Loading...
HomeMy WebLinkAboutFULL 05-15-23 Parks Packet NOTICE OF MEETING City of Lake Elmo Parks Commission 3800 Laverne Avenue North May 15th 2023 AGENDA 1. Call to Order 2. Pledge of Allegiance 3. Approve Agenda 4. Approve Minutes a) April 17th 2023 5. Public Comment 6. Northshore Development - Concept Plan 7. Capital Improvement Plan (CIP) 8. Communication a) Baseball Field Updates b) Tablyn and Pebble Court Updates 9. Adjourn ***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this meeting due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special accommodations. Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner in Partnership with our Community. City of Lake Elmo Parks Commission Minutes April 17, 2023 Members Present: Commissioners Kastler, Rivera-Reyes, Hoelscher, Barrett, Bloyer, and Esch Absent: none Staff Present: Assistant Public Works Director Swanepoel The meeting was called to order by Kastler at 6:30 PM. Approval of Agenda Hoelscher motioned to approve the agenda as presented, Barrett provided a second; no discussion. Unanimously approved 6-0. Approval of Minutes Esch motioned to approve the March 20, 2023 Parks Commission Minutes, Hoelscher provided a second; no comments. Motion passed unanimously 6-0. Public Comments John Howley located at 8190 Lake Jane Trl. N. provided his concerns regarding video quality of meetings, the proposed Dog Park, and proposed changes at Pebble Park. Suzy and Josh Godbout located at 8100 Lake Jane Trl provided their concerns regarding the state of Pebble Park and adding pickleball. Todd Bruchu located at 3150 Klondike Ave and Lake Elmo Baseball Association representative provided a recommendation and design proposal for Reid Park. Tony Manzara located at 5050 50th St N and Sunfish Lake Park representative commented about park activities, making special mention about the new plant a tree program. Tablyn and Pebble Courts Bid Review Assistant Public Works Director Swanepoel presented the background and bids. Discussion held. Hoelscher moved to recommend to the City Council the lowest bid presented by T.A. Schifsky and Sons Inc. to complete Pebble and Tablyn Court projects as proposed, Barrett provided a second; discussion held. Motion carried 5-1, Kastler nay. Communications a) ADA compliance for those proposed layouts will be mapped out this summer for completion. b) Donation was approved by the Council for bench, tree, and plaque or combination of. c) RFP was approved by Council to go out and included Pebble Park. d) 2023 has no CIP items for baseball. e) Dog Park was approved by the Council. Council asked to add a small dog park, access to running water, and add double doors/gate. That would likely bring us up to that 25,000 mark. f) Working on a RPF for a new Parks Use Plan. g) Communication strategy. Kastler adjourned the meeting at 7:37 PM Respectfully Submitted Rebecca McGuire, Deputy Clerk STAFF REPORT PARKS COMMISSION DATE: 5-15-2023 TO: Parks Commission FROM: Sophia Jensen, City Planner AGENDA ITEM: Northshore Development Concept Plan REVIEWED BY: Jenni Faulkner, Planning Consultant BACKGROUND: The City has received a request from Northshore Development for review of a Concept Plan on the Screaton property north of Stillwater Blvd. The site is currently comprised of an active farm field and vacated road right of way. The project consists of both a residential and commercial component. The commercial component consists of a bank, office building, and vacant sites. The commercial zoning would be around the South and East sides of the site. The residential portion of the project is to develop at a later date and would be zoned village medium density residential (V-MDR). The V-MDR zoning would be around the North and West sides of the site. The site is located between Stillwater Way and Stillwater Blvd. The proposed project would require approval of a Planned Unit Development (PUD), plat, comprehensive plan amendment and a zoning map amendment (rezoning) to the land use designations guided by the Comprehensive Plan. No development rights are granted at this stage. ISSUE BEFORE THE PARKS COMMISSION: The Parks Commission is