HomeMy WebLinkAbout#09 - Tamarack Farm Estates Street & Utility Project STAFF REPORT DATE: June 1, 2021 REGULAR AGENDA ITEM: Accept Bids and Award Contract for the Tamarack Farm Estates Street Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a contract for the Tamarack Farm Estates Street Improvements? BACKGROUND: On April 20, 2021, the City Council approved the plans and specifications for the Tamarack Farm Estates Street Improvements and authorized staff to advertise the project for bids. The project was initiated as part of the City’s annual Capital Street Improvement Program and includes the reconstruction of Linden Trail North, within the Tamarack Farm Estates subdivision, including the one-way loop street at the northwest end of the subdivision and consisting of approximately 2,100 feet of roadway. The proposed improvements include a fully reconstructed street with new granular subbase drainage layer, new Class 6 aggregate base and new bituminous pavement. The existing bituminous curb will be replaced with new concrete curb and gutter to improve drainage, improve the construction quality, and provide edge control to protect and extend the service life of the new bituminous surface. Storm sewer structure repair and replacement will be completed to restore the storm sewer system integrity and functionality. The existing stormwater basin located within the HOA Outlot will be expanded to meet VBWD rules for stormwater management. Roadway widening is proposed along the one-way loop to increase the street width from 14-feet to 19-feet. The added width is provided by holding the outside edge of the road at its existing location to minimize driveway and property impacts. The widening therefore occurs toward the center island area resulting in the removal of the existing interior boulevard trees. The added width is necessary to improve the turning radii at each corner and to better accommodate maintenance and emergency vehicle access. The design also includes 12 dedicated parking stalls using parallel parking bump-outs along the straight segments of the one-way loop roadway. The post bid cost for the dedicated parking areas is $15,300. Staff has forwarded this cost information to the property owners to inquire if they are amenable to pay the added costs for the requested improvement. Linden Trail, from 50th Street to the one-way loop, is proposed to remain at its current width of 26-feet, however, city staff is recommending that parking be allowed along one side the street, even though the roadway width does not fully meet the city’s current parking standards. As part of the project design, the team held 2 neighborhood design meetings. At each meeting the discussion of the one-way loop street widening was the primary concern for the neighborhood together with the need for parking opportunities. It was determined that the trees should be removed along the interior of the one-way loop to accommodate the added street width toward the center open area. The final design scope of improvements remains generally consistent with the feasibility report that was approved by the City Council on December 15, 2020, as recommended for the street and drainage improvements. Through neighborhood meetings it was determined to not move forward with the extension of municipal water to the neighborhood as part of this project. PROPOSAL DETAILS/ANALYSIS: Bids were received and opened electronically on May 20, 2021. The