HomeMy WebLinkAbout#09 - Kokoro VolleyballSTAFF REPORT DATE: 10/4/2022 REGULAR MOTION TO: City Council FROM: Ben Hetzel, Lake Elmo City Planner AGENDA ITEM: Kokoro Volleyball Conditional Use Permit and Variance INTRODUCTION: Raymond Luczak, owner of Kokoro Volleyball, recently submitted a conditional use permit and variance application for a proposed indoor athletic facility at the southeast quadrant of intersection 39th Street N and Lake Elmo Avenue N (PID1302921220011). The 27,540 square foot building and parking lot is intended to be a year round volleyball training facility with four full time employees and 52 part time employees. The indoor athletic facility use is permitted by conditional use permit in the Village Mixed-Use zoning district. The applicant is also requesting a variance to allow one access onto a public street. An indoor athletic facility use requires a minimum of 2 accesses onto a public street according to the Lake Elmo City Code. REQUEST DETAILS/ANALYSIS: Applicant: Kokoro Volleyball Property Owner: Lake Elmo Business Park Location: Southeast quadrant of intersection 39th Street N and Lake Elmo Avenue N. Brookman 3rd Addition Lot 1, Block 1 Request: 1. Conditional Use Permit for an indoor athletic facility 2. Variance to allow a single access on a public street where a minimum of two is required. Site Area: 2.7 acres Existing Land Use: Vacant Existing Zoning: Village Mixed Use Surrounding: North - Low Density Residential South - Village Mixed Use East - Village Mixed Use West - Village Low Density Residential Comprehensive Plan: Village Mixed Use Deadline for Action: Application Complete - 7/20/22 60 Day Deadline - 9/20/22 Extension Letter Sent – 9/2/22 2 120 Day Deadline – 11/8/22 Regulations: Article XIII Village Districts LEC 105.12.550 Indoor Athletic Facilities LEC 105.12.410 Off Street Parking Article VIII Environmental Performance Standards 105.04 – XIV Stormwater and Erosion and Sediment Control ISSUE BEFORE CITY COUNCIL: The City Council is being asked to review and make a determination on the requests to approve a conditional use permit for an indoor athletic facility and variance to allow a single access onto a public street. PROJECT ANALYSIS The proposed facility would consist of one large 27,540 square foot building. 21,600 square feet will consist of 6 volleyball courts. The other 5,906 square feet will consist of offices, yoga studio, lounge, restrooms, suites, and a workout and training room. An additional 30,301 square feet is designated as a parking lot. The applicant estimates that the use will draw 150,000 visitors per year and average 150-200 cars per day. Proposed hours of operation are 3:30 pm-9:30 pm Monday-Friday and 8-4 Saturday and Sunday. A variance is being requested for a single access due to the inability to gain access onto Lake Elmo Ave N. Washington County manages access to Lake Elmo Ave via a permit process. The County has indicated that it would not support or permit for a direct access onto Lake Elmo Ave due to the north bound right turn lane and the proximity to the intersection of Lake Elmo Ave and 39th St N. The applicant also suggested a shared access using the existing entrance off of Lake Elmo Ave with the parcel to the south, which the County also rejected. Without another access point, a variance is being requested. REVIEW COMMENTS City Engineer (Summary of Memo dated September 19, 2022) 1. The plans must be revised to verify the future right of way dedication of Lake Elmo Ave. 2. A 10 foot drainage and utility easement should be dedicated immediately adjacent of the future right of way of Lake Elmo Ave. 3. The construction of a bituminous trail along Lake Elmo Ave should be required as part of the site improvements. 4. Washington County anticipates signalized intersection improvements to Lake Elmo Ave and 39th Street which will require the realignment of the eastbound through lane with the west leg of 39th Street. 5. The commercial driveway access is proposed to align directly across from the Senior Living facility. This location is acceptable. 6. No secondary access is proposed. Secondary access to Lake Elmo Ave is prohibited. Washington County has encouraged a joint access between Kokoro and 3825 Lake Elmo Ave. 3 7. The site is subject to a stormwater management plan meeting State, Valley Branch Watershed District, and City Rules. 8. Post construction discharge rates and volumes must be equal or less than pre-existing discharge rates at all discharge locations and cumulative for the site. 9. The storm water facilities constructed for this development should remain privately owned and maintained. 