications facility, the site shall be returned to its
natural state and topography and vegetated consistent with the natural surroundings,
§ 150.124 MINIMUM CONDITIONS
(A) General conditions on a wireless communications permit may include,but not be
limited to the following:
(1) An agreement providing for co-location and six(6)month removal of unused
and/or obsolete towers shall be attached and become part of the permit.
(2) The tower shall be set back a distance equal to the tower height from all property
lines. All accessory structures shall be setback a minimum of twenty (20) feet from
all side yard and rear yard property lines
(3) Zoning Permits shall be applied for and issued before any construction is started.
(4) Prior to application for a conditional use permit, applicant must obtain FAA
approval and/or provide documentation that FAA approval is not needed.
(5) Applicant must obtain FCC licensure and approval as required for various
communications applications.
(6) Applicant must submit proof of liability and Worker's compensation Insurance.
(7) Proof that towers and their antennas have been designed by, and following
completion of construction were inspected by a qualified and licensed professional
engineer (at the applicant's expenses)to conform to applicable state structural
building standards and all other applicable reviewing agencies and to conform with
accepted electrical engineering methods and practices as specified in applicable
provisions of the National Electrical Code.
(8) Metal towers shall be constructed of, or treated with, corrosive resistant material.
(9) The addition of antennas and associated equipment of an additional provider to an
existing permitted tower shall be considered co-location and shall require a zoning
permit and site plan approval. An amendment to a conditional use permit shall
typically not be required
(10)All towers shall be reasonably protected against unauthorized climbing. The area
around the base of the tower and guy wire anchors shall be enclosed by a fence
with a minimum height of six(6) feet with a locked gate.
City Council ff orkshop Draft- CLEAN - 14 - 1012212009
(11)All towers and their antennas shall utilize building materials, colors, textures,
screening and landscaping that effectively blend the tower facilities within the
surrounding natural setting and built environmentally to the greatest extent
possible.
(12)No part of any antenna or tower,nor any lines, cable, equipment,wires, or braces
shall at any time extend across or over any part of the right of way,public street,
highway, or sidewalk,without approval by the City through the zoning permit
approval process.
(13)All obsolete or unused towers and accompanying accessory facilities shall be
removed within six(6)months of the cessation of operations at the site unless a
time extension is approved by the City.After the facilities are removed,the site
shall be restored to its original or an improved state which includes removal of all
concrete to 6-feet below normal grade and surrounding area returned to normal
grading. Electronic equipment shall not be removed in advance of removal of
obsolete or unused towers. To ensure compliance,the applicant must submit a
performance bond or letter of credit in an amount sufficient to cover all removal
costs as determined by the City prior to the issuance of a building permit for the
facility. Failure to remove the structure shall be cause for the City to remove the
tower and associated equipment and assess the cost against the required bonding or
letter of credit instrument.
(14)The City of Lake Elmo shall conduct a final inspection of the site to ensure that all
requirements of the City Code and all conditions of approval attached as part of the
wireless communications permit are met prior to the start of operation of the
facility.
(15)For installations of a facility in an area that could potentially be accessed by the
public(including rooftop installations or other locations that would be considered
public verses occupational) a radio frequency hazard analysis and a yearly report
must be submitted before December 31 of each year showing the results of on-site
measurements at the site. A Registered Professional Engineer hired by the provider
must sign these measurements and report. At a minimum, the report must
document any changes to the site over the course of the previous year.
City Council Workshop Draft- CLEAN - 15 - 1012212009
City Council
Date: 10/27/09
WORKSHOP
Item:4a
INFORMATION:
AGENDA ITEM: Review of Proposed 2010 General Fund Budget
SUBMITTED BY: Tom Bouthilet,Finance Director
THROUGH: Bruce A Messelt, City Administrat4p
REVIEWED BY: Joe Rigdon, KDV
SUMMARY AND ACTION REQUESTED:
Attached please find preliminary draft General Fund Budget. Council is being asked to review
the draft General Fund Budget as part of its workshop on October 27, 2009 and provide
direction, as appropriate, on preparation of the final budget.
STAFF REPORT:
City staff has been meeting with the Council Budget Advisory Committee and have developed
several scenarios for possible final formation of the 2010 General Fund Budget. In conjunction
with the Council Advisory Committee, City staff have honed in on one specific approach
(Scenario F) that appears to meet the overall will and desire of the City Council, as expressed in
previous meetings and discussions.
ADDITIONAL INFORMATION:
City staff proposes discussing with the City Council the various scenarios and, specifically,
presenting in detail several variations to the preferred scenario, Scenario F, which:
• Reduces general operating activities and personnel due to the overall economic recession;
• Takes available action to replace lost MVHC due to the Governor's 2009 unallotments;
• Constructs a modest General Fund transfer for the City's Capital Improvement Program
of approximately$145,000, separate from the Parks CIP funding;
• Utilizes a portion of the City's remaining 2004 G.O. bond proceeds to pay down
remaining debt on this bond issuance;
• Retains approximately $500,000 from the 2004 G.O. bond proceeds for major facility
capital improvements or allocation against remaining debt in the future;
--page 1 --
City Council Workshop Review of Proposed 2010 General Fund Budget
October 27t,2009 Agenda Item#4a
• Holds the overall increase in the Tax Levy to a modest increase, aimed primarily at
capturing back the lost MVHC and accelerating the City's debt repayment; and
• Reduces or holds at the same level the actual amount of property taxes paid by a typical
Lake Elmo property owner and resident.
