Loading...
HomeMy WebLinkAbout#20 - Pavement Condition Evaluation STAFF REPORT DATE: June 15, 2021 CONSENT AGENDA ITEM: Approve Contract with GoodPointe Technology for Pavement Condition Evaluation Services SUBMITTED BY: Jack Griffin, City Engineer and Marty Powers, Public Works Director REVIEWED BY: Kristina Handt, City Administrator Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve a contract with GoodPointe Technology for Pavement Condition Evaluation Services? BACKGROUND: Developing and implementing a systematic pavement management program enables a community to more effectively plan and program maintenance and rehabilitation strategies for the public street and pavement assets. A good pavement management program will help to provide more accurate and accessible information on the pavement network, will better track pavement performance, will help to better predict funding needs and will make more efficient use of available resources. In addition, the data driven process will improve communications between staff and the city council for the purpose of establishing and supporting the proper funding and budget levels. A good Pavement Management Program will consist of the following elements: 1. A current and accurate street and pavement inventory. 2. Condition Assessment for each street segment, updated every 3 years. 3. Repair/maintenance strategies with cost estimates. 4. Prioritization methodology. 5. Process for creating and evaluating maintenance/rehabilitation budgets. The key to strategic maintenance planning is in knowing the current condition of the various elements of your infrastructure network and understanding how it is changing with time and in response to the ongoing maintenance, repair, and rehabilitation efforts. PROPOSAL DETAILS/ANALYSIS: In 2016 the city retained GoodPointe Technology to conduct a city-wide street inventory and pavement condition assessment using the PCI rating system. The pavement management information was uploaded to ICON, an Infrastructure CONsultant relational database management program that is used to manage and track the condition of the city’s physical pavements, signs, and any other miscellaneous infrastructure assets located in the public right of way. Proposals were then obtained in 2018 to begin re-rating parts of the city street pavements on a bi-annual basis in a manner to maintain current condition assessments for accurate reporting and evaluation. However, due to staff and council turnover, the 2018 condition assessments were not supported by the budget. To better ensure that the city is investing its maintenance and reconstruction dollars more strategically for extending the serviceable life of the city pavements, staff is recommending that the pavement condition assessment and inventory be updated in 2021. The proposal also includes consulting services to be provided by GoodPointe Technology to assist the city with setup and training on the ICON database system so that the system can be maintained over time. The updated rating/inventory will provide the city with a current and accurate street inventory and condition assessment that will be accessible to Public Works and Engineering for ongoing updates, capital improvement planning and annual street maintenance programming. FISCAL IMPACT: $20,900 to be paid from the Street Maintenance Fund. RECOMMENDATION: Staff is recommending that the City Council approve a contract with GoodPointe Technology for Pavement Condition Evaluation Services. The recommended motion for the action is as follows: “Move to approve a contract with GoodPointe Technology for Pavement Condition Evaluation Services in a not to exceed amount of $20,900”. ATTACHMENTS: 1. GoodPointe Technology Professional Services Proposal dated June 7, 2021. Network Level Pavement Condition Evaluation for the City of Lake Elmo, Minnesota Version A.2 Submitted June 7, 2021 GoodPointe Technology 287 E. 6th Street, Suite 200 St. Paul, MN 55101 www.goodpointe.com June 7, 2021 Mr. Marty Powers Public Works Director 3880 Laverne Ave N Lake Elmo, MN 55042 Dear Marty: Re: A.2 Proposal for Pavement Evaluation Consulting Services for the City of Lake Elmo, Minnesota We are pleased to present the following scope of work and related cost proposal