DATE: April 20, 2021
CONSENT
AGENDA ITEM: Authorize Purchase of Individual Pump Grinder Stations for the Old Village Phase 5 and 6 Street, Drainage, and Utility Improvements SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Project Engineer
ISSUE BEFORE COUNCIL: Should the City Council authorize the purchase of individual grinder pump stations for the Old Village Phase 5 and 6 Street, Drainage, and Utility Improvements? BACKGROUND: On March 16, 2021, the City Council awarded a construction contract for the Old Village Phase 5 and 6 Street, Drainage, and Utility Improvements. The improvements include street and
drainage improvements; watermain improvements; sanitary sewer improvements including new municipal sanitary sewer service to replace individual on-site septic systems; a reconstructed bituminous street with new concrete curb and gutter; and a repair or restoration of the existing street drainage system. The approved
project design included the need for seventeen (17) properties to utilize an individual pump grinder station to make the connection to the public sewer system. Twelve (12) of these properties are located along south side of 32nd Street where the pump stations are necessary due to lower topography, and the other five (5)
properties are located along the private driveway along the UPRR, east of Lake Elmo Avenue. Project implementation includes the city purchasing the individual pump grinder stations directly and issuing them to each of the properties when they issue their connection permits. Each property is then responsible for the installation and ongoing ownership and maintenance. The purchase of the grinder stations are included in the property’s assessment for the project. PROPOSAL DETAILS/ANALYSIS: The City has received a quote for twelve (12) of the grinder pump stations from Minnesota Pump Works in the amount of $59,180, that will be needed for installation in 2021. The remaining five (5) grinder pump stations will be purchased in 2022 to coincide with sewer installation work to be completed in 2022 for the private drive area. The deferred purchase date is intended to preserve the manufacturers 1-year warranty on the equipment for when the equipment is installed. FISCAL IMPACT: $59,180. This cost is within the authorized scope and budget for the project.
RECOMMENDATION: Staff is recommending that the City Council authorize the City Administrator to purchase twelve individual grinder stations in the amount of $59,180 from Minnesota Pump Works for
the Old Village Phase 5 and 6 Street, Drainage, and Utility Improvements. The recommended motion for the action is as follows:
“Move to authorize the City Administrator to purchase twelve individual grinder stations in the amount
of $59,180 from Minnesota Pump Works for the Old Village Phase 5 and 6 Street, Drainage, and
Utility Improvements.”
ATTACHMENTS: 1. Individual grinder station quote from Minnesota Pump Works.
Minnesota Pump Works
1 Cannon Street W
Dundas, MN 55019
Pricing valid for 30 days and does not include freight charges or applicable taxes.
$59,180.00Total
$59,180.00Subtotal
Lake Elmo MN, City of
3880 Laverne Ave N
Lake Elmo, MN 55042
Ship ToLake Elmo MN, City of
3880 Laverne Ave N
Lake Elmo, MN 55042-9629
Bill To
Scott SwensonSales Rep
NET 30Terms
00010289Quote Number
4/9/2021Created Date
info@minnesotapumpworks.comEmail
877-645-8004Phone
Scott SwensonPrepared By
Product Code Product Quantity Rate Total
NA0043P07 E/ONE 1 YR WARRANTY, EXTENDED 12.00 $0.00 $0.00
DH071-124 Station Kit ()E/ONE DH071-124 Outdoor Station Kit 12.00 $4,665.00 $55,980.00
FREIGHT IN /OUT SHIPPING & HANDLING 1.00 $3,200.00 $3,200.00