City received 9 bids for this project, with OMG Midwest Inc. DBA Minnesota Paving and Material providing the lowest bid in the amount of $585,765.39. Contractor references for OMG Midwest Inc. DBA Minnesota Paving and Material were reviewed and verified. The City Engineer and the design engineer (TKDA) are therefore recommending, should the Council choose to Order the Improvements, that the City award the contract to the lowest responsible bidder OMG Midwest Inc. DBA Minnesota Paving and Material, as outlined in the attached letter. As a part of this award staff is requesting Council to provide the City Administrator authorization to enter into a material testing contract for the construction geotechnical work in the not-to-exceed amount of $10,000. This amount has been budgeted in the total cost figures presented below and is necessary to complete the project. Staff has requested proposals from Braun Intertec and AET, Inc. FISCAL IMPACT: Approval of this resolution commits the council to enter into a construction contract for the project. The estimated total post-bid project cost is $756,000 with $193,800 paid through special assessments, $15,300 paid directly by property owners for the parallel parking, and the remaining $546,900 paid through the general tax levy. OPTIONS: Staff has identified the following options for council consideration. 1. Accept bids, award a contract, and complete the improvements as planned, while maintaining the assessments per the preliminary assessment roll. • Option 1A. Direct staff to process change order to remove the parallel parking along the Linden Trail one way street. 2. Reject ALL bids that were received and direct the City Clerk to return all bid bonds. Provide staff direction to prepare the project for rebidding to ready the project for 2022 construction. RECOMMENDATION: Staff is recommending that the City Council consider approving a Resolution accepting bids and awarding a contract to OMG Midwest Inc. DBA Minnesota Paving and Material in the amount of $585,765.39 for the Tamarack Farm Estates Street Improvements. The recommended motion for this action is as follows: “Move to approve Resolution No. 2021–XXX, accepting bids and awarding a contract to OMG Midwest Inc. DBA Minnesota Paving and Material in the amount of $585,765.39 for the Tamarack Farm Estates Street Improvements.” Staff is also recommending that the City Council authorize the City Administrator to enter into a material testing contract for the project construction services, in the not-to-exceed amount of $10,000. The recommended motion for this action is as follows: “Move to authorize the City Administrator to enter into a material testing contract for project construction services in the not-to-exceed amount of $10,000 for the Tamarack Farm Estates Street Improvements.” OR To reject the bids, staff is recommending that Council approve a motion receiving contractor bids and rejecting all bids. Project construction would not occur in 2021. Staff would also request direction to prepare the project for rebidding to ready the project for 2022 construction. The recommended motion for this action is as follows: “Move to receive contractor bids and reject all bids for the Tamarack Farm Estates Street Improvements, and direct staff to prepare the project for rebidding for 2022 construction.” ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract for the Tamarack Farm Estates Street Improvements. 