HomeMy WebLinkAbout#08 - Well 1 Pay Request 1 STAFF REPORT DATE: August 16, 2022 CONSENT AGENDA ITEM: Approve Pay Request No. 1 for the Well No. 1 Abandonment and Pumphouse Demolition SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the Well No. 1 Abandonment and Pumphouse Demolition? BACKGROUND: Keys Well Drilling Company was awarded a construction contract on June 7, 2022 to complete the Well No. 1 Abandonment and Pumphouse Demolition. Work remains in progress with coordination with the reconstruction of Langly Court as a part of the Old Village Phase 5 and 6 Improvements project. PROPOSAL DETAILS/ANALYSIS: Keys Well Drilling Company has submitted Partial Pay Request No. 1 in the amount of $7,410.00. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $390. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 for the Well No. 1 Abandonment and Pumphouse Demolition. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 to Keys Well Drilling Company in the amount of $7,410.00 for the Well No. 1 Abandonment and Pumphouse Demolition”. ATTACHMENTS: 1. Partial Pay Estimate No. 1. 8/5/2022 PARTIAL PAY ESTIMATE NO.1 WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2022.113 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $16,000.00 $16,000.00 0.25 $4,000.00 0.25 $4,000.00 2 LS 1 $3,500.00 $3,500.00 1.00 $3,500.00 1.00 $3,500.00 3 LS 1 $300.00 $300.00 1.00 $300.00 1.00 $300.00 4 LS 1 $200.00 $200.00 0.00 $0.00 0.00 $0.00 5 LS 1 $5,000.00 $5,000.00 0.00 $0.00 0.00 $0.00 6 CY 75 $600.00 $45,000.00 0.00 $0.00 0.00 $0.00 7 CY 12 $250.00 $3,000.00 0.00 $0.00 0.00 $0.00 8 CY 25 $600.00 $15,000.00 0.00 $0.00 0.00 $0.00 9 LS 1 $2,000.00 $2,000.00 0.00 $0.00 0.00 $0.00 10 LF 279 $20.00 $5,580.00 0.00 $0.00 0.00 $0.00 11 LS 1 $5,500.00 $5,500.00 0.00 $0.00 0.00 $0.00 12 LF 75 $90.00 $6,750.00 0.00 $0.00 0.00 $0.00 13 SY 575 $5.00 $2,875.00 0.00 $0.00 0.00 $0.00 14 CY 65 $17.00 $1,105.00 0.00 $0.00 0.00 $0.00 15 LF 230 $6.00 $1,380.00 0.00 $0.00 0.00 $0.00 16 CY 125 $30.00 $3,750.00 0.00 $0.00 0.00 $0.00 17 SY 575 $5.00 $2,875.00 0.00 $0.00 0.00 $0.00 $119,815.00 $7,800.00 $7,800.00 TOTALS - BASE CONTRACT $119,815.00 $7,800.00 $7,800.00 BASE BID SEED MIXTURE 25-151 & HYDRAULIC MULCH ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE BASE BID MOBILIZATION REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT COMMON EXCAVATION (EV) (P) SILT FENCE, MACHINE SLICED TOPSOIL BORROW (LV) PERFORATE 20" WELL CASING (IF REQUIRED) DEMOLISH PUMPHOUSE REMOVE WATERMAIN REMOVE WELL PUMP AND MEASURE THE BOTTOM OF THE WELL OBTAIN A SAMPLE OF THE MATERIAL IN THE BOTTOM OF THE BOREHOLE (BAIL) FLUSH THE WELL WITH CLEAN WATER FOR 48 HOURS PRIOR TO MGS/MDH LOGGING THE WELL REMOVE SAND ACCUMULATED IN THE WELL BOTTOM AS REQUIRED BY MDH NEAT CEMENT GROUT (CEMENT TYPE APPROVED BY MDH) WASHED SAND OR PEA ROCK TO FILL VOID SPACE OR PREVENT GROUT LOSS NEAT CEMENT GROUT (CASED PORTION) MOBILIZE CASING PERFORATION EQUIPMENT (IF REQUIRED) COMPLETED ITEMS BY PAY PERIOD WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2022.113 PAY QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT BASE BID 1 LS $16,000.00 0.25 $4,000.00 $0.00 $0.00 $0.00 $0.00 0.25 $4,000.00 2 LS $3,500.00 1 $3,500.00 $0.00 $0.00 $0.00 $0.00 1.00 $3,500.00 3 LS $300.00 1 $300.00 $0.00 $0.00 $0.00 $0.00 1.00 $300.00 4 LS $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 5 LS $5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 6 CY $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 7 CY $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 8 CY $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 9 LS $2,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 10 LF $20.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 11 LS $5,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 12 LF $90.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 13 SY $5.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 14 CY $17.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 15 LF $6.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 16 CY $30.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 17 SY $5.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $7,800.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 TOTALS - BASE CONTRACT $7,800.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 BASE BID MOBILIZATION REMOVE WELL PUMP AND MEASURE THE BOTTOM OF THE WELL OBTAIN A SAMPLE OF THE MATERIAL IN THE BOTTOM OF THE BOREHOLE (BAIL) FLUSH THE WELL WITH CLEAN WATER FOR 48 HOURS PRIOR TO MGS/MDH LOGGING THE WELL REMOVE WATERMAIN NEAT CEMENT GROUT (CASED PORTION) MOBILIZE CASING PERFORATION EQUIPMENT (IF REQUIRED) PERFORATE 20" WELL CASING (IF REQUIRED) ITEM DESCRIPTION OF PAY ITEM UNIT TOTAL TO DATEUNIT PRICE PARTIAL PAY ESTIMATE 2 PARTIAL PAY ESTIMATE 3 PARTIAL PAY ESTIMATE 4 PARTIAL PAY ESTIMATE 5PARTIAL PAY ESTIMATE 1 DEMOLISH PUMPHOUSE WASHED SAND OR PEA ROCK TO FILL VOID SPACE OR PREVENT GROUT LOSS REMOVE SAND ACCUMULATED IN THE WELL BOTTOM AS REQUIRED BY MDH NEAT CEMENT GROUT (CEMENT TYPE APPROVED BY MDH) COMMON EXCAVATION (EV) (P) SILT FENCE, MACHINE SLICED TOPSOIL BORROW (LV) SEED MIXTURE 25-151 & HYDRAULIC MULCH REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT