NOTICE OF MEETING
City of Lake Elmo
3800 Laverne Avenue North
Park Commission Meeting
Monday July 15th, 2013
AGENDA
A. 7:00 Call to Order/Approval of Agenda
B. 7:01 Minutes: May 20th & June 17th
C. 7:10 Hammes West Concept Review-N. Johnson
D. 7:40 Preliminary Park Survey Results-D. Zuleger
E. 7:50 Sanctuary Park Discussion-S. Weis
F. 8:15 Trail Sub-Committee Report-S. Weis
G. 8:45 Tapestry Access to Sunfish-P. Hartley
Our Mission is to Provide Quality Public
Services in a Fiscally Responsible Manner
While Preserving the City’s Open Space
Character
HAMMES ESTATES
CONCEPT PLAN NARRATIVE
June 12, 2013
The project property consists of 78 acres located along the west side of Keats Avenue North about a
quarter mile south of 10th Street North. The property is owned by the Hammes Family and is being
purchased by Hammes West, LLC.. The project will be developed by Hammes West LLC in conjunction
with Ryland Homes. The property is currently used as a part of an active mining operation with an
existing mining permit. The property is currently zoned RT, Rural Development Transitional District, and
guided Low Density Residential in the Comprehensive Plan, Planned Land Use section. No change is
required or requested of the Comprehensive Plan designation. The Zoning will need to be changed to
LDR, Low Density Residential as a part of the Preliminary Plat process.
BUFFERING/TRANSITION
There is a considerable buffer required and provided to the existing neighborhood on our north and west
sides. We are planning a public park with walking trails to connect to the existing and future trails for
these areas. The project features 173 single family home sites. They are varied in sizes and potential
home uses from the buffered areas out toward the south and east. The plan includes custom lots adjoining
the existing neighborhoods. Some of the custom lots will be developed and built by the national builder
associated with the project. These lots have some of the best features and will probably feature the higher
home values. There are 33 custom lots that will be reserved for local specialty builders that are even
larger than the majority. This transition approach is designed to accentuate the buffering that was
envisioned by the City to keep the newer projects from creating negative impacts on the existing homes.
DENSITY/LOTS
The area used for home sites is 61.1% of the gross project area. The balance is Open Space and road
right-of-way. The density of the project is 2.22 units per gross acre and 3.63 units per acre of net area.
This is clearly within the density allowed in the Comprehensive Plan for this area (2.5 to 4 units of net
density allowed). The average of the lots for the national builder is 11,800 square feet. The average of the
lots for the specialty builders is 12,800 square feet. Minimum Lot area allowed is 8,000 square feet. All
of the lots will meet or exceed the minimum standards of the LDR Low Density Residential zoning
district. No variances or exceptions are anticipated.
PHASING
The phasing of the project is anticipated to begin with approximately one third to one half of the lots on
the easterly end starting first. This corresponds with the availability of the sanitary sewer and water on the
east side of the project.
6/13/2013
HAMMES ESTATES
CONCEPT NARRATIVE
Page 2 of 2
UTILITIES
We are assured by City Staff that the new utilities should be available this fall when this project comes on
line. The home sites will be served with City Sewer and City Water from the new systems that are
currently under way in the construction process. The storm water facilities will be designed in accordance
with the requirements of the Watershed District. New and innovative design features are anticipated to
enhance the storm water system of this project. This approach is in keeping with Lake Elmo’s long
standing desire to be on the cutting edge of storm water handling.
STREETS/TRAILS
The street design will be the (new) standard urban street section. This will feature concrete curb and
gutter sections where appropriate with bituminous surfacing and sections built to the depth and thickness
appropriate for the traffic anticipated. The trails shown on the plan are proposed to be bituminous surface
8 feet wide. This trail section provides for the most varied use of the trails over any other trail materials.
MINING/GRADING
The project will continue to be utilized as a mining operation to facilitate the removal of the materials that
are stockpiled on the property. It is anticipated that some of this mining will be used to grade portions of
the property for the final project grades. This is the reclamation portion of the existing mining permit.
The mining operations will cease as the residential project phases become active.