HomeMy WebLinkAbout#10 - Public Works Revisions Change OrderSTAFF REPORT
DATE: July 5, 2022
REGULAR
AGENDA ITEM: City Center-Public Works Addition Change Order-Public Works Revisions SUBMITTED BY: Kristina Handt, City Administrator
BACKGROUND: At the November 3rd meeting, Council awarded bids for the new city center and public works
addition. Also established at that time was Guaranteed Maximum Price (GMP) with H+U for construction costs. The GMP was $13,402,788. Per the city’s purchasing policy:
Change Orders Change orders may occur due to City driven changes, errors and omissions, field directives, unforeseen/hidden conditions, regulatory requirements or changes that are contractor driven. Changes that need to be made during construction need to be addressed and approved in a timely
manner in order to keep the project on schedule. 1) For a change order less than $100,000, which does not result in exceeding the overall project budget, the City Administrator may approve these. 2) At the discretion of the City Administrator, for a change order less than $100,000, but still within the scope of the overall project budget, it may be presented to the City Council for
consideration and approval. 3) For any change order that results in exceeding the overall project budget, and/or exceeds $100,000 must be approved by the City Council. ISSUE BEFORE COUNCIL:
Should Council approve the change order related to the Public Works Revisions for the City Center and Public Works Addition project? PROPOSAL: Attached is pricing for PR-12 Public Works Revisions which exceeds $100,000. This PR covers two things as noted from Leo A Daly: 1) Revisions to the Public Works Steel Package. o After Addendum 3 and before Addendum 4, back in Sept/Oct of 2021, 8
columns were revised upon final QC by our Structural Engineering Consultant and approximately 27 pieces of bracing were added at the public works addition. Unfortunately, the revisions were not clouded and therefore not picked up by the Steel Contractor. Most of the additional costs listed in this PR are related to the revisions that were supposed to be included in Addendum No.
4. LEO A DALY and H+U agree with the Steel Contractor’s request for
additional compensation for these revisions as it would be unlikely any
contractor would have picked up on the revision without it being clouded.
o Of the approximately $65k of additional steel material modifications, approximately $5k of that were due to revisions made in the floor plans at the request of the City after learning of an error with the existing Public Works floor plan background which did not include an alternate that was built during the time
of the original construction.
2) Revisions to the floor plan at the request of the City based upon the misalignment of the small addition in relation to the existing Public Works building. Space previously designed as storage space (less cost per square foot) was converted to more open office space, an enlargement of the conference room, and the creation of two private offices. With these
revisions were increases in the amount of drywall, electrical / lighting requirements, HVAC
loads, and other items that drive up the cost of the same area of construction. FISCAL IMPACT: With this pay request, the project remains within budget by using the contingency.
OPTION: 1) Approve PR-12 2) Don’t approve PR-12
RECOMMENDATION:
“Motion to approve PR-12 for the New City Center and Public Works Addition.” ATTACHMENTS:
• Change Order-PR-12
H+U Construction | 5555 West 78th Street | Suite A | Minneapolis MN 55439
Phone: 952 831 5408 | Email: info@hu-construction.com | Web: hu-construction.com
M E M O R A N D U M
DATE: May 19, 2022
TO: Kristina Handt, City of Lake Elmo
FROM: Luke Nelson, Hoffmann + Uhlhorn Construction, Inc.
SUBJECT: Lake Elmo City Center
Proposal Request #12 – Public Works Revised Layout
Attached for your review is the deduct cost to perform the work outlined in PR#12 to make
revisons to the storm shelter.
H+U Construction finds the pricing to be an accurate reflection of work completed.
