Loading...
HomeMy WebLinkAbout#18 - Tamarack Farms Change Order 2DATE: December 7, 2021 CONSENT AGENDA ITEM: Approve Compensating Change Order No. 2 for the Tamarack Farm Estates Street Improvements SUBMITTED BY: Mike Rusenovich, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Compensating Change Order No. 2 for the Tamarack Farm Estates Improvements? BACKGROUND: Minnesota Paving and Materials was awarded a construction contract on June 1, 2021 to complete the Tamarack Farm Estates Street Improvements. The contractor has completed the work in accordance with the contract, plans, and specifications. PROPOSAL DETAILS/ANALYSIS: Minnesota Paving and Materials has submitted a compensating change order to reconcile the estimated and actual quantities installed on the project. With approval of this change order the contract amount will be adjusted to reflect the actual quantities installed as a part of the project. FISCAL IMPACT: $41,956.97 decrease to the final construction contract amount. This compensating change order will decrease the final construction contract amount to $544,164.92. The original construction contract amount at the time of award was $585,765.39. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Compensating Change Order No. 2 for the Tamarack Farm Estates Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Compensating Change Order No. 2 for the Tamarack Farm Estates Improvements, thereby decreasing the contract amount by $41,956.97”. ATTACHMENTS: 1. Compensating Change Order No. 2. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO.DATE: TO: UNIT Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO No.1)$ Contract Amount to date $ Amount of this Change Order (ADD) (DEDUCT) (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be (UNCHANGED) (INCREASED) (DECREASED)days APPROVED BY ENGINEER: FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are modified as follows upon execution of this Change Order. BYENGINEER 585,765.39 356.50 586,121.89 (41,956.97) 544,164.92 INCREASE/(DECREASE) OMG Midwest DBA MN Paving & Materials, 14475 Quiram Drive, Rogers, MN 55374 TAMARACK FARM ESTATES STREET IMPROVEMENTS PROJECT NO. 2020.125 2 December 7, 2021 ITEM **See attached itemization NET CONTRACT CHANGE ($41,956.97) CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: Per the project Contract Documents the original contract amount and basis of award is established using the estimated quantities for each item of work listed in the bid schedule and multiplying them by the Contractor’s corresponding unit bid price. The Contractor is paid for the actual final quantities installed on the project at the unit bid prices. At the completion of the project, a compensating change order is prepared to revise the estimated quantities for each work item listed in the bid schedule to the actual quantities installed and the corresponding Contract Amount is revised accordingly. This compensating change order reflects a net decrease to the contract amount by $41,956.97. Attachments (list documents supporting change):Itemization of Materials DESCRIPTION OF PAY ITEM QTY UNIT PRICE FOCUS Engineering, inc.CHANGE ORDER FORM Dan LoBello Digitally signed by Dan LoBelloDN: C=US, E=dan.lobello@minnpm.com, O=Minnesota Paving & Materials, CN=Dan LoBelloDate: 2021.11.30 15:25:54-06'00' CHANGE ORDER NO. 2 TAMARACK FARM ESTATES STREET IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2020.125 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT SCHEDULE A - GENERAL 1 LS 1.00 $35,000.00 $35,000.00 1.00 $35,000.00 0.00 $0.00 2 LS 1.00 $5,000.00 $5,000.00 1.00 $5,000.00 0.00 $0.00 3 LF 2,990.00 $1.00 $2,990.00 1,441.00 $1,441.00 -1,549.00 -$1,549.00 4 LF 130.00 $3.01 $391.30 130.00 $391.30 0.00 $0.00 5 EA 13.00 $106.05 $1,378.65 13.00 $1,378.65 0.00 $0.00 6 TREE 45.00 $250.71 $11,281.95 60.00 $15,042.60 15.00 $3,760.65 7 TREE 45.00 $200.57 $9,025.65 55.00 $11,031.35 10.00 $2,005.70 8 CY 441.00 $19.00 $8,379.00 294.00 $5,586.00 -147.00 -$2,793.00 9 EA 1.00 $0.01 $0.01 0.00 $0.00 -1.00 -$0.01 10 HR 26.00 $158.45 $4,119.70 4.00 $633.80 -22.00 -$3,485.90 11 HR 6.00 $147.38 $884.28 0.00 $0.00 -6.00 -$884.28 12 SY 173.40 $2.51 $435.23 2,600.00 $6,526.00 2,426.60 $6,090.77 13 AC 0.70 $9,710.00 $6,797.00 0.62 $6,020.20 -0.08 -$776.80 14 SY 6,130.00 $4.50 $27,585.00 3,825.00 $17,212.50 -2,305.00 -$10,372.50 SCHEDULE B - STORM SEWER 15 LF 145.00 $10.13 $1,468.85 145.00 $1,468.85 0.00 $0.00 16 EA 5.00 $531.75 $2,658.75 5.00 $2,658.75 0.00 $0.00 17 EA 1.00 $177.25 $177.25 1.00 $177.25 0.00 $0.00 18 EA 5.00 $222.83 $1,114.15 5.00 $1,114.15 0.00 $0.00 19 EA 4.00 $2,582.81 $10,331.24 4.00 $10,331.24 0.00 $0.00 20 EA 1.00 $1,519.30 $1,519.30 1.00 $1,519.30 0.00 $0.00 21 EA 1.00 $303.86 $303.86 1.00 $303.86 0.00 $0.00 22 LF 20.00 $60.77 $1,215.40 20.00 $1,215.40 0.00 $0.00 23 LF 266.00 $55.45 $14,749.70 270.00 $14,971.50 4.00 $221.80 24 LF 27.00 $63.81 $1,722.87 27.00 $1,722.87 0.00 $0.00 25 EA 1.00 $2,476.45 $2,476.45 1.00 $2,476.45 0.00 $0.00 26 EA 1.00 $3,134.52 $3,134.52 1.00 $3,134.52 0.00 $0.00 27 EA 2.00 $3,007.91 $6,015.82 2.00 $6,015.82 0.00 $0.00 28 EA 2.00 $4,871.58 $9,743.16 3.00 $14,614.74 1.00 $4,871.58 29 EA 1.00 $5,464.11 $5,464.11 0.00 $0.00 -1.00 -$5,464.11 30 EA 2.00 $3,995.45 $7,990.90 2.00 $7,990.90 0.00 $0.00 31 CY 15.00 $177.25 $2,658.75 9.00 $1,595.25 -6.00 -$1,063.50 32 LF 313.00 $4.01 $1,255.13 320.00 $1,283.20 7.00 $28.07 33 CY 500.00 $16.97 $8,485.00 356.00 $6,041.32 -144.00 -$2,443.68 34 LF 200.00 $6.84 $1,368.00 225.00 $1,539.00 25.00 $171.00 SCHEDULE C - STREETS 35 EA 19.00 $110.31 $2,095.89 19.00 $2,095.89 0.00 $0.00 36 EA 2.00 $200.57 $401.14 2.00 $401.14 0.00 $0.00 37 SF 440.00 $16.55 $7,282.00 115.00 $1,903.25 -325.00 -$5,378.75 38 EA 7.00 $50.00 $350.00 2.00 $100.00 -5.00 -$250.00 39 LF 170.00 $4.08 $693.60 254.00 $1,036.32 84.00 $342.72 40 SY 4,640.00 $4.20 $19,488.00 4,720.00 $19,824.00 80.00 $336.00 41 SY 272.30 $11.00 $2,995.30 158.00 $1,738.00 -114.30 -$1,257.30 42 SY 100.30 $11.00 $1,103.30 43.00 $473.00 -57.30 -$630.30 43 SY 30.00 $34.00 $1,020.00 8.00 $272.00 -22.00 -$748.00 44 EA 1.00 $346.02 $346.02 1.00 $346.02 0.00 $0.00 45 SY 38.00 $34.60 $1,314.80 15.00 $519.00 -23.00 -$795.80 46 LF 72.00 $12.91 $929.52 98.00 $1,265.18 26.00 $335.66 47 CY 3,900.00 $19.00 $74,100.00 3,900.00 $74,100.00 0.00 $0.00 48 CY 2,060.00 $25.00 $51,500.00 2,060.00 $51,500.00 0.00 $0.00 49 CY 278.00 $32.41 $9,009.98 40.00 $1,296.40 -238.00 -$7,713.58 50 RD STA 20.00 $96.22 $1,924.40 20.00 $1,924.40 0.00 $0.00 51 TN 1,970.00 $17.86 $35,184.20 1,970.00 $35,184.20 0.00 $0.00 52 SY 279.00 $0.01 $2.79 262.00 $2.62 -17.00 -$0.17 53 TN 479.60 $84.00 $40,286.40 459.00 $38,556.00 -20.60 -$1,730.40 AGGREGATE BASE CLASS 6 BITUMINOUS DRIVEWAY PAVEMENT TYPE SP 9.5 WEARING COURSE MIX (2,C) REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER COMMON EXCAVATION (P) SELECT GRANULAR BORROW (P) SUBGRADE CORRECTION SUBGRADE PREPARATION CLEAN AND TELEVISE STORM SEWER CHANNEL AND POND EXCAVATION SALVAGE AND REINSTALL PAVERS REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (FLUME) REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (DRIVEWAY) EXPLORATORY DIGGING STREET SWEEPER (WITH PICKUP BROOM) DITCH GRADING SALVAGE AND REINSTALL MAILBOX SALVAGE AND REINSTALL SIGN REMOVE SIGN REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWAY) SAWCUT BITUMINOUS OR CONCRETE REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (P) REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (WALK) EROSION CONTROL BLANKET SEEDING SODDING REMOVE AND DISPOSE OF EXISTING STORM SEWER REMOVE AND DISPOSE OF EXISTING CATCH BASIN INLET PROTECTION CLEARING GRUBBING IMPORT AND PLACE TOPSOIL BORROW TEMPORARY ROCK CONSTRUCTION ENTRANCE COMPENSATING CHANGE ORDER NO. 2 MOBILIZATION TRAFFIC CONTROL SILT FENCE SEDIMENT CONTROL LOG TYPE COMPOST ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT TOTAL TO DATE REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT (WALK) REMOVE AND DISPOSE OF EXISTING FLARED END SECTION REMOVE CATCH BASIN CASTING CONNECT TO EXISTING STORM SEWER CONNECT TO EXISTING CATCH BASIN CONNECT DRAINTILE TO EXISTING CATCH BASIN 18" RC PIPE SEWER CLASS V CATCH BASIN TYPE 402 CATCH BASIN MANHOLE TYPE 406 15" RC PIPE SEWER CLASS V 15" RC PIPE FLARED END SECTION CLASS V CATCH BASIN MANHOLE WITH SUMP TYPE SPECIAL CATCH BASIN TYPE 404 CATCH BASIN MANHOLE WITH SUMP TYPE 405 12" RC PIPE SEWER CLASS V RIPRAP CLASS II 54 TN 640.00 $79.00 $50,560.00 498.00 $39,342.00 -142.00 -$11,218.00 55 GAL 290.00 $1.60 $464.00 300.00 $480.00 10.00 $16.00 56 LF 4,000.00 $13.04 $52,160.00 3,987.00 $51,990.48 -13.00 -$169.52 57 SY 37.60 $78.22 $2,941.07 26.11 $2,042.32 -11.49 -$898.75 58 SY 32.00 $53.15 $1,700.80 6.78 $360.36 -25.22 -$1,340.44 59 EA 2.00 $852.41 $1,704.82 2.00 $1,704.82 0.00 $0.00 60 SF 32.00 $52.15 $1,668.80 48.00 $2,503.20 16.00 $834.40 61 LF 1,000.00 $21.27 $21,270.00 1,000.00 $21,270.00 0.00 $0.00 62 EA 10.00 $227.89 $2,278.90 10.00 $2,278.90 0.00 $0.00 63 SF 35.25 $30.09 $1,060.67 35.00 $1,053.15 -0.25 -$7.52 64 EA 16.00 $175.50 $2,808.00 16.00 $2,808.00 0.00 $0.00 $585,765.39 $543,808.42 -$41,956.97 TOTALS - BASE CONTRACT $585,765.39 $543,808.42 -$41,956.97 CHANGE ORDER NO. 1 CO1-1 AC 0.62 $575.00 $356.50 0.62 $356.50 0.00 $0.00 $356.50 $356.50 $0.00 TOTALS - REVISED CONTRACT $586,121.89 $544,164.92 -$41,956.97 4" PERFORATED PVC EDGE DRAIN DRAINTILE CLEANOUT FURNISH SIGN PANEL INSTALL SIGN PANELS CONCRETE CURB AND GUTTER DESIGN B612 6" CONCRETE DRIVEWAY 5" CONCRETE WALK CONCRETE PEDESTRIAN RAMP TRUNCATED DOME PANELS TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,C) BITUMINOUS MATERIAL FOR TACK COAT SUBTOTAL - CHANGE ORDER NO. 1 BASE BID MNDOT SEED MIX 35-641