being asked to review the concept to provide feedback on the proposal to meet the City Code Park Land Dedication Requirements and the Comprehensive Plan guidance. GENERAL INFORMATION: • Property Owner: Screaton Family Trust • Applicant: Northshore Development • Parcel: 12.029.21.44.0020, 12.029.21.44.0022, and 13.029.21.11.0006 • Site Area: ~25.98 acres (subject to change due to Right of Way Acquisition) • Land Use Guidance: Commercial and Village Medium Density Residential • Current Zoning: Rural Transitional • Surrounding Land Use: Open Space PUD to North, Rural Transitional (residential and cemetery) to West, Stillwater Blvd. and Rural Transitional farm fields to South, and commercial gas station and Baytown Township to the East. PARKS PROPOSAL DETAILS: The proposed project would have ~7 acres zoned commercial and ~17.3 acres zoned residential according to the site plan. The park dedication for the commercial land would be the fee determined by council ($6,000/acre). The land zoned residential has the option of: a fee (estimated at $120,000), land 10% (1.73 acres), or a combination of both. The applicant is proposing a 0.74 acre lot for parkland dedication. The proposed site is surrounded by streets and would be accessible via on-street parking. The applicant is not proposing any trail construction although they are willing to accommodate trail connectivity if recommended. SUBDIVISION CODE: §103.00.150 Park Land Dedication Requirements. The City Code outlines the type of land that is considered acceptable for park dedication. Park Dedication Requirement. The developer is required to provide the City with either physical land, cash payment, or a combination of both. Land acceptability. The City must approve the location and configuration of any park land which is proposed for dedication and shall take into consideration the suitability of the land and for its intended purpose; the future needs of the City for parks, playgrounds, trails, or open space; and the recommendations of the City’s Parks Commission. The following properties shall not be accepted for park land dedications: 2 (1) Land dedicated or obtained as easements for streets, sewer, electrical, gas, storm water drainage and retention areas, or other similar utilities and improvements; (2) Land which is unusable or of limited use; and/or (3) Land within a protected wetland or within a flood plain area unless the Council determines that all of the following criteria are satisfied: (a) Would be in the best interests of the general public; (b) Would be valuable resource for environmental preservation, educational, or habitat preservation purposes; (c) Has an exceptional aesthetic value; and (d) Would not become financially burdensome to the City as a result of maintenance or preservation requirements. Trails. Trails constructed by a subdivider within dedicated public open space having at least 30 feet of width are eligible for park credit. The amount of trail dedication credit shall not exceed 25% of the total dedication. To receive credit for a trail, there must be a through public trail connection to the larger Lake Elmo or Washington County trail network. If the proposed trails are not able to connect to existing trails, they must be installed in a way that would provide a connection to future planned trails as additional infrastructure is established. COMPREHENSIVE PLAN – PARKS: Chapter 6 Parks, Trails & Open Space has area and site specific recommendations that should influence the recommendation of the Parks Commission. The park search map identifies the property to be within a sports complex and community park search area. According to the Comprehensive Plan, the community park for the village planning area should be roughly 10-15 acres a landmark and gathering place for the community. COMPREHENSIVE PLAN - TRAILS: Chapter 6 Parks, Trails & Open Space has area and site specific recommendations that should influence the recommendation of the Parks Commission. The trail search map identifies that the property to be within the Regional trail search corridor and depicts future road separated trails along Stillwater Blvd and Stillwater Way (prior to road reconfiguration). There is an existing regional trail along the north side of Stillwater Way build from previous development. 