Contractor/Supplier WS Description Amount
Axel Ohman 330L Stoop Foundation, deduct block, seal existing concrete Add 4,702.00$
Axel Ohman 330M Stoop Foundation, deduct block, seal existing concrete Add 1,390.00$
AME 510 Erect additional steel - 27 steel tubes Add 5,958.00$
CSI 512 Additonal steel (including Add.3 missing items) Add 65,552.00$
Carciofini 0790L
Caulk window sills, window perimeter, hm frame, casework,
countertops Add 644.00$
Carciofini 0790M
Caulk window sills, window perimeter, hm frame, casework,
countertops Add 143.00$
TCH 810 Changes to Doors 011, 016, 017, 014B Add 1,357.00$
Quality Overhead Door 0833L Deduct storage shed coiling door Deduct (2,000.00)$
Quality Overhead Door 0833M Deduct storage shed coiling door Deduct (17,050.00)$
Commercial Drywall 0920L Revised framing Add 15,795.00$
Commercial Drywall 0920M Revised framing Add 8,906.00$
Commercial Flooring 0965L Additonal vinyl base Add 300.00$
Commercial Flooring 0965M Additonal vinyl base Add 275.00$
SCR 2300L Add GRDs, Controls, ductwork, & refrigeration Add 4,829.00$
SCR 2300M Add GRDs, Controls, ductwork, & refrigeration Add 10,061.00$
Vinco 2600L Changes to fire alarm and electrical layout changes Add 11,000.00$
Vinco 2600M Changes to fire alarm and electrical layout changes Add 12,131.00$
Ebert 3210L Deduct bollards and asphalt paving Deduct (978.00)$
Ebert 3120M Deduct bollards and asphalt paving Deduct (2,179.00)$
Subtotal 120,836.00$
Bond Cost (.96%)1,160.03$
Subtotal 121,996.03$
H+U Fee (.65%)792.97$
Total 122,789$
Please, review and provide comments and/or approval.
Let me know if you have questions or need additional information.
Attachments – 34 pages
Address
Hours Trade Hourly Rate Total Quantity Rate Total Total
22 Laborer $92.20 2,028.40$ 18 $4.00 72.00$ -$
Laborer Foreman $97.20 -$ 3.5 $146.00 511.00$ -$
Bricklayer $100.04 -$ 1 $414.00 414.00$ -$
-3 Bricklayer Foreman $106.22 (318.66)$ 4 $110.00 440.00$ -$
Finisher $97.66 -$ 60 $2.50 150.00$ -$
11 Finisher Foreman $102.29 1,125.19$ 36 ($11.00)(396.00)$ -$
Carpenter $98.98 -$ -$ -$
14 Carpenter Foreman $102.84 1,439.76$ -$ -$
49er/Operator $98.15 -$ -$ -$
Truck Driver / Trucking $294.00 -$ -$ -$
Supervisor $152.00 -$ -$ -$
Time and a Half Premium $38.00 -$ -$ -$
Double Time $78.00 -$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ -$ -$
-$ 72.36$ -$
Subtotals 4,274.69$ 1,263.36$ -$
5,538.05$
Sub-Contracted Work 5%-$
Overhead & Profit 10%553.81$
Total Cost Labor $4,702.16 Material $1,389.84 6,092$
Below are the added costs for PR 12 (added stoop with foundation, eliminated 36 rf block, added sealing two rooms of existing concrete floor)(note that keynote 5 was added on ST205 for a concrete
ramp, but this is not called out anywhere and therefore not included in this pricing)
Labor
Performance Bond for Extra
Sales Tax
LS rebar
Gal sealer
SF symons forms
RF block
Materials (with tax) / Equipment Sub-Contractors
CompanyMaterial
LF formwork and stakes
CY added concrete
Total before overhead and profit
General Contractor Attention Date
Task
247 West 61st Street
Minneapolis, MN 55419
Scope of Work Description:
Jordan Boeser
Estimator / Project Manager
Cell 612-490-3724
Office 612-861-6025
Email Jordan@axelohman.com
Lake Elmo Public Facilities H & U Lucas Nelson 4/18/2022
Project
1
Lucas Nelson
From:scott ameconstructioncorp.com <scott@ameconstructioncorp.com>
Sent:Monday, April 18, 2022 9:08 AM
To:Lucas Nelson
Subject:Re: [External] New PR - No.12: PR 12 - Public Works Revised Layout
Lucas
A.M.E. Construction has an add of $5,958.00 for PR #12.
