Loading...
HomeMy WebLinkAbout#23 - Water Tower 3 Trunk Watermain Accept Bids and Award ContraceDATE: January 18, 2022 REGULAR AGENDA ITEM: Accept Bids and Award Contract for the Water Tower No. 3 Trunk Watermain Extension SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a contract for the Water Tower No. 3 Trunk Watermain Extension? BACKGROUND: In accordance with the City’s Capital Improvement Plan, a new water tower is planned for construction in 2022/2023 to support growth and development within the low-pressure zone areas of the city and to provide overall storage capacity for the city’s water supply system. The Water Tower No. 3 Trunk Watermain Extension will connect the new water tower to the city’s trunk watermain distribution system. The project includes approximately 2,000 feet of 16-inch HDPE watermain pipe extended along Lake Elmo Avenue, from 5th Street North to the water tower side located at the southwest corner of Hudson Boulevard and Lake Elmo Avenue. A 10-inch watermain will extend across Lake Elmo Avenue to the east boulevard to connect to the proposed Crossroads-Launch development, and an 8-inch stub will be placed at the 3rd Street Place intersection for potential future extension of watermain into the Forest neighborhood. Hydrants and system valves have been placed according to city standards and as determined by the Lake Elmo Fire Department and Department of Public Works. The watermain extension project is planned for construction in 2022. On November 16, 2021, the City Council approved the plans and specifications for the Project and authorized staff to advertise the project for bids. The Project was advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota Competitive Bidding requirements. PROPOSAL DETAILS/ANALYSIS: Bids were received and opened electronically on December 15, 2021. The City received 6 bids for this project, with Northdale Construction Company, Inc. providing the lowest bid in the amount of $523,672.42. Contractor references for Northdale Construction Company, Inc. were reviewed by the City’s engineering consultant for the project and a letter recommending the award of the project is attached as part of this agenda item. The City Engineer and his consultant are therefore recommending that the Council award the contract to the lowest responsible bidder, Northdale Construction Company, Inc. as outlined in the attached letter. As a part of this award staff is requesting Council to provide the City Administrator authorization to enter into a material testing contract for the geotechnical construction phase services for the project in the not-to-exceed amount of $10,000. Staff has requested proposals from Braun Intertec and AET, Inc. FISCAL IMPACT: Approval of this resolution commits the council to enter into a construction contract for the Water Tower No. 3 Trunk Watermain Extension improvements. Entering into a construction contract for this portion of the project has a total post-bid estimated project cost of $634,000. The project will be funded through the Water Enterprise Fund. This project is a part of the Water Tower No. 3 Capital Improvement Project which has a total post-bid estimated project cost of $4,550,000 (vs. CIP