3 FINDINGS: 1. This area is already serviced by a handful of neighborhood parks. Within about a 1-mile radius these include: Carriage Station, Tana Ridge, Firefly, Reid, Pilot, Lions. 2. The area is serviced by two community parks within a 2-mile radius: Sunfish Lake Park and VFW Park. 3. Due to the acreage of residential land that is proposed for developed a 10% land dedication would not be large enough to support a community park or sports complex as described in the Comprehensive Plan. 4. An existing trail along the North side of Stillwater Way satisfies the trail search corridor. A pedestrian crossing should be incorporated into the site to connect this site to the existing regional trail system. OPTIONS: For the residential portion of land the Commission may recommend to that: • The City accept cash in lieu of land. • The City accept land in lieu of cash. • The City take a combination of both. RECOMMENDATION: Staff recommends the Parks Commission recommend to the City Council the following: “Move to recommend approval of the Northshore Development Concept Plan with the acceptance of the set fee for the commercial component of the project, the acceptance of cash in lieu of land for the residential component of the project, and to recommend a pedestrian crossing be added to connect to the existing regional trail based on the findings listed in the staff report.” ATTACHMENT: 1. Application and Narrative 2. Concept Plan 3. Map 6-7. Search Areas for New Parks and Facilities (Comprehensive Plan) 4. Map 6-8. Future Trail Plan (Comprehensive Plan) April 20th, 2023 City of Lake Elmo, MN 3800 Laverne Ave N Lake Elmo, MN 55042 Village Hub - Mixed Use PUD Project Narrative Background Bridgewater Bancshares, LLC, represented by North Shore Development Partners, is pleased to be applying for Sketch Plan Review for an approximately 25-acre site for future development. The site is located at the northwest corner of Stillwater Boulevard N and Manning Ave N. The proposed project consists of three parcels, the main subject parcel, a future County ROW acquisition, and the northern portion above Stillwater Blvd N of the adjacent southern parcel (PIDs 1202921440020, 1202921440022, and 1302921110006 respectively). The project also proposed ROW acquisition of a portion of Stillwater Way N which bounds the project on the northwest side. The proposed project proposes a first phase of commercial development with a residential component to follow in the future pending favorable market conditions – all of which is intended to be consistent with Lake Elmo’s 2040 Comprehensive Plan. The commercial portion of the project will face the south and east along Stillwater Boulevard N and Manning Ave n (C.S.A.H No. 14, and 15 respectively). The project proposes four commercial buildings within the proposed 7-acre commercial area. The first phase will include a bank facility on the southeast corner of the parcel. Bridgewater Bancshares, LLC & North Shore Development Partners About Bridgewater Bancshares, Inc. is a St. Louis Park, Minnesota-based financial holding company. Bridgewater’s primary banking subsidiary, Bridgewater Bank, is a premier, full-service Twin Cities bank dedicated to serving the diverse needs of commercial real estate investors, entrepreneurs, business clients and successful individuals. By pairing a range of deposit, lending and business services solutions with a responsive service model, Bridgewater has seen continuous growth and profitability. With total assets of $4.3 billion and seven branches as of December 31, 2022, Bridgewater is considered one of the largest locally led banks in the State of Minnesota, and has received numerous awards for its growth, banking services and esteemed corporate culture. North Shore Development Partners (North Shore) is locally based out of Wayzata, MN with strong background in high quality multifamily and mixed-use real estate assets for Twin Cities communities. North Shore has over thirty years of development