Loading...
HomeMy WebLinkAbout#25 - Tapestry Sanitary SewerDATE: November 16, 2021 PUBLIC HEARING AGENDA ITEM: Public Improvement Hearing: Resolution Ordering the Improvement for the Tapestry Sanitary Sewer Extension; Approve Sanitary Sewer Cleaning and Inspections Services; and Approve Geotechnical Services SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Sarah Sonsalla, City Attorney Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: The City Council is respectfully requested to open the Public Improvement Hearing for the Tapestry Sanitary Sewer Extension, and following the Hearing, consider adopting a Resolution Ordering the Improvement; Approving a Sanitary Sewer Cleaning and Inspections Services Contract; and Approving a Geotechnical Services Contract. BACKGROUND: Pursuant to Minnesota Statutes, Section 429.011 to 429.111, a Public Improvement Hearing was noticed for November 16, 2021, to consider making the improvements necessary to extend municipal sanitary sewer service to the Tapestry at Charlotte’s Grove subdivision, including the construction of a city owned lift station, gravity sewer pipe and forcemain. The project will connect to the HOA owned conveyance system serving 65 residents in the Tapestry at Charlottes Grove subdivision. The attached notice was published in the official newspaper and individual notifications were sent to each address that will be wholly or partially assessed for the improvements. A feasibility report was accepted by the City Council on October 19, 2021 in order to ready these improvements for 2022 construction. The feasibility report is needed to meet state statutory requirements if any portion of the project is to be assessed. The report identifies the necessary improvements, the estimated project costs, the assessment methodology and preliminary assessment amounts to be levied against benefitting properties. On July 6, 2021, the City Council authorized the preparation of a feasibility report and preliminary design services for the Tapestry Sanitary Sewer Extension project. The report was authorized in response to a petition received on June 1, 2020 from the Tapestry at Charlotte’s Grove subdivision requesting the connection to municipal sanitary sewer. There were 56 of the 65 property owners voting in favor of the petition and 2 property owners voting against the petition. The Tapestry subdivision is located outside of the Village Area Municipal Urban Service Area (MUSA) and is currently operating a private community wastewater conveyance and treatment system that serves 65 residential properties. Should the project be authorized to be constructed, the City will need to complete a Comprehensive Plan Amendment to revise the Municipal Urban Services Area. PROPOSAL DETAILS/ANALYSIS: The Tapestry Sanitary Sewer Extension project proposes to extend municipal sanitary sewer service to replace the private HOA owned community wastewater treatment system for the 65 residential properties. The scope of recommended improvements includes the installation of a city owned sanitary lift station, constructed near the existing community wastewater treatment facility, together with the construction of approximately 2,400 feet of 4-inch sanitary sewer forcemain. The forcemain would extend and connect to the existing 10-inch gravity sewer system located in the adjacent Hamlet on Sunfish Lake neighborhood. The forcemain would be routed generally through HOA Outlots using directional drilling to avoid or minimize construction impacts and disturbance to the public streets. The improvements to extend and connect the HOA system to city sanitary sewer is proposed to be completed during the 2022 construction season. The scope of this project is currently limited to the construction of the city owned lift station/forcemain improvements and would provide sewer service by receiving the discharges from the privately owned sanitary collection system. The report also recommends that before allowing the connection to the municipal sewer system, that the privately owned collection system be cleaned, televised and inspected to identify potential repairs that would be necessary to ensure that discharges are maintained within standard acceptable parameters. The report does not address the improvements or costs necessary for the city to assume ownership of the privately owned and maintained conveyance system. Furthermore, if the project proceeds to construction it will remove all future discharges to the existing community wastewater treatment system, however, the scope of this project does not include the work necessary to decommission this system. The HOA would need to pursue this work separately from the city project as required by the applicable permitting agencies. To assist with completing the engineering design, the City Engineer prepared and sent out a Request for Proposal (RFP) for Sanitary Sewer Cleaning and Inspections Services, and for Geotechnical Engineering Services. Quotes were obtained from 3 companies for the cleaning and televising of the sewer mains and portions of the sewer services, including American Environmental, Empire Pipe Services, and Hydrovac, with Hydrovac providing the lowest responsible quote in the amount of $23,526.01. Hyperion Consulting (Dave Klocker), together with public works will inspect and evaluate each sewer manhole for deficiencies and necessary repairs and sealing. In addition, Hyperion Consulting and FOCUS Engineering will review the televised sewer tapes to evaluate necessary repairs and corrections. In addition, Geotechnical Services proposals were requested from Braun Intertec, Inc. and American Engineering and Testing, Inc. (AET). AET provided the lowest cost proposal in the not to exceed amount of $10,500. Braun Intertec did not submit a proposal. FISCAL IMPACT: The estimated total cost for the sanitary sewer extension project is $1,682,500, including $1,089,400 for construction of the city sanitary infrastructure improvements, $260,000 for city connection fees, $123,500 in city oversize cost recovery fees, $161,525 in Met Council connection fees, and $48,000 for recommended sewer cleaning and televising costs. The Met Council fees ($161,525) would be required to be paid in full from the HOA prior to awarding a construction contract and the remaining costs and fees would be assessed against the benefitting properties. Sanitary sewer improvements are assessed at a rate of 100% of the total project costs for residential properties on a per Residential Equivalent Connection basis. The 65 residential properties are each considered “1” REC unit, therefore the preliminary assessment to each property is $23,400. Assessments for public sanitary sewer are levied over a 20-year period and charged an interest rate of 1% over the bond rate for the project. The preliminary assessment rolls detailing each property’s proposed assessment amount are included in the Council packet and can be found in the Appendix of the report. RECOMMENDATION: Staff is recommending that the City Council adopt a