Loading...
HomeMy WebLinkAbout#14 - Tamarack Farm Estates Street Improvements STAFF REPORT DATE: January 19, 2021 PUBLIC HEARING AGENDA ITEM: Public Improvement Hearing; Approve Resolution Ordering the Improvement and the Preparation of Plans and Specifications for the Tamarack Farm Estates Street Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Sarah Sonsalla, City Attorney Marty Powers, Public Works Director Cara Geheren, Project Engineer ISSUE BEFORE COUNCIL: The City Council is respectfully requested to open the Public Improvement Hearing for the Tamarack Farm Estates Street Improvements; and following the Hearing, consider adopting a Resolution Ordering the Improvement and the Preparation of Plans and Specifications. Should the City Council proceed with the improvement project as planned in the City’s Capital Improvement Plan? If so, should the City Council wish to proceed with only the street improvements or both the street and watermain improvements? BACKGROUND: Pursuant to Minnesota Statutes, Section 429.011 to 429.111, a Public Improvement Hearing was noticed for January 19, 2021, to consider making the improvements necessary to improve the public streets in the Tamarack Farm Estates neighborhood, and to consider the option of extending municipal water into the neighborhood as part of the reconstruction of the public streets. The attached notice was published in the official newspaper and individual notifications were sent to each address that will be wholly or partially assessed for the improvements. A feasibility report was adopted by the City Council on December 15, 2020 in order to ready these improvements for 2021 construction. The feasibility report is needed to meet state statutory requirements if any portion of the project is to be assessed. The report identifies the necessary improvements, the estimated project costs, the assessment methodology and preliminary assessment amounts to be levied against benefitting properties. PROPOSAL DETAILS/ANALYSIS: The Tamarack Farm Estates Street Improvement project includes the reconstruction of Linden Trail North, within the Tamarack Farm Estates subdivision, including the one-way loop street at the northwest end of the subdivision, consisting of approximately 2,100 feet of roadway. The proposed improvements include a fully reconstructed street with new granular subbase drainage layer, new Class 6 aggregate base and new bituminous pavement. The existing bituminous curb will be replaced with new concrete curb and gutter to improve drainage, improve the construction quality, and provide edge control to protect and extend the service life of the new bituminous surface. Roadway widening is proposed along the one-way loop to increase the street width and turning radius to better accommodate maintenance and emergency vehicle access. The timing of these street improvements was determined by the City’s pavement management program. Upon review of the necessary street improvements, staff also reviews the street drainage systems and existing public utilities. In addition to the street improvements, the scope of this Report includes the restoration of the existing street drainage system, including either repair or replacement of existing drainage pipe and structures, and storm sewer casting replacement. Drainage improvements are limited to the necessary improvements to meet watershed rules and to prevent water from standing on or along the new street pavements, and are not intended to resolve pre-existing private property drainage issues. The Tamarack Farm Estates subdivision is a rural open space development consisting of 19 residential lots. The subdivision is served by private water wells and a community wastewater treatment system. The neighborhood resides outside of the City’s Municipal Urban Service Area (MUSA), therefore there are no current plans to extend public sanitary sewer to the neighborhood. However, public watermain currently exits directly adjacent to the subdivision, along 50th Street North. This Report therefore includes a preliminary layout to extend municipal water into the neighborhood to serve each of the 19 properties. An estimated project cost and corresponding unit assessment is reported to allow the City Council and property owners to make an informed decision as to whether connecting to the public water system is a desirable improvement to be completed at the time of the street reconstruction work. The neighborhood is not located in a known area for PFAS contamination or within a Special Well Construction Area. The total estimated street and drainage improvement cost is $645,000. The improvements would be partially assessed against the benefitting properties consistent with the City’s Special