Loading...
HomeMy WebLinkAbout#17 - OV 5 & 6 Chane Order STAFF REPORT DATE: July 20, 2021 CONSENT AGENDA ITEM: Old Village Phase 5 and 6 Street, Drainage and Utility Improvements – Change Order No. 1 SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 1 for the Old Village Phase 5 and 6 Street, Drainage and Utility Improvements? BACKGROUND: A-1 Excavating was awarded a construction contract on March 16, 2021 to complete the Old Village Phase 5 and 6 Street Drainage, and Utility Improvements. Work remains in progress with a milestone 1 completion date of October 15, 2021, milestone 2 completion date of October 14, 2022, substantial completion date of June 30, 2023 and final completion date of July 28, 2023. Completion dates are subject to change with the revised sanitary sewer design underway. PROPOSAL DETAILS/ANALYSIS: A-1 Excavating has submitted a change order to address installation of a water service to 3240 Lake Elmo Avenue. The service was found to be in a different location in the field directly in conflict with Boring Pit #3. In order to maintain water service to the property a new service line had to be installed from where the watermain was cut off to the line running into the home. The change order also captures the Council direction to allow parking on the south side of 32nd Street between Lake Elmo Avenue and Klondike Avenue. Four “No Parking” signs will be removed from the contract based on this direction. FISCAL IMPACT: This change order will increase the contract in the amount of $5,554.56 bringing the revised construction contract to $6,493,712.39. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for the Old Village Phase 5 and 6 Street, Drainage and Utility Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the Old Village Phase 5 and 6 Street, Drainage, and Utility Improvements, thereby increasing the contract amount by $5,554.56”. ATTACHMENTS: 1. Change Order No. 1. 15"48"48"12"48"15"15"15"24"24"24"TELPPPPGPPPPGEE12"12"36"36"18"36"15"15"12"36"24"24"36"36"12"24"12"24"24"36"6"36"24"36" : STUMP15"24"18"18"24"12"12"12"18"15"18"18"15"15"24"24"12"12"12"24"15"24"12"18"15"15"15"24"18"24"12"12"12"12"12"12"12"12"24"24"24"24"15"18"24"36"15"15"15"18"12"18"18"12"24"18"18"12"18"10"15"12"10"12"12"24"24"24"36"24"36"18"10"18"CO18"18"36"15"18"18"36"COCO18"24"24"12"15"18"CO15"15"12"15"36"18"48"48"36"S24"18"12"12"24"24"30"12"12"10"16"36"48"3"6"12""COFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGGGGGGGGGGGGGGGGGGGGGGTV-OHTV-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OHP-OH TV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OH TV-OH TV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHP-OHP-OHP-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BUR FOFO FOFOFOFOTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BUR TV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-BURTV-DUCTFOFOFOFOFOP-OHP-OHP-OHP-OHP-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHP-OHP-OHP-OHP-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHP-OH P-OH P-OHP-OHP-OHP-OHP-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHP-OHP-OHTV-OHTV-OHTV-OHTV-OHP-OHGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG18"18"15"15"12"36"15"2"36"36"4"CO5"36"8"15"26"36"24"CO36"18"12"15"20"3"3R:TREES" FOR JEFF24"12"6"24"FOFOFOFOFOFOFOFOFOF OFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOBIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.PAVERS BIT. BIT.BIT. BIT.BIT. BIT. BIT. BIT. BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.BIT.CONC.CONC.CONC.CONC.CONC.CONC.CONC. CONC. CONC. CONC.CONC.CONC.CONC.CONC. CONC. CONC. CONC. BIT. GRAVEL G R A V E L GRAVELGRAVEL GRAVELGRAVELGRAVELPAVERSGRAVELGRAVEL GRAVELGRAVELGRAVELGRAVELGRAVELGRAVELBIT.BIT.MSB:6MSB:7MSB:8MSB:9MSB:10MSB:15DRILLEDMSB:16DRILLEDMSB:17MSB:18MSB:19MSB:20DRILLEDMSB:12MSB:11MSB:14MSB:4DRILLEDMSB:13DRILLEDMSB:20DRILLEDMSB:21DRILLEDMSB:GP-3MSB:GP-1MSB:GP-2MSB:GP-4MSB:GP-5COCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOCOGARAGEGARAGEGARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGEGARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGECONC.FOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV-OHTV- O H TV-OH TV-OH TV- O H FOGP-OHP-OHFOFOSS GGFOS4"30"42"2"30"36"24"24"24"36"36"10"10"16"36"COCOCOHHTETSS""HH45.72+10900+11000+11500+12000+12500+13030.87+1346"8"8"00+3000+3100+3200+3300+3400+3500+3000+3100+3200+3300+3400+3545.72+10900+11000+11100+11200+11300+11400+11500+11600+11700+11800+11900+12000+12100+12200+12300+12400+12500+12600+12700+12800+12900+13000+13100+13200+13300+13430.87+134FOFOTV-BURTV-BURTV-BURP-OHTV-OHTV-OHGGGG33943417FOFOFOFOFOP-OHTV-OH TV-OHTV-OHTV -OHTV-OHTV-OHTV-OHTV-OHFOFOFOFOTV-BURGP-OH GGGGGSS16" DIP8" PVC15" RCP12" RCP·ALL PAVEMENT MARKING, EXCEPT PAVEMENT MARKINGSYMBOLS, SHALL BE EPOXY RESIN WITH DROP-ONGLASS BEADS.·ALL PAVEMENT MARKING SYMBOLS SHALL BEPREFORMED THERMOPLASTIC, GROUND IN ANDCOMPLY WITH MNDOT APPROVED PRODUCTS85Save: 7/14/2021 10:58 AM zstafslien Plot: 7/14/2021 10:58 AM S:\KO\L\Lakmo\151537\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\le151537M01.dwgZTSZTS/JRTSDH12/15/202056679ZACHARY STAFSLIEN, PEI HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDERTHE LAWS OF THE STATE OF MINNESOTA.0feetscale801608040137PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.comDESIGN TEAMNO.BYDESIGNER:DRAWN BY:CHECKED BY:FILE NO.Date:Lic. No.REVISIONSDATELAKMO 151537LAKE ELMO,MINNESOTAOLD VILLAGE PHASE 5 & 6IMPROVEMENTSSIGNING AND STRIPING PLAN3__ZTSZTS__7/14/213/2/214____REMOVE (4) NO PARKING SIGNS SOUTH SIDE OF 32ND STCHANGE ORDER #112344 4444 44444444 4 4 4 4 44 444444444 4 1 11 11 1111 1111111111 32RAIL ROADCROSSINGSNS SNSSNS SNSSNSSNSSNSSNSSNSSNSFURNISH AND INSTALLINPLACESALVAGE AND INSTALLREMOVESTREET NAME SIGNSNSNOTES:1 111111111111111111 1 11 1111 12RAIL ROADCROSSING2LAKE ELMO AVE.LAKE ELMO AVE.LANGLY CT. N.LAMPERT AVE. N. KRAFT CIR. N. 33RD ST. LN. N. 33RD ST. LN. N.33RD ST. N .33RD ST . N.32ND ST. N.32ND ST. N.33rd St NKraft Cir N33rd St NKraft Cir N33rd S t NLampert Ave N33rd St NLampert Ave N33rd S t NLangly C t N33rd St NLangly C t N233rd St N33rd St Ln N33rd St N33rd St Ln N33rd St N33rd St Ln N33rd St N33rd St Ln N33rd St NKlondike Ave N 33rd St NKlondike Ave N32nd St NKlondike Ave N32nd St NKlondike Ave N32nd St NLampert Ave N32nd St NLampert Ave N41C-1C-1C-1 C-1 C-1C-1C-1 C-18 C-1C-1C-1C-1C-1C-1 C-1 C-1C-1C-1C-1C-1C-1C-1C-1 C-1C-1C-1C-1C-1C-3C-4C-4 C-4C-5C-6 C-7C-7 C-8 C-9 C-11C-12C-12C-12C-12C-12C-13C-13SEE INSET AINSET ACROSS WALK54.0 SQ. FT.4" DOUBLE SOLID YELLOW4" SOLID WHITE4" SOLID WHITEC-101S-1S-2S-3 S-4S-4S-5S-6S-71C-191 C-19 334444