10. Municipal water supply is available to the site. 11. Sanitary sewer service is available to the site. Fire Department (Summary of Memos dated 7/26/22) The Minnesota State Fire Code does not require two separate and approved fire apparatus access roads as it does not have a gross building area of more than 62,000 square feet. The building is placed in a way that provides the fire department adequate access if necessary. Washington County Public Works (Summary of letter dated July 29, 2022) In the interest of safe and efficient operation of county highways, Washington County does not support or permit direct access onto CSAH 17. Any development decisions being made at this time should consider the south adjacent parcel at 3825 Lake Elmo Ave, known as Brookfield 1 building. This section of roadway could see a scenario with a raised median in the future to improve traffic safety, calm speeds, and provide pedestrian refuge for crossing points. Brookfield would not be eligible for a left turn lane due to short spacing from 39th Street. Washington County would like to see the existing driveway access disconnected from Lake Elmo Ave with an alternative access. An alternative would be to have a shared access where the proposed volleyball driveway access is located heading south to 3825 Lake Elmo Ave. There are concerns of the proposed stormwater ponding located in this area. RECCOMMENDED CONDITIONAL USE PERMIT FINDINGS Conditional use means a land use or development as defined by ordinance that would not be appropriate generally but may be allowed with appropriate restrictions as provided by official controls only upon a finding that all of the following provisions are met. Staff recommends the following findings: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The proposed use should not be detrimental or in any way endanger the public health, safety, comfort, convenience, or general welfare of the neighborhood or the city if plans are meeting all stormwater management requirements for State, Valley Branch Watershed District, and City requirements. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The proposal conforms to the Comprehensive Plan. 3. The use or development is compatible with the existing neighborhood. The proposed use is permitted in the Village Mixed Use District as a Conditional Use. The properties to the south and west are non-residential uses (City Hall and Day Care Center). The residential development to the west is separated by Lake Elmo Ave and the senior living center to north gathers a congregation of people similar to that of the indoor recreation facility. 4 4. The proposed use meets all specific development standards for such use listed in the Zoning Code. The proposed use requires a minimum of two accesses as per 105.12.550. This criteria would be satisfied with the proposed variance approval. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Article XIX (Shoreland Management) and Title 100 (Flood Plain Management). The proposed use is not in a flood plain management or shoreland area. 6. The proposed use will be designed, constructed, operated, and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed use will be compatible in appearance with the existing character of the general vicinity and will not change the essential character of the area. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use indoor athletic facility should not create be hazardous or create a nuisance 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed use will be served adequately by essential public facilities and services. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. 10. The proposed use will not involve uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors. The proposed use will not produce noise, smoke, fumes, glare or odors. Traffic amounts will increase in the area, but these increases will occur during typical low traffic volume time periods. All activities are to occur indoors. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic amounts will increase in the area, but these increases will occur during typical low traffic volume time periods. Vehicle queuing for possible pickups and drop offs shall be contained to the site as per the conditions of approval. 12. The proposed use will not result in the destruction, loss, or damage of a natural or scenic feature of major importance. The proposed use should not impact natural or scenic features. 5 RECCOMENDED VARIANCE FINDINGS An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake Elmo City Code Section 105.12.320 before the City may grant an exception or modification to city code requirements. These criteria are listed below, along with comments from Staff about the applicability of these criteria to the applicant’s request. 1) Practical Difficulties. A variance to the provision of this chapter may be granted by the Board of Adjustment upon the application by the owner of the affected property where the strict enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such actions will be in keeping with the spirit and intent of this chapter. Definition of practical difficulties - “Practical difficulties” as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. The applicant is unable to obtain a second access point as required by City Code for an indoor athletic facility. Access along Lake Elmo Ave N would require Washington County approval. Washington County will not support an access along Lake Elmo Ave N due to the existing turn lane and proximity to the intersection of 39th Street North and Lake Elmo Ave N. The applicant explored other alternatives that were denied, such as a shared access with the existing Day Care Center access to the south. The County would like to remove the day care access in the future with an alternative access. Washington County has recommended to not move the proposed Kokoro Volleyball access any closer to Lake Elmo Ave. 2) Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner. The unique circumstances were not created by the applicant or property owner. The existing turn lane and intersection were not created by the applicant or property owner. Nor is the proposed site design prohibiting a second access opportunity. 