HomeMy WebLinkAbout#31 - 2022-2026 Capital Improvement PlanDATE: December 7th, 2021 AGENDA ITEM: 2022-2026 CIP TO: Mayor and City Council SUBMITTED BY: Samuel Magureanu, Finance Director BACKGROUND: In May staff developed recommendations for updates to the 2022-2026 Capital Improvement Plan (CIP) working in consultation with the Parks Commission. Finance Department reviewed the plan and presented to the Council at its workshop meeting on August 24th. The Planning Commission held a public hearing on the 2022-2026 CIP at their October 25th, 2021 meeting. There were no public comments at the meeting or written comments received prior. The Planning Commission voted 5-1to find the CIP consistent with the 2040 Comprehensive Plan. ISSUE BEFORE COMMISSION: Should Council approve the 2022-2026 Capital Improvement Plan? PROPOSAL DETAILS/ANALYSIS: A copy of the 2022-2026 CIP is included in your packet. It includes projects that cost at least $25,000 and have a useful life span of five years or longer. Projects are prioritized and funding sources are identified. The 2022-2026 CIP includes 79 separate projects with a total estimated cost of about $81 million. These projects include street work, equipment (fire, public works, parks and utilities), park and trail improvements, and utility infrastructure. FISCAL IMPACT: The total estimated costs of all the projects is $81 million. Funding sources are identified for each project with a summary included on page 17. OPTIONS: 1) Approve the 2022-2026 CIP 2) Amend and then Approve the 2022-2026 CIP RECOMMENDATION: “Motion to approve the 2022-2026 Capital Improvement Plan” ATTACHMENT: • Draft 2022-2026 Capital Improvement Plan City of Lake Elmo Capital Improvement Program 2022 – 2026 City Council Draft 12/07/21 TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................1 Scope of the Draft CIP .....................................................................................................1 Funding Sources...............................................................................................................2 Project Priorities ...............................................................................................................3 2022-2026 CIP Overview Street Projects ..................................................................................................................6 Project Highlights by Department ...................................................................................7 CIP Reports (Appendix) Projects Listings………………………………………………………………………..10 Projects by Year & Priority...…………………………………………………………..13 Funding Source Summary……………………………………………………………...17 Projects by Funding Source 2022-2026 ……………………………………………….18 Projects by Funding Source 2022-2031 ……………………………………………….21 Projects & Funding Sources by Department…………………………………………...26 Project Detail……………………………….…………………………………………..30 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment, and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget, but would not be included in the CIP. Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system Wastewater Fund Funds come from fees paid by users of the Wastewater System Vehicle Replacement Fund Fund used to segregate funds set aside for planned replacements of existing vehicles. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Municipal State Aid (MSA) Funds come from fees paid by users of the Water System State aid funds allocated to the City each year; annual allocation grows as the City grows. In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. The Vehicle Replacement Fund at 12/31/2020 had a fund balance of $1,716,283. The estimated balance at 12/31/2021 is $909,703. The updated proposed schedule of revenues and expenditures assumes the tax rate is 2% or greater increase in the tax rate each year after that, except 2029- 2031 flat rate. Year Revenue Expense Fund Balance 2020 $1,051,228 $596,409 $1,716,283 2021 $260,746 $1,067,326 $909,703 2022 $150,000 $409,000 $650,703 2023 $175,000 $526,500 $299,203 2024 $265,000 $228,000 $336,203 2025 $368,000 $187,000 $517,203 2026 $200,000 $65,000 $652,203 2027 $331,000 $1,020,000 -$36,797 2028 $517,000 $0 $480,203 2029 $709,000 $365,000 $824,203 2030 $953,000 $0 $1,777,203 2031 $677,000 $30,000 $2,424,203 Schedule of Revenues and Expenditures Revenue from investments and the sale of equipment is not included in the above table. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1 Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low-priority projects; desirable but not essential. 5 Future Consideration 2022-2026 CIP OVERVIEW For 2022 through 2026, the draft CIP includes 79 separate projects (active, pending and new recommendations) with a total estimated cost of $81,022,019. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The update includes the following street projects in the CIP: • PW-030, CSAH 15/30th St Signal for $628,152 in 2022. • PW-031, CSAH6/Inwood Street Signal for $250,000 in 2025. • PW-034, 15th St N (MSA Street) for $1,200,000 in 2023. • PW-035, UP RR Crossing-Village Parkway for $525,000 in 2022. • PW-036, UP RR Crossing-Private Drive Closure for $105,000 in 2022. • PW-037, UP RR Crossing-Klondike Ave for $262,500 in 2022. • PW-038, Reclaim roads in Parkview Estates, Cardinal Ridge, Cardinal View, Whistling Valley, Torres Pines, Fields of St. Croix 1st Addition, Beaut Crest, and Old Village 5 and 6 streets. Total projects cost $10,055,000 in 2022. Grant contributions are anticipated at $5,430,000. • PW-039, Reclaim roads in Packard Park, Eden Park and 20th St. Circle, Fields of St. Croix 2nd Addition, Tana Ridge, and Old Village Phase 7, $6,996,250 in 2023. Grant contributions are anticipated at $3,950,000. • PW-040, Reclaim roads for Homestead and The Forest, Carriage Station plus 59th St Ct/55th/ Julep Way for $4,704,750 in 2024. Grant contributions are anticipated at $2,070,000. • PW-041, Reclaim roads in Tartan Meadows, Klondike for $3,040,000, and Annual Street Improvements to be determined for $2,500,000 million in 2025. Grant contributions are anticipated at $3,040,000. • PW-042, Reclaim roads in Stillwater Lane, Downs Lake Estates, Sunfish Ponds for $3,268,000, and Annual Street Improvements to be determined for $2,5000,000 million in 2026. Grant contributions are anticipated at $3,268,000. • PW-052, Ideal Ave (Phase 2) for $400,000 in 2022. • PW-067, Manning/Hudson Stoplight for $250,000 in 2023 is covered by developer. • PW-074, Lake Elmo Avenue and TH 36 including on/off ramps, for $4,500,000 in 2025 (new) • PW-076, South Frontage Road between Keats Ave and Lake Elmo Ave for $2,500,000 in 2026 (new) • PW-077, 5th St Medians in 2022 for $206,350. Project Highlights by Department Building:  B-002, Replace 2021 Jeep used for inspections in 2026 for $30,000.  B-003, Replace 2017 Equinox used for inspections in 2022 for $30,000.  B-004, Replace 2019 Equinox used for inspections in 2024 for $30,000. Fire:  F-012, Replace B2 (brush rig) for $90,000 in 2024.  F-014, Replace rescue boat and trailer for $30,000 in 2024.  F-017, Turnout Gear Replacements for $83,000 in 2022.  F-019, Tahoe CV2 Replacement for $67,000 in 2025.  F-020, 2015 Tahoe CV3 Replacement for $65,500 in 2023 (new)  F-021, Replace Radios for $195,000 in 2022 (new)  F-022, Replace SCBA Fill Station & Compressor for $50,000 in 2024 (new) Parks and Recreation:  PR-009, Central Greenway Regional Trail for $220,000 in 2023. The segments contemplated in 2023 include the area south of the Lake Elmo Park Preserve entrance along Keats Ave and a connecting segment on CSAH 14 in front of Hagberg’s Market.  PR-017, New or Refurbished Ballfields for $1 million in 2024.  PR-019, Dog Park for $25,000 in 2023  PR-020, Utility Vehicle/Trail Groomer for $37,000 in 2024  PR-021, Neighborhood Trail Connections for $266,430 in 2022 and $56,213 in 2023.  PR-022, Replace Pebble Park Playground Equipment for $130,000 in 2023 (new)  PR-023, Replace 30 year old playground equipment at Demontriville Park for $130,000 in 2023 (new)  PR-024, Tablyn Park Court Resurfacing for $75,000 in 2025 (new)  PR-025, Pebble Park Courts for $85,000 in 2024 (new)  PR-026, Trail Seal Coat. Seal coating 49,000 square yards of city owned park and trails for $65,000 in 2022 (new)  PR-027, Kleis Park Disc Golf for $25,000 in 2023. Public Works: Street Projects were mentioned above. The remaining projects are equipment and vehicle purchases. Costs have been updated to reflect more recent pricing.  PW-004, Replace 1999 Loader for $185,000 in 2023.  PW-006, Replace 2004 John Deere Tractor for $130,000 in 2023.  PW-019, Replace 2012 F250 Pickup/Plow for $44,000 in 2022.  PW-044, Replace 2006 Case Backhoe with a more maneuverable unit for $85,000 in 2023.  PW-048, Replace Mini Loader for $120,000 in 2025.  PW-049, Replace trailer hot box unit with a dump style trailer unit for $50,000 in 2022.  PW-050, Replace Dump Truck with Plow 2006 model with a Tandem for $275,000 in 2022.  PW-054, Additional Skidloader for $70,000 in 2023.  PW-060, Pickup with plow to replace 2014 F250 for $41,000 in 2024.  PW-061, Replace 2016 F150 Pickup for $35,000 in 2026.  PW-071, Replace 2013 Bobcat for $70,000 in 2022 (new)  PW-072, Purchase new Pickup for $42,000 in 2023 (new) Sewer System:  S-005, Old Village Phase 5 and 6, in 2022 to include sewer along 33rd and 32nd St N. for $1,475,000.  S-013, Sewer Oversizing for $22,438 in 2022, $32,922 in 2023, and $40,000 in 2024.  S-017, Old Village Sewer Extension Phase Seven for $575,000 in 2023.  S-019, VAC Truck for $250,000 in 2024. Costs to be split between sewer and storm water funds.  S-020, Sewer Upgrades to provide service to 180 acres for $540,000 in 2022 and $100,000 in 2023. Sewer trunk extension from lift station in Oakdale at Elmo Ave/Stillwater Blvd north on Ideal Ave to city property across from Target. Includes contribution to Oakdale lift station upgrade and capacity improvements ($267k). Segments of sewer to south of the railroad tracks ($270k). Oversizing costs to developer in 2023 ($100,000). 2022 will be funded with ARPA funds?  S-021, Low Pressure Sewer to Klondike. Cost to be determined in 2025 (new)  S-022, Sewer to Sunfish Ponds. Cost to be determined in 2026 (new)  S-023, Tapestry Neighborhood Sanitary Sewer Extension for $922,000 in 2022 (new)  S-024, I-94 Station and Forcemain Upgrade, Met Council Gravity Sewer Extension for $1,900,000 in 2024 (new) Storm Water System:  SW-001, Phase 2 Regional Drainage Improvements for $800,000 in 2023. The costs and dates are estimates and will depend upon development.  SW-002, Phase 3 Regional Drainage Improvements for $500,000 in 2024. The costs and dates are estimates and will depend upon development.  SW-003, Kramer Lake Floodplain Study for $60,000 in 2024 assumes a grant from the watershed district Water System:  W-006, Elevated Storage Tank #3, for $4,110,000 in 2022.  W-008, Village East Trunk Watermain 12" trunk extension to north side of UPRR with 12" pressure reduction valve with bypass for $375,000 in 2022.  W-010, Paint Water Tower Tank #2 for $800,000 in 2024.  W-012, Well #4 pump to be pulled and rebuilt for $35,000 in 2022.  W-013, Watermain Oversizing for $235,219 in 2022, $40,695 in 2023, $120,000 in 2024, and $60,000 in 2025.  W-023, Water Meter Change for $200,000 total for years 2022-2024.  W-024, Automated Radio Read System for $300,000 in 2025.  W-025, Old Village Phase 5 and 6 Watermain component of $1,040,000 in 2022.  W-026, Old Village water extension Phase Seven for $270,000 in 2023.  W-031, Watermain extension to Parkview Estates, Cardinal Ridge, Cardinal View, Torres Pines, and Whistling Valley consistent with road work for $4,186,000 in 2022, and assumes state grants for $3,745,000.  W-032, Watermain upgrades in Fields of St Croix 2nd Addition and Tana Ridge, Packard Park, Eden Park and 20th St Circle for $2,550,600 in 2023, and assumes state grants of $2,280,000.  W-033, Homestead and The Forest, Carriage Station + 59th St Ct/55th St/Julep Way for $1,497,000 in 2024. Homestead and The Forest assumes 3M Grant of $1,200,000.  