HomeMy WebLinkAbout#26 - Washington County Draft CIP City CommentsDATE: November 16, 2021 REGULAR AGENDA ITEM: Approve City Comments on the Washington County DRAFT 2022-2026 Capital Improvement Plan (CIP) SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve the City comments to be submitted to Washington County regarding the County’s DRAFT 2022-2026 Capital Improvement Plan? BACKGROUND: On October 20th, City staff received notice from Washington County that the Draft 2022-2026 Capital Improvement Plan (CIP) was available for review and that comments must be received by November 19, 2021 for consideration when developing the final CIP. A public hearing will be held on November 30, 2021, prior to adopting the final document on December 14, 2021. As part of the annual budget process, Washington County prepares a five-year Capital Improvement Plan (CIP), which includes the county's tentative plans for roads, bridges, parks, land, trails, transit, and public facilities. The first year of this plan is included in the county's proposed 2022 budget. The “out-years” of 2023-2026 reflect projected needs and estimated costs, which may change based on future priorities and funding opportunities. Projects that were budgeted in 2021 (or prior to), and are not yet complete, are not reflected in the draft 2022-2026 CIP; funding for the completion of those projects has been set aside, and therefore aren’t reflected in future years’ CIP documents. A full copy of the draft CIP document is available online at the county website. The attached packet highlights the substantial transportation roadway related projects included within the City of Lake Elmo over the next five years. Parks and Public Facility projects are not included in this review. It should also be noted that the County completes intersection control projects and pavement preservation projects each year but the specific work related to these improvements is not identified within the CIP document. The County budgets $420,000 for one intersection control project each year, and has budgeted $35M over 5 years for various pavement maintenance and preservation projects. The transportation roadway projects identified on the County’s 2022-2026 CIP that are located in Lake Elmo are summarized below: • 2022: CSAH 13 Phase 2, from CSAH 14 to 44th Street. $6.2M Estimated City cost share has been negotiated to be $367,718 (signed Cooperative Cost Share Agreement). • 2022: CSAH 15 & TH 36 Landscaping. $300.000. Project description indicates local cost share of $75,000. • 2022-2025: CSAH 15, from CSAH 10 to CSAH 14. $2.5M. City cost share is unknown. The Project scope of the CSAH 15 (Manning Avenue) Phase 3 Improvements for a 4-lane divided highway has been scaled down to Traffic Management Projects with $1.25M becoming available for 2022 construction; $300,000 becoming available for 2023 construction; and $2.75M becoming available in 2025 for construction. The 2022 construction is for the traffic signal and intersection improvements at CSAH 15 and 30th Street North. The 2023 and 2025 projects are not determined. • 2025: CSAH 17 & TH 36 Intersection. $39.5M. City cost share will be significant but is unknown. The project will include a grade separated interchange and south frontage road improvements, will include Federal funding and approvals, and will be multi-jurisdictional, including Washington County, MnDOT, Grant and Lake Elmo. • 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. $950,000. City cost is unknown. This project borders both Lake Elmo and Oakdale and would include safety improvements, including widening for shoulders, pavement improvements, railroad crossing upgrades, turn lane improvements, drainage improvements and pedestrian upgrades. • 2025-2026: CSAH 19 and CSAH 10 Intersection. $1.1M. City cost share is unknown but should be limited as all four legs of the intersection are County owned roadways. Project is needed to address intersection delays and may result in the construction of a roundabout. PROPOSAL DETAILS/ANALYSIS: Staff has reviewed the County’s Draft 2022-2026 CIP and has the following comment for council