Resolution Ordering the Improvements and to continue with the Preparation of Plans and Specifications for the Tapestry Sanitary Sewer Extension as outlined in the Feasibility Report approved on October 19, 2021. The recommended motion for this action is as follows: “Move to adopt Resolution No. 2021-123 Ordering the Improvements and to continue with the Preparation of Plans and Specifications for the Tapestry Sanitary Sewer Extension as outlined in the Feasibility Report accepted on October 19, 2021.” Staff is also recommending that the City Council approve a Sanitary Sewer Cleaning and Inspections Services Contract, and approve a Geotechnical Services Contracts for the Tapestry Sanitary Sewer Extension project. The recommended motion for this action is as follows: “Move to approve Sanitary Sewer Cleaning and Inspection Services by Hydrovac, Inc. in the not to exceed amount of $23,526.01 and to approve a Geotechnical Services Contract to AET, Inc. in the not to exceed amount of $10,500.00.” ATTACHMENTS: 1. Resolution Ordering the Improvements and Continuing with the Preparation of Plans and Specifications. 2. Notice of Hearing on Improvement. 3. Preliminary Assessment Roll and Exhibit. 4. Location Map. 5. Proposed Improvement Exhibits. 6. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2021-123 A RESOLUTION ORDERING THE IMPROVEMENT FOR THE TAPESTRY SANITARY SEWER EXTENSION WHEREAS, pursuant to City Council authorization, adopted on July 6, 2021, a feasibility report has been prepared by FOCUS Engineering, Inc. for the Tapestry Sanitary Sewer Extension, and the City Engineer was designated as the engineer for making this improvement. The engineer, and his consultants, were directed to oversee the preparation of the Plans and Specifications for the making of such improvement.; and WHEREAS, pursuant to City Council authorization, adopted on October 19, 2021, the council ordered a hearing on improvement for the Tapestry Sanitary Sewer Extension; and WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon on the 16th day of November 2021, at which all persons desiring to be heard were given the opportunity to be heard thereon; and WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc., and dated October 2021 states that the project is necessary, cost-effective, and feasible. NOW, THEREFORE, BE IT RESOLVED, 1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the Feasibility Report dated October 2021. 2. Such improvement is hereby ordered as proposed in the council resolution adopted this 16th day of November, 2021. 3. The city council declares its official intent to reimburse itself for the costs of the improvement from the proceeds of tax-exempt bonds. 4. The city engineer, and his consultant’s, shall continue with the preparation of plans and specifications, as the designated engineer for making this improvement, to ready the improvement for construction in 2022 and 2023. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF NOVEMBER, 2021. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO NOTICE OF HEARING ON IMPROVEMENT TAPESTRY SANITARY SEWER EXTENSION Notice is hereby given that the City Council of Lake Elmo will conduct a public hearing on Tuesday, November 16, 2021, at or approximately after 7:00 PM to consider the making of the following improvements, pursuant to Minnesota Statutes, Sections 429.011 to 429.111: Extension of municipal sanitary sewer to the Tapestry at Charlottes Grove subdivision, including the construction of a city owned lift station and