W-034, Tartan Meadows + Klondike assumes 3M grant in 2025 for $1,640,000 and $180,000 pending roadway pavement evaluation.  W-035, Watermain extension to Stillwater Lane, Downs Lake Estates and Sunfish Ponds, assumes grants of $1,620,000, and $180,000 pending roadway pavement evaluation, in 2026 (new)  W-036, 9757, 9759 & 9765 45th Street Watermain Extension (Blackford Extension) for $400,000 in 2023. Would only be completed if funding is received from the 3M Grants.  W-037, Well and Pumphouse No. 6 and monitoring Well as required by the DNR, for $2,700,000 in 2026 (new)  W-038, Watermain Trunk Watermains, inlcuding area on Hudson between Keats and Lake Elmo Ave, Stillwater Blvd, Downs Lake area, etc, for $1,392,000 in 2024, $1,000,000 in 2025, and $1,000,000 in 2026 (new)  W-039, Decommissioning and removal of water tower #1 on Langly Court for $50,000 in 2026 (new) Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota PROJECT LISTING2022 2026thru Includes Projects from All Years Building Department Status Project #Project Name Replacement Inspection TruckActive B-001 Inspection VehcileActive B-002 Inspection VehcileActive B-003 Inspection VehicleActive B-004 Fire Department Status Project #Project Name SCBA ReplacementsActive F-007 Brush Truck 2Active F-012 T2 Tender/EngineActive F-013 Rescue Boat & Trailer ReplacementActive F-014 Rescue/Brush Fire UTVActive F-015 L1 Ladder TruckActive F-016 Turnout Gear ReplacementsActive F-017 Command Vehicle 1 (2021 Tahoe)Active F-018 Command Vehicle 2 (2016 Tahoe)Active F-019 Command Vehicle 3 (2015 Tahoe)New Recommendation F-020 800 MHz Radio ReplacementNew Recommendation F-021 SCBA Fill Station & CompressorNew Recommendation F-022 Parks and Recreation Status Project #Project Name Central Greenway Regional TrailActive PR-009 New or Refurbished BallfieldsActive PR-017 Dog ParkActive PR-019 Utility Vehicile/Trail GroomerActive PR-020 Neighborhood Trail ConnectionsActive PR-021 Pebble Park Playground ReplacementNew Recommendation PR-022 Demontriville Park Playground ReplacementNew Recommendation PR-023 Tablyn Park Court ResurfacingNew Recommendation PR-024 Pebble Park CourtsNew Recommendation PR-025 Trail Seal CoatNew Recommendation PR-026 Kleis Park Disc GolfNew Recommendation PR-027 Public Works Department Status Project #Project Name LoaderActive PW-004 TractorActive PW-006 PickupTruck / plowActive PW-019 CSAH 15/30th Street SignalActive PW-030 CSAH 6/Inwood SignalActive PW-031 15th Street North (MSA Street)Active PW-034 UP RR Crossing - Village ParkwayActive PW-035 UP RR Crossing - Private Drive ClosureActive PW-036 UP RR Crossing: Klondike AveActive PW-037 2022 Street ImprovementsActive PW-038 2023 Street ImprovementsActive PW-039 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software 2024 Street ImprovementsActive PW-040 2025 Street IrmprovementsActive PW-041 2026 Street ImprovementsActive PW-042 Service TruckActive PW-043 Back HoeActive PW-044 Tandem Plow TruckActive PW-045 Dump Truck w/PlowActive PW-047 Mini LoaderActive PW-048 Asphalt Hot BoxActive PW-049 Dump Truck with PlowActive PW-050 Ideal Ave (CSAH 13) Phase 2Active PW-052 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6Active PW-053 SkidloaderActive PW-054 2027 Street ImprovementsActive PW-055 2028 Street ImprovementsActive PW-056 Manning Ave Phase 3Active PW-057 TH 36/Manning InterchangeActive PW-058 Pickup w/plowActive PW-060 PickupActive PW-061 DumpTruck w/plow, sander & underbodyActive PW-062 Pickup w/lift gate & plowActive PW-063 Pickup w/lift gate & plowActive PW-064 Dump Truck w/plow, sander & underbodyActive PW-065 Manning Phase 4Active PW-066 Manning/Hudson StoplightActive PW-067 2029 Steet ImprovementsActive PW-068 2030 Street ImprovementsActive PW-070 2031 Street ImprovementsActive PW-075 5th St MediansActive PW-077 2013 Bobcat T590 Track Skid Steer ReplacementNew Recommendation PW-071 Pickup truck additionNew Recommendation PW-072 TH36-Lake Elmo Ave (CSAH 17) ImpNew Recommendation PW-074 South Frontage Road (Keats to Lake Elmo Ave)New Recommendation PW-076 Sewer Department Status Project #Project Name Hamlet on Sunfish Lake Sewer ExtensionActive S-003 Old Village Sewer Extension Phase 5Active S-005 Sewer OversizingActive S-013 Old Village Sewer Extension Phase 7Active S-017 VAC TruckActive S-019 Sewer to 180 AcresActive S-020 Low Pressure Sewer to KlondikeNew Recommendation S-021 Sewer to Sunfish PondsNew Recommendation S-022 Tapestry Neighborhood Sanitary Sewer ExtNew Recommendation S-023 I-94 Lift Station and Forcemain UpgradeNew Recommendation S-024 Storm Water Department Status Project #Project Name Phase 2 Regional Drainage ImprovementsActive SW-001 Phase 3 Regional Drainage ImprovementsActive SW-002 Kramer Lake Floodplain StudyActive SW-003 Water Department Status Project #Project Name Elevated Storage Tank #3Active W-006 Village East Trunk Watermain & PRVActive W-008 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Paint Water Tank at PWActive W-010 Well #4 Pump - Pull and RebuildActive W-012 Watermain OversizingActive W-013 Well & Pumphouse #5Active W-014 2020 Street & Utility Improvements-WaterActive W-017 Utility TruckActive W-022 Water Meter Change OutActive W-023 Automated Radio Read SystemActive W-024 OV sewer extension phase 6 & 5; water componentActive W-025 OV sewer extension Phase 7; water componentActive W-026 Pressure Reduction Station-Connection to WT #3Active W-027 2022 Street Projects-water componentActive W-031 2023 Street Projects-water componentActive W-032 2024 Street Projects-water componentActive W-033 2025 Street Projects-water componentActive W-034 45th Street Watermain ExtensionActive W-036 2026 Street Projcts-water componentNew Recommendation W-035 Well, Pumphouse No. 6 and monitoring wellNew Recommendation W-037 Watermain Trunk WatermainsNew Recommendation W-038 Decommission Water Tower 1New Recommendation W-039 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota PROJECTS BY YEAR & PRIORITY 2022 2026thru Project Name Department Project #Priority Project Cost 2022 Priority 1 Critical F-017Turnout Gear Replacements 1 83,000Fire Department F-021800 MHz Radio Replacement 1195,000Fire Department PW-050Dump Truck with Plow 1275,000Public Works Department W-006Elevated Storage Tank #3 1 4,110,000Water Department W-023Water Meter Change Out 1 75,000Water Department 4,738,000Total for: Priority 1 Priority 2 Very Important PR-021Neighborhood Trail Connections 2266,430Parks and Recreation PR-026Trail Seal Coat 2 65,000Parks and Recreation PW-035UP RR Crossing - Village Parkway 2525,000Public Works Department PW-036UP RR Crossing - Private Drive Closure 2105,000Public Works Department PW-037UP RR Crossing: Klondike Ave 2262,500Public Works Department PW-049Asphalt Hot Box 2 50,000Public Works Department PW-0712013 Bobcat T590 Track Skid Steer Replacement 2 70,000Public Works Department PW-0775th St Medians 2206,350Public Works Department W-008Village East Trunk Watermain & PRV 2375,000Water Department 1,925,280Total for: Priority 2 Priority 3 Important B-003Inspection Vehcile 3 30,000Building Department PW-030CSAH 15/30th Street Signal 3628,152Public Works Department PW-0382022 Street Improvements 3 10,055,000Public Works Department PW-052Ideal Ave (CSAH 13) Phase 2 3400,000Public Works Department S-005Old Village Sewer Extension Phase 5 3 1,475,000Sewer Department S-013Sewer Oversizing 3 22,438Sewer Department S-020Sewer to 180 Acres 3540,000Sewer Department S-023Tapestry Neighborhood Sanitary Sewer Ext 3922,000Sewer Department W-012Well #4 Pump - Pull and Rebuild 3 35,000Water Department W-013Watermain Oversizing 3235,219Water Department W-025OV sewer extension phase 6 & 5; water component 3 1,040,000Water Department W-0312022 Street Projects-water component 3 4,186,000Water Department 19,568,809Total for: Priority 3 Priority 4 Less Important PW-019PickupTruck / plow 4 44,000Public Works Department 44,000Total for: Priority 4 26,276,089Total for 2022 2023 Priority 1 Critical W-023Water Meter Change Out 1 75,000Water Department Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Project Name Department Project #Priority Project Cost 75,000Total for: Priority 1 Priority 2 Very Important F-020Command Vehicle 3 (2015 Tahoe)2 65,500Fire Department PR-021Neighborhood Trail Connections 2 56,213Parks and Recreation PR-022Pebble Park Playground Replacement 2130,000Parks and Recreation PR-023Demontriville Park Playground Replacement 2130,000Parks and Recreation PW-004Loader 2185,000Public Works Department PW-006Tractor 2130,000Public Works Department PW-044Back Hoe 2 85,000Public Works Department PW-067Manning/Hudson Stoplight 2250,000Public Works Department PW-072Pickup truck addition 2 42,000Public Works Department 1,073,713Total for: Priority 2 Priority 3 Important PR-009Central Greenway Regional Trail 3220,000Parks and Recreation PR-027Kleis Park Disc Golf 3 25,000Parks and Recreation PW-03415th Street North (MSA Street)3 1,200,000Public Works Department PW-0392023 Street Improvements 3 6,996,250Public Works Department PW-054Skidloader 3 70,000Public Works Department S-013Sewer Oversizing 3 32,922Sewer Department S-017Old Village Sewer Extension Phase 7 3575,000Sewer Department S-020Sewer to 180 Acres 3100,000Sewer Department SW-001Phase 2 Regional Drainage Improvements 3800,000Storm Water Department W-013Watermain Oversizing 3 40,695Water Department W-026OV sewer extension Phase 7; water component 3270,000Water Department W-0322023 Street Projects-water component 3 2,550,600Water Department W-03645th Street Watermain Extension 3400,000Water Department 13,280,467Total for: Priority 3 Priority 4 Less Important PR-019Dog Park 4 25,000Parks and Recreation 25,000Total for: Priority 4 14,454,180Total for 2023 2024 Priority 1 Critical F-014Rescue Boat & Trailer Replacement 1 30,000Fire Department F-022SCBA Fill Station & Compressor 1 50,000Fire Department PR-017New or Refurbished Ballfields 1 1,000,000Parks and Recreation W-023Water Meter Change Out 1 50,000Water Department 1,130,000Total for: Priority 1 Priority 2 Very Important F-012Brush Truck 2 2 90,000Fire Department S-019VAC Truck 2250,000Sewer Department 340,000Total for: Priority 2 Priority 3 Important B-004Inspection Vehicle 3 30,000Building Department PR-020Utility Vehicile/Trail Groomer 3 37,000Parks and Recreation PR-025Pebble Park Courts 3 85,000Parks and Recreation PW-0402024 Street Improvements 3 4,704,750Public Works Department PW-060Pickup w/plow 3 41,000Public Works Department Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Project Name Department Project #Priority Project Cost S-013Sewer Oversizing 3 40,000Sewer Department S-024I-94 Lift Station and Forcemain Upgrade 3 1,900,000Sewer Department SW-002Phase 3 Regional Drainage Improvements 3500,000Storm Water Department SW-003Kramer Lake Floodplain Study 3 60,000Storm Water Department W-013Watermain Oversizing 3120,000Water Department W-0332024 Street Projects-water component 3 1,497,000Water Department W-038Watermain Trunk Watermains 3 1,392,000Water Department 10,406,750Total for: Priority 3 Priority 4 Less Important W-010Paint Water Tank at PW 4800,000Water Department 800,000Total for: Priority 4 12,676,750Total for 2024 2025 Priority 2 Very Important F-019Command Vehicle 2 (2016 Tahoe)2 67,000Fire Department PW-048Mini Loader 2120,000Public Works Department 187,000Total for: Priority 2 Priority 3 Important PR-024Tablyn Park Court Resurfacing 3 75,000Parks and Recreation PW-031CSAH 6/Inwood Signal 3250,000Public Works Department PW-0412025 Street Irmprovements 3 5,540,000Public Works Department PW-074TH36-Lake Elmo Ave (CSAH 17) Imp 3 4,500,000Public Works Department W-013Watermain Oversizing 3 60,000Water Department W-024Automated Radio Read System 3300,000Water Department W-0342025 Street Projects-water component 3 1,820,000Water Department W-038Watermain Trunk Watermains 3 1,000,000Water Department 13,545,000Total for: Priority 3 Priority 5 Future Consideration S-021Low Pressure Sewer to Klondike 50Sewer Department 0Total for: Priority 5 13,732,000Total for 2025 2026 Priority 2 Very Important B-002Inspection Vehcile 2 30,000Building Department 30,000Total for: Priority 2 Priority 3 Important PW-0422026 Street Improvements 3 