consideration: • 2022: CSAH 15 & TH 36 Landscaping: City staff has previously indicated to Washington County that per City policy, the City does not generally participate in landscaping improvements or replacement along public right-of-way. Therefore, although the City supports landscaping improvements for the intersection area, the City will not provide cost participation in the proposed landscaping project to replace trees that have been removed by the project. • 2022-2025: CSAH 15, from CSAH 10 to CSAH 14: The CSAH 15 and 30th Street North intersection and traffic signal improvements should be planned for construction in 2022 to ready this intersection for the Easton Village access closure to CSAH 15 and as the Easton Village and Northport development build-outs are directed to this intersection. City staff has emphasized to Washington County that the project description should specifically identify the CSAH 15 and 30th Street North traffic signal and intersection improvements to be constructed in 2022. • 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection improvements is an important project for the City of Lake Elmo to address the safety improvements needed along the TH36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The City therefore supports the planning and construction of this project and emphasizes the need to maintain the proposed construction schedule and to maximize outside funding assistance in order to provide a financially viable project for the local communities. • 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with the sale and development of the City owned property along Ideal Avenue and Stillwater Boulevard, and the extension of sanitary sewer to this property, improvements to this segment of Ideal Avenue may be required. The City therefore supports, at a minimum, that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific intersection improvements that will be undertaken at the time of the development of the adjacent properties. • The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience continued traffic growth, and will likely require intersection and turn lane improvements along with some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14. The need for these improvements will increase quickly as the surrounding property develops. The City therefore supports, at a minimum, that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific improvements that will be undertaken at the time of the development of the adjacent properties. FISCAL IMPACT: No Fiscal Impacts at this time. However, County improvement projects completed within the City of Lake Elmo often contain a cost participation by the City. OPTIONS: 1) The City Council can approve the City comments to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan. 2) The City Council can approve the City comments, as amended, to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan. RECOMMENDATION: Staff is recommending that the City Council approve the City comments to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan. The recommended motion for the action is as follows: “Move to approve City comments to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan with comments to be submitted on or before November 19, 2021.” ATTACHMENTS: 1. Summary packet of the Washington County Draft 2022-2026 Capital Improvement Plan. 2. Draft City Comment Letter. 3. Project Location Map. 3880 Laverne Avenue North • Lake Elmo • Minnesota 55042 Phone: (651) 747-3900 • Fax: (651) 747-3901 • www.lakeelmo.org November 18, 2021 Mr. Wayne Sandberg via email: wayne.sandberg@co.washington.mn.us Deputy Director larry.phillips@co.washington.mn.us Washington County Public Works Department 11660 Myeron Road North Stillwater, MN 55082 Dear Mr. Sandberg: The City of Lake Elmo has reviewed the County’s Draft 2022-2026 Capital Improvement Plan (CIP). After reviewing these projects and in reviewing other potential transportation needs in Lake Elmo, we have the following comments: 1) 2022: CSAH 15 & TH 36 Landscaping: City staff has previously indicated to Washington County that per City policy, the City does not generally participate in landscaping improvements or replacement along public right-of-way. Therefore, although the City supports landscaping improvements for the intersection area, the City will not provide cost participation in the proposed landscaping project to replace trees that have been removed by the project. 