38 man hours @ $90 per hour $3,420
14 hours truck & welder @ $32 per hour $448
5 hours crane @ $238 per hour $1,190
28 hours boom lift @ $28 per hour $784
Bond @ 2% $116
Total $5,958
I picked up twenty-seven added tubes to install.
R.Scott Vickerman
A.M.E. Construction Corp.
Estimator / Owner
scott@ameconstructioncorp.com
Office: (952)449-8866 / Mobile (612) 919 2281
From: Lucas Nelson <lnelson@hu-construction.com>
Sent: Monday, April 18, 2022 8:44 AM
To: scott ameconstructioncorp.com <scott@ameconstructioncorp.com>
Subject: RE: [External] New PR - No.12: PR 12 - Public Works Revised Layout
Scott,
As far as we can tell it was included in Addendum #3 or the bid set. Still haven’t gotten an answer as to why from the
design team. Consider it part of PR#12.
Thanks,
Luke Nelson
Project Manager
JOINT SEALANTS FIRESTOPPING RESTORATION TRAFFIC COATINGS EXPANSION JOINT SYSTEMS
To: H&U Construction Date:April 21, 2022
Project:Lake Elmo Public Facilities
Location:Lake Elmo, MN
Architect:Leo A Daly
Plan Date:September 10, 2021
Section: Joint Sealants PR#12
Base Bid Scope of Work Bid Price: $787.00
Labor: $644.00(7 hours @$92.00/HR)
Materials: $143.00(10% Markup)
(1 case urethane sealant-misc. colors @ $130.00/case)
Caulk additional interior window sills
Caulk additional interior window perimeter finish beads
Caulk additional hollow metal door frame perimeter
Caulk additional vertical joints between casework and wall
Caulk additional countertops to wall
Exclusions:
Exterior window perimeters
Wall expanison joints
Respectfully Submitted,
Adam Bauchle
Project Manager/Estimator
PROPOSAL
This proposal is offered and based on the terms and conditions of the Minnesota AGC Subcontract or AIA Contract A201
With no additional terminology or riders
Pricing includes labor, material, and equipment
Sales tax is included unless noted otherwise
Pricing is subject to acceptance within 60
calendar days from date of proposal
12101 NICOLLET AVE S
BURNSVILLE, MN 55337
PH: 952.252.0303
FAX 952.252.0304
WWW.CARCIOFINI.COM
A SMALL BUSINESS ENTERPRISE
128 35TH STREET SE
ROCHESTER, MN 55904
507-281-2772
507-281-2430 fax
To H & U CONSTRUCTION ATTN: LUKE Date 5/16/2022
Address Phone
Project PR #12 Location:
We propose to furnish the following:
DELETE STORAGE SHED DOOR
QTY 1 12' X 12' RAYNOR SERIES "DURACOIL IF" COILING DOOR
INTERIOR FACE OF WALL MOUNT
CHOICE OF 187 RAL COLORS
22 GAUGE EXTERIOR / 24 GAUGE INTERIOR SLAT
POLYURETHANE INSULATION - 8 R VALUE
25,000 CYCLE SPRING ASSEMBLY
HOOD BAFFLE & GUIDE VINYL
RAYNOR SERIES "CSH 211" 1/2 HP COMMERCIAL OPERATOR
SPREADER BAR - CHAIN HOIST - STANDARD THREE BUTTON STATION
PHOTO SAFETY EYES - RECEIVER W/ (2) FULL CONTROL REMOTES
DEDUCT MATERIALS -$17,050.00
DEDUCT LABOR -$2,000.00
TOTAL DEDUCT -$19,050.00
ESTIMATE ONLY - FINAL PRICE TO BE DETERMINED WHEN ORDER IS PLACED
ELECTRICAL WIRING IS NOT INCLUDED
Terms:BALANCE DUE UPON COMPLETION OF OUR JOB
Service Charge of 11/2% per month added after 30 days
DATE INSTALLATION DESIRED 10-12 WEEKS FROM ORDER DATE NET TOTAL
Openings are to be prepared by others in accordance with our specifications. The above price does not include glass, glazing, painting or
wiring for electric operator, unless included in the above proposal. Above proposal is made for prompt acceptance.