2. Letter of Award Recommendation and Tabulation of Bids. 3. Location Map. 4. Linden Trail one way loop street – Parallel Parking Exhibit. 5. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2021-064 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE TAMARACK FARM ESTATES STREET IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the Tamarack Farm Estates Street Improvements, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, OMG Midwest Inc. DBA Minnesota Paving and Material, for the base bid amount of $585,765.39. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIRST DAY OF JUNE, 2021. CITY OF LAKE ELMO By: __________________________ (Seal) Charles Cadenhead ATTEST: Mayor ________________________________ Julie Johnson City Clerk TKDA® | 444 Cedar Street Suite 1500 | Saint Paul, MN 55101 651.292.4400 • tkda.com An employee-owned company promoting affirmative action and equal opportunity. May 24, 2021 Honorable Mayor and City Council City of Lake Elmo 3880 Laverne Avenue North, Suite 100 Lake Elmo, MN 55042 Re: Tamarack Farms Estates Street Improvements Project City of Lake Elmo, Minnesota City Project No. 2020.125 TKDA Project No. 18016.001 Dear Mayor and City Council: On May 20, 2021, nine bids for the referenced project were received. The lowest bid was submitted by OMG Midwest dba Minnesota Paving & Materials. Listed below is a summary of the bids received, and a complete Tabulation of Bids is enclosed for your information. Contractor Total Base Bid OMG Midwest dba Minnesota Paving & Materials $585,765.39 Meyer Contracting, Inc. $602,704.61 Dresel Contracting, Inc. $616,983.37 Miller Excavating, Inc. $628,512.33 T.A. Schifsky & Sons, Inc. $640,979.77 A-1 Excavating, Inc. $656,970.60 Max Steininger, Inc. $663,612.18 Bituminous Roadways, Inc. $672,987.83 Pember Companies, Inc. $701,039.49 We have reviewed the bids and recommend awarding this bid to the lowest responsible bidder, OMG Midwest dba Minnesota Paving & Materials, for their Total Base Bid of $585,765.39. Please do not hesitate to call me with any questions or comments. Sincerely, Mark O. Byers, PE Project Engineer MOB:ksb Enclosure TABULATION OF BIDSTAMARACK FARMS ESTATES STREET IMPROVEMENTSCITY OF LAKE ELMO, MINNESOTACITY PROJECT NO. 2020.125TKDA PROJECT NO. 18016.001 UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 1 MOBILIZATION 1 LS 35,000.00$ 35,000.00$ 30,000.00$ 30,000.00$ 55,046.25$ 55,046.25$ 31,140.00$ 31,140.00$ 2 TRAFFIC CONTROL 1 LS 5,000.00$ 5,000.00$ 1,500.00$ 1,500.00$ 4,380.00$ 4,380.00$ 9,345.01$ 9,345.01$ 3 SILT FENCE 2,990 LF 1.00$ 2,990.00$ 1.98$ 5,920.20$ 3.60$ 10,764.00$ 2.10$ 6,279.00$ 4 SEDIMENT CONTROL LOG TYPE COMPOST 130 LF 3.01$ 391.30$ 2.47$ 321.10$ 3.60$ 468.00$ 2.65$ 344.50$ 5 INLET PROTECTION 13 EA 106.05$ 1,378.65$ 169.46$ 2,202.98$ 150.00$ 1,950.00$ 125.00$ 1,625.00$ 6 CLEARING 45 TREE 250.71$ 11,281.95$ 133.33$ 5,999.85$ 144.00$ 6,480.00$ 135.05$ 6,077.25$ 7 GRUBBING 45 TREE 200.57$ 9,025.65$ 133.33$ 5,999.85$ 144.00$ 6,480.00$ 135.05$ 6,077.25$ 8 IMPORT AND PLACE TOPSOIL BORROW 441 CY 19.00$ 8,379.00$ 31.40$ 13,847.40$ 34.59$ 15,254.19$ 41.25$ 18,191.25$ 9 TEMPORARY ROCK CONSTRUCTION ENTRANCE 1 EA 0.01$ 0.01$ 3,057.65$ 3,057.65$ 1,368.00$ 1,368.00$ 1,160.00$ 1,160.00$ 10 STREET SWEEPER (WITH PICKUP BROOM) 26 HR 158.45$ 4,119.70$ 130.00$ 3,380.00$ 190.38$ 4,949.88$ 140.00$ 3,640.00$ 11 EXPLORATORY DIGGING 6 HR 147.38$ 884.28$ 319.29$ 1,915.74$ 600.00$ 3,600.00$ 300.00$ 1,800.00$ 