sanitary sewer conveyance system. The project will connect to the HOA owned conveyance system serving 65 residents in the Tapestry at Charlottes Grove subdivision. The area proposed to be assessed for these improvements include properties connected to the existing HOA conveyance and treatment system. The estimated total cost for the sanitary sewer extension improvements and connection fees is $1,682,500. A reasonable estimate of the impact of the assessment will be available at the hearing. Such persons as desiring to be heard with reference to the proposed improvements will be heard during this meeting. DATED: October 19, 2021 BY ORDER OF THE LAKE ELMO CITY COUNCIL Charles Cadenhead, Mayor (Published in the Stillwater Gazette on October 22, 2021 and October 29, 2021) CITY OF LAKE ELMO, MN. OCTOBER, 2021 TAPESTRY SANITARY SEWER EXTENSION PRELIMINARY ASSESSMENT ROLL PAGE 1 of 1 NO. NAME PID SANITARY  SEWER  ASSESSMENT 1 CARNEY CHAD M & KATIE L CARNEY 9906 TAPESTRY RD 9906 TAPESTRY RD LAKE ELMO MN 55042 1002921410013 $23,400 2 NIGHTINGALE MICHAEL & PAM S 9954 TAPESTRY RD 9954 TAPESTRY RD LAKE ELMO MN 55042 1002921410014 $23,400 3 METZGER GREGORY J & ANJA K 9986 TAPESTRY RD 9986 TAPESTRY RD LAKE ELMO MN 55042 1002921410015 $23,400 4 JESSE W & PAMELA M HARTLEY LIVING TRS 10010 TAPESTRY RD 10010 TAPESTRY RD LAKE ELMO MN 55042 1102921320006 $23,400 5 LESTER JOHN & LINDSAY FAHRNER TRS 10024 TAPESTRY RD 10024 TAPESTRY RD LAKE ELMO MN 55042 1102921320007 $23,400 6 ZIMICK CHRISTOPHER T & MEAGEN A ZIMICK 10042 TAPESTRY RD 10042 TAPESTRY RD LAKE ELMO MN 55042 1102921320008 $23,400 7 COX TRACI & NATHAN 10064 TAPESTRY RD 10064 TAPESTRY RD LAKE ELMO MN 55042 1102921320009 $23,400 8 SQUIRES JEREMY T & EDITE V 10080 TAPESTRY RD 10080 TAPESTRY RD LAKE ELMO MN 55042 1102921320010 $23,400 9 OSTEN DAVID W & CATHERINE H 9901 TAPESTRY GRV 9901 TAPESTRY GRV LAKE ELMO MN 55042 1002921410026 $23,400 10 HACKLEY ROBERT & SUZANNE LAJOIE 9915 TAPESTRY GRV 9915 TAPESTRY GRV LAKE ELMO MN 55042 1002921410025 $23,400 11 CARLSON NEAL J 9927 TAPESTRY GRV 9927 TAPESTRY GRV LAKE ELMO MN 55042 1002921410024 $23,400 12 HATHAWAY CHARLES D & KATHLEEN C BERNARD 9949 TAPESTRY GRV 9949 TAPESTRY GRV LAKE ELMO MN 55042 1002921410023 $23,400 13 WANAT MATT & ERIN 9971 TAPESTRY GRV 9971 TAPESTRY GRV LAKE ELMO MN 55042 1002921410022 $23,400 14 SMITHBERG JON & CHRISTINE 9997 TAPESTRY GRV 9997 TAPESTRY GRV LAKE ELMO MN 55042 1002921410021 $23,400 15 HOLMGREN LEAH M 10029 TAPESTRY GRV 10029 TAPESTRY GRV LAKE ELMO MN 55042 1102921320030 $23,400 16 BILOT DANIEL A 10114 TAPESTRY BND 10114 TAPESTRY BND LAKE ELMO MN 55042 1102921320023 $23,400 17 JOHNSON NICOLE & JOSHUA GILES 10118 TAPESTRY BND 10118 TAPESTRY BND LAKE ELMO MN 55042 1102921320024 $23,400 18 HAUGEN JONATHAN K & ALYSSA A 10138 TAPESTRY BND 10138 TAPESTRY BND LAKE ELMO MN 55042 1102921320025 $23,400 19 SULLIVAN PETER W & WENDY A 10150 TAPESTRY BND 10150 TAPESTRY BND LAKE ELMO MN 55042 1102921320026 $23,400 20 JOHNSON JEFFREY J & AMANDA S 10168 TAPESTRY BND 10168 TAPESTRY BND LAKE ELMO MN 55042 1102921320027 $23,400 21 RED DENIM FAMILY TRS 10220 TAPESTRY BND PO BOX 25066 WOODBURY MN 55125 1102921320028 $23,400 22 FOSTER SCOTT E & BONITA M 10278 TAPESTRY BND 10278 TAPESTRY BND LAKE ELMO MN 55042 1102921320011 $23,400 23 MARLENE E DYER & JEREMY J DYER TRS 10316 TAPESTRY BND 10316 TAPESTRY BND LAKE ELMO MN 55042 1102921320012 $23,400 24 FRY GREG & KRISTIN 10342 TAPESTRY BND 10342 TAPESTRY BND LAKE ELMO MN 55042 1102921320013 $23,400 25 SUZANNE SILLERS SCHWARTZ REV TRS 10356 