HomeMy WebLinkAbout#02 - Conceptual Drinking Water Supply PlanDATE: October 12, 2021
REVIEW/DISCUSSION
AGENDA ITEM: Review of the Final Conceptual Drinking Water Supply Plan
SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator
BACKGROUND: The State of Minnesota, through its Co-Trustees, released the Final Conceptual Drinking Water Supply Plan (CDWSP) for providing safe, sustainable drinking water to the 14 communities in the East Metropolitan Area that are currently known to be affected by PFAS groundwater contamination. The Final Plan is dated August 2021 and was released to the public and workgroups in September. The complete plan can be found at 3msettlement.state.mn.us. The Final Plan identifies the long-term goals for Priority 1 of the Settlement Agreement as follows:
• Provide clean drinking water to residents and businesses to meet current and future needs under changing conditions, population, and health-based values (HBVs), health risk limits (HRLs), and health indices (HIs).
• Protect and improve groundwater quality.
• Protect and maintain groundwater quantity.
• Minimize long-term cost burdens for communities. The Final Plan allocates the $700 million in available funding to the following priorities:
• $317 million (45%) for capital infrastructure. Capital funding will be used to construct and install the drinking water supply infrastructure for public water systems and private wells. Capital infrastructure includes:
o Treatment facilities using granulated active carbon (GAC) and based on community 2040 demands. Ion exchange (IX) will be allowed if approved for use in MN and if cost is less than
or similar to GAC. o Distribution systems to deliver treated water.
o New connections to municipal water (includes related stormwater mgmt. costs).
o City connection fees.
o Point of entry treatment systems (POETS).
o Groundwater pretreatment, if determined to be cost effective (e.g. iron/manganese removal).
• $115 million (16%) for operation and maintenance funding (O&M) for the public water systems and private well treatment. o $87 million for public water systems. O&M for public water systems based on 20 years.
o $28 million for POETS. O&M for private well POETS based on 30 years.
o When settlement funds are depleted, Public and Private Wells with HI >/= 1.0 will receive continued funding through Consent Order[KH1]. Wells below HI=1.0 no longer State funded.
For Lake Elmo areas related to Washington County Landfill the hazardous substance program funding will continue.
o Breakdown presented in Section 9.3.
• $70 million (10%) for drinking water protection. Funding will be used to improve drinking water quality at the source. Does not replace 3M cleanup obligations in place through Consent Order.
• $183 million (26%) for contingencies. o To address new sampled wells; PFAS plume movement; Lower or new HBVs/HRLs. o To address cost overruns and increases for approved projects.
o The Co-Trustees will determine what costs are eligible for funding by the contingency fund allocation based on the Settlement-eligible costs in the Final Plan and consistency with the framework of the Settlement and the Final Plan.
o The contingency fund allocation may also be used to help PFAS-affected East Metropolitan Area communities fund the cost of providing an alternative source of water due to potential
restrictions on use of aquifers that affect White Bear Lake levels. If an alternative water source is needed, this contingency fund could be used to help connect to St. Paul Regional Water Services (SPRWS) (See Section 9.4 for further discussion).
• $15 million (2%) for State administration. Final Plan for each Community: In addition, the Final Plan identifies drinking water projects for all 14
communities affected by PFAS contamination. The projects include treatment for wells that meet or exceed a health index value of at least 0.5. This treatment threshold is lower than the value that triggers a health advisory for a well, providing resilience against future changes in contamination or changes in health
guidance values for PFAS. The attached exhibit provides an overview of the recommendations for each impacted community and the Plan’s key components. For Lake Elmo, the Plan summary includes the following recommendations:
• Supply drinking water from a combination of existing wells and new wells or an interconnect with
Woodbury. The Co-Trustees set aside sufficient capital funding for either an autonomous option
(two wells within Lake Elmo's borders that likely will need treatment) or an interconnect between
Woodbury and Lake Elmo, due to some uncertainty regarding their future water source.
• Connect 97 homes to the municipal water supply[KH2] in addition to the 290 properties approved
through the expedited projects.
• Supply other private wells with POETSs if over threshold.
Additional Final Plan details can be referenced in the following sections:
• Figure 8.3. Summarizes Final Plan for each Community.
• Section 9.2. Provides further details on the elements of each community.
• Section 10.3. Details the Funding Reallocation Strategy. o The Final Plan is not designed to allocate the exact amount listed for each community (Section 9.2). Rather, it is intended to fund the actual expenses for the projects.
o As communities develop detailed designs and solicit bids for construction, Settlement-eligible costs may be higher or lower than the estimates. The Co-Trustees developed a funding reallocation strategy to outline how such differences in actual expenses will be addressed
(Section 10.3). ISSUE BEFORE COUNCIL: The City Council is asked to review the findings and recommendations outlined in the Final CDWSP dated August 2021, and to provide direction to staff related to the plan and implementation. PROPOSAL DETAILS/ANALYSIS: The Final Plan Recommendations and plan details for the City of Lake Elmo is summarized as follows:
• Supply drinking water from a combination of existing wells and new wells, or an interconnect with Woodbury. Plan Capital costs based on the higher Woodbury Interconnect. o Due to court decisions about White Bear Lake water levels and ongoing work to implement the
court order, there is some uncertainty about Lake Elmo’s future water source. The Co-Trustees
will work with Lake Elmo to determine a reasonable solution within the constraints of the White Bear Lake decision. Thus, the Co-Trustees set aside sufficient capital funding for either an autonomous option (two wells within Lake Elmo’s borders that likely will need treatment) or an interconnect between Woodbury and Lake Elmo.
• Connect 97 homes to the municipal water supply. o Homestead 18 homes.
o Packard Park/Eden Park 62 homes (64 lots).
o 20th Street Circle. 4 homes. o Impacted individual Homes 11 homes (location unspecified).
• In addition, there has been $34.3 million previously funded for 12 expedited projects in Cottage Grove, Lake Elmo, Oakdale and Woodbury. Lake Elmo included $22,760,600 to serve 290 homes.
o Stonegate 1 and 2nd Additions 65 homes. o 31st Street-Stillwater Boulevard area 6 homes.
o 38th-39th Street neighborhood area 48 homes. o Hamlet on Sunfish Lake 41 homes. o Torre Pines 23 homes (24 lots).
o Parkview Estates-Cardinal View/Ridge 62 homes. o Whistling Valley 37 homes (44 lots).
• Supply other private wells with POETS if over HI >/= 0.5. o 7 existing POETS installed since the Settlement.
o 18 estimated new POETS.
• Final Plan 20-Year Cost Allocation to Lake Elmo o $31.845 Million Capital costs (assumes higher cost Woodbury Interconnect) o $ 0.426 Million per year O&M
o $40.23 Million Total 20-year cost allocation Co-trustee representatives will join the meeting remotely and provide a brief presentation about the plan.
ATTACHMENTS:
• Plan Summary and Key Components Exhibit.
• Plan Exhibits – Lake Elmo Options.
1312
Lakeland
Prairie Island Indian Community
Maplewood
Oakdale
Lake Elmo
West Lakeland Township
Lakeland Shores
Woodbury
Newport
SaintPaulPark
GreyCloudIsland Township
Denmark Township
1
5
8
1
2
9
1
1
4
4
6 3 1
7
Afton
Cottage Grove
The Plan is...
The Plan
Comprehensive
Considers all private and municipal well users in
all 14 communities
Safe and sustainable
Meets MDH health-based values for drinking
water by addressing drinking water coming out of
residents’ faucets, as well as the source of drinking
water
Resilient
Includes treatment for wells below the MDH
health-based values so the Plan can absorb
changes in those values or changing levels of
PFAS in drinking water sources in the future
Flexible
Provides flexible funding so
communities can adjust to
accommodate their implementation
preferences, along with time for each
community to implement projects
PFAS Health Index threshold at or above 0.5
Maplewood, West Lakeland Township, Afton,
Grey Cloud Island Township, Denmark Township
• Supply private wells with point of entry treatmentsystems (POETSs) - a whole home waterfiltration system - if over threshold
Cottage Grove
• Treat 8 of 12 existing public wells
• Replace 2 existing public wells with 1 newpublic well that will receive treatment
• Add 2 new water treatment plants
• Connect 156 homes
• Supply other private wells with POETSs ifover threshold
Lake Elmo
• Supply drinking water from a combination ofexisting wells and new wells or aninterconnect with Woodbury*
• Connect 97 homes
• Supply other private wells with POETSs ifover threshold
Lakeland, Lakeland Shores
• Connect 29 homes
• Supply other private wells with POETSsif over threshold
Newport
• One interconnect with Woodbury and onewith Cottage Grove
• Connect 3 homes
• Supply other private wells with POETSs ifover threshold
1
3
4
5
2
Oakdale
• Treat 2 of 9 existing public wells and expand 1water treatment plant
• Replace 3 existing public wells with 3 newpublic wells that will receive treatment
• Supply other private wells with POETSs ifover threshold
Prairie Island Indian Community
• Treat 1 existing public well
• Add 1 new water treatment plant
Saint Paul Park
• Treat 3 of 3 public wells
• Add 1 new water treatment plant
• Connect 6 homes
• Supply other private wells with POETSsif over threshold
Woodbury
• Treat 15 of 19 existing wells
• Replace 1 existing public well with 1 new public well
• Add 1 new water treatment plant
• Connect 5 homes
• Supply other private wells with POETSs ifover threshold
6
7
8
9
*The Co-Trustees set aside sucient capital funding foreither an autonomous option (two wells within Lake Elmo'sborders that likely will need treatment) or an interconnectbetween Woodbury and Lake Elmo, due to some uncertaintyregarding their future water source.