to perform the above-referenced project for roadway pavements under the jurisdiction of the City of Lake Elmo. This revised version A.2 reflects the input of City engineer Jack Griffin from Friday June 4, 2021. All official correspondence during this project may be directed to: Tony Kadlec President Phone: (651) 726-2555 Fax: (651) 726-2545 E-mail: tkadlec@goodpointe.com We appreciate the opportunity to work with you on this project, and we look forward to providing high quality pavement and infrastructure management consulting services! Sincerely, GoodPointe Technology Anthony J. Kadlec President Attachments: Technical Scope of Work Proposed Cost Estimate \proposal\Lake Elmo\GoodPointe Technology_PCI Rating_A.2_06072021.pdf GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 1 1. Firm Information We are pleased to submit the following information on our company and the services we can provide for this project: WHY SELECT GOODPOINTE TECHNOLOGY FOR THIS PROJECT? Simply put, the collection of high-quality pavement condition data and the implementation of pavement and related infrastructure asset management systems is what we do for a living, day in and day out. We take pride in building and maintaining long-term client relationships and supporting our clients with their use of their pavement management software and through the delivery of high- quality pavement condition data. Our project team includes staff with vast experience to deliver exceptional value above and beyond the data that is collected and delivered in this project. OUR FIRM GoodPointe Technology, Inc. (GoodPointe) appreciates this opportunity to serve the City of Lake Elmo and to present the qualifications of our firm. GoodPointe has the extensive knowledge in necessary to perform this work efficiently and effectively. Our firm provides a wealth of experience that has already served the needs of a variety of local governmental clients throughout the state of Minnesota, across North America, and around the world. Our clients include cities, counties, state DOTs, telecommunication companies, utility companies, and transportation agencies. To date, we have processed more than 500,000 miles of digital right of way data collection, mapping, road geometry and asset inventory on roads and rails throughout North America and Asia since 1999. INTRODUCING GOODPOINTE TECHNOLOGY GoodPointe Technology (GoodPointe) is one of the leading infrastructure management systems- engineering and software-consulting firms in North America. The core mission of GoodPointe is to develop and provide high-quality roadway maintenance management software and system consulting services to clients in the government and private sector. We help the authorities of public and private infrastructure/facilities to more effectively meet their management and maintenance needs by providing powerful, flexible, and easy to use management system software and implementation services. Our management system implementation services include: x Strategic capital improvement project planning and needs analysis for your local conditions; x Data transfer and design of infrastructure condition data collection services; GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 2 x Digital Right of Way imaging data collection and integration services; x Infrastructure system performance analysis; x Software Development and Implementation Services; x GIS Consulting, Crystal Reports Development, and System Training Services; x Generating budget investment and deferred maintenance analysis scenarios; and, x The development of short-term and long-term infrastructure maintenance, repair, and rehabilitation plans. To summarize: we design, develop, market, implement, and maintain maintenance management software systems used by businesses, government agencies and other organizations. The use of these systems enables responsible officials to more cost- effectively manage assets. These assets include highways, county roads, city streets, sidewalks, curb and gutter, signs and signals, lighting systems, bridges, parking lots, wastewater and storm drainage systems, water pipelines, park features and other miscellaneous assets. OUR PHILOSOPHY We realize that understanding and effectively resolving today's