5,768,000Public Works Department PW-061Pickup 3 35,000Public Works Department PW-076South Frontage Road (Keats to Lake Elmo Ave)3 2,500,000Public Works Department W-0352026 Street Projcts-water component 3 1,800,000Water Department W-037Well, Pumphouse No. 6 and monitoring well 3 2,700,000Water Department W-038Watermain Trunk Watermains 3 1,000,000Water Department W-039Decommission Water Tower 1 3 50,000Water Department 13,853,000Total for: Priority 3 Priority 5 Future Consideration S-022Sewer to Sunfish Ponds 50Sewer Department Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Project Name Department Project #Priority Project Cost 0Total for: Priority 5 13,883,000Total for 2026 GRAND TOTAL 81,022,019 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota FUNDING SOURCE SUMMARY 2022 thru 2026 TotalSource2022 2023 2024 2025 2026 Debt Service 27,998,6528,442,652 4,421,250 3,134,750 7,000,000 5,000,000 General Fund 398,636348,636 50,000 Grants/Donation 31,178,71410,400,714 6,880,000 4,330,000 4,680,000 4,888,000 Municipal Sate Aid (MSA)1,450,0001,200,000 250,000 Park Dedication Fund 1,077,643331,430 586,213 85,000 75,000 Sewer Fund 2,247,36022,438 149,922 2,075,000 0 0 Storm Water Fund 102,00010,000 17,000 75,000 Street Fund 40,00040,000 Vehicle Replacement Fund 1,415,500409,000 526,500 228,000 187,000 65,000 Water Fund 15,113,5146,311,219 673,295 2,659,000 1,540,000 3,930,000 26,276,089 14,454,180 12,676,750 13,732,000 13,883,000 81,022,019GRAND TOTAL Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2022 2026thru TotalSource Project # Priority 2022 2023 2024 2025 2026 Debt Service PW-030 628,152628,152CSAH 15/30th Street Signal 3 PW-035 25,00025,000UP RR Crossing - Village Parkway 2 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 PW-038 4,625,0004,625,0002022 Street Improvements 3 PW-039 3,046,2503,046,2502023 Street Improvements 3 PW-040 2,634,7502,634,7502024 Street Improvements 3 PW-041 2,500,0002,500,0002025 Street Irmprovements 3 PW-042 2,500,0002,500,0002026 Street Improvements 3 PW-052 400,000400,000Ideal Ave (CSAH 13) Phase 2 3 PW-074 4,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) Imp 3 PW-076 2,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave) 3 S-005 1,475,0001,475,000Old Village Sewer Extension Phase 5 3 S-017 575,000575,000Old Village Sewer Extension Phase 7 3 S-023 922,000922,000Tapestry Neighborhood Sanitary Sewer Ext 3 SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 27,998,6528,442,652 4,421,250 3,134,750 7,000,000 5,000,000Debt Service Total General Fund F-017 83,00083,000Turnout Gear Replacements 1 F-021 9,2869,286800 MHz Radio Replacement 1 F-022 50,00050,000SCBA Fill Station & Compressor 1 PW-049 50,00050,000Asphalt Hot Box 2 PW-077 206,350206,3505th St Medians 2 398,636348,636 50,000General Fund Total Grants/Donation F-021 185,714185,714800 MHz Radio Replacement 1 PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PW-035 500,000500,000UP RR Crossing - Village Parkway 2 PW-038 5,430,0005,430,0002022 Street Improvements 3 PW-039 3,950,0003,950,0002023 Street Improvements 3 PW-040 2,070,0002,070,0002024 Street Improvements 3 PW-041 3,040,0003,040,0002025 Street Irmprovements 3 PW-042 3,268,0003,268,0002026 Street Improvements 3 PW-067 250,000250,000Manning/Hudson Stoplight 2 S-020 540,000540,000Sewer to 180 Acres 3 SW-003 60,00060,000Kramer Lake Floodplain Study 3 W-031 3,745,0003,745,0002022 Street Projects-water component 3 W-032 2,280,0002,280,0002023 Street Projects-water component 3 W-033 1,200,0001,200,0002024 Street Projects-water component 3 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software TotalSource Project # Priority 2022 2023 2024 2025 2026 W-034 1,640,0001,640,0002025 Street Projects-water component 3 W-035 1,620,0001,620,0002026 Street Projcts-water component 3 W-036 400,000400,00045th Street Watermain Extension 3 31,178,71410,400,714 6,880,000 4,330,000 4,680,000 4,888,000Grants/Donation Total Municipal Sate Aid (MSA) PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,200,0001,200,00015th Street North (MSA Street) 3 1,450,0001,200,000 250,000Municipal Sate Aid (MSA) Total Park Dedication Fund PR-009 220,000220,000Central Greenway Regional Trail 3 PR-019 25,00025,000Dog Park 4 PR-021 322,643266,430 56,213Neighborhood Trail Connections 2 PR-022 130,000130,000Pebble Park Playground Replacement 2 PR-023 130,000130,000Demontriville Park Playground Replacement 2 PR-024 75,00075,000Tablyn Park Court Resurfacing 3 PR-025 85,00085,000Pebble Park Courts 3 PR-026 65,00065,000Trail Seal Coat 2 PR-027 25,00025,000Kleis Park Disc Golf 3 1,077,643331,430 586,213 85,000 75,000Park Dedication Fund Total Sewer Fund PW-044 17,00017,000Back Hoe 2 S-013 55,36022,438 32,922Sewer Oversizing 3 S-019 175,000175,000VAC Truck 2 S-020 100,000100,000Sewer to 180 Acres 3 S-021 00Low Pressure Sewer to Klondike 5 S-022 00Sewer to Sunfish Ponds 5 S-024 1,900,0001,900,000I-94 Lift Station and Forcemain Upgrade 3 2,247,36022,438 149,922 2,075,000 0 0Sewer Fund Total Storm Water Fund PW-044 17,00017,000Back Hoe 2 PW-071 10,00010,0002013 Bobcat T590 Track Skid Steer Replacement 2 S-019 75,00075,000VAC Truck 2 102,00010,000 17,000 75,000Storm Water Fund Total Street Fund S-013 40,00040,000Sewer Oversizing 3 40,00040,000Street Fund Total Vehicle Replacement Fund B-002 30,00030,000Inspection Vehcile 2 B-003 30,00030,000Inspection Vehcile 3 B-004 30,00030,000Inspection Vehicle 3 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software TotalSource Project # Priority 2022 2023 2024 2025 2026 F-012 90,00090,000Brush Truck 2 2 F-014 30,00030,000Rescue Boat & Trailer Replacement 1 F-019 67,00067,000Command Vehicle 2 (2016 Tahoe) 2 F-020 65,50065,500Command Vehicle 3 (2015 Tahoe) 2 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PW-004 185,000185,000Loader 2 PW-006 130,000130,000Tractor 2 PW-019 44,00044,000PickupTruck / plow 4 PW-044 34,00034,000Back Hoe 2 PW-048 120,000120,000Mini Loader 2 PW-050 275,000275,000Dump Truck with Plow 1 PW-054 70,00070,000Skidloader 3 PW-060 41,00041,000Pickup w/plow 3 PW-061 35,00035,000Pickup 3 PW-071 60,00060,0002013 Bobcat T590 Track Skid Steer Replacement 2 PW-072 42,00042,000Pickup truck addition 2 1,415,500409,000 526,500 228,000 187,000 65,000Vehicle Replacement Fund Total Water Fund PW-044 17,00017,000Back Hoe 2 W-006 4,110,0004,110,000Elevated Storage Tank #3 1 W-008 375,000375,000Village East Trunk Watermain & PRV 2 W-010 800,000800,000Paint Water Tank at PW 4 W-012 35,00035,000Well #4 Pump - Pull and Rebuild 3 W-013 455,914235,219 40,695 120,000 60,000Watermain Oversizing 3 W-023 200,00075,000 75,000 50,000Water Meter Change Out 1 W-024 300,000300,000Automated Radio Read System 3 W-025 1,040,0001,040,000OV sewer extension phase 6 & 5; water component 3 W-026 270,000270,000OV sewer extension Phase 7; water component 3 W-031 441,000441,0002022 Street Projects-water component 3 W-032 270,600270,6002023 Street Projects-water component 3 W-033 297,000297,0002024 Street Projects-water component 3 W-034 180,000180,0002025 Street Projects-water component 3 W-035 180,000180,0002026 Street Projcts-water component 3 W-037 2,700,0002,700,000Well, Pumphouse No. 6 and monitoring well 3 W-038 3,392,0001,392,000 1,000,000 1,000,000Watermain Trunk Watermains 3 W-039 50,00050,000Decommission Water Tower 1 3 15,113,5146,311,219 673,295 2,659,000 1,540,000 3,930,000Water Fund Total 81,022,01926,276,089 14,454,180 12,676,750 13,732,000 13,883,000GRAND TOTAL Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026City of Lake Elmo, MinnesotaPROJECTS BY FUNDING SOURCE2022 2031thruTotal2022 2023 2024 2025 2026Source2027 2028 2029 2030 2031 # PriorityDebt Service628,152628,152CSAH 15/30th Street SignalPW-030325,00025,000UP RR Crossing - Village ParkwayPW-0352105,000105,000UP RR Crossing - Private Drive ClosurePW-0362262,500262,500UP RR Crossing: Klondike AvePW-03724,625,0004,625,0002022 Street ImprovementsPW-03833,046,2503,046,2502023 Street ImprovementsPW-03932,634,7502,634,7502024 Street ImprovementsPW-04032,500,0002,500,0002025 Street IrmprovementsPW-04132,500,0002,500,0002026 Street ImprovementsPW-0423400,000400,000Ideal Ave (CSAH 13) Phase 2PW-0523800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6PW-05332,000,0002,000,0002027 Street ImprovementsPW-05532,000,0002,000,0002028 Street ImprovementsPW-05631,650,0001,650,000Manning Ave Phase 3PW-05732,000,0002,000,0002029 Steet ImprovementsPW-06832,000,0002,000,0002030 Street ImprovementsPW-07034,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) ImpPW-07432,000,0002,000,0002031 Street ImprovementsPW-07532,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave)PW-07631,475,0001,475,000Old Village Sewer Extension Phase 5S-0053575,000575,000Old Village Sewer Extension Phase 7S-0173922,000922,000Tapestry Neighborhood Sanitary Sewer ExtS-0233800,000800,000Phase 2 Regional Drainage ImprovementsSW-0013500,000500,000Phase 3 Regional Drainage ImprovementsSW-0023Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Source2027 2028 2029 2030 2031 # PriorityDebt Service Total40,448,6528,442,652 4,421,250 3,134,750 7,000,000 5,000,000 4,450,000 2,000,000 2,000,000 4,000,000General Fund83,00083,000Turnout Gear ReplacementsF-01719,2869,286800 MHz Radio ReplacementF-021150,00050,000SCBA Fill Station & CompressorF-022150,00050,000Asphalt Hot BoxPW-049250,00050,000Manning Phase 4PW-0661206,350206,3505th St MediansPW-0772General Fund Total448,636348,636 50,000 50,000Grants/Donation50,00050,000Rescue/Brush Fire UTVF-0153185,714185,714800 MHz Radio ReplacementF-02111,000,0001,000,000New or Refurbished BallfieldsPR-0171500,000500,000UP RR Crossing - Village ParkwayPW-03525,430,0005,430,0002022 Street ImprovementsPW-03833,950,0003,950,0002023 Street ImprovementsPW-03932,070,0002,070,0002024 Street ImprovementsPW-04033,040,0003,040,0002025 Street IrmprovementsPW-04133,268,0003,268,0002026 Street ImprovementsPW-0423250,000250,000Manning/Hudson StoplightPW-0672540,000540,000Sewer to 180 AcresS-020360,00060,000Kramer Lake Floodplain StudySW-00333,745,0003,745,0002022 Street Projects-water componentW-03132,280,0002,280,0002023 Street Projects-water componentW-03231,200,0001,200,0002024 Street Projects-water componentW-03331,640,0001,640,0002025 Street Projects-water componentW-03431,620,0001,620,0002026 Street Projcts-water componentW-0353400,000400,00045th Street Watermain ExtensionW-0363Grants/Donation Total31,228,71410,400,714 6,880,000 4,330,000 4,680,000 4,888,000 50,000Municipal Sate Aid (MSA)250,000250,000CSAH 6/Inwood SignalPW-0313Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Source2027 2028 2029 2030 2031 # Priority1,200,0001,200,00015th Street North (MSA Street)PW-0343Municipal Sate Aid (MSA) Total1,450,0001,200,000 250,000Park Dedication Fund220,000220,000Central Greenway Regional TrailPR-009325,00025,000Dog ParkPR-0194322,643266,430 56,213Neighborhood Trail ConnectionsPR-0212130,000130,000Pebble Park Playground ReplacementPR-0222130,000130,000Demontriville Park Playground ReplacementPR-023275,00075,000Tablyn Park Court ResurfacingPR-024385,00085,000Pebble Park CourtsPR-025365,00065,000Trail Seal CoatPR-026225,00025,000Kleis Park Disc GolfPR-0273Park Dedication Fund Total1,077,643331,430 586,213 85,000 75,000Sewer Fund17,00017,000Back HoePW-044255,36022,438 32,922Sewer OversizingS-0133175,000175,000VAC TruckS-0192100,000100,000Sewer to 180 AcresS-020300Low Pressure Sewer to KlondikeS-021500Sewer to Sunfish PondsS-02251,900,0001,900,000I-94 Lift Station and Forcemain UpgradeS-0243Sewer Fund Total2,247,36022,438 149,922 2,075,000 0 0Storm Water Fund17,00017,000Back HoePW-044210,00010,0002013 Bobcat T590 Track Skid Steer ReplacementPW-071275,00075,000VAC TruckS-0192Storm Water Fund Total102,00010,000 17,000 75,000Street Fund40,00040,000Sewer OversizingS-0133Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Source2027 2028 2029 2030 2031 # PriorityStreet Fund Total40,00040,000Vehicle Replacement Fund60,00030,00030,000Inspection VehcileB-002260,00030,000 30,000Inspection VehcileB-003360,00030,000 30,000Inspection VehicleB-004390,00090,000Brush Truck 2F-0122650,000650,000T2 Tender/EngineF-013430,00030,000Rescue Boat & Trailer