TAPESTRY BND 10356 TAPESTRY BND LAKE ELMO MN 55042 1102921320014 $23,400 26 FISHBECK JAMIE & DOREEN 10368 TAPESTRY BND 10368 TAPESTRY BND LAKE ELMO MN 55042 1102921320015 $23,400 27 FORSBERG PAUL T & ALEXIS A 10380 TAPESTRY BND 10380 TAPESTRY BND LAKE ELMO MN 55042 1102921320016 $23,400 28 ARCO STEPHEN D & REBECCA L 10375 TAPESTRY BND 10375 TAPESTRY BND LAKE ELMO MN 55042 1102921320017 $23,400 29 WARLICK CHRISTOPHER A & ERICA D 10353 TAPESTRY BND 10375 TAPESTRY BND LAKE ELMO MN 55042 1102921320018 $23,400 30 COADY BRIAN J & NICOLE L 10325 TAPESTRY BND 10325 TAPESTRY BND LAKE ELMO MN 55042 1102921320019 $23,400 31 PETERMAN SCOTT D & KARI L 10289 TAPESTRY BND 10289 TAPESTRY BND LAKE ELMO MN 55042 1102921320020 $23,400 32 VANWYCHEN TRS 10263 TAPESTRY BND 10263 TAPESTRY BND LAKE ELMO MN 55042 1102921320021 $23,400 33 TRS AGR DONALD & MELINDA GUSTAFSON 10231 TAPESTRY BND 10231 TAPESTRY BND LAKE ELMO MN 55042 1102921320022 $23,400 34 SCOTT PAUL D & ANDREA K 10030 TAPESTRY RD 10030 TAPESTRY RD LAKE ELMO MN 55042 1102921320029 $23,400 35 PAUL C VAHLE LIVING TRS ETAL 9984 TAPESTRY RD 9984 TAPESTRY RD LAKE ELMO MN 55042 1002921410020 $23,400 36 MAGNUS SCOTT & TRACY 9958 TAPESTRY RD 9958 TAPESTRY RD LAKE ELMO MN 55042 1002921410019 $23,400 37 PIERSON WILLIAM R & MARGARET M 9936 TAPESTRY RD 9936 TAPESTRY RD LAKE ELMO MN 55042 1002921410018 $23,400 38 WHITEHEAD NICHOLAS R & MARIE E 9918 TAPESTRY RD 9918 TAPESTRY RD LAKE ELMO MN 55042 1002921410017 $23,400 39 FOOTE MARTIN J & HEATHER B 9902 TAPESTRY TRL 9902 TAPESTRY TRL LAKE ELMO MN 55042 1002921410016 $23,400 40 SCHAKEL ANDREW L & AMI L VOELTZ‐SCHAKEL 9905 TAPESTRY RD 9905 TAPESTRY RD LAKE ELMO MN 55042 1002921440014 $23,400 41 CHRISTIANSON JULIA L 9915 TAPESTRY RD 9915 TAPESTRY RD LAKE ELMO MN 55042 1002921440013 $23,400 42 BERES TIM M & DIANE M 9929 TAPESTRY RD 9929 TAPESTRY RD LAKE ELMO MN 55042 1002921440012 $23,400 43 DAHLIN BRIAN C & MARGARET C 9957 TAPESTRY RD 9957 TAPESTRY RD LAKE ELMO MN 55042 1002921440011 $23,400 44 PETERSON DAVID R & KATHARINE B H 9985 TAPESTRY RD 9985 TAPESTRY RD LAKE ELMO MN 55042 1002921440010 $23,400 45 EMILY MAZANEC LIV TRS 10011 TAPESTRY RD 10011 TAPESTRY RD LAKE ELMO MN 55042 1102921330024 $23,400 46 ABRAMS JAMES E & AMY A 10037 TAPESTRY RD 10037 TAPESTRY RD LAKE ELMO MN 55042 1102921330023 $23,400 47 BENNETT MICHAEL K & ALLISON M 10059 TAPESTRY RD 10059 TAPESTRY RD LAKE ELMO MN 55042 1102921330022 $23,400 48 LOZANO ALLISON L 10071 TAPESTRY RD 10071 TAPESTRY RD LAKE ELMO MN 55042 1102921330021 $23,400 49 HAYUNGS JESSICA L & MICHAEL 10095 TAPESTRY RD 10095 TAPESTRY RD LAKE ELMO MN 55042 1102921330004 $23,400 50 LIGTENBERG KEVIN L & CHARLINE C 10125 TAPESTRY RD 10125 TAPESTRY RD LAKE ELMO MN 55042 1102921330005 $23,400 51 FREDENBERG LIV TRS 10159 TAPESTRY RD 10159 TAPESTRY RD LAKE ELMO MN 55042 1102921330006 $23,400 52 ELIZABETH B GERMAINE TRS 10191 TAPESTRY RD 10191 TAPESTRY RD LAKE ELMO MN 55042 1102921330007 $23,400 53 STANG LAWRENCE J & KAREN 10225 TAPESTRY HL 10225 TAPESTRY HL LAKE ELMO MN 55042 1102921330008 $23,400 54 COX ERIC & ELIZABETH 10206 TAPESTRY HL 10206 TAPESTRY HL LAKE ELMO MN 55042 1102921330009 $23,400 55 REISTAD CHRISTOPHER A & CYNTHIA J S 10178 TAPESTRY HL 10178 TAPESTRY HL LAKE ELMO MN 55042 1102921330010 $23,400 56 LOEHR TRICIA A AND PATRICK M EVELAND 10144 TAPESTRY HL 10144 TAPESTRY HL LAKE ELMO MN 55042 1102921330011 $23,400 57 MEYER ERIK A & ANNE W 10100 TAPESTRY HL 10100 TAPESTRY HL LAKE ELMO MN 55042 1102921330012 $23,400 58 SKUBIC MARK A 10057 TAPESTRY HL 10057 TAPESTRY HL