increasingly complex infrastructure problems requires an experienced, interdisciplinary team of professionals. Pavement and related infrastructure management systems no longer present single-issue solutions but interdependent ones that cross technical, departmental, regulatory, and provincial boundaries. That is why we take an integrated, interdisciplinary approach to help our clients meet these challenges. We take great pride in delivering high-quality infrastructure management software and system data to our clients, and we encourage you to contact our references to verify our claim as you perform your due diligence in consideration of this project. Since we work on "both sides of this equation", we realize it is not good enough to implement our industry leading software (or any other third party software program) with average quality data. Nor will it suffice to have the world’s best data reside within a software program that is difficult to use, maintain, and cannot model the local dynamics that challenge your infrastructure system. OUR PEOPLE Our personnel have been developing successful pavement management consultation relationships with local, national, and international government agencies since the 1980’s. Our team for this project includes staff whose work has advanced the technology of infrastructure management science in North America and the rest of the world. We believe our experience in the field of pavement management science, management system implementations, and our experience in knowing how to work well with governmental agencies across the world, demonstrates our strong commitment to serving clients like you. GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 3 Role in this Project: GoodPointe will serve as the sole contractor and will perform the visual surface rating survey specified for this project. GoodPointe Technology is headquartered in St. Paul, Minnesota, and has offices located regionally across North America, Europe, and Asia. 2. Project Outline The project deliverables shall include the following: Task A. Pavement Condition Survey Perform a detailed pavement surface condition evaluation that identifies pavement distress type, quantity, severity, and extent expressed as a percent. The roadway pavements to be evaluated in this project will be identified in an ESRI ArcGIS shapefile, to total approximately 70 centerline miles. NOTE: the approximately 20 miles of roadways constructed since 2016 will NOT be field surveyed under this task, but will be assigned a ‘No-Distress’ survey with a 2021 survey date. General Survey Methodology The PCI is a numerical expression of a pavement condition rating system which was initially developed by the U.S. Army Corps of Engineers. The PCI methodology is used nationwide and is endorsed by the American Public Works Association (APWA), the Federal Aviation Administration (FAA), the U.S. Military, and has been standardized by the American Society of Testing and Materials (ASTM). The surface condition assessment for this project will be based upon the standard survey condition methodology as defined in the ASTM 6433-11, by the American Society for Testing and Materials. The assessment will provide a Pavement Condition Index (PCI) for each pavement section defined in this project. GoodPointe Technology uses the PCI methodology as the basis for the majority of our pavement management system implementations because it provides a reliable and repeatable methodology, which follows nationally established definitions, procedures, and provides the greatest utility for pavement rehabilitation analysis. Survey Methodology Proposed for This Project GoodPointe Technology will use the most current set of available data to perform the field survey of physical pavement features. Using a relational database of inventory sections, which will be prepared for this project, GoodPointe Technology will generate data collection forms to be used for executing the survey. If there are historical records of pavement construction/maintenance projects that have most recently been performed, then please include the construction, and/or maintenance project (type of maintenance and date of project) for the relevant inventory record(s) for the pavement sections