#20 - Authorize Bids for City Center and Public Works Addition
STAFF REPORT DATE: September 7, 2021 REGULAR #20 AGENDA ITEM: Authorize Bids for City Center and Public Works Addition SUBMITTED BY: Jake Dickson, Assistant City Administrator BACKGROUND: In June the City Council voted to move forward with the preparation of construction documents for the City Center and Public Works addition. Leo A Daly and H+U Construction completed construction documents in August and the project is ready to progress to the bidding phase. ISSUE BEFORE COUNCIL: Should the Council approve the release of bids for the City Center and Public Works Addition? PROPOSAL: Included in your packet is a memo prepared by Todd LaVold of Lea A Daly and Andy Hoffmann of H+U Construction that outlines cost, scope, and schedule updates as well as the project budget. At the conclusion of the Construction Documents Phase the cost of the project is up to approximately $14.9m, up 5.25% from the design develop estimate completed in May. The next phase of the project is the bidding phase. If approved the bidding documents will be released tomorrow, September 8th with bids opened on September 30th. The management team will bring bids before the City Council on October 19th to award a bid. Construction is expected to start approximately April 1st. FISCAL IMPACT: The latest estimated total project cost is $14,958,469. This is a $133,088 increase from Design Development. OPTIONS: 1)Move forward and Authorize the Release of Bidding Documents 2)Table 3)Do not move forward on the new city center and public works addition. RECOMMENDATION: “Motion to approve the release of Bidding Documents.” ATTACHMENTS: LEO A DALY and H+U Construction City Center and Public Works Renovations and Additions Update LAKE ELMO CITY CENTER 3880 Laverne Avenue North Lake Elmo, Minnesota 55042 PLANNING ARCHITECTURE ENGINEERING INTERIORS ABU DHABI ATLANTA AUSTIN CHICAGO CONROE COLLEGE STATION CORPUS CHRISTI DALLAS DAMMAM DOHA FORT WORTH FRISCO HOUSTON LANSING LAS VEGAS LOS ANGELES MIAMI MINNEAPOLIS OMAHA ORANGE SAN ANTONIO SAN JOSE SAN MARCOS WACO WASHINGTON DC WEST PALM BEACH 730 Second Avenue South Suite 1300 Minneapolis, MN 55402-2406 612.338.8741 leoadaly.com memo To: Kristina Handt, City Administrator Jake Dickson, Assistant City Administrator Lake Elmo City Council From: Todd LaVold, LEO A DALY Andy Hoffmann, H+U Construction CC: Michelle Watanabe, LEO A DALY Date: August 31, 2021 Re: Lake Elmo City Center & Public Works Renovations and Additions Update The following is an update of the project since the Design Development phase (May 2021). 1. Cost Update: a. Upon the conclusion of the Construction Documents phase, the estimated total project cost is $14,958,469 or a $133,088 increase from Design Development. Refer to the attached overall project budget estimate. b. Below represents the variation per the different aspects of the project from Design Development to Construction Documents. c. Construction costs have risen by 5.25% since the Design Development estimate was completed in May of 2021 and are up nearly 10% since the beginning of the year according to Engineering News Record’s Building Cost Index for Minneapolis. While costs have increased LEO A DALY Memo Page | 2 across the board, several areas have increased more rapidly than others, including the following: I. Roofing costs have increased by approximately $340,000, primarily because of widespread material shortages. II. Steel costs have increased by approximately $133,000, which is largely attributed to material shortages and the increased cost of raw materials. d. Approximately $32,000 of finishes were reduced, while still maintaining a quality and durable building design. e. Site Work, Mechanical, Electrical, and Plumbing categories were relatively stable across the phases of design. 2. Scope Update: a. At the instruction of the City, due to rapidly increasing construction costs, the Sheriff’s garage bay was removed from the project and will not be bid as an alternate. b. Heated Apparatus Aprons and Entry Sidewalks at the City Center remain as an alternate. The current estimate for this alternate is $92,713. 3. Schedule Update: a. September 7: Council approval to release bids. b. September 8: Release of Bidding Documents c. September 16: Pre-Bid conference. d. September 30: Bid Opening e. October 19: Council Award of Bids f. October 20+: Procure long lead items for Spring start g. April 1: Approximate construction start. 4. Permitting Update: a. Zoning Compliance: Submitted August 5. b. Permit Review: Submitted for review on August 24. c. Met Council SAC: Determination letter submitted August 26. d. Plumbing Review: Submitted August 27. If you have further questions, please do not hesitate to contact me. Sincerely, LEO A DALY Todd LaVold, AIA Associate, Project Manager. City of Lake Elmo Lake Elmo City Center and Public Works August 10,2021 Design Development Estimate Budget LEO A DALY H+U Construction % Separate 3/10/2021 5/11/2021 8/10/2021 Date Date Current Current BUDGET CATEGORY Owner's Funding SD DD CD CD CA Source of Reference No. Description Contingency Bucket Phase Phase Phase Phase Phase Responsibility Document Notes PRE-DESIGN 1 Legal/Title Work:.1 Title Work for Replatting/Vacation of Property Lines -$ 5,000$ -$ -$ -$ -$ Lake Elmo Estimate Per KH, if required this will happen after construction is complete and come from different funding soursces .2 Legal Work for Replatting/Utility Easements -$ -$ -$ -$ -$ -$ Lake Elmo If there are existing easements we need to build on, none known at this time. 2 Administrative Services -$ N/A N/A N/A N/A N/A N/A N/A City time for this project will not be tracked and billed against this budget.3 Real Estate Services:-$ .1 Appraissal -$ N/A N/A N/A N/A N/A N/A N/A Previous funding .2 Lease buyout -$ 50,000$ 55,000$ 40,000$ -$ -$ Lake Elmo KH email 1/6/21 Revised per KH..2 Lease buyout consultant -$ 50,000$ 4,000$ 4,000$ -$ -$ Lake Elmo KH 5 Real Estate Acquisition (Brookfield Building)-$ 860,000$ 860,000$ 860,000$ -$ -$ Lake Elmo KH email 1/6/21 6 Land Surveying -$ 7,100$ 7,100$ 7,100$ -$ -$ Lake Elmo Sunde Contract7 Subsurface (Geotechnical) Investigation: .1 Soil borings -$ 9,950$ 9,950$ 9,950$ -$ -$ Lake Elmo AET Contract .2 Contaminated Soils -$ -$ -$ -$ -$ -$ If required.3 Soil and Ground Water Analysis at Infiltration Basins -$ 2,000$ 2,000$ 2,000$ -$ -$ AET Contract Double ring test during construction documents to verify filtration rates for storm water design 8 Existing Building Structural Analysis -$ -$ -$ -$ -$ -$ LEO A DALY Add Service If existing drawings are not adequate to analyse modifications required of existing building 9 Hazardous Material Survey -$ 10,000$ 10,000$ 10,000$ -$ -$ Lake Elmo Estimate Phase 1 Envirionmental Assesment identified some asbestos. Waiting to receive bids.DESIGN10 Project Management/Architecture/Interior Design/Structural Engineering: .1 Pre-Design Phase -$ N/A N/A N/A N/A N/A N/A N/A Previous funding .2 Site Due Diligence -$ N/A N/A N/A N/A N/A N/A N/A Previous funding.3 Schematic Design through Construction Administration Phases -$ 516,720$ 516,720$ 516,720$ -$ -$ LEO A DALY B133 Contract .4 Reimbursable Expenses -$ 6,000$ 6,000$ 6,000$ -$ -$ LEO A DALY B133 Contract .5 Verification/Documentation of Existing Conditions -$ 7,000$ 7,000$ 7,000$ -$ -$ LEO A DALY B133 Contract11 Civil Engineering -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 10 12 Landscape Architecture -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 10 13 Mechanical Engineering -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 1014 Sustainable Design/B3 N/A N/A N/A N/A N/A N/A N/A N/A There are no sustainability requirements beyond best practices 15 Fire Protection Engineering -$ -$ -$ -$ -$ -$ LEO A DALY / DB B133 Contract Performance specifications included in line item 10 16 Electrical Engineering -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 1017 Technology (Low-Voltage Systems) Engineering: .1 Voice/Data/Network -$ -$ -$ -$ -$ -$ Roseville IT / Lake Elmo PB email 1/6/21 Design per Roseville IT, Pete Bauer .2 Audio/Video (design)-$ 35,000$ 34,000$ 34,000$ -$ -$ Lake Elmo Contract Contract with Fine Point.3 Sound-Masking N/A N/A N/A N/A N/A N/A N/A N/A Not included .4 Card Access -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 10 .5 Surveillance/Security (design)-$ -$ -$ -$ -$ -$ Lake Elmo PB email 1/6/21 Design per Roseville IT, Pete Bauer & FinePoint.6 Fire Alarm -$ -$ -$ -$ -$ -$ LEO A DALY B133 Contract Included in line item 10 .7 Emergency Services Radio -$ -$ -$ -$ -$ -$ Lake Elmo Design services if any, provided by vendor. .8 Fiber (comcast)-$ 5,000$ -$ -$ -$ -$ Lake Elmo Lake Elmo verified there will be no cost to relocate fiber. This scope of work and cost was written into their contract..9 WiFi -$ -$ -$ -$ -$ -$ Roseville IT / Lake Elmo PB email 1/6/21 Per Roseville IT, Pete Bauer 18 Commissioning -$ -$ -$ -$ -$ -$ Lake Elmo LEO A DALY to provide customary review of MEP installation. Commissioning can be examined as an additional service later 19 Acoustical Engineering -$ -$ -$ -$ -$ -$ Lake Elmo Not included in basic services20 Furniture, Fixtures and Equipment (FF&E Design)-$ 39,000$ 39,000$ 39,000$ -$ -$ LEO A DALY B133 Contract LEO A DALY to provide design assistance with furniture selection and procurement through State of Mn contracts21 Specialty Equipment (FF&E Procurement)-$ -$ -$ -$ -$ -$ Assumes all design services for specialty fire equipment and technology will be included in the cost of the products provided. 