2) 2022-2025: CSAH 15, from CSAH 10 to CSAH 14: The CSAH 15 and 30th Street North intersection and traffic signal improvements should be planned for construction in 2022 to ready this intersection for the Easton Village access closure to CSAH 15 and as the Easton Village and Northport development build-outs are directed to this intersection. City staff has emphasized to Washington County that the project description in the County CIP should specifically identify the CSAH 15 and 30th Street North traffic signal and intersection improvements to be constructed in 2022. 3) 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection improvements is an important project for the City of Lake Elmo to address the safety improvements needed along the TH36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The City therefore supports the planning and construction of this project and emphasizes the need to maintain the proposed construction schedule and to maximize outside funding assistance in order to provide a financially viable project for the local communities. 4) 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with the sale and development of the City owned property along Ideal Avenue and Stillwater Boulevard, and the extension of sanitary sewer to this property, improvements to this segment of Ideal Avenue may be required. The City therefore supports, at a minimum, that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific intersection improvements that will be undertaken at the time of the development of the adjacent properties. 5) The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience continued traffic growth, and will likely require intersection and turn lane improvements along with some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14. The need for these improvements will increase quickly as the surrounding property develops. The City therefore supports, at a minimum, that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific improvements that will be undertaken at the time of the development of the adjacent properties. Please feel free to contact me at 651.747.3905, or at KHandt@lakeelmo.org, with any questions you may have regarding Lake Elmo’s comments. Sincerely, Kristina Handt City Administrator cc: Marty Powers, Public Works Director Jack Griffin, City Engineer 36 10th 60th 5th HudsonKeats Lake Elmo50th 15th Inwood34th 20th 27th 53rd 55th Jane Lake Jane Jamaca57th 59th Hill 47th 7th 31st 51st 43rd 39th Demontreville45th 38th ManningStillwater 24th26th 42nd Island58th9th 30th 32ndKimbro 21st Jade6thIvoryHill t o p IsleOls o n L a k e 8thJulep 12th Jewel 44th 56th Iris22nd 37th 36th 35th LaverneJuniperAnnikaJasmineJamley LegionLily Klondike16th Upper 33Rd ImperialLinden3rdKirkwood 33rd Deer PondHytrail IrvingHidden Bay4thJerome14thJune28th VillageTapestryJasper Eagle Point Jonquil Wildflower LaytonPrivateKelvinIronwoodHighlandsJaneroLe e w a r d Cimarron10th StreetKindr e d JamesIrishPrairievie wJack Pine49th JayLower 31st Marquess IrvinLilacMonarchLower 8th LisbonBirch Bark40thLavender KraftLampertBlazingstarWhistling Valley Junco Little Bluestem 11thLady Slipper5t h S t r e e t Windbreak Sunfish Lake Park InboundIvywoodInnsdale3rd Street Marquess TrailLang l y JunoLan s i n g JulianneUpper 30th 6th S t r e e t Lisbon AvenueIrwinSunflower 41st WB I9 4 T o I n w o o d A v e N Upper 7t h Queen Upper 9th 57th StreetUpper 42Nd 27 t h S t r e e t 15th Stree t Cherrywood WB I94 To Keats A v e N 44th Street 41st Street Jas m i n e A v e n u e 59th Street HummingbirdJero m e A v e n u e Keats Ave N To W B I 9 4 Manning Ave N To W B I 9 4 Hill Trail 30th Street33rd Street24t h S t r e e t 20th Street58th StreetLegion Lane Lark s p u r Demontreville Trail HummingbordAccess21st Laverne57th Street32nd ManningIrish35th 34th LilyLilac 