HomeMy WebLinkAbout#14 - Water Tower 3 Watermain Pay Req 1 STAFF REPORT DATE: July 19, 2022 CONSENT AGENDA ITEM: Approve Pay Request No. 1 for the Water Tower No. 3 Trunk Watermain Extension SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the Water Tower No. 3 Trunk Watermain Extension project? BACKGROUND: Northdale Construction Company, Inc. was awarded a construction contract on January 18, 2022 to complete the Water Tower No. 3 Trunk Watermain Extension project. Work remains in progress with a substantial completion date of September 30, 2022 and final completion date of October 28, 2022. PROPOSAL DETAILS/ANALYSIS: Northdale Construction Company, Inc. has submitted Partial Pay Request No. 1 in the amount of $496,128.49. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $26,112.03. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 for the Water Tower No. 3 Trunk Watermain Extension project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 to Northdale Construction Company, Inc. in the amount of $496,128.49 for the Water Tower No. 3 Trunk Watermain Extension project”. ATTACHMENTS: 1. Partial Pay Estimate No. 1. PARTIAL PAY ESTIMATE NO. 1 WATER TOWER NO. 3 TRUNK WATER MAIN EXTENSION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2021.125 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $22,392.50 $22,392.50 1.00 $22,392.50 1.00 $22,392.50 2 SY 494 $10.00 $4,940.00 307.00 $3,070.00 307.00 $3,070.00 3 LF 510 $5.00 $2,550.00 337.00 $1,685.00 337.00 $1,685.00 4 EACH 2 $446.25 $892.50 2.00 $892.50 2.00 $892.50 5 LF 70 $68.25 $4,777.50 100.00 $6,825.00 100.00 $6,825.00 6 HOUR 20 $420.00 $8,400.00 5.00 $2,100.00 5.00 $2,100.00 7 TON 280 $31.50 $8,820.00 128.00 $4,032.00 128.00 $4,032.00 8 CY 9 $63.00 $567.00 0.00 $0.00 0.00 $0.00 9 GAL 66 $2.36 $155.76 10.00 $23.60 10.00 $23.60 10 TON 110 $178.50 $19,635.00 58.00 $10,353.00 58.00 $10,353.00 11 SY 20 $47.53 $950.60 0.00 $0.00 0.00 $0.00 12 EACH 2 $500.00 $1,000.00 2.00 $1,000.00 2.00 $1,000.00 13 EACH 1 $29,422.24 $29,422.24 1.00 $29,422.24 1.00 $29,422.24 14 EACH 4 $7,192.05 $28,768.20 4.00 $28,768.20 4.00 $28,768.20 15 EACH 4 $263.09 $1,052.36 5.00 $1,315.45 5.00 $1,315.45 16 EACH 3 $2,535.31 $7,605.93 3.00 $7,605.93 3.00 $7,605.93 17 EACH 2 $3,094.03 $6,188.06 2.00 $6,188.06 2.00 $6,188.06 18 EACH 1 $3,966.44 $3,966.44 1.00 $3,966.44 1.00 $3,966.44 19 EACH 6 $5,349.31 $32,095.86 6.00 $32,095.86 6.00 $32,095.86 20 EACH 2 $3,398.20 $6,796.40 2.00 $6,796.40 2.00 $6,796.40 21 EACH 6 $1,762.42 $10,574.52 6.00 $10,574.52 6.00 $10,574.52 22 LF 65 $82.31 $5,350.15 32.00 $2,633.92 32.00 $2,633.92 23 LF 170 $92.79 $15,774.30 193.00 $17,908.47 193.00 $17,908.47 24 LF 10 $105.06 $1,050.60 4.00 $420.24 4.00 $420.24 25 LF 10 $117.82 $1,178.20 0.00 $0.00 0.00 $0.00 26 LF 210 $55.00 $11,550.00 197.00 $10,835.00 197.00 $10,835.00 27 LF 75 $166.18 $12,463.50 100.00 $16,618.00 100.00 $16,618.00 28 LF 1,780 $112.30 $199,894.00 1,740.00 $195,402.00 1,740.00 $195,402.00 29 LB 2,660 $16.78 $44,634.80 3,233.00 $54,249.74 3,233.00 $54,249.74 30 SF 75 $75.00 $5,625.00 0.00 $0.00 0.00 $0.00 31 LS 1 $10,500.00 $10,500.00 1.00 $10,500.00 1.00 $10,500.00 32 LF 300 $6.30 $1,890.00 0.00 $0.00 0.00 $0.00 33 SF 15 $96.60 $1,449.00 0.00 $0.00 0.00 $0.00 34 CY 90 $55.00 $4,950.00 300.00 $16,500.00 300.00 $16,500.00 35 SY 1,500 $2.36 $3,540.00 2,124.00 $5,012.64 2,124.00 $5,012.64 36 LF 400 $5.68 $2,272.00 580.00 $3,294.40 580.00 $3,294.40 TOTALS ‐ BASE CONTRACT $523,672.42 $512,481.11 $512,481.11 CHANGE ORDER NO. 1 CO 1‐1 LF 1,895 $1.80 $3,411.00 1,895.00 $3,411.00 1,895.00 $3,411.00 CO 1‐2 LS 1 $6,348.41 $6,348.41 1.00 $6,348.41 1.00 $6,348.41 TOTAL ‐ CHANGE ORDER NO. 1 $9,759.41 $9,759.41 $9,759.41 TOTALS ‐ REVISED CONTRACT $533,431.83 $522,240.52 $522,240.52 12" WATER MAIN HDD HDPE DR11 SEEDING (SEED MIX TYPE 25‐141) W/ EROSION CONTROL BLANKET CAT 3N SEDIMENT CONTROL LOG 4" CONCRETE SPLASH PAD TRAFFIC CONTROL 4" SOLID LINE WHITE MULTI COMP PAVEMENT MESSAGE PREFORM TAPE GROUND IN COMMON TOPSOIL BORROW (PULVERIZED) (LV) CONNECT TO EXISTING WATER MAIN HYDRANT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE BASE BID MOBILIZATION TYPE SP 12.5 WEARING COURSE MIX (3,C) 2" RIGID INSULATION ADJUST GATE VALVE & BOX REMOVE BITUMINOUS PAVEMENT SAWING BIT PAVEMENT (FULL DEPTH) SALVAGE AND INSTALL SIGN (TYPE C OR STREET NAME SIGN) SALVAGE AND INSTALL GUARD RAIL STREET SWEEPING AGGREGATE BASE CLASS 5 AGGREGATE BASE CLASS 1 (MODIFIED) ‐ SHOULDER (CV) (P) BIT. MATERIAL FOR TACK COAT CONNECT TO EXISTING WATERMAIN (EXTRA DEPTH) WATER MAIN OFFROAD STRUCTURE MARKER 6" GATE VALVE & BOX 8" GATE VALVE & BOX 10" GATE VALVE & BOX TRACER WIRE MATERIAL 16" BUTTERFLY VALVE & BOX 10" DIP TO 12" HDPE POLY CAM ADAPTOR 16" DIP TO 16" HDPE POLY CAM ADAPTOR 6" WATER MAIN DIP ‐ CL 52 (POLY ENCASED) 16" WATER MAIN HDD HDPE DR11 DUCTILE IRON FITTINGS 8" WATER MAIN DIP ‐ CL 52 (POLY ENCASED) 10" WATER MAIN DIP ‐ CL 52 (POLY ENCASED) 12" WATER MAIN DIP ‐ CL 52 (POLY ENCASED) 16" WATER MAIN DIP ‐ CL 52 (POLY ENCASED)