Budget of $4,110,000). RECOMMENDATION: Staff is recommending that the City Council approve a resolution accepting bids and awarding a contract to Northdale Construction Company, Inc. in the low bid amount of $523,672.42 for the Water Tower No. 3 Trunk Watermain Extension. The recommended motion for this action is as follows: “Move to approve Resolution No. 2022–013, accepting bids and awarding a contract to Northdale Construction Company, Inc. in the amount of $523,672.42 for the Water Tower No. 3 Trunk Watermain Extension.” Staff is also recommending that the City Council authorize the City Administrator to enter into a material testing contract for geotechnical construction phase services for the project, in the not-to-exceed amount of $10,000. The recommended motion for this action is as follows: “Move to authorize the City Administrator to enter into a material testing contract for geotechnical construction phase services in the not-to-exceed amount of $10,000 for the Water Tower No. 3 Trunk Watermain Extension.” ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract for the Water Tower No. 3 Trunk Watermain Extension. 2. Letter of Award Recommendation and Tabulation of Bids. 3. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2022-013 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE WATER TOWER NO. 3 WATERMAIN EXTENSION WHEREAS, pursuant to an advertisement for bids for the Water Tower No. 3 Watermain Extension, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, Northdale Construction Company, Inc. for the bid amount of $523,672.42. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE EIGHTEENTH DAY OF JANUARY, 2022. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 651.490.2000 | 800.325.2055 | 888.908.8166 fax | sehinc.com SEH is 100% employee-owned | Affirmative Action–Equal Opportunity Employer December 16, 2021 RE: City of Lake Elmo Water Tower No. 3 Trunk Water Main Extension City Project No. 2021.125 SEH No. LAKMO 162018 Mr. Jack Griffin City Engineer City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, MN 55042 On Wednesday, December 15, 2021 at 1:00 p.m., six bids were received for the above-referenced project. The bids ranged from a high of $709,390.24 to a low of $523,672.42. The low bid received was submitted by Northdale Construction Company, Inc., of Albertville, MN. Contractor Total Bid 1 Northdale Construction Company, Inc. $523,672.42 2 Pember Companies, Inc. $558,932.40 3 Minger Construction Co. Inc. $580,813.00 4 McNamara Contracting $675,042.00 5 A-1 Excavating Inc. $699,617.00 6 G M Contracting, Inc. $709,390.24 Engineer's Estimate $471,580.00 In reliance on our experience with Northdale Construction Company, Inc. and/or materials and information provided by the contractor, we have determined that according to their bonding agent they presently have the financial ability to complete the project. SEH makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. Northdale Construction Company, Inc. has worked in Lake Elmo and other metro communities on similar utility construction projects of various sizes. SEH engineers can conclude that Northdale Construction Company, Inc. has the experience and ability to complete a project of