12 EROSION CONTROL BLANKET 173 SY 2.51$ 435.23$ 3.11$ 539.27$ 3.60$ 624.24$ 3.30$ 572.22$ 13 SEEDING 1 AC 9,710.00$ 6,797.00$ 6,485.96$ 4,540.17$ 540.00$ 378.00$ 6,860.00$ 4,802.00$ 14 SODDING 6,130 SY 4.50$ 27,585.00$ 7.83$ 47,997.90$ 6.38$ 39,109.40$ 8.30$ 50,879.00$ 15REMOVE AND DISPOSE OF EXISTING STORM SEWER145 LF 10.13$ 1,468.85$ 13.45$ 1,950.25$ 9.39$ 1,361.55$ 7.47$ 1,083.15$ 16 REMOVE AND DISPOSE OF EXISTING CATCH BASIN 5 EA 531.75$ 2,658.75$ 303.44$ 1,517.20$ 272.40$ 1,362.00$ 285.00$ 1,425.00$ 17REMOVE AND DISPOSE OF EXISTING FLARED END SECTION1 EA 177.25$ 177.25$ 203.39$ 203.39$ 285.00$ 285.00$ 285.00$ 285.00$ 18 REMOVE CATCH BASIN CASTING 5 EA 222.83$ 1,114.15$ 69.30$ 346.50$ 228.00$ 1,140.00$ 145.00$ 725.00$ 19 CONNECT TO EXISTING STORM SEWER 4 EA 2,582.81$ 10,331.24$ 628.09$ 2,512.36$ 570.00$ 2,280.00$ 835.00$ 3,340.00$ 20 CONNECT TO EXISTING CATCH BASIN 1 EA 1,519.30$ 1,519.30$ 945.57$ 945.57$ 570.00$ 570.00$ 1,750.00$ 1,750.00$ 21 CONNECT DRAINTILE TO EXISTING CATCH BASIN 1 EA 303.86$ 303.86$ 315.64$ 315.64$ 285.00$ 285.00$ 1,750.00$ 1,750.00$ 22 12" RC PIPE SEWER CLASS V 20 LF 60.77$ 1,215.40$ 68.92$ 1,378.40$ 84.42$ 1,688.40$ 64.65$ 1,293.00$ 23 15" RC PIPE SEWER CLASS V 266 LF 55.45$ 14,749.70$ 65.98$ 17,550.68$ 67.06$ 17,837.96$ 69.30$ 18,433.80$ 24 18" RC PIPE SEWER CLASS V 27 LF 63.81$ 1,722.87$ 67.51$ 1,822.77$ 100.04$ 2,701.08$ 72.80$ 1,965.60$ 25 15" RC PIPE FLARED END SECTION CLASS V 1 EA 2,476.45$ 2,476.45$ 1,268.92$ 1,268.92$ 872.10$ 872.10$ 1,840.00$ 1,840.00$ 26 CATCH BASIN TYPE 402 1 EA 3,134.52$ 3,134.52$ 2,853.71$ 2,853.71$ 2,105.88$ 2,105.88$ 2,600.00$ 2,600.00$ 27 CATCH BASIN TYPE 404 2 EA 3,007.91$ 6,015.82$ 3,000.18$ 6,000.36$ 2,183.40$ 4,366.80$ 2,845.00$ 5,690.00$ 28 CATCH BASIN MANHOLE WITH SUMP TYPE 405 2 EA 4,871.58$ 9,743.16$ 9,470.52$ 18,941.04$ 3,825.00$ 7,650.00$ 14,255.00$ 28,510.00$ 29CATCH BASIN MANHOLE WITH SUMP TYPE SPECIAL1 EA 5,464.11$ 5,464.11$ 10,974.69$ 10,974.69$ 4,224.00$ 4,224.00$ 9,700.00$ 9,700.00$ 30 CATCH BASIN MANHOLE TYPE 406 2 EA 3,995.45$ 7,990.90$ 4,273.49$ 8,546.98$ 2,565.00$ 5,130.00$ 4,165.35$ 8,330.70$ 31 RIPRAP CLASS II 15 CY 177.25$ 2,658.75$ 192.96$ 2,894.40$ 148.40$ 2,226.00$ 160.00$ 2,400.00$ 32 CLEAN AND TELEVISE STORM SEWER 313 LF 4.01$ 1,255.13$ 4.00$ 1,252.00$ 14.40$ 4,507.20$ 4.82$ 1,508.66$ 33 CHANNEL AND POND EXCAVATION 500 CY 16.97$ 8,485.00$ 15.81$ 7,905.00$ 36.24$ 18,120.00$ 22.20$ 11,100.00$ 34 DITCH GRADING 200 LF 6.84$ 1,368.00$ 3.72$ 744.00$ 9.90$ 1,980.00$ 15.75$ 3,150.00$ 35 SALVAGE AND REINSTALL MAILBOX 19 EA$110.312,095.89$ 200.00$ 3,800.00$ 240.00$ 4,560.00$ 124.70$ 2,369.30$ 36 SALVAGE AND REINSTALL SIGN 2 EA$200.57401.14$ 215.00$ 430.00$ 300.00$ 600.00$ 226.73$ 453.46$ 37 SALVAGE AND REINSTALL PAVERS 440 SF$16.557,282.00$ 17.00$ 7,480.00$ 6.75$ 2,970.00$ 18.33$ 8,065.20$ 38 REMOVE SIGN 7 EA$50.00350.00$ 50.00$ 350.00$ 48.00$ 336.00$ 56.68$ 396.76$ 39 SAWCUT BITUMINOUS OR CONCRETE 170 LF$4.08693.60$ 6.71$ 1,140.70$ 4.80$ 816.00$ 2.15$ 365.50$ 40REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (P)4,640 SY$4.2019,488.00$ 2.98$ 13,827.20$ 2.79$ 12,945.60$ 2.40$ 11,136.00$ 41REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWAY)272 SY$11.002,995.30$ 7.87$ 2,143.00$ 4.87$ 1,326.10$ 3.30$ 898.59$ 42REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (WALK)100 SY$11.001,103.30$ 5.85$ 586.76$ 7.66$ 768.30$ 6.05$ 606.82$ 43REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (WALK)30 