ReplacementF-014170,00070,000Command Vehicle 1 (2021 Tahoe)F-018367,00067,000Command Vehicle 2 (2016 Tahoe)F-019265,50065,500Command Vehicle 3 (2015 Tahoe)F-020237,00037,000Utility Vehicile/Trail GroomerPR-0203185,000185,000LoaderPW-0042130,000130,000TractorPW-006244,00044,000PickupTruck / plowPW-019434,00034,000Back HoePW-0442120,000120,000Mini LoaderPW-0482275,000275,000Dump Truck with PlowPW-050170,00070,000SkidloaderPW-054341,00041,000Pickup w/plowPW-060335,00035,000PickupPW-0613250,000250,000DumpTruck w/plow, sander & underbodyPW-062345,00045,000Pickup w/lift gate & plowPW-063345,00045,000Pickup w/lift gate & plowPW-0643265,000265,000Dump Truck w/plow, sander & underbodyPW-065360,00060,0002013 Bobcat T590 Track Skid Steer ReplacementPW-071242,00042,000Pickup truck additionPW-0722Vehicle Replacement Fund Total2,830,500409,000 526,500 228,000 187,000 65,000 1,020,000 365,000 30,000Water Fund17,00017,000Back HoePW-04424,110,0004,110,000Elevated Storage Tank #3W-0061375,000375,000Village East Trunk Watermain & PRVW-0082800,000800,000Paint Water Tank at PWW-0104Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Source2027 2028 2029 2030 2031 # Priority35,00035,000Well #4 Pump - Pull and RebuildW-0123455,914235,219 40,695 120,000 60,000Watermain OversizingW-0133200,00075,000 75,000 50,000Water Meter Change OutW-0231300,000300,000Automated Radio Read SystemW-02431,040,0001,040,000OV sewer extension phase 6 & 5; water componentW-0253270,000270,000OV sewer extension Phase 7; water componentW-0263441,000441,0002022 Street Projects-water componentW-0313270,600270,6002023 Street Projects-water componentW-0323297,000297,0002024 Street Projects-water componentW-0333180,000180,0002025 Street Projects-water componentW-0343180,000180,0002026 Street Projcts-water componentW-03532,700,0002,700,000Well, Pumphouse No. 6 and monitoring wellW-03733,392,0001,392,000 1,000,000 1,000,000Watermain Trunk WatermainsW-038350,00050,000Decommission Water Tower 1W-0393Water Fund Total15,113,5146,311,219 673,295 2,659,000 1,540,000 3,930,00026,276,089 14,454,180 12,676,750 13,732,000 13,883,00094,987,019GRAND TOTAL5,520,000 2,000,000 2,415,000 4,000,000 30,000Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota PROJECTS & FUNDING SOURCES BY DEPARTMENT 2022 2026thru Total2022 2023 2024 2025 2026Department Project # Priority Building Department 90,00030,000 30,000 30,000Vehicle Replacement Fund 90,00030,000 30,000 30,000Building Department Total B-002 30,00030,000Inspection Vehcile 2 B-003 30,00030,000Inspection Vehcile 3 B-004 30,00030,000Inspection Vehicle 3 90,00030,000 30,000 30,000Building Department Total Fire Department 142,28692,286 50,000General Fund 185,714185,714Grants/Donation 252,50065,500 120,000 67,000Vehicle Replacement Fund 580,500278,000 65,500 170,000 67,000Fire Department Total F-012 90,00090,000Brush Truck 2 2 F-014 30,00030,000Rescue Boat & Trailer Replacement 1 F-017 83,00083,000Turnout Gear Replacements 1 F-019 67,00067,000Command Vehicle 2 (2016 Tahoe) 2 F-020 65,50065,500Command Vehicle 3 (2015 Tahoe) 2 F-021 195,000195,000800 MHz Radio Replacement 1 F-022 50,00050,000SCBA Fill Station & Compressor 1 580,500278,000 65,500 170,000 67,000Fire Department Total Parks and Recreation PR-009 220,000220,000Central Greenway Regional Trail 3 PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PR-019 25,00025,000Dog Park 4 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PR-021 322,643266,430 56,213Neighborhood Trail Connections 2 PR-022 130,000130,000Pebble Park Playground Replacement 2 PR-023 130,000130,000Demontriville Park Playground Replacement 2 PR-024 75,00075,000Tablyn Park Court Resurfacing 3 PR-025 85,00085,000Pebble Park Courts 3 PR-026 65,00065,000Trail Seal Coat 2 PR-027 25,00025,000Kleis Park Disc Golf 3 2,114,643331,430 586,213 1,122,000 75,000Parks and Recreation Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Department Project # Priority 1,000,0001,000,000Grants/Donation 1,077,643331,430 586,213 85,000 75,000Park Dedication Fund 37,00037,000Vehicle Replacement Fund 2,114,643331,430 586,213 1,122,000 75,000Parks and Recreation Total Public Works Department 23,726,6526,045,652 3,046,250 2,634,750 7,000,000 5,000,000Debt Service 256,350256,350General Fund 18,508,0005,930,000 4,200,000 2,070,000 3,040,000 3,268,000Grants/Donation 1,450,0001,200,000 250,000Municipal Sate Aid (MSA) 17,00017,000Sewer Fund 27,00010,000 17,000Storm Water Fund 1,036,000379,000 461,000 41,000 120,000 35,000Vehicle Replacement Fund 17,00017,000Water Fund 45,038,00212,621,002 8,958,250 4,745,750 10,410,000 8,303,000Public Works Department Total PW-004 185,000185,000Loader 2 PW-006 130,000130,000Tractor 2 PW-019 44,00044,000PickupTruck / plow 4 PW-030 628,152628,152CSAH 15/30th Street Signal 3 PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,200,0001,200,00015th Street North (MSA Street) 3 PW-035 525,000525,000UP RR Crossing - Village Parkway 2 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 PW-038 10,055,00010,055,0002022 Street Improvements 3 PW-039 6,996,2506,996,2502023 Street Improvements 3 PW-040 4,704,7504,704,7502024 Street Improvements 3 PW-041 5,540,0005,540,0002025 Street Irmprovements 3 PW-042 5,768,0005,768,0002026 Street Improvements 3 PW-044 85,00085,000Back Hoe 2 PW-048 120,000120,000Mini Loader 2 PW-049 50,00050,000Asphalt Hot Box 2 PW-050 275,000275,000Dump Truck with Plow 1 PW-052 400,000400,000Ideal Ave (CSAH 13) Phase 2 3 PW-054 70,00070,000Skidloader 3 PW-060 41,00041,000Pickup w/plow 3 PW-061 35,00035,000Pickup 3 PW-067 250,000250,000Manning/Hudson Stoplight 2 PW-071 70,00070,0002013 Bobcat T590 Track Skid Steer Replacement 2 PW-072 42,00042,000Pickup truck addition 2 PW-074 4,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) Imp 3 PW-076 2,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave) 3 PW-077 206,350206,3505th St Medians 2 45,038,00212,621,002 8,958,250 4,745,750 10,410,000 8,303,000Public Works Department Total Sewer Department Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Department Project # Priority 2,972,0002,397,000 575,000Debt Service 540,000540,000Grants/Donation 2,230,36022,438 132,922 2,075,000 0 0Sewer Fund 75,00075,000Storm Water Fund 40,00040,000Street Fund 5,857,3602,959,438 707,922 2,190,000 0 0Sewer Department Total S-005 1,475,0001,475,000Old Village Sewer Extension Phase 5 3 S-013 95,36022,438 32,922 40,000Sewer Oversizing 3 S-017 575,000575,000Old Village Sewer Extension Phase 7 3 S-019 250,000250,000VAC Truck 2 S-020 640,000540,000 100,000Sewer to 180 Acres 3 S-021 00Low Pressure Sewer to Klondike 5 S-022 00Sewer to Sunfish Ponds 5 S-023 922,000922,000Tapestry Neighborhood Sanitary Sewer Ext 3 S-024 1,900,0001,900,000I-94 Lift Station and Forcemain Upgrade 3 5,857,3602,959,438 707,922 2,190,000 0 0Sewer Department Total Storm Water Department 1,300,000800,000 500,000Debt Service 60,00060,000Grants/Donation 1,360,000800,000 560,000Storm Water Department Total SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 SW-003 60,00060,000Kramer Lake Floodplain Study 3 1,360,000800,000 560,000Storm Water Department Total Water Department W-006 4,110,0004,110,000Elevated Storage Tank #3 1 W-008 375,000375,000Village East Trunk Watermain & PRV 2 W-010 800,000800,000Paint Water Tank at PW 4 W-012 35,00035,000Well #4 Pump - Pull and Rebuild 3 W-013 455,914235,219 40,695 120,000 60,000Watermain Oversizing 3 W-023 200,00075,000 75,000 50,000Water Meter Change Out 1 W-024 300,000300,000Automated Radio Read System 3 W-025 1,040,0001,040,000OV sewer extension phase 6 & 5; water component 3 W-026 270,000270,000OV sewer extension Phase 7; water component 3 W-031 4,186,0004,186,0002022 Street Projects-water component 3 W-032 2,550,6002,550,6002023 Street Projects-water component 3 W-033 1,497,0001,497,0002024 Street Projects-water component 3 W-034 1,820,0001,820,0002025 Street Projects-water component 3 W-035 1,800,0001,800,0002026 Street Projcts-water component 3 W-036 400,000400,00045th Street Watermain Extension 3 W-037 2,700,0002,700,000Well, Pumphouse No. 6 and monitoring well 3 W-038 3,392,0001,392,000 1,000,000 1,000,000Watermain Trunk Watermains 3 Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Total2022 2023 2024 2025 2026Department Project # Priority 10,885,0003,745,000 2,680,000 1,200,000 1,640,000 1,620,000Grants/Donation 15,096,5146,311,219 656,295 2,659,000 1,540,000 3,930,000Water Fund 25,981,51410,056,219 3,336,295 3,859,000 3,180,000 5,550,000Water Department Total W-039 50,00050,000Decommission Water Tower 1 3 25,981,51410,056,219 3,336,295 3,859,000 3,180,000 5,550,000Water Department Total 81,022,01926,276,089 14,454,180 12,676,750 13,732,000 13,883,000Grand Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Building Official 2022 2026thru Department Building Department Description Replace 2015 Jeep Project #B-002 Priority 2 Very Important Justification End of Useful Life, currently inoperable Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehcile Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total2022 2023 2024 2025 2026Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Building Official 2022 2026thru Department Building Department Description Replace 2017 Equinox Project #B-003 Priority 3 Important Justification End of Useful Life, beginning to incur additonal maintenance costs Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehcile Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total2022 2023 2024 2025 2026Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Building Official 2022 2026thru Department Building Department Description Replace 2019 Equinox Project #B-004 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehicle Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total2022 2023 2024 2025 2026Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of 2004 B 2 Brush/grass rig Project #F-012 Priority 2 Very Important Justification Budget Impact/Other Useful Life 20 yearsProject Name Brush Truck 2 Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 90,00090,000Equip/Vehicles/Furnishings 90,000 90,000Total Total2022 2023 2024 2025 2026Funding Sources 90,00090,000Vehicle Replacement Fund 90,000 90,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of rescue boat and trailer. Project #F-014 Priority 1 Critical Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The rescue boat will be utilized by Fire Department staff to respond to water emergency incidents. These funds will be utilized to replace the rescue boat in a timely manner to reduce maintenance costs and down time. Budget Impact/Other Useful Life 15 yearsProject Name Rescue Boat & Trailer Replacement Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total2022 2023 2024 2025 2026Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of 25 sets of turnout gear (Jacket, Pants, Particulate Hood and Boots). Project #F-017 Priority 1 Critical Justification The majority of our current inventory of structural firefighting turnout gear will be 10 years old in 2022 and 2 NFPA cycles behind current standards. Per NFPA 1971, turnout gear is required to be retired and taken out of service after 10 years. The requested sets of turnout gear, additional hoods and boots include the enhanced safety features available through the 2018 NFPA 1971 standard. New safety features include, less water absorption by the turnout gear outer shell, a particle protection barrier on hoods, and better ergonomic design of turnout gear to minimize gaps in protection. The benefit of acquiring this funding will greatly increase the safety of our firefighters during all types of incidents and drills requiring structural firefighting turnout gear. Budget Impact/Other Useful Life 10 yearsProject Name Turnout Gear Replacements Category Equipment: Fire Equip Type Maintenance Status Active Total2022 2023 2024 2025 2026Expenditures 83,00083,000Equip/Vehicles/Furnishings 83,000 83,000Total Total2022 2023 2024 2025 2026Funding Sources 83,00083,000General Fund 83,000 83,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of CV2 (2016 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Project #F-019 Priority 2 Very Important Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 