PLEASE SIGN AND RETURN A COPY. THANK YOU!
We accept above proposal:
BY:__________________________________________ BY: BEN PEHLING
DATE ________________________________________
RAYNOR
garage doors
DATE
JOB NAME
PROJECT MANAGER
QTY DESCRIPTION SIZE UNIT PRICE AMOUNT ROOM NUMBER
-$ LOCATION OF WORK
-$
-$ DESCRIPTION OF WORK
-$
-$
-$
-$ TASK/CLASSIFICATION HOURS RATE AMOUNT
-$ ADD -$
-$ Framing 85.00 104.50 8,882.50$
-$ Heavy Gauge Framing 22.00 104.50 2,299.00$
-$ Hang Sheathing/Caulking 57.00 104.50 5,956.50$
-$ Insulation 17.00 104.50 1,776.50$
-$ Taping 43.00 104.50 4,493.50$
-$ DEDUCT -$
-$ Framing -50.00 104.50 (5,225.00)$
-$ Heavy Gauge Framing 0.00 104.50 -$
-$ Hang Sheathing/Caulking -28.00 104.50 (2,926.00)$
-$ Insulation -7.00 104.50 (731.50)$
-$ Taping -20.00 104.50 (2,090.00)$
-$ -$
-$ TOTAL LABOR 119.00 HRs 12,435.50$
-$
-$ DESCRIPTION QTY RATE AMOUNT
-$ Air Barrier-Henkemeyer 848.00$
-$ Shop Drawings: VAA 800.00$
-$ TOTAL SUBCONTRACTOR 1,648.00$
-$
-$ DESCRIPTION DAYS RATE AMOUNT
-$ Shop Drawings -$
-$ -$
-$ -$
TOTAL MATERIALS -$ TOTAL EQUIPMENT -$
-$
12,435.50$
1,648.00$
-$
14,083.50$
-$
1,243.55$
82.40$
-$
385.24$
15,794.69$
SUNCONTRACTOR
EQUIPMENT/OTHER
Notes:SUBTOTALS
MATERIAL
LABOR
SUBCONTRACTOR
EQUIPMENT/OTHER
SUBTOTAL
(SELF-PERFORMED) OH/P (10%)
(SUBCONTRACTOR) OH/P (5%)
BOND PREMIUM
PLEASE PAY THIS AMOUNT
Revision to Layout of the Public Works
LABOR
MATERIAL SUMMARY OF WORK
Public Works Addition
REASON PR#012 - Revised Public Works Lake Elmo City Center
CDI FOREMAN TBD Rodney Hintz
RFCO #
PR-12 (Labor)
Request for Change Order
CUSTOMER H+U Construction 4/25/2022
1550 - 91st Ave. NE, Suite #304
Blaine MN, 55449
www.commercialdrywall.net
DATE
JOB NAME
PROJECT MANAGER
QTY DESCRIPTION SIZE UNIT PRICE AMOUNT ROOM NUMBER
12.00 600T125-54 10' 54.20 650.40$ LOCATION OF WORK
8.00 600S162-54-UP 12' 78.80 630.40$
27.00 600S162-54 12' 78.80 2,127.60$ DESCRIPTION OF WORK
-70.00 800S162-33 16' 53.55 (3,748.50)$
-16.00 800T125-33 10' 33.50 (536.00)$
1.00 S975 (Stiff Clip) Carton 286.50 286.50$
10.00 5/8" Gypsum Sheathing 4x8 31.70 317.00$ TASK/CLASSIFICATION HOURS RATE AMOUNT
1.00 Sill Seal Roll 7.50 7.50$ -$
10.00 250T200-18 10' 18.00 180.00$ -$
10.00 250T125-18 10' 13.40 134.00$ -$
55.00 250S125-18 12' 16.10 885.50$ -$
15.00 362ST250-33 10' 36.50 547.50$ -$
15.00 362T125-18 10' 16.50 247.50$ -$
29.00 362S125-18 12' 19.80 574.20$ -$
82.00 362S125-18 19' 31.35 2,570.70$ -$
56.00 5/8" Type X Gypsum Board 4x10 24.00 1,344.00$ -$
9.00 Joint Compound Box 19.50 175.50$ -$
12.00 Cornerbead 10' 9.00 108.00$ -$
4.00 Zip Bead 10' 8.00 32.00$ -$
12.00 CP606 Sound Caulk Tube 9.50 114.00$ -$
