HomeMy WebLinkAbout#14 - 2021 Mill & Overlay Pay Req 3DATE: November 16, 2021 CONSENT AGENDA ITEM: Accept Improvements and Approve Pay Request No. 3 (Final) for the 2021 Mill and Overlay Project SUBMITTED BY: Mike Rusenovich, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements and approve Pay Request No. 3 (Final) for the 2021 Mill and Overlay Project? BACKGROUND: Asphalt Surface Technologies was awarded a construction contract on March 3, 2021 to complete the 2021 Mill and Overlay Project. The contractor has completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: Asphalt Surface Technologies has submitted Partial Pay Request No. 3 (Final) in the amount of $22,558.27. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on November 16, 2021 and will extend through November 16, 2022. FISCAL IMPACT: The final total construction cost is $399,200.48. This is 16% over the original contract amount of $343,603.94. During construction, additional contract quantities were needed to address pedestrian ramps at locations where the trails intersected the street. In addition, additional full depth patching work was required to address failing pavement sections. The overall street maintenance work is projected to remain within the 2021 street maintenance budget. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements and approve Pay Request No. 3 (Final) for the 2021 Mill and Overlay Project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the 2021 Mill and Overlay Project and approve Pay Request No. 3 (Final) to Minnesota Paving and Materials in the amount of $22,558.27”. ATTACHMENTS: 1. Partial Pay Estimate No. 3 (Final). 2. Certificate of Completion. PARTIAL PAY ESTIMATE NO. 3 (FINAL) 2021 MILL AND OVERLAY PROJECT CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2021.110 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $23,000.00 $23,000.00 0.00 $0.00 1.00 $23,000.00 2 LS 1 $3,000.00 $3,000.00 0.00 $0.00 1.00 $3,000.00 3 LF 100 $3.50 $350.00 0.00 $0.00 0.00 $0.00 4 LF 306 $4.00 $1,224.00 0.00 $0.00 0.00 $0.00 5 SY 26390 $1.00 $26,390.00 0.00 $0.00 26,700.00 $26,700.00 6 SY 20 $10.00 $200.00 0.00 $0.00 26.00 $260.00 7 EA 1 $1,210.00 $1,210.00 0.00 $0.00 1.00 $1,210.00 8 EA 14 $154.00 $2,156.00 0.00 $0.00 14.00 $2,156.00 9 LF 359 $5.50 $1,974.50 0.00 $0.00 649.00 $3,569.50 10 TN 2480 $61.62 $152,817.60 0.00 $0.00 2,812.00 $173,275.44 11 GAL 1850 $2.75 $5,087.50 0.00 $0.00 2,150.00 $5,912.50 12 SY 20 $25.00 $500.00 0.00 $0.00 26.00 $650.00 13 LF 120 $12.10 $1,452.00 0.00 $0.00 100.00 $1,210.00 14 EA 2 $2,548.80 $5,097.60 0.00 $0.00 2.00 $5,097.60 15 EA 3 $550.00 $1,650.00 0.00 $0.00 3.00 $1,650.00 16 EA 3 $918.00 $2,754.00 0.00 $0.00 3.00 $2,754.00 17 EA 18 $696.60 $12,538.80 0.00 $0.00 18.00 $12,538.80 18 EA 3 $450.00 $1,350.00 0.00 $0.00 5.00 $2,250.00 19 EA 1 $500.00 $500.00 0.00 $0.00 1.00 $500.00 20 LF 359 $35.48 $12,737.32 0.00 $0.00 649.00 $23,026.52 21 EA 1 $2,106.00 $2,106.00 0.00 $0.00 1.00 $2,106.00 22 EA 1 $1,917.00 $1,917.00 0.00 $0.00 1.00 $1,917.00 23 CY 74 $115.00 $8,510.00 0.00 $0.00 74.00 $8,510.00 24 CY 20 $40.00 $800.00 0.00 $0.00 20.00 $800.00 25 SY 200 $5.00 $1,000.00 547.00 $2,735.00 547.00 $2,735.00 26 LF 10190 $0.25 $2,547.50 0.00 $0.00 6,532.00 $1,633.00 27 LF 240 $0.25 $60.00 0.00 $0.00 