22 Food Service Furniture - (FF&E Procurement)-$ -$ -$ -$ -$ -$ No design services required. 23 Other -$ -$ -$ -$ -$ -$ 24 Signage - Exterior N/A N/A N/A N/A N/A N/A N/A N/A Included in line item 10, limited building mounted signage 25 Signage/Displays/Exhibits - Interior (not including code-required)N/A N/A N/A N/A N/A N/A N/A N/A Included in line item 10, limited to typical way finding signage 26 Landscape Irrigation N/A N/A N/A N/A N/A N/A N/A N/A Included in line item 35, design requirement of performance specification27 Utility Rebates (EDA Program Results)-$ (25,000)$ (25,000)$ (25,000)$ -$ -$ Xcel/CenterPoint Estimate PRE-CONSTRUCTION 28 Hazardous Materials Abatement (include in construction)-$ 40,000$ 40,000$ 40,000$ -$ -$ TBD Estimate Cost based upon results of finding in line item 929 Structure (Building) Demolition N/A N/A N/A N/A N/A N/A N/A N/A None anticipated 30 Site Demolition (Clearing)-$ -$ -$ -$ -$ -$ Included in line item 34 31 Pre-Construction FF&E - Procurement/Installation N/A N/A N/A N/A N/A N/A N/A N/A Anticipate re-use and relocation of existing furniture by Owner32 Pre-Construction Moving -$ -$ -$ -$ -$ -$ H+U Estimate Included in Line 35.1 33 Authority Entitlement: .1 Met. Council/Lake Elmo - SAC -$ 44,850$ 24,850$ 24,850$ -$ -$ MC/Lake Elmo KH email 5/11/21 Assuming 10 units @ $2,485 per plus city fees ($2,000 per unit, waived $20k on May 11), 5 SAC's credit existing..2 Met. Council/Lake Elmo - WAC -$ 8,000$ -$ -$ -$ -$ MC/Lake Elmo KH email 5/11/21 Assumes 10 units @ 4,000 per, (waived on May 11) .3 Lake Elmo Planning/Development - Application(s)/Review -$ 300$ -$ -$ -$ -$ Lake Elmo Lake Elmo to verify, nothing listed on Application .4 Lake Elmo Re-Zoning - Application N/A N/A N/A N/A N/A N/A N/A N/A Not anticipated.5 Lake Elmo Re-Platting - Application (including park dedication fee) -$ 500$ -$ -$ -$ -$ Lake Elmo N/A If combining of lots is desired. .6 Watershed District - Application/Permit -$ 500$ -$ -$ -$ -$ Lake Elmo N/A Branch Valley Watershed District waives fee for governmental agencies .7 Minnesota Dept. of Labor - Review -$ 1,000$ 1,000$ 1,130$ -$ -$ Lake Elmo Submitted Payable to DOLI.34 Preconstruction CM Services -$ 7,500$ 7,500$ 7,500$ -$ -$ H+U Construction ContractCONSTRUCTION 35 Phase 4 Construction:.1 City Hall / Fire Station -$ 11,616,286$ 12,470,858$ 12,679,179$ -$ -$ H+U Construction 8/10/21 Estimate Includes bid alternate, 0% design contigency, and 5% construction contingency.2 Public Works -$ 697,871$ -$ -$ Combined with line item 35.1 36 Soil Corrections -$ -$ -$ -$ -$ -$ H+U Construction Included in line item 35.1 37 Plan Review(s) and Permit(s)-$ 72,050$ 2,000$ 2,000$ -$ -$ Lake Elmo KH email 5/11/21 Waive all but state surcharge of $2,000 on May 1138 Building Risk policy -$ -$ -$ -$ -$ -$ H+U or Lake Elmo Estimate Lake Elmo to verify if this will be waived, currently included in line item 35. 39 Technology (Low-Voltage Systems): .1 Voice/Data/Network cabling and equipment -$ 65,000$ 85,000$ 85,000$ -$ -$ Roseville IT / Lake Elmo 5/11/21 EstimmateROM Estimate by Finepoint. Conduit, boxes, cable tray, and racks provided in Construction Documents only. .2 Audio/Video 99,000$ 50,000$ 118,600$ 168,600$ -$ -$ FinePoint 5/11/21 Estimmate$99k from cable commission as separate PO. Remaining funds provided by City as separate PO. FinePoint preliminary budget review = $267,600.Conduit and boxes provided in Construction Documents only. .3 Sound-Masking N/A N/A N/A N/A N/A N/A N/A N/A.4 Card Access -$ -$ 45,000$ 45,000$ -$ -$ Included in line item 35 .5 Surveillance/Security -$ 25,000$ 35,340$ 35,340$ -$ -$ Lake Elmo 5/11/21 EstimmateFinePoint ROM Estimate. Conduit and boxes provided in Construction Documents only. .6 Emergency Services Radio -$ 10,000$ -$ -$ Lake Elmo 5/11/21 EstimmateLake Elmo to provide table top radios or hand held devices only under separate PO. Antenae to be located on roof (supplied and installed by others) with 2" conduit back to radior room (installed per construction documents). .7 Fiber -$ 10,000$ -$ -$ -$ -$ Lake Elmo 5/11/21 EstimmateIncluded in line item 39.1. Exterior fiber to be paid for by contract with City outside source of this project. .8 WiFi -$ 7,500$ -$ -$ -$ -$ Lake Elmo 5/11/21 EstimmateNeed to review scope of work to understand if there will be any work and whether it is included in construction cost40 Landscape Irrigation -$ -$ -$ -$ -$ -$ Included in line item 35 41 Electrical Site Utilities (Electrical Service)-$ -$ -$ -$ -$ -$ Assume Xcel to waive fees. 42 Back-up (Emergency) Electrical Systems -$ -$ -$ -$ -$ -$ Included in line item 3543 Construction Testing / Inspection -$ 35,000$ -$ -$ -$ -$ H+U Estimate Included in line item 35 OCCUPANCY 44 City Hall Offices (FF&E) - Procurement & Install 334,100$ 334,100$ Lake Elmo Estimate DD FFE Estimate by LEO A DALY, Intereum verifying.1 Office -$ 40,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44 .2 Workstation -$ 63,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44 .3 Lobby Furniture -$ 5,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44.4 xxx -$ -$ -$ -$ -$ -$ 45 Conference Rooms (FF&E) - Procurement & Install -$ 24,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44 46 Council Chambers (FF&E) - Procurement & Install -$ 15,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 4447 Exercise Equipment (FF&E) - Procurement & Install -$ 25,000$ 25,000$ 25,000$ -$ -$ Lake Elmo Allowance Lake Elmo to verify, pending donations or grants. 48 Fire Station (FF&E) - Procurement & Install tt .1 Office -$ 15,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44.2 Dorms -$ 9,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44 .3 Dayroom -$ 9,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44 .4 Dining Room -$ 4,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 44.5 Gear Extractor -$ -$ -$ -$ -$ -$ Lake Elmo Lake Elmo to relocate existing, purchase additional one in the future..6 Gear Dryer -$ -$ -$ -$ -$ -$ Lake Elmo Lake Elmo to relocate existing, purchase additional one in the future. .7 SCBA Cascade System -$ -$ -$ -$ -$ -$ Lake Elmo Lake Elmo to relocate existing. .8 SCBA Compressor -$ -$ -$ -$ -$ -$ Lake Elmo Lake Elmo to relocate existing.49 Sherriff's(FF&E) - Procurement & Install -$ -$ -$ .1 Office -$ 10,000$ -$ -$ -$ -$ WCSO Estimate 2 offices, re-use existing furniture .2 Workstation -$ 4,500$ -$ -$ -$ -$ WCSO Estimate 3 hoteling workstations. Reuse existing furniture50 Equipment - Procurement/Installation .1 Fire Department Kitchen Equipment -$ -$ -$ -$ -$ -$ H+U Refer to line item 35. Include in construction documents per plans. .2 Kitchenette -$ -$ -$ -$ -$ -$ H+U Refer to line item 35. Include in construction documents per plans..3 Laundry -$ -$ -$ -$ -$ -$ H+U Refer to line item 35. Include in construction documents per plans. .4 City Hall Breakroom -$ -$ -$ -$ -$ -$ H+U Refer to line item 35. Include in construction documents per plans. 51 Training / Community Room Furniture - Procurement/Installation -$ 24,000$ -$ -$ -$ -$ Lake Elmo Estimate Included in line item 4452 Signage - Exterior -$ -$ -$ -$ -$ -$ H+U Included in line item 35 53 Signage - Interior (not including code-required)-$ -$ -$ -$ -$ -$ H+U Included in line item 35 54 Displays/Exhibits - Interior -$ -$ -$ -$ -$ -$ H+U Included in line item 3555 Move-In -$ -$ -$ -$ -$ -$ Lake Elmo Lake Elmo to move their own equipment. 56 Record Documentation -$ -$ -$ -$ -$ -$ N/A N/A PROJECT COST SUBTOTAL 99,000$ 14,516,627$ 14,715,018$ 14,958,469$ #REF! #REF! OWNER'S PROJECT CONTINGENCY A Pre-Design Phase 1.00% 990$ 145,166$ does not include H+U construction contingencyB Schematic Design Phase 1.00%does not include H+U construction contingency C Design Development Phase 0.75%110,363$ does not include H+U construction contingency D Construction Documents Phase 0.00%-$ #REF!does not include H+U construction contingencyE Construction Administration Phase 0.00%#REF!does not include H+U construction contingency PROJECT COST 99,990$ 14,661,793$ 14,825,381$ 14,958,469$ #REF! #REF! F Project Budget $11,278,500 $11,278,500 $11,278,500 Lake Elmo Previous CIP G Deviation 3,383,293$ 3,546,881$ 3,679,969$ H Construction Cost 12,314,157$ 12,470,858$ 12,679,179$ Line item 35.1 + 35.2 I Soft Costs 2,347,636$ 2,354,523$ 2,279,290$ Project cost - Line item H 156,701$ 208,321$ Building Contruction Cost Delta 163,587$ 133,088$ Overall Project Cost Delta from Previous Estimate Percent OfEstimateCSI DivisionTotal Total02 00 00Existing Conditions$216,2761.71 %03 00 00Concrete$2,153,16616.98 %04 00 00Masonry$94,1280.74 %05 00 00Metals$540,4714.26 %06 00 00Wood, Plastics & Composites$325,9452.57 %07 00 00Thermal & Moisture Protection$1,048,2458.27 %08 00 00Openings$785,2106.19 %09 00 00Finishes$1,128,6798.90 %10 00 00Specialties$202,5501.60 %11 00 00Equipment$45,0000.35 %12 00 00Furnishings$318,8002.51 %13 00 00Special Construction$014 00 00Conveying Systems$95,0000.75 %21 00 00Fire Supression$127,1911.00 %22 00 00Plumbing$441,4883.48 %23 00 00Heating, Ventilating, and Air-Conditioning (HVAC)$1,632,30012.87 %25 00 00Integrated Automation$026 00 00Electrical$993,0007.83 %27 00 00Communications$028 00 00Electronic Safety and Security$031 00 00Earthwork$623,8984.92 %32 00 00Exterior Improvements$487,6913.85 %33 00 00Utilities$166,3261.31 %34 00 00Transportation$040 00 00Material Processing & Handling Equipment$25,0000.20 %44 00 00Pollution Control Equipment$048 00 00Electrical Power Generation$070 00 00Contingencies$572,5174.52 %80 00 00General Conditions/Construction