HomeMy WebLinkAbout#20 - Torre Pines Street and Utility Improvements STAFF REPORT
DATE: October 19, 2021
REGULAR
AGENDA ITEM: Approve Resolution Receiving Feasibility Report, Calling Hearing on
Improvement, Approving Plans and Specifications, and Ordering Advertisement
for Bids for the Torre Pines Street and Utility Improvements
SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council accept the Feasibility Report, call a Public Hearing, approve the Plans and Specifications, and Order the Advertisement for Bids for the Torre Pines Street and Utility Improvements, with the Improvement Hearing to be held at the December 7, 2021 council meeting? BACKGROUND: On July 6, 2021, the City Council authorized the preparation of a feasibility report and the preparation of plans and specifications for the Torre Pines Street and Utility Improvements. The project
area includes the Torre Pines subdivision, located east of Inwood Avenue (CSAH 13), with a single access to the neighborhood at the intersection of Inwood Avenue and 21st Street North. The neighborhood was developed as residential Rural Estate lots ranging in size from 2.5 to 5.4 acres. The residential properties
are served by private wells and individual on-site wastewater treatment systems. The neighborhood is located in a Special Well Construction Area (SWCA) as designated by the Minnesota Department of Health (MDH) after the discovery of PFAS groundwater contamination. Eleven (11) well advisories have been
issued. The public streets located in the subdivision, including 21st Street, 22nd Street, and 22nd Street Court have been identified in the street capital improvement plan (CIP) for improvement in 2022. In addition, the City of Lake Elmo was approved to receive grant funding from the Minnesota Pollution Control Agency (MPCA) under the 2018 3M Settlement Agreement as an expedited project to extend municipal water and connect each of the 23 properties. PROPOSAL DETAILS/ANALYSIS: A Feasibility Report has been prepared to address the extension of clean drinking water to 23 properties located in the Torre Pines subdivision by extending the municipal water system into the neighborhood prior to reconstructing the neighborhood streets as scheduled for
improvement in 2022 in the City’s capital improvement plan. The report serves to identify the necessary improvements, the estimated project costs, and to consider the assessment of a portion of the project costs to properties adjacent to and benefitting from the improvements.
The proposed project extends a 10-inch HDPE (nominal 8-inch) public watermain from Inwood Avenue into and throughout the Torres Pines neighborhood along 21st Street, 22nd Street, and 22nd Street Court. Watermain will be installed through directional drilling to minimize impacts to the streets and boulevards.
Individual water service stubs will be installed to the edge of right-of-way at each of the 23 residential properties. Following the watermain installation, street and drainage improvements will be completed including the excavation and replacement of the aggregate base to a depth of 6-inches, and pavement of a
new bituminous surface. The existing concrete curb and gutter was found to be in servable condition
therefore, only curb and gutter sections found to be cracked or damaged will be replaced. The project plans
include an alternate bid package for replacing all curb and gutter to determine if full replacement is more cost effective than spot replacement.
As part of the Grant Agreement with the MPCA, all households in the development, regardless of Health
Based Values (HBVs), are eligible to connect to municipal water and all households that connect to city water must have the private wells properly sealed and abandoned as part of the project and within the timeframe of the grant agreement. To implement these State requirements for the project the city intends to levy assessments for the public watermain, and the street and storm sewer improvements in accordance with the city’s Special Assessment Policy and current practices. Each property that connects to city water must abandon all private wells, unless exempted by the MPCA as a monitoring well, within one year after water service is made available and following written notice from the city to connect. Once the private improvements are completed, the public watermain, and street and storm sewer improvement assessments levied for this project will be fully or partially reduced based on the grant amount applied by the state.
In order to assess all or a portion of the improvements, the city has prepared a feasibility report as required by the statutory process for public improvements that are specially assessed. The feasibility report has been
completed and provides the scope of recommended improvements; estimated project costs; identifies easement and right-of-way, permits and other requirements needed to implement the improvements; recommends whether the improvements should be best made as proposed or in connection with some other
improvement; and advises that the improvements are necessary, cost effective, and feasible. The report also includes a preliminary assessment roll for each of the benefitting properties based upon the city’s Special Assessment Policy for Local Improvements.