2.00 CP606 Sound Caulk (Pails) Pail 245.00 490.00$ TOTAL LABOR 0.00 HRs -$
100.00 Mineral Wool Deck Plugs LF 1.55 155.00$
16.00 R11x16" UFB Insulation Bag 73.40 1,174.40$ DESCRIPTION QTY RATE AMOUNT
2.00 R19x16" UFB Insulation Bag 62.40 124.80$ Air Barrier-Henkemeyer 383.00$
-17.00 R25x16" UFB Insulation Bag 72.00 (1,224.00)$ Shop Drawings: VAA -$
1.00 Hilti XU-17 B3MX Pins Box 165.00 165.00$ TOTAL SUBCONTRACTOR 383.00$
-$
-$ DESCRIPTION DAYS RATE AMOUNT
-$ -$
-$ -$
-$ -$
TOTAL MATERIALS 7,533.00$ TOTAL EQUIPMENT -$
7,533.00$
-$
383.00$
-$
7,916.00$
-$
753.30$
19.15$
-$
217.21$
8,905.66$
SUNCONTRACTOR
EQUIPMENT/OTHER
Notes:SUBTOTALS
MATERIAL
LABOR
SUBCONTRACTOR
EQUIPMENT/OTHER
SUBTOTAL
(SELF-PERFORMED) OH/P (10%)
(SUBCONTRACTOR) OH/P (5%)
BOND PREMIUM
PLEASE PAY THIS AMOUNT
Revision to Layout of the Public Works
LABOR
MATERIAL SUMMARY OF WORK
Public Works Addition
REASON PR#012 - Revised Public Works Lake Elmo City Center
CDI FOREMAN TBD Rodney Hintz
RFCO #
PR-12 (Materials)
Request for Change Order
CUSTOMER H+U Construction 4/25/2022
1550 - 91st Ave. NE, Suite #304
Blaine MN, 55449
www.commercialdrywall.net
4/21/2022
Henkemeyer Coatings
P.O Box 459 Clearwater, MN 55320
P 320.558.4447 F 320.558.4448
info@henkemeyercoatings.com
henkemeyercoatings.com
Change Order
Note: This change order becomes part of and in conformance with the existing contract.
We agree hereby to make changes(s) specified at this price: $
Previous Contract Amount: $
Revised Contract Amount: $
Authorized Signature: __________________________(Contractor) Date of Agreement: _____________________
Payment will be made as follows:
Accepted – The above prices and specification of this Change Order are satisfactory and are hereby accepted. All work to be
performed under same terms and conditions as specified in the original contact unless otherwise stipulated.
Authorized Signature: ______________________________(Owner) Date of Agreement: _____________________
Change order includes labor, materials, furnished and installed for: PR#12
Labor and Milledge: $848.00
Tax Exempt Materials: $383.00 (membrane flashing, adhesive, caulk, and sundries)
Proposal submitted to: Commercial Drywall
Job Name: Lake Elmo City Center
Attention: Rodney Hintz Job Location: Lake Elmo, MN
ADDITIONAL SERVICES AGREEMENT #1
April 18, 2022
Rodney Hintz
Vice President
Commercial Drywall, Inc
1550 91st Avenue NE, STE 304
Blaine, MN 55449
Subject: Professional Services Proposal
Lake Elmo City Center
Lake Elmo, MN
Dear Rodney,
This ASA is intended to document the structural engineering scope changes from the original agreement
dated October 11th, 2021.
