HomeMy WebLinkAbout#26 - Washington County Draft CIP City CommentsDATE: November 16, 2021
REGULAR
AGENDA ITEM: Approve City Comments on the Washington County DRAFT 2022-2026 Capital Improvement Plan (CIP)
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council approve the City comments to be submitted to Washington County regarding the County’s DRAFT 2022-2026 Capital Improvement Plan?
BACKGROUND: On October 20th, City staff received notice from Washington County that the Draft 2022-2026 Capital Improvement Plan (CIP) was available for review and that comments must be received
by November 19, 2021 for consideration when developing the final CIP. A public hearing will be held on November 30, 2021, prior to adopting the final document on December 14, 2021.
As part of the annual budget process, Washington County prepares a five-year Capital Improvement Plan (CIP), which includes the county's tentative plans for roads, bridges, parks, land, trails, transit, and public facilities. The first year of this plan is included in the county's proposed 2022 budget. The “out-years” of 2023-2026 reflect projected needs and estimated costs, which may change based on future priorities and funding opportunities. Projects that were budgeted in 2021 (or prior to), and are not yet complete, are not reflected in the draft 2022-2026 CIP; funding for the completion of those projects has been set aside, and therefore aren’t reflected in future years’ CIP documents. A full copy of the draft CIP document is available online at the county website.
The attached packet highlights the substantial transportation roadway related projects included within the City of Lake Elmo over the next five years. Parks and Public Facility projects are not included in this review. It should also be noted that the County completes intersection control projects and pavement preservation projects each year but the specific work related to these improvements is not identified within the CIP document. The County budgets $420,000 for one intersection control project each year, and has
budgeted $35M over 5 years for various pavement maintenance and preservation projects. The transportation roadway projects identified on the County’s 2022-2026 CIP that are located in Lake
Elmo are summarized below:
• 2022: CSAH 13 Phase 2, from CSAH 14 to 44th Street. $6.2M Estimated City cost share has been negotiated to be $367,718 (signed Cooperative Cost Share Agreement).
• 2022: CSAH 15 & TH 36 Landscaping. $300.000. Project description indicates local cost share of
$75,000.
• 2022-2025: CSAH 15, from CSAH 10 to CSAH 14. $2.5M. City cost share is unknown. The Project scope of the CSAH 15 (Manning Avenue) Phase 3 Improvements for a 4-lane divided highway has been scaled down to Traffic Management Projects with $1.25M becoming
available for 2022 construction; $300,000 becoming available for 2023 construction; and $2.75M becoming available in 2025 for construction. The 2022 construction is for the traffic signal and intersection improvements at CSAH 15 and 30th Street North. The 2023 and 2025 projects are not determined.
• 2025: CSAH 17 & TH 36 Intersection. $39.5M. City cost share will be significant but is unknown.
The project will include a grade separated interchange and south frontage road improvements, will
include Federal funding and approvals, and will be multi-jurisdictional, including Washington
County, MnDOT, Grant and Lake Elmo.
• 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. $950,000. City cost is unknown. This project borders both Lake Elmo and Oakdale and would include safety improvements, including widening for shoulders, pavement improvements, railroad crossing upgrades, turn lane improvements, drainage improvements and pedestrian upgrades.
• 2025-2026: CSAH 19 and CSAH 10 Intersection. $1.1M. City cost share is unknown but should be limited as all four legs of the intersection are County owned roadways. Project is needed to address
intersection delays and may result in the construction of a roundabout. PROPOSAL DETAILS/ANALYSIS: Staff has reviewed the County’s Draft 2022-2026 CIP and has the following comment for council consideration:
• 2022: CSAH 15 & TH 36 Landscaping: City staff has previously indicated to Washington County that per City policy, the City does not generally participate in landscaping improvements or replacement along public right-of-way. Therefore, although the City supports landscaping improvements for the
intersection area, the City will not provide cost participation in the proposed landscaping project to replace trees that have been removed by the project.
• 2022-2025: CSAH 15, from CSAH 10 to CSAH 14: The CSAH 15 and 30th Street North intersection and traffic signal improvements should be planned for construction in 2022 to ready this intersection for the Easton Village access closure to CSAH 15 and as the Easton Village and Northport development build-outs are directed to this intersection. City staff has emphasized to Washington County that the project description should specifically identify the CSAH 15 and 30th Street North traffic signal and
intersection improvements to be constructed in 2022.