1514
It is a long-term solution:
Health Index (HI)
An HI of 1 or greater indicates one or more
PFAS are present in sufficient concentrations
to potentially have health effects. An HI of
1 or greater triggers a health advisory from
MDH. The understanding of PFAS and the
ability to detect it is continually evolving. As
a result, health-based values may change or
new compounds may be used to calculate the
HI, or the area of contaminated groundwater
may change in the future. The Plan provides
treatment for wells at or above 0.5 of the
current HI, which means more wells will receive
treatment. This helps the State be proactive and
build a degree of resiliency into communities’
drinking water systems to better cover future
potential changes.
The Plan’s key components
Neighborhood connections to municipal systems
In some areas the Plan calls for connecting
homes to municipal systems, which reduces their
risk of future PFAS contamination.
Groundwater protection
This includes money for drinking water
protection projects. The fund will be used to
reduce PFAS concentrations in groundwater,
which can help reduce future treatment needs
and costs, and will generally improve overall
water quality.
Contingency funds
The Plan sets aside contingency funds to address
a variety of factors, including treatment of
additional wells should they become impacted in
the future.
2040 population estimates
The Plan used 2040 water demand estimates to
ensure that infrastructure built today will serve
the East Metro in the future.
Granulated activated carbon (GAC)
The Plan includes using GAC treatment
(very large-scale filters for community water
treatment facilities and much smaller filters used
to treat water from private wells) to remove
PFAS. Communities may elect to use ion
exchange (IX) instead of GAC if it is approved
for use in Minnesota and it is less than or
similarly expensive as GAC.
SAFE AND RESILIENT
The Plan goes beyond treating those wells with a health advisory to build in
resiliency due to future unknowns. A health advisory is issued by MDH when a
well’s HI is above at least 1. An HI equal to or greater than 1 indicates possible
combined health effects.
WWKKKKKK[[KK!Ø[!Öl!Ö[K[b Oakdale b b!Ö bb b !Ö Ø !! Ø !ØWTPXW K K !ÖK b !ÖK bK b b bK b !Ö [BPS !Ö ELakelmo b b bb[BPS!Ö !Ö K b K WX!Ø!Ö!ØWX b [BPS!Ö This area is not a plume/contamination boundary,but is an area used for estimating potential futurecosts. It is not expected that each location withinthis area wi l become impacted, but contingencyfunding is set aside in the event that it exceedsthe treatment threshold. The particle tracking areasare only shown within the boundaries of the 14communities currently included in the Settlement.WeT!Ö [BPSK[BPS b !Ö
WWKKKKK[KK!Ø[lt!Ö!Ö[K[akdale b!Ö bb b !Ö Ø !! Ø !ØWTPXW K K !ÖK !ÖK bbK b !Ö [BPS !ÖWX ELakelmo b !Ø b b!Ø b !Ö !Ö K b K WX!Ø!Ö!ØWX b [BPSThis area is not a plume/contamination boundary,but is an area used for estimating potential futurecosts. It is not expected that each location withinthis area wi l become impacted, but contingencyfunding is set aside in the event that it exceedsthe treatment threshold. The particle tracking areasare only shown within the boundaries of the 14communities currently included in the Se tlement.West LaTown!Ö !Ö [BPSK[BPS b !Ö L
KlKr[K[KWKKKK!Ø[!Ö[This area is not aK but is an area usecosts. It is not expthis area wi l becoK funding is set asidthe treatment threare only shownwMaplewood Oakdale communities curb b!Ö b b b b "I "I "I C CC ! bÖ [!ÖBPSbK b [BPS !Ö ELakelmo b b K b b WTPW K K !ÖK b !ÖK !Ö b b b b !Ö !Ö WX!Ø !Ö!ØWX b [BPS!Ö [BPS