The total estimated project cost is $2,243,000. This includes $875,000 for the public watermain improvements, $944,000 for the street and drainage improvements, and $424,000 for the private water service connections/well sealing improvements. The proposed public watermain assessment is $38,000 for
each of the 23 residential properties based on assessing 100% of the public watermain improvements on a per REC basis. The proposed street and storm sewer assessment is $12,300 for each of the 23 residential properties with direct access to the improved roadways. This unit assessment is based on assessing 30% of the street and storm sewer costs on a per unit basis. Assessments for street and drainage improvements will be levied over a 15-year period. Assessments for new watermain improvements will be levied over a 20-
year period. All assessments that are not waived and removed from the property will be charged an interest rate of 1% over the bond rate for the project.
In addition, the plans and specifications have been completed for the improvements and are ready to be
advertised for contractor bids. A bid date has been scheduled for December 15, 2021. Once received, bids may be held for up to 60 days providing the option to present Council with an award recommendation at a future council meeting up the first meeting in February.
FISCAL IMPACT: The total estimated project cost is $2,243,000. The improvements will be funded primarily through a grant from the MPCA under the 2018 3M Settlement Agreement, in the amount of
$2,219,000, and in accordance with the terms of the MPCA-Lake Elmo Grant Agreement dated April 2, 2021. Special assessments will be levied, and general city funds will be considered to cover costs incurred outside the grant agreement terms.
The city will contract for the public watermain, and street and storm sewer improvements located within the public right-of-way, make payment to the contractors and submit invoices for reimbursement through the MPCA Grant. The City intends to use fund reserves for the public improvements to pay the up-front project costs and to cover any city cost participation. Project invoices will be periodically submitted to the MPCA for grant reimbursement in accordance with the terms of the grant agreement. The private water service connection and well sealing work will be contracted separately by each individual property owner. Eligible private property costs will be paid from the MPCA Grant on a reimbursement basis through the city. This reimbursement applies to the contractor costs to install the water service line from the right-of-
way to the home connection, the costs to abandon the private well(s) on the property, and all permit fees
including a $3,000 Water Availability Charge (WAC), a $1,000 Water Connection Charge, a $1,040 Meter Fee, and a $60 Plumbing Permit Fee. If the property currently has a granular activated carbon (GAC) treatment system, the removal of the system from the home will also be reimbursed.
RECOMMENDATION: Staff is recommending that the City Council approve a Resolution, receiving the Feasibility Report, calling a public hearing, approving the plans and specifications, and ordering the
advertisement for bids for the Torre Pines Street and Utility Improvements. The recommended motion for this action is as follows:
“Move to approve Resolution No. 2021-116, receiving the Feasibility Report, Calling Hearing on Improvement, Approving the Plans and Specifications, and Ordering the Advertisement for Bids for
the Torre Pines Street and Utility Improvements.”
ATTACHMENTS: 1. Resolution Receiving a Feasibility Report, Calling for Hearing on Improvement, Approving
Plans and Specifications, and Ordering Advertisement for Bids. 2. Notice of Hearing on Improvement. 3. Preliminary Assessment Roll and Exhibit. 4. Location Map. 5. Proposed Improvements Exhibit. 6. Project Schedule.
Feasibility Report (available for review at City Hall). Project Plans and Specifications (available for review at City Hall).
CITY OF LAKE ELMO
WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2021-116 A RESOLUTION RECEIVING A FEASIBILITY REPORT, CALLING HEARING ON IMPROVEMENT, APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE TORRE PINES STREET AND UTILITY IMPROVEMENTS
WHEREAS, pursuant to City Council resolution, adopted on July 6, 2021, a feasibility report has
been prepared by FOCUS Engineering, Inc. for the Torre Pines Street and Utility Improvements; and WHEREAS, the feasibility report recommends that benefitting properties be assessed all or a
portion of the cost of the improvements pursuant to the City’s Special Assessment Policy and Minnesota Statutes, Chapter 429; and WHEREAS, the feasibility report provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvements as recommended; and a description of the methodology used to calculate individual assessments for affected parcels; and WHEREAS, pursuant to City Council resolution, adopted on July 6, 2021, the City Engineer, together with Bolton and Menk, Inc., has prepared plans and specifications for the Torre Pines Street and Utility Improvements and has presented such plans and specifications to the Council for approval.