• 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection improvements is an important project for the City of Lake Elmo to address the safety improvements needed along the TH36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The City
therefore supports the planning and construction of this project and emphasizes the need to maintain the proposed construction schedule and to maximize outside funding assistance in order to provide a financially viable project for the local communities.
• 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with the sale
and development of the City owned property along Ideal Avenue and Stillwater Boulevard, and the extension of sanitary sewer to this property, improvements to this segment of Ideal Avenue may be required. The City therefore supports, at a minimum, that preliminary engineering and planning efforts
be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific intersection improvements that will be undertaken at the time of the development of the adjacent properties.
• The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience continued traffic growth, and will likely require intersection and turn lane improvements along with some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14.
The need for these improvements will increase quickly as the surrounding property develops. The City therefore supports, at a minimum, that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific improvements that will be undertaken at the time of the development of the adjacent properties. FISCAL IMPACT: No Fiscal Impacts at this time. However, County improvement projects completed within the City of Lake Elmo often contain a cost participation by the City.
OPTIONS: 1) The City Council can approve the City comments to be submitted to Washington County regarding
the County’s 2022-2026 Capital Improvement Plan.
2) The City Council can approve the City comments, as amended, to be submitted to Washington
County regarding the County’s 2022-2026 Capital Improvement Plan.
RECOMMENDATION: Staff is recommending that the City Council approve the City comments to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan. The recommended motion for the action is as follows:
“Move to approve City comments to be submitted to Washington County regarding the County’s 2022-2026 Capital Improvement Plan with comments to be submitted on or before November 19, 2021.” ATTACHMENTS:
1. Summary packet of the Washington County Draft 2022-2026 Capital Improvement Plan.
2. Draft City Comment Letter.
3. Project Location Map.
3880 Laverne Avenue North • Lake Elmo • Minnesota 55042
Phone: (651) 747-3900 • Fax: (651) 747-3901 • www.lakeelmo.org
November 18, 2021
Mr. Wayne Sandberg via email: wayne.sandberg@co.washington.mn.us
Deputy Director larry.phillips@co.washington.mn.us
Washington County Public Works Department
11660 Myeron Road North
Stillwater, MN 55082
Dear Mr. Sandberg:
The City of Lake Elmo has reviewed the County’s Draft 2022-2026 Capital Improvement Plan (CIP). After
reviewing these projects and in reviewing other potential transportation needs in Lake Elmo, we have
the following comments:
1) 2022: CSAH 15 & TH 36 Landscaping: City staff has previously indicated to Washington County that
per City policy, the City does not generally participate in landscaping improvements or replacement
along public right-of-way. Therefore, although the City supports landscaping improvements for the
intersection area, the City will not provide cost participation in the proposed landscaping project to
replace trees that have been removed by the project.
2) 2022-2025: CSAH 15, from CSAH 10 to CSAH 14: The CSAH 15 and 30th Street North intersection and
traffic signal improvements should be planned for construction in 2022 to ready this intersection for
the Easton Village access closure to CSAH 15 and as the Easton Village and Northport development
build-outs are directed to this intersection. City staff has emphasized to Washington County that the
project description in the County CIP should specifically identify the CSAH 15 and 30th Street North
traffic signal and intersection improvements to be constructed in 2022.
3) 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection improvements is an
important project for the City of Lake Elmo to address the safety improvements needed along the
TH36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The City
therefore supports the planning and construction of this project and emphasizes the need to
maintain the proposed construction schedule and to maximize outside funding assistance in order to
provide a financially viable project for the local communities.
4) 2025-2026: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with the sale and
development of the City owned property along Ideal Avenue and Stillwater Boulevard, and the
extension of sanitary sewer to this property, improvements to this segment of Ideal Avenue may be
required. The City therefore supports, at a minimum, that preliminary engineering and planning
efforts be completed to better identify the future improvements and alignments that will be needed
in order to preserve the necessary right-of-way and to guide the specific intersection improvements
that will be undertaken at the time of the development of the adjacent properties.
5) The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience
continued traffic growth, and will likely require intersection and turn lane improvements along with
some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14.