ATTACHMENTS:
Draft 2010 General Fund Budget
Detail Explanation of Scenario F (one additional variant of Scenario F is still being
constructed for Council review)
ORDER OF BUSINESS:
- Introduction..................................................Bruce Messelt, City Administrator
- General Presentation.......................................Tom Bouthilet,Finance Director
- Detail Presentation..............................................Joe Rigdon, Financial Advisor
- Questions & Discussion..........................................Mayor& Council Members
--page 2 --
DRAFT
8
E E E gR o o
P X v8�'8Rv m^
2
88 $ m� 01 PSI
o 8� S Sm 8� R A n' R
sandneYi m _ p
Z.12 Z. zn
RR a R<
2 tt
�, g SS RAo R� m o� Moo.
xn o
11.9
>�o R - -
9` �m { 8i �z°z° aQ �R P.� - Qo mB Ha N $n - R
>18
_
W" ss 88 m8 N9om mm o 9 o$ok x
u x
R iM
¢`vB;
.u�xi F
R 8
- o
�ovoo $ e
2aR 88 R mS o� -d lb- v G 1. _
- U
Al or o s s
e� s mR as
OF "S ono ps
` o �
_ x �
x 3 F E
S4 Q qq
U Y
=qw m new FLLur n— �_ aaF ❑ eu 2 —(�(� 2 —� � '
3 u��
City of Lake Elmo
Budget 2010
0 DAYS UNPAID FURLOUGH
2009 2010 200D
2008 2008 200D Year-to-Date 2009 Preliminary to 2010
Account Number Description Budget Actual Budget (07/31109) Projected Budget Change
GENERAL FUND
Revenues
Property Taxes/Franchise Fees
101-000-D000-31010 Current Ad Valorem Taxes $2,221,486 $1,983.206 $2,332,130 $1,012,177 $2,119.749 $2,360.790 1.2%
101-000.0000-31010 2008 MVHC Unallotment Recovery $0 $0 $o $0 $0 $19,366 NIA
101.000-000031010 2009 MVHC Unallotment Recovery $0 $0 $D $0 $0 $36,475 WA
101-GOO-000031010 MVHC state UnaBolmenl $0 $0 $0 $0 ($35,475) ($33,759) WA
101-000-0000.31020 Delinquent Ad Valorem Taxes $0 $11,899 $0 $26,176 $40,000 $0 WA
101-000-0000.31030 Mobile Home Tax $8.000 $7,884 $81000 $3,549 $7,500 $B,DDO 0.0%
101-000.00DD-31040 Fiscal Disparities $0 $107.768 $0 $88,327 $172,381 $0 NIA
101-DOD-0000.31910 Penalty&Interest on Taxes $0 ($77) $0 $96 $100 $0 NIA
101-000-0000-33620 Gravel Tax $3,250 $2,881 $2,500 $1,567 $3,100 $3,100 24.0%
101400-0000-33622 Cable Franchise Revenue $27 000 $31 680 $30 000 $34,916 $34.918 $35,000 16.7%_
Total Properly TaxesiFranchlse Fees $2 259 736 $2145,140 $2,372 630 111,165,909 $2.342,271 $2,427,971 2.3%
Licenses and Permits
101-ODO-DODO32JID Liquor License $7,200 $7,200 $7,2DO m$0' $7,200 $7,200 0.0%
101-000-00OD-32180 WastehaulorLicense $500 $440 $600 _41o, $1,365 $1,000 100A%
101-ODO-0000-32181 General Contractor License $2,000 $1.610 $1,600 .nS.-K$gj�225 $2,226 $1,800 20.0%
101-000-0000-32183 HestingConlractorLicense $800 $640 $795 z=_"'`' &6,:�, $600 $200 -74.8%
JDI-000-0000-32184 Blacktopping Contractor License $60 $0 $60 T $dr $0 $60 D,0°k
101-000.0000-32210 Building Permits $200,000 $154,889 $140,000.;;;:. $66.418i� $90,00o $100,000 -28.6%
101.000-0000-32220 Heating Permits $11,000 $8,B75 $4,500':" $6,022 -% '<;. $7,000 $3,000 33.3%
101-000-OODD-32230 Plumbing Permits $11,000 $6,810 $4;606 $2,405 -i-,-$3,000 $3,000 .33,3°h
:
101-000-0000-32231 Sewer Permits $2,000 $3,375 „$Iisoo $371 -.: $500 $600 -66.7%
101-000-0000.32240 Animal License $2,000 $2,302 J,$2;000 .=s$1,754 -E2,000 $2,000 0.0%
101-000-000032260 UBIItyPermits $5,000 $B,840 $4,OOD $14,310 $15,000 $6,000 50.0%
101-000-0000-32260 Burning Permit $1,200 $1.260 -,_$1000 ,; ' $675 $1,000 $1,000 0.0%
101-WO-00OD-34104 Plan Chock Fees $86160 $48.853 $45;000:; $16,538 $25 000 $32,000 -28.9%_
Total Licenses and Permits $329 920 $242 074 $212 lin,,-: $112 104 $154,790 $157 760 -25.8%
Intergovernmental
-_,. `
101 OOD-o00D33g01 Local Government $o D-, i ;y" 1:;,- $o $0 $o N/A
101-DOD-0000-33402 Homestead Credit Aid $0 $2e.50,, F r "$d?° $0 $0 $0 NIA
101-000,0000-33418 MSA-Maintenance $67,275.._,W,_ $67,27 ?;,;�-:=$67,275 $88,797 $88,797 $63,500 1.8%
101.000-OOOa-33420 State Fire Akl $57,394 $39,747°^=^ $60,00a $1,690 $40,000 $40,000 33.3%
101-000-000033422 PERA Aid 3 '1-d =` $2,749'" � $2,750 $1,376 $2,760 $2,750 D.0%
101-000-W(10.33426 Miscellaneous State Grants 8,068 $0 $13,964 $'14,00 $0 NIA
101-000-DODO-33621 Recycling Grant - 1b,270 _$15476 - $15000 $15476 $16476 $15000 0.0%
......_.....,__.^_.. Yam.