8 yearsProject Name Command Vehicle 2 (2016 Tahoe)Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 67,00067,000Equip/Vehicles/Furnishings 67,000 67,000Total Total2022 2023 2024 2025 2026Funding Sources 67,00067,000Vehicle Replacement Fund 67,000 67,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of CV3 (2015 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Project #F-020 Priority 2 Very Important Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Budget Impact/Other Useful Life 8 yearsProject Name Command Vehicle 3 (2015 Tahoe)Category Equipment: Fire Equip Type Equipment Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 65,50065,500Equip/Vehicles/Furnishings 65,500 65,500Total Total2022 2023 2024 2025 2026Funding Sources 65,50065,500Vehicle Replacement Fund 65,500 65,500Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of 29 portable and 9 mobile fire department 800 MHZ radios and associated accessories. Project #F-021 Priority 1 Critical Justification Our current inventory of radios is 14 years old resulting in numerous repairs and radios taken out of service. Our current radio models were canceled by the manufacturer in 2014 and manufacturer service and support discontinued in 2019. Our operations are heavily reliant on radio communications with dispatch, law enforcement, and other surrounding fire jurisdictions. The radios used by the fire department experience heavy use and are prone to failure from aging and wear-and-tear. The funds requested will allow the fire department to replace older, obsolete, and broken radios. Budget Impact/Other Useful Life 10 yearsProject Name 800 MHz Radio Replacement Category Equipment: Fire Equip Type Equipment Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 195,000195,000Equip/Vehicles/Furnishings 195,000 195,000Total Total2022 2023 2024 2025 2026Funding Sources 9,2869,286General Fund 185,714185,714Grants/Donation 195,000 195,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Fire Chief 2022 2026thru Department Fire Department Description Replacement of SCBA (Self Contained Breathing Air) Fill Station & Compressor. Project #F-022 Priority 1 Critical Justification The SCBA (Self Contained Breathing Air) Fill Station & Compressor system has a life expectancy of 20 years. As the unit ages, maintenance and repair costs will continue to increase. These funds will be utilized to replace equipment in a timely manner to reduce maintenance costs and down time. Budget Impact/Other Useful Life 20 yearsProject Name SCBA Fill Station & Compressor Category Equipment: Fire Equip Type Equipment Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total2022 2023 2024 2025 2026Funding Sources 50,00050,000General Fund 50,000 50,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact City Administrator 2022 2026thru Department Parks and Recreation Description Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. 2023 potential segments include in front of Hagbergs and near Keats/CSAH 10 (if a road project is funded). Project #PR-009 Priority 3 Important Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Budget Impact/Other Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Useful Life 25 yearsProject Name Central Greenway Regional Trail Category Park Improvements Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 220,000220,000Construction/Maintenance 220,000 220,000Total Total2022 2023 2024 2025 2026Funding Sources 220,000220,000Park Dedication Fund 220,000 220,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact City Administrator 2022 2026thru Department Parks and Recreation Description New ballfields to be constructed or refurbished after Tartan ball fields are no longer used by the public Project #PR-017 Priority 1 Critical Justification Replacement of some of the fields at Tartan Park lost to development of Royal Oaks Golf Course Community Budget Impact/Other Funding to be provided from developer in development agreement with Royal Golf. Funds to be used for acquisition of land, if necessary, and builidngor refurbishing of (a) new ballfield(s). Useful Life 40 yearsProject Name New or Refurbished Ballfields Category Park Improvements Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,000,0001,000,000Construction/Maintenance 1,000,000 1,000,000Total Total2022 2023 2024 2025 2026Funding Sources 1,000,0001,000,000Grants/Donation 1,000,000 1,000,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Parks commission recommended the search and planning for a dog park somewhere near the denser developments Improvements would be minimal such as fencing Project #PR-019 Priority 4 Less Important Justification Residents on small lots in denser developments need a place to take their dogs for exercise. By providing a dog park those who let their dogs run off leash in other parks can be redirected Budget Impact/Other Useful Life 25 yearsProject Name Dog Park Category Park Improvements Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total2022 2023 2024 2025 2026Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Replaces 2014 Kubota Project #PR-020 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Utility Vehicile/Trail Groomer Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 37,00037,000Equip/Vehicles/Furnishings 37,000 37,000Total Total2022 2023 2024 2025 2026Funding Sources 37,00037,000Vehicle Replacement Fund 37,000 37,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Parks Commission request to develop trail connections between neighborhoods. May be spent over 2021-2023. Installing a trail connection between Wildflower & Tana Ridge. 525 feet $56,213.00 in 2023 Installing a trail connection between Inwood Park and Stonegate Park. 750 feet $58,875.00 Improving the Stonegate trails with Pavement 2,309 ft - $181,257 in 2022 Installing a trail connection between Hamlet on Sunfish and Tapestry. 335 feet $26,297.50 in 2022 Project #PR-021 Priority 2 Very Important Justification The Parks Commission indicated trail connections were a priority throughout the city. Budget Impact/Other Would result in additional trail miles to maintain in the future. Useful Life 40 yearsProject Name Neighborhood Trail Connections Category Park Improvements Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 15,00015,000Land Acquisition 307,643251,430 56,213Construction/Maintenance 266,430 56,213 322,643Total Total2022 2023 2024 2025 2026Funding Sources 322,643266,430 56,213Park Dedication Fund 266,430 56,213 322,643Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Replace Pebble Park Playground Equipment Project #PR-022 Priority 2 Very Important Justification The main playground equipment is over 30 years old. Two slides and one cat walk have been removed due to failure/sfety issues. The coating on metals are deteriating and creating sharp safety hazards. Public Works does not recommed spending funds to maintain this equipment Budget Impact/Other Useful Life 20 yearsProject Name Pebble Park Playground Replacement Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2022 2023 2024 2025 2026Funding Sources 130,000130,000Park Dedication Fund 130,000 130,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Replacing the existing 30 year old playground equipment at Demontriville park Project #PR-023 Priority 2 Very Important Justification The slide was removed and capped off. The Coatings on the metal are deteriating creating sharp hazards Budget Impact/Other Useful Life 20 yearsProject Name Demontriville Park Playground Replacement Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2022 2023 2024 2025 2026Funding Sources 130,000130,000Park Dedication Fund 130,000 130,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Resurface the existing tennis courts Project #PR-024 Priority 3 Important Justification The court surface is failing, cracking and is unlevel Budget Impact/Other Useful Life 20 yearsProject Name Tablyn Park Court Resurfacing Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 75,00075,000Construction/Maintenance 75,000 75,000Total Total2022 2023 2024 2025 2026Funding Sources 75,00075,000Park Dedication Fund 75,000 75,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Full depth reclamation on court surface, pave, stripe for either picklball or tennis, add new posts and nets, change out electrical cabinet, improve sidewalk, resurface basket ball court Project #PR-025 Priority 3 Important Justification The exsiting court surfaces are failing, cracking and is unlevel. Tennis is a less desirable sport so picklball would see more use Budget Impact/Other Useful Life 20 yearsProject Name Pebble Park Courts Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 85,00085,000Construction/Maintenance 85,000 85,000Total Total2022 2023 2024 2025 2026Funding Sources 85,00085,000Park Dedication Fund 85,000 85,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description Seal coating 49,000 sq yards of city owned park trails Project #PR-026 Priority 2 Very Important Justification Little maintenance has been completed on most of the city owned trails. Crack filling of selected trails is being completed in 2021 with intentions of seal coating the same trails in 2022. This maintenance willl likely add 5-6 years of life Budget Impact/Other Useful Life 5 yearsProject Name Trail Seal Coat Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 65,00065,000Construction/Maintenance 65,000 65,000Total Total2022 2023 2024 2025 2026Funding Sources 65,00065,000Park Dedication Fund 65,000 65,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Parks and Recreation Description The Park Commison has recommended adding Disc Golf as an improvement to Kleis Park as an amenity Project #PR-027 Priority 3 Important Justification Kleis Park has minum use currently. It is believed Disc Golf would bring an amenity to the city that we currently do not have and increase that specific park use Budget Impact/Other Useful Life 20 yearsProject Name Kleis Park Disc Golf Category Park Improvements Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total2022 2023 2024 2025 2026Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace 1999 loader Project #PW-004 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 yearsProject Name Loader Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 185,000185,000Equip/Vehicles/Furnishings 185,000 185,000Total Total2022 2023 2024 2025 2026Funding Sources 185,000185,000Vehicle Replacement Fund 185,000 185,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace 2004 John Deere Tractor Cost include all ditch and mowing attachments Additional cost for snowblower ($30k included in total) Project #PW-006 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 yearsProject Name Tractor Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 130,000130,000Equip/Vehicles/Furnishings 130,000 130,000Total Total2022 2023 2024 2025 2026Funding Sources 130,000130,000Vehicle Replacement Fund 130,000 130,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replacement for 2012 F250 End of usefull life (7 years) Project #PW-019 Priority 4 Less Important Justification Replacement for 2012 F250 End of useful life Budget Impact/Other Useful Life 10 yearsProject Name PickupTruck / plow Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 44,00044,000Equip/Vehicles/Furnishings 44,000 44,000Total Total2022 2023 2024 2025 2026Funding Sources 44,00044,000Vehicle Replacement Fund 44,000 44,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description CSAH 15/30th Street signal improvements. May be stand alone project or with CSAH 15 Phase 3 Project #PW-030 Priority 3 Important Justification Improvement needed due to increase of traffic Washington County study Budget Impact/Other Useful Life 25 yearsProject Name CSAH 15/30th Street Signal Category Street Construction Type Maintenance Status Active Total2022 2023 2024 2025 2026Expenditures 628,152628,152Construction/Maintenance 628,152 628,152Total Total2022 2023 2024 2025 2026Funding Sources 628,152628,152Debt Service 628,152 628,152Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Project #PW-031 Priority 3 Important Justification Budget Impact/Other Useful Life 25 