The need for these improvements will increase quickly as the surrounding property develops. The
City therefore supports, at a minimum, that preliminary engineering and planning efforts be
completed to better identify the future improvements and alignments that will be needed in order
to preserve the necessary right-of-way and to guide the specific improvements that will be
undertaken at the time of the development of the adjacent properties.
Please feel free to contact me at 651.747.3905, or at KHandt@lakeelmo.org, with any questions you
may have regarding Lake Elmo’s comments.
Sincerely,
Kristina Handt
City Administrator
cc: Marty Powers, Public Works Director
Jack Griffin, City Engineer
36
10th
60th
5th
HudsonKeats Lake Elmo50th
15th Inwood34th
20th
27th
53rd
55th
Jane
Lake Jane
Jamaca57th
59th
Hill
47th
7th
31st
51st
43rd
39th Demontreville45th
38th
ManningStillwater
24th26th
42nd
Island58th9th
30th
32ndKimbro
21st
Jade6thIvoryHill
t
o
p
IsleOls
o
n
L
a
k
e
8thJulep
12th
Jewel
44th
56th
Iris22nd
37th
36th
35th LaverneJuniperAnnikaJasmineJamley LegionLily
Klondike16th
Upper 33Rd
ImperialLinden3rdKirkwood 33rd
Deer PondHytrail
IrvingHidden Bay4thJerome14thJune28th VillageTapestryJasper
Eagle Point
Jonquil
Wildflower
LaytonPrivateKelvinIronwoodHighlandsJaneroLe
e
w
a
r
d
Cimarron10th StreetKindr
e
d
JamesIrishPrairievie
wJack Pine49th
JayLower 31st
Marquess
IrvinLilacMonarchLower 8th LisbonBirch Bark40thLavender
KraftLampertBlazingstarWhistling Valley
Junco Little Bluestem
11thLady Slipper5t
h
S
t
r
e
e
t
Windbreak
Sunfish Lake Park InboundIvywoodInnsdale3rd Street Marquess TrailLang
l
y
JunoLan
s
i
n
g
JulianneUpper 30th
6th
S
t
r
e
e
t
Lisbon AvenueIrwinSunflower
41st
WB I9
4
T
o
I
n
w
o
o
d
A
v
e
N
Upper 7t
h
Queen
Upper 9th 57th StreetUpper 42Nd
27
t
h
S
t
r
e
e
t
15th Stree
t
Cherrywood
WB I94 To Keats
A
v
e
N
44th Street
41st Street
Jas
m
i
n
e
A
v
e
n
u
e
59th Street
HummingbirdJero
m
e
A
v
e
n
u
e
Keats Ave N To
W
B
I
9
4
Manning Ave N To W
B
I
9
4
Hill Trail
30th Street33rd Street24t
h
S
t
r
e
e
t
20th Street58th StreetLegion Lane
Lark
s
p
u
r
Demontreville Trail
HummingbordAccess21st
Laverne57th Street32nd ManningIrish35th
34th LilyLilac
55th
Jamaca
35th
Laverne56th
Stillwater36
Lake ElmoLanglyLaytonLilac33rd Lily10th StreetMan
n
i
n
g
6th StreetIsle21st
9th
57th
36th
Kirkwood
53rd
Linde
n
Whistling ValleyManning
50th
5th
33rd
Highlands
59th
6th Street
Innsda
le
Ir
o
nw
o
o
d
Linden
Legion Lane
LindenPrivate
Julep28th VillageLilac
IvyInnsdaleLower 8th
31st
57th
Lisbon
9th
39thKeats55th56th36
IsleJulepIrvin55th
Manning32nd
Laverne37thKelv
in
ManningLegion9th
Ivy
34th
LaytonLindenJade5thHudson
36th
39th
DOWNSLAKE
LAKE ELMOREGIONALPARK RESERVE
LAKE ELMO
LAKE JANE
SUNFISH LAKE
OLSONLAKE
LAKE DEMONTREVILLE
CLEARLAKE
HORSESHOELAKE
ROSELAKE
REIDPARK
VFWPARK
LIONS PARK
TANA RIDGEPARK
City of Woodbury
STONEGATEPARK
KRAMERLAKE
GOOSELAKEARMSTRONGLAKE
RIDGEPARK
KEATS AVE NEAGLE POINTLAKE
TABLYNPARK
HEIGHTSPARK
LAKE JANEHILLS PARK
PEBBLEPARK
City of Oakdale
West LakelandTownship
Baytown Township
City ofOak ParkHeights
City of GrantCity ofPine Springs
DEMONTREVILLEWILDLIFE PARK