SY$34.001,020.00$ 8.58$ 257.40$ 12.80$ 384.00$ 6.75$ 202.50$ 44REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (FLUME)1 EA$346.02346.02$ 231.04$ 231.04$ 396.00$ 396.00$ 199.95$ 199.95$ 45REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (DRIVEWAY)38 SY$34.601,314.80$ 7.93$ 301.34$ 14.37$ 546.06$ 10.00$ 380.00$ SCHEDULE C - STREETS MEYER CONTRACTING DRESEL CONTRACTING, INC. MILLER EXCAVATING, INC.ITEM NO. DESCRIPTION QUANTITY UNIT OMG MIDWEST DBA MINNESOTA PAVING & MATERIALS SCHEDULE A - GENERALSCHEDULE B - STORM SEWER TABULATION OF BIDSTAMARACK FARMS ESTATES STREET IMPROVEMENTSCITY OF LAKE ELMO, MINNESOTACITY PROJECT NO. 2020.125TKDA PROJECT NO. 18016.001 UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT MEYER CONTRACTING DRESEL CONTRACTING, INC. MILLER EXCAVATING, INC.ITEM NO. DESCRIPTION QUANTITY UNIT OMG MIDWEST DBA MINNESOTA PAVING & MATERIALS 46REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER72 LF$12.91929.52$ 5.15$ 370.80$ 6.92$ 498.24$ 12.00$ 864.00$ 47 COMMON EXCAVATION (P) 3,900 CY$19.0074,100.00$ 16.08$ 62,712.00$ 11.69$ 45,591.00$ 15.35$ 59,865.00$ 48 SELECT GRANULAR BORROW (P) 2,060 CY$25.0051,500.00$ 25.09$ 51,685.40$ 27.38$ 56,402.80$ 19.30$ 39,758.00$ 49 SUBGRADE CORRECTION 278 CY$32.419,009.98$ 41.74$ 11,603.72$ 36.25$ 10,077.50$ 33.85$ 9,410.30$ 50 SUBGRADE PREPARATION 20 RD STA$96.221,924.40$ 118.27$ 2,365.40$ 405.00$ 8,100.00$ 340.00$ 6,800.00$ 51 AGGREGATE BASE CLASS 6 1,970 TN$17.8635,184.20$ 20.45$ 40,286.50$ 23.63$ 46,551.10$ 17.00$ 33,490.00$ 52 BITUMINOUS DRIVEWAY PAVEMENT 279 SY$0.012.79$ 23.67$ 6,603.93$ 38.11$ 10,632.69$ 54.42$ 15,183.18$ 53 TYPE SP 9.5 WEARING COURSE MIX (2,C) 480 TN$84.0040,286.40$ 85.87$ 41,183.25$ 78.28$ 37,543.09$ 86.16$ 41,322.34$ 54 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,C) 640 TN$79.0050,560.00$ 81.47$ 52,140.80$ 77.25$ 49,440.00$ 85.02$ 54,412.80$ 55 BITUMINOUS MATERIAL FOR TACK COAT 290 GAL$1.60464.00$ 3.63$ 1,052.70$ 0.01$ 2.90$ 0.01$ 2.90$ 56 CONCRETE CURB AND GUTTER DESIGN B612 4,000 LF$13.0452,160.00$ 13.90$ 55,600.00$ 13.65$ 54,600.00$ 14.80$ 59,200.00$ 57 6" CONCRETE DRIVEWAY 38 SY$78.222,941.07$ 78.00$ 2,932.80$ 81.90$ 3,079.44$ 88.45$ 3,325.72$ 58 5" CONCRETE WALK 32 SY$53.151,700.80$ 53.00$ 1,696.00$ 55.65$ 1,780.80$ 60.10$ 1,923.20$ 59 CONCRETE PEDESTRIAN RAMP 2 EA$852.411,704.82$ 850.00$ 1,700.00$ 892.50$ 1,785.00$ 965.00$ 1,930.00$ 60 TRUNCATED DOME PANELS 32 SF$52.151,668.80$ 52.00$ 1,664.00$ 54.60$ 1,747.20$ 58.95$ 1,886.40$ 61 4" PERFORATED PVC EDGE DRAIN 1,000 LF$21.2721,270.00$ 15.51$ 15,510.00$ 25.80$ 25,800.00$ 17.70$ 17,700.00$ 62 DRAINTILE CLEANOUT 10 EA$227.892,278.90$ 204.64$ 2,046.40$ 178.80$ 1,788.00$ 315.00$ 3,150.00$ 63 FURNISH SIGN PANEL 35 SF$30.091,060.67$ 30.00$ 1,057.50$ 52.50$ 1,850.63$ 34.10$ 1,202.03$ 64 INSTALL SIGN PANELS 16 EA$175.502,808.00$ 175.00$ 2,800.00$ 157.50$ 2,520.00$ 200.00$ 3,200.00$ TOTAL BASE BID585,765.39$ 602,704.61$ 616,983.37$ 628,512.33$ TABULATION OF BIDSTAMARACK FARMS ESTATES STREET IMPROVEMENTSCITY OF LAKE ELMO, MINNESOTACITY PROJECT NO. 2020.125TKDA PROJECT NO. 18016.0011 MOBILIZATION 1 LS2 TRAFFIC CONTROL 1 LS3 SILT FENCE 2,990 LF4 SEDIMENT CONTROL LOG TYPE COMPOST 130 LF5 INLET PROTECTION 13 EA 6 CLEARING 45 TREE7 GRUBBING 45 TREE8 IMPORT AND PLACE TOPSOIL BORROW 441 CY9 TEMPORARY ROCK CONSTRUCTION ENTRANCE 1 EA10 STREET SWEEPER (WITH PICKUP BROOM) 26 HR11 EXPLORATORY DIGGING 6 HR12 EROSION CONTROL BLANKET 173 SY13 SEEDING 1 AC14 SODDING 6,130 SY15REMOVE AND DISPOSE OF EXISTING STORM SEWER145 LF16 REMOVE AND DISPOSE OF EXISTING CATCH BASIN 5 EA17REMOVE AND DISPOSE OF EXISTING FLARED END SECTION1 EA18 REMOVE CATCH BASIN CASTING 5 EA19 CONNECT TO EXISTING STORM SEWER 4 EA20 CONNECT TO EXISTING CATCH BASIN 1 EA21 CONNECT DRAINTILE TO EXISTING CATCH BASIN 1 EA22 12" RC PIPE SEWER CLASS V 20 LF23 15" RC PIPE SEWER CLASS V 266 LF24 18" RC PIPE SEWER CLASS V 27 LF25 15" RC PIPE FLARED END SECTION CLASS V 1 EA26 CATCH BASIN TYPE 402 1 EA27 CATCH BASIN TYPE 404 2 EA28 CATCH BASIN MANHOLE WITH SUMP TYPE 405 2 EA29CATCH BASIN MANHOLE WITH SUMP TYPE SPECIAL1 EA30 CATCH BASIN MANHOLE TYPE 406 2 EA31 RIPRAP CLASS II 15 CY32 CLEAN AND TELEVISE STORM SEWER 313 LF33 CHANNEL AND POND EXCAVATION 500 CY34 DITCH GRADING 200 LF35 SALVAGE AND REINSTALL MAILBOX 19 EA36 SALVAGE AND REINSTALL SIGN 2 EA37 SALVAGE AND REINSTALL PAVERS 440 SF38 REMOVE SIGN 7 EA39 SAWCUT BITUMINOUS OR CONCRETE 170 LF40REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (P)4,640 SY41REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWAY)272 SY42REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (WALK)100 SY43REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (WALK)30 SY44REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (FLUME)1 EA45REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (DRIVEWAY)38 SYSCHEDULE C - STREETSITEM NO. DESCRIPTION QUANTITY UNITSCHEDULE A - GENERALSCHEDULE B - STORM SEWER UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT 31,000.00$ 31,000.00$ 69,300.00$ 69,300.00$ 68,750.00$ 68,750.00$ 41,451.00$ 41,451.00$ 34,520.00$ 34,520.00$ 20,000.00$ 20,000.00$ 3,000.00$ 3,000.00$ 1,604.26$ 1,604.26$ 6,620.00$ 6,620.00$ 3,650.00$ 3,650.00$ 2.00$ 5,980.00$ 0.50$ 1,495.00$ 2.78$ 8,312.20$ 2.70$ 8,073.00$ 2.00$ 5,980.00$ 3.50$ 455.00$ 6.00$ 780.00$ 10.70$ 1,391.00$ 10.50$ 1,365.00$ 2.40$ 312.00$ 125.00$ 1,625.00$ 50.00$ 650.00$ 236.57$ 3,075.41$ 158.00$ 2,054.00$ 130.00$ 1,690.00$ 210.00$ 9,450.00$ 100.00$ 4,500.00$ 128.34$ 5,775.30$ 105.00$ 4,725.00$ 120.00$ 5,400.00$ 105.00$ 4,725.00$ 100.00$ 4,500.00$ 128.34$ 5,775.30$ 158.00$ 7,110.00$ 80.00$ 3,600.00$ 35.00$ 15,435.00$ 28.00$ 12,348.00$ 34.75$ 15,324.75$ 54.00$ 23,814.00$ 42.00$ 18,522.00$ 850.00$ 850.00$ 900.00$ 900.00$ 550.00$ 550.00$ 949.00$ 949.00$ 1,100.00$ 1,100.00$ 165.00$ 4,290.00$ 65.00$ 1,690.00$ 75.00$ 1,950.00$ 174.00$ 4,524.00$ 135.00$ 3,510.00$ 350.00$ 2,100.00$ 150.00$ 900.00$ 556.14$ 3,336.84$ 527.00$ 3,162.00$ 400.00$ 2,400.00$ 2.10$ 364.14$ 5.00$ 867.00$ 5.12$ 887.81$ 5.10$ 884.34$ 3.00$ 520.20$ 630.00$ 441.00$ 11,000.00$ 7,700.00$ 6,524.01$ 4,566.81$ 6,432.00$ 4,502.40$ 6,420.00$ 4,494.00$ 10.25$ 62,832.50$ 11.00$ 67,430.00$ 10.37$ 63,568.10$ 10.00$ 61,300.00$ 7.75$ 47,507.50$ 26.00$ 3,770.00$ 20.00$ 2,900.00$ 19.25$ 2,791.25$ 26.50$ 3,842.50$ 15.65$ 2,269.25$ 788.00$ 3,940.00$ 500.00$ 2,500.00$ 299.46$ 1,497.30$ 791.00$ 3,955.00$ 550.00$ 2,750.00$ 525.00$ 525.00$ 250.00$ 250.00$ 299.46$ 299.46$ 527.00$ 527.00$ 195.00$ 195.00$ 131.00$ 655.00$ 100.00$ 500.00$ 256.68$ 1,283.40$ 105.00$ 525.00$ 75.00$ 375.00$ 1,208.00$ 4,832.00$ 800.00$ 3,200.00$ 994.64$ 3,978.56$ 1,213.00$ 4,852.00$ 1,050.00$ 4,200.00$ 1,100.00$ 1,100.00$ 800.00$ 800.00$ 994.64$ 994.64$ 1,107.00$ 1,107.00$ 670.00$ 670.00$ 1,260.00$ 1,260.00$ 800.00$ 800.00$ 171.12$ 171.12$ 422.00$ 422.00$ 525.00$ 525.00$ 51.50$ 1,030.00$ 92.00$ 1,840.00$ 69.52$ 1,390.40$ 51.50$ 1,030.00$ 62.00$ 1,240.00$ 58.75$ 15,627.50$ 