Total Intergovernmental t42,83B $1i 961^. $145,025 $121.291 $161.023 $126 250 -12.9%
Charges for Services
101-000-000034103 Zoning&Subdivision $11,410 $4,000 $1,050 $1,500 $1,000 -75.0%
101-000-1)(W34105 Sale ofCcoes,Book s,,fJjaps $300 ; $205 $3110 $110 $200 $300 0.0%
101 00000003g107 Assessment Search.... w =•$160 '" $175 $150 $210 $300 $200 33.3%
00
101.000 0034109 Clean Up Days
�'t:-- 00 $3,833 $5,000 $4,367 $4,367 $4,000 -20.0%
1 01-000-000034 1 1 1 Cable Operation R101@ 6menl '$2i000 $1,67a $2A00 $911 $1,800 $2,400 0.0%
Total Charges for Services. $3450 $17 300 $11,051) $6 648 58167 $7 900 33.3%
Fines
101-000-0000-35100 Fines 11166,000 $601919 $52,ODO $24,830 $49,600 $52,000 D.0%
Total Fines $65 000 $60.919 $62 000 $24 830 $49,500 $62,000 0.0%
Other
101-000-000036200 Miscellaneous Revenue $21,973 $19,886 $18,000 $24,191 $25,000 $17,126 -0.8%
101-D00-0000.36210 Interest Earnings $80,000 $78,026 $80.000 $0 $60,000 $60,000 -25,0%
101-000-0000.36230 Donations $0 $8500 $0 $8500 $8500 $0 NIA
Total Other $101973 $106390 $98000 $32691 $935m $77128 -21.3%
Total Revenues $2,932 748 $2.751 712 $2 892 0W $1 4e4 474 $2 809.251 $2 649 0D9 -1.5%
Other Financing Sources
101-000-0000.392GO TransterIn $O $0 $0 $D $0 $0 NIA
Total Other Financing Sources $0 $0 $0 $0 $0 $0 N/A
Total Revenues and Other Financing Sources $2 932,718 $2,751,7112 $2,892 060 $1 454,474 $2.809 251 _$2.849 009 -1.5%
City of Lake Elmo
Budget2010
0 DAYS UNPAID FLLRLDLIGN
2D39 20D 2009
Department 20D9 2008 2009 Year-to-Date 2009 Prellmiriary to 2010
Number laoscrhp`ion _ budget Actual Budget 107i311091 Projected Dudget Chan_
GENERALFUND
ExpendhUre$by Pmgrarn&Department -
General Government
1110 Mayor&Council $43,298 $34,322 $33,992 $19,041 $93,892 $33,992 0,0%
1320 Administration $547,007 $490,040 $466,192 $228,618 $442.870 $457,792 -1.8%
1410 beckons $17,014 $10,505 $1,000 $M $080 $11,950 1095.0%
1450 Communications $0 $0 $66,364 $29,665 $57.824 $51,012 -9.5%
1620 Finance $157,891 $177,255 $107,121 $04,363 $126,710 $105,788 -1.2%
1810 Planning&Zoning $214,603 $108,198 $202,657 $126,288 11244,397 $182,028 -10.2%
11930 Englneering Services $94,0W $108,119 $72,D06 $32,741 $72,000 $70,001) -2,3%
1940 City Hall t$0 525 $39 989 $40 943 $20,946 $41,803 $40,750 -0.5%
Total General Government $1 113 038 $1058428 $980 2% $522 545 $10201le6 $953 312 -2.7%
PUNK Safety
2100 Police $431,000 $436,773 $466,1350 $0, $463,950 $474,936 1.7%
2150 Prosecution $58,000 $51,246 $55.000 $2106'' $65,000 $51,000 -7.3%
2220 no $416,858 $313,214 $390,930 $1765'6 $383,186 $377,483 -3.4%
2250 Fire Relief $57.344 $39,747 $80,000 ' $40,000 $57.664 -3.0%
2400 Building Inspection $131,456 $87.677 $1188,580 , D,337 $99,463 $94.992 •49.8%
2700 Animal Control - $12250 $12862 $12,8b0 •`�$4;a81 E12,6oD $12,860 0,D%
Total Public Safety $1 105 008 $941 218 $1.174 310. ': $2b3,630-= $1.057,199 $1 069,124 -8.D%
PUNIC Works
3100 Public Works $488,928 $409,182 $324,978 „"''$172,121 Na$306,432 $305,471 .8.0%
3120 Streets $0 $D *$78,880,0-:' $16,913 $71.500 $80,50D 2.1%
3125 We&Snow Removal $o $o 583,50a' $37,424 $661500 $53,500 0.0%
3180 Street Lighting $251000 $27,410 `="sg%kQtld' $10.192 $24,000 $24,000 0.0%
32M Recycling $16,000 $9,564 $15f1pu; $1,18e $151000 $15,000 0.0%
3250 Tree Program $0 F-_$0 $12 006 - $20,000_ $10 000 -28,696
Total Public Works $528 928 ^^°tt6&4.A56 $520 338= z,.$249 842 $603 432 $498 471 -4.2%
Culture&Recreation
6200 Perks&Recreation .$1$&944': $141.52D $217143 $101350 $1913216 $1B2452
Total Culture&Rperaafipn =5183,944 $141 620 $217143 $101 356 $1913,216 $182152
Total Expenditures -$2 992.Z? L- -S�38 $2,692 060 $1 127 375 $2 779.013 $2,703,059 -6.5%
Other Financing Uses ry::•
Transfers out :t;.••:, - =tgti $Br50o $0 $D $e 600 $145 B50 NrA
3.
Total Other Financing $0-`"� $8 500 $0 $0 B 500 145,950 $0
US
Total Expenditures and Other Fbi „Uses ,t '932718 $2,595,822 $2,892,060 $1,127,376 $2,787,513 _ $2,849,009 -1.51/6
Expenditures by Classifiestlort -
Personnel Services $1,339.012 $1,051,240 $1,306,897 $692,328 $1,149.973 $1,144,674 .12.4%
Supplies $167,100 $1e5,089 $183,830 $67,607 $165,733 $181,400 -1.3440
Other Services and Charges $1,399,686 $1,351,328 $1,401,333 $467,440 $1,462,307 $1,376,985 -1.7%
capital away $28 940 $19 655 $0 $0 $0 $0 NIA
Total Expenditures $2,932,716 $2,667,322 $2,992,060 $1,127,375 $2,779,013 $2,703,059 -6.5%
Transfers Out $0 $8 500 $0 $0 $B,500 $145 950 NIA
Total Expenditures and Other Financing Uses $2,032,71ft $2.695,822 $2,892,080 $1,127,375 $2,787,513 $2,849.009 -1,5%
City of Lake Elmo
2010 Proposed Property Tax Scenario
Residential Homesteads
SCENARIO F: MAXIMUM LEVY(TO THE LEVY LIMIT,PLUS LEVIES FOR 2008 AND 2009 MVHC UNALLOTMENTS)
INCLUDES REDUCTION IN BUILDING BONDS LEVY OF$134,764
2009 2010 Chance
Tax Rate: Variable 19.878% 20.099% 1.1%
General Fund Levy: Variable $2,332,130 $2,360,790 $28,660
Levy Limit Increase: 0.83%,plus misc.