3) Character of Locality. The proposed variance will not alter the essential character of the locality in which the property in question is located. The request will not alter the essential character. The proposed single access is to align directly across from the existing Senior Living Facility. The directly adjacent parcels are also of a nonresidential use. Adjacent parcels to the south and east also have one access. 4) Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood. The proposed request should not impair adjacent property values. Traffic numbers will increase, but these increases will occur during typical low traffic volume times. Hours of operation are proposed between as 3:30 pm- 9:30 pm Monday-Friday and 8am -4pm Saturday and Sunday. 6 FISCAL IMPACT: None RECOMMENDED CONDITIONS OF APPROVAL 1. The applicant must obtain all other necessary City, State, and other governing body permits and approvals before the commencement of any construction activity on the site. These include, but not limited to, City of Lake Elmo grading permit, Minnesota Pollution Control Agency stormwater permit, Valley Branch Watershed District permit, approval of revised plans from the City Engineer, and a building permit. 2. No construction may begin until all items and changes outlined by the City Engineer in the memorandum dated September 19, 2022 are addressed. 3. No construction may begin until all items and changes outlined by the Fire Department’s memorandum dated July 26, 2022 are addressed. 4. Plans must be revised to comply with the landscape requirements of City Code Article VIII Environmental Standards and the City Landscapes Architect’s memorandum dated August 3, 2022. 5. The applicant shall provide the City with proof approval of a Minnesota Pollution Control Agency stormwater permit and a Valley Branch Watershed District stormwater permit prior to any construction. 6. The applicant must meet all requirements of the Lake Elmo Building Official. 7. Any vehicle queuing shall be contained within the parking lot onsite. 8. The applicant must demonstrate the availability of overflow parking prior to any construction. 9. No parking may occur along 39th Street N 10. The proposed trail along Lake Elmo Ave N shall be constructed at a width of 10 feet. 11. If substantial construction has not taken place within 12 months of the City’s approval, the conditional use permit and variance shall become void. PUBLIC COMMENT: A public hearing notice was sent to surrounding property owners on July 27, 2022 and published in the Stillwater Gazette on July 29, 2022. Staff has received six public comments. Five comments were in support, while the sixth was inquiring about specific concerns. OPTIONS: The City Council may: • Approve the requests. • Approve the requests with conditions. • Deny the requests, citing findings of fact for denial. RECOMMENDATION: The Planning Commission recommended approval of the requests at the August 8th meeting. The commission thought the proposed use would make a great addition to the City and that the variance request met all the required criteria. Staff recommends that the City Council approve the requests from Kokoro Volleyball to construct an indoor athletic facility and allow one access onto a public street where a minimum of two are required. 7 “Motion to approve Resolution No. 2022-089, approving a conditional use permit with conditions for an indoor athletic facility at the property described as Brookman 3rd Addition, Lot 1, Block 1.” “Motion to approve Resolution No. 2022-090, approving a variance to allow one access onto a public street where a minimum of two are required at the property described as Brookman 3rd Addition, Lot 1, Block 1.” ATTACHMENTS: 1) Land Use Applications 2) Written Statements 3) Location Map 4) Plan Sets 5) Building Plans 6) City Engineer Memo Dated September 19, 2022 7) Fire Department Memos Dated July 26, 2022 8) Washington County Public Works Letter Dated July 29, 2022 9) Washington County Email Correspondence 10) City Landscape Architect Memorandum dated August 3, 2022 11) Public Comment 12) Resolution No. 2022-089 13) Resolution No. 2022-090 Conditional Use Permit – Kokoro Volleyball, LLC Written Statements: a) Current owners of the property are Lake Elmo Business Park Company: Lake Elmo Business Park Company, a Minnesota general partnership – contact Mick Lynskey, 651-439-1412, mick@lynskeyclark.com Purchasing entity – Kokoro Volleyball, LLC a Minnesota limited liability company – contact Raymond Luczak and Jennifer Brathol, 612-750-2876, rt@kokorovolleyball.com Engineer – Stevens Engineers, 642 Brakke Drive, Suite 202, Hudson, WI 54016, 715-386- 7488, jraverty@stevenengineers.com b) Address: XXX 39th Street N., Lake Elmo, MN 55042 Current Zoning: Existing use is raw land and current zoning is Village Mixed-Use District (VMX) Parcel size: 2.7 acres/117,612 square feet PID# 13-029-21-22-0011 Legal description of property: Lot 1, Block 1, Brookman 3rd Addition, Washington County, MN c) The property has been vacant land for our known history. It is unknown