Assessment Policy. Street and drainage improvements are assessed at a rate of 30% of the total project costs for residential properties using a unit method. Residential properties are considered to provide an equal demand on street use and are therefore assessed on a per unit basis, including “flag” lots located on private streets. The remaining 70% of the project costs are paid through the City general fund. Residential properties along Linden Trail North with direct access to the street, vacant lots, and lots with direct access from a private street, are included as benefitting properties. Each property is assessed one unit unless the property has the ability to be subdivided using the current underlying land use and zoning regulations. The City planning department reviews larger parcels to determine if a parcel can be subdivided and the number of lots that could be obtained. The total estimated public watermain cost is $312,000. Watermain extension improvements are assessed 100% against the benefitting properties using per residential equivalent unit method. In addition to the watermain improvement assessment, each property will incur a $3,000 Water Availability Charge (WAC), a $1,000 Water Connection Charge, a meter fee and permit fee at the time they make the connection to the public watermain. The preliminary assessment rolls detailing each property’s proposed assessment amount are included in the Council packet and can be found in the Appendix of the report. Assessments for street and drainage improvements will be levied over a 15-year period. If watermain improvements are incorporated into the project, assessments for public watermain will be levied over a 20-year period. All assessments are be charged an interest rate of 1% over the bond rate for the project. FISCAL IMPACT: The total estimated street and drainage improvement cost is $645,000, with $193,800 paid through special assessments and the remaining $451,200 paid through the general tax levy. If watermain improvements are incorporated into the project, the total estimated public watermain cost is $312,000, with 100% paid through special assessments. RECOMMENDATION: Staff is recommending that the City Council adopt a Resolution Ordering the Improvements (4/5th vote required) and the Preparation of Plans and Specifications for the Tamarack Farm Estates Street Improvements as outlined in the Feasibility Report approved on December 15, 2020, including the Street Improvements only, or for both the Street and Watermain Improvements. The recommended motion for this action is as follows: “Move to adopt Resolution No. 2021-007 Ordering the Tamarack Farm Estates Street Improvements (4/5th vote required) and the Preparation of Plans and Specifications for the recommended street improvements as outlined in the Feasibility Report approved on December 15, 2020.” Or “Move to adopt Resolution No. 2021-007 Ordering the Tamarack Farm Estates Street Improvements (4/5th vote required) and the Preparation of Plans and Specifications for both the recommended street and watermain improvements as outlined in the Feasibility Report approved on December 15, 2020.” Staff is also recommending that the City Council award a Professional Engineering Design and Construction Support Services Contract for the Tamarack Farm Estates Street Improvements. Staff is recommending TKDA, Inc. be awarded the contract in a not to exceed amount of $54,700. The recommended motion for this action is as follows: “Move to approve a Professional Engineering Design and Construction Support Services Contract to TKDA, Inc in the not to exceed amount of $54,700 for the Tamarack Farm Estates Street Improvements.” ATTACHMENTS: 1. Resolution Ordering the Improvements and Preparation of Plans and Specifications. 2. Notice of Hearing on Improvement. 3. Preliminary Assessment Roll. 4. Tamarack Farm Estates Street Improvements – Location Map. 5. Tamarack Farm Estates Street Improvements – Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2021-007 A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS FOR THE TAMARACK FARM ESTATES STREET IMPROVEMENTS WHEREAS, pursuant to City Council authorization, adopted on October 6, 2020, a feasibility report has been prepared by FOCUS Engineering, Inc. for the Tamarack Farm Estates Street Improvements; and WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon on the 19th day of January 2021, at which all persons desiring to be heard were given the opportunity to be heard thereon; and WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc., and dated December 2020 states that the project is necessary, cost-effective, and feasible. NOW, THEREFORE, BE IT RESOLVED, 1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the Feasibility Report dated December 2020. 