experience across their partners. Notable recent projects include The Exchange in New Brighton, MN and The Stax of Long Lake, in Long Lake, MN. North Shore operates a high standard of quality within their developments and seeks to provide a sense of community that supports the local growth of Lake Elmo. The development team anticipates that this project will kickstart development within this area of the City with a high standard of quality and workmanship in initial construction, but also in operation and management. Buildings The development team will follow the City of Lake Elmo Design Guidelines and Standards by putting forth a quality development with buildings of high architectural quality and an efficient site that will work well for all users, both vehicular and pedestrian. The buildings will be placed in a manner to ensure good sightlines while also maintaining safe circulation patterns. Streetscapes, landscaping, and parking areas will be designed to create an enjoyable outdoor environment of high aesthetic value while also maximizing pervious surfaces. Buildings will be designed using quality materials and human-scale massing to promote visual interest and support Lake Elmo’s unique identity. Site The site is currently zoned Rural Transitional with a future Land Use of Residential and Commercial. It is anticipated that the future zoning will be Commercial and V-MDR Village Medium Density Residential per the City of Lake Elmo’s 2040 Comprehensive Plan. The development team is working directly with City Planning Staff and MET Council regarding the proposed residential & commercial acreages as it pertains to the Comprehensive Plan. The project proposes the commercial area to be approximately 7-acres in size, consistent with the previously approved Land Use areas per MET Council and the Comprehensive Plan. The base parcel for the project is ~21.86 acres in size. The project will acquire ~2.77 acres of previous Washington County ROW area adjacent to the east and is seeking to acquire up to 45’ width of additional City ROW from Stillwater Way N to the northwest. The total site area with the County ROW area added is ~24.63 acres. Depending on the final area of Stillwater Way N ROW, the total project area could be up to ~25.98 acres in size. Access and Parking Site access to the overall development will be provided via three access points to the south, northwest, and northeast. An existing curb cut for C.S.A.H. 14 will be utilized for the southern driveway connection. A new turn lane and driveway will be designed for access off the northwest from Stillwater Way N. Finally, a new driveway will be coordinated with the adjacent neighbor to the northeast connecting to the existing fuel station driveway. The project proposes new public and private roadways within the development for site circulation and access to all proposed lots. Parking will be provided for each use per City Code requirements at the time of site plan development. Accessible stalls will be provided for each lot in accordance with current Minnesota accessible parking requirements. Parks and Trails The City requires 10% of the proposed development area to be dedicated as a public park. There may be opportunities with the proposed development for a small local park within the project area. The project area is also within a future community park opportunity area per the Lake Elmo 2040 Comprehensive Plan. The future community park may be better suited offsite at a location more desirable for the surrounding community. The development team looks forward to coordinating with the Park Commission as the development evolves and will support park dedication either via land or other means per City Code requirements. The project is within a regional trail opportunity area per the Lake Elmo 2040 Comprehensive Plan. The development team is currently not proposing any trails as part of the project but is open to coordinating with Parks, Council, and the County on any trail needs. Grading and Drainage The project site is proposed to be mass graded for future development as part of the initial sitework. The proposed site grades will generally