NOW, THEREFORE, BE IT RESOLVED,
1. That the City Council will consider the improvements in accordance with the report and the assessments of the abutting properties for all or a portion of the cost of the improvements pursuant to Minnesota Statues, Chapter 429 at an estimated total project cost of $2,243,000.
2. A public hearing shall be held on such proposed improvements on the 7th day of December, 2021 in the council chambers of City Hall, at or approximately after 7:00 P.M. and the clerk shall give mailed and published notice of such hearing and improvement as required by law. 3. Such plans and specifications, a copy of which is on file at Lake Elmo City Hall, and made a part hereof, are hereby approved. 4. The City Clerk shall prepare and cause to be inserted in the official paper and posted online with Quest Construction Data Network (QuestCDN.com) an advertisement for bids upon the making of such improvements under such approved plans and specifications. The advertisement shall be
published for at least 21 days, shall specify the work to be done, and shall state that sealed bids provided by following required electronic bidding procedures outlined by QuestCDN prior to the specified bid date and time and accompanied by a bid bond or cashier’s check made payable to
the City of Lake Elmo in an amount not less than 5% of the amount of such bid will be considered.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE NINETEENTH DAY OF OCTOBER, 2021. CITY OF LAKE ELMO By: __________________________
Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk
CITY OF LAKE ELMO NOTICE OF HEARING ON IMPROVEMENT
TORRE PINES STREET AND UTILITY IMPROVEMENTS Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing on Tuesday, December 7, 2021, at or approximately after 7:00 PM to consider the
making of the following improvements, pursuant to Minnesota Statutes, Sections 429.011
to 429.111: The extension of municipal water into the Torre Pines subdivision to replace individual private wells along 21st Street North, 22nd Street North, and 22nd Street Court North to
provide clean drinking water to each of the 23 homes adjacent to the new watermain,
including a water service stub to the public right-of-way. Following the watermain installation, street and drainage improvements will be completed along the following public streets:
• 21st Street North, from Inwood Avenue North to 22nd Street Court North.
• 22nd Street North, from 21st Street North to 22nd Street Court North.
• 22nd Street Court North.
The area proposed to be assessed for the watermain improvements include each of the 23 properties located along 21st Street North, 22nd Street North, and 22nd Street Court North that will be receiving access to connect to city water; and the area proposed to be assessed for the street and storm sewer improvements include each of the 23 properties
that gain direct driveway access from the above referenced streets to be improved as part of this project. The estimated total cost for the project is $2,243,000; consisting of $875,000 for the public watermain improvements, $944,000 for the street and drainage improvements, and $424,000 for the private water service connections/well sealing improvements. A reasonable estimate of the impact of the assessment will be available at