to be evaluated in the project. The proposed survey will cover the surface of the specified roadway pavement section(s) using the PCI/Street Saver survey procedure in conjunction with the sampling procedures specified for this project. Data entry will be performed concurrently with the pavement surface condition data collection process. GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 4 For the bituminous pavements within the selected area of evaluation, the following pavement surface condition distresses and their related quantities will be recorded: x Alligator Cracking x Depression x Patching x Shoving x Bleeding x Edge Cracking x Polished Aggregate x Slippage Cracking x Block Cracking x Joint Reflection Cracking x Potholes x Swell x Bumps and Sags x Lane/Shoulder Drop Off x Railroad Crossing x Weathering/ Raveling x Corrugation x Long. & Trans. Cracking x Rutting Other Right of Way Data to be Verified/Updated in this Project In addition to collecting the PCI data in this project, we will field verify/update the following data, which was initially collected in our previous 2016 survey: 1. Roadway Pavement Width (e.g. pavement edge to pavement edge, measured to the nearest tenth of a foot, rounded to the nearest foot); 2. Curb & Gutter Inventory (e.g. yes/no/partial extent of the primary curb type present on the roadway section). The list of curb attributes to be extracted will be developed with, confirmed/finalized by the City. 3. Shoulder Width (e.g. if a shoulder is present, the material type (gravel, AC) and total width will be measured; if no shoulder is present, a rating of ‘none’ will be recorded). Task 1. Deliverable o Data entered into City’s ICON system, deliver digital MS Excel spreadsheet of tabulated survey results for each pavement inventory section (street block) to City. Task B. ICON Premium Consulting Agreement Under this task GoodPointe will provide value-added consulting effort under this task based on the specific needs of the City. This work may include a combination of the following task/deliverables: x Holding a conference call with the City to confirm the City’s needs for this project. x Assisting the City with the establishment of the approximately twenty (20) centerline miles of City asset inventory (e.g. attributing the inventory (from/to) termini for the City roadway network) added since the 2016 survey. x Transferring and/or update the pre-existing geocode link/asset data from the City’s legacy and/or third-party database system(s). x Providing onsite or online ICON system training for City staff designated to work with the system. x Entering/importing the paving projects completed in recent years, registering the improved condition into the ICON database. x Receiving and entering the City's Proposed Capital Improvement Projects (CIP List) and proposed project costs into the Predetermined Plan of ICON. GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 5 x Updating the ICON program to reflect the City's current asset management policies, paving strategies, application parameters, unit costs, etc. x Reviewing/Updating the pavement performance curves to be loaded in ICON based on actual City pavement performance data. x Assisting the City with using the ICON Budget Analysis Module to run multiple, multi-year projections (1 to 75 years into the future) to document the projected average network condition and deferred maintenance backlog results, based on the data supplied in above items. x Documenting the Trends in Pavement Condition, queried out of the historical database tables of ICON. x Including the scenario results run in an executive summary report. x Generating GIS mapping data and/or PowerPoint presentation materials for elected officials. Note: The above items are offered as a preliminary suggestion of work objectives for the City under this project. GoodPointe will work with your staff to define/refine the set of deliverables under this task. GoodPointe will provide an ongoing report of the consulting effort provided under this task throughout the duration of the project. Out of pocket expenses (e.g. billable project mileage ($0.75/mile) will be billed separately. 