DEMONTREVILLEPARK
KLEISPARK CARRIAGESTATIONPARK
SUNFISH LAKEPARK
City ofOak ParkHeights
StillwaterTownship
HOMESTEDPARK
7
HERITAGEPARK
VERONICAPOND
GOETSCHEL'SPOND
City ofAfton
TablynPark
Eagle PointCreek Estates
Lake ElmoHeights
Torre Pines
Farms ofLake Elmo
Parkview Estates
WildflowersShores
HuppertAdd
BeautCrest Estates FriedrichHghts
Kenridge Add
Prairie RidgeOffice Park
Eagle PointBusiness Park
Stonegate
Hammes CountryVista
Whistling Valley
MidlandMeadows
DavidNelson Est
TheHomestead
TartanMeadows
The Forest
Schwartz-Martinco Add
PackardPark
EdenPark
HeritageFarm
LonesomePine Add
DownsLake Est
MyronEllman
Elmo View
Cty AudPlat No. 8
Lake Elmo Park
Brookman Add
Sunfish Ponds
Hamlet OnSunfish Lake
ParkMeadows
Tapestry AtCharlottes' Grove
Berschen's Shores
DawcinAcres
LakeJaneHighlands
TealPass Est
Fox FireEstates
Meyer'sPineridgeKrausesAdd
Springborn'sGreen Acres
Arabian Hills
JudithMaryManor
Lake Elmo Vista
Rolling Hills Est
Prairie Hamlet
HiddenMeadowsOf Lake Elmo
Jesse'sHideaway
DiscoverCrossing
Arvold'sAcres
St. Croix'sSanctuary
TamarackFarm Est
CarriageStation
TanaRidgeJohn M DayFarm Add
The Fields ofSt. Croix2nd Add
The Fieldsof St. Croix
BluestemAt The Fieldsof St. Croix
BurrwoodEstBergmannAdd
DemontrevilleHighlands Add
Lane's DemontrevilleCountry ClubDemontrevilleHighlands Add
Olson Lake Add
Oace AcresAdd
LakeJaneHills
Lake JaneManor No. 1
ThreeLakesFarm Add
Bordners Garner
Farmettes
Royal Golf Club
Southwind
Hunters Crossing
HammesEstates
Savona
Boulder Ponds
Inwood
Lakewood Crossing2nd Addition
Easton Village
Wildflower
Cimarron
Legacy At Northstar
Village Preserve
ST. CROIX SANCTUARY PARK
EDENPARK
PILOTPARK
HAMMESPARK
GOOSE LAKEPARK
F
Map Date: November 2020010.5 Miles
Created By: Planning Department
2022 Capital Improvement Plan
Washington County, Minnesota
PROJECTS BY CATEGORY
2022 2026thru
Total2022 2023 2024 2025 2026Category Project #
Road & Bridge
RB-2201 2,950,000620,000 520,000 570,000 620,000 620,000Intersection Control Projects
RB-2203 800,000200,000 200,000 200,000 200,000Misc. Safety/Traffic Capacity Projects
RB-2204 35,800,00011,000,000 5,900,000 6,000,000 5,800,000 7,100,000Pavement Preservation & Rehab
RB-2216 1,687,600300,000 250,000 250,000 437,600 450,000Structures
RB-2567 3,700,000400,000 3,300,000CSAH 14 & CSAH 24
RB-2609 12,065,000440,000 450,000 1,175,000 10,000,000CSAH 32 - CSAH 33 (Everton Ave) to US TH 61
RB-2611 5,675,000750,000 4,925,000CSAH 33 - CSAH 32 to CSAH 2
RB-2613 2,855,00030,000 2,825,000CSAH 5 - CR 64 to Sycamore St W
RB-2621 10,150,0001,150,000 9,000,000CR 65 - Reconstruction
RB-2623 6,200,0006,200,000CSAH 13 - CSAH 14 to 44th St - Phase II
RB-2627 4,300,0001,250,000 300,000 2,750,000CSAH 15 - CSAH 10 to CSAH 14
RB-2629 600,000600,000CSAH 21- I-94 to 40th Street N
RB-2639 3,975,000225,000 3,750,000CSAH 5 - Sycamore St to TH 96
RB-2641 3,625,000225,000 3,400,000CSAH 3 - CSAH 7 to CSAH 4
RB-2645 950,000550,000 400,000CSAH 13 - CSAH 14 to CSAH 6
RB-2650 800,000400,000 400,000CSAH 29 - TH 36 to CSAH 12
RB-2651 7,400,0001,500,000 900,000 1,000,000 2,000,000 2,000,000Construction Engineering, Inspection and Survey