be between 1.5% and 4% within roadways and parking areas. The parking lot and drive aisles will be bounded with curb and gutter to collect stormwater runoff and direct it to the onsite storm sewer. Landscape grades vary but will not exceed 3:1. Site grades naturally fall to the south of the parcel where existing drainage is collected in a culvert and discharged south under the highway. The proposed drainage outfall will match existing drainage patterns. Stormwater Stormwater management for the development will be provided by a stormwater pond and irrigation reuse. Preliminary geotechnical investigation implies clayey soils on site. Therefore, stormwater management will be provided by one or more stormwater retention ponds and irrigation reuse. The irrigation reuse system will be designed per City requirements and will support the volume management requirement per City and Watershed rules. The final stormwater management system will meet City and Watershed rules for site discharge rate, high water levels, and water quality treatment. Utilities The proposed development will be served by trunk sanitary sewer, storm sewer, and watermain utilities for the entire site. The proposed public sanitary main will be an extension of the existing 8” PVC stub along C.S.A.H. 14 from the south. This main will be extended north into the site per City requirements with branches to service both commercial and residential sections. The sewer extension will require an MCES sanitary sewer extension permit. Sanitary service stubs will be provided for each lot for future building connection. Services will be private and dedicated to each use. The proposed public watermain will be a 12” DIP main extended south from Stillwater Way N. The existing watermain is at Little Bluestem Trail N and Stillwater Way N. It is anticipated that some offsite work will be required to bring watermain to the subject parcel. The proposed main will run to the southern side of the site with 8” loops broken off to service the commercial and residential areas as necessary. Hydrants will be provided as necessary for adequate fire suppression coverage for the development. Water service stubs will be provided for each lot for future building connection. Services will be private and dedicated to each use. The proposed storm sewer will collect stormwater runoff from each impervious area and convey drainage to the proposed stormwater pond as previously discussed. C.S.A.H. NO. 14(STILLWATER(MANNING AVENUE N)C.S.A.H. NO. 15(STILLWATER BOULEVARD N)C.S.A.H. NO. 15STILLWATERWAY NPROPOSED PARCEL 2PROPOSED PARCEL 1BOULEVARD N)EXISTING WASHINGTON COUNTY ROW AREA - 2.77 ACRESPROPOSED STILLWATER WAY N ROWACQUISITION (ASSUME 45' WIDTH) -1.35 ACRESPROPOSED COMMERCIAL AREA - 6.99 ACRESPROPOSED RESIDENTIALAREA - 4.0 ACRESPROPOSED RESIDENTIALAREA - 6.45 ACRESPROPOSED PUBLIC ROW AREA -3.39 ACRESWASHINGTON COUNTY AREA NORTH OF DRIVEWAY - 1.36 ACRESWASHINGTON COUNTY AREA SOUTH OF DRIVEWAY - 1.41 ACRESEXISTING ZAYO FIBER OPTIC LINEPROPOSED PARK / OPEN SPACE.INCLUDED IN RESIDENTIAL AREA-0.74 ACRESDWN BY:ISSUE DATE:PROJECT NO.:U:\193806140\LDev\5_DESIGN\1_CAD\2 EXHIBITS\COMERCIAL SITE LAYOUT.dwg 3/23/2023 GRUNKLEE, SAM DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:3/23/2023 1:38:41 PM SUB CONSULTANT:CLIENT:PROJECT TITLE:CHK'D BY:APP'D BY:CERTIFICATION:N O T F O R C O N S T R U C T I O N 733 MARQUETTE AVENUESUITE 1000MINNEAPOLIS, MN 55402PHONE: 612-712-2000FAX: 952-831-1268WWW.STANTEC.COM####MIXED USE DEVELOPMENT PROJECT LAKE ELMO LAKE ELMO MINNESOTA, WASHINGTON COUNTY193806140SAGJRAJRA03/16/20230( IN FEET )GRAPHIC SCALE01 inch = 100 ft.100200100EX-1LAND USE AREA EXHIBITLOT LINEEASEMENT LINESETBACK LINERIGHT OF WAY LINESECTION LINEQUARTER LINEEXISTING EASEMENT LINEEXISTING PROPERTY LINEPROPERTY BOUNDARYLEGENDCURB AND GUTTERROAD CENTERLINEPROPOSED COMMERCIAL AREAPROPOSED STILLWATER WAY N ROWACQUISITION (ASSUME 45' WIDTH)WASHINGTON COUNTY PROPERTYNORTH OF DRIVEWAYPROPOSED ROWPROPOSED RESIDENTIAL AREAWASHINGTON COUNTY PROPERTYSOUTH OF DRIVEWAYEXISTING SITE AREA±21.86 ACRESPROPOSED STILLWATER WAY N ROW ACQUISITION(ASSUME 45' WIDTH)±1.35 ACRESPROPOSED WASHINGTON