3. Time Schedule At the writing of this proposal, the preliminary schedule for this project, assuming written notice to proceed on or before June 30th is to deliver proposed services on or before October 31, 2021. Please note: a delay in the notice to proceed date may require an adjustment in the estimated date of completion for this project. GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 6 4. Compensation Task A. Pavement Condition Survey: 70 centerline miles @$240/centerline mile, $16,800 Task B. ICON Premium Consulting Agreement: Forty (40) Hour package, $100/hour, $4,000.00 Estimated Out of Pocket Expenses: billable mileage for onsite meetings will be billed at $0.75/mile, not to exceed $100.00 Proposed not-to-exceed cost: $20,900.00 This cost estimate is based on providing the services described under the version A.2 Scope of Services, and Proposed Cost Schedule dated June 7, 2021. The cost estimate will not be exceeded without additional authorization from your organization. Out of pocket expenses such as billable project mileage for onsite meetings will be billed at $0.75/mile. The hourly or unit cost presented in this contract is based on the scope of services described and the assumption that the project will be completed within one year from the signature date. If the project cannot be completed within the proposed schedule due to circumstances beyond our control, revising the unit costs may be required for completion of the remaining tasks. GoodPointe Technology Proposal A.2 June 7, 2021 City of Lake Elmo, MN GoodPointe Technology, Inc. info@goodpointe.com Page 7 Signature Page: please sign, scan and email to tkadlec@goodpointe.com Attention: Tony Kadlec, GoodPointe Technology Re: City of Lake Elmo Pavement Evaluation Project RE: INFRASTRUCTURE MANAGMENT SYSTEM PROFESSIONAL SERVICES The agreement is based on providing the services described under Exhibit A.2 Scope of Work for the City of Lake Elmo, dated June 7, 2021. The project budget will not be exceeded without the additional authorization from the client. The hourly or unit cost presented in this contract is based on the scope of services described and the assumption that the project will be completed within one year from the signature date. If the project cannot be completed within the proposed schedule due to circumstances beyond our control, revising the unit costs may be required for completion of the remaining tasks. Invoices will be submitted on a monthly basis in accordance with the progress achieved in this project. Terms on payment for services are due immediately upon receipt. GoodPointe Technology appreciates the opportunity to present this contract to you. Please sign this page and return a scanned copy to GoodPointe Technology via email to tkadlec@goodpointe.com. Receipt of the signed agreement will serve as our written authorization to proceed with the proposed scope of work. Authorization to Proceed: Please proceed according to the described scope of services denoted in Exhibit A.2 Total Authorized Budget: $20,900.00 Date Client City of Lake Elmo, Minnesota Authorized Signature Name Title Date June 7, 2021 Authorized Signature Name Anthony J. Kadlec Title President Appendix A. GoodPointe Technology Experience June 7, 2021 GoodPointe Technology, Inc. info@goodpointe.com GOODPOINTE PROJECT EXPERIENCE In the last five years, GoodPointe has served as the preferred pavement management/data collection consultant for the following agencies: Total Centerline Miles Agency Coordinate Survey Crews Tabulation of Data Quality Control Review Services Database Management Data Collection Services Point of Contact Department 425 Anoka County, MN x x x x x Mr. Andy Witter Highway Department 422 Arlington County, VA x x x x x Mr. Hung Tran Public Works Department 713 Beltrami County, MN x x x Mr. Bruce Hasbargen Highway Department 366 Chisago County, MN x x x Mr. Joe Triplett Highway Department 28 City of Arden Hills, MN x x x x x Ms. Sally Ricard Engineering Department 399 City of Bloomington, MN x x x x x Mr. Charlie Wild Public Works Department 211 City of Burnsville, MN x x x x x Mr. Jeff Radick Engineering Department 101 City of Champlin, MN x x x x x Ms. Sue Knight Public Works Department 161 City of Chanhassen, MN x x x x x Ms. Alyson Fauske Public Works Department 170 City of Cottage Grove, MN x x x x x