yearsProject Name CSAH 6/Inwood Signal Category Street Reconstruction Type Maintenance Status Active Total2022 2023 2024 2025 2026Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total2022 2023 2024 2025 2026Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description 15th Street reconstruction Project #PW-034 Priority 3 Important Justification Significant patching made in 2018 to extend road life a couple years. Recon needed per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other Potential for some assessments Useful Life 25 yearsProject Name 15th Street North (MSA Street)Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,200,0001,200,000Construction/Maintenance 1,200,000 1,200,000Total Total2022 2023 2024 2025 2026Funding Sources 1,200,0001,200,000Municipal Sate Aid (MSA) 1,200,000 1,200,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description UP RR Crossing - Village Parkway Project #PW-035 Priority 2 Very Important Justification To allow connectivity between developing neighborhoods north and south of the tracks Budget Impact/Other Useful Life 40 yearsProject Name UP RR Crossing - Village Parkway Category Street Construction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 525,000525,000Construction/Maintenance 525,000 525,000Total Total2022 2023 2024 2025 2026Funding Sources 25,00025,000Debt Service 500,000500,000Grants/Donation 525,000 525,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Project #PW-036 Priority 2 Very Important Justification Railroad requirement in order to get new crossing at Village Parkway Budget Impact/Other Useful Life 40 yearsProject Name UP RR Crossing - Private Drive Closure Category Unassigned Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2022 2023 2024 2025 2026Funding Sources 105,000105,000Debt Service 105,000 105,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description UP RR Crossing - Klondike - upgraded crossing to inlcude light and gates Project #PW-037 Priority 2 Very Important Justification Railroad requirement in order to build new crossing at Village Parkway Budget Impact/Other Useful Life 40 yearsProject Name UP RR Crossing: Klondike Ave Category Street Construction Type Unassigned Status Active Total2022 2023 2024 2025 2026Expenditures 262,500262,500Construction/Maintenance 262,500 262,500Total Total2022 2023 2024 2025 2026Funding Sources 262,500262,500Debt Service 262,500 262,500Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description $2,782,000 for Parkview Estates, Cardinal Ridge and Cardinal View (3M Grant) $1,636,000 for Whistling Valley and $1,012,000 Torres Pines (3M Grant) $2,520,000 for Fields of St. Croix 1st Addition, Beaut Crest (30% assessed) $2,105,000 for remaining streets on OV 5 and 6 (30% assessed) Project #PW-038 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $756,000 assessment revenue for Fields, Beaut Crest $645,000 assessment revenue for Ov 5&6 City share of debt would be $3,224,000 over 10 years Grant funds cash flowed by city would be $5,430,000 Useful Life 25 yearsProject Name 2022 Street Improvements Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 10,055,00010,055,000Construction/Maintenance 10,055,000 10,055,000Total Total2022 2023 2024 2025 2026Funding Sources 4,625,0004,625,000Debt Service 5,430,0005,430,000Grants/Donation 10,055,000 10,055,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description $3,950,000 for Packard Park, Eden Park and 20th St Cir assumes 3M Grant $2,540,250 for Fields of St. Croix 2nd Addition and Tana Ridge (30% assessed) $506,000 for OV 7 Legion Avenue (assessed 30%) Project #PW-039 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $762,075 assessment revenue for neighborhoods $151,800 assessment revenue for OV 7 City share of debt service would be $2,132,375 Useful Life 25 yearsProject Name 2023 Street Improvements Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 6,996,2506,996,250Construction/Maintenance 6,996,250 6,996,250Total Total2022 2023 2024 2025 2026Funding Sources 3,046,2503,046,250Debt Service 3,950,0003,950,000Grants/Donation 6,996,250 6,996,250Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description $2,070,000 Homestead and The Forest assumes 3M Grant $2,634,750 Carriage Station + 59th St Ct/55th St/Julep Way ( 30% Assessed) Project #PW-040 Priority 3 Important Justification Annual street improvements per recommendation by City Engineer Budget Impact/Other $2,070,000 3M Grant $2,634,750 Debt Service - with $790,425 Assessed Useful Life 25 yearsProject Name 2024 Street Improvements Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 4,704,7504,704,750Construction/Maintenance 4,704,750 4,704,750Total Total2022 2023 2024 2025 2026Funding Sources 2,634,7502,634,750Debt Service 2,070,0002,070,000Grants/Donation 4,704,750 4,704,750Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description $3,040,000 - Tartan Meadows + Klondike assumes 3M Grant $2,500,0000 Annual street improvements Project #PW-041 Priority 3 Important Justification Annual street improvements per recommendation from Engineering Budget Impact/Other $3,040,000 3M Grant $2,500,0000 Debt Service - $750,000 30% Assessed Useful Life 25 yearsProject Name 2025 Street Irmprovements Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 5,540,0005,540,000Construction/Maintenance 5,540,000 5,540,000Total Total2022 2023 2024 2025 2026Funding Sources 2,500,0002,500,000Debt Service 3,040,0003,040,000Grants/Donation 5,540,000 5,540,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description $3,268,000 Stillwater Lane, Downs Lake Estates, Sunfish Ponds assumes 3M grant $2,500,000 Annual street improvements-TBD Project #PW-042 Priority 3 Important Justification Annual street improvements per recommendation by City Engineer Budget Impact/Other $3,268,000 3M grant $2,500,000 debt including $750,000 in assessments Useful Life 25 yearsProject Name 2026 Street Improvements Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 5,768,0005,768,000Construction/Maintenance 5,768,000 5,768,000Total Total2022 2023 2024 2025 2026Funding Sources 2,500,0002,500,000Debt Service 3,268,0003,268,000Grants/Donation 5,768,000 5,768,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace 2006 Case Backhoe with a more manuverable unit. Project #PW-044 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other $85,000 total cost split amongst water, stormwater , streets, and parks sewer Useful LifeProject Name Back Hoe Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 85,00085,000Equip/Vehicles/Furnishings 85,000 85,000Total Total2022 2023 2024 2025 2026Funding Sources 17,00017,000Sewer Fund 17,00017,000Storm Water Fund 34,00034,000Vehicle Replacement Fund 17,00017,000Water Fund 85,000 85,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Mini loader will be outfitted with necessary snow removal equipment for cul de sacs, narrow streets and sidewalks/paths Project #PW-048 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful LifeProject Name Mini Loader Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 120,000120,000Equip/Vehicles/Furnishings 120,000 120,000Total Total2022 2023 2024 2025 2026Funding Sources 120,000120,000Vehicle Replacement Fund 120,000 120,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace trailer hot box unit with a dump style trailer unit Project #PW-049 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful LifeProject Name Asphalt Hot Box Category Equipment: PW Equip Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total2022 2023 2024 2025 2026Funding Sources 50,00050,000General Fund 50,000 50,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace 2006 model with a Tandem Project #PW-050 Priority 1 Critical Justification End of Useful Life The second tandem will be efficient all months of the year, not just efficient the four months of winter such as the single axles are. We have plans that would utilize both tandems all year- hauling snow out of cul de sacs, efficiently adding gravel or millings on shoulders and gravel roads, material from the pit to the shop for stock, moving street sweeping, fill and black dirt for park improvements and sewer water repairs. The addition of the tandem has allowed us to save on not only the fuel of running multiple small trucks but frees up the additional drivers aswell!! I am a HUGE fan of how efficient that truck is making things here. Jamie and I have already discussed changing up the plow routes so the tandems could plow in many of the new developments with wider roads not to mention they would not have to reload as often and the additional weight on the trucks add a ton of traction Budget Impact/Other Useful LifeProject Name Dump Truck with Plow Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 275,000275,000Equip/Vehicles/Furnishings 275,000 275,000Total Total2022 2023 2024 2025 2026Funding Sources 275,000275,000Vehicle Replacement Fund 275,000 275,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description Cooperatvie project between Washington County, City of Oakdale and City of Lake Elmo Improvements to CSAH 13 from CSAH 14 to 44th St Project #PW-052 Priority 3 Important Justification Need determined by Washington County New development in Oakdale will increase traffic in area Budget Impact/Other all debt service agreement with Oakdale to split city costs 45/55 with Lake Elmo's cap at $400k additional $15k for city engineer Useful Life 20 yearsProject Name Ideal Ave (CSAH 13) Phase 2 Category Street Reconstruction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 400,000400,000Construction/Maintenance 400,000 400,000Total Total2022 2023 2024 2025 2026Funding Sources 400,000400,000Debt Service 400,000 400,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Additional skidloader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed highflow Project #PW-054 Priority 3 Important Justification additional skidloader needed due to growth in streets and parks Budget Impact/Other Useful LifeProject Name Skidloader Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total2022 2023 2024 2025 2026Funding Sources 70,00070,000Vehicle Replacement Fund 70,000 70,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Pickup with plow to replace 2014 F250 Project #PW-060 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup w/plow Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total2022 2023 2024 2025 2026Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Replace 2016 F150 Project #PW-061 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total Total2022 2023 2024 2025 2026Funding Sources 35,00035,000Vehicle Replacement Fund 35,000 35,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description Stoploght at realigned Hudson Blvd and Manning Ave Project #PW-067 Priority 2 Very Important Justification per Washington County Budget Impact/Other Funding from Four Corners 1st Addition Useful Life 25 yearsProject Name Manning/Hudson Stoplight Category Street Construction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total2022 2023 2024 2025 2026Funding Sources 250,000250,000Grants/Donation 250,000 250,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description The replacement of this unit was not scheduled. This is a 2013 Bobcat T590 Track skid steer Project #PW-071 Priority 2 Very Important Justification This unit should have been schedule to be replaced at year ten as outlined in the vehicle replacement policy. After reviewing the unit we are finding numberous maintenance issues as it does get used daily. Mainenace issues include 1)wore ouot tracks 2) wore out sprokets and undercarriage 3)wore out buctet quick tach 4) A/C issues 5) Windsheild whipper motor issues Budget Impact/Other Useful Life 10 yearsProject Name 2013 Bobcat T590 Track Skid Steer Replacement Category Vehicles Type Equipment Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total2022 2023 2024 2025 2026Funding Sources 10,00010,000Storm Water Fund 60,00060,000Vehicle Replacement Fund 70,000 70,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description Addition of a pick up for use on streets and parks. Project #PW-072 Priority 2 Very Important Justification