the hearing. Such persons as desiring to be heard with reference to the proposed improvements will be heard at this meeting. DATED: October 19, 2021 BY ORDER OF THE LAKE ELMO CITY COUNCIL
Charles Cadenhead, Mayor
(Published in the Stillwater Gazette on October 22, 2021 and October 29, 2021)
CITY OF LAKE ELMO, MN.OCTOBER 2021TORRE PINES STREET AND UTILITY IMPROVEMENTSPRELIMINARY ASSESSMENT ROLLPAGE 1 of 1NO. NAMEPIDTOTAL ASSESSMENTSTREET & DRAINAGE ASSESSMENTWATERMAIN ASSESSMENT1KROSCHEL DAVID M & BRENDA K 8141 21ST ST N 8141 21ST ST NLAKE ELMO MN 55042 2102921330010 $50,300 $12,300 $38,0002 GOLDSTROHM AARON C & TRISTA L SCHAGAT 8171 21ST ST N 8171 21ST ST NLAKE ELMO MN 55042 2102921330011 $50,300 $12,300 $38,0003BEST WALTER G & LAN N 8180 21ST ST N 8180 21ST ST NLAKE ELMO MN 55042 2102921330014 $50,300 $12,300 $38,0004LIEBENOW DAVID W & BEVERLY A 8219 21ST ST N 8219 21ST ST NLAKE ELMO MN 55042 2102921330012 $50,300 $12,300 $38,0005BOURNE MICHAEL R & KATHERINE M 8260 21ST ST N 8260 21ST ST NLAKE ELMO MN 55042 2102921340008 $50,300 $12,300 $38,0006LISA LARAE SETTERSTROM TRS 8271 21ST ST N 8271 21ST ST NLAKE ELMO MN 55042 2102921340011 $50,300 $12,300 $38,0007SELBY MEGAN A 8311 21ST ST N 8311 21ST ST NLAKE ELMO MN 55042 2102921340012 $50,300 $12,300 $38,0008YOCUM RUTH A 8330 21ST ST N 8330 21ST ST NLAKE ELMO MN 55042 2102921340009 $50,300 $12,300 $38,0009 SEVENICH JOHN & BETH 8381 21ST ST N 8381 21ST ST NLAKE ELMO MN 55042 2102921340014 $50,300 $12,300 $38,00010 KATARE RAJESH & SHILPA SHUKLA 8125 22ND ST N 8125 22ND ST NLAKE ELMO MN 55042 2102921330013 $50,300 $12,300 $38,00011 MATTHEW D MOORE TRS & JANE B MOORE TRS 8134 22ND ST N 8134 22ND ST NLAKE ELMO MN 55042 2102921330004 $50,300 $12,300 $38,00012 GARDENHIRE RONALD C & CAROL J 8206 22ND ST N 8206 22ND ST NLAKE ELMO MN 55042 2102921330003 $50,300 $12,300 $38,00013 MCGEE FAMILY REV TRS 8263 22ND ST N 8263 22ND ST NLAKE ELMO MN 55042 2102921340007 $50,300 $12,300 $38,00014 COHEN ANNE N & DWAYNE L 8276 22ND ST N 8276 22ND ST NLAKE ELMO MN 55042 2102921340005 $50,300 $12,300 $38,00015 LARSON MICHAEL P & MELISSA D 8335 22ND ST N 8335 22ND ST NLAKE ELMO MN 55042 2102921340006 $50,300 $12,300 $38,00016 SCHARA JODELL L 8340 22ND ST N 8340 22ND ST NLAKE ELMO MN 55042 2102921340004 $50,300 $12,300 $38,00017 MALMBERG JOHN A & JUDITH A 8382 22ND ST N 8382 22ND ST NLAKE ELMO MN 55042 2102921340003 $50,300 $12,300 $38,00018 EMILY M BLISS IRREV TRS 8414 22ND ST N 11514 PLANDOME DR SE HOBE SOUND FL 33455 2102921340002 $50,300 $12,300 $38,00019 CASWELL JEFFREY K & VICTORIA 8006 22ND CT N 8006 22ND CT NLAKE ELMO MN 55042 2102921330008 $50,300 $12,300 $38,00020 PETERSON BRUCE A & NORMA JEAN 8028 22ND CT N 8028 22ND CT NLAKE ELMO MN 55042 2102921330007 $50,300 $12,300 $38,00021 KORY L & MAUREEN C NEISES LIV TRS 8042 22ND CT N 8042 22ND CT NLAKE ELMO MN 55042 2102921330006 $50,300 $12,300 $38,00022 FLEMING BERNHARD M & JEANNE 8047 22ND CT N 8047 22ND CT NLAKE ELMO MN 55042 2102921330009 $50,300 $12,300 $38,00023 ODOM LISA M & ANTHONY L WINCZEWSKI JR 8074 22ND CT N 8074 22ND CT NLAKE ELMO MN 55042 2102921330005 $50,300 $12,300 $38,000TOTALS $1,156,900 $282,900 $874,000ADDRESS MAILING ADDRESS