Reduction in Building Bonds Levy: Yes
Existing Debt Service Levies: Variable $376,073 $241,716 ($134,357)
New Special Levies:
2009 Street Bonds: Yes $0 $51,000 $51,000
2008 MVHC Unallotment Recovery: Yes $0 $19,365 $19,365
2009 MVHC Unallotment Recovery: Yes $0 =3 $35,475 $35,475
2009 CITY PROPERTY TAXES
City Local C[ty M
Market Tax Tax Capacity Property
Value Capacity* Rate 'pJ" Taxes
m:
2009 2009 Pay 2009 009
$100,000 $1,000 19877% $a99
$300,ODO $3,000 19.8
$500,000 $5,000 19.878°Zo,
$70D,000 $7,500 19.878��g mm °`' $1:491
2010 CITY PROPERTY TAXES(WIT_H No,IUTARKET VALUE CHANGE)
Market C+total City Property Percentage
Value Tax ''T:i)sCapacity Property Taxes Tax
2010 Capacity w Rate Taxes increase Increase
NO CHANGE 215;1 b __ PayO 10 2010 (Decrease) (Decrease)
$100,000 T-n $1,000 20.099% $201 $2 1.1%
$300,000 ";$3,000 20.099% $603 $7 1.1%
$500,000 5,000 20.099% $1,005 $11 1.1%
$700,000 $7,5:ClQ 20.099% $1,507 $17 1.1%
2010 CITY PROPERTY TAXES(WITH 4.9% MARKET VALUE DECREASE)
Market
Value City Local City Property Percentage
2010 Tax Tax Capacity Property Taxes Tax
DECREASE OF Capacity* Rate Taxes Increase Increase
-4.9% 2010 Pay 2010 2010 (Decrease) (Decrease)
$95,100 $951 20.099% $191 ($8) -3.8%
$285,300 $2,853 20.099% $573 ($23) -3.8%
$475,500 $4,755 20.099% $956 ($38) -3.8%
$665,700 $7,071 20.099% $1,421 ($70) -4.7%
* Tax Capacity rates for residential homesteads are 1.00%of the first$500,000 of market value,
plus 1.25%of any market value over$500,000
City of Lake Elmo
2010 Proposed Property Tax Scenario
Residential Homesteads
SCENARIO F1: MAXIMUM LEVY(TO THE LEVY LIMIT,PLUS LEVIES FOR 2008 AND 2009 MVHC UNALLOTMENTS
INCLUDES REDUCTION IN BUILDING BONDS LEVY OF$32,264
2009 2010 Change
Tax Rate: Variable 19,878% 20,910% 5.2%
General Fund Levy: Variable $2,332,130 $2,360,790 $28,660
Levy Limit Increase: 0.83%, plus mist.
Reduction in Building Bonds Levy: Yes
Existing Debt Service Levies: Variable $376,073 $344,216 ($31,857)
New Special Levies:
2009 Street Bonds: Yes $0 $51,000 $51,000
2008 MVHC Unallotment Recovery: Yes $0 $19,365 $19,366
2009 MVHC Unallotment Recovery: Yes $0 -� $36,475 $35,476
2009 CITY PROPERTY TAXES
City Local City,
Market Tax Tax Capacity P.roPe4Y
Value Capacity* Rate =Taxes
2009 2009 Pay 2009009
$100,000 $1,000 19,878% V r$.199
$300,000 $3,000 19 878% $ 96
$500,000 $5,000 19.878%,
$700,000 $7,600 19.878%M. '`R$ °;491
2010 CITY PROPERTY TAXES(WITH Na MARKEFVALUE CHANGE)
Market - CiVE'dcal -. City Property Percentage
Value Tax R T .capacity Property Taxes Tax
2010 Capacity Rate Taxes Increase Increase
NO CHANGE 4 i0 Pay 'Q10 2010 (Decrease) (Decrease)
$100,000 m',._ $1,000 20.910% °$209 $10 5.2/o
$300,000 n$3,000 20.910% $627 $31 5.2%
$500,0005,000 20.910% $1,046 $52 5.2%
$700,000 $7;50Q 20.910% $1,568 $77 5.2%
2010 CITY PROPERTY TAXES(WITH 4.9%MARKET VALUE DECREASE)
Market
Value City Local City Property Percentage
2010 Tax Tax Capacity Property Taxes Tax
DECREASE OF Capacity* Rate Taxes Increase Increase
-4.9% 2010 Pay 2010 2010 (Decrease) (Decrease)
$95,100 $951 20.910% $199 $0 0.0%
$285,300 $2,853 20.910% $597 $0 0.0%
$475,500 $4,755 20.910% $994 $0 0.0%
$665,700 $7,071 20.910% $1,479 ($12) -0.8%
* Tax Capacity rates for residential homesteads are 1.00%of the first$600,000 of market value,
plus 1.26%of any market value over$500,000
City of Lake Elmo
2010 Proposed Property Tax Scenario
Residential Homesteads
SCENARIO F2: MAXIMUM LEVY(TO THE LEVY LIMIT,PLUS LEVIES FOR 2008 AND 2009 MVHC UNALLOTMENTS}
INCLUDES REDUCTION IN BUILDING BONDS LEVY OF$99,764
2009 2010 Change
Tax Rate: Variable 19.878% 20.376% 2.5%
General Fund Levy: Variable $2,332,130 $2,360,790 $28,660
Levy Limit Increase: 0.83%,Pius misc.
Reduction in Building Bonds Levy: Yes
Existing Debt Service Levies: Variable $376,073 $276,716 ($99,357)
New Special Levies:
2009 Street Bonds: Yes $0 $51,000 $51,000
2008 MVHC Unallotment Recovery; Yes $0 n $19,365 $19,365
-z 2009 MVHC Unallotment Recovery: Yes $0 .��':_� $35,475 $35,475
2009 CITY PROPERTY TAXES
City Local City
Market Tax Tax Capacity Property
Value Capacity" Rate Taxes
2009 2009 Pay 2009 2009
$100,000 $1,000 19.8�8%0 $199
$300,000 $3,000 19 878% $596.