Ms. Jennifer Levitt Public Works Department 516 City of Dothan, MN x x x x x Mr. Charles Metzger Engineering Department 444 City of Duluth, MN x x x x x Mr. Chauncey Bangs Engineering Department 228 City of Eagan, MN x x x x x Ms. Sara Pluta Public Works - Streets Department 224 City of Eden Prairie, MN x x x x x Mr. Rod Rue Engineering Department 193 City of Eden Prairie Parks, MN x x x x x Mr. Bill Olmschenk Parks and Recreation 200 City of Edina, MN x x x x x Mr. Carter Schulze Engineering Department 146 City of Elk River, MN x x x Mr. John Anderson Public Works/Engineering 14 City of Falcon Heights, MN x x x x x Ms. Sally Ricard Engineering Department 452 City of Fargo, ND x x x x x Mr. Tom Knakmuhs Engineering Department 111 City of Fergus Falls, MN x x x x x Mr. Brian Yavarow Engineering Department 98 City of Hastings, MN x X x x x Mr. John Caven Engineering Department 57 City of Hopkins, MN x x x x x Mr. Rich Hill Engineering Department 76 City of Hutchinson, MN x x x x x Mr. John Olson Public Works Department 151 City of Inver Grove Heights, MN x x x x x Mr. Scott Thureen Engineering Department 217 City of Maple Grove, MN x x x Mr. Marc Culver Engineering Department 132 City of Maplewood, MN x x x x x Mr. Michael Thompson Public Works Department 1,338 City of Minneapolis, MN x x Mr. Joe Casey Public Works Department 39 City of Mounds View, MN x x Mr. Jim Hess Department of Public Works 63 City of New Hope, MN x x x x x Mr. Guy Johnson Public Works Department 320 City of Newark, NJ x x x Mr. Jason Hahn Michael Baker Jr. 224 City of Norfolk, NE x x x x x Mr. Mark Dolechek Engineering Department 100 City of Northfield, MN x x x x x Mr. David Bennett Public Works Department 286 City of Plymouth, MN x x Mr. Jim Renneberg Engineering Department 131 City of Richfield, MN x x x Mr. Derick Anderson Department of Public Works 53 City of Robbinsdale, MN x x x x x Mr. Richard McCoy Public Works Department 422 City of Rochester, MN x x x x x Mr. Russ Kelm Department of Public Works 120 City of Roseville, MN x x x x x Mr. Pat Dolan Department of Public Works 3800 City of San Antonio, TX x x x x x Mr. Rocky Aranda, Jr. Streets Division, Public Works 108 City of Savage, MN x x x x x Ms. Jeannie Briol Engineering Department 88 City of Shoreview, MN x x x x x Mr. Tom Wesolowski Department of Public Works 83 City of St. Louis Park, MN x x x x x Mr. Scott Merkley Public Works Department 71 City of West St. Paul, MN x x x x x Mr. Ross Beckwith Engineering Department 243 City of Woodbury, MN x x x x x Mr. Tony Kutzke Public Works Department 745 Clay County, MN x x x Mr. Dave Overbo Highway Department 951 Columbus Consolidated Government, GA x x x x x Mr. Farhad AliFarhani Department of Engineering 603 Crow Wing County, MN x x x Mr. Steve Stroschein Highway Department 428 Dakota County, MN x x x Ms. Jodi Ulrich Highway Department 331 Dodge County, MN x x x Ms. Jessica Brennan Highway Department 412 Fillmore County, MN x x x Mr. John Grindeland Highway Department 623 Freeborn County, MN x x x Mr. Dan Kenison Highway Department 401 Goodhue County, MN x x x Mr. Greg Isakson Highway Department 321 Grand Forks East Grand Forks MPO, ND x x x x x Ms. Teri Kouba Planning Department 561 Hennepin County, MN x x x Ms. Jamie Hendrickson Transportation Division 420 Kanabec County, MN x x x Mr. Greg Nikodym Public Works 399 McLeod County, MN x x x x x Mr. John Brunkhorst Highway Department 402 Mille Lacs County, MN x x x Mr. Bruce Cochran Highway Department 1200 Monterrey County, CA x x x x x Mr. Javad Tanbakuchi AAE Project Manager 2226 Montgomery County, TX x x x Ms. Rhonda Hovater Communication Information Services 381 Olmsted County, MN x x x Mr. Zach Demmer Department of Public Works 1058 Ottertail County, MN x x x Mr. Chuck Grotte Highway Department 1469 City of Tulsa, OK Residential Network x x x Mr. Jim Hemphill Poe & Associates, Inc. 531 City of Tulsa, OK Arterial Network x x x Mr. Jim Hemphill Poe & Associates, Inc. 967 Polk County, MN x x x Mr. Rich Sanders Highway Department 450 Rice County, MN x x x Mr. Jim Kollar Highway Department 2650 San Bernardino County, CA x x x Mr. Medhat Matta Pavement Mgmt. Department 340 Scott County, MN x x x Ms. Jeannie Briol Highway Department 3004 St. Louis County, MN x x x Mr. Brian