RB-2652 9,300,000800,000 8,500,00058th Street Extension/County Highway 15 S. Segment
RB-2653 100,000100,000Century Ave Extension Study
RB-2655 1,100,000400,000 700,000CSAH 19 and CSAH 10 Intersection
RB-2660 1,205,000320,000 885,000CSAH 38 Multi-Use Trail
RB-2663 4,975,000475,000 4,500,000CSAH 12 East Ave/Hallam Ave to CSAH 9
RB-2664 6,340,0006,340,000CSAH 12 - County Line Road to Stillwater Road
RB-2666 1,450,000200,000 50,000 1,200,000CSAH 8 and Oneka Pkwy Intersection
RB-2667 4,150,000350,000 200,000 3,600,000CSAH 19 and 80th Street Intersection
RB-2669 2,650,000350,000 2,300,000CSAH 2 Rehabilitation
RB-2671 250,000250,000Highway 61 Turnback Visioning
RB-2672 1,500,000300,000 500,000 700,000CSAH 13 - CSAH 20 to Hargis Parkway
RB-2673 136,400136,400CSAH 15 Rumble Strips
RB-2674 39,500,0001,500,000 1,500,000 36,500,000CSAH 17 at TH 36 Intersection
RB-2675 3,000,000100,000 200,000 200,000 2,500,000CR 74 - County 38 to Geneva Ave
RB-2676 300,000300,000CSAH 15 & TH 36 Landscaping
RB-2677 2,000,0002,000,000CSAH 6 Jurisdictional Transfer
RB-2678 250,000250,00022nd Street - CSAH 21 to TH 95 Study
RB-2679 425,800100,000 325,800CSAH 12 Trail Project
RB-2680 100,000100,000Scandia City Center Study
RB-2681 1,210,000300,000 910,000CSAH 28 at TH 95 Improvements
RB-2682 2,400,000300,000 600,000 1,500,000CR 50 - TH 61 to CSAH 15
RB-2683 200,000200,000CSAH 11 Improvement Project
RRA-2297-11 77,562,50013,700,000 43,042,500 15,860,000 4,960,000Gold Line Bus Rapid Transit (BRT)
263,637,30049,350,000 71,547,500 44,165,800 68,504,000 30,070,000Road & Bridge Total
GRAND TOTAL 263,637,30049,350,000 71,547,500 44,165,800 68,504,000 30,070,000
77
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope for Phase II includes the following improvements on County State Aid Highway (CSAH) 13 (Ideal Avenue) from approximately
44th Street to CSAH 14 (40th Street North):
1) two-lane highway construction
2) construction of trails on the west side of the highway
3) drainage improvements, including storm water treatment facilities
4) intersection control improvement at CSAH 13 and 40th Street and 36th Street
Preliminary design, along with public engagement, was completed with the corridor study and will need to be reviewed due to the fact that there is
large-scale development potential to the west of CSAH 13 that will require coordination. A final project scope, right-of-way acquisition required,
and cost estimates will be refined prior to starting final design. The estimated cost is based on the corridor study.
Project #RB-2623
Justification
CSAH 13 is a north-south minor arterial serving regional traffic in Oakdale and Lake Elmo. Land development in the area continues, including
requests for new access onto CSAH 13. Providing for increased capacity and allowing appropriate access is critical for regional traffic.
Phase I was constructed in 2017 and included highway reconstruction with the addition of a trail on the west side, sanitary sewer, and storm water
treatment facilities.
Budget Impact/Other
The project will increase operations and maintenance costs because of added pavement widths and infrastructure.