$500,000 $5,000 $994
$700,000 $7,500 19.87 $1,491
2010 CITY PROPERTY TAXES(WITH NO MARKET VALUE CHANGE)
Market 0ty- ocal s City Property Percentage
Value Tax Tax Capacity Property Taxes Tax
2010 Capaoityl-�.,-= : `Rate Taxes Increase Increase
NO CHANGE Pay2010 2010 (Decrease) (Decrease)
$100,000 $1,000 20.376% $204 $5 2.5%
$300,000 $3,000 20.376% $611 $15 2.5%
$500,000 $5,000 r; 20,376% $1,019 $25 2.5%
$700,000 $.7 500 0.=M' 20.376% $1,528 $37 2.5%
2010 CITY PROPERTY TAXES(WITH 4.9%MARKET VALUE DECREASE)
Market
Value City Local City Property Percentage
2010 Tax Tax Capacity Property Taxes Tax
DECREASE OF Capacity* Rate Taxes Increase Increase
-Q g% 2010 Pay 2010 2010 (Decrease) (Decrease)
$95,100 $951 20.376% $194 ($5) -2.5%
$285,300 $2,853 20.376% $581 ($15) -2.5%
$475,500 $4,755 20,376% $969 ($25) -2.5%
$666,700 $7,071 20.376% $1,441 ($50) -3.4%
Tax Capacity rates for residential homesteads are 1.00%of the first$500,000 of market value,
plus 1.25%of any market value over$500,000
City Council
Date: 10/27/09
WORKSHOP
Item: 4b
INFORMATION:
AGENDA ITEM: Review of Proposed 2010 Budgets for Enterprise Funds
SUBMITTED BY: Tom Bouthilet, Finance Director W,1
THROUGH: Bruce A Messelt City Administrator
REVIEWED BY: Joe Rigdon, KDV
SUMMARY AND ACTION REQUESTED:
Attached please find preliminary draft enterprise funds budgets. The City has accounts for three
separate enterprise funds; water sewer & surface water. Council is being asked to review the
draft Enterprise Fund Budgets as part of its workshop on October 27, 2009 and provide
direction, as appropriate, on preparation of the final budgets.
STAFF REPORT:
Water Enterprise Budget: Based upon current projections, the Water Fund is expected to incur
an annual loss of$393,609 in 2010, approximately $75,000 less than that budgeted in 2009. This
deficiency is primarily due to debt service payment on a Water Revenue Bond of$191,955 and a
result of slower-than-expected community development and increase in customers. When issues,
these G.O. Revenue Bond payments reflected funding from WAC charges from new
developments and ongoing annual service charges. Once planned development occurs, these
revenues are still projected to be sufficient to cover the bond payments.
In the interim,while somewhat problematic,the Water Fund does not presently represent a major
financial challenge. When adding back non-cash depreciation expense of approximately
$310,000, the City is faced with an actual negative cash flow of$73,609. Moreover, sufficient
reserve funds exist within the Water Utility to cover reasonable annual fiscal deficiencies for the
near future.
Nevertheless, City staff recommends addressing this issue now through a proposed new
conservation rate structure (included in this analysis and attached behind the Enterprise Fund
budgets), utilization of some Water Fund Reserves, and a proposed transfer from the 2010
General Fund Budget to the Capital Improvement Program, earmarked for the Water Fund bond
repayment.
--page 1 --
City Council Workshop Review of Proposed 2010 Budgets for Enterprise Funds
October 27 h,2009 Agenda Item#4b
Sewer Enterprise Budget: The 2010 Draft Sewer Enterprise Budget is expected to incur a loss
of$37,783, which is significantly reduced from the projected 2009 Budget loss of$74,540.00.
From a cash-flow perspective, adding back non-cash depreciation expense of$9,000 results in an
actual negative cash flow of$ 28,783. This deficiency will more than likely have to be made up
via a transfer from the General Fund Reserve Account, as insufficient funds exist within the
Sewer Enterprise Fund Reserve Account to cover this amount.
Also of note, City staff is expecting a possible increase in sewer charges from the Met Council.
As a result, we will continue to monitor the Sewer Fund and will return to the city council with
both an update and possible actions. While sewer rates were increased recently, given the nature
of this Enterprise Fund, such options must include a potential increase in sewer rates, among
others, to reach a balanced fund for subsequent years.
Surface Water Enterprise Budget: The 2010 Draft Surface Water Budget indicates a 2.5%
increase in revenue due to a proposed modest rate increase. As a result, the Fund is balanced for
2010.
ADDITIONAL INFORMATION:
None at this time.