COUNTY HWY ROW ACQUISITION±2.77 ACRESTOTAL PROPOSED SITE AREA WITH ROW ADDED±25.98 ACRESWASHINGTON COUNTY HWY ROW ACQUISITION±2.77 ACRESNORTHERN WASHINGTON COUNTY HWY ROW±1.36 ACRESSOUTHERN WASHINGTON COUNTY HWY ROW±1.41 ACRESPROPOSED COMMERCIAL AREA PER EXISTING SITE±5.58 ACRESPROPOSED COMMERCIAL COUNTY ROW ACQUISITION±1.41 ACRESTOTAL PROPOSED COMMERCIAL AREA±6.99 ACRESPROPOSED RESIDENTIAL AREA PER EXISTING SITE±10.45 ACRESPROPOSED STILLWATER WAY N ROW ACQUISITION±1.35 ACRESPROPOSED RESIDENTIAL COUNTY ROW ACQUISITION±1.36 ACRESPROPOSED PARK / OPEN SPACE AREA±0.74 ACRESPROPOSED ROW AREA±3.39 ACRESTOTAL PROPOSED RESIDENTIAL AREA±17.29 ACRESPER LAKE ELMO 2040 COMP PLAN ALLOWABLE V-MDR DENSITY = 3.01-5 UNITS / ACREPROPOSED RESIDENTIAL ACREAGE YIELDS 52 - 86 RESIDENTIAL UNITSPER LAKE ELMO PARK DEDICATION REQUIREMENT OF 10% OF SITE AREA TO BE DEDICATED AS PUBLIC PARK PROPOSEDPUBLIC PARK SHOWN IS 0.74 ACRES TO ABOUT 3% OF TOTAL SITE AREA.NEW PROPOSED ROW AREA IS ADDED INTO THE TOTAL PROPOSED RESIDENTIAL AREA STAFF REPORT DATE: 05/15/2023 REGULAR TO: PARKS COMMISSION FROM: Adam Swanepoel, Assistant Public Works Director AGENDA ITEM: Items for 2024-2033 Parks CIP REVIEWED BY: Marty Powers, Public Works Director Kristina Handt, City Administrator BACKGROUND: A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a City’s infrastructure (such as streets, parks and utility systems), and equipment and public buildings. The CIP identifies the major projects needed and desired by the community, their potential costs and how they would be financed. A project or purchase identified and budgeted through the CIP does not commit the City to that project. The City Council must specifically authorize each one and the associated funding for the expenditure before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process) projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added. These adjustments are dependent upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept up to date and in synch with city budgets. The primary benefit of a CIP is as a financial planning tool, to help the City plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and help the City Council sort out competing priorities. Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. ISSUE BEFORE COMMISSION: What park improvements would the Commission like to have in the 2024-2033 CIP? When should they be completed? PROPOSAL DETAILS/ANALYSIS: Projects in the 2024-2033 CIP include play equipment replacement. Seven parks have been identified for play equipment replacement. Play equipment has a useful life of 25 years. The Commission should consider to implement CIP placeholders for play equipment that is identified to be replaced beyond 2028 as this will help us with long range planning. The following items will be funded through the Park Dedication Fund. 1. Pebble Park- Playground replacement rescheduled for 2024. ($125,000) 2. Demontreville Park- Playground replacement rescheduled for 2024. ($125,000) 3. Stonegate Park- Play equipment replacement scheduled for 2027. ($125,000) 4. Carraige Station- Play equipment replacement scheduled for 2028. ($125,000) 5. Tablyn Park- Play equipment replacement scheduled for 2025. ($95,000) 6. Ridge Park – Play equipment replacement scheduled for 2028. ($125,000) Staff recommends adding the following to the 2024-2033 CIP: 1. Parking Lot Extension (2) – Tablyn for 2024. ($75,000) 2. Sand volleyball courts (3) – 2024. ($30,000) 3. Court Resurfacing (2): Demontreville, Carriage Station, Lions 2026. ($30,000) 4. Lions Park (3) – Play Equipment Replacement 2026. ($125,000) 5. Increase dollars towards Central Greenway regional Trail (3) ($20,000) 6. Klies Park (3) – Play equipment replacement scheduled for 2025. ($65,000) 7. Lions Park Concession Building Updates (3) – 2027 ($65,000) The following items carry over from the 2023-2027 CIP with the appropriate funding source listed: 1. Central Greenway Regional Trail - Park Dedication Fund ($220,000) 2. Dog Park. Scheduled 2024. Park Dedication Fund ($25,000) 3. New Ballfields. Scheduled 2024. Grants/ Donations (1,000,000). Other Items? If there are other items that the Parks Commission would like to see in the 2024-2028 CIP they should be identified at this time. The Commission should also assign a priority to each project, both new and existing based upon the following framework: 1. Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2. Very important, high-priority projects that should be done as funding becomes available. 3. Important and worthwhile projects if funding is available; may be deferred to a subsequent year. 4. Less important, low-priority projects; desirable but not essential. 5. Future Consideration. When determining a project, the Commission should keep in mind the requirements set out in the City Code. Section 154.15 (F) Park Dedication Fund (1) A cash contribution paid to the City shall be placed in a special fund. The money shall be used only for: (a) The acquisition and development or improvement of parks, recreational facilities, playgrounds, trails, wetlands or open space based on the approved park systems plan; (b) Redevelopment or rehabilitation of existing park facilities or sites; or (c) Debt service in connection with land previously acquired or improvements thereto previously constructed. (2) No funds shall be used for ongoing operation or maintenance of existing parks recreational facilities or sites or City vehicles FISCAL IMPACT: Items Scheduled for 2023: Neighborhood Trial Connections (Budget and approved in 2022): Inwood, Stonegate - $240,132 Tapestry/Hamlet on Sunfish Lak - $26,298 2023 - Reconstruction Demontreville Wildlife Park Trail, City Walking Path 36th St., Sunfish Ponds - $250, 000 Tablyn and Pebble Park Courts: $461,875 TOTAL: $978,305 Expected Funds in 2023: Inwood 7th Add. - $11,400 Royal Golf 5th - $133,298.67 Amira FKA Applewood Point - $369,138.51 Drake Motor Partners - $102,360 Frisbie Minor – $30,000 *Prairie Sky/ Landucci Twin homes - $105,000 9450 Hudson Dr./ Hendrix - $380,000 Total $1,131,197.10 Park Dedication Fund Balance: (Dec 2022) $3,024,220 2023 Expenditures $978,305 Baseball field Improvements $1,000,000 Balance: $1,045,915 OPTIONS: 1.) Parks Commission can adjust, remove or identify additional projects to add to the 2024-2033 CIP. 2.) Recommend the CIP as proposed to City Council. RECOMMENDATION: “Motion to recommend the 2024-2033 Parks Capital Improvement Plan to City Council” ATTACHMENTS: • 2024-2033 Draft Capital Improvement Plan for Parks Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2024 2033thru Total20242025202620272028Source20292030203120322033 #Priority Grants/Donation 1,000,0001,000,000New or Refurbished Ballfields PR-017 1 Grants/Donation Total 1,000,0001,000,000 Park Dedication Fund 300,000300,000Central Greenway Regional Trail PR-009 3 25,00025,000Dog Park PR-019 4 125,000125,000Pebble Park Playground Replacement PR-022 3 125,000125,000Demontriville Park Playground Replacement PR-023 3 150,00050,000 100,000Trail Seal Coat PR-026 3 65,00065,000Kleis Park Playground PR-027 3 125,000125,000Tana Ridge Park Play Equipment PR-028 5 95,00095,000Tablyn Park Play Equipment PR-029 4 125,000125,000Stonegate Park Play Equipment PR-030 4 125,000125,000Reid Park Play Equipment PR-031 5 125,000125,000Ridge Park Play Equipment PR-032 3 125,000125,000Hidden Knoll Park Play Equipment PR-034 5 125,000125,000Carriage Station Park Play Equipment PR-036 5 78,00078,000Trail Additions PR-038 3 125,000125,000Lions Park Playground Equipment Replacement PR-039 3 30,00030,000Court Resurfacing PR-040 2 30,00030,000Additional Sand Volleyball Courts PR-041 3 75,00075,000Tablyn Parking Lot Extension PR-042 2 65,00065,000Lions Park Concession Building Updates PR-043 3 Park Dedication Fund Total 2,038,000458,000 65,000 425,000 190,000 425,000 125,000 100,000 125,000 125,000 Wednesday, May 10, 2023Produced Using the Plan-It Capital Planning Software Total20242025202620272028Source20292030203120322033 #Priority Vehicle Replacement Fund 40,00040,000Utility Vehicile/Trail Groomer PR-020 3 Vehicle Replacement Fund Total 40,00040,000 1,458,000 65,000 465,000 190,000 425,000 3,078,000GRAND TOTAL 125,000 100,000 125,000 125,000 Wednesday, May 10, 2023Produced Using the Plan-It Capital Planning Software