HomeMy WebLinkAbout#04 - July 2021 Public Works ReportMAYOR AND COUNCIL COMMUNICATION
DATE 7/20/2021
CONSENT
AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities
that have taken place in the Public Works Department in the month of July 2021.
PROPOSAL DETAILS/ANALYSIS:
STREETS
• Continue pot hole repair
• The Heritage Farms, Old Village, Hamlet on Sunfish and 38th/39th street/utility
projects continue
• 2021 crack sealing of many city trails and select streets were completed
• The city radar trailer has been moved around the city this month to include 39th St
• Set up barricades, extra garbage cans and participated in National
• GIS intern completed gpsing all city street signs and creating a digital map
• Staff continue setting up devices to take annual traffic counts
• Completed 1st round of Ditch mowing
• Set up Radar Trailer on 5th st and 39th for a week each
WATER
• Complete monthly MDH bacteria, fluoride, Lead/copper sampling and submit well
water draw down reports
• Water usage is averaging 2.1 million per day. Wells are averaging 12-13 hrs per
day. The implementation of the new irrigation hours has kept water demand down
during peak hours and the city’s water system in check
• A dozen water restriction signs were installed at the entrances of developments
with the highest violations, including Inwood, Savona, LakesRidge Crossing and
Boulder Ponds
• Staff continue irrigation violation enforcement one to two days a week. Staff are
finding around a dozen violators each time we go out to enforce in the early
mornings
• Begin updating our emergency response plan for the water system
• Correct meter reading issues
• Rebuilt and maintained two Pressure Reducing valves. Added pressure gauges on
the PRV located at the raidroad tracks on Lake Elmo Ave. All PRV’s will be on a
regular maintenance schedule going forward.
City Council Meeting Date Consent/Regular Agenda Item #__
Page 2
• All city curb stops have been located, gpsed and added to the map
SEWER
• Completed annual lift station pump inspections. Issues found are being addressed
SURFACE WATER
• Begin 2021 MS4 inspections
PARKS
• Completed mowing all city trail edges
• Created new intersection maps for the Sunfish Lake Park Trails. The signs are being
produced and are expected to be install by August 20th.
• The two new bike paths have been completed in Sunfish Lake Park. The trails will
minimize contact and complaints between the users.
• Complete monthly playground inspections
FACILITIES
• Rebuilt the failing Fire Hall 2 retaining walls
SAFETY COMMITTIEE
• Completed quarterly safety inspections of Fire Department. Review all department
safety concerns and any incident/accidents
June 2021 PW Metrics Review
Quantity
Gallons of well water pumped 68,480,000 gal
Tons of ashpalt mix used for potholes 37.5 tons
Miles of ditches mowed 7 miles
Sanitary jetted n/a
Number of hydrants flushed n/a
Number of winter weather events attended too n/a
Tons of salt used n/a
Feet of shouldering completed n/a
Yards of wood chips spread n/a
Gallons of fuel used 1116.7 gals
Square yards of seal coat completed n/a
Hours spent dragging ball fields 12 hrs
Hours of tree trimming 12 hrs
Number of MS4 devices inspected 7
Hours spent collecting park garbage 40 hrs
Hours spent clearing snow from sidewalks n/a
Number of Locates 584
Number of meters installed or changed out 51
City Council Meeting Date Consent/Regular Agenda Item #__
Page 3
Hours replacing Street Signs 12 hrs
Hours completing road counts 24 hrs
Auction Revenue $19,451.49
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the July 2021 Public
Works Report.