55th Jamaca 35th Laverne56th Stillwater36 Lake ElmoLanglyLaytonLilac33rd Lily10th StreetMan n i n g 6th StreetIsle21st 9th 57th 36th Kirkwood 53rd Linde n Whistling ValleyManning 50th 5th 33rd Highlands 59th 6th Street Innsda le Ir o nw o o d Linden Legion Lane LindenPrivate Julep28th VillageLilac IvyInnsdaleLower 8th 31st 57th Lisbon 9th 39thKeats55th56th36 IsleJulepIrvin55th Manning32nd Laverne37thKelv in ManningLegion9th Ivy 34th LaytonLindenJade5thHudson 36th 39th DOWNSLAKE LAKE ELMOREGIONALPARK RESERVE LAKE ELMO LAKE JANE SUNFISH LAKE OLSONLAKE LAKE DEMONTREVILLE CLEARLAKE HORSESHOELAKE ROSELAKE REIDPARK VFWPARK LIONS PARK TANA RIDGEPARK City of Woodbury STONEGATEPARK KRAMERLAKE GOOSELAKEARMSTRONGLAKE RIDGEPARK KEATS AVE NEAGLE POINTLAKE TABLYNPARK HEIGHTSPARK LAKE JANEHILLS PARK PEBBLEPARK City of Oakdale West LakelandTownship Baytown Township City ofOak ParkHeights City of GrantCity ofPine Springs DEMONTREVILLEWILDLIFE PARK DEMONTREVILLEPARK KLEISPARK CARRIAGESTATIONPARK SUNFISH LAKEPARK City ofOak ParkHeights StillwaterTownship HOMESTEDPARK 7 HERITAGEPARK VERONICAPOND GOETSCHEL'SPOND City ofAfton TablynPark Eagle PointCreek Estates Lake ElmoHeights Torre Pines Farms ofLake Elmo Parkview Estates WildflowersShores HuppertAdd BeautCrest Estates FriedrichHghts Kenridge Add Prairie RidgeOffice Park Eagle PointBusiness Park Stonegate Hammes CountryVista Whistling Valley MidlandMeadows DavidNelson Est TheHomestead TartanMeadows The Forest Schwartz-Martinco Add PackardPark EdenPark HeritageFarm LonesomePine Add DownsLake Est MyronEllman Elmo View Cty AudPlat No. 8 Lake Elmo Park Brookman Add Sunfish Ponds Hamlet OnSunfish Lake ParkMeadows Tapestry AtCharlottes' Grove Berschen's Shores DawcinAcres LakeJaneHighlands TealPass Est Fox FireEstates Meyer'sPineridgeKrausesAdd Springborn'sGreen Acres Arabian Hills JudithMaryManor Lake Elmo Vista Rolling Hills Est Prairie Hamlet HiddenMeadowsOf Lake Elmo Jesse'sHideaway DiscoverCrossing Arvold'sAcres St. Croix'sSanctuary TamarackFarm Est CarriageStation TanaRidgeJohn M DayFarm Add The Fields ofSt. Croix2nd Add The Fieldsof St. Croix BluestemAt The Fieldsof St. Croix BurrwoodEstBergmannAdd DemontrevilleHighlands Add Lane's DemontrevilleCountry ClubDemontrevilleHighlands Add Olson Lake Add Oace AcresAdd LakeJaneHills Lake JaneManor No. 1 ThreeLakesFarm Add Bordners Garner Farmettes Royal Golf Club Southwind Hunters Crossing HammesEstates Savona Boulder Ponds Inwood Lakewood Crossing2nd Addition Easton Village Wildflower Cimarron Legacy At Northstar Village Preserve ST. CROIX SANCTUARY PARK EDENPARK PILOTPARK HAMMESPARK GOOSE LAKEPARK F Map Date: November 2020010.5 Miles Created By: Planning Department 2022 Capital Improvement Plan Washington County, Minnesota PROJECTS BY CATEGORY 2022 2026thru Total2022 2023 2024 2025 2026Category Project # Road & Bridge RB-2201 2,950,000620,000 520,000 570,000 620,000 620,000Intersection Control Projects RB-2203 800,000200,000 200,000 200,000 200,000Misc. Safety/Traffic Capacity Projects RB-2204 35,800,00011,000,000 5,900,000 6,000,000 5,800,000 7,100,000Pavement Preservation & Rehab RB-2216 1,687,600300,000 250,000 250,000 437,600 450,000Structures RB-2567 3,700,000400,000 3,300,000CSAH 14 & CSAH 24 RB-2609 12,065,000440,000 450,000 1,175,000 10,000,000CSAH 32 - CSAH 33 (Everton Ave) to US TH 61 RB-2611 5,675,000750,000 4,925,000CSAH 33 - CSAH 32 to CSAH 2 RB-2613 2,855,00030,000 2,825,000CSAH 5 - CR 64 to Sycamore St W RB-2621 10,150,0001,150,000 9,000,000CR 65 - Reconstruction RB-2623 6,200,0006,200,000CSAH 13 - CSAH 14 to 44th St - Phase II RB-2627 4,300,0001,250,000 300,000 2,750,000CSAH 15 - CSAH 10 to CSAH 14 RB-2629 600,000600,000CSAH 21- I-94 to 40th Street N RB-2639 3,975,000225,000 3,750,000CSAH 5 - Sycamore St to TH 96 RB-2641 3,625,000225,000 3,400,000CSAH 3 - CSAH 7 to CSAH 4 RB-2645 950,000550,000 400,000CSAH 13 - CSAH 14 to CSAH 6 RB-2650 800,000400,000 400,000CSAH 29 - TH 36 to CSAH 12 RB-2651 7,400,0001,500,000 900,000 1,000,000 2,000,000 2,000,000Construction Engineering, Inspection and Survey RB-2652 9,300,000800,000 8,500,00058th Street Extension/County Highway 15 S. Segment