Support & Management$820,6866.47 %90 00 00Other Project Costs($164,387)-1.30 %Grand Total$12,679,179100.00 %CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks02 00 00 Existing Conditions02 40 00 Demolition and Structure Moving02 41 16Interior Demo16,696.0sqft8.00133,568Base Bid02 41 16Remove Portion of Wall for New Opening, Sawcut as Needed1.0each1,500.001,500Public Works Building02 41 16Roofing Demo8,367.0sqft2.5020,918Base Bid02 41 16Precast Wall Openings1.0allow6,000.006,000Base Bid02 41 16Remove Existing Windows52.0each250.0013,000Base Bid02 41 16Remove Existing Exterior Door1.0each250.00250Base Bid02 41 16Remove Existing Metal Paneling. Metal Framing to Remain. Close Opening to Temporary Protect from Weather26.0each500.0013,000Base Bid02 41 16Remove Existing Skylights1.0allow2,500.002,500Base Bid02 41 16Remove Existing Stairways3.0each2,500.007,500Base Bid02 41 16Remove Existing Downspouts & Splashblocks8.0each250.002,000Base Bid02 41 16Remove Existing Building Awning & Exterior Dimensional Signage1.0allow2,000.002,000Base Bid02 41 16Grind & Expose Concrete Aggregate to Receive Floor Leveling Compound1,872.0sqft7.5014,040Base BidTotal216,276Existing Conditions Total216,27603 00 00 Concrete03 11 00 Concrete Stairs03 11 23Concrete Pan Fill398.0sqft15.005,970Base BidTotal5,97003 31 00 Concrete Foundations03 31 00.2Spread Footing, 4'-0" sq. x 1'-0"3.0each505.001,515Base Bid03 31 00.2Spread Footing, 6'-0" sq. x 1'-4"2.0each1,050.002,100Base Bid03 31 00.2Spread Footing, 6'-6" sq. x 1'-6"3.0each1,340.004,020Base Bid03 31 00.2Spread Footing, 7'-6" sq. x 1'-8"8.0each1,875.0015,000Base Bid03 31 00.3Continuous Footings - 1'-8" W x 1'-0" D79.0lnft28.502,252Base Bid03 31 00.3Continuous Footings - 1'-8" W x 1'-0" D13.0lnft28.50371Public Works Building03 31 00.3Continuous Footings - 2'-0" W x 1'-0" D189.0lnft31.005,859Base BidFooting Depth Unknown03 31 00.3Continuous Footings - 2'-0" W x 1'-0" D120.0lnft31.003,720Public Works BuildingFooting Depth Unknown03 31 00.3Continuous Footings - 2'-6" W x 1'-0" D591.0lnft38.0022,458Base BidFooting Depth Unknown03 31 00.3Continuous Footings - 4'-0" W x 1'-0" D142.0lnft50.007,100Base BidFooting Depth Unknown03 31 00.3Stepped Footings17.0each200.003,400Base BidTotal67,79403 31 01 Below Grade Concrete03 31 01.2Concrete Trench Drain Forming1.0allow5,000.005,000Base BidTotal5,00003 31 02 Concrete Walls03 31 02.18" Concrete Foundation Wall463.0sqft38.0017,594Base Bid03 31 02.18" Concrete Foundation Wall53.0sqft38.002,014Public Works Building03 31 02.112" Concrete Foundation Wall2,265.0sqft44.0099,660Base Bid03 31 02.112" Concrete Foundation Wall470.0sqft44.0020,680Public Works Building03 31 02.116" Concrete Foundation Wall706.0sqft55.0038,830Base BidTotal178,77803 31 03 Concrete Columns/Capitals03 31 03.1Concrete Piers at Precast Columns9.0each600.005,400Base Bid03 31 03.1Concrete Piers at Steel Columns5.0each575.002,875Base BidTotal8,27503 31 05 Concrete Slabs03 31 05.14" Slab on Grade6,935.0sqft7.0048,545Base Bid03 31 05.14" Slab on Grade1,305.0sqft7.509,788Public Works Building03 31 05.16" Slab On Grade1,944.0sqft9.0017,496Base BidCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks03 31 05.16" Slab on Grade788.0sqft9.007,092Public Works Building03 31 05.16" Slab at Elevator Pit151.0sqft10.001,510Base Bid03 31 05.18" Slab on Grade7,703.0sqft12.0092,436Base Bid03 31 05.14" Slab On Grade Ramp55.0sqft8.50468Base Bid03 31 05.1Thickened Slab142.0lnft15.002,130Base Bid03 31 05.1Concrete Stoops122.0sqft15.001,830Base Bid03 31 05.1Concrete Stoops20.0sqft15.00300Public Works Building03 31 05.1Concrete Pads Allowance (Benches, Bike Loops)1.0allow6,000.006,000Base Bid03 31 05.4Concrete at Training Tower Balcony40.0sqft15.00600Base Bid03 31 05.42.5" Normal Weight Concrete Topping776.0sqft5.504,268Base Bid03 31 05.43" Concrete Topping1,618.0sqft6.009,708Base Bid03 31 05.43" Concrete Slab Infill at Brookfield Building311.0sqft8.002,488Base Bid03 31 05.4Concrete Floor Sawcutting as Required Where Old Building Meets New One1.0lsum2,000.002,000Base BidTotal206,65803 35 00 Concrete Finishes03 35 19Sealed Concrete12,902.0sqft1.7522,579Base Bid03 35 19Sealed Concrete - Stair Treads & Risers184.0sqft3.00552Base Bid03 35 19Sealed Concrete W/ Color2,016.0sqft3.757,560Public Works BuildingTotal30,69103 45 00 Architectural Precast Concrete03 45 01Precast1.0lsum1,650,000.001,650,000Base BidTotal1,650,000Concrete Total2,153,16604 00 00 Masonry04 22 00 Concrete Unit Masonry04 22 054" CMU Partition Wall817.0sqft19.5015,932Base Bid04 22 058" CMU Partition Wall1,714.0sqft22.0037,708Base Bid04 22 058" CMU Reinforced Wall330.0sqft22.007,260Public Works Building04 22 0512" CMU Partition Wall236.0sqft23.005,428Base Bid04 22 0512" CMU Infill at Demolished Window Openings6.0each400.002,400Base Bid04 22 058" & 12" CMU at Existing Wall92.0lnft150.0013,800Public Works BuildingAssuming shoring of existing roof for wallconnection04 22 05Masonry Locker Bases1.0allow5,000.005,000Base Bid04 22 05Rock Face Block Veneer330.0sqft20.006,600Public Works BuildingTotal94,128Masonry Total94,12805 00 00 Metals05 10 00 Structural Steel Framing05 10 01Structural Steel Columns - Supply1.6ton7,000.0011,200Base Bid05 10 01Structural Steel Columns - Erection1.6ton2,500.004,000Base Bid05 10 02Structural Steel Beams - Supply13.0ton7,000.0091,000Base Bid05 10 02Structural Steel Beams - Erection13.0ton2,500.0032,500Base Bid05 10 02Structural Steel at Public Works Addition1.0allow20,000.0020,000Public Works BuildingAllowance - pending design05 10 02Structural Steel at Training Tower Balcony1.0allow7,500.007,500Base Bid05 10 03Misc. Steel Channels/Angles/Plates1.0allow7,500.007,500Base BidTotal173,70005 30 00 Metal Decking05 31 231.5" - 20GA Metal Decking3,294.0sqft8.0026,352Base Bid05 31 231.5" - 20GA Metal Decking Infill at Brookfield Roof & Floor Openings456.0sqft9.004,104Base BidTotal30,456CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks05 40 00 Structural Lightgage Framing/Cold Formed Metal Framing05 41 00Exterior Wall Furring Assembly @ Brookfield Windows1,801.0sqft15.0027,015Base Bid05 41 00Exterior Wall Assembly1,500.0sqft25.0037,500Public Works BuildingTotal64,51505 50 00 Metal Fabrications05 51 00Metal Pan Stairs3.0flgt25,000.0075,000Base Bid05 51 00Entryway Metal Pan Stairs & Decorative Rail1.0flgt60,000.0060,000Base Bid05 51 00Roof Access Ladders1.0allow37,000.0037,000Base Bid05 52 00Guardrail at Training Tower & Training Tower Balcony66.0lnft175.0011,550Base Bid05 52 00Wire Mesh Guardrail with Wood Handrail at Lobby Mezzanine21.0lnft350.007,350Base Bid05 52 00Steel Picket Guardrail with Steel Handrail at Lobby Mezzanine58.0lnft300.0017,400Base Bid05 52 00Floor-Mounted Handrail14.0lnft200.002,800Base Bid05 52 00Wall-Mounted Handrail40.0lnft100.004,000Base Bid05 52 00Steel Guardrail & Gate with Kick Plate at Apparatus Support Mezzanine12.0lnft250.003,000Base Bid05 52 00Roof Hatch Railing Guard1.0each2,000.002,000Base Bid05 52 00Cane Detection Rail12.0lnft125.001,500Base Bid05 58 00Diamond Plate Window Trim & Sill Aprons1.0lsum750.00750Base Bid05 58 00D-Ring Anchors5.0each200.001,000Base Bid05 58 00Fixed Fire Hose Dry Hooks6.0each1,500.009,000Base Bid05 58 00Heavy Duty Wood Top Workbench with Steel Drawers & Open Shelving Below12.0lnft750.009,000Base Bid05 58 001.5" Slip Resistant Metal Floor Grating61.0sqft50.003,050Base Bid05 59 00Concrete-Filled Metal Bollard26.0each900.0023,400Base Bid05 59 00Concrete-Filled Metal Bollard2.0each900.001,800Public Works Building05 59 00Metal Bollard for ADA Operators2.0each1,100.002,200Base BidTotal271,800Metals Total540,47106 00 00 Wood, Plastics & Composites06 10 00 Rough Carpentry06 12 00Soffit & Fascia Framing464.0sqft15.006,960Public Works Building06 12 00Roof Assembly2,538.0sqft27.5069,795Public Works Building06 12 00Carpentry Allowance270.0hour85.0022,950Base Bid06 12 00Carpentry Allowance20.0hour85.001,700Public Works Building06 12 00Labor Allowance330.0hour80.0026,400Base Bid06 12 00Labor Allowance30.0hour75.002,250Public Works Building06 12 00Material Allowance1.0allow18,500.0018,500Base Bid06 12 00Material Allowance1.0allow3,500.003,500Public Works Building06 12 00Misc. Blocking & Furring1.0allow5,000.005,000Base Bid06 12 00Misc. Blocking & Furring1.0allow1,000.001,000Public Works Building06 12 00FRP375.0sqft8.003,000Base BidTotal161,05506 20 00 Finish Carpentry06 22 00Cedar Bench at Main Entry34.0lnft350.0011,900Base Bid06 22 00Cedar Timber Surround at Apparatus Bay OH Doors473.0lnft65.0030,745Base Bid06 22 00Large Cedar Timber Fins Sunshade193.0lnft125.0024,125Base Bid06 22 00Small Cedar Timber Fins Sunshade199.0lnft70.0013,930Base Bid06 22 00Wood Wainscot at Council Chambers546.0sqft45.0024,570Base Bid06 22 00Wood Wall Planks at Council Chambers203.0sqft45.009,135Base Bid06 22 00Wood Ceiling Planks at Council Chambers195.0sqft45.008,775Base Bid06 22 00Wood Base295.0lnft25.007,375Base Bid06 22 00Wood Trim at AWP74.0lnft25.001,850Base Bid06 22 00Wood Beadboard176.0sqft40.007,040Base Bid06 22 00Cedar Vestibule Ceiling & Exterior Soffit306.0sqft45.0013,770Base Bid06 22 00Tool Peg Board on 2x2 Sleepers51.0sqft25.001,275Base BidTotal154,490CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks06 60 00 Plastic Fabrications06 60 00Solid Surface Window Sills208.0lnft50.0010,400Base BidTotal10,400Wood, Plastics & Composites Total325,94507 00 00 Thermal & Moisture Protection07 10 00 Waterproofing07 14 00Bentonite Waterproofing at Elevator Pit1.0lsum5,000.005,000Base Bid07 14 00Foundation Waterproofing & Protection Board2,436.0sqftBase BidExcluded per LAD07 14 