2. Such improvement is hereby ordered as proposed in the council resolution adopted this 19th day of January, 2021. 3. The city engineer is hereby designated as the engineer for making this improvement. The engineer, and his consultants, shall oversee the preparation of the Plans and Specifications for the making of such improvement. 4. The city engineer shall retain the services of a consulting engineering firm to assist, where needed, to prepare Plans and Specifications for the making of such improvement and to assist the city engineer during the construction phase of the improvement as requested. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE NINETEENTH DAY OF JANUARY, 2021. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO NOTICE OF HEARING ON IMPROVEMENT TAMARACK FARM ESTATES STREET IMPROVEMENTS Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing on Tuesday, January 19, 2021, at or approximately after 7:00 PM to consider the making of the following improvements, pursuant to Minnesota Statutes, Sections 429.011 to 429.111: Street and drainage improvements along Linden Trail North, within the Tamarack Farm Estates subdivision, including a reconstructed street with new granular subbase drainage layer, new Class 6 aggregate base, new bituminous pavement, and new concrete curb and gutter. The improvements will also incorporate the restoration of the existing street drainage system, including either repair or replacement of existing drainage pipe and structures. Due to the ongoing COVID-19 pandemic, members of the City Council will either participate in the meeting by telephone or other electronic means pursuant to Minnesota Statutes, Section 13D.021, or in-person at the City Council’s regular meeting place at Lake Elmo City Hall, 3800 Laverne Avenue North, Lake Elmo, Minnesota. The City will provide an update on the meeting method/type for the hearing on the City’s website at http://www.lakeelmo.org/ as the meeting gets closer and those details can be finalized with certainty. Additionally, questions or comments related to the public hearing may be emailed to Julie Johnson, City Clerk at jjohnson@lakeelmo.org, made by phone at 651.747.3914, or mailed to 3880 Laverne Avenue North, Suite 100, Lake Elmo, MN 55042. Comments submitted through these methods must be received by Tuesday, January 19, 2021 at 12:00 p.m. in order to be considered during the hearing. Please note that any emails, letters and attachments you send to the City are likely considered public information and the City staff may use them in staff reports that go to the City Council and/or the general public. The area proposed to be assessed for these improvements include properties abutting the above referenced streets or properties that gain direct driveway access from the above referenced streets. The estimated total cost for the project is $645,000 for the street and drainage improvements, and $312,000 for extending watermain to the neighborhood should public watermain be requested or authorized. A reasonable estimate of the impact of the assessment will be available at the hearing. Such persons as desiring to be heard with reference to the proposed improvements will be heard during this meeting. DATED: December 15, 2020 BY ORDER OF THE LAKE ELMO CITY COUNCIL Mike Pearson, Mayor (Published in the Stillwater Gazette on December 18, 2020 and December 25, 2020) CITY OF LAKE ELMO, MN.DECEMBER, 2020TAMARACK FARM ESTATESSTREET AND DRAINAGE IMPROVEMENTSPRELIMINARY ASSESSMENT ROLLPAGE 1 of 1NO. NAMEPIDSTREET AND DRAINAGE ASSESSMENT AMOUNT1 SCHUMACHER STEPHEN J 5038 LINDEN TRAIL N 5038 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440034 $10,2002 PALMER STEVEN D & KATHLEEN A 5041 LINDEN TRAIL N 5041 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440027 $10,2003 KATHERINE J LEONIDAS REV TRS 5049 LINDEN TRAIL N 5049 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440028 $10,2004 BROCHMAN JUNE TRS 5057 LINDEN TRAIL N 5057 LINDEN TRAIL N LAKE ELMO MN55042 0102921440029 $10,2005 VINESKI VICKI R & RICHARD E 5063 LINDEN TRAIL N 5063 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440030 $10,2006 WALLRICH WILLIAM T & PHYLLIS A 5067 LINDEN TRAIL N 5067 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440007 $10,2007 MARIE L OLSEN LIV TRS 5073 LINDEN TRAIL N 5073 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440008 $10,2008 STANCUK PETER M & NANCY L 5079 LINDEN TRAIL N 5079 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440009 $10,2009 COLE LUCAS C & STACY L 5080 LINDEN TRAIL N 5080 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440024 $10,20010 ISAACSON MATTHEW 5085 LINDEN TRAIL N 5085 LINDEN TRAIL N LAKE ELMO MN55042 