RB-2653 100,000100,000Century Ave Extension Study RB-2655 1,100,000400,000 700,000CSAH 19 and CSAH 10 Intersection RB-2660 1,205,000320,000 885,000CSAH 38 Multi-Use Trail RB-2663 4,975,000475,000 4,500,000CSAH 12 East Ave/Hallam Ave to CSAH 9 RB-2664 6,340,0006,340,000CSAH 12 - County Line Road to Stillwater Road RB-2666 1,450,000200,000 50,000 1,200,000CSAH 8 and Oneka Pkwy Intersection RB-2667 4,150,000350,000 200,000 3,600,000CSAH 19 and 80th Street Intersection RB-2669 2,650,000350,000 2,300,000CSAH 2 Rehabilitation RB-2671 250,000250,000Highway 61 Turnback Visioning RB-2672 1,500,000300,000 500,000 700,000CSAH 13 - CSAH 20 to Hargis Parkway RB-2673 136,400136,400CSAH 15 Rumble Strips RB-2674 39,500,0001,500,000 1,500,000 36,500,000CSAH 17 at TH 36 Intersection RB-2675 3,000,000100,000 200,000 200,000 2,500,000CR 74 - County 38 to Geneva Ave RB-2676 300,000300,000CSAH 15 & TH 36 Landscaping RB-2677 2,000,0002,000,000CSAH 6 Jurisdictional Transfer RB-2678 250,000250,00022nd Street - CSAH 21 to TH 95 Study RB-2679 425,800100,000 325,800CSAH 12 Trail Project RB-2680 100,000100,000Scandia City Center Study RB-2681 1,210,000300,000 910,000CSAH 28 at TH 95 Improvements RB-2682 2,400,000300,000 600,000 1,500,000CR 50 - TH 61 to CSAH 15 RB-2683 200,000200,000CSAH 11 Improvement Project RRA-2297-11 77,562,50013,700,000 43,042,500 15,860,000 4,960,000Gold Line Bus Rapid Transit (BRT) 263,637,30049,350,000 71,547,500 44,165,800 68,504,000 30,070,000Road & Bridge Total GRAND TOTAL 263,637,30049,350,000 71,547,500 44,165,800 68,504,000 30,070,000 77 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope for Phase II includes the following improvements on County State Aid Highway (CSAH) 13 (Ideal Avenue) from approximately 44th Street to CSAH 14 (40th Street North): 1) two-lane highway construction 2) construction of trails on the west side of the highway 3) drainage improvements, including storm water treatment facilities 4) intersection control improvement at CSAH 13 and 40th Street and 36th Street Preliminary design, along with public engagement, was completed with the corridor study and will need to be reviewed due to the fact that there is large-scale development potential to the west of CSAH 13 that will require coordination. A final project scope, right-of-way acquisition required, and cost estimates will be refined prior to starting final design. The estimated cost is based on the corridor study. Project #RB-2623 Justification CSAH 13 is a north-south minor arterial serving regional traffic in Oakdale and Lake Elmo. Land development in the area continues, including requests for new access onto CSAH 13. Providing for increased capacity and allowing appropriate access is critical for regional traffic. Phase I was constructed in 2017 and included highway reconstruction with the addition of a trail on the west side, sanitary sewer, and storm water treatment facilities. Budget Impact/Other The project will increase operations and maintenance costs because of added pavement widths and infrastructure. Useful Life 5+ yearsProject Name CSAH 13 - CSAH 14 to 44th St - Phase II Category Road & Bridge Type Construction Location Lake Elmo Total Project Cost:$7,290,300 District #Multiple Total2022 2023 2024 2025 2026Expenditures 6,200,0006,200,000Construction 6,200,000 6,200,000Total Prior 1,090,300 Total Total2022 2023 2024 2025 2026Funding Sources 1,200,0001,200,000Local Contributions 5,000,0005,000,000State Aid 6,200,000 6,200,000Total Prior 1,090,300 Total 90 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes the following improvements on County State Aid Highway (CSAH) 15 (Manning Avenue) between CSAH 10 (10th Street North) and CSAH 14 (40th Street North): 1) addition of center left turn lanes at key locations 2) pavement rehabilitation 3) stormwater treatment improvements Project #RB-2627 Justification CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route connecting Interstate-94 to Lake Elmo, Stillwater, and beyond. These improvements are necessary to ensure the ongoing safe and efficient operation of this highway segment. Budget Impact/Other The project will increase