Useful Life 5+ yearsProject Name CSAH 13 - CSAH 14 to 44th St - Phase II Category Road & Bridge
Type Construction
Location Lake Elmo
Total Project Cost:$7,290,300
District #Multiple
Total2022 2023 2024 2025 2026Expenditures
6,200,0006,200,000Construction
6,200,000 6,200,000Total
Prior
1,090,300
Total
Total2022 2023 2024 2025 2026Funding Sources
1,200,0001,200,000Local Contributions
5,000,0005,000,000State Aid
6,200,000 6,200,000Total
Prior
1,090,300
Total
90
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes the following improvements on County State Aid Highway (CSAH) 15 (Manning Avenue) between CSAH 10 (10th
Street North) and CSAH 14 (40th Street North):
1) addition of center left turn lanes at key locations
2) pavement rehabilitation
3) stormwater treatment improvements
Project #RB-2627
Justification
CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route connecting Interstate-94 to Lake Elmo,
Stillwater, and beyond. These improvements are necessary to ensure the ongoing safe and efficient operation of this highway segment.
Budget Impact/Other
The project will increase operations and maintenance costs because of added pavement widths and infrastructure.
Useful Life 5+ yearsProject Name CSAH 15 - CSAH 10 to CSAH 14 Category Road & Bridge
Type Construction
Location Various
Total Project Cost:$4,815,000
District #3
Total2022 2023 2024 2025 2026Expenditures
250,000250,000Planning / Design
4,000,0001,250,000 2,750,000Construction
50,00050,000Right-of-Way
1,250,000 300,000 2,750,000 4,300,000Total
Prior
515,000
Total
Total2022 2023 2024 2025 2026Funding Sources
1,025,000750,000 25,000 250,000Local Contributions
3,275,000500,000 275,000 2,500,000State Aid
1,250,000 300,000 2,750,000 4,300,000Total
Prior
515,000
Total
91
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Ideal Avenue) located in Oakdale and Lake
Elmo:
1) safety improvements including widening for shoulders
2) pavement improvement
3) turn lane and intersection improvements
4) pedestrian and non-motorized upgrades
5) drainage improvements
Project #RB-2645
Justification
Increased traffic and development drive the need for roadway upgrades, including widening of the road and the railroad crossing. This area is also
a nexus for regional surface water drainage, hence the design needs to work toward accommodating and improving regional surface water
management in this area.
Budget Impact/Other
The project will increase operation and maintenance costs associated with additional pavement, drainage, and sidewalk infrastructure.
Useful Life 5+ yearsProject Name CSAH 13 - CSAH 14 to CSAH 6 Category Road & Bridge
Type Construction
Location Various
Total Project Cost:$950,000
District #Multiple
Total2022 2023 2024 2025 2026Expenditures
950,000550,000 400,000Planning / Design
550,000 400,000 950,000Total
Total2022 2023 2024 2025 2026Funding Sources
200,000100,000 100,000Local Contributions
300,000300,000Local Option Sales Tax
450,000450,000State Aid
550,000 400,000 950,000Total
95
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 19 (Keats Avenue) and CSAH 10
(10th Street North):
1) evaluation for roundabout construction
2) park entrance improvements
3) roadway drainage and surface water management
4) pedestrian and bicycle facility improvements
Preliminary design along with public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates
which will be included in a future capital improvement plan.
Project #RB-2655
Justification
Traffic growth and ongoing development in the region has increased volumes around this intersection. The current all-way stop control can be
confusing during peak traffic times and does not adequately service the demand. Delays are common and backups more than 1,000 feet occur
frequently. This intersection is ranked near the top of the county's Intersection Control Ranking System. It is well suited for a roundabout, but will
need significant reconstruction to address other needs.
Budget Impact/Other
This project will increase operation and maintenance costs because of the added infrastructure.
Useful Life 5+ yearsProject Name CSAH 19 and CSAH 10 Intersection Category Road & Bridge
Type Construction
Location Lake Elmo
Total Project Cost:$1,100,000
District #3
Total2022 2023 2024 2025 2026Expenditures
1,100,000400,000 700,000Planning / Design
400,000 700,000 1,100,000Total
Total2022 2023 2024 2025 2026Funding Sources
50,00050,000Local Contributions
700,000700,000Local Option Sales Tax
350,000350,000State Aid
400,000 700,000 1,100,000Total
100
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes improvements to County State Aid Highway (CSAH) 17 at the intersection with Trunk Highway (TH) 36 located in the
City's of Lake Elmo and Grant.