00Foundation Waterproofing & Protection Board470.0sqftPublic Works BuildingExcluded per LADTotal5,00007 20 00 Insulation/Thermal Protection07 21 13Rigid Insulation (Aprons & Sidewalk)5,124.0sqft4.5023,058Heated Aprons & Entrance Sidewalk07 21 13Fill Existing Exterior Wall with Mineral Wool Batt Insulation at Brookfield Windows798.0sqft9.007,182Base Bid07 21 13Mineral Wool Batt Insulation at Existing Wall92.0lnft20.001,840Public Works BuildingTotal32,08007 40 00 Preformed Roofing & Siding07 41 00Metal Roof Panels2,538.0sqft30.0076,140Public Works Building07 41 00Metal Wall Panels1,377.0sqft30.0041,310Public Works Building07 41 00Fundermax HPL Wall Panels368.0sqft30.0011,040Base Bid07 41 00Nichiha Wall Panels430.0sqft27.5011,825Base Bid07 41 00Soffit & Fascia Metal Panels464.0sqft25.0011,600Public Works BuildingTotal151,91507 50 00 Membrane Roofing07 51 00Fully Adhered EPDM Roofing - Tapered25,257.0sqft30.00757,710Base BidTotal757,71007 60 00 Flashing & Sheet Metal07 62 00Parapet Blocking & Coping885.0lnft30.0026,550Base Bid07 62 00Parapet Renovation (Reduce Height for Thinner Profile)368.0lnft45.0016,560Base Bid07 63 00Gutters92.0lnft40.003,680Public Works BuildingTotal46,79007 90 00 Sealants07 92 00Prefabricated Expansion Joints1.0allow2,500.002,500Base Bid07 92 00Prefabricated Expansion Joints1.0allow500.00500Public Works Building07 92 00Sealants/Joint Fillers/Caulking1.0allow45,000.0045,000Base Bid07 92 00Caulking & Firestopping Labor Allowance50.0hour85.004,250Base Bid07 92 00Caulking & Firestopping Material Allowance1.0allow2,500.002,500Base BidTotal54,750Thermal & Moisture Protection Total1,048,24508 00 00 Openings08 11 00 Metal Doors & Frames08 11 13Temp. Door & Hardware Allowance1.0allow5,000.005,000Base Bid08 11 133'-0" x 7'-0" HM Door Frame82.0each400.0032,800Base Bid08 11 133'-0" x 7'-0" HM Door Frame5.0each400.002,000Public Works Building08 11 133'-6" x 7'-0" HM Door Frame1.0each420.00420Base Bid08 11 136'-0" x 7'-0" HM Door Frame2.0each540.001,080Base Bid08 11 136'-0" x 7'-0" HM Door Frame1.0each540.00540Public Works Building08 11 137'-0" x 7'-0" HM Door Frame2.0each560.001,120Base Bid08 11 13Install HM Door Frames90.0each250.0022,500Base Bid08 11 13Install HM Door Frames6.0each250.001,500Public Works BuildingCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks08 11 133'-0" x 7'-0" Storm-Rated HM Door/Frame/Hardware3.0each6,300.0018,900Base Bid08 11 133'-0" x 7'-0" Insulated HM Door - Flush5.0each1,350.006,750Base Bid08 11 133'-0" x 7'-0" Insulated HM Door - Flush - 90 Min. Rated2.0each1,600.003,200Public Works Building08 11 133'-0" x 7'-0" Insulated HM Door - Flush - Extended Swing1.0each1,500.001,500Base Bid08 11 133'-0" x 7'-0" Insulated HM Door - Narrow Lite1.0each1,500.001,500Public Works Building08 11 133'-0" x 7'-0" HM Door - Flush2.0each525.001,050Base Bid08 11 133'-0" x 7'-0" HM Door - Flush3.0each525.001,575Public Works Building08 11 133'-0" x 7'-0" HM Door - Narrow Lite - 60 Min. Rated1.0each875.00875Base Bid08 11 133'-0" x 7'-0" HM Door - Half Lite3.0each785.002,355Base Bid08 11 133'-0" x 7'-0" HM Door - Full Lite2.0each1,000.002,000Base Bid08 11 133'-6" x 7'-0" HM Door - Flush3.0each580.001,740Base Bid08 11 13Install HM Doors & Hardware20.0each300.006,000Base Bid08 11 13Install HM Doors & Hardware6.0each300.001,800Public Works Building08 11 16Aluminum Doors & Hardware8.0each4,500.0036,000Base BidTotal152,20508 14 00 Wood & Plastic Doors08 14 003'-0" x 7'-0" WD Door - Flush57.0each450.0025,650Base Bid08 14 003'-0" x 7'-0" WD Door - Flush1.0each450.00450Public Works Building08 14 003'-0" x 7'-0" WD Door - Flush - 60 Min. Rated6.0each650.003,900Base Bid08 14 003'-0" x 7'-0" WD Door - Narrow Lite2.0each650.001,300Base Bid08 14 003'-0" x 7'-0" WD Door - Narrow Lite - 60 Min. Rated1.0each800.00800Base Bid08 14 003'-0" x 7'-0" WD Door - Half Lite1.0each710.00710Base Bid08 14 003'-0" x 7'-0" WD Door - Full Lite3.0each925.002,775Base Bid08 14 003'-0" x 7'-0" WD Door - Flush - Extended Swing1.0each550.00550Base Bid08 14 003'-0" x 7'-0" WD Door - Flush - Extended Swing - 45 Min. Rated1.0each710.00710Base Bid08 14 003'-6" x 7'-0" WD Door - Flush2.0each475.00950Base Bid08 14 005'-0" x 7'-0" WD Bifold Door/Frame/Hardware1.0each550.00550Base Bid08 14 006'-0" x 7'-0" WD Bifold Door/Frame/Hardware2.0each580.001,160Base Bid08 14 007'-4" x 8'-0" WD Door (Full Lite)/Frame/Hardware1.0each3,600.003,600Base Bid08 14 001'-10" x 8'-0" WD Sidelight2.0each1,300.002,600Base Bid08 14 00Install WD Doors & Hardware74.0each300.0022,200Base Bid08 14 00Install WD Doors & Hardware1.0each300.00300Public Works BuildingTotal68,20508 30 00 Special Doors08 31 00Access Doors1.0allow2,500.002,500Base Bid08 33 0011'-0" x 8'-0" OH Coiling Storm Door1.0each47,500.0047,500Base Bid08 33 0012'-0" x 12'-0" OH Sectional Door1.0each11,500.0011,500Public Works Building08 36 1314'-0" x 16'-0" OH Door With 3 Panels of Glazing10.0each12,400.00124,000Base BidTotal185,50008 40 00 Entrances & Storefronts08 43 00Exterior Aluminum Storefront153.0sqft80.0012,240Base Bid08 43 00Interior Aluminum Storefront251.0sqft75.0018,825Base Bid08 43 00Interior Storefront Reduction at Conference Room1.0lsum-4,000.00-4,000Base BidTotal27,06508 44 00 Window Walls & Curtain Walls08 44 13Curtainwall271.0sqft100.0027,100Base Bid08 44 13All-Glass, Butt-Glazed Curtainwall311.0sqft110.0034,210Base BidTotal61,31008 51 00 Metal Windows08 51 13Exterior Aluminum Windows958.0sqft70.0067,060Base Bid08 51 13Exterior Aluminum Windows - Blast Resistant72.0sqft300.0021,600Base Bid08 51 13Interior Aluminum Windows398.0sqft65.0025,870Base Bid08 51 13Interior Aluminum Windows33.0sqft65.002,145Public Works BuildingCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name RemarksTotal116,67508 56 00 Special Windows08 56 533' x 3'-8" Ballistic Resistant Window with Transaction Openings2.0each3,300.006,600Base Bid08 56 533' x 4'-8" Ballistic Resistant Window with Transaction Openings2.0each4,200.008,400Base Bid08 56 533'-0" x 4'-0" HM Casement Window at Apparatus Support Mezzanine1.0each750.00750Base Bid08 56 532'-4" x 4'-6" Clad Double Hung Window at Apparatus Support Mezzanine1.0each750.00750Base BidTotal16,50008 62 00 Unit Skylights08 62 00Replace Skylight at Existing Opening1.0each20,000.0020,000Base BidTotal20,00008 70 00 Hardware & Specialties08 71 00Finish Hardware 91.0each1,100.00100,100Base Bid08 71 00Finish Hardware 7.0each1,100.007,700Public Works Building08 71 00New Door Hardware at Existing Doors13.0each1,100.0014,300Public Works Building08 71 13ADA Door Operators2.0each4,500.009,000Base BidTotal131,10008 80 00 Glazing08 81 00ADD for Impact Resistant Glazing133.0sqft50.006,650Base BidDiscussed for LEC, but not noted on plansTotal6,650Openings Total785,21009 00 00 Finishes09 20 00 Gypsum Wallboard09 20 01Gyp Partition - Stud, Gyp Both Sides, Acoustic Insulation15,208.0sqft10.50159,684Base Bid09 20 01Gyp Partition - Stud, Gyp Both Sides, Acoustic Insulation2,137.0sqft10.5022,439Public Works Building09 20 01Gyp Partition - Stud, Gyp One Side, Acoustic Insulation7,000.0sqft9.0063,000Base Bid09 20 01Gyp Partition - Stud, Gyp One Side, Acoustic Insulation3,268.0sqft9.0029,412Public Works Building09 20 01Gyp Partition - Stud, Gyp Both Sides120.0sqft10.001,200Base Bid09 20 01Gyp Partition - Stud, Gyp One Side8,652.0sqft8.5073,542Base Bid09 20 01Gyp Partition - Stud, One Layer Gyp One Side, Two Layers Gyp Other Side, Acoustic Insulation414.0sqft11.504,761Base Bid09 20 01Gyp Partition - Stud, Gyp Both Sides, Acoustic Insulation - 1 Hr. Rated1,686.0sqft11.2518,968Base Bid09 20 01Gyp Partition - Furring, Gyp One Side, Spray Foam Insulation7,277.0sqft12.0087,324Base Bid09 20 01Recessed Monitor Niche in Lobby1.0lsum500.00500Base Bid09 20 01Level 5 Gyp Wall Finish1,039.0sqft4.504,676Base Bid09 20 05 Gyp Ceiling704.0sqft20.0014,080Base Bid09 20 05 Gyp Soffit895.0sqft20.0017,900Base BidTotal497,48509 30 00 Tile09 30 13Porcelain Floor Tile (PT-1)1,580.0sqft20.7032,706Base Bid09 30 13Porcelain Floor Tile (PT-2)1,696.0sqft25.5043,248Base Bid09 30 13Porcelain Floor Tile (PT-3)877.0sqft21.1018,505Base Bid09 30 13Porcelain Floor Tile - Stair Treads (PT-4)116.0sqft35.004,060Base Bid09 30 13Porcelain Tile Base (PTB-1)442.0lnft19.008,398Base Bid09 30 13Porcelain Tile Base (PTB-3)407.0lnft20.008,140Base Bid09 30 13Metal Base280.0lnft19.005,320Base Bid09 30 13Porcelain Wall Tile (PT-1)1,424.0sqft20.7029,477Base Bid09 30 13Porcelain Wall Tile (PT-3)965.0sqft21.1020,362Base Bid09 30 13Reduce Tile Wainscot at Main Restroom1.0lsum-7,500.00-7,500Base BidReduced Scope TBD09 30 13Ceramic Wall Tile249.0sqft24.456,088Base BidTotal168,80309 50 00 Acoustical TreatmentCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks09 51 00ACT19,798.0sqft4.4588,101Base Bid09 51 00ACT2,069.0sqft4.459,207Public Works Building09 51 00ACT, Moisture Resistant307.0sqft5.501,689Base Bid09 51 00Acoustical Wood Veneer Wall Panels276.0sqft50.0013,800Base BidTotal112,79709 65 00 Resilient Flooring09 65 01Static Dissipative Tile104.0sqft12.501,300Base Bid09 65 01Athletic Rubber Flooring671.0sqft15.0010,065Base Bid09 65 01Resilient Sheet Flooring1,390.0sqft12.0016,680Base Bid09 65 01Resilient Flooring - Stair Treads & Risers98.0sqft15.001,470Base Bid09 65 13Resilient Base4,824.0lnft3.5016,884Base Bid09 65 13Resilient Base411.0lnft3.501,439Public Works Building09 65 13Floor Leveling Allowance1.0allow2,500.002,500Base BidTotal50,33809 68 00 Carpeting09 68 01Carpet1,497.0sqyd52.0077,844Base Bid09 68 01Carpet, Moisture Resistant73.0sqyd55.004,015Base Bid09 68 01Entrance Carpet51.0sqyd60.003,060Base BidTotal84,91909 70 