ATTACHMENTS:
Draft 2010 Enterprise Fund Budgets
Proposed Water Conservation Fee Structures (one additional scenario, based solely on
consumptive volume,is still being constructed for Council review)
ORDER OF BUSINESS:
- Introduction..................................................Bruce Messelt, City Administrator
- Presentation.....................................................Tom Bouthilet, Finance Director
- Questions &Discussion..........................................Mayor& Council Members
--page 2--
City of Lake Elmo
Budge12010
2009 2D10 20D9
2008 2008 2009 Year-to-Date Preliminary to 2010
Account Number Description Budget Actual Budget (09;30109) Budget Change
601 Water
Revenue
000 General
0000 General
601-000.0000-36100 Special Assessments $5,000.00 $5,372.13 $4.000.00 $19,891.37 $4,00D.00 0.0%
601-000-0000-36205 Refunds and Reimbursements $0.00 $0.00 $0.00 $12,676.21 $0.00 NIA
601-000-0000-36210 Interest on Investments $20,000.00 $24,322.94 $10,000.00 $517.31 $9,000.00 •10.0%
601-000-0000-36231 Contrib.of Capital Assets $0.00 $669,031.30 $0.00 $0.00 $0.00 N/A
601-000-0000.37100 Water Sales $375,000.00 $430,174.11 $400,000.00 $258,650.11 $425,000.00 6.3%
601-000-0000-37160 Water Connections-Municipal $40,01)0.00 $45,500.00 $25,000.00 $33,875.00 $37,850.00 61.4%
601.000-0000.37160 Penalties $0.00 $om $0.00 $0.00 $0,00 NIA
601-000-0000-37170 Meter Sales $12,000.00 $5,997.00 $3,000.00 $5,629.73 $4,150.00 38.3%
601-000-0000.37180 Tower Rent $26,500.00 $25,792.50 $28,000.00 $33,924.19 $27,600.00 -1.4%
601-000-0000.39210 Transfer In $0 0000 $0.00 $0.00 $0.00 $50,000,00 NIA
0000 General $478,600. $1206,109.98 $470,000.00 `: $365A5.92 $557,600,00 18.6%
000 General $478,500.00 $1,206,189.98 $4700ODU6'-- ,_ $365.065.92 1557,600.00 1616%
Revenue $478,5DC.00 S",206,189.98 $h 0000.00 $38,;,065.92 $587.600.00 18.6%
Expense
494 Water -
9400 Water
601-494-MO 41010 Full-time Salaries $82,543.00 $721108.80"�,:T nM17.D0 $51,581.03 $73.587.00 -0.8%
601-494-9400 41210 PERA Contributions $6,365.00 $4,773.38 �ti b,007.00 $3,481.04 $5,150.00 2.9%
601.494-9400-41220 FICA Contributions $6.118.00 ;_$4,599.10 4,599.00 $3,113.06 $4,561.00 -0,8%
601-494-9400-41230 Medicare Contributions $1,197.00 $=1;075.60 ;"r �;076.00 $728.00 $1,067.00 -0.8%
601-494-9400-41300 Health/Dental Insurance $30,g8o,00 A -4;8 07 $iG?00,00 $10,967.10 $15,100.00 -6.8%
601-494-9400-41420 Unemployment Benefits $0.00 $t35 t15== `'S0:00 $0.00 $0.00 NIA
601-494-9400-41610 Workers Compensation $4,254.00 µ$2,604.7E':,- - 4,669.00 $3,890.57 $4,339.00 7,1%
60149 4-9 400-4200 0 Office Supplies $50A,DD " ,$0 -$500.00 $0.00 $200.00 -60.0%
601494-94W-42030 Printed Forms 0"D a-,2Q- $2,500.00 $11,1192.07 $2,500.00 0.01/0
601494-9400-42160 Chemicals ;rx1,0000;00'. $35 §.03 $8,00D.00 $3,418.40 $5.00D.00 -37.5%
601494-940042270 Utility System Maintenance $8,DD0.00 $t,9D3 35 $6,000A0 $1,959.67 $6,00D.00 0.0%
601494-940042300 Water Meters&Supplies ' $9,000.OD ;ed,= -$gA&.69 $60,230A0 $2,477.85 $65,000.00 7.9%
601494 Small Tools&Minor Equipment $2,50049 `'== 1,391`79 $2,500,00 $387.86 $2,500.00 0.0%
601-494-9400.43030 Engineering Services , -$ 00 $6Q?155.96 $20,000.00 $38,518.86 $50,000.00 150.0%
601.494-9400.43160 Contract Services $7,966.27 $16,000.00 $135.00 $15,000.00 0.0%
601-494-9400.43180 Software Supportf100.00 $5.763.00 $4,200.00 $3,063.00 $4,200.00 0.0%
601-494-9400.43210 Telephone $192.14 $600.00 $292.48 $550,00 -8.3%
601-494-8400-43220 Postage '-- $2,406:40L, $2,600.00 $2.400.00 $2,000.00 $2,100.00 -12.5%
M1 ;,,
601-494-9400-43230 Radio �- w.•• $O.OD $0.00 $0.00 $0.00 $0.00 q NIA
�
601.494-9400-43310 Mileage a:. `°;��,000.00 $711.00 $1,000.00 $O.DO $0.00 -100.0%
601494-940043320 Depreciation Expens6r .. 00.000.00 $281,163.00 $310,000.00 $0.00 $310,00.00 0.0%
601494-940043610Insurance f- 6,600.00 $8,826.00 $11,150.00 $9,143.00 $10,143.00 -9.0%
601494.940043810 Electric Utility ,14-k,000.00 $22,954.26 $30,000.00 $12,658.46 $30,000.00 0.0%
601494-9400.43820 Water Utility == $60,000.00 $114,958.28 $120,000.00 $62,615.91 $120,000.00 0.0%
601-4 Gas Ulilily - $0.00 $0.00 $0.00 $0.00 $0.00 NIA
601-494-9400-44030 RepairsWaint Imp Not Bldgs $10,000.00 $10,772.86 $10,000.00 $20,821.21 $10,000.00 0.0%
601-494-9400.44300 Miscellaneous $6,000.00 $6,754.20 $5,000.00 $1.622.96 $5,000.00 0.0%
60 1-4 94-9400-443 7 0 Conferences&Training $1,000.00 $1.191.15 $1,000.00 -$11.00 $1,000.00 0.0%
601.494-940045200 Building and Structures $0.00 $0.00 $0.00 $0.00 $0.00 NIA
601494-940045300 improvments Other Than Bldgs $0,00 $0.00 $0.00 $0,00 $0.00 N/A
601494-940045800 Other Equipment $10,000.00 $0.00 $5,000.00 $0.00 $0.00 -100.0%
601494-9400.46010 Bond Principal $0.00 $0.00 $0.00 $0.00 $0.90 N/A
601494-94OD-46110 Bond Interest $202,445.00 $202,224.00 $199,790.00 $99,895.00 $191,955.00 -3.9%
601494-9400.462DO Fiscal Agent Fees $0.00 $0.00 $1,835.00 $0.00 $0.00 -100.0%
601-494-9400-46300 Bond DlscountAmort. $6,277.00 $6.279.00 $6,277.00 $0.00 $6,277.00 0.0%
601.494-9400-46400 Water Mains $0.00 $0.00 $0.00 $0.00 $0.00 N/A
601-494-940047200 Transfer Out $0.00 $0.00 $0.00 $0.00 $0.00 NIA
9400 Water $11 179 00 $849 019.22 $928,710.00 $333 951.53 _ $941,209.00 1.3%
494 Water $813 179 00 $849 019.22 $928 710.00 $333.951.63 $941,209.00 1.3%_
Expense $813,179,00 $849,019.22 $928.710.00 $333,951.53 $941,209.00 1.3%
601 Water -$334 679.00 $357.170.76 -$458,710.00 $31,114.39 -$383,609.00 N/A
City of take Elmo
Budget 2010
2009 2010 2099
2000 2008 2000 Year-to-Date Preliminary to 2010
Account Number Description Budget Actual Budget 091301091 Bud et Chan o
602 Sewer
Revenue
000 General
0000 General
602-000-0000.30100 Special Assessment& $O,DD $0.00 $0.00 $04.86 N/A
602-000-0000-38210 Interest on Investments $2,500.00 $2,638.70 $2,500.00 $0.00 -100.0%
602-000.0000.37200 Sewer Sales $35,000.00 $44,568.26 $37,500.00 $21.682.87 $37,500.00 0.00/.