The work is expected to include:
1) a grade separated crossing of TH 36
2) ramps to provide access between CSAH 17 and TH 36
3) retaining walls
4) stormwater treatment facilities
5) pedestrian facilities
6) intersection controls for frontage roads
7) frontage road extension on south side
Project #RB-2674
Justification
TH 36 users currently experience congestion (capacity constraints) during both A.M. and P.M. peak hours resulting from the existing signal at
CSAH 17 (Lake Elmo Avenue). This congestion results in an unacceptable level-of-service during peak hours which is expected to worsen as
traffic volumes are forecast to increase. Due to the extended cycle lengths, CSAH 17 (Lake Elmo Avenue) has long wait times before being served
by the signal. The existing closely-spaced frontage road intersection on the north of TH 36 consistently queues traffic through the intersection.
The CSAH 17 (Lake Elmo Avenue) intersection has a crash and severity rate that is significantly higher than the Minnesota Department of
Transportation (MnDOT) statewide system average for similar signalized intersections.
Budget Impact/Other
This project will increase operation and maintenance costs because of the added infrastructure.
It is expected that local agencies, the State of Minnesota, and federal aid will provide funding for this project. If this funding is not obtained, this
project will be postponed until adequate funding is received.
Useful Life 5+ yearsProject Name CSAH 17 at TH 36 Intersection Category Road & Bridge
Type Construction
Location Lake Elmo/Grant
Total Project Cost:$40,534,300
District #Multiple
Total2022 2023 2024 2025 2026Expenditures
1,500,0001,500,000Planning / Design
36,500,00036,500,000Construction
1,500,0001,500,000Right-of-Way
1,500,000 1,500,000 36,500,000 39,500,000Total
Prior
1,034,300
Total
Total2022 2023 2024 2025 2026Funding Sources
10,000,00010,000,000Federal Grants
4,250,000500,000 750,000 3,000,000Local Contributions
5,250,0001,000,000 750,000 3,500,000State Aid
20,000,00020,000,000State Grants
1,500,000 1,500,000 36,500,000 39,500,000Total
Prior
1,034,300
Total
110
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes the addition of landscaping to the area associated with the County State Aid Highway (CSAH) 15 at Trunk Highway
(TH) 36 interchange project in the cities of Stilwater, Lake Elmo, and Grant.
Project #RB-2676
Justification
Along with the county's project partners MnDOT, Lake Elmo, Stillwater, and Grant, the county is leading a project to install landscaping in
appropriate areas within the CSAH 15 Interchange Project limits to replace vegetation impacted by the construction and to improve aesthetics.
Budget Impact/Other
This project will not increase operation and maintenance costs because the county will not own the installed vegetation. There is no anticipated
change within the Road & Bridge Division operating budget.
It is expected that local agencies, the State of Minnesota, and federal aid will provide funding for this project. If this funding is not obtained, this
project will be postponed until adequate funding is received.
Useful Life 5+ yearsProject Name CSAH 15 & TH 36 Landscaping Category Road & Bridge
Type Construction
Location Various
Total Project Cost:$300,000
District #Multiple
Total2022 2023 2024 2025 2026Expenditures
300,000300,000Construction
300,000 300,000Total
Total2022 2023 2024 2025 2026Funding Sources
75,00075,000Local Contributions
75,00075,000State Aid
150,000150,000State Grants
300,000 300,000Total
112
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes an annual program for intersection control upgrades determined to be needed, but not incorporated, as part of a larger
roadway improvement project.
Projects under this program would typically be individually identified and programmed through the County's Intersection Control Ranking System
(ICRS).
This program assumes one intersection improvement is programmed per year at a cost of $420,000.
Project #RB-2201
Justification
High-level intersection controls (roundabouts and traffic signals) may be constructed at county highway intersections meeting criteria set forth in
the County Intersection Control Ranking System.
The county proactively plans for the installation of intersection controls to improve the safety and efficiency of traffic flow on the County Highway
System. The annual Intersection Control Ranking System determines the priority of these installations.
The number of projects programmed varies depending on actual budget funding, the availability of matching funds, unforeseen development, or
intersection safety problems.