this size and scope. Accordingly, we recommend the project be awarded to Northdale Construction Company, Inc. in the amount of $523,672.42. Please contact me if you need any additional information or wish to discuss further. I can be reached at 651.490.2055, or via email at shaupt@sehinc.com. Sincerely, Scott Haupt, PE (Lic. MN, WI) Project Manager \\sehinc.com\panzura\pzprojects\ko\l\lakmo\162018\6-bid-const\bidding documents\tower no. 3-trunk wm extension rec awrd ltr.docx TABULATION OF BIDS12Water Tower No. 3 Trunk Water Main ExtensionEngineer's EstimateNorthdale Construction Company, Pember Companies, Inc.City of Lake Elmo9760 71st Street NE N4449 469th StreetSEH No.: LAKMO 162018Albertville, MN 56055Menomonie, WI 54751Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price1 2021.501 Mobilization LS 1 $20,000.00 $20,000.00 $22,392.50 $22,392.50 $22,575.00 $22,575.002 2104.505 Remove Bituminous Pavement SY 494 5.00 2,470.00 10.00 4,940.00 10.00 4,940.003 2104.513 Sawing Bit Pavement (Full Depth) LF 510 6.00 3,060.00 5.00 2,550.00 2.80 1,428.004 2104.523 Salvage and Install Sign (Type C or Street Name Sign)EACH 2 200.00 400.00 446.25 892.50 450.00 900.005 2104.523 Salvage and Install Guard Rail LF 70 75.00 5,250.00 68.25 4,777.50 50.00 3,500.006 2123.61 Street Sweeping HOUR 20 150.00 3,000.00 420.00 8,400.00 135.00 2,700.007 2211.501 Aggregate Base Class 5 TON 280 20.00 5,600.00 31.50 8,820.00 55.00 15,400.008 2211.507 Aggregate Base Class 1 (Modified) - Shoulder (CV) (P)CY 9 50.00 450.00 63.00 567.00 140.00 1,260.009 2357.502 Bit. Material for Tack Coat GAL 66 5.00 330.00 2.36 155.76 2.40 158.4010 2360.501 Type SP 12.5 Wearing Course Mix (3,C) TON 110 175.00 19,250.00 178.50 19,635.00 248.00 27,280.0011 2503.604 2" Rigid Insulation SY 20 30.00 600.00 47.53 950.60 67.50 1,350.0012 2504.602 Adjust Gate Valve & Box EACH 2 400.00 800.00 500.00 1,000.00 220.00 440.0013 2504.602 Connect to Existing Water Main EACH 1 5,000.00 5,000.00 29,422.24 29,422.24 2,050.00 2,050.0014 2504.602 Hydrant EACH 4 5,500.00 22,000.00 7,192.05 28,768.20 6,500.00 26,000.0015 2505.602 Water Main Offroad Structure Marker EACH 4 200.00 800.00 263.09 1,052.36 165.00 660.0016 2504.602 6" Gate Valve & Box EACH 3 1,800.00 5,400.00 2,535.31 7,605.93 1,865.00 5,595.0017 2504.602 8" Gate Valve & Box EACH 2 2,500.00 5,000.00 3,094.03 6,188.06 2,450.00 4,900.0018 2504.602 10" Gate Valve & Box EACH 1 3,000.00 3,000.00 3,966.44 3,966.44 3,550.00 3,550.0019 2504.602 16" Butterfly Valve & Box EACH 6 6,000.00 36,000.00 5,349.31 32,095.86 5,250.00 31,500.0020 2504.602 10" DIP TO 12" HDPE Poly Cam Adaptor EACH 2 3,000.00 6,000.00 3,398.20 6,796.40 4,500.00 9,000.0021 2504.602 16" DIP TO 16" HDPE Poly Cam Adaptor EACH 6 4,000.00 24,000.00 1,762.42 10,574.52 2,675.00 16,050.00$471,580.00$523,672.42 $558,932.40Short Elliott Hendrickson Inc.Page 1 of 6 TABULATION OF BIDS12Water Tower No. 3 Trunk Water Main ExtensionEngineer's EstimateNorthdale Construction Company, Pember Companies, Inc.City of Lake Elmo9760 71st Street NE N4449 469th StreetSEH No.: LAKMO 162018Albertville, MN 56055Menomonie, WI 54751Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price$471,580.00$523,672.42 $558,932.4022 2504.603 6" Water Main DIP - CL 52 (Poly Encased) LF 65 80.00 5,200.00 82.31 5,350.15 104.00 6,760.0023 2504.603 8" Water Main DIP - CL 52 (Poly Encased) LF 170 80.00 13,600.00 92.79 15,774.30 102.00 17,340.0024 2504.603 10" Water Main DIP - CL 52 (Poly Encased) LF 10 90.00 900.00 105.06 1,050.60 127.00 1,270.0025 2504.603 12" Water Main DIP - CL 52 (Poly Encased) LF 10 100.00 1,000.00 117.82 1,178.20 140.00 1,400.0026 2504.603 16" Water Main DIP - CL 52 (Poly Encased) LF 210 100.00 21,000.00 55.00 11,550.00 162.50 34,125.0027 2504.603 12" Water Main HDD HDPE DR11 LF 75 100.00 7,500.00 166.18 12,463.50 186.00 13,950.0028 2504.603 16" Water Main HDD HDPE DR11 LF 1780 90.00 160,200.00 112.30 199,894.00 123.00 218,940.0029 2504.608 Ductile Iron Fittings LB 2660 10.00 26,600.00 16.78 44,634.80 9.60 25,536.0030 2521.518 4" Concrete Splash Pad SF 75 20.00 1,500.00 75.00 5,625.00 12.00 900.0031 2563.601 Traffic Control LS 1 50,000.00 50,000.00 10,500.00 10,500.00 38,000.00 38,000.0032 2582.503 4" Solid Line White Multi Comp LF 300 5.00 1,500.00 6.30 1,890.00 6.35 1,905.0033 2582.518 Pavement Message Preform Tape Ground In SF 15 10.00 150.00 96.60 1,449.00 98.00 1,470.0034 2574.525 Common Topsoil Borrow (Pulverized) (LV) CY 90 38.00 3,420.00 55.00 4,950.00 80.00 7,200.0035 2575.605 Seeding (Seed Mix Type 25-141) w/ Erosion Control Blanket Cat 3NSY 1500 6.00 9,000.00 2.36 3,540.00 5.00 7,500.0036 2575.523 Sediment Control Log LF 400 4.00 1,600.00 5.68 2,272.00 3.50 1,400.00TOTAL BID PRICE$471,580.00 $558,932.40$523,672.42Short Elliott Hendrickson Inc.Page 2 of 6 TABULATION OF BIDSWater Tower No. 3 Trunk Water Main ExtensionCity of Lake ElmoSEH No.: LAKMO 162018Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity1 2021.501 Mobilization LS 12 2104.505 Remove Bituminous Pavement SY 4943 2104.513 Sawing Bit Pavement (Full Depth) LF 5104 2104.523 Salvage and Install Sign (Type C or Street Name Sign)EACH 25 2104.523 Salvage and Install Guard Rail LF 706 2123.61 Street Sweeping HOUR 207 2211.501 Aggregate Base Class 5 TON 2808 2211.507 Aggregate Base Class 1 (Modified) - Shoulder (CV) (P)CY 99 2357.502 Bit. Material for Tack Coat GAL 6610 2360.501 Type SP 12.5 Wearing Course Mix (3,C) TON 11011 2503.604 2" Rigid Insulation SY 2012 2504.602 Adjust Gate Valve & Box EACH 213 2504.602 Connect to Existing Water Main EACH 114 2504.602 Hydrant EACH 415 2505.602 Water Main Offroad Structure Marker EACH 416 2504.602 6" Gate Valve & Box EACH 317 2504.602 8" Gate Valve & Box EACH 218 2504.602 10" Gate Valve & Box EACH 119 2504.602 16" Butterfly Valve & Box EACH 620 2504.602 10" DIP TO 12" HDPE Poly Cam Adaptor EACH 221 2504.602 16" DIP TO 16" HDPE Poly Cam Adaptor EACH 6345Minger Construction Co. Inc. McNamara Contracting A-1 Excavating Inc.620 Corporate Drive 16700 Chippendale Avenue 8237 State Highway 64Jordan, MN 55352 Rosemount, MN 55068 Bloomer, WI 54724Unit Price Total Price Unit Price Total Price Unit Price Total Price$25,000.00 $25,000.00 $52,000.00 $52,000.00 $80,400.00 $80,400.005.00 2,470.00 10.75 5,310.50 23.00 11,362.003.50 1,785.00 4.00 2,040.00 4.00 2,040.00350.00 700.00 450.00 900.00 500.00 1,000.0050.00 3,500.00 53.00 3,710.00 60.00 4,200.00140.00 2,800.00 185.00 3,700.00 50.00 1,000.0040.00 11,200.00 30.00 