00 Wall Finishes09 78 00PLAM Wall Cladding262.0sqft30.007,860Base BidTotal7,86009 90 00 Painting/Wallcovering09 91 00Wallcoverings1,039.0sqft4.004,156Base Bid09 91 00Paint - Walls44,042.0sqft1.2555,053Base Bid09 91 00Paint - Walls5,489.0sqft1.256,861Public Works Building09 91 00Paint - Gyp Ceiling & Soffit1,599.0sqft1.452,319Base Bid09 91 01Paint - Exposed Ceiling964.0sqft1.651,591Base Bid09 91 01Paint - Exposed Ceiling769.0sqft1.651,269Public Works Building09 91 01Epoxy Paint - Exposed Ceiling9,161.0sqft1.8516,948Base Bid09 91 10Epoxy Paint - Walls19,107.0sqft1.6030,571Base Bid09 91 15Paint - HM Frames90.0each125.0011,250Base Bid09 91 15Paint - HM Doors20.0each125.002,500Base Bid09 91 15Stain - WD Doors74.0each125.009,250Base Bid09 91 15Paint - HM Frames6.0each125.00750Public Works Building09 91 15Paint - HM Doors6.0each125.00750Public Works Building09 91 15Stain - WD Doors1.0each125.00125Public Works Building09 91 15Refinish Existing Frames10.0each125.001,250Public Works Building09 91 15Refinish Existing Doors10.0each125.001,250Public Works Building09 91 15Paint - Stair System214.0sqft3.50749Base Bid09 91 15Epoxy Paint - Stair System187.0sqft3.75701Base Bid09 91 15Paint - Roof Ladders, Guardrails, Handrails, Etc.1.0lsum2,500.002,500Base Bid09 91 15Paint - Door Numbers at Apparatus Bay (Exterior)10.0each350.003,500Base Bid09 91 15Paint - Door Numbers at Apparatus Bay (Interior)10.0each75.00750Base Bid09 91 15Paint - Touch Up Allowance20.0hour80.001,600Base Bid09 91 15Stain - Ceilings, Fins, Trim, Wainscot, Beadboard, Etc.1.0lsum7,500.007,500Base Bid09 91 15Tuffcrete Stain4,417.0sqft1.807,951Base Bid09 91 15Waterproof Masonry Coating4,417.0sqft8.0035,336Base BidTotal206,479Finishes Total1,128,67910 00 00 Specialties10 11 00 Visual DisplayCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks10 11 16Whiteboard/Tackboard Allowance1.0allowBase BidNone shown or included10 12 00Custom Recessed Display Cases16.0lnft2,200.0035,200Base BidTotal35,20010 14 00 Signage & Graphics10 14 2312" Dimensional Letters, Back Lit18.0each400.007,200Base Bid10 14 23Maltese Logo Sign, Halo Lit1.0each7,500.007,500Base Bid10 14 23Room Identification Panel Signage1.0allow5,000.005,000Base Bid10 14 238" Architectural Letters at Council Chambers14.0each175.002,450Base Bid10 14 235" Architectural Letters61.0each150.009,150Base BidTotal31,30010 21 00 Compartments & Cubicles10 21 16Toilet Partitions6.0each1,300.007,800Base Bid10 21 16Urinal Screens1.0each600.00600Base BidTotal8,40010 26 00 Wall & Corner Guards10 21 13Corner Guards1.0allow3,000.003,000Base BidTotal3,00010 28 00 Toilet & Bath Accessories10 28 00Bathroom Mirrors1.0lsum7,000.007,000Base Bid10 28 00Toilet Paper Dispensers18.0each250.004,500Base Bid10 28 00Grab Bars46.0each125.005,750Base Bid10 28 00Soap Dispenser21.0each200.004,200Base Bid10 28 00Paper Towel Dispenser18.0each275.004,950Base Bid10 28 00Waste Receptacle14.0each200.002,800Base Bid10 28 00Sanitary Napkin Disposal16.0each300.004,800Base Bid10 28 00Infant Changing Station5.0each750.003,750Base Bid10 28 00Shower Rod & Curtain3.0each250.00750Base Bid10 28 00Folding ADA Wood Shower Bench1.0each1,000.001,000Base Bid10 28 00Coat Hook34.0each50.001,700Base Bid10 28 00Mop & Broom Holder wtih Shelf3.0each250.00750Base BidTotal41,95010 44 00 Fire Protection Specialties10 44 00Fire Extinguisher Cabinet Allowance6.0each600.003,600Base Bid10 44 0060 Gallon Flammable Cabinet1.0each3,000.003,000Base BidTotal6,60010 51 00 Lockers10 51 00Fire Department Wardrobe Lockers19.0each750.0014,250Base Bid10 51 00Patrol Wardrobe Lockers7.0each2,000.0014,000Base Bid10 51 00Public Works Building Wardrobe Lockers19.0each550.0010,450Public Works Building10 51 00New Gear Lockers24.0each850.0020,400Base Bid10 51 00Pass-Thru Evidence Lockers1.0allowBase BidBy Owner per LAD10 51 00Weapons Lockers1.0allowBase BidBy Owner per LAD10 51 00Integral Bench at Fire Department Wardrobe Lockers29.0lnft150.004,350Base Bid10 51 00Integral Bench at Patrol Wardrobe Lockers11.0lnft150.001,650Base BidTotal65,10010 55 00 Postal Specialties10 55 00Recessed Exterior Utility Bill Dropbox1.0each1,000.001,000Base BidTotal1,00010 75 00 Flagpoles10 75 00Flagpole1.0each10,000.0010,000Base BidCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name RemarksTotal10,000Specialties Total202,55011 00 00 Equipment11 11 00 Vehicle Service Equipment11 11 13Air Compressor1.0allow5,000.005,000Base Bid11 11 26Pressure Washer Control & Reel1.0each3,500.003,500Base Bid11 11 26Garden Hose Reel1.0each750.00750Base BidTotal9,25011 23 00 Laundry Equipment - Commercial11 23 003-Compartment Sink at SCBA1.0allow2,500.002,500Base Bid11 23 00Decon Sink Hook & Rack System1.0allow3,500.003,500Base BidTotal6,00011 30 00 Residential Equipment11 30 00Fire Department Kitchen Appliances1.0allow15,000.0015,000Base Bid11 30 00Community Room Applicances1.0allow2,500.002,500Base Bid11 30 00City Hall Breakroom Appliances1.0allow3,500.003,500Base Bid11 30 00Laundry Equipment1.0allow2,500.002,500Base Bid11 30 00Work Room Appliances1.0allow3,000.003,000Base Bid11 30 00Patrol Area Kitchenette1.0allow2,500.002,500Base Bid11 30 00Wellness Room Appliances1.0each750.00750Base Bid11 30 00Gear Washer & Dryer1.0allowBase BidExcluded - By Owner11 30 00Extractor2.0eachBase BidExcluded - By OwnerTotal29,750Equipment Total45,00012 00 00 Furnishings12 20 00 Window Treatments12 20 00Window Treatments - Manual1,036.0sqft12.5012,950Base Bid12 20 00Window Treatments - Motorized72.0sqft25.001,800Base BidTotal14,75012 30 00 Manufactured Casework12 32 00Wall-Mounted Shelving System at Laundry Room6.0lnft300.001,800Base Bid12 32 00PLAM Base Cabinets with Solid Surface Countertops150.0lnft350.0052,500Base Bid12 32 00PLAM Upper Cabinets101.0lnft250.0025,250Base Bid12 32 00PLAM Tall Cabinets14.0lnft550.007,700Base Bid12 32 00PLAM Island with Solid Surface Countertops66.0lnft650.0042,900Base Bid12 32 00PLAM Island with Solid Surface Countertops9.0lnft650.005,850Public Works Building12 32 00PLAM Mailbox Cubbies10.0lnft450.004,500Base Bid12 32 00PLAM Adjustable Shelving5.0lnft300.001,500Base Bid12 35 00Phenolic Base Cabinets with Stainless Steel Countertops18.0lnft750.0013,500Base Bid12 35 00Phenolic Upper Cabinets18.0lnft300.005,400Base Bid12 35 00Phenolic Tall Cabinets7.0lnft800.005,600Base Bid12 35 00L-Shaped Bench in FD Kitchen19.0lnftBase BidExcluded in lieu of FF&E? 12 35 00Service Counter33.0lnft475.0015,675Base Bid12 35 00Ballistic Council Dias60.0lnft1,500.0090,000Base Bid12 36 00Wall-Mounted Solid Surface Countertop (Restroom)53.0lnft175.009,275Base Bid12 36 00Wall-Mounted Countertop128.0lnft175.0022,400Base Bid12 36 00Solid Surface Countertop at Exterior Utility Drop1.0lsum200.00200Base BidTotal304,050CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name RemarksFurnishings Total318,80014 00 00 Conveying Systems14 20 00 Elevators14 20 00Passenger Elevator, 2-Stop1.0lsum95,000.0095,000Base BidTotal95,000Conveying Systems Total95,00021 00 00 Fire Supression21 00 00 Fire Protection21 00 00Fire Protection at Brookfield Building16,709.0sqft3.7562,659Base Bid21 00 00Fire Protection at New Additions19,856.0sqft3.2564,532Base Bid21 00 00Fire Protection at Public Works Addition2,096.0sqftPublic Works BuildingConfirm - no Fire Supression at PWTotal127,191Fire Supression Total127,19122 00 00 Plumbing22 00 00 Plumbing22 00 00Plumbing 1.0lsum380,000.00380,000Base Bid22 00 00In-Floor Heat at Aprons & Entry Sidewalk5,124.0sqft12.0061,488Heated Aprons & Entrance SidewalkTotal441,488Plumbing Total441,48823 00 00 Heating, Ventilating, and Air-Conditioning (HVAC)23 00 00 HVAC23 00 00HVAC1.0lsum1,548,300.001,548,300Base Bid23 00 00HVAC at Public Works1.0lsum84,000.0084,000Public Works BuildingTotal1,632,300Heating, Ventilating, and Air-Conditioning (HVAC) Total1,632,30026 00 00 Electrical26 00 00 Electrical26 00 00General Conditions1.0lsum32,000.0032,000Base Bid26 00 00Demolition1.0lsum20,000.0020,000Base Bid26 00 00General Power1.0lsum135,000.00135,000Base Bid26 00 00Motor & Conns1.0lsum95,000.0095,000Base Bid26 00 00Interior Lighting1.0lsum240,000.00240,000Base Bid26 00 00Lighting Controls1.0lsum45,000.0045,000Base Bid26 00 00Switchgear1.0lsum45,000.0045,000Base Bid26 00 00Service/Feeders1.0lsum68,000.0068,000Base Bid26 00 00Generator1.0lsum55,000.0055,000Base Bid26 00 00Fire Alarm1.0lsum30,000.0030,000Base Bid26 00 00Communications Rough-In1.0lsum20,000.0020,000Base Bid26 00 00Security Rough-In1.0lsum8,000.008,000Base Bid26 00 00Public Works Addition1.0lsum90,000.0090,000Public Works BuildingReview scope 26 00 00Wiring for Snow Melt Boiler & Pumps1.0lsum5,000.005,000Heated Aprons & Entrance Sidewalk26 00 00Site Lighting1.0lsum105,000.00105,000Base BidTotal993,000Electrical Total993,00027 00 00 Communications27 20 00 Data System27 20 00Voice/Data Network Equipment & Installation1.0lsumBase BidExcludedCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks27 20 00Audio/Visual Equipment & Installation1.0lsumBase BidExcluded27 20 00Fiber Equipment & Installation1.0lsumBase BidExcluded27 20 00WiFi Equipment & Installation1.0lsumBase BidExcludedTotalCommunications Total28 00 00 Electronic Safety and Security28 01 00 Electronic Safety and Security28 01 10Surveilllance/Security Equipment & Installation1.0lsumBase BidExcluded28 01 10Emergency Radio Equipment & Installation1.0lsumBase BidExcludedTotalElectronic Safety and Security Total31 00 00 Earthwork31 20 00 Earth Moving31 22 00Earthwork & Excavation1.0lsum645,298.00645,298Base Bid31 22 00Export Excess Topsoil by City4,700.0cuyd-7.00-32,900Base Bid31 22 00City Supply Recycled