Budget Impact/Other
The typical traffic signal costs $1,500 per year to operate and maintain. This cost to the public is off-set by the increased traffic flow efficiency and
enhanced safety.
Useful Life 5+ yearsProject Name Intersection Control Projects Category Road & Bridge
Type Improvement
Location Various Roads District #Multiple
Total2022 2023 2024 2025 2026Expenditures
100,00020,000 20,000 20,000 20,000 20,000Planning / Design
2,850,000600,000 500,000 550,000 600,000 600,000Construction
620,000 520,000 570,000 620,000 620,000 2,950,000Total
Total2022 2023 2024 2025 2026Funding Sources
1,050,000210,000 210,000 210,000 210,000 210,000Local Contributions
1,900,000410,000 310,000 360,000 410,000 410,000State Aid
620,000 520,000 570,000 620,000 620,000 2,950,000Total
81
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes an annual program for mitigation of safety or traffic-capacity problems. Examples of solutions include:
1) turn-lane construction
2) signal-timing studies
3) flasher installations
4) minor curve corrections
5) pedestrian and trail projects
6) signing and striping improvements
Project #RB-2203
Justification
This annual program is needed to provide the county with the ability to be responsive to small safety or traffic-capacity problems throughout the
year that are not programmed into a larger capital project.
The county proactively plans for various safety/capacity projects in its budget. Keeping an allotment in the budget for these types of projects
eliminates future safety hazards for vehicular and pedestrian traffic. Proactively improving/reducing safety or traffic-capacity problems is cost-
efficient and keeps the potential for larger expenditures minimal.
Budget Impact/Other
The project scope doesn't significantly increase the operating costs of a county highway. There is no anticipated change within the Road & Bridge
Division operating budget.
Useful Life 5+ yearsProject Name Misc. Safety/Traffic Capacity Projects Category Road & Bridge
Type Improvement
Location Various District #Multiple
Total2022 2023 2024 2025 2026Expenditures
800,000200,000 200,000 200,000 200,000Construction
200,000 200,000 200,000 200,000 800,000Total
Total2022 2023 2024 2025 2026Funding Sources
100,000100,000County Program Aid
700,000100,000 200,000 200,000 200,000State Aid
200,000 200,000 200,000 200,000 800,000Total
82
2022 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2022 2026thru Department Capital Road & Bridge Project
Description
The project scope includes an annual program comprised of pavement preservation projects including:
1) seal coating
2) crack filling
3)pavement milling
4) overlays
5) hot and cold-in-place recycling
6) pavement reclaim
7)full-depth reclamation
8) paving gravel shoulders
9) minor subgrade corrections
10)right-of-way
2022 may include:
1) CSAH 3 - CSAH 4 to Old Marine Trail
2) CSAH 15 - TH 97 to 240th Street North
3) County 10 - County 21 to County 15
4) County 15 - Lynch Road to TH 97
5) crack sealing and misc. concrete at various locations throughout the County
Project #RB-2204
Justification
These projects are scheduled to interrupt the normal deterioration of highways to extend the pavement life. Pavement condition is
measured/calculated annually and reported as the system-wide Pavement Condition Index (PCI) that assigns a value to each roadway segment on a
scale of 1-100, with higher numbers equating to better pavement condition. Public Works Performance Measures set two goals: 1) system-wide
average PCI = 72 or greater, and 2) no roadway PCI should be lower than 40.
Budget Impact/Other
Projects completed under the Pavement Preservation Program reduce operation and maintenance costs.
Useful Life 5+ yearsProject Name Pavement Preservation & Rehab Category Road & Bridge
Type Improvement
Location Various Roads District #Multiple
Total2022 2023 2024 2025 2026Expenditures
35,800,00011,000,000 5,900,000 6,000,000 5,800,000 7,100,000Construction
11,000,000 5,900,000 6,000,000 5,800,000 7,100,000 35,800,000Total
Total2022 2023 2024 2025 2026Funding Sources
5,500,0005,000,000 500,000Local Option Sales Tax
6,800,0001,500,000 800,000 1,300,000 1,000,000 2,200,000State Aid
23,500,0004,500,000 4,600,000 4,700,000 4,800,000 4,900,000Wheelage Tax
11,000,000 5,900,000 6,000,000 5,800,000 7,100,000 35,800,000Total