Boder Highway Department 274 Wadena County, MN x x x Mr. Jeff Adolphson Highway Department 281 Washington County, MN x x x x x Mr. Don Theisen Transportation Department 380 Winona County, MN x x x Mr. Dave Kramer Highway Department Appendix A. GoodPointe Technology Experience June 7, 2021 GoodPointe Technology, Inc. info@goodpointe.com 516 Wright County, MN x x x Mr. Kevin Johnson Highway Department 36,068 Total in last 5 Years Past Infrastructure Management Projects Done by GoodPointe Staff x Arlington County, VA x City of Norfolk, NE x Grand Forks-East Grand Forks MPO x Beltrami County, MN x City of Newark, NJ o City of Grand Forks, ND x Cook County, MN x City of New Ulm, MN o City of East Grand Forks, MN x CAI Recon Optical, Barrington IL x City of Oakdale, MN x Carlton County, MN x City of Ottumwa, IA x Hidalgo County MPO x Chisago County, MN x City of Plymouth, MN o City of Alamo, TX x City of Apple Valley, MN x City of Richfield, MN o City of Edinburg, TX x City of Arden Hills, MN x City of Robbinsdale, MN o City of McAllen, TX x City of Bloomington, MN x City of Rochester, MN o City of Mercedes, TX x City of Brooklyn Center, MN x City of Rosemount, MN o City of Pharr, TX x City of Brooklyn Park, MN x City of Roseville, MN o City of San Juan, TX x City of Burnsville, MN x City of San Antonio, TX o City of Weslaco, TX x City of Cedar Falls, IA x City of San Francisco, CA x Hunter Army Air Field x City of Champlin, MN x City of Sausalito, CA x Kanabec County, MN x City of Chanhassen, MN x City of Shawnee, OK x Marine Corps Recruit Depot, SC x City of Coon Rapids, MN x City of Shijiazhuang, PRC x McClellan Air Force Base, CA x City of Cottage Grove, MN x City of Sioux Falls, SD x McLeod County, MN x City of Denver, CO x City of Shoreview, MN x Metropolitan Airports Commission (MAC) x City of Donna, TX x City of South Pasadena, CA x Mille Lacs County, MN x City of Dothan, AL x City of St. Paul, MN x Minneapolis Park and Rec Board, MN x City of Duluth, MN x City of Tallahassee, FL x Monterrey County, CA x City of Eagan, MN x City of Tulsa, OK x Montgomery County, TX x City of Eden Prairie, MN x City of West Des Moines, IA x NHAI Natl. Highways Authority of India x City of Edina, MN x City of West St. Paul, MN x Naval Air Station, Cecil Field, FL x City of Elk Grove, IL x City of Woodbury, MN x Naval Air Station, Ingelside, TX x City of Evanston, IL x Bombay Municipal Corporation (BMC) x Olmsted County, MN x City of Farmington, MN x Clay County, MN x Ohio Dept. of Transportation (ODOT) x City of Fairmont, MN x Coco Solo Hospital, Panama x Peterson Air Force Base, CO x City of Fargo, ND x Columbus Consolidated Gov., GA x Polk County, MN x City of Fort Wayne, IN x Crow Wing County, MN x San Bernardino County, CA x City of Grand Rapids, MN x Dakota County, MN x Scott County, MN x City of Guangzhou, PRC x Dodge County, MN x Sherburne County, MN x City of Hopkins, MN x Douglas County, NE x Stanford University, CA x City of Hutchinson, MN x El Paso County, Texas x Steele County, MN x City of International Falls, MN x Fairfax County, VA x St. Cloud APO x City of Inver Grove Heights, MN x Fillmore County, MN x St. Louis County, MN x City of Lake Elmo, MN x Fort Buchanan, San Juan, Puerto Rico x Tulsa District Corps of Eng., OK x City of Lakeville, MN x Fort Clayton, Republic of Panama x University of Minnesota, Minneapolis, MN x City of Mankato, MN x Fort Devens, Ayer, MA x Virginia Dept. of Transp. (VDOT) x City of Maplewood, MN x Fort Drum, Watertown, NY x USMCA, Baumholder, Germany x City of Medicine Lake, MN x Fort Gillem, Georgia x USMCA, Fulda, Germany x City of Mendota Heights, MN x Fort McCoy, Sparta, WI x USMCA, Goppingen, Germany x City of Menlo Park, CA x Fort McPherson, GA x USMCA, Hanau, Germany x City of Miami/Dade County, FL x Fort Meade. Baltimore MD x Ventura County, CA x City of Minneapolis x Fort Sam Houston, San Antonio, TX x Village of Highland Park, IL x City of Monticello, MN x Fort Stewart, GA x Village of Inverness, IL x City of Moorhead, MN x Fort Story, Virginia Beach, VA x Village of St. Anthony, MN x City of Mounds View, MN x Freeborn County, MN x Wadena County, MN x City of Mumbai, India x Goodhue County, MN x Washington County, MN x City of New Hope, MN x Winona County, MN