73.00$ 19,418.00$ 69.52$ 18,492.32$ 59.00$ 15,694.00$ 66.25$ 17,622.50$ 64.00$ 1,728.00$ 104.00$ 2,808.00$ 79.14$ 2,136.78$ 64.50$ 1,741.50$ 69.50$ 1,876.50$ 1,505.00$ 1,505.00$ 1,100.00$ 1,100.00$ 1,711.21$ 1,711.21$ 1,513.00$ 1,513.00$ 910.00$ 910.00$ 4,000.00$ 4,000.00$ 2,050.00$ 2,050.00$ 2,673.77$ 2,673.77$ 3,413.00$ 3,413.00$ 2,175.00$ 2,175.00$ 3,680.00$ 7,360.00$ 2,700.00$ 5,400.00$ 3,529.38$ 7,058.76$ 3,697.00$ 7,394.00$ 2,410.00$ 4,820.00$ 10,400.00$ 20,800.00$ 8,600.00$ 17,200.00$ 7,914.37$ 15,828.74$ 10,439.00$ 20,878.00$ 4,865.00$ 9,730.00$ 10,600.00$ 10,600.00$ 9,700.00$ 9,700.00$ 8,983.88$ 8,983.88$ 10,637.00$ 10,637.00$ 9,825.00$ 9,825.00$ 4,170.00$ 8,340.00$ 4,750.00$ 9,500.00$ 3,529.38$ 7,058.76$ 4,188.00$ 8,376.00$ 3,060.00$ 6,120.00$ 150.00$ 2,250.00$ 120.00$ 1,800.00$ 126.53$ 1,897.95$ 148.00$ 2,220.00$ 120.00$ 1,800.00$ 4.25$ 1,330.25$ 4.00$ 1,252.00$ 10.70$ 3,349.10$ 16.00$ 5,008.00$ 4.00$ 1,252.00$ 22.00$ 11,000.00$ 18.00$ 9,000.00$ 29.13$ 14,565.00$ 45.50$ 22,750.00$ 29.00$ 14,500.00$ 21.00$ 4,200.00$ 14.00$ 2,800.00$ 21.51$ 4,302.00$ 12.00$ 2,400.00$ 16.00$ 3,200.00$ 150.00$ 2,850.00$ 125.00$ 2,375.00$ 160.43$ 3,048.17$ 211.00$ 4,009.00$ 140.00$ 2,660.00$ 200.00$ 400.00$ 250.00$ 500.00$ 213.90$ 427.80$ 227.00$ 454.00$ 210.00$ 420.00$ 5.00$ 2,200.00$ 18.00$ 7,920.00$ 18.18$ 7,999.20$ 31.50$ 13,860.00$ 15.00$ 6,600.00$ 50.00$ 350.00$ 60.00$ 420.00$ 53.48$ 374.36$ 42.00$ 294.00$ 55.00$ 385.00$ 2.00$ 340.00$ 4.00$ 680.00$ 5.35$ 909.50$ 2.10$ 357.00$ 3.25$ 552.50$ 3.00$ 13,920.00$ 3.00$ 13,920.00$ 3.61$ 16,750.40$ 2.60$ 12,064.00$ 4.20$ 19,488.00$ 7.00$ 1,906.10$ 7.00$ 1,906.10$ 3.58$ 974.83$ 7.70$ 2,096.71$ 5.00$ 1,361.50$ 10.00$ 1,003.00$ 7.00$ 702.10$ 5.83$ 584.75$ 9.50$ 952.85$ 6.60$ 661.98$ 10.00$ 300.00$ 10.00$ 300.00$ 8.93$ 267.90$ 19.50$ 585.00$ 11.15$ 334.50$ 150.00$ 150.00$ 200.00$ 200.00$ 267.94$ 267.94$ 19.50$ 19.50$ 60.00$ 60.00$ 10.00$ 380.00$ 12.00$ 456.00$ 10.89$ 413.82$ 19.50$ 741.00$ 13.25$ 503.50$ T.A. SCHIFSKY & SONS, INC. BITUMINOUS ROADWAYS, INC. PEMBER COMPANIES, INC. A-1 EXCAVATING, INC. MAX STEININGER, INC. TABULATION OF BIDSTAMARACK FARMS ESTATES STREET IMPROVEMENTSCITY OF LAKE ELMO, MINNESOTACITY PROJECT NO. 2020.125TKDA PROJECT NO. 18016.001ITEM NO. DESCRIPTION QUANTITY UNIT46REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER72 LF47 COMMON EXCAVATION (P) 3,900 CY48 SELECT GRANULAR BORROW (P) 2,060 CY49 SUBGRADE CORRECTION 278 CY50 SUBGRADE PREPARATION 20 RD STA51 AGGREGATE BASE CLASS 6 1,970 TN52 BITUMINOUS DRIVEWAY PAVEMENT 279 SY53 TYPE SP 9.5 WEARING COURSE MIX (2,C) 480 TN54 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,C) 640 TN55 BITUMINOUS MATERIAL FOR TACK COAT 290 GAL56 CONCRETE CURB AND GUTTER DESIGN B612 4,000 LF57 6" CONCRETE DRIVEWAY 38 SY58 5" CONCRETE WALK 32 SY59 CONCRETE PEDESTRIAN RAMP 2 EA60 TRUNCATED DOME PANELS 32 SF61 4" PERFORATED PVC EDGE DRAIN 1,000 LF62 DRAINTILE CLEANOUT 10 EA63 FURNISH SIGN PANEL 35 SF64 INSTALL SIGN PANELS 16 EATOTAL BASE BID UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT T.A. SCHIFSKY & SONS, INC. BITUMINOUS ROADWAYS, INC. PEMBER COMPANIES, INC. A-1 EXCAVATING, INC. MAX STEININGER, INC.5.00$ 360.00$ 6.00$ 432.00$ 7.44$ 535.68$ 10.50$ 756.00$ 7.00$ 504.00$ 22.00$ 85,800.00$ 20.00$ 78,000.00$ 16.13$ 62,907.00$ 12.00$ 46,800.00$ 32.50$ 126,750.00$ 11.50$ 23,690.00$ 23.00$ 47,380.00$ 19.14$ 39,428.40$ 25.50$ 52,530.00$ 25.50$ 52,530.00$ 30.00$ 8,340.00$ 37.00$ 10,286.00$ 26.66$ 7,411.48$ 