8,400.00 25.00 7,000.0090.00 810.00 64.00 576.00 110.00 990.003.00 198.00 3.00 198.00 5.00 330.00180.00 19,800.00 165.00 18,150.00 210.00 23,100.0020.00 400.00 35.00 700.00 38.00 760.00500.00 1,000.00 450.00 900.00 300.00 600.0015,000.00 15,000.00 6,500.00 6,500.00 8,000.00 8,000.006,000.00 24,000.00 9,800.00 39,200.00 7,000.00 28,000.00100.00 400.00 200.00 800.00 110.00 440.002,500.00 7,500.00 2,500.00 7,500.00 2,000.00 6,000.003,000.00 6,000.00 4,400.00 8,800.00 2,900.00 5,800.004,000.00 4,000.00 5,300.00 5,300.00 4,150.00 4,150.006,500.00 39,000.00 8,350.00 50,100.00 5,700.00 34,200.005,000.00 10,000.00 4,300.00 8,600.00 2,800.00 5,600.008,000.00 48,000.00 3,300.00 19,800.00 3,000.00 18,000.00$580,813.00 $675,042.00 $699,617.00Short Elliott Hendrickson Inc.Page 3 of 6 TABULATION OF BIDSWater Tower No. 3 Trunk Water Main ExtensionCity of Lake ElmoSEH No.: LAKMO 162018Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity22 2504.603 6" Water Main DIP - CL 52 (Poly Encased) LF 6523 2504.603 8" Water Main DIP - CL 52 (Poly Encased) LF 17024 2504.603 10" Water Main DIP - CL 52 (Poly Encased) LF 1025 2504.603 12" Water Main DIP - CL 52 (Poly Encased) LF 1026 2504.603 16" Water Main DIP - CL 52 (Poly Encased) LF 21027 2504.603 12" Water Main HDD HDPE DR11 LF 7528 2504.603 16" Water Main HDD HDPE DR11 LF 178029 2504.608 Ductile Iron Fittings LB 266030 2521.518 4" Concrete Splash Pad SF 7531 2563.601 Traffic Control LS 132 2582.503 4" Solid Line White Multi Comp LF 30033 2582.518 Pavement Message Preform Tape Ground In SF 1534 2574.525 Common Topsoil Borrow (Pulverized) (LV) CY 9035 2575.605 Seeding (Seed Mix Type 25-141) w/ Erosion Control Blanket Cat 3NSY 150036 2575.523 Sediment Control Log LF 400TOTAL BID PRICE345Minger Construction Co. Inc. McNamara Contracting A-1 Excavating Inc.620 Corporate Drive 16700 Chippendale Avenue 8237 State Highway 64Jordan, MN 55352 Rosemount, MN 55068 Bloomer, WI 54724Unit Price Total Price Unit Price Total Price Unit Price Total Price$580,813.00 $675,042.00 $699,617.00110.00 7,150.00 90.00 5,850.00 125.00 8,125.00100.00 17,000.00 90.00 15,300.00 116.00 19,720.00100.00 1,000.00 100.00 1,000.00 155.00 1,550.00100.00 1,000.00 115.00 1,150.00 180.00 1,800.00135.00 28,350.00 140.00 29,400.00 161.00 33,810.00190.00 14,250.00 295.00 22,125.00 247.00 18,525.00125.00 222,500.00 145.00 258,100.00 163.00 290,140.007.00 18,620.00 10.50 27,930.00 1.00 2,660.0040.00 3,000.00 71.00 5,325.00 40.00 3,000.0032,000.00 32,000.00 43,600.00 43,600.00 65,000.00 65,000.006.00 1,800.00 10.50 3,150.00 8.00 2,400.0092.00 1,380.00 52.50 787.50 101.00 1,515.0020.00 1,800.00 66.00 5,940.00 50.00 4,500.004.00 6,000.00 7.00 10,500.00 1.00 1,500.003.50 1,400.00 4.25 1,700.00 6.00 2,400.00$675,042.00 $699,617.00$580,813.00Short Elliott Hendrickson Inc.Page 4 of 6 TABULATION OF BIDSWater Tower No. 3 Trunk Water Main ExtensionCity of Lake ElmoSEH No.: LAKMO 162018Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity1 2021.501 Mobilization LS 12 2104.505 Remove Bituminous Pavement SY 4943 2104.513 Sawing Bit Pavement (Full Depth) LF 5104 2104.523 Salvage and Install Sign (Type C or Street Name Sign)EACH 25 2104.523 Salvage and Install Guard Rail LF 706 2123.61 Street Sweeping