DESCRIPTION OF ADDITIONAL SERVICES:
1. Changes resulting from PR 12 dated 03-31-2022
a) AE104 – Floor Plan Public Works
-Revised plan including additional window openings in stud wall
Estimated Total hours (Engineer 3hrs, Drafting 3hr) Estimated Fee 3*150 + 120*3 ~ $810
Compensation for our services will be on a fixed basis: Total Additional Service Fee………$800
If this ASA meets with your approval, please sign and return one copy. This ASA is in addition to the
agreement currently in place. It does not replace any of the Terms and Conditions previously agreed.
Commercial Drywall, INC
Accepted this _________ day of
_______________________, 2022.
Sincerely;
VAA, LLC
______________________________
Officer
Joel Sherman, P.E. (MN) ______________________________
Senior Structural Engineer Title
To:PR #:12
ITEM(S) #:1
Attn:
Date:
From:
Project:
ITEM #1
Scope of Change:
Labor:110.00 X $100.00 /hr $11,000.00
Material:$12,131.00 X 1 =$12,131.00
Equipment:$0.00 X 1 =$0.00
Permit:$0.00 X 1 =$0.00
Misc:$0.00 X 1 =$0.00
Mark-Up (10%):$23,131.00 X 0.00%=$0.00
Subcontractor:$0.00 X 0 =$0.00
Sub Mark-Up (5%):$0.00 X 0.00%=$0.00
Tax:$12,131.00 X 0.00%=$0.00
Bond:$23,131.00 X 0.00%=$0.00
TOTAL:=$23,131.00
Total Add:
5/4/2022
Date
PROPOSAL REQUEST #12-TM
H&U Construction
5555 West 78th Street, Suite A
Minneapolis, MN 55439
Luke Nelson
5/4/2022
Terry Heidemann
Lake Elmo City Center
Revise public works layout per PR #12
Vinco Inc.
This PR is valid for (30) days from the date of issue. If this PR is not
approved within (30) days Vinco reserves the right to revise the
pricing as necessary.
$23,131.00
Terry Heidemann
Terry Heidemann
Commercial Department Manager
Corcoran, MN 55357
23350 County Road 10
Ph : 763-498-7844
Change Proposal
Phone:
Job:6517 Lake Elmo CC & PW Asph Pave L
Number:
Date:
2
4/21/22
To:Luke Nelson
H & U Construction
5555 West 78th Street
Suite A
Minneapolis, MN 55439
Ph: (952)831-5408
Description:PR #12
Proposed are the following changes:
Deduct bollards = 2 hours @ $98/hr = <$196.00>
Deduct asphalt pavng = <$782.43>
The total amount to provide this work is .................................................................................................. $-978.43
(Please refer to attached sheet for details.)
If you have any questions, please contact me at 763-498-7844.
Submitted by:Approved by:
Date:
David Swanson, Project Manager
Ebert Constuction
Pricing subject to review/change if not approved within 14 days of receipt.
Page 1 of 2
Corcoran, MN 55357
23350 County Road 10
Ph : 763-498-7844
Change Proposal 2 Price Breakdown
Continuation Sheet
Description:PR #12
Description PriceMaterial Subcontract OtherEquipmentLabor
Concrete Paving $-196.00$-196.00
Asphalt Paving $-782.43$-782.43
Subtotal:$-978.43
Total: $-978.43
Page 2 of 2
1
David Swanson
From:John Anderson <JohnA@nwasphalt.net>
Sent:Thursday, April 21, 2022 12:39 PM
To:David Swanson
Subject:RE: New PR - No.12: PR 12 - Public Works Revised Layout
Hi David,
The HD paving on this project is bid at 17.37 per SY (mix and tack only). I take off 165 SY at the Ideal Ave. site: 165 x
17.37 = <2866.05>.