Millings/Gravel1,000.0cuyd-7.00-7,000Base Bid31 22 00Building Excavation1.0lsum3,500.003,500Base Bid31 22 00Building Excavation & Sitework1.0lsum15,000.0015,000Public Works BuildingTotal623,898Earthwork Total623,89832 00 00 Exterior Improvements32 10 00 Paving32 12 00Standard Asphalt Paving2,008.0sqyd24.0048,192Base Bid32 12 00Asphalt Patching Allowance1.0allow1,500.001,500Base Bid32 12 00Heavy Duty Asphalt Paving3,394.0sqyd26.0088,244Base Bid32 13 00Heavy Duty Concrete Pavement7,048.0sqft12.0084,576Base Bid32 13 00Heavy Duty Concrete Pavement230.0sqft14.003,220Public Works Building32 13 00Concrete Sidewalk4,150.0sqft8.2534,238Base Bid32 13 00Concrete Sidewalk Patching Allowance1.0allow1,000.001,000Base Bid32 13 00Concrete Training Pad574.0sqft9.005,166Base Bid32 13 00Concrete Patio510.0sqft9.004,590Base Bid32 13 00ADA Ramp with Truncated Domes4.0each3,600.0014,400Base Bid32 16 00Concrete Curb & Gutter2,406.0lnft25.0060,150Base Bid32 16 00Curb Replacement Allowance1.0allow3,000.003,000Base Bid32 17 00Pavement Markings1.0lsum5,000.005,000Base BidTotal353,27632 30 00 Site Improvements32 31 00Monument Sign1.0eachBase BidExcluded32 31 00Trash Enclosure Fence10.0lnft300.003,000Base Bid32 31 00Trash Enclosure Gate2.0each5,000.0010,000Base Bid32 36 00Light Bollards3.0each1,450.004,350Base Bid32 36 00Site Signage15.0each300.004,500Base Bid32 36 00Bike Loops3.0allow1,500.004,500Base Bid32 36 00Backless Bench2.0allow1,500.003,000Base Bid32 36 00Picnic Table2.0allow2,250.004,500Base Bid32 36 00Raised Planter2.0allow7,500.0015,000Base BidTotal48,85032 80 00 Irrigation32 84 00Irrigation1.0lsumBase BidExcludedTotalCD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks32 90 00 Planting32 92 00Native Seed Mix1,071.0sqyd5.505,891Base Bid32 92 00Turf Grass Seed2,320.0sqyd2.756,380Base Bid32 93 00Landscaping, Restoration, Misc. Site Finishes1.0allow15,000.0015,000Public Works Building32 93 00Deciduous Trees20.0each550.0011,000Base Bid32 93 00Evergreen Trees23.0each550.0012,650Base Bid32 93 00Ornamental Trees4.0each550.002,200Base Bid32 93 00Shrubs177.0each65.0011,505Base Bid32 93 00Perennials129.0each18.002,322Base Bid32 94 00Rock Mulch & Fabric4,478.0sqft1.104,926Base Bid32 94 00Wood Mulch & Fabric2,539.0sqft0.802,031Base Bid32 94 00Mulch Rings Around Trees in Turf Areas15.0each250.003,750Base Bid32 94 00Steel Edging879.0lnft9.007,911Base BidTotal85,566Exterior Improvements Total487,69133 00 00 Utilities33 00 00 Utilities33 00 00Utilities1.0lsum166,326.00166,326Base BidTotal166,32633 50 00 Fuel Distribution33 51 00CenterPoint Fees & Gas Meter1.0lsumBase BidExcluded Total33 70 00 Electrical Utilities33 70 00Xcel Power Fees1.0lsumBase BidExcludedTotal33 80 00 Communication Utilities33 82 00Comcast Fiber Connection Fees1.0lsumBase BidExcludedTotalUtilities Total166,32640 00 00 Material Processing & Handling Equipment41 22 23 Hoists41 22 23Ceiling Hung 2-Ton Monorail Crain with Electric Chain Hoist1.0allow15,000.0015,000Base Bid41 22 23Electric Chain Hoist with Trolley1.0allow10,000.0010,000Base BidTotal25,000Material Processing & Handling Equipment Total25,00070 00 00 Contingencies70 10 00 Construction Contingency70 10 00Construction Contingency1.0lsum532,688.00532,688Base Bid5%70 10 00Construction Contingency1.0lsum4,477.004,477Heated Aprons & Entrance Sidewalk5%70 10 00Construction Contingency1.0lsum35,352.0035,352Public Works Building5%Total572,517Contingencies Total572,51780 00 00 General Conditions/Construction Support & Management80 10 00 General Conditions80 10 00General Conditions1.0lsum243,080.00243,080Base Bid80 10 00Builders Risk Insurance1.0lsumBase BidExcludedTotal243,080CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC Takeoff Unit AlternateCSI DescriptionQty Unit Price Total Name Remarks80 20 00 Construction Support/Project Management80 20 00Preconstruction Fees (CM)1.0lsum7,500.007,500Base Bid80 21 00Project Reimbursables (CM)1.0allow488,555.00488,555Base Bid80 22 00Construction Management Fee1.0allow76,205.0076,205Base Bid0.65%80 22 00Construction Management Fee1.0allow599.00599Heated Aprons & Entrance Sidewalk0.65%80 22 00Construction Management Fee1.0allow4,747.004,747Public Works Building0.65%Total577,606General Conditions/Construction Support & Management Total820,68690 00 00 Other Project Costs90 30 00 Surveying/Testing/Assessments90 30 00Testing & Inspections1.0allow25,000.0025,000Base Bid90 30 00Testing & Inspections1.0allow3,000.003,000Public Works BuildingTotal28,00090 40 00 Permits/Fees90 40 00Permits/Plan Review1.0lsumBase BidExcluded90 40 00SAC/WAC Fees1.0unitsBase BidExcluded90 40 00Permits/Plan Review1.0lsumHeated Aprons & Entrance SidewalkExcluded90 40 00Permits/Plan Review1.0lsumPublic Works BuildingExcludedTotal90 50 00 Misc. Owner Expenses90 55 00Temp. Office Trailer for City1.0lsum51,370.0051,370Base Bid90 55 00FF&E1.0allowBase BidExcludedTotal51,37090 60 00 Legal/Insurance90 61 00Sales Tax Savings1.0allow-342,886.00-342,886Base Bid90 61 00Sales Tax Savings1.0allow-2,821.00-2,821Heated Aprons & Entrance Sidewalk90 61 00Sales Tax Savings1.0allow-22,271.00-22,271Public Works BuildingTotal-367,97890 70 00 Development/Financing90 70 00Payment & Performance Bonds1.0lsum116,077.00116,077Base Bid1%90 70 00Payment & Performance Bonds1.0lsum912.00912Heated Aprons & Entrance Sidewalk1%90 70 00Payment & Performance Bonds1.0lsum7,232.007,232Public Works Building1%Total124,221Other Project Costs Total-164,387Grand Total SF 12,679,179CD EstimateAugust 10, 2021Completed By: AH/JKCity of Lake ElmoLake Elmo City Hall, Fire Station, & LEC 14159910PROPOSED BUILDINGFFE = 938.01PROPOSED BUILDINGFFE = 938.01CBDCBDDDDCODCB CBDCBCB 0 40'20'10'LL101ABCD1EF234567KEY PLANREVISIONSFILE LOGACTIVITYDrawDesignManagerCheckSTAMPProject No.BY3800 Laverne Avenue NorthLake Elmo, Minnesota 55042LANDSCAPE PLANLake Elmo Public Facilities023-10262-001CheckerAuthorDesignerCity Hall, Fire Department, County Sheriff'sOffice, and Public WorksPERMIT SET 8/18/2021NO. DESCRIPTION DATE08/18/2021Landscape Architecture /Planning / Urban Designwww.hkgi.comMinneapolis, Minnesota730 Second Avenue South, Suite 1300Minneapolis, MN 55402-2455Tel 612.338.8741 Fax 612.338.4840 WDUP UP E E DN APPARATUS BAY 143 ELEVATOR EL-1 STAIR ST-1 DAY ROOM 224 RESTROOM 216 RESTROOM 217 OFFICE 209 STORAGE 212 CONFERENCE 205 OFFICE 206 OFFICE 207 OFFICE 208 FITNESS 211 BATHROOM 214 DORM 227 DORM 229 DORM 231 LOCKERS 213 DUTY ROOM KITCHEN AND DINING 223 DORM 228 DORM 226 DORM 230 LAUNDRY 225 STAIR ST-2 OPEN OFFICE 204 CONFERENCE 210 LOBBY MEZZANINE 201 BREAK ROOM 203 BATHROOM 220 HALLWAY222CORRIDOR 215 CUSTODIAL 232 1 1 2 3 4 5 6 7 8 8 9 10 10 A B C D E F G H H J K L H.7 J.9 M 8.B 8.A J.A J.BFINANCE STORAGE 237 ? ? PROVIDE EXPANSION JOINTS WHERE NEW ADDITION MEETS EXISTING BUILDING 19'-3"16'-9"17'-0"17'-0"17'-0"16'-3"38'-7"23'-0"17'-3 5/8"49'-8 3/8"44'-0"38'-0"24'-11 1/2"16'-0 1/4"33'-8 1/2"16'-0 1/4"24'-11 1/2"24'-11 3/4"82'-0"55'-3 3/4"85'-3 5/8"MATCHLINE29'-9 1/4"12'-8"29'-9 1/4"5'-2 1/2"10'-2"26'-10"40'-3 5/8" 8'-7 5/8" ELECTRICAL 132 RESTROOM 134 RESTROOM 133 APPARATUS BAY 143 CONFERENCE 114 OFFICE 135 OFFICE 116 OFFICE 118 COMMUNICATIONS 129 OFFICE 117 OFFICE 119 OFFICE 121 OFFICE 122 CONFERENCE 124 LOCKERS 125 WORK ROOM 128 EVIDENCE & WEAPONS 127 OFFICE 131 OFFICE 136 FAMILY RESTROOM 113 COMMUNITY ROOM 110 MEN 111 WOMEN 112 AV 106 ELEVATOR EL-1 STAIR ST-1 COUNCIL CHAMBERS 104 WATCH ROOM 137 STORAGE 130 MECHANICAL 141 ELECTRICAL 139 TRAINING TOWER ST-3 DECON 145 TURN-OUT GEAR 146 SCBA 148 LOBBY 102 STAIR ST-2 TURN-OUT RESTROOM 147 MAINTENANCE 140 VESTIBULE 120 CORRIDOR 138 VESTIBULE 101 RESTROOM 108 STORAGE 107 RESTROOM 126 OPEN OFFICE 123 DECON BATHROOM 144 1 1 2 3 4 5 6 7 8 8 9 10 10 A B C D E F G H H J K L H.7 J.9 M 8.B 8.A J.A J.BWELLNESS 150 OPEN OFFICE 115 CIRCULATION 152 SERVICE COUNTER 151 STORAGE 103 RESTROOM 109 MATCH LINE SEE AE101 PROVIDE EXPANSION JOINTS WHERE NEW ADDITION MEETS EXISTING BUILDING 19'-3"16'-9"17'-0"17'-0"17'-0"16'-3"38'-7"23'-0"17'-3 5/8"49'-8 3/8"82'-0"55'-3 3/4"85'-3 5/8"10'-0 3/8"1'-0"19'-0"3"84'-0"5'-7"32'-0"1'-0"22'-4 1/4"7 3/4"67'-0"1'-0" 1'-0"103'-3"6'-7"31'-0"1'-0"72'-2 1/2"1'-0" 29'-9 1/4"12'-8"29'-9 1/4"1'-4"85'-3 5/8"11'-4 3/8"1'-0"81'-0"1'-0"44'-3 3/4"9'-8"10'-7 1/2"5.00°5'-11 1/4"7"16'-6 15/128"17'-7 1/2"6"141'-10"23'-4 1/4"68'-7 3/4"1'-0"44'-0"38'-0"24'-11 1/2"16'-0 1/4"33'-8 1/2"16'-0 1/4"24'-11 1/2"1'-0"23'-11 3/4"1'-4"98'-0"44'-11 3/8"82'-0"110'-10"31'-0"74'-2 1/2" 1X 2X 3X 4X 5X 6X 7X 8X AX BX CX DX SCADA 003 OFFICE 002 BREAK ROOM 004 STORAGE 014 CONFERENCE 010 OPEN OFFICE 011 CHANGING ROOM 012 MECHANICAL 008 RESTROOM 005 RESTROOM 006 CUSTODIAL 007VESTIBULE 001 HALL 009 LOCKERS 013 VEHICLE STORAGE AND MAINTENANCE 015 PROVIDE EXPANSION JOINTS WHERE NEW ADDITION MEETS EXISTING BUILDING 22'-8"23'-0"23'-0"23'-0"23'-0"23'-0"23'-0"24'-0"13'-6"20'-0"23'-0"20'-0"13'-6"13'-0"11'-0"1'-0"68'-8"1'-0"P.1 P.2 P.3 P.4 P.6 P.A P.B P.5 1. CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS PRIOR TO START OF WORK. 2. REFER TO DRAWINGS BY OTHER DISCIPLINES FOR ADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.. 3. REFER TO FF&E PLANS FOR EQUIPMENT SCHEDULE. 4. PROVIDE CONTINUOUS INSULATION THROUGHOUT EXTERIOR ENVELOPE OF NEW ADDITION AND AT ROOF AND ALL OPENINGS AT EXISTING BUILDING. 5. PROVIDE CONTINUOUS EXPANSION JOINTS ALONG INDICATED AREAS. 6. DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF STOREFRONT FRAMING, OR FACE OF EXISTING WALL TO REMAIN. NOTIFY ARCHITECT OF ANY DISCREPANCIES OR REQUEST CLARIFICATION WHERE DIMENSIONS ARE UNCLEAR PRIOR TO PROCEEDING WITH WORK. ARCHITECTURAL FLOOR PLAN NOTES N A B C D 1 E F 2 3 4 5 6 7 KEY PLAN REVISIONS FILE LOG ACTIVITY Draw Design Manager Check STAMP Project No. BY Copyright © 2020 LEO A DALY Company A B 8/18/2021 7:38:17 PMBIM 360://023-10262-001_City_of_Lake_Elmo/ CLE-CityofLakeElmo.rvt3880 Laverne Avenue North Lake Elmo, Minnesota 55042 OVERALL FLOOR PLANS AE100 Lake Elmo City Center 023-10262-001 08/18/2021 PERMIT SET HOISINGTON KOEGLER GROUP INC. MEYER | BORGMAN | JOHNSON FINEPOINT TECHNOLOGY LANDSCAPE ARCHITECTURE STRUCTURAL DESIGN + ENGINEERING TELECOMMUNICATIONS ENGINEERING 123 North Third Street Suite 100, Minneapolis, MN 55401 T: 612-338-0800 510 Marquette Avenue South Suite 900, Minneapolis, MN 55402 T: 612-338-0713 12209 Wood Lake Dr, Burnsville, MN 55337 T: 612-254-7462 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402-2455 Tel 612.338.8741 Fax 612.338.4840 PERMIT SETSCALE:1/16" = 1'-0"A4 OVERALL FLOOR PLAN - LEVEL 2 SCALE:1/16" = 1'-0"A1 OVERALL FLOOR PLAN - LEVEL 1 SCALE:1/16" = 1'-0"D1 OVERALL FLOOR PLAN - PUBLIC WORKS NO. DESCRIPTION DATE Michelle Watanabe 8/18/2021 50554 UP UP WDE E AE441 C4 A1 AE302 C1 AE301 D4 AE301 A1 AE301 B1 AE302 D1 AE301 S4A S4A S4A S6A S6A S4A SF-2S4A S2CO 1S4A S2CO 105A 106151104A 114B114A101C 101D 101B 101A 110A CONFERENCE 114 FAMILY RESTROOM 113 COMMUNITY ROOM 110 MEN 111 WOMEN 112 AV 106 ELEVATOR EL-1 STAIR ST-1 COUNCIL CHAMBERS 104 LOBBY 102 VESTIBULE 101 RESTROOM 108 STORAGE 107 ANTE-CHAMBERS 105 OPEN OFFICE 115 W1 W6 W7 W7 W7 W7 W7 W7 W9 AE401 D1 AE201 B1 AE201 A1 AE801 C1 AE401 C1 AE401 A5 ELECTRICAL 132 RESTROOM 134 RESTROOM 133 OFFICE 135 OFFICE 116 OFFICE 118 COMMUNICATIONS 129 OFFICE 117 OFFICE 119 OFFICE 121 OFFICE 122 CONFERENCE 124 LOCKERS 125 WORK ROOM 128 EVIDENCE & WEAPONS 127 OFFICE 131 OFFICE 136 STORAGE 130 STAIR ST-2 VESTIBULE 120 RESTROOM 126 OPEN OFFICE 123 S4A S4A S4A S4A S4A S6A S4A S4A S4A S4A S4A S4A M4 S4AO S4A S6A S4A2 S4A S4A2 S4A S4A S4COS4CO S4A S4AOS4AO S4A 116 117 118 119 124 121 122131135127120C129 136 130120BW1S W1S W10 W10 W10 W10 W10 W10 AE401 C2 AE444 A4 SF-4SF-3SF-5SF-7AE444 B5 AE444 B1 B2 2 3 4 5 6 7 8 9 10 H J K L H.7 J.9 M 8.B 8.A J.A J.B AE444 B4 AE444 D1 SF-9 SF-10 SF-8W1 132 S4A S4A S4O S6A S4COS4COS4CO S4A S4C W9 AE804 C1 S4C S2CO S4CO S4ACO S4A2 S4A2 W10152 STORAGE 103 S4CO S4CO S4CO S4A S4AO S4AO S4AO2 S4AO S4AO S4AO S4O S4O S4O S4O S4CO S4CO S4COS4CO S4ACO S4ACO S4A S4A M12 S4O CUSTODIAL 149 149 AE441 D4 C1 D1 E4 D1 AE513 A5 D1 AE513 D1 AE513 AE444 C4 W1S W1S W1S W1S W1S W1S W1S W1 W1 W1 W1 W1 W10 17'-3 5/8"49'-8 3/8" 29'-9 1/4"12'-8"29'-9 1/4" RESTROOM 109 103107 105B WELLNESS 150 150123 AE26AE26 AF34 120A 125126CIRCULATION 152 SERVICE COUNTER 15110'-10"8'-6"5'-6" 4'-6" 7'-1" 15'-5" 9" 10'-6" 10'-6" 9" 11'-2" 7"11"S2CO S2CO 22'-7"21'-5"10'-0"15'-6"6'-5"10'-11"2'-8"6'-10"5'-8" 1'-8" 18'-0" 9'-0" 9'-4" 9'-8"7'-7" 22'-5"24'-10"S4O 1'-11"2'-3"9'-6"1'-10"11'-4"7'-5"1'-11"2'-0"11'-4"S4O 2'-3"5'-8" 7"EQEQJNTEXPEXP JNT EXP JNT EXP JNT EXP JNT AE402 A1 AE444 D2 4'-6"7'-6"6'-0"6'-0"6'-0"14'-0"AE441 E1 AE501 D6 AE501 D6 133 134111112113 S4CO S4A 1S4A AE501 D6 AE501 D6 AE501 D6 AE501 A4 110B AE802 D4 C8 D2 AE503 SIM AE503 B2 SIM C1 AE503 AE503 F6 SIMM12 M12 M12 M12 M12 MIN CLR 4'-8 7/16" A1 A3 S4AO 3'-4" AE444 A2 CLEAR18" MINS4A S6A S2CO S2CO AE444E1 A1 ELECTRICAL 139 SIM SIM 16'-1" 10'-2 1/2" 5'-6" 10'-9 3/4" 17'-2 1/4" 12'-5" 15'-3 1/2" 1'-5"1'-5" 8'-2" 5'-8 1/4" 8'-2 1/2" 12'-5" 19'-7 1/2" 8'-3 3/4" 3'-7" 7'-2" 7'-2 3/4" 27'-8" 5'-5" 2'-2 3/4" 10'-7 1/2" 8'-6 1/4" 3'-4" 12'-5 1/4" 4'-9 3/4" 14'-0" 1'-4"10'-6 1/2" 12'-2 1/4" 19'-3 3/4" 11'-1 1/4" 11'-2" 9 3/4" 10'-9" 10" 5'-5" 12'-10 1/4"1'-8"11'-4"11'-1 1/2"7'-0 3/4"34'-1 1/4"11'-4 1/2"6"OH-2104B6" W1A W1A W1 W14 W13 44'-0"38'-0"24'-11 1/2"16'-0 3/16"14'-4 1/16"19'-4 5/16"16'-0 3/16"24'-11 1/2"29'-9 1/4"12'-8"29'-9 1/4" MATCH LINE SEE AE101 AF37 C2 AE512 4'-0" 5'-8 1/4" 1'-8 3/4" 15'-3 1/2" 15'-3 1/2" 1'-8 3/4" 6'-0" ALIGN ALIGN 30.00°3 0 .0 0 °5'-10"4'-2"16'-4 1/2"2'-2"75.00°75.00°22' -11" EQ EQ 3'-4 1/4" 5'-8 1/2"2'-2"8'-0"2'-2"3'-4 1/4" 1'-2" ALIGN S4A S4AO S4AO S4AO S4AO M4 M4 S4AOS4AO M4 S4AO S4C S4C SF-1 W2 5.00°5.00°5'-11 1/4"7"3'-0"14'-11 3/4"1'-8"2'-8"7'-7 1/4"3'-4 1/2"C2 AE512 C2 AE512 138B 108 109 D1 AE302 D4 AE302 E1 AE302 WATCH ROOM 137 MECHANICAL 141 CORRIDOR 138 APPARATUS BAY 143 TRAINING TOWER ST-3 DECON 145 TURN-OUT GEAR 146 SCBA 148 TURN-OUT RESTROOM 147 MAINTENANCE 140 DECON BATHROOM 144 PCS-B M8 S4AO M8 M8 M8 M8 M8 M8 138A 139146B 148 137143A141 140146A 145A145B W2W2W16 W4 W17 AE803 A3 AE401 A1 AE401 B1 1 1 5 5 A B C D E F G H AE443 C6 OH-1OH-1OH-1OH-1OH-1OH-1OH-1OH-1OH-1W10152 S4AO S4AO S4AO S4AO AE443D1 AE442 C1 OH-1AE443 C2 A1 AE302 B1 AE302 AE444 B4 SIM 19'-3"16'-9"17'-0"17'-0"17'-0"16'-3"38'-7" 123 AF3 AF1 AF2 AF5AF5 AF6 AF5 AF5 AF7 AF8 22'-8"5'-9"5'-1"18'-11"10'-11"6'-11"3'-4"4'-0"7'-10"5'-8" 3'-4" 5'-0" 5'-5" 14'-8"10'-10"9'-8"42'-8 1/4"5'-8 1/4"3'-5 3/4"2'-9 3/4"3'-4"1'-3 3/4"6'-7 1/2"8'-6 1/2"4'-6" 1'-2" 32'-0" 6'-7" 31'-0" AE442 E1 A3 F001 18" MIN CLREQEQALIGN INSIDE FACE OF OPEN LEAF EXP JNT EXP JNT EXP JNT EXP JNT S4AO AE501 D6 AE501 D6 AE501 D6 AE501 D6 AE442 A1 AE443 C1 2'-0" TYPM12 M12 M12 M12 M12B1 AE503 SIM AE503 A1 SIM ELECTRICAL 139 23'-10" (8'-0" MIN CLR) 8'-2"1'-11"6" 6" AF36 AF35 1'-4" 4'-6" MATCH LINE SEE AE101 AF36 S4AO S4AO M4 S4AO S4C S4C 5"1'-0 1/2"10'-5 1/2"10'-5 1/2"5'-0"5'-0"5"CLR2'-6"CFMF-BCFMF-B GT1GT1E4 AE302 PTD SD SANSD PTD PTD SAN PTD SD SAN C2 AE512 138B ST-3B ST-3A 147144B144A PARTITION TYPES LEGEND PARTITION TYPE SYMBOL PARTITION DESIGNATION 1S6O FIRE RATING *MATERIAL NOMINAL THICKNESS **OPTION(S) *** 1 -1 HR 2 -2 HR 3 -3 HR S -STUD M -CMU C -CONCRETE 4" 6" 8" SEE BELOW OPTIONS LIST A -ACOUSTICAL INSULATION B -BOTH FACES C -PARTITION EXTENDS 6" PAST CEILING, (PROVIDE BRACING TO STRUCTURE) D -DOUBLE WALL H -SHAFT WALL L -(2) 5/8" GWB BOTH SIDES M -8" MINERAL FIBER INSULATION N -ABUSE RESISTANT GYPSUM BOARD, WAREHOUSE SIDE ONLY O -ONE FACE ONLY P -PARTIAL HEIGHT PARTITION T -WATER RESISTANT BACKING FOR FINISHES, SEE FINISH PLAN X -STUDS ONLY, NO SHEATING Y -PLYWOOD SHEATHING ONLY Z -18 GA STUD -(2" FLANGE AT 3 5/8" STUD), (1 5/8" FLANGE AT 6" STUD) *-DESIGNATION NOT INDICATED FOR NON-RATED PARTITIONS **-DESIGNATION NOT INDICATED FOR PROJECT STANDARD THICKNESS *** -DESIGNATION NOT INDICATED IF OPTIONS ARE NOT APPLICABLE NOTE: AT STUD PARTITIONS THAT EXTEND ONLY TO 6" PAST CEILING (OPTION "C"). PROVIDE DIAGONAL BRACING FROM TOP OF TRACK BACK TO STRUCTURE. MAXIMUM SPACING BETWEEN BRACES NOT TO EXCEED 4'-0". L -LOW TEMP METAL PANEL P -PRECAST CONCRETE PANEL 12" F -HAT CHANNEL 4 -4 HR 1. CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS PRIOR TO START OF WORK. 2. REFER TO DRAWINGS BY OTHER DISCIPLINES FOR ADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.. 3. REFER TO FF&E PLANS FOR EQUIPMENT SCHEDULE. 4. PROVIDE CONTINUOUS INSULATION THROUGHOUT EXTERIOR ENVELOPE OF NEW ADDITION AND AT ROOF AND ALL OPENINGS AT EXISTING BUILDING. 5. PROVIDE CONTINUOUS EXPANSION JOINTS ALONG INDICATED AREAS. 6. DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF STOREFRONT FRAMING, OR FACE OF EXISTING WALL TO REMAIN. NOTIFY ARCHITECT OF ANY DISCREPANCIES OR REQUEST CLARIFICATION WHERE DIMENSIONS ARE UNCLEAR PRIOR TO PROCEEDING WITH WORK. ARCHITECTURAL FLOOR PLAN NOTES N A B C D 1 E F 2 3 4 5 6 7 KEY PLAN REVISIONS FILE LOG ACTIVITY Draw Design Manager Check STAMP Project No. BY Copyright © 2020 LEO A DALY Company A B 8/18/2021 7:38:30 PMBIM 360://023-10262-001_City_of_Lake_Elmo/ CLE-CityofLakeElmo.rvt3880 Laverne Avenue North Lake Elmo, Minnesota 55042 FLOOR PLANS LEVEL 1 AREAS A & B AE101 Lake Elmo City Center 023-10262-001 08/18/2021 PERMIT SET HOISINGTON KOEGLER GROUP INC. MEYER | BORGMAN | JOHNSON FINEPOINT TECHNOLOGY LANDSCAPE ARCHITECTURE STRUCTURAL DESIGN + ENGINEERING TELECOMMUNICATIONS ENGINEERING 123 North Third Street Suite 100, Minneapolis, MN 55401 T: 612-338-0800 510 Marquette Avenue South Suite 900, Minneapolis, MN 55402 T: 612-338-0713 12209 Wood Lake Dr, Burnsville, MN 55337 T: 612-254-7462 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402-2455 Tel 612.338.8741 Fax 612.338.4840 PERMIT SETKEYNOTE LEGEND AE26 PRECAST PANEL CORNER JOINT - SHIPLAP MITER QUIRK CORNER AF1 METAL BOLLARD, PAINT; TYP. SEE DETAIL AF2 STAINLESS STEEL COUNTERTOP. AF3 TURNOUT GEAR LOCKERS, BY OWNER. AF5 MULTI-BUTTON OVERHEAD DOOR OPERATOR - SEE ELECTRICAL. AF6 MULTI-BUTTON, MULTI-DOOR OPERATORS FOR ALL OVERHEAD DOORS IN APPARATUS BAY 143 GANGED TOGETHER AT THIS LOCATION - SEE ELECTRICAL. AF7 SCBA FILL STATION - SEE MECHANICAL. AF8 OVERHEAD DOOR TRACK ABOVE, TYP. AF34 UTILITY DROP AF35 ADD NORTH ELEVATION AF36 NEED ADDITIONAL ELEVATIONS OF ENTIRE ROOM AF37 ADD ELEVATION OF CASEWORK SCALE:1/8" = 1'-0"A5 FLOOR PLAN LEVEL 1 AREA A SCALE:1/8" = 1'-0"A1 FLOOR PLAN LEVEL 1 AREA B NO. DESCRIPTION DATE Michelle Watanabe 8/18/2021 50554 DN RESTROOM 216 RESTROOM 217 OFFICE 209 STORAGE 212 CONFERENCE 205 OFFICE 206 OFFICE 207 OFFICE 208 FITNESS 211 BATHROOM 214 DORM 227 DORM 229 LOCKERS 213 DUTY ROOM KITCHEN AND DINING 223DORM 228 DORM 226 DORM 230 LAUNDRY225DAY ROOM 224 AE441 C4 OPEN OFFICE 204 STAIR ST-2 CONFERENCE 210 ROOF A1 AE302 D4 AE301 OPEN TO BELOW BREAK ROOM 203AE444 LOBBY MEZZANINE 201 A1 AE301 B1 AE302 D1 AE301 AE801 E1 ELEVATOR EL-1 STAIR ST-1 BATHROOM 220 HALLWAY222CORRIDOR 215 205B221A211213232204B207 208 209 206 227 226 228 231 224 210 229 230 204A 203 221B 212 W1 W1 W1S W8 MATCH LINE SEE AE102 MATCH LINE SEE AE102 2 3 4 5 6 7 8 9 10 H H J J K K L L H.7 J.9 M 8.B 8.A J.A J.B AE444 C1 W10 W10 W10 W9 CUSTODIAL 232 AE401 B5 AE401 B2 W1 225C 225B 225A