operations and maintenance costs because of added pavement widths and infrastructure. Useful Life 5+ yearsProject Name CSAH 15 - CSAH 10 to CSAH 14 Category Road & Bridge Type Construction Location Various Total Project Cost:$4,815,000 District #3 Total2022 2023 2024 2025 2026Expenditures 250,000250,000Planning / Design 4,000,0001,250,000 2,750,000Construction 50,00050,000Right-of-Way 1,250,000 300,000 2,750,000 4,300,000Total Prior 515,000 Total Total2022 2023 2024 2025 2026Funding Sources 1,025,000750,000 25,000 250,000Local Contributions 3,275,000500,000 275,000 2,500,000State Aid 1,250,000 300,000 2,750,000 4,300,000Total Prior 515,000 Total 91 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Ideal Avenue) located in Oakdale and Lake Elmo: 1) safety improvements including widening for shoulders 2) pavement improvement 3) turn lane and intersection improvements 4) pedestrian and non-motorized upgrades 5) drainage improvements Project #RB-2645 Justification Increased traffic and development drive the need for roadway upgrades, including widening of the road and the railroad crossing. This area is also a nexus for regional surface water drainage, hence the design needs to work toward accommodating and improving regional surface water management in this area. Budget Impact/Other The project will increase operation and maintenance costs associated with additional pavement, drainage, and sidewalk infrastructure. Useful Life 5+ yearsProject Name CSAH 13 - CSAH 14 to CSAH 6 Category Road & Bridge Type Construction Location Various Total Project Cost:$950,000 District #Multiple Total2022 2023 2024 2025 2026Expenditures 950,000550,000 400,000Planning / Design 550,000 400,000 950,000Total Total2022 2023 2024 2025 2026Funding Sources 200,000100,000 100,000Local Contributions 300,000300,000Local Option Sales Tax 450,000450,000State Aid 550,000 400,000 950,000Total 95 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 19 (Keats Avenue) and CSAH 10 (10th Street North): 1) evaluation for roundabout construction 2) park entrance improvements 3) roadway drainage and surface water management 4) pedestrian and bicycle facility improvements Preliminary design along with public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates which will be included in a future capital improvement plan. Project #RB-2655 Justification Traffic growth and ongoing development in the region has increased volumes around this intersection. The current all-way stop control can be confusing during peak traffic times and does not adequately service the demand. Delays are common and backups more than 1,000 feet occur frequently. This intersection is ranked near the top of the county's Intersection Control Ranking System. It is well suited for a roundabout, but will need significant reconstruction to address other needs. Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Useful Life 5+ yearsProject Name CSAH 19 and CSAH 10 Intersection Category Road & Bridge Type Construction Location Lake Elmo Total Project Cost:$1,100,000 District #3 Total2022 2023 2024 2025 2026Expenditures 1,100,000400,000 700,000Planning / Design 400,000 700,000 1,100,000Total Total2022 2023 2024 2025 2026Funding Sources 50,00050,000Local Contributions 700,000700,000Local Option Sales Tax 350,000350,000State Aid 400,000 700,000 1,100,000Total 100 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes improvements to County State Aid Highway (CSAH) 17 at the intersection with Trunk Highway (TH) 36 located in the City's of Lake Elmo and Grant. The work is expected to include: 1) a grade separated crossing of TH 36 2) ramps to provide access between CSAH 17 and TH 36 3) retaining walls 4) stormwater treatment facilities 5) pedestrian facilities 6) intersection controls for frontage roads 7) frontage road extension on south side Project #RB-2674 Justification TH 36 users currently experience congestion (capacity constraints) during both A.M. and P.M. peak hours resulting from the existing signal at CSAH 17 (Lake Elmo Avenue). This congestion results in an unacceptable level-of-service during peak hours which is expected to worsen as traffic volumes are forecast to increase. Due to the extended cycle lengths, CSAH 17 (Lake Elmo Avenue) has long wait times before being served by the signal. The existing closely-spaced frontage road intersection on the north of TH 36 consistently queues traffic through the intersection. The CSAH 17 (Lake Elmo Avenue) intersection has a crash and severity rate that is significantly higher than the Minnesota Department of Transportation (MnDOT) statewide system average for similar signalized intersections. Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. It is expected that local agencies, the State of Minnesota, and federal aid will provide funding for this project. If this funding is not obtained, this project will be postponed until adequate funding is received. Useful Life 5+ yearsProject Name CSAH 17 at TH 36 Intersection Category Road & Bridge Type Construction Location Lake Elmo/Grant Total Project Cost:$40,534,300 District #Multiple Total2022 2023 2024 2025 2026Expenditures 1,500,0001,500,000Planning / Design 36,500,00036,500,000Construction 1,500,0001,500,000Right-of-Way 1,500,000 1,500,000 36,500,000 39,500,000Total Prior 1,034,300 Total Total2022 2023 2024 2025 2026Funding Sources 10,000,00010,000,000Federal Grants 4,250,000500,000 750,000 3,000,000Local Contributions 5,250,0001,000,000 750,000 3,500,000State Aid 20,000,00020,000,000State Grants 1,500,000 1,500,000 36,500,000 39,500,000Total Prior 1,034,300 Total 110 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes the addition of landscaping to the area associated with the County State Aid Highway (CSAH) 15 at Trunk Highway (TH) 36 interchange project in the cities of Stilwater, Lake Elmo, and Grant. Project #RB-2676 Justification Along with the county's project partners MnDOT, Lake Elmo, Stillwater, and Grant, the county is leading a project to install landscaping in appropriate areas within the CSAH 15 Interchange Project limits to replace vegetation impacted by the construction and to improve aesthetics. Budget Impact/Other This project will not increase operation and maintenance costs because the county will not own the installed vegetation. There is no anticipated change within the Road & Bridge Division operating budget. It is expected that local agencies, the State of Minnesota, and federal aid will provide funding for this project. If this funding is not obtained, this project will be postponed until adequate funding is received. Useful Life 5+ yearsProject Name CSAH 15 & TH 36 Landscaping Category Road & Bridge Type Construction Location Various Total Project Cost:$300,000 District #Multiple Total2022 2023 2024 2025 2026Expenditures 300,000300,000Construction 300,000 300,000Total Total2022 2023 2024 2025 2026Funding Sources 75,00075,000Local Contributions 75,00075,000State Aid 150,000150,000State Grants 300,000 300,000Total 112 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes an annual program for intersection control upgrades determined to be needed, but not incorporated, as part of a larger roadway improvement project. Projects under this program would typically be individually identified and programmed through the County's Intersection Control Ranking System (ICRS). This program assumes one intersection improvement is programmed per year at a cost of $420,000. Project #RB-2201 Justification High-level intersection controls (roundabouts and traffic signals) may be constructed at county highway intersections meeting criteria set forth in the County Intersection Control Ranking System. The county proactively plans for the installation of intersection controls to improve the safety and efficiency of traffic flow on the County Highway System. The annual Intersection Control Ranking System determines the priority of these installations. The number of projects programmed varies depending on actual budget funding, the availability of matching funds, unforeseen development, or intersection safety problems. Budget Impact/Other The typical traffic signal costs $1,500 per year to operate and maintain. This cost to the public is off-set by the increased traffic flow efficiency and enhanced