if other applications have been filed with the City of Lake Elmo. d) A specific written description of the proposed use(s) i. The proposed use of the land would be for a volleyball training facility with parking lot. The property is currently vacant, and the building will be constructed based of preliminary designs shown in application. The landscaping and building will meet all city ordinances. The facility will have approximately 52 part time employees varying in schedules, and 4 full time employees with anticipated growth in the next few years. ii. The facility is open year-round with some busier “seasons” listed below. Girls Regular Season Twin Cities – November through June Girls Regular Season Eau Claire – Starting 2022 – November through June Boys Regular Season Twin Cities – Starting 2022 – September through March Summer Camp Twin Cities – July through August Summer Camp Eau Claire – Starting 2022 – July through August Summer Team Program Twin Cities – July Fall Team Program Twin Cities – August - October In preparation for our continued grown, we began expanding the roles of our staff and training additional staff members to fill current and future needs. Current traffic count is around 150,000 visitors per year or averaging about 150-200 cars per day. General hours of operation are 3:30pm-9:30pm Mon-Fri and 8am-4pm Saturday and Sunday. We generally see, at most, 75 cars per two-hour time block. e. Provide justification that the proposed use meets the following findings: i. Kokoro will not be a danger to the public health, safety, or comfort but instead an asset for our youth. The services we currently offer to our athletes and families exceeds expectations. All athletes in our program have access to volleyball training services, physical strength services, physical therapy services, mental strength services, academic tutoring services, and mindfulness/meditation services. All those services are included in our regular season participation fees. Additionally, we house a chiropractic service in our facility for those that desire to add that service to their experience. ii. The comprehensive plan shows this site as Village- Mixed Use (V-MU). We believe the Kokoro Volleyball facility fits this zoning well and will be a benefit to the commercial and residential neighborhoods in this vicinity. The facility will be a big draw from local Lake Elmo families, many of whom already have children in Kokoro programs. Lake Elmo businesses will also benefit from users outside the area who will help support the local economy. iii. The proposed site is in what’s listed as the Lake Elmo Business Park. The location is surrounded by Time For Me Early Learning Center and the Lake Elmo City Hall. One block to the south is the Lake Elmo Elementary School and within a quarter mile is Lions Park. The Kokoro Volleyball facility will be built to conforming Lake Elmo standards and will be a beautiful addition to this neighborhood. We believe it is in the best available location and will be very compatible with the existing uses surrounding the site. WASHINGTON CO. COUNTY LOCATION MAP KOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA SITE LOCATION SHEET INDEX DISCIPLINE SHEET NUMBER DRAWING NUMBER SHEET TITLE DESCRIPTION GENERAL 1 G1 TITLE SHEET 2 G2 CONSTRUCTION AND GENERAL NOTES 3 G3 BOUNDARY AND TOPOGRAPHIC SURVEY CIVIL 4 C1 SITE PLAN 5 C2A UTILITY PLAN 6 C2B GRADING AND EROSION CONTROL 6 C3 DETAILS - 1 7 C4 DETAILS - 2 8 C5 DETAILS - 3 9 C6 DETAILS - 4 10 C7 DETAILS - 5 12 C8 DETAILS - 6 13 C9 STORMWATER POLLUTION PREVENTION PLAN 14 C10 STORMWATER POLLUTION PREVENTION PLAN SITE IMAGE SOURCE: GOOGLE MAPS DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH G1 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_G01.DWG9/9/2022 4:07:19 PM 9/9/2022 4:08:15 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 1 TITLE SHEETJRAVERTY07/07/2022 14 OAK PARK HEIGHTS BAYPORT HUDSON NORTH HUDSON LAKELAND OAKDALE PINE SPRINGS LAKE ELMO AVE NSTILLWATER BLVD 40TH ST N MANNING AVE NSTILLWATER BLVD SEEDING NOTES: 1.TEMPORARY SEEDING IS DESIGNED TO CONTROL EROSION FOR A PERIOD OF ONE YEAR OR LESS AND IS GENERALLY REMOVED TO PERFORM FURTHER CONSTRUCTION ACTIVITES OR TO PERMANENTLY STABLIZE A CONSTRUCTION SITE. 2.PERMANENT SEEDING IS DESIGNED TO CONTROL EROSION FOR AN INDEFINITE PERIOD AFTER LAND DISTURBING ACTIVITIES HAVE CEASED ON THE SITE. 3.COVER CROP IS THE APPLICATION OF TEMPORARY SEED (ANNUAL) WITH PERMANENT SEEDING TO ESTABLISH QUICK GROUND COVER. 4.MULCHING IS DESIGNED TO COVER SOIL TO ABSORB THE EROSIVE IMPACT OF RAINFALL AND REDUCE THE FLOW VELOCITY OF RUNOFF. 5.APPLICATION RATES: TEMPORARY SEEDING: FALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE PERMANENT SEEDING: SITE SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE INFILTRATION BASIN SEEDING: MNDOT MIX 25-131 AT 220 LBS/ACRE COVER CROP: FFALL (AUGUST 1 - OCTOBER 1) - MNDOT MIX 21-112 AT 100 LBS/ACRE SPRING/SUMMER (MAY 1 - AUGUST 1) - MNDOT MIX 21-111 AT 100 LBS/ACRE MULCHING: (DISC ANCHORED) MNDOT TYPE III AT 2 TONS/ACRE EROSION AND SEDIMENT CONTROL NOTES: 1.THE IMPROVEMENTS INCLUDED ON THIS PLAN ARE PART OF THE TEMPORARY AND PERMANENT EROSION CONTROL PLAN. 2.EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE MINNESOTA STORMWATER MANUAL OR THE CURRENT " BEST MANAGEMENT PRACTICES MANUAL" AS PUBLISHED BY THE MPCA. 3.MAINTAIN A COPY OF THE GRADING PLAN AND EROSION CONTROL PLAN WITH REQUIRED DOCUMENTATION AT THE CONSTRUCTION SITE THROUGH THE ENTIRE PROJECT DURATION. 