120.00 $30.00 28 EA 2 $82.50 $165.00 0.00 $0.00 2.00 $165.00 29 EA 2 $440.00 $880.00 0.00 $0.00 2.00 $880.00 30 EA 4 $1,089.00 $4,356.00 0.00 $0.00 0.00 $0.00 $278,330.82 $2,735.00 $307,536.36 1-1 SY 2650 $2.64 $6,996.00 0.00 $0.00 2,580.00 $6,811.20 1-2 CY 993 $19.36 $19,224.48 0.00 $0.00 993.00 $19,224.48 1-3 SF 100 $27.50 $2,750.00 0.00 $0.00 112.00 $3,080.00 1-4 SY 2650 $9.90 $26,235.00 0.00 $0.00 2,580.00 $25,542.00 $55,205.48 $0.00 $54,657.68 2-1 SY 440 $2.64 $1,161.60 0.00 $0.00 410.00 $1,082.40 2-2 CY 164 $19.36 $3,175.04 0.00 $0.00 164.00 $3,175.04 2-3 SF 50 $27.50 $1,375.00 0.00 $0.00 464.00 $12,760.00 2-4 SY 440 $9.90 $4,356.00 0.00 $0.00 410.00 $4,059.00 $10,067.64 $0.00 $21,076.44 TOTALS - BASE CONTRACT & ALTERNATES $343,603.94 $2,735.00 $383,270.48 CO1-1 SF 2,124 $3.10 $6,584.40 0.00 $0.00 2,124.00 $6,584.40 CO1-2 SF 2,124 $4.40 $9,345.60 0.00 $0.00 2,124.00 $9,345.60 $15,930.00 $0.00 $15,930.00 CO2-1 LS 1 $39,666.54 $39,666.54 0.00 $0.00 0.00 $0.00 $39,666.54 $0.00 $0.00 TOTALS - REVISED CONTRACT $399,200.48 $2,735.00 $399,200.48 CHANGE ORDER NO. 1 REMOVE AND PREP PATCH AREA BASE BID BITUMINOUS TRAIL SUBTOTAL - ALTERNATE NO. 1 ALTERNATE NO. 2 REMOVE AND DISPOSE OF EXIST. BITUMINOUS PAVEMENT COMMON EXCAVATION (CV) (P) CONCRETE PEDESTRIAN RAMP BITUMINOUS TRAIL SUBTOTAL - ALTERNATE NO. 2 PAVE 2" BITUMINOUS PATCH SUBTOTAL - CHANGE ORDER NO. 1 CHANGE ORDER NO. 2 COMPENSATING CHANGE ORDER SUBTOTAL - CHANGE ORDER NO. 2 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE BASE BID MOBILIZATION TYPE SP 9.5 BITUMINOUS WEARING COURSE (SPWEA330B) BITUMINOUS MATERIAL FOR TACK COAT 2360 BITUMINOUS WEAR COURSE, DRIVEWAYS TRAFFIC CONTROL BIOROLL DITCH CHECK SAWCUT PAVEMENT (ALL TYPES) MILL 1.5" OF EXIST. BITUMINOUS PAVEMENT REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT (DRIVEWAYS) REMOVE AND REPLACE CONCRETE FLUME CLEAN FLARED END SECTION / CONCRETE FLUME REMOVE & DISPOSE OF CONCRETE CURB (ALL TYPES) CLASS 5 AGGREGATE SHOULDER STABLIZATION (100% CRUSHED LIMESTONE) CUT DOWN EXISTING STORM SEWER STRUCTURE ADJUST CASTING REMOVE AND REPLACE CASTING REPAIR STORM STRUCTURE INTERIOR ADJUST VALVEBOX REMOVE AND REPLACE VALVE BOX TOP SECTION CONCRETE CURB AND GUTTER (ALL TYPES) REMOVE AND REPLACE FES TRASH GUARD 8" METAL FLARED END SECTION CLASS 3 RIP RAP W/GEOTEXTILE FABRIC ALTERNATE NO. 1 REMOVE AND DISPOSE OF EXIST. BITUMINOUS PAVEMENT COMMON EXCAVATION (CV) (P) CONCRETE PEDESTRIAN RAMP PAVEMENT MESSAGE (GROUND IN) - TURN ARROW REMOVE AND REPLACE PVC INDUCTION LOOP DETECTORS IMPORT AND PLACE TOPSOIL (LV) SEEDING, FERTILIZER, AND WOOD FIBER BLANKET 4" EPOXY YELLOW STRIPING (STYLE VARIES) 4" EPOXY WHITE STRIPING 24" EPOXY WHITE STRIPING - STOP BAR CITY OF LAKE ELMO, MN 2021 MILL AND OVERLAY PROJECT PROJECT NO. 2021.110 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: NOVEMBER 16, 2021 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: ASPHALT SURFACE TECHNOLOGIES CORPORATION PROJECT NAME: 2021 MILL AND OVERLAY PROJECT PROJECT NO.: 2021.110 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated March 11, 2021. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: NOVEMBER 16, 2021 Michael Rusenovich Reg. No. 58717 FOCUS Engineering, Inc. THE WARRANTY PERIOD BEGINS November 16, 2021 AND ENDS November 16, 2022