0102921440010 $10,20011 WISEMAN PAUL & PAMALA 5165 LINDEN TRAIL N 5165 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440015 $10,20012 ESVEDBERG LIV TRS 5197 LINDEN TRAIL N 5197 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440016 $10,20013 HANSEN CRAIG T & ANNE E 5226 LINDEN TRAIL N 124 LAKESIDE DRIVE STILLWATER MN 55082 0102921440025 $10,20014 GALL LINDA L & RICHARD T 5235 LINDEN TRAIL N 5235 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440017 $10,20015 GMEINDER MARK J & LORI 5257 LINDEN TRAIL N 5257 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440018 $10,20016 WORM THOMAS B & MELISSA R L 5264 LINDEN TRAIL N 5264 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440022 $10,20017 MEZERA RONALD L & HOLLY B 5279 LINDEN TRAIL N 5279 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440019 $10,20018 MCGINLEY KENNETH C & ELIZABETH 5288 LINDEN TRAIL N 5288 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440021 $10,20019 CAMPBELL NATHAN J & CAITLIN M 5308 LINDEN TRAIL N 5308 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440020 $10,200TOTAL$193,800ADDRESS MAILING ADDRESS CITY OF LAKE ELMO, MN.DECEMBER, 2020TAMARACK FARM ESTATESWATERMAIN IMPROVEMENTSPRELIMINARY ASSESSMENT ROLLPAGE 1 of 1NO. NAMEPIDWATERMAIN ASSESSMENT AMOUNT1 SCHUMACHER STEPHEN J 5038 LINDEN TRAIL N 5038 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440034 $16,5002 PALMER STEVEN D & KATHLEEN A 5041 LINDEN TRAIL N 5041 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440027 $16,5003 KATHERINE J LEONIDAS REV TRS 5049 LINDEN TRAIL N 5049 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440028 $16,5004 BROCHMAN JUNE TRS 5057 LINDEN TRAIL N 5057 LINDEN TRAIL N LAKE ELMO MN55042 0102921440029 $16,5005 VINESKI VICKI R & RICHARD E 5063 LINDEN TRAIL N 5063 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440030 $16,5006 WALLRICH WILLIAM T & PHYLLIS A 5067 LINDEN TRAIL N 5067 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440007 $16,5007 MARIE L OLSEN LIV TRS 5073 LINDEN TRAIL N 5073 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440008 $16,5008 STANCUK PETER M & NANCY L 5079 LINDEN TRAIL N 5079 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440009 $16,5009 COLE LUCAS C & STACY L 5080 LINDEN TRAIL N 5080 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440024 $16,50010 ISAACSON MATTHEW 5085 LINDEN TRAIL N 5085 LINDEN TRAIL N LAKE ELMO MN55042 0102921440010 $16,50011 WISEMAN PAUL & PAMALA 5165 LINDEN TRAIL N 5165 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440015 $16,50012 ESVEDBERG LIV TRS 5197 LINDEN TRAIL N 5197 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440016 $16,50013 HANSEN CRAIG T & ANNE E 5226 LINDEN TRAIL N 124 LAKESIDE DRIVE STILLWATER MN 55082 0102921440025 $16,50014 GALL LINDA L & RICHARD T 5235 LINDEN TRAIL N 5235 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440017 $16,50015 GMEINDER MARK J & LORI 5257 LINDEN TRAIL N 5257 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440018 $16,50016 WORM THOMAS B & MELISSA R L 5264 LINDEN TRAIL N 5264 LINDEN TRAIL NLAKE ELMO MN 55042 0102921440022 $16,50017 MEZERA RONALD L & HOLLY B 5279 LINDEN TRAIL N 5279 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440019 $16,50018 MCGINLEY KENNETH C & ELIZABETH 5288 LINDEN TRAIL N 5288 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440021 $16,50019 CAMPBELL NATHAN J & CAITLIN M 5308 LINDEN TRAIL N 5308 LINDEN TRAIL N LAKE ELMO MN 55042 0102921440020 $16,500TOTAL$313,500ADDRESS MAILING ADDRESS LOCATION MAP FIGURE NO. 1 TAMARACK FARM ESTATES NEIGHBORHOOD CITY OFLAKE ELMO TAMARACK FARM ESTATES LEGEND PROJECT NO. 2020.125 TAMARACK FARM ESTATES STREET IMPROVEMENTS CITY LIMITS PROJECT STREETS LINDEN TRAIL N, FROM 50TH STREET N TO THE CUL-DE-SAC PROJECT SCHEDULE  CITY OF LAKE ELMO    TAMARACK FARM ESTATES STREET IMPROVEMENTS  PROJECT NO. 2020.125  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                  OCTOBER 6, 2020  Council orders preparation of Feasibility Report and Topographic Survey.      DECEMBER 15, 2020  Presentation  of  Feasibility  Report.  Council  accepts  Report  and  calls  for  Improvement Hearing.       JANUARY 19, 2021  Public Improvement Hearing. Council Orders the Improvement (4/5th Vote)  and preparation of Plans and Specfications.    APRIL 6, 2021  Council approves Plans and Specifications and orders Advertisement for Bids.      MAY 6, 2021      Project Bid Date: Receive contractor bids.      MAY 18, 2021  Council accepts Bids and awards Contract.       JUNE 14, 2021    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   OCTOBER 1, 2021    Substantial Completion.   NOVEMBER 19, 2021    Final Completion.                               *Final Assessment Hearing Schedule TBD