4.THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, REGULATIONS, ORDERS AND DECREES PERTAINING TO EROSION CONTROL, SEDIMENT CONTROL AND STORM WATER MANAGEMENT AFFECTING TO CONDUCT OF THE WORK. 5.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL EROSION CONTROL AND SHALL INDEMNIFY OWNER AND ENGINEER FOR ACTIONS AGAINST CONTRACTOR, INCLUDING FINES AND ASSESSMENTS, RESULTING FROM CONTRACTORS FAILURE TO PROVIDE PROPER EROSION AND SEDIMENT CONTROL. 6.INSTALL ALL EROSION CONTROL MEASURES PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITIES AND MAINTAIN UNTIL ALL ALTERED AREAS ON THE SITE HAVE BEEN PERMANENTLY RESTORED TO A MINIMUM OF 70% VEGETATION. 7.INSTALL ROCK CONSTRUCTION ENTRANCES PER DETAIL AND MAINTAIN AS NEEDED TO PREVENT TRACKING OF DIRT ONTO PUBLIC ROADWAYS. SCRAPE ALL SOILS TRACKED ONTO ROADWAYS WITHIN 4 HOURS AND SWEEP WITHIN 24 HOURS. 8.INSTALL SILT FENCE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 9.SOIL STOCKPILES THAT ARE IN PLACE MORE THAN 7-DAYS SHALL BE PROTECTED BY SEEDING, MULCHING, EROSION MAT, SILT FENCE, COVERING OR OTHER APPROVED METHODS. 10.INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES FOR STABILITY AND OPERATION AT LEAST ONCE PER WEEK AND WITHIN 24-HOURS AFTER A RAINFALL EVENT OF 0.5 INCHES OR GREATER. A RAINFALL EVENT IS CONSIDERED TO BE THE TOTAL AMOUNT OF RAINFALL RECORDED IN ANY CONTINUOUS 24-HOUR PERIOD. IMMEDIATELY FOLLOWING EVERY RUNOFF PRODUCING RAINFALL. WRITTEN DOCUMENTATION OF EACH INSPECTION SHALL BE MAINTAINED AT THE CONSTRUCTION SITE AND SHALL INCLUDE THE TIME, DATE AND LOCATION OF INSPECTION, THE PHASE OF LAND DISTURBANCE AT THE CONSTRUCTION SITE, PERSON CONDUCTING THE INSPECTION, ASSESSMENT OF CONTROL PRACTICES, AND A DESCRIPTION OF ANY EROSION OR SEDIMENT CONTROL MEASURE INSTALLATION OR MAINTENANCE PERFORMED IN RESPONSE TO THE INSPECTION. 11.REPAIR, REPLACE OR SUPPLEMENT EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES AS NECESSARY WITHIN 24 HOURS OF AN INSPECTION OR NOTIFICATION THAT REPAIR OR REPLACEMENT IS NEEDED. 12.FERTILIZE, RE-SEED AND MULCH ALL ERODED AREAS IMMEDIATELY IN ACCORDANCE WITH SPECIFICATION TO MAINTAIN A DENSE VEGETATIVE COVER. 13.SEED AND MULCH WITHIN 7-DAYS FOLLOWING ACTIVE DISTURBANCE OF THE SOIL SURFACE, OR WHEN FINAL GRADES ARE REACHED AT ANY PORTION OF THE SITE. 14.ALL DISTURBED AREAS WITH SLOPES 4:1 OR FLATTER SHALL BE SEEDED AND MULCHED. 15.ALL DISTURBED AREAS WITH SLOPES IN EXCESS OF 4:1 SHALL BE SEEDED AND PROTECTED WITH EROSION MAT (CATEGORY 20). 16.ALL DITCH BOTTOMS SHALL BE PROTECTED WITH CATEGORY 30 EROSION MAT. GRADING NOTES: 1.SITE GRADING/EXCAVATION/EMBANKMENT/COMPACTION SHALL USE ONLY SUITABLE MATERIAL AS APPROVED BY THE ENGINEER. REMOVE UNSUITABLE AND UNSTABLE MATERIALS INCLUDING BUT NOT LIMITED TO TOPSOIL, ORGANIC MATERIAL, AND DEBRIS FROM THE PAVEMENT AREAS. 2.BACKFILL ALL BELOW GRADE EXCAVATIONS IMMEDIATELY UPON REMOVAL OF THE UNSUITABLE SOILS. BACKFILL EXCAVATIONS ADJACENT TO EXISTING FEATURES PROMPTLY TO AVOID UNDERMINING ADJACENT AREAS. 3.EMBANKMENT BACKFILL MATERIAL IN BUILDING PADS AND PAVED AREAS SHALL BE COMPACTED TO 95% MODIFIED PROCTOR, EXCEPT THE TOP 3' WITHIN PAVED AREAS SHALL BE COMPACTED TO 100% MODIFIED PROCTOR. 4.THE SPECIFIED DENSITY METHOD OF COMPACTION IS REQUIRED FOR ALL PORTIONS OF PERMANENT CONSTRUCTION. STANDARD COMPACTION IS REQUIRED FOR ANY TEMPORARY CONSTRUCTION. 5.SALVAGE AND PROVIDE A MINIMUM DEPTH OF 6-INCHES OF TOPSOIL TO ALL AREAS DISTURBED BY CONSTRUCTION. 6.DISPOSE OF ALL REMOVED, UNSUITABLE, AND EXCESS MATERIALS OFF THE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS, UNLESS OTHERWISE SPECIFIED. 7.PROPOSED SPOT ELEVATIONS AND CONTOURS ARE TO FINISHED GRADE. SPOT ELEVATIONS ARE DEFINED BY THE LEGEND. 8.PROVIDE A SMOOTH AND THOROUGH TRANSITION BETWEEN PROPOSED SITE GRADES AND DRAINAGE WAYS AND EXISTING SURROUNDING SITE GRADES AND DRAINAGE WAYS. 9.PROVIDE NECESSARY SOIL TESTING TO THE OWNERS SATISFACTION THAT COMPACTION LEVELS AND DEFINED SOIL GRADATIONS ARE BEING MET. 10.COMPLETE ALL PROPOSED CONSTRUCTION USING APPROVED MATERIALS, METHODS OF PLACEMENT AND TESTING AS REQUIRED BY ALL GOVERNING SPECIFICATIONS. 11.CARE MUST BE TAKEN DURING CONSTRUCTION AND EXCAVATION TO PROTECT ALL SURVEY MONUMENTS AND/OR PROPERTY IRONS ON AND ADJACENT TO THIS SITE. ALL MONUMENTS/IRONS DAMAGED DURING CONSTRUCTION WILL BE REPLACED/RESET BY THE CONTRACTOR AT NO COST TO THE OWNER. 12.REPAIR ALL DAMAGE TO EXISTING FACILITIES RESULTING FROM CONSTRUCTION ACTIVITIES AT NO COST TO THE OWNER. 13.SEQUENCE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AMOUNT OF LAND DISTURBED. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL THE SITE HAS BEEN STABILIZED. 14.WRITTEN DIMENSIONS PREVAIL OVER SCALED DIMENSIONS. 15.1' VERTICAL CONTOUR INTERVAL. GENERAL NOTES: 1.THE CURRENT EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION GOVERNS EXCEPT AS MODIFIED BY THE PROJECT SPECIFICATIONS CITY OF LAKE ELMO CODES, ORDINANCES, STANDARDS AND SPECIFICATIONS. 2.FURNISH, INSTALL, INSPECT, MAINTAIN AND REMOVE ALL NECESSARY TRAFFIC CONTROL SIGNAGE. ALL TRAFFIC CONTROL DEVICES AND SIGNAGE SHALL CONFORM TO ALL LOCAL, COUNTY AND STATE TRAFFIC CONTROL GUIDELINES, INCIDENTAL TO PROJECT. 