M = 2083.62
L = 782.43
Thank you,
John Anderson
E-mail johna@nwasphalt.net
Cell : 952 292 8458
From: David Swanson <dswanson@ebertconst.com>
Sent: Wednesday, April 20, 2022 11:36 AM
To: John Anderson <JohnA@nwasphalt.net>
Subject: FW: New PR - No.12: PR 12 - Public Works Revised Layout
John,
Please see below link to PR #12. Looks like they are taking away all the asphalt at the second site.
Thank you,
David Swanson | Project Manager Concrete/Masonry | Cell: 763-614-7835
23350 County Road 10, Corcoran, MN 55357 | Phone: 763-498-7844 | Fax: 763-498-9951 | Web www.ebertconst.com
From: Luke Nelson (H+U Construction) <HU@procoretech.com>
Sent: Friday, April 15, 2022 3:48 PM
To: David Swanson <dswanson@ebertconst.com>
Subject: New PR - No.12: PR 12 - Public Works Revised Layout
Lake Elmo Public Facilities
More details: View online | View PDF
Corcoran, MN 55357
23350 County Road 10
Ph : 763-498-7844
Change Proposal
Phone:
Job:6518 Lake Elmo CC & PW Asph Pave M
Number:
Date:
2
4/21/22
To:Luke Nelson
H & U Construction
5555 West 78th Street
Suite A
Minneapolis, MN 55439
Ph: (952)831-5408
Description:PR #12
Proposed are the following changes:
Deduct Bollards = <$95.02>
Deduct asphalt paving = <$2083.62>
The total amount to provide this work is .................................................................................................. $-2,178.64
(Please refer to attached sheet for details.)
If you have any questions, please contact me at 763-498-7844.
Submitted by:Approved by:
Date:
David Swanson, Project Manager
Ebert Constuction
Pricing subject to review/change if not approved within 14 days of receipt.
Page 1 of 2
Corcoran, MN 55357
23350 County Road 10
Ph : 763-498-7844
Change Proposal 2 Price Breakdown
Continuation Sheet
Description:PR #12
Description PriceMaterial Subcontract OtherEquipmentLabor
Concrete Paving $-95.02$-95.02
Asphalt Paving $-2,083.62$-2,083.62
Subtotal:$-2,178.64
Total: $-2,178.64
Page 2 of 2
1
David Swanson
From:John Anderson <JohnA@nwasphalt.net>
Sent:Thursday, April 21, 2022 12:39 PM
To:David Swanson
Subject:RE: New PR - No.12: PR 12 - Public Works Revised Layout
Hi David,
The HD paving on this project is bid at 17.37 per SY (mix and tack only). I take off 165 SY at the Ideal Ave. site: 165 x
17.37 = <2866.05>.
M = 2083.62
L = 782.43
Thank you,
John Anderson
E-mail johna@nwasphalt.net
Cell : 952 292 8458
From: David Swanson <dswanson@ebertconst.com>
Sent: Wednesday, April 20, 2022 11:36 AM
To: John Anderson <JohnA@nwasphalt.net>
Subject: FW: New PR - No.12: PR 12 - Public Works Revised Layout
John,
Please see below link to PR #12. Looks like they are taking away all the asphalt at the second site.
Thank you,
David Swanson | Project Manager Concrete/Masonry | Cell: 763-614-7835
23350 County Road 10, Corcoran, MN 55357 | Phone: 763-498-7844 | Fax: 763-498-9951 | Web www.ebertconst.com
From: Luke Nelson (H+U Construction) <HU@procoretech.com>
Sent: Friday, April 15, 2022 3:48 PM
To: David Swanson <dswanson@ebertconst.com>
Subject: New PR - No.12: PR 12 - Public Works Revised Layout
Lake Elmo Public Facilities
More details: View online | View PDF