safety. Useful Life 5+ yearsProject Name Intersection Control Projects Category Road & Bridge Type Improvement Location Various Roads District #Multiple Total2022 2023 2024 2025 2026Expenditures 100,00020,000 20,000 20,000 20,000 20,000Planning / Design 2,850,000600,000 500,000 550,000 600,000 600,000Construction 620,000 520,000 570,000 620,000 620,000 2,950,000Total Total2022 2023 2024 2025 2026Funding Sources 1,050,000210,000 210,000 210,000 210,000 210,000Local Contributions 1,900,000410,000 310,000 360,000 410,000 410,000State Aid 620,000 520,000 570,000 620,000 620,000 2,950,000Total 81 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes an annual program for mitigation of safety or traffic-capacity problems. Examples of solutions include: 1) turn-lane construction 2) signal-timing studies 3) flasher installations 4) minor curve corrections 5) pedestrian and trail projects 6) signing and striping improvements Project #RB-2203 Justification This annual program is needed to provide the county with the ability to be responsive to small safety or traffic-capacity problems throughout the year that are not programmed into a larger capital project. The county proactively plans for various safety/capacity projects in its budget. Keeping an allotment in the budget for these types of projects eliminates future safety hazards for vehicular and pedestrian traffic. Proactively improving/reducing safety or traffic-capacity problems is cost- efficient and keeps the potential for larger expenditures minimal. Budget Impact/Other The project scope doesn't significantly increase the operating costs of a county highway. There is no anticipated change within the Road & Bridge Division operating budget. Useful Life 5+ yearsProject Name Misc. Safety/Traffic Capacity Projects Category Road & Bridge Type Improvement Location Various District #Multiple Total2022 2023 2024 2025 2026Expenditures 800,000200,000 200,000 200,000 200,000Construction 200,000 200,000 200,000 200,000 800,000Total Total2022 2023 2024 2025 2026Funding Sources 100,000100,000County Program Aid 700,000100,000 200,000 200,000 200,000State Aid 200,000 200,000 200,000 200,000 800,000Total 82 2022 Capital Improvement Plan Washington County, Minnesota Contact PWD 2022 2026thru Department Capital Road & Bridge Project Description The project scope includes an annual program comprised of pavement preservation projects including: 1) seal coating 2) crack filling 3)pavement milling 4) overlays 5) hot and cold-in-place recycling 6) pavement reclaim 7)full-depth reclamation 8) paving gravel shoulders 9) minor subgrade corrections 10)right-of-way 2022 may include: 1) CSAH 3 - CSAH 4 to Old Marine Trail 2) CSAH 15 - TH 97 to 240th Street North 3) County 10 - County 21 to County 15 4) County 15 - Lynch Road to TH 97 5) crack sealing and misc. concrete at various locations throughout the County Project #RB-2204 Justification These projects are scheduled to interrupt the normal deterioration of highways to extend the pavement life. Pavement condition is measured/calculated annually and reported as the system-wide Pavement Condition Index (PCI) that assigns a value to each roadway segment on a scale of 1-100, with higher numbers equating to better pavement condition. Public Works Performance Measures set two goals: 1) system-wide average PCI = 72 or greater, and 2) no roadway PCI should be lower than 40. Budget Impact/Other Projects completed under the Pavement Preservation Program reduce operation and maintenance costs. Useful Life 5+ yearsProject Name Pavement Preservation & Rehab Category Road & Bridge Type Improvement Location Various Roads District #Multiple Total2022 2023 2024 2025 2026Expenditures 35,800,00011,000,000 5,900,000 6,000,000 5,800,000 7,100,000Construction 11,000,000 5,900,000 6,000,000 5,800,000 7,100,000 35,800,000Total Total2022 2023 2024 2025 2026Funding Sources 5,500,0005,000,000 500,000Local Option Sales Tax 6,800,0001,500,000 800,000 1,300,000 1,000,000 2,200,000State Aid 23,500,0004,500,000 4,600,000 4,700,000 4,800,000 4,900,000Wheelage Tax 11,000,000 5,900,000 6,000,000 5,800,000 7,100,000 35,800,000Total 83