S4A S4A S4A S4A S4AS4A S4A S4A S4ADZ S4A S4A S4A S4A S4A S6A S4AS4A S4A S4A S4A S4A S4AS4AS4A S4A S4A S4A S8A S4A S4A S4A S4A S4A S4A S4A S4A S4A A1 AE513 SIM A5 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1A W1 W1 W1 W1 W1 W1 D4 FINANCE STORAGE 237 D5 24'-11 1/2"16'-0 1/4"19'-4 1/4"14'-4"16'-0 1/4"24'-11 1/2"38'-0"44'-0"8'-1" 29'-9 1/4"12'-8"29'-9 1/4"237S4ACO S4ACO S4A S4A C3 AE507 AE444 C2 D5 AE507 AE501 A4 AE501 B6 SIM AE802 E4 23'-0 1/2"12'-6 1/8"7'-11 1/4"28'-8 5/8"ALIGNALIGNSERVICE COUNTER 202 LK-1 LK-1 LK-1 LK-1 LK-1LK-1LK-1LK-1 LK-1LK-1LK-1LK-1LK-1 LK-1LK-1LK-1LK-1LK-1LK-1 EQ5'-0"EQA1 A3 7'-4 3/4" A7 AE801 ALIGN18'-10 3/4"7'-11 1/2"3'-6 5/8"8'-11 1/4"1'-4"13'-7 1/2"4'-4 1/4"10'-8"9'-4"9'-4"9'-4"8'-5 3/4"3'-0 3/4"6'-9 3/8"14'-5" CLEAR18" CLRHOLD10'-6 1/2" 10 3/4" 5'-7" 6'-1" 5'-9 3/4" 19'-3 1/2"24'-0 1/4" 16'-2 5/8"9'-4 3/4"5'-7 1/8"1'-8 3/4"10'-8"1'-11"24'-10"21'-0 3/16"15'-9 13/16"5'-8 3/4"18'-11 3/8"11'-11 1/4" 5'-7" 3'-1 1/2" 10 3/4" 20'-4 3/4" 1'-0 1/4" 10'-7 1/4" 5'-11" 12'-9 1/4" DORM 231 W14 W13 AE402 C1 17'-3 5/8"49'-8 3/8" 18" MIN CLR ALIGNALIGN ALIGN 205A W10 W9 AE402 A3 AE402A5 B6 B5 A6 SAN AE402 2 AE4021 205A ROOF D1 AE302 D4 AE302 E1 AE302 A1 AE302 B1 AE302 APPARATUS BAY 143 OH-1OH-1OH-1OH-1234233236W11 1 1 2 3 4 5 5 A B C D E F G H AE803 C3 AE803 E3 8'-2"18'-6"16'-2"38'-8 1/4"10'-4 7/8"12'-10 7/8"98'-0"20'-0"89'-10"8'-8 1/4"AF33 S4AOH-1OH-1OH-1AE443D1 AE442 C1 TRAINING TOWER ST-3 OPEN TO BELOW AE443 B1 W1 W1 W1 W1 W1 W1 19'-3"16'-9"17'-0"17'-0"17'-0"16'-3"38'-7"9'-8"AE442 E1 A3 F001 OH-1OH-1OH-1REALITY BASED TRAINING AREA 235 AIR COMPRESSORS 236 AE442 A1 AE443 C1 LK-1LK-1 STORAGE 234 STORAGE 233 MATCH LINE SEE AE102 238 DORM 231 E4 AE302 W15 TRAINING WINDOWS CONFINED SPACE TRAININGST-3CPARTITION TYPES LEGEND PARTITION TYPE SYMBOL PARTITION DESIGNATION 1S6O FIRE RATING *MATERIAL NOMINAL THICKNESS **OPTION(S) *** 1 -1 HR 2 -2 HR 3 -3 HR S -STUD M -CMU C -CONCRETE 4" 6" 8" SEE BELOW OPTIONS LIST A -ACOUSTICAL INSULATION B -BOTH FACES C -PARTITION EXTENDS 6" PAST CEILING, (PROVIDE BRACING TO STRUCTURE) D -DOUBLE WALL H -SHAFT WALL L -(2) 5/8" GWB BOTH SIDES M -8" MINERAL FIBER INSULATION N -ABUSE RESISTANT GYPSUM BOARD, WAREHOUSE SIDE ONLY O -ONE FACE ONLY P -PARTIAL HEIGHT PARTITION T -WATER RESISTANT BACKING FOR FINISHES, SEE FINISH PLAN X -STUDS ONLY, NO SHEATING Y -PLYWOOD SHEATHING ONLY Z -18 GA STUD -(2" FLANGE AT 3 5/8" STUD), (1 5/8" FLANGE AT 6" STUD) *-DESIGNATION NOT INDICATED FOR NON-RATED PARTITIONS **-DESIGNATION NOT INDICATED FOR PROJECT STANDARD THICKNESS *** -DESIGNATION NOT INDICATED IF OPTIONS ARE NOT APPLICABLE NOTE: AT STUD PARTITIONS THAT EXTEND ONLY TO 6" PAST CEILING (OPTION "C"). PROVIDE DIAGONAL BRACING FROM TOP OF TRACK BACK TO STRUCTURE. MAXIMUM SPACING BETWEEN BRACES NOT TO EXCEED 4'-0". L -LOW TEMP METAL PANEL P -PRECAST CONCRETE PANEL 12" F -HAT CHANNEL 4 -4 HR 1. CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS PRIOR TO START OF WORK. 2. REFER TO DRAWINGS BY OTHER DISCIPLINES FOR ADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.. 3. REFER TO FF&E PLANS FOR EQUIPMENT SCHEDULE. 4. PROVIDE CONTINUOUS INSULATION THROUGHOUT EXTERIOR ENVELOPE OF NEW ADDITION AND AT ROOF AND ALL OPENINGS AT EXISTING BUILDING. 5. PROVIDE CONTINUOUS EXPANSION JOINTS ALONG INDICATED AREAS. 6. DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF STOREFRONT FRAMING, OR FACE OF EXISTING WALL TO REMAIN. NOTIFY ARCHITECT OF ANY DISCREPANCIES OR REQUEST CLARIFICATION WHERE DIMENSIONS ARE UNCLEAR PRIOR TO PROCEEDING WITH WORK. ARCHITECTURAL FLOOR PLAN NOTES N A B C D 1 E F 2 3 4 5 6 7 KEY PLAN REVISIONS FILE LOG ACTIVITY Draw Design Manager Check STAMP Project No. BY Copyright © 2020 LEO A DALY Company A B 8/18/2021 7:38:42 PMBIM 360://023-10262-001_City_of_Lake_Elmo/ CLE-CityofLakeElmo.rvt3880 Laverne Avenue North Lake Elmo, Minnesota 55042 FLOOR PLANS LEVEL 2 AREAS A & B AE102 Lake Elmo City Center 023-10262-001 08/18/2021 PERMIT SET HOISINGTON KOEGLER GROUP INC. MEYER | BORGMAN | JOHNSON FINEPOINT TECHNOLOGY LANDSCAPE ARCHITECTURE STRUCTURAL DESIGN + ENGINEERING TELECOMMUNICATIONS ENGINEERING 123 North Third Street Suite 100, Minneapolis, MN 55401 T: 612-338-0800 510 Marquette Avenue South Suite 900, Minneapolis, MN 55402 T: 612-338-0713 12209 Wood Lake Dr, Burnsville, MN 55337 T: 612-254-7462 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402-2455 Tel 612.338.8741 Fax 612.338.4840 PERMIT SETSCALE:1/8" = 1'-0"A5 FLOOR PLAN LEVEL 2 AREA A SCALE:1/8" = 1'-0"A1 FLOOR PLAN LEVEL 2 AREA B KEYNOTE LEGEND AF33 OPENING IN FLOOR SLAB FOR CONFINED SPACE TRAINING - SEE STRUCTURAL. NO. DESCRIPTION DATE Michelle Watanabe 8/18/2021 50554 LEVEL 1 100'-0" TOW ROOF 2 120'-3 1/2" D1 AE302 D4 AE302 E1 AE302 C1 AE301 A1 AE301 TOW ROOF 3 128'-3 1/2" ABCDEFGHJKLH.7J.9M AE10 AE12 AE04AE01 AE01 AE02 AE05 AE01 AE02 AE01 AE01AE02AE02 AR03AR03 TOW ROOF 5 127'-3 3/4" TOW ROOF 6 134'-10" EQEQEQEQ 12'-0"12'-0"12'-0" 3'-0"10'-0"12'-0" AE08 W7 W7 W2 W2 W3 143AOH-1OH-1OH-1OH-1ST-3DB2 AE502 TYP B1 AE503 SIM A1 AE503 SIM AE03 AE03 AE03E4 AE302 EQEQ EQEQ PJPJ PJ PJPJPJ PJ PJ PJ EQEQ EQEQ AE06 AE07 PJ PJPJ 12'-0"12'-0"12'-0"12'-0" PJPJPJ PJ PJ PJ PJ PJ PJ PJ 25'-9"7'-0"LEVEL 1 100'-0" D1 AE302 D4 AE302 E1 AE302 C1 AE301 A1 AE301 TOW ROOF 3 128'-3 1/2" TOW ROOF 4 114'-6" A B C D E F G H J K LH.7 J.9 M AE02 AE01AE22 AE01 AE13 AE14 AE09AE12 AR03AR03 AR03 TOW ROOF 5 127'-3 3/4" TOW ROOF 6 134'-10" 20'-4"15'-2" 8'-0" 12'-0"OH-1OH-1OH-1OH-1OH-1W1 W1 W1 W1 W1 W1 W1SW1SW1SW1SW1SW1S B1 AE503 SIM A1 AE503 SIM B2 AE502 TYP AR03 EQEQAE36 AE37 AE03 AE03 AE38 7'-0"2"AE01AE01AE01 9'-6" CLR MIN 9'-6" CLR MIN AE39 AE39 E4 AE302 AE20 AE17AE17 PJ PJ 12'-0"ALIGNPJPJ EQEQ PJ PJPJPJPJ EQEQ PJ EQEQ PJPJ PJ EXISTING BUILDING LEVEL 1 100'-0" TOW ROOF 2 120'-3 1/2" A1 AE302 D4 AE301 TOW ROOF 3 128'-3 1/2" B1 AE302 D1 AE301 1 2 3 4 5 6 7 8 9 10 EXISTING BUILDING AE09 AE19 AE05 AE21 AE02 AE01 AE14 AE01 AE02 AR03 AR03 AR03 TOW ROOF 5 127'-3 3/4" TOW ROOF 6 134'-10"104AW7 W7 W7 W1W1W1S W1S W1 W1W1 W1W1 W1W1 W1W1 W1W1 W1W1 W1SW1S W1 EQ EQ W7 1'-11"4'-2" ALIGN 120AAE29 12'-0"12'-0"12'-0" 8'-0 1/4"12'-0"12'-0"12'-0"9'-2"7'-5 5/8"14'-2"11'-9 3/4"1'-4" AE32 AE03 EQ EQ AR03 AE11 AE19 AE05 PJ PJPJPJPJPJPJ PJ PJ 3'-0"6'-0"3'-0"3'-0"6'-0"3'-0" W8 101B101AD5 AE507 AE01 AE02 AE20AE17 AE17ALIGNPJ EQ EQ PJ PJ PJ AE15AE15 PJ AE15 3'-6"AE24 LEVEL 1 100'-0" TOW ROOF 2 120'-3 1/2" A1 AE302 D4 AE301 TOW ROOF 3 128'-3 1/2" B1 AE302 D1 AE301 12345678910 AE09 AE01 AE02 AE16 AE01 AE02AR03AR03AR03 AR03 TOW ROOF 5 127'-3 3/4" TOW ROOF 6 134'-10"ALIGNALIGN12'-0"12'-0"12'-0"12'-0"12'-0"12'-0" 7'-6"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-6" 10'-6"12'-0" 12'-0" 3'-6"ALIGNAR03 ST-3B152W1 W1 W1AW1 W1AW1A W1 110A105AEQ EQ ALIGN EQ EQEQEQ EQ EQ ALIGN EQ EQ ALIGN2'-0" AE03 AE30 AE31 AE33 SF-7 AE34 AE34 AE34 AE34 AE34 AE34 AE34 AE32AE03 AE03 AE34 AE34 AE34 AE35 5'-9"3'-2 5/8"AE40 AE40 AE40 AE05 EXISTING BUILDING AE05152A B C D 1 E F 2 3 4 5 6 7 KEY PLAN REVISIONS FILE LOG ACTIVITY Draw Design Manager Check STAMP Project No. BY Copyright © 2020 LEO A DALY Company8/30/2021 9:08:12 PMBIM 360://023-10262-001_City_of_Lake_Elmo/ CLE-CityofLakeElmo.rvt3880 Laverne Avenue North Lake Elmo, Minnesota 55042 EXTERIOR ELEVATIONS AREAS A & B AE201 Lake Elmo City Center 023-10262-001 08/18/2021 PERMIT SET HOISINGTON KOEGLER GROUP INC. MEYER | BORGMAN | JOHNSON FINEPOINT TECHNOLOGY LANDSCAPE ARCHITECTURE STRUCTURAL DESIGN + ENGINEERING TELECOMMUNICATIONS ENGINEERING 123 North Third Street Suite 100, Minneapolis, MN 55401 T: 612-338-0800 510 Marquette Avenue South Suite 900, Minneapolis, MN 55402 T: 612-338-0713 12209 Wood Lake Dr, Burnsville, MN 55337 T: 612-254-7462 730 Second Avenue South, Suite 1300 Minneapolis, MN 55402-2455 Tel 612.338.8741 Fax 612.338.4840 PERMIT SETSCALE:1/8" = 1'-0"E1 CITY CENTER - NORTH ELEVATION SCALE:1/8" = 1'-0"B1 CITY CENTER - SOUTH ELEVATION SCALE:1/8" = 1'-0"D1 CITY CENTER - EAST ELEVATION SCALE:1/8" = 1'-0"A1 CITY CENTER - WEST ELEVATION KEYNOTE LEGEND AE01 SHEET METAL PARAPET CAP FLASHING AE02 PRECAST CONCRETE PANEL WITH FORMLINER AE03 ROOF ACCESS LADDER AE04 SIGN TYPE M, SEE SIGNAGE SCHEDULE AE05 EXTERIOR DOOR, PAINT AE06 TRAINING TOWER BALCONY AND RAILING, AE07 RAISED NUMBERS ON OVERHEAD DOOR, PAINT, TYPICAL AE08 TRAINING FDC AE09 ALUMINUM STOREFRONT WINDOWS TO REPLACE EXISTING WINDOWS AT EXISTING ROUGH OPENING, TYPICAL AT ALL FIXED WINDOWS IN EXISTING BUILDING AE10 ALIGN REVEALS IN FORMLINER AT PANEL JOINTS TO FORM CONTINUOUSLY PATTERNED REVEALS, TYP AT ALL PANEL JOINTS AE11 BLACK HPL CLADDING, TYPICAL AE12 TIMBER SURROUND AT EACH OPENING AE13 2 PIECE SHEET METAL PARAPET CAP FLASHING AE14 EXISTING WALL TO RECEIVE ELASTERMIC COATING AE15 ALIGN PANEL JOINT TO EDGE OF OPENING AE16 EXTERIOR HPL WALL PANELS TO REPLACE EXISTING METAL PANELS ABOVE AND BELOW EACH FIXED WINDOW AT EXISTING BUILDING AE17 WOOD FINS AE19 CARBON GREY HPL CLADDING, TYPICAL AE20 WOOD BENCH AE21 BLAST RESISTANT WINDOWS, TYPICAL AT COUNCIL CHAMBERS AE22 HOLLOW METAL ROOF ACCESS DOOR, PAINT AE24 12" HALO LIT DIMENSIONAL SIGN ON CONTINUOUS BASE PLATE, SECURED TO PRECAST PANEL BEHIND AE29 UTILITY DROP BOX AE30 ROOF EXHAUST VENT. SEE MECHANICAL AE31 EXTERIOR DOOR, PAINT TO MATCH PRECAST FINISH AE32 SAFETY RAILING AE33 CCTV CAMERA. SEE TECHNOLOGY AE34 LOUVER. SEE MECHANICAL AE35 RTU. SEE MECHANICAL AE36 FDC AE37 GAS METER AE38 METAL PANEL ENCLOSURE AT RECYCLING, FINISH: MATTE BLACK AE39 CUSTOM FABRICATED METAL GATE ASSEMBLY. GALVANIZED STEEL TUBE WITH METAL PANEL WRAP AE40 LIGHT FIXTURE. SEE ELECTRICAL AR03 OVERFLOW SCUPPER NO. DESCRIPTION DATE