602-000-0000.37260 Connection Fees Municipal $0.00 $0A0 $0.00 $963.00 NIA
0000 General $37,600.00 $47,204.98 $40 000.00 $22,710.73 $37,500.00 _ - -6.3%
000 General $37a600 00 $47 204.98 $40 000 00 $22,710.73 $37,500,00 -0.3%
Revenue $37i600 00 $47 204 98 $40 000.00 $22,710.73 $37,600,00 -15.3%
Expense
495 Sewer
9460 Sewer 1,
602-496-9450-41010 Full-time$ataries $18,422.00 $15,122.24 $18821,OU=m:. $11,339A4 $16,218.00 3.8%
602A96-9450-41210 PERAContdbtMons $1,197.00 $1,048,00 $1135A0 �F ?,,. $764.77 $1,136.00 0.0%
602.495 M0.41220 FICA Contributions $1,142.00 $1.008,27 $1,043.00 -$677.88 $1,006.00 -3.5%
_602 96-94WA1230-Medicare Contributions- - -$267:00-- ---$236.76- - $244.00 $158.66- $235.00 -3.7%
602-495-9460-41300 Health/Dental insurance $4,648,00 $3,609.2 a $4 094.00 $2,794.71 $3,821.00 -6.7%
802 495 9460.41420 Unemployment BeneOts $0.00 $13 $000 $0.00 $GAO NIA
602.496-9460.41510 Workers Compensation $1,082.00 $463. ;_ $1�828.00 $1,023.27 $1,118.00
602-496-9450-42270 Utility System Maint Supplies $5,000,0D $1,824.V7 R j-`4"S8'.o00.00 $643.01 $2,000,00 -60.0%
602-495-9460-42400 Small Tools&Minor Equipment $2,500.00 $489.90 '-,$2,500,00 $630,22 $1,600.01) -40,0%
602-495-9450.43030 Engineering Services $1,500.00 ` $10,911,07 $1.0,000.OD $4,197.96 $6,000.00 -40,0%
602 495-9460.43150 Contract Services $0.o0 $3:98314 $35,0f o.00 $0.00 $10,000.00 -71.4%
602496-9450-43218 Telephone $1,800.00 $1,14492,; $i-1660,00 $724,11 $1,000.00 -33.3%
602-496-9460.43310 Mileage $500.00 $600.00 $0.00 $250.00 -50.0%
602-495-045DA3320 Depreciation Expense $9,000.00 $8 740;0(l' "$9,000,00 $O.DD $9,DDD.00 0,0%
602.495-9450.43610 insurance $D 00 $9,00 $2,476.00 $0.00 $2,500,00 1.0%
602-495-9450.43810 Electric Utility $23800D_ $1,132.06 $1,500,00 $746.23 $1,600.00 0.0%
602-495-9450-43820 Sewer Utility-MetCounctf $15,00000 $12,967,68 $16,000.00 $9,617.94 $15,000.00 0.0%
602-49M460.44030 RepairslMaint Imp Not Bidgs - w$0,000 00_ $690 00 $5,000.00 $325,30 $2,000.00 -00.0%
602-495-9460-44300 MisceOaneousExpenses a $1D000.DD;- $72.00 $1,000.00 $634.86 $60Q.00 50.0%
502.495-9450.44370 Conferences&Training =r= $1 SQfi3OD $0,00 $1,5D0.00 $638.00 $500.OQ 66.7%
602495-94504$300 Improvements Other Than 810gs -.00 $0.00 $0.00 $0.00 $0.00 _ NIA
9450 Sewer W,%18.00 $63 400 14 $114 540.00 $34,716.34 $75,283.00 -34.3%
496 Sewer aT 64,Ot8µ00 S63 400.14 $114,,540.00 $34,71634 _ $75,263.00 -34.3%
�.-.:.