LAKE ELMO MN 55042 1102921330020 $23,400 59 PALMER DAVID J & MELISSA L 10069 TAPESTRY HL 10069 TAPESTRY HL LAKE ELMO MN 55042 1102921330019 $23,400 60 NYGARD MARNI & GREG 10073 TAPESTRY HL 10073 TAPESTRY HL LAKE ELMO MN 55042 1102921330018 $23,400 61 BENSON DAVID J & KRISTYN M BENSON 10079 TAPESTRY HL 10079 TAPESTRY HL LAKE ELMO MN 55042 1102921330017 $23,400 62 KENADY JEANNE & BRIAN 10085 TAPESTRY HL 10085 TAPESTRY HL LAKE ELMO MN 55042 1102921330016 $23,400 63 SANDS SEAN & KRISTA 10097 TAPESTRY HL 10097 TAPESTRY HL LAKE ELMO MN 55042 1102921330015 $23,400 64 BAILEY RONALD C & DONNA J 10115 TAPESTRY HL 10115 TAPESTRY HL LAKE ELMO MN 55042 1102921330014 $23,400 65 GRANDT MICHAEL ALAN & CARRIE ELAINE 10149 TAPESTRY HL 10149 TAPESTRY HL LAKE ELMO MN 55042 1102921330013 $23,400 TOTAL $1,521,000 ADDRESS MAILING ADDRESS Feet0300600TAPESTRY SANITARY SEWEREXTENSION IMPROVEMENTSPROJECT NO. 2020.119TAPESTRY SANITARY SEWER EXTENSIONIMPROVEMENTSOCTOBER, 2021FIGURE NO. 3ASSESSABLE PROPERTIESLEGENDASSESSABLE PROPERTY - SANITARY SEWER EXTENSION IMPROVEMENTS990699549986100101002410042100641008010114101181013810150101681022010278103161034210356103681038010375103531032510289102631023110029999799719949992799159901100309984995899369918990210149101151009710085100791007310069100571007110059100371001110100101441017810206100951012510159101911022599859957992999159905 10th 5th Keats$YHLake Elmo50th 15th Inwood34th 20th 27th 53rd Jane Lake Jane Jamaca47th 7th 31st 51st 43rd 39th 45th 38th ManningStillwater 24th 26th 42nd Island9th 30th 32ndKimbro 21st e6t hIvoryIsleOlson Lak e 8th Julep 12th Jewel 44th 56th Iris22nd 37th 36th 35th LaverneJuniperAnnikaJasmineJamley LegionLilyKlondike16th Upper 33Rd Imperial3rdKirkwood 33rd Deer Pond IrvingHidden Bay4thJerome 14th June28th VillageTapestryJasper Eagle Poi n t Jonquil Wildflower LaytonPrivateKelvinIronwoodJaneroLe ew a r d Cimarron10th Street/DQHKin d r e d JamesIrishPrairi e v i e wJack Pine49th JayLower 31stIrvin LilacMonarchLower 8th LisbonBirch Bark40thLavender KraftLampertBlazingstarWhistling Valle y 5RDG JuncoLittle Bluestem 11thLady Slipper5 t h S t r e e t Windbreak Sunfish Lake Park InboundIvywoodInnsdale3rd Street MarLang ly JunoLa n s i n g JulianneUpper 30th 6t h S t r e e t Lisbon AvenueIrwinSunflower 41st WB I 9 4 To I Upper 7 t h Queen Upper 9th 57th SUpper 42Nd 27t h S t r e e t 15th St r e e t Cherryw o o d 44th Street 41st Stree t Ja sm i n e A v e n u e HummingbirdJer o m e A v e n u e 4 Hill Trail 30th Street33rd Street24 t h S t r e e t 20th StreetLegion Lane Lar k s p u r Demontreville T r a i l Hummingbord21st Laverne32nd Irish35th 34th LilyLilac 55th Jamaca 35th Laverne56th Lake ElmLanglyLaytonLilac33rd Lily10th StreetMa n n i ng 6th StreetIsle21st 9th 36th Kirkwoo d Lin d e n Whistl ing Valley 7UDLO Manning 50th 5th 33rd 6th StreetInnsdale Ir onw ood Linden LindenPrivate Julep28th VillageLilac IvyInnsdaleLower 8th 31st Lisbon 9th 39thKeats55th IsleJulepIrvinManning32nd Laverne37thManningLegion9th Ivy 34th LaytonLindenJade5th 36th 39t h DOWNSLAKE LAKE ELMOREGIONALPARK RESERVE LAKE ELMO LAKE JANE SUNFISH LAKE OLSONLAKE LAKE DEMONTREVILLE CLEARLAKE HORSESHOELAKE ROSELAKE REIDPARK VFWPARK LIONS PARK TANA RIDGEPARK STONEGATE PARK KRAMERLAKE GOOSELAKEARMSTRONGLAKE RIDGEPARK KEATS AVE NEAGLE POINTLAKE TABLYNPARK HEIGHTSPARK LAKE JANEHILLS PARK PEBBLEPARK f le KLEISPARK SUNFISH LAKEPARK HOMESTEDPARK HERITAGEPARK VERONICAPOND GOETSCHEL'SPOND TablynPark Eagle Point Creek Estates Lake Elmo Heights Torre Pines Farms of Lake Elmo Parkview