3.SECURE ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES WITH UTILITIES ON SITE PRIOR TO THE CONSTRUCTION OF THE PROJECT. ADHERE TO ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL LAWS FOR ANY COST INCURRED DUE TO THE DAMAGE OF SAID UTILITIES. 5.PROTECT ALL ITEMS WITHIN CONSTRUCTION LIMITS NOT DESIGNATED FOR REMOVAL OR MODIFICATIONS. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, CURB AND GUTTER, CONCRETE AND BITUMINOUS SURFACES, TREES, SIGNS, BUILDINGS, FENCES, ETC. 6.CONTRACTOR SHALL LOCATE AND/OR PROTECT ALL UTILITIES WITHIN CONSTRUCTION LIMITS NOT DESIGNATED FOR REMOVAL OR MODIFICATIONS. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO, TELEPHONE, ELECTRICAL, GAS, CABLE TV, FIBER OPTIC, TOWERS, POWER POLES, LIGHT POLES, WATER, SEWER, OVERHEAD LINES, ETC. ANY DAMAGE TO EXISTING UTILITIES WILL BE REPAIRED IN-KIND AT THE EXPENSE OF THE CONTRACTOR. 7.THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATIONS AS TO THE TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE TO THESE UTILITIES. CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL PRIOR TO CONSTRUCTION. DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH G2 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_G02.DWG9/9/2022 3:28:45 PM 9/9/2022 4:08:19 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 2 CONSTRUCTION AND GENERAL NOTESJRAVERTY07/07/2022 14 39TH STREET N.LAKE ELMO AVENUE N.PARCEL UNDERCONSTRUCTIONTag numberTree tpeDBH/ HTNotes515Siberian Elm23516Siberian Elm20517Siberian Elm20518Siberian Elm19520Siberian Elm19521Siberian Elm24522Amur Maple36Multi Stem523Basswood13524Siberian Elm17525Amur Maple45Multi Stem526Amur Maple29Multi Stem527Crab Apple22Multi Stem528Bur Oak8529Spruce18dbh/30'530Spruce18dbh/30'531Crab Apple26Multi Stem532Siberian Elm14533Siberian Elm13534Siberian Elm17535Siberian Elm16536Siberian Elm26Multi Stem537Siberian Elm14538Siberian Elm13PID#1302921220011BENCHMARKSELEVATIONS BASED ON AN ASSUMED VERTICAL DATUMDERIVED FROM GPS VALUES (NAVD 88). LOCAL PROJECTBENCHMARKS SHOWN GRAPHICALLY.CONTACT:DERRICK BUILDING SOLUTIONSChad Derrick1505 Highway 65New Richmond, WI 54017715-246-2320cderrick@derrickbuilt.comVICINITY MAPUNDERGROUND UTILITIES NOTES:THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATEDFROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.THE SURVEYOR MAKES NO GUARANTEE THAT THEUNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCHUTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.THE SURVEYOR FURTHER DOES NOT WARRANT THAT THEUNDERGROUND UTILITIES SHOWN ARE IN THE EXACTLOCATION INDICATED ALTHOUGH HE DOES CERTIFY THATTHEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THEINFORMATION AVAILABLE. THIS SURVEY HAS NOT PHYSICALLYLOCATED THE UNDERGROUND UTILITIES. GOPHER STATE ONECALL LOCATE TICKET NUMBER(S) 221230142. SOME MAPSWERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPONDTO THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICHWE ARE UNAWARE MAY EXIST.COUNTY/CITY:REVISIONS:PROJECT LOCATION:DATEREVISIONXXXXCALL BEFORE YOU DIG!TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002Gopher State One CallLEGAL DESCRIPTION:39TH ST. N.1. BEARINGS ARE BASED ON THE WASHINGTON COUNTYCOORDINATE SYSTEM (NAD83). BEARINGS AREDIFFERENT THAN SHOWN ON THE RECORDED PLAT.ALL INTERIOR ANGLES MATCH THE RECORDED PLATANGLES.2. UNDERGROUND UTILITIES SHOWN PER GOPHER ONELOCATES AND AS-BUILTS PLANS PROVIDED BY THECITY OF LAKE ELMO.3. THERE MAY SOME UNDERGROUND UTILITIES, GAS,ELECTRIC, ETC. NOT SHOWN OR LOCATED.SURVEY NOTES:CITY OF LAKE ELMOWASHINGTONCOUNTYThe following legal description appears on WashingtonCounty Quit Claim Deed as Document Number 3989069:Lot 1, Block 1, BROOKMAN 3RD ADDITIONWashington County, Minnesota**ADDITIONAL PARCELS ARE DESCRIBED ON SAIDDOCUMENT. FOR THE PURPOSES OF THIS SURVEY ONLYLOT 1, BLOCK 1 IS SHOWN.**NORTH(NOT TO SCALE)05-20-22INITIAL ISSUE08-08-22REVISED SURVEY AREASEC. 13, TWP. 29, RNG. 21,CITY OF LAKE ELMO, WASHINGTON COUNTY,MINNESOTACERTIFICATION:I hereby certify that this plan was prepared byme, or under my direct supervision, and that I ama duly Licensed Land Surveyor under the laws ofthe state of Minnesota.Daniel L. Thurmes Registration Number: 25718Date:__________________NO TITLE INFORMATION WAS PROVIDED AS A BENEFIT TOTHIS SURVEY. ADDITIONAL EASEMENTS MAY EXIST THATTHE SURVEYOR IS UNAWARE OF.TITLE NOTES:KOKOROLAKE ELMO0NORTH3060DC22027SURVDC27TOPOGRAPHICSURVEYLAND SURVEYING, INC.CORNERSTONESuite #2001970 Northwestern AveStillwater, MN 55082Phone 651.275.8969Fax 651.275.8976dan@cssurvey.netPROJECT NO.FILE NAMEVOLLEYBALLBOUNDARY AND05-20-22LOT 1 = 116,869 SQ.FT., BEING 2.68 ACRES, MORE OR LESSAREA 39TH STREET N LAKE ELMO AVENUE N(C.S.A.H 17)0 60 SCALE IN FEET 30 KEYNOTES: 1.ASPHALT PAVEMENT. 2.B612 CONCRETE CURB AND GUTTER. SEE LAKE ELMO STANDARD DRAWING NO. 501A. 3.COMMERCIAL CONCRETE DRIVEWAY. SEE LAKE ELMO STANDARD DRAWING NO. 502. 4.4" CONCRETE SIDEWALK. 5.24" CONCRETE VALLEY GUTTER. 6.6" CONCRETE PAVEMENT - DUMPSTER PAD 7.DUMPSTER ENCLOSURE. SEE ARCHITCTURAL 8.INFILTRATION BASIN. SEE GRADING PLAN. 9.PAVEMENT MARKING, HANDICAP SYMBOL (TYP) 10.PAVEMENT MARKING, DIAGONAL 4" WHITE PAINT (TYP) 11.PAVEMENT MARKING, 4" WHITE PAINT (TYP). 