As we rapidly grow we need to spread staff out to complete all assigned tasks in an efficent manner. Very often that does not allow enough vehicles and staff are using utlity vehicles or plow trucks to travel. With the planned addition of another staff member, GIS interns and seasonal staff we are continuously experiencing vehicle stortages and struggle to complete tasks efficently. Budget Impact/Other Useful Life 10 yearsProject Name Pickup truck addition Category Vehicles Type Equipment Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 42,00042,000Equip/Vehicles/Furnishings 42,000 42,000Total Total2022 2023 2024 2025 2026Funding Sources 42,00042,000Vehicle Replacement Fund 42,000 42,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description Improvements at Lake Elmo Ave and TH 36 including on/off ramps but may not be a full blown interchange Project #PW-074 Priority 3 Important Justification Budget Impact/Other $4,500,000 estimate is only for the intersection improvements and does not inlcude any cost for frontage roads (PW-076) Useful LifeProject Name TH36-Lake Elmo Ave (CSAH 17) Imp Category Unassigned Type Unassigned Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 4,500,0004,500,000Construction/Maintenance 4,500,000 4,500,000Total Total2022 2023 2024 2025 2026Funding Sources 4,500,0004,500,000Debt Service 4,500,000 4,500,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Public Works Department Description Contracuton of south frontage road between Keats Ave and Lake Elmo Ave in order to improve traffic flow to new Lake Elmo Ave/TH36 Improvement and remove direct private accesses to TH 36 Project #PW-076 Priority 3 Important Justification Necessary safety and traffic improvements Budget Impact/Other Useful Life 40 yearsProject Name South Frontage Road (Keats to Lake Elmo Ave)Category Street Construction Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 2,500,0002,500,000Construction/Maintenance 2,500,000 2,500,000Total Total2022 2023 2024 2025 2026Funding Sources 2,500,0002,500,000Debt Service 2,500,000 2,500,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Public Works Department Description $186,350 to the street landscape budget for 2022 for the 5th St medians Project #PW-077 Priority 2 Very Important Justification Budget Impact/Other Useful Life 20 yearsProject Name 5th St Medians Category Street Construction Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 206,350206,350Construction/Maintenance 206,350 206,350Total Total2022 2023 2024 2025 2026Funding Sources 206,350206,350General Fund 206,350 206,350Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description Sewer extension in the Old Village Phases 5 & 6 (over 2 years) OV 5: 33rd, 32nd OV 6: Upper 33rd, 34th, 35th, 36th, private drive south of UPRR Kraft, Lampert, Langley 2021 will include work on 32nd St, then move to remaining areas in 2022 Project #S-005 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other $1,237,500 in sewer assessment income $2,461,000 city sewer fund contribution to pay debt Useful Life 40 yearsProject Name Old Village Sewer Extension Phase 5 Category Wastewater Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,475,0001,475,000Land Acquisition 1,475,000 1,475,000Total Total2022 2023 2024 2025 2026Funding Sources 1,475,0001,475,000Debt Service 1,475,000 1,475,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description Sewer Oversizing Project #S-013 Priority 3 Important Justification Sewer oversizing based on developer pace and phasing Also $1 million of trunk sewer oversixing applied to OV sewer phases 1-7 in 2021 and $1,275,750 in 2022 Budget Impact/Other Useful Life 40 yearsProject Name Sewer Oversizing Category Wastewater Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 95,36022,438 32,922 40,000Other 22,438 32,922 40,000 95,360Total Total2022 2023 2024 2025 2026Funding Sources 55,36022,438 32,922Sewer Fund 40,00040,000Street Fund 22,438 32,922 40,000 95,360Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description $575,000 Legion Ave N. $314,4000 Assessment Revenue Project #S-017 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems Budget Impact/Other Useful LifeProject Name Old Village Sewer Extension Phase 7 Category Wastewater Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 575,000575,000Construction/Maintenance 575,000 575,000Total Total2022 2023 2024 2025 2026Funding Sources 575,000575,000Debt Service 575,000 575,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Sewer Department Description Used VAC Truck Project #S-019 Priority 2 Very Important Justification As the City’s water, sewer and storm sewer systems continue to expand at a fast rate we are seeing more and more of a need to maintain the utilities in a time sensitive manner. The addition of a VAC truck would benefit the city by improving the response time to sewer backups. It would allow more frequent cleaning of lift stations, reducing plugged pumps. We would Jet the required 1/3 of the cities sanitary mains as it fits our schedule. Currently we are not meeting the 1/3 rule due to the cost of contracting out the jetting. Water main gate valve boxes can be cleaned when full of sediment quickly to allow staff access to control valves to isolate main breaks. Plugged storm sewers and culverts can be cleaned quickly the same day issues are identified. The MPCA mandates we clean storm water sumps yearly. This piece of equipment would allow us to do the work in- house on our schedule instead of contracting it out. The Vac truck can safely and efficiently expose power, gas and communication lines. It reduces labor when excavating around curb stops, gate valves. This piece of equipment would replace the small VAC trailer unit we have now that cannot perform the majority of task provided above. Budget Impact/Other Useful Life 20 yearsProject Name VAC Truck Category Vehicles Type Equipment Status Active Total2022 2023 2024 2025 2026Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total2022 2023 2024 2025 2026Funding Sources 175,000175,000Sewer Fund 75,00075,000Storm Water Fund 250,000 250,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description Sewer trunk extension from lift station in Oakdale at Helmo Ave/Stillwater Blvd north on Idela Ave to city propoerty across from Target Note: $540,000 paid with ARPA funds in 2022. Includes contribution to Oakdale lift station upgrade and capacity improvements ($267k) Segments of sewer to south of the railraod tracks ($270k) Oversizing costs to developer in 2023 ($100,000) Project #S-020 Priority 3 Important Justification Serve 180 acres to allow for sewered development. Plan per the Section 16 Master Plan completed by Focus Engineering and HKGI in 2020 Budget Impact/Other Assumes 425 RECs for entire 180 acres May use ARPA funds for $540k cost in 2022 Useful Life 40 yearsProject Name Sewer to 180 Acres Category Wastewater Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 540,000540,000Construction/Maintenance 100,000100,000Other 540,000 100,000 640,000Total Total2022 2023 2024 2025 2026Funding Sources 540,000540,000Grants/Donation 100,000100,000Sewer Fund 540,000 100,000 640,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description If 3M Grant is received for watermain extension to Klondike, the city may want to consider the extension of city sewer at the same time. This would be a low pressure system. Project #S-021 Priority 5 Future Consideration Justification Located in MUSA area Many lake lots-connecting to city sewer could improve water quality Budget Impact/Other 100% assessed to property owners Useful Life 40 yearsProject Name Low Pressure Sewer to Klondike Category Wastewater Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 00Construction/Maintenance 00Total Total2022 2023 2024 2025 2026Funding Sources 00Sewer Fund 00Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description If 3M Grant is recevied for watermain extension, the city may consider also extending sewer. Project #S-022 Priority 5 Future Consideration Justification Not located within the MUSA however there have been many failed septic systems and finding replacement locations has been a challenge Sewer stub is available to Sunfish Ponds HOA property (from Legacy at North Star develompment) Budget Impact/Other 100% assessed to property owners Useful Life 40 yearsProject Name Sewer to Sunfish Ponds Category Wastewater Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 00Construction/Maintenance 00Total Total2022 2023 2024 2025 2026Funding Sources 00Sewer Fund 00Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description Tapestry submitted a petition for city sewer in 2020. The next step would be authorization for a feasibility study in 2021 with potential construction of the project in 2022. Sewer main would be extended from Hamlet on Sunfish Lake to a lift station in Tapestry Project #S-023 Priority 3 Important Justification Tapestry community septic is having challenges so the HOA reached out to the city to explore the option of connecting to city sewer Budget Impact/Other Costs would be 100% assessed to Tapestry Useful Life 40 yearsProject Name Tapestry Neighborhood Sanitary Sewer Ext Category Wastewater Type Unassigned Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 922,000922,000Construction/Maintenance 922,000 922,000Total Total2022 2023 2024 2025 2026Funding Sources 922,000922,000Debt Service 922,000 922,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Sewer Department Description Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The route would roughly follow the alignment of the current City of Oakdale gravity line that Lake Elmo’s lift station utilizes, but be extended further to the east. The exact terminus of the gravity line needs to be determined based on elevation survey and other investigations during preliminary design. The I-94 lift station would continue to pump through a City-owned forcemain to the MCES gravity sewer connection point. This alternative also includes the replacement of portions of the 1-WO-500 interceptor to accommodate larger ultimate flow rates from Lake Elmo and Oakdale. The above project proposed by Met Council will result in the city upgrading the forcemain in order to serve the growth in the southwest portionof the city. Cost estimates to be revised when Met Council complete their upgrades in 2022-2024 Project #S-024 Priority 3 Important Justification Upgrades to lift station and foremain in order to provide for continued growth in the southwest area of the city Budget Impact/Other Useful LifeProject Name I-94 Lift Station and Forcemain Upgrade Category Unassigned Type Unassigned Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 1,900,0001,900,000Construction/Maintenance 1,900,000 1,900,000Total Total2022 2023 2024 2025 2026Funding Sources 1,900,0001,900,000Sewer Fund 1,900,000 1,900,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Storm Water Department Description Lake Elmo Ave and Stillwater Blvd Area Project #SW-001 Priority 3 Important Justification 2nd Phase to improving the regional drainage issues timing dependent upon development Budget Impact/Other Compensation for oversizing to developer Useful Life 40 yearsProject Name Phase 2 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total2022 2023 2024 2025 2026Funding Sources 800,000800,000Debt Service 800,000 800,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Storm Water Department Description Phase 3 of Regional Drainage Improvements (VFW Park) Project #SW-002 Priority 3 Important Justification 3rd Phase of Regional Drainage Improvements (VFW Park) Timing dependent upon development Budget Impact/Other Useful Life 40 yearsProject Name Phase 3 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 500,000500,000Construction/Maintenance 500,000 500,000Total Total2022 2023 2024 2025 2026Funding Sources 500,000500,000Debt Service 500,000 500,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Storm Water Department Description Kramer Lake Floodplain Study Project #SW-003 Priority 3 Important Justification Required for I94 Phase 3 area development Budget Impact/Other Funding to