Estates Wildflowers Shores Huppert Add Beaut Crest Estates Friedrich Hghts Kenridge Add Prairie Ridge Office Park Eagle PointBusiness Park Stonegate Hammes Country Vista Whistling Valley Midland Meadows David Nelson Est The Homestead Tartan Meadows The Forest Schwartz- Martinco Add Packard Park EdenPark Heritage Farm Lones Pine A Down Lake Myron Ellman Elmo View Cty Aud Plat No. 8 Lake Elmo Park Brookman Add Sunfish Ponds Hamlet OnSunfish Lake Park Meadows Tapestry At Charlottes' Grove Berschen's Shores DawcinAcres Lake Jane Highlands Teal Pass Est Fox Fire Estates Meyer's Pineridge KrausesAdd Springborn's Green Acres Arabian Hills Lake Elmo Vista MeadowsOf Lake Elmo Jesse's Hideaway Arvold's Acres Tamarack Farm Est Carriage Station Tana RidgeJohn M Day Farm Add The Fields of St. Croix 2nd Add The Fieldsof St. Croix Blue At The of St Lane's Demontreville Country Club d Olson Lake Add Oace Acres Add LakeJaneHills Lake Jane Manor No. 1 Three Lakes Farm Add Bordners Garner Farmettes Royal Golf Club Southwind Hunters Crossing Hammes Estates Savona Boulder Ponds Inwood Lakewood Crossing 2nd Addition Easton Village Wildflower Cimarron Legacy At Northstar Village Preserve ST. CROIX SANCTUARY PARK EDENPARK PILOTPARK HAMMES PARK GOOSE LAKEPARK 10th6WUHHW1 >>l ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll l l l l l l l l ll ll ll ll ll ll l l l l l l l 012 345 6 7 8 9101112131415 16 17 18 19 20 21 22 23 24 25 26 Tapestry Grove Tapest r y B e n d Ta p e s t r y H i l l Kindred WayTapestry RoadEXISTING SANITARY SEWER LIFT STATION EXISTING SANITARY SEWER DRAIN FIELD CONNECT TO EXISTING SANITARY STUB (WEST OF EXISTING MANHOLE) PROPOSED 4" FORCEMAIN PROPOSED SANITARY SEWER LIFT STATION LOCATION AIR RELEASE MANHOLE EXISTING WASTEWATER TREATMENT SYSTEM APPROXIMATE BOUNDARY HAMLET ON SUNFISH LAKE FEETSCALE 0 100 200 R H:\LKELMN\0N1125011\CAD\C3D\FIGR- Site Location Plan.dwg 10/8/2021 9:29:06 AMR Tapestry Sanitary Sewer Extension Lake Elmo, MN Figure 1: Site Location Plan October 2021 TAPESTRY RO A D 12'30'>>>>>>>>> CONTROL PANEL BACKUP GENERATOR LIFT STATION WET WELL VALVE VAULT TRANSFORMER 8' R2 0 'R10'25' 10" GRAVITY SEWER 4" HDPE FORCEMAIN l l>l ll ll ll ll ll ll ll ll ll ll EXISTING SANITARY LIFT STATION EXISTING BITUMINOUS TRAIL PROPOSED BITUMINOUS TRAIL EXISTING WASTEWATER TREATMENT SYSTEM APPROXIMATE BOUNDARY FEETSCALE 02550 R H:\LKELMN\0N1125011\CAD\C3D\FIGR- Lift Station Location.dwg 10/8/2021 9:22:17 AMR Tapestry Sanitary Sewer Extension Lake Elmo, MN Figure 2: Lift Station Location October 2021 PROJECT SCHEDULE  CITY OF LAKE ELMO    TAPESTRY SANITARY SEWER EXTENSION IMPROVEMENTS  PROJECT NO. 2020.119  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                  JUNE 1, 2020  City received Petition for Public Sanitary Sewer.      JULY 6, 2021  Council orders preparation of Feasibility Report and Design Phase Services.      OCTOBER 19, 2021  Presentation  of  Feasibility  Report.  Council  accepts  Report  and  calls  for  Improvement Hearing.      NOVEMBER 16, 2021    Public Improvement Hearing. Council Orders the Improvement.      FEBRUARY 15, 2022  Council approves Plans and Specifications and orders Advertisement for Bids.      MARCH 16, 2022    Project Bid Date: Receive contractor bids.      APRIL 5, 2022       Council accepts Bids and awards Contract.      APRIL/MAY, 2022    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   OCTOBER 14, 2022    Substantial Completion.   NOVEMBER 25, 2022    Final Completion.      *Final Assessment Hearing Schedule TBD