HOUR 207 2211.501 Aggregate Base Class 5 TON 2808 2211.507 Aggregate Base Class 1 (Modified) - Shoulder (CV) (P)CY 99 2357.502 Bit. Material for Tack Coat GAL 6610 2360.501 Type SP 12.5 Wearing Course Mix (3,C) TON 11011 2503.604 2" Rigid Insulation SY 2012 2504.602 Adjust Gate Valve & Box EACH 213 2504.602 Connect to Existing Water Main EACH 114 2504.602 Hydrant EACH 415 2505.602 Water Main Offroad Structure Marker EACH 416 2504.602 6" Gate Valve & Box EACH 317 2504.602 8" Gate Valve & Box EACH 218 2504.602 10" Gate Valve & Box EACH 119 2504.602 16" Butterfly Valve & Box EACH 620 2504.602 10" DIP TO 12" HDPE Poly Cam Adaptor EACH 221 2504.602 16" DIP TO 16" HDPE Poly Cam Adaptor EACH 66G M Contracting, Inc.19810 515th AveLake Crystal, MN 56055Unit Price Total Price$95,000.00 $95,000.005.50 2,717.006.25 3,187.50425.00 850.00140.00 9,800.00165.00 3,300.0035.70 9,996.0085.00 765.0010.50 693.00189.30 20,823.0017.51 350.20335.00 670.003,375.00 3,375.007,368.00 29,472.00125.00 500.002,288.00 6,864.002,663.00 5,326.004,098.08 4,098.085,554.11 33,324.66300.00 600.00475.00 2,850.00$709,390.24Short Elliott Hendrickson Inc.Page 5 of 6 TABULATION OF BIDSWater Tower No. 3 Trunk Water Main ExtensionCity of Lake ElmoSEH No.: LAKMO 162018Bid Date: Wednesday, December 15, 2021 at 1:00 p.m.Line No. Item No. Item UnitEst. Quantity22 2504.603 6" Water Main DIP - CL 52 (Poly Encased) LF 6523 2504.603 8" Water Main DIP - CL 52 (Poly Encased) LF 17024 2504.603 10" Water Main DIP - CL 52 (Poly Encased) LF 1025 2504.603 12" Water Main DIP - CL 52 (Poly Encased) LF 1026 2504.603 16" Water Main DIP - CL 52 (Poly Encased) LF 21027 2504.603 12" Water Main HDD HDPE DR11 LF 7528 2504.603 16" Water Main HDD HDPE DR11 LF 178029 2504.608 Ductile Iron Fittings LB 266030 2521.518 4" Concrete Splash Pad SF 7531 2563.601 Traffic Control LS 132 2582.503 4" Solid Line White Multi Comp LF 30033 2582.518 Pavement Message Preform Tape Ground In SF 1534 2574.525 Common Topsoil Borrow (Pulverized) (LV) CY 9035 2575.605 Seeding (Seed Mix Type 25-141) w/ Erosion Control Blanket Cat 3NSY 150036 2575.523 Sediment Control Log LF 400TOTAL BID PRICE6G M Contracting, Inc.19810 515th AveLake Crystal, MN 56055Unit Price Total Price$709,390.2476.08 4,945.2086.53 14,710.1099.32 993.20111.42 1,114.20138.91 29,171.10225.00 16,875.00152.80 271,984.0018.60 49,476.0012.00 900.0072,250.00 72,250.006.00 1,800.0092.00 1,380.0049.50 4,455.002.25 3,375.003.50 1,400.00$709,390.24Short Elliott Hendrickson Inc.Page 6 of 6 PROJECT SCHEDULE  CITY OF LAKE ELMO  WATER TOWER NO. 3 WATERMAIN EXT  PROJECT NO. 2021.125  FOCUS ENGINEERING, inc. Cara Geheren, P.E.  651.300.4261  Jack Griffin, P.E.         651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4283  Authorize Plans and Specifications for Water Tower No. 3 Watermain  Extension  Approve Plans and Specifications for Elevated Storage Tank No. 3.  Receive Contractor Bids.  Accept Bids and Award Contract.  Conduct Pre‐construction meeting and issue Notice to Proceed.  Substantial Completion (watermain operational).  JULY 6, 2021  NOVEMBER 16, 2021   DECEMBER 15, 2021   JANUARY 18, 2022 MARCH 21, 2022 SEPTEMBER 30, 2022   OCTOBER 28, 2022  Final Completion (punch list and final paperwork).