Expense �:'=' ,584,918.00 _ $63,400 14 $114 540.00 $34•3716.34 $75,283.00__- -34.3°°
602 Sewer e` 44741000 -$1619516 -$74 54D 00 -$12 005,61 $3r703.00 NIA
s�
City of Lake Elmo
Budget 2010
2009 2010 2009
2008 2008 2009 Year-to-Date Preliminary to 2010
Account Number Description Budget Actual Budget (081191t19) Budslet Change
603 Surface Water Utility
Revenue
000 General
0000 General
603-000.00OM6210 Interest on investment 41,500.00 -$3,423.54 41,000.00 $0.00 -$4,000,00 NIA
e03-000-OOOD-36231 Contrib.of Capital Assets $0.00 $85,699,88 $0.00 $0.00 NIA
6OU00-0000-37100 Surface Water Utility Sales $116,000.00 $134 673.66 $120.DDO,00 $96 017 21 $123 000,00 _ __ 2 5%
0000 General $113,500.00 $21.7,150.00 $110,000,00 $96,017.21 $119 Ooo o0o0 0 0%
000 General _ $113,6D0.00 $217 150.00 $119,000,00 $98 017.21 $119 000 00 P 0%
Revenue $113.500.00 S217 15D.00 $119 000,00 $96,017.21 $1,19,000 00 O 0%
Expense
496 Surface Water
9600 Surface Water
603-496-9500-41010 Full-time Salaries $38,468.00 $37,763.07 $30,371.(M $12,796,61 $29,041.00 -4,4%
603-496.9500.41210 P15RAContributions $2,500.00 $2,067.28 $2,050.00 $863.18 $2,033.00 -0.8%
603498.9500.41220 FICA Contributions $2,385.00 $2,010.96 $1,883.00 $771.03 $1,001.00 4.4%
603-496.960041230 Medicare Contributions $668,00 $470.40 $440.00 $180.49 $421.00 -4.3%
503-496.9500.41300 MealthlDental Insurance $8,6e8.OD $6,818.46, $8,050.00 '$2,928.22 $5,670,00 6.3%
603.496-9600-41420 Unemployment Benefits $0.00 $521 64 $0.00 $0.00 $0,00 NIA
603-496-960041510 Workers'Compensation $1,472.00 $0 1 $. 531.DD $1,275.75 $1,390.00 9,2%
603490-950042000 Office Supplies $1,500.00 $6 1 W $:i 000.0o $0.00 $700A0 -30.0%
603.496-050042270 Utility System Maint Supplies $2,600.00 $225.30==a mm 1,5p0.00 $0.00 $1,000.00 -33.3%
003-496-9500-42400 Small Tools&Minor Equipment $1,000.00 $17.49 =a '.$1,000.00 $85.39 $600.00 -50.0%
803.496-95OD-43020 Comprehensive Planning $0.00 $0.0D $4%000.00 $0,00 $5,000.00 -87.5%
603.496-9500-43030 Engineering Services $40.000.00 $52,656.99 $$4i00D.00 $33,964.97 $40,060.00 6.3%
603-496-9500.43150 Contract Service$ $2,000.00 m$5 7Q(3 77 _., $12 000.0P $0.00 $10,000.00 16.7%
�. .,..
003-496-9500-43180 Software Support $3,D00,00 $O Q t e ro$1,Do0.00 $0.00 $1,000,00 0,0%
603.496-9600-43220 Postage $1,500.00 :-$12o0.OD $0.00 1600 25,6%
603.496-8500.43320 Depredation Expense �S2 500:00 '$1,�t39;00 $3,000.60 $0.00 $3,000.00 0.0%
803-496-950044010 Street Sweeping $15,2T12z0p $10,212.00 $12,500,00 $8,580.00 $11,600,00 -7.2%
603 49B-9500 44030 Repairs/Malnt Not Bldg $3,000.00 $0.00 $3,000.00 $0.00 $2,000AO 33.3%
603.496-9600-44300 Miscellaneous Expenses =- $1,000.00 $0.00 $500.00 $0.00 $500.00 0.0%
603-496.9500.44370 Conferences&Training s $$0004 $2 200.00 $1,200.00 $500.00 $1,800.00 50.0%
603+496 9500 46300 Improvements Other Than Bldps = $1 .* O
96Do So,oO $0.00 $0,00 $0.00 NIA
603 4 9600 472D0 Transfer Out D.00 $0.00 $0.00 _ $0.00 $0.00 NIA
9500 Surface Water ;:. $19f T63.p0 $123 903.21 $158 225.00 $61 944 44 $11 958 00 24.8°/°
Ao-
496 Surface Water ` W 7*37.76 bb $123,903.21 $158,225.00 $61,944.44 $1.18,956.00 -24.8%
Expense _ $1 37,763.00 $123 903.21 $158,225.00 $61 944 44 $118 966 00 .8%
003 Surface Water Utility ____ _-$24,263.00 $93,246.79 -$39,225.00 $34,672.77 $44.00 N/A
City of Lake Elmo Scenario#1
Current Quarterly Information:
Base Charge $25.00
Rate per 1,000 gallons $2 15
Average Residential Bill $91.20
Average Residential Quarterly Consumption (gallons) 30,166
Hypothetical Quarterly Conservation Rates:
Base Charge $25.00
Rate per 1,000 gallons:
0- 15,000 gallons $2.15
15,000 - 30,000 gallons $2.70 26%
30,000 - 50,000 gallons $3.40 26%
50,000 - 80,000 gallons $4.30
80,000+ gallons 26%
$5.40 26%
Average Residential Bill Using Conservation Rates: (30,166 gallons);YO«r
Base Charge $25.00
0 - 15,000 gallons $32.25
15,000-30,000 gallons Via: '
30,000- 50,000 gallons , .
- $98.31
Increase to Average Residential Bill Using Conservation tesrti g/°
Aid
.�•�• .._
r�y
City of_Lake Elmo Scenario#2
Current Quarterly Information:
Base Charge $25.00
Rate per 1,000 gallons $2.15
Average Residential Bill $91.20
Average Residential Quarterly Consumption(gallons) 30,166
Hypothetical Quarterly Conservation Rates:
Base Charge $25.00
Rate per 1,000 gallons:
0-20,000 gallons $2.15
20,000-30,000 gallons $2.85 33%
30,000-50,000 gallons $3.80 33%
50,000-80,000 gallons $5.05 33%
80,000+gallons $6.70 33%
Average Residential Bill Using Conservation Rates: (30,166 gallons):
Base Charge $25.00
0-20,000 gallons $43.00
20,000- 30,000 gallons $28.50
30,000- 50,000 gallons =_ $0.63
Increase to Average Residential Bill Using Conservation,Raf6s `z 7.
: -
^�N
N-;,3':'
3
l>
= y
`s°'�•ram:. Yi
q7
"M
gp
,:
City of Lake Elmo Scenario#3
Current Quarterly Information:
Base Charge $26.00
Rate per 1,000 gallons $2.15
Average Residential Bill $91.20
Average Residential Quarterly Consumption (gallons) 30,166
Hypothetical Quarterly Conservation Rates:
Base Charge $25.00
Rate per 1,000 gallons:
0- 15,000 gallons $210
15,000 - 30,000 gallons $2.80 33%
30,000 - 50,000 gallons $3.70 32%
50,000 -80,000 gallons $4.90 32%
80,000+ gallons $6.50 33%
Average Residential Bill Using Conservation Rates: (30,166 gallons),-
Base Charge $25.00
0 - 15,000 gallons ``' ` - $31.50
15,000 -30,000 gallons _"�� $42,00
30,000 -50,000 gallons
Increase to Average Residential Bill Using Conservationa�atdg=='`' 9%
IM
�^