12.ASPHALT PATHWAY 13.B612 CONCRETE CURB AND CUTTER (TIPOUT GUTTER)MODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C1 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C01.DWG9/9/2022 4:07:07 PM 9/9/2022 4:08:30 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 4 SITE PLANJRAVERTY07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTION 20 24 PROPOSED BUILDING EXISTING DRIVEWAY 20 25 27' 27' 27' 22' 9' 22' 8' 18' 10' BUILDING SETBACK 20' BUILDING SETBACK 25' REQUIRED RIGHT-OF-WAY DEDICATION PER WASHINGTON COUNTY COMPREHENSIVE PLAN 20' BUILDING SETBACK HARDCOVER CALCULATIONS SURFACE AREA (SF)% COVER BUILDING 27,452 25.14% PARKING LOT 30,301 27.74% SIDEWALK 1,736 1.59% TOTAL IMPERVIOUS 59,489 54.47% TOTAL GREENSPACE 49,729 45.53% TOTAL LOT AREA *109,218 * EXCLUDES COUNTY R/W DEDICATION AREA 1 2 13 13 13 1 3 4 5 6 7 8 910 11 EXISTING BUILDING 12 8' 1' 2 2 6' 10' DRAINAGE AND UTILITY EASEMENT ST-1 ST-2 ST-3 ST-4 ST-5 ST-12 ST-11 ST-10 ST-9 ST-8 ST-7 ST-6 ST-15 ST-13 ST-14 39TH STREET N LAKE ELMO AVENUE N(C.S.A.H 17)940943935938935943 940 939 940 935 93 5 932940943 940 937 943939942>> >>>>>>>>>> >>>>>>>> >> >> >> D D>>>>WWWW>>>>D>>>>>>D >> 938 939 93 9 937 934934934936 934940935943 936 939940 940941941 PROPOSED BUILDING FFE = 941.50 9350 4020 SCALE IN FEETMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C2A S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C02A.DWG9/9/2022 4:05:53 PM 9/9/2022 4:08:35 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 5 UTILITY PLANJRAVERTY07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTION CB 207 27" DIA. RIM ELEV = 939.50 INV ELEV = 936.50 R-2561-A CASTING MH 204 48" DIA. RIM ELEV = 940.56 INV ELEV = 935.54 (W&E) INV ELEV = 935.87 (S) R-1642 CASTING MH 202 48" DIA. RIM ELEV = 939.10 INV ELEV = 934.35 (W) INV ELEV = 934.10 (N&S) R-1642 CASTING FES 200 INV ELEV = 933.82 CB 203 2'X3' RECT. RIM ELEV = 937.47 INV ELEV = 934.47 R-3067V CASTING 46' - 12" HDPE N12 WT PIPE @ 0.7% 168' - 12" HDPE N12 WT PIPE @ 0.71% 26' - 15" HDPE N12 WT PIPE @ 0.5% 39' - 24" HDPE N12 WT PIPE @ 2.05% FES 301 INV ELEV = 933.80 FES 300 INV ELEV = 933.00 MH 201 48" DIA. RIM ELEV = 939.70 INV ELEV = 933.95 SUMP ELEV = 929.95 R-1642 CASTING 48" X 36" SAFL BAFFLE SAFL BAFFLE BTM ELEV = 932.95 KEYNOTES: 1.4" SCHEDULE 40 PVC SANITARY SEWER SERVICE. INSTALL AT 2.0% MIN. SLOPE. MAINTAIN 4' MIN. COVER ON PIPE. PROVIDE ALL FITTINGS AND APPURTENANCES AS REQUIRED TO INSTALL PIPE. INSTALL CLEAN-OUTS AS REQUIRED PER CODE. VERIFY END LOCATION AND INVERT ELEVATION AT BUILDING WITH PLUMBER. 2.CONNECT TO EXISTING 6" PVC SERVICE STUB. VERIFY LOCATION AND ELEVATION. 3.6" DIP CL. 52 WATER SERVICE. MAINTAIN 8' MIN. COVER ON PIPE. PROVIDE ALL FITTINGS AND APPURTENANCES AS REQUIRED TO INSTALL PIPE. VERIFY END LOCATION AT BUILDING WITH PLUMBER. 4.CONNECT TO EXISTING 6" DIP WATER SERVICE STUB. VERIFY LOCATION AND ELEVATION. 5.INSULATE WATER SERVICE / STORM SEWER CROSSING WITH 4' X 8', 4" THICKNESS INSULATION. 1 2 3 4 30' - 15" HDPE N12 WT PIPE @ 0.5% 75' - 15" HDPE N12 WT PIPE @ 0.5% MH 206 48" DIA. RIM ELEV = 940.56 INV ELEV = 935.86 R-1642 CASTING 92' - 12" HDPE N12 WT PIPE @ 0.7% STUB 205 INTERNAL ROOF DRAIN CONNECTION 20' - 8" SCH 40 PVC @ 1.0% INV ELEV AT END = 936.01 FES 400 INV ELEV = 934.00 205' - 12" HDPE N12 WT PIPE @ 1.0% INSTALL PLUG AT WEST END OF PIPE DOWNSPOUT CONNECTION (TYP) 8" HDPE N12 WT PIPE @ 1.0% VERIFY EXACT DOWNSPOUT LOCATIONS WITH ARCHITECTURAL 5 43' - 18" RCP @ 0.93% FES 501 INV ELEV = 937.9 FIELD VERIFY INV ELEV. INSTALL TRASH GUARD FES 500 INV ELEV = 938.30 FIELD VERIFY INV ELEV INSTALL TRASH GUARD FES 600 INV ELEV = 936.35 FIELD VERIFY INV ELEV INSTALL TRASH GUARD FES 601 INV ELEV = 936.0 FIELD VERIFY ELEV. INSTALL TRASH GUARD 54' - 18" RCP @ 0.65% ST-1 ST-2 ST-3 ST-4 ST-5 ST-12 ST-11 ST-10 ST-9 ST-8 ST-7 ST-6 ST-15 ST-13 ST-14 39TH STREET N LAKE ELMO AVENUE N(C.S.A.H 17)940943935938935943 940 939 940 935 93 5 932940943 940 937 943939942>> >>>>>>>>>> >>>>>>>> >> >> >> D D >>>>D>>>>>>D >> 938 939 93 9 937 940935943 936 939 939940 940941PROPOSED BUILDING FFE = 941.50 941.00941.50 941.50 941.50 941.00 941.00941.00941.00 941.00 940.11 BC 938.07 BC 938.13 BC 938.34 BC 938.56 BC 938.81 BC 938.69 BC 938.95 BC 939.40 BC939.65 BC 940.50 BC 941.28 BC 939.85 BC 939.52 BC 939.61 939.94 941.50 941.00 940.50 941.50 941.50 EOF 940.62 BC 940.64 BC 941.22 BC 940.72 FL 940.63 FL 940.12 FL 940.22 BC 940.21 FL 940.73 941.30 940.71940.31 940 933933935935935 935 936 936940 940 937 932936 937938 940942941940940939 941.37 941.37 941.37941.50 941.66 940.60 940.76 941.79 941.95 943.63 941.50 941.66 942.00 942.16 941.60941.76 4:1 4:14:1 4:1 3:1 939.51 BC939.81 BC 939.14 939.25 939.51 939.62 939.14 BC 939.23 BC 938.84 BC 938.93 BC 939.19 FL 939.10 FL 938.80 FL 938.89 FL 938.93 BC939.29 BC 0 4020 SCALE IN FEET KEYNOTES: 1.20' WIDE INFILTRATION BASIN MAINTENANCE ACCESS 2.SILT FENCE (TYP) 3.SEDIMENT LOGS 4.ROCK CONSTRUCTION ENTRANCE 5.INLET PROTECTION 6.INSTALL INLET PROTECTION IN NEXT CATCH BASIN DOWNSTREAM IN 39TH ST. NMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C2B S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C02B.DWG9/9/2022 4:05:14 PM 9/9/2022 4:08:40 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 6 GRADING AND EROSION CONTROLJRAVERTY07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTION INFILTRATION BASIN BOTTOM ELEV = 933.00 100-YR HWL = 934.92 2 2 2 2 2 EMERGENCY OVERFLOW ELEV = 935.0 1 1 1 333 3 4 ELEVATION NOTES: 1.PROPOSED ELEVATIONS SHOWN ARE TO FINAL GRADE. TOP OF ASPHALT, TOP OF WALK, TOP OF CONCRETE, TOP OF CURB, TOP OF TOPSOIL, ETC. UNLESS NOTED OTHERWISE AS FOLLOWS: FL = CURB FLOW LINE BC = TOP BACK OF CURB GENERAL NOTES: 1.CONTRACTOR TO VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2.CONTRACTOR TO MAINTAIN EROSION CONTROL PRACTICES THROUGHOUT DURATION OF PROJECT. 