42.00$ 11,676.00$ 50.00$ 13,900.00$ 175.00$ 3,500.00$ 300.00$ 6,000.00$ 125.00$ 2,500.00$ 383.00$ 7,660.00$ 200.00$ 4,000.00$ 23.00$ 45,310.00$ 16.70$ 32,899.00$ 19.98$ 39,360.60$ 14.00$ 27,580.00$ 29.00$ 57,130.00$ 37.00$ 10,323.00$ 9.50$ 2,650.50$ 55.39$ 15,453.81$ 21.50$ 5,998.50$ 24.50$ 6,835.50$ 76.00$ 36,449.60$ 84.00$ 40,286.40$ 82.35$ 39,495.06$ 78.00$ 37,408.80$ 84.85$ 40,694.06$ 75.00$ 48,000.00$ 79.00$ 50,560.00$ 78.07$ 49,964.80$ 74.00$ 47,360.00$ 79.55$ 50,912.00$ 0.01$ 2.90$ 1.70$ 493.00$ 1.07$ 310.30$ 3.30$ 957.00$ 1.70$ 493.00$ 14.25$ 57,000.00$ 13.50$ 54,000.00$ 13.90$ 55,600.00$ 16.50$ 66,000.00$ 13.60$ 54,400.00$ 74.00$ 2,782.40$ 80.00$ 3,008.00$ 112.08$ 4,214.21$ 93.50$ 3,515.60$ 76.25$ 2,867.00$ 50.50$ 1,616.00$ 57.50$ 1,840.00$ 85.34$ 2,730.88$ 86.00$ 2,752.00$ 68.00$ 2,176.00$ 1,260.00$ 2,520.00$ 1,320.00$ 2,640.00$ 1,291.13$ 2,582.26$ 1,081.00$ 2,162.00$ 1,465.00$ 2,930.00$ 63.00$ 2,016.00$ 65.00$ 2,080.00$ 55.61$ 1,779.52$ 74.00$ 2,368.00$ 56.00$ 1,792.00$ 18.50$ 18,500.00$ 13.00$ 13,000.00$ 15.43$ 15,430.00$ 22.00$ 22,000.00$ 24.00$ 24,000.00$ 150.00$ 1,500.00$ 700.00$ 7,000.00$ 243.16$ 2,431.60$ 791.00$ 7,910.00$ 275.00$ 2,750.00$ 31.50$ 1,110.38$ 34.00$ 1,198.50$ 32.09$ 1,131.17$ 26.50$ 934.13$ 32.00$ 1,128.00$ 185.00$ 2,960.00$ 185.00$ 2,960.00$ 187.16$ 2,994.56$ 148.00$ 2,368.00$ 185.00$ 2,960.00$ 640,979.77$ 656,970.60$ 663,612.18$ 672,987.83$ 701,039.49$ LOCATION MAP FIGURE NO. 1 TAMARACK FARM ESTATES NEIGHBORHOOD CITY OFLAKE ELMO TAMARACK FARM ESTATES LEGEND PROJECT NO. 2020.125 TAMARACK FARM ESTATES STREET IMPROVEMENTS CITY LIMITS PROJECT STREETS LINDEN TRAIL N, FROM 50TH STREET N TO THE CUL-DE-SAC >>>>>>>>>>>>>>>>4"2"15"14"20"16"2"2"1"2"3"1"2"1"3"2"2"3"2"1"3"3"3"3"4"4"4"4"6"6"4"6"6"5"5"5"8"6"4"4"6"4"4"4"30"4"27"9"11"5"12"4"10"4"4"4"7"14"12"12"12"8"12"4"5"3"10"3"3"10"2"12"10"10"14"14"12"9"2"2"2"10"12"3"12"12"18"2"3"10"1">>>>>>>>>28'K:\g-m\LakeElmo\18016001\04_Production\01_CAD\03_Concepts\C-Base Parking Stalls-Update 4-1-2021.dwg Apr 07, 2021 - 8:55am444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDCITY PROJ. NO.PROJ. NO.DRAWING NO.FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:APARALLEL PARKING######### ############# ################# ### ### ###### ### ### ###### ### ### ###### ### ### ###### ### ### ###I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED##################### UNDER THE LAWS OF THE STATE OF#########.TAMARACK FARMSESTATES18016.0012020.1256 STALLS6 STALLS PROJECT SCHEDULE  CITY OF LAKE ELMO    TAMARACK FARM ESTATES STREET IMPROVEMENTS  PROJECT NO. 2020.125  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                  OCTOBER 6, 2020  Council orders preparation of Feasibility Report and Topographic Survey.      DECEMBER 15, 2020  Presentation  of  Feasibility  Report.  Council  accepts  Report  and  calls  for  Improvement Hearing.       JANUARY 19, 2021  Public Improvement Hearing. Council Orders the Improvement (4/5th Vote)  and preparation of Plans and Specfications.    APRIL 20, 2021  Council approves Plans and Specifications and orders Advertisement for Bids.      MAY 20, 2021     Project Bid Date: Receive contractor bids.      JUNE 1, 2021  Council accepts Bids and awards Contract.       JUNE 28, 2021    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   OCTOBER 1, 2021    Substantial Completion.   NOVEMBER 19, 2021    Final Completion.                               *Final Assessment Hearing Schedule TBD