Feet0200400TORRE PINES STREET AND UTILITYIMPROVEMENTSPROJECT NO. 2020.122TORRE PINES STREET AND UTILITYIMPROVEMENTSOCTOBER, 2021FIGURE NO. 3ASSESSABLE PROPERTIES8414LEGENDASSESSABLE PROPERTY - STREET AND WATERMAIN IMPROVEMENTS8382834082768206813480748042802880068047814181718219827183118381812582638335833082608180
10th
5th Keats$YHLake Elmo50th
15th Inwood34th
20th
27th
53rd
Jane
Lake Jane
Jamaca47th
7th
31st
51st
43rd
39th
45th
38th
ManningStillwater
24th
26th
42nd
Island9th
30th
32ndKimbro
21st
e6t
hIvoryIsleOlson
Lak
e
8th
Julep
12th
Jewel
44th
56th
Iris22nd
37th
36th
35th LaverneJuniperAnnikaJasmineJamley LegionLilyKlondike16th
Upper 33Rd
Imperial3rdKirkwood 33rd
Deer Pond
IrvingHidden Bay4thJerome
14th
June28th VillageTapestryJasper
Eagle Poi
n
t
Jonquil
Wildflower
LaytonPrivateKelvinIronwoodJaneroLe
ew
a
r
d
Cimarron10th Street/DQHKin
d
r
e
d
JamesIrishPrairi
e
v
i
e
wJack Pine49th
JayLower 31stIrvin LilacMonarchLower 8th LisbonBirch Bark40thLavender
KraftLampertBlazingstarWhistling Valle
y
5RDG
JuncoLittle Bluestem
11thLady Slipper5
t
h
S
t
r
e
e
t
Windbreak
Sunfish Lake Park InboundIvywoodInnsdale3rd Street MarLang
ly
JunoLa
n
s
i
n
g
JulianneUpper 30th
6t
h
S
t
r
e
e
t
Lisbon AvenueIrwinSunflower
41st
WB I
9
4
To
I
Upper
7
t
h
Queen
Upper 9th 57th SUpper 42Nd
27t
h
S
t
r
e
e
t
15th St
r
e
e
t
Cherryw
o
o
d
44th Street
41st Stree
t
Ja
sm
i
n
e
A
v
e
n
u
e HummingbirdJer
o
m
e
A
v
e
n
u
e
4
Hill Trail
30th Street33rd Street24
t
h
S
t
r
e
e
t
20th StreetLegion Lane
Lar
k
s
p
u
r
Demontreville T
r
a
i
l
Hummingbord21st
Laverne32nd
Irish35th
34th LilyLilac
55th
Jamaca
35th
Laverne56th
Lake ElmLanglyLaytonLilac33rd Lily10th StreetMa
n
n
i
ng
6th StreetIsle21st
9th
36th
Kirkwoo
d
Lin
d
e
n
Whistl ing Valley 7UDLO Manning
50th
5th
33rd
6th StreetInnsdale
Ir
onw
ood
Linden
LindenPrivate
Julep28th VillageLilac
IvyInnsdaleLower 8th
31st
Lisbon
9th
39thKeats55th
IsleJulepIrvinManning32nd
Laverne37thManningLegion9th
Ivy
34th
LaytonLindenJade5th
36th
39t
h
DOWNSLAKE
LAKE ELMOREGIONALPARK RESERVE
LAKE ELMO
LAKE JANE
SUNFISH LAKE
OLSONLAKE
LAKE DEMONTREVILLE
CLEARLAKE
HORSESHOELAKE
ROSELAKE
REIDPARK
VFWPARK
LIONS PARK
TANA RIDGEPARK
STONEGATE
PARK
KRAMERLAKE
GOOSELAKEARMSTRONGLAKE
RIDGEPARK
KEATS AVE NEAGLE POINTLAKE
TABLYNPARK
HEIGHTSPARK
LAKE JANEHILLS PARK
PEBBLEPARK
f
le
KLEISPARK
SUNFISH LAKEPARK
HOMESTEDPARK
HERITAGEPARK
VERONICAPOND
GOETSCHEL'SPOND
TablynPark
Eagle Point
Creek Estates
Lake Elmo
Heights
Torre Pines
Farms of
Lake Elmo
Parkview Estates
Wildflowers
Shores
Huppert
Add
Beaut
Crest Estates
Friedrich
Hghts
Kenridge Add
Prairie Ridge
Office Park
Eagle PointBusiness Park
Stonegate
Hammes Country
Vista
Whistling Valley
Midland
Meadows
David
Nelson Est
The
Homestead
Tartan
Meadows
The Forest
Schwartz-
Martinco Add
Packard
Park
EdenPark
Heritage
Farm
Lones
Pine A
Down
Lake
Myron
Ellman
Elmo
View
Cty Aud
Plat No. 8
Lake Elmo Park
Brookman Add
Sunfish Ponds
Hamlet OnSunfish Lake
Park
Meadows
Tapestry At
Charlottes' Grove
Berschen's
Shores
DawcinAcres
Lake
Jane
Highlands
Teal
Pass Est
Fox Fire
Estates
Meyer's
Pineridge
KrausesAdd
Springborn's
Green Acres
Arabian Hills
Lake Elmo Vista
MeadowsOf Lake Elmo
Jesse's
Hideaway
Arvold's
Acres Tamarack
Farm Est
Carriage
Station
Tana
RidgeJohn M Day
Farm Add
The Fields of
St. Croix
2nd Add
The Fieldsof St. Croix
Blue
At The
of St
Lane's Demontreville
Country Club
d
Olson
Lake Add
Oace Acres
Add
LakeJaneHills
Lake Jane
Manor No. 1
Three
Lakes
Farm Add
Bordners Garner
Farmettes
Royal Golf Club
Southwind
Hunters Crossing
Hammes
Estates
Savona
Boulder
Ponds
Inwood
Lakewood Crossing
2nd Addition
Easton Village
Wildflower
Cimarron
Legacy At Northstar
Village
Preserve
ST. CROIX SANCTUARY PARK
EDENPARK
PILOTPARK
HAMMES
PARK
GOOSE LAKEPARK
10th6WUHHW1
2038
8381
83118271 INWOOD AVENUE N (CSAH 13)22ND STREET N
21ST STREET N
22ND COURT N
82198171
8141
8047
8006
8028
8042 8074
8134 8206
8276 8340
8382
8414
8125
8180
8260
8263 8335
8330
21ST STREET N
l l l l l llllll
llllllllllllllll l l l l l l l l l l l l l l l l
l
l
lllllllllllllllllllllllllll l l l l l l lllllllllllllllllllllll>>>>>>>>>>>>>>>>
>>>>>>>>>>>>>>
>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>REPLACE RIP RAP
& PERFORM DITCH
GRADING
REPLACE RIP RAP &
PERFORM DITCH
GRADING
REPLACE RIP RAP
& PERFORM DITCH
GRADING
REPLACE RIP RAP
& PERFORM DITCH
GRADING
H:\LKELMN\0N1125010\CAD\C3D\FIGR-Proposed Utility Improvements.dwg 10/6/2021 11:52:52 AMR
Torre Pines Street and Utility Improvements
Lake Elmo, MN
Figure 1: Proposed Street & Utility Improvements
October 2021
LEGEND
PROPOSED 10" HDPE WATERMAIN (HDD)
PROPOSED WATER SERVICE
PROPOSED HYDRANT
PROPOSED GATE VALVE
EXISTING 16" HDPE WATERMAIN
REMOVE & REPLACE STORM STRUCTURE
REMOVE & REPLACE STORM SEWER
EXISTING STORM STRUCTURE
EXISTING STORM SEWER
REMOVE & REPLACE STREET WITH 30' B/B
B618 CONCRETE CURB & GUTTER
PER TYPICAL SECTION
R
FEETSCALE
0 80 160
HORZ.
l l l
l l l l l l
l l l
>>>>
>>>>ll
llll
llllll
PROJECT SCHEDULE
CITY OF LAKE ELMO
TORRES PINES STREET AND UTILITY IMPROVEMENTS
PROJECT NO. 2020.122
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
APRIL 6, 2021 Council Approves MPCA Grant Agreement.
JULY 6, 2021 Council orders preparation of Feasibility Report and Design Phase Services.
OCTOBER 19, 2021 Presentation of Feasibility Report. Council accepts Report and calls for
Improvement Hearing. Council approves Plans and Specifications and orders
Advertisement for Bids.
DECEMBER 7, 2021 Public Improvement Hearing. Council Orders the Improvement (4/5th Vote).
DECEMBER 15, 2021 Project Bid Date: Receive contractor bids.
DECEMBER 21, 2021 Council accepts Bids and awards Contract.
or JANUARY 4, 2022 (bids may be held for 60 days)
or JANUARY 18, 2022
MARCH, 2022 Conduct Pre‐Construction Meeting and issue Notice to Proceed.
OCTOBER 14, 2022 Substantial Completion.
NOVEMBER 25, 2022 Final Completion.
*Final Assessment Hearing Schedule TBD