3.CONTRACTOR TO ENSURE ADA COMPLIANCE FOR ALL ACCESSIBLE PARKING STALLS, ACCESSIBLE ROUTES, PEDESTRIAN RAMPS, ETC. REGARDLESS OF ANY CONTOURS OR SPOT ELEVATIONS PROVIDED ON THE PLANS. CONTRACTOR SHALL KEEP ALL CONSTRUCTION EQUIPMENT OFF AREAS IDENTIFIED AS INFILTRATION BASINS. COMPACTION OF UNDERLYING SOILS WILL DECREASE THE INFILTRATING CAPACITIY. COMPACTION MITIGATION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR 5 5 6 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C3 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C03.DWG9/9/2022 2:53:23 PM 9/9/2022 4:08:44 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 7 DETAILS - 1BHEINRICH07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C4 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C04.DWG9/9/2022 2:53:17 PM 9/9/2022 4:08:49 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 8 DETAILS - 2BHEINRICH07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C5 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C05.DWG9/9/2022 2:53:25 PM 9/9/2022 4:08:54 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 9 DETAILS - 3BHEINRICH07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C6 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C06.DWG9/9/2022 2:53:18 PM 9/9/2022 4:08:59 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 10 DETAILS - 4BHEINRICH07/07/2022 14 DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C7 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C07.DWG9/9/2022 3:49:32 PM 9/9/2022 4:09:03 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 11 DETAILS - 5JRAVERTY07/07/2022 14 NOTES: 1.INSTALLATION IS TO BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. ADDITIONAL INFORMATION IS AVAILABLE IN PRODUCT LITERATURE. 2.TYPE OF EROSION MAT SPECIFIED ON PLANS. 3.IF TYPE OF EROSION MAT IS NOT SHOWN ON PLANS, FURNISH AND INSTALL CLASS 2, TYPE B MAT. 4.EROSION MAT SHALL BE INSTALLED VERTICALLY, DOWNSLOPE ON DISTURBED SLOPES AS SHOWN ON PLANS OR AS DIRECTED BY ENGINEER. TAMP D I R T O V E R M A T / B L A N K E T 4" MIN OVERLAY 3' MIN STAPLES SHALL BE U-SHAPED 11 GA WIRE (MIN) 8" LONG @ 2/SY (MIN) 2' MIN 1 C7 EROSION MAT ON SLOPE NO SCALE 2 C7 ASPHALT PAVEMENT NO SCALE 1.5" ASPHALT PAVEMENT SPWEB240B TACK COAT 1.5" ASPHALT PAVEMENT SPNWB230B 8" CLASS 5 AGGREGATE BASE 24" SELECT GRANULAR SUBGRADE 6" CLASS 5 AGGREGATE BASE WIRE MESH: 6X6-W2.1XW2.1 6" MIN OVERLAP, 2" CLR COMPACTED SUBGRADE 3 C7 CONCRETE PAD NO SCALE NOTES: 1.MNDOT 3F52 CONCRETE COMPACTED SUBGRADE 6" CONCRETE PAVEMENT 1' 2'6" MIN3/4" PER FT 3/4" 1/2" RAD 1/2" RAD 7" MINNOTES: 1.THE BOTTOM OF THE GUTTER MAY BE CONSTRUCTED EITHER LEVEL OR PARALLEL TO THE SUBGRADE OR BASE COURSE PROVIDED THAT A 6" MIN CONCRETE THICKNESS IS MAINTAINED. 3/4" PER FT 1' 5 C7 CONCRETE VALLEY GUTTER NO SCALE 6"BWAH 7"6 C7 TIPOUT B STYLE CURB & GUTTER NO SCALE 3" R1/2" R MNDOT DESIGN STYLE B GUTTER WIDTH (W) 12"18"24" CURB HEIGHT CURB WIDTH CURB BACK DESIGN DESIGN DESIGN (H)(A)(B)NO.NO.NO. 4"7-3/8"11-1/2"B412 B418 B424 6"8"13-1/2"B612 B618 B624 8"8-5/8"15-1/2"B812 B818 B824 3" R (USE 2-5/8" R FOR 4" CURB) 2% 1/2" RADCOLORS: "GREEN" LETTERING & TRIM ON A "WHITE" FIELD RESERVED VAN ACCESSIBLE PARKING 4 C7 ACCESSIBLE PARKING SIGN NO SCALE 12" MIN 28" MIN "BLUE" SYMBOL BACKGROUND 14 GAUGE STEEL SIGN W/PAINTED SYMBOL & LETTERING PER MNDOT REQUIREMENTS 2" X 2" SQUARE UNISTRUT POST (GALV STEEL) VARIABLE LENGTH (PERFORATED) GRADE 3" X 3/8" BOLT (ZINC PLATED) AND 3/8" DIA NUT (ZINC PLATED) 7'-0" PROVIDE "VAN ACCESSIBLE" SIGN AS INDICATED ON THE PLANS 4" TO 6" 4'-0" NOTES: 1.HANDICAP PARKING SIGN SHALL CONFORM WITH THE CURRENT STATE AND LOCAL CODES AND REGULATIONS. DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C8 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C08.DWG9/9/2022 3:51:18 PM 9/9/2022 4:09:08 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 12 DETAILS - 6JRAVERTY07/07/2022 14 VARIES BOTTOM WIDTH INFILTRATION BASIN TYPICAL SECTION INFILTRATION BASIN NOTES: 1.DO NOT EXCAVATE THE INFILTRATION BASIN UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN CONSTRUCTED AND FULLY STABILIZED. 2.DURING CONSTRUCTION OF THE CONTRIBUTING DRAINAGE AREA, STAKE OFF THE PROPOSED INFILTRATION BASIN TO PREVENT HEAVY EQUIPMENT AND TRAFFIC FROM COMPACTING THE NATIVE SOILS. 3.AFTER CONSTRUCTION OF THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETED AND THE SITE IS FULLY STABILIZED, EXCAVATE THE INFILTRATION BASIN TO SUBGRADE. 4.LOOSEN SOILS TO A DEPTH OF 3' BELOW SUBGRADE. 5.PLACE ENGINEERED MEDIA, SEED AND MULCH. 6.SEEDING AND MULCHING SHALL BE COMPLETED WITHIN 48-HOURS OF FINAL GRADING. 7.THE IN A MANNER THAT AVOIDS RECOMPACTION OF THE SOIL BY CONSTRUCTION TRAFFIC. TYPICAL METHODS FOR LOOSENING SOIL ARE PLOWING, ROTO-TILLING, OR OTHER MECHANICAL MEANS. 6.EXCAVATION/GRADING OF THE INFILTRATION BASIN SHALL BE COMPLETED USING