come from developer or included as watershed study Useful Life 40 yearsProject Name Kramer Lake Floodplain Study Category Storm Sewer/Drainage Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 60,00060,000Planning/Design 60,000 60,000Total Total2022 2023 2024 2025 2026Funding Sources 60,00060,000Grants/Donation 60,000 60,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Water Tower #3 Project #W-006 Priority 1 Critical Justification needed for development in Phase 2/Phase 3 (low pressure zone) 400 RECs available before needed Can be located in either Phase 2 or 3, the closer to Lake Elmo Ave the better Budget Impact/Other Useful Life 40 yearsProject Name Elevated Storage Tank #3 Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 435,000435,000Land Acquisition 3,675,0003,675,000Construction/Maintenance 4,110,000 4,110,000Total Total2022 2023 2024 2025 2026Funding Sources 4,110,0004,110,000Water Fund 4,110,000 4,110,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description 12" trunk watermain extension to north side of UPRR with 12" pressure reduction valve with bypass Project #W-008 Priority 2 Very Important Justification Need to reduce pressure and accommodate water flows Part of Old Village trunk watermain loop to serve Old Village development Budget Impact/Other Useful Life 40 yearsProject Name Village East Trunk Watermain & PRV Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 375,000375,000Construction/Maintenance 375,000 375,000Total Total2022 2023 2024 2025 2026Funding Sources 375,000375,000Water Fund 375,000 375,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Water Department Description Project #W-010 Priority 4 Less Important Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Budget Impact/Other Useful Life 25 yearsProject Name Paint Water Tank at PW Category Water Type Maintenance Status Active Total2022 2023 2024 2025 2026Expenditures 800,000800,000Equip/Vehicles/Furnishings 800,000 800,000Total Total2022 2023 2024 2025 2026Funding Sources 800,000800,000Water Fund 800,000 800,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Water Department Description Pull and Rebuild Well #4 pump Project #W-012 Priority 3 Important Justification Recommended by 2016 TKDA Utility Study to be on a regular rotation Budget Impact/Other Useful Life 15 yearsProject Name Well #4 Pump - Pull and Rebuild Category Water Type Maintenance Status Active Total2022 2023 2024 2025 2026Expenditures 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total Total2022 2023 2024 2025 2026Funding Sources 35,00035,000Water Fund 35,000 35,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Oversizing cost of watermain pipe installed by developers. Project #W-013 Priority 3 Important Justification Ensures all pipe in the City will have flow capacity necessary for water system Budget Impact/Other Useful Life 40 yearsProject Name Watermain Oversizing Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 455,914235,219 40,695 120,000 60,000Other 235,219 40,695 120,000 60,000 455,914Total Total2022 2023 2024 2025 2026Funding Sources 455,914235,219 40,695 120,000 60,000Water Fund 235,219 40,695 120,000 60,000 455,914Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Water Department Description Replace 200 obsolete Sensus and Neptune meters each year with new Sensus 1 pro meters Project #W-023 Priority 1 Critical Justification Old meters not working properly leads to the need to estimate usage therefore billing process takes more staff time Budget Impact/Other Useful Life 15 yearsProject Name Water Meter Change Out Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 200,00075,000 75,000 50,000Equip/Vehicles/Furnishings 75,000 75,000 50,000 200,000Total Total2022 2023 2024 2025 2026Funding Sources 200,00075,000 75,000 50,000Water Fund 75,000 75,000 50,000 200,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Water Department Description Automated radio read system for water meters. Project #W-024 Priority 3 Important Justification Eliminates the need to drive around and obtain reads. Improves billing and gives "real time" readings to help detect leaks. Budget Impact/Other Useful LifeProject Name Automated Radio Read System Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 300,000300,000Equip/Vehicles/Furnishings 300,000 300,000Total Total2022 2023 2024 2025 2026Funding Sources 300,000300,000Water Fund 300,000 300,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Replacement of water mains in conjunction with sewer extension to Phase 6 and 5 done over 2 years Project #W-025 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful LifeProject Name OV sewer extension phase 6 & 5; water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,040,0001,040,000Construction/Maintenance 1,040,000 1,040,000Total Total2022 2023 2024 2025 2026Funding Sources 1,040,0001,040,000Water Fund 1,040,000 1,040,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Old Village Phase 7 water main replacement on Legion Ave Project #W-026 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful LifeProject Name OV sewer extension Phase 7; water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 270,000270,000Construction/Maintenance 270,000 270,000Total Total2022 2023 2024 2025 2026Funding Sources 270,000270,000Water Fund 270,000 270,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Water main extensions to Parkview Estates, Cardinal Ridge, Cardinal View, Whistling Valley, Torres Pines Water maintenance items in Irish Ct and Beaut Crest in conjunction with road project Project #W-031 Priority 3 Important Justification Bring water to neighborhoods in Special Well Construction Area with contaminated wells. Coordinate with road work for efficiency. Exisitng water systems to be upgraded in conjuction with road work Budget Impact/Other $1,557,000 for Parkview Estates, Cardinal Ridge and Carinal View (3M Grant) $1,405,000 for Whistling Valley (3M Grant) $783,000 Torres Pines (3M Grant) $441,000 for Beaut crest upgrades Useful Life 40 yearsProject Name 2022 Street Projects-water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 4,186,0004,186,000Construction/Maintenance 4,186,000 4,186,000Total Total2022 2023 2024 2025 2026Funding Sources 3,745,0003,745,000Grants/Donation 441,000441,000Water Fund 4,186,000 4,186,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description $270,600 Fields of St Croix 2nd Addition and Tana Ridge $2,280,000 for Packard Park, Eden Park and 20th St Circle assumes 3M Grant Project #W-032 Priority 3 Important Justification water upgrades with road projects in Fields 2 and Tana watermain extensions to neighborhoods with well advisories or in the special well construction area Budget Impact/Other $2,280,000 3M grant assumption Useful Life 40 yearsProject Name 2023 Street Projects-water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 2,550,6002,550,600Construction/Maintenance 2,550,600 2,550,600Total Total2022 2023 2024 2025 2026Funding Sources 2,280,0002,280,000Grants/Donation 270,600270,600Water Fund 2,550,600 2,550,600Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description $1,200,000 Homestead and The Forest assumes 3M Grant $297,000 Carriage Station + 59th St Ct/55th St/Julep Way Project #W-033 Priority 3 Important Justification watermain extensions to Homestead and The Forest due to well advisories or being in Special Well Construction Area upgrades to existing water system in conjunction with road projects Budget Impact/Other assumes $1,200,000 3M grant Useful Life 40 yearsProject Name 2024 Street Projects-water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,497,0001,497,000Construction/Maintenance 1,497,000 1,497,000Total Total2022 2023 2024 2025 2026Funding Sources 1,200,0001,200,000Grants/Donation 297,000297,000Water Fund 1,497,000 1,497,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Water system upgrades as road work is completed for efficiency $1,640,000 Tartan Meadows + Klondike assumes 3M grant $180,000 Pending Roadway pavement evaluation Project #W-034 Priority 3 Important Justification Watermain extnsion to Tartan Meadows and Klondike due to location in special well construction area Budget Impact/Other assumes 3M grant Useful Life 40 yearsProject Name 2025 Street Projects-water component Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 1,820,0001,820,000Construction/Maintenance 1,820,000 1,820,000Total Total2022 2023 2024 2025 2026Funding Sources 1,640,0001,640,000Grants/Donation 180,000180,000Water Fund 1,820,000 1,820,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description $1,620,000 for watermain extension to Stillwater Lane, Downs Lake Estates and Sunfish Ponds $180,000 Water upgrades with pending road work Project #W-035 Priority 3 Important Justification Watermain extension to areas in ornear special well construction area Budget Impact/Other $1,620,000 3m Grant assumes Useful LifeProject Name 2026 Street Projcts-water component Category Unassigned Type Unassigned Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 1,800,0001,800,000Construction/Maintenance 1,800,000 1,800,000Total Total2022 2023 2024 2025 2026Funding Sources 1,620,0001,620,000Grants/Donation 180,000180,000Water Fund 1,800,000 1,800,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description $400,000 - 9757,9759 & 9765 45th Street Watermain Extension (Blackford Extension) Would only be completed if funding is received from the 3M Grants Project #W-036 Priority 3 Important Justification One of three wells on this private drive has a well adviosry Budget Impact/Other Useful Life 40 yearsProject Name 45th Street Watermain Extension Category Water Type Improvement Status Active Total2022 2023 2024 2025 2026Expenditures 400,000400,000Construction/Maintenance 400,000 400,000Total Total2022 2023 2024 2025 2026Funding Sources 400,000400,000Grants/Donation 400,000 400,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description New well and pumphouse. Monitoring well as required by the DNR. Project #W-037 Priority 3 Important Justification Growth in water system users both in and outside of MUSA Budget Impact/Other Useful LifeProject Name Well, Pumphouse No. 6 and monitoring well Category Unassigned Type Unassigned Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 2,700,0002,700,000Construction/Maintenance 2,700,000 2,700,000Total Total2022 2023 2024 2025 2026Funding Sources 2,700,0002,700,000Water Fund 2,700,000 2,700,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Engineer 2022 2026thru Department Water Department Description Trunk watermains that may be needed to shore up the system and impacted by state's Conceptual Drinking Water Supply Plan final recommendations Inlcuding area on Hudson between Keats and Lake Elmo Ave, Stillwater Blvd, Downs Lake area, etc Project #W-038 Priority 3 Important Justification Budget Impact/Other Useful Life 40 yearsProject Name Watermain Trunk Watermains Category Water Type Improvement Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 3,392,0001,392,000 1,000,000 1,000,000Construction/Maintenance 1,392,000 1,000,000 1,000,000 3,392,000Total Total2022 2023 2024 2025 2026Funding Sources 3,392,0001,392,000 1,000,000 1,000,000Water Fund 1,392,000 1,000,000 1,000,000 3,392,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software Capital Improvement Plan - 2022 - 2026 City of Lake Elmo, Minnesota Contact Public Works Director 2022 2026thru Department Water Department Description Decommissioning and removal of water tower #1 on Langly Court. Project #W-039 Priority 3 Important Justification Once water tower 3 is constructed in the low poressure area, water tower 1 shuld be decommissioned. If not decommissioned, it will need significant maintenance to upkeep. Location (monopole?) needed to relocate cell antennas Budget Impact/Other Useful Life 0Project Name Decommission Water Tower 1 Category Water Type Maintenance Status New Recommendation Total2022 2023 2024 2025 2026Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total2022 2023 2024 2025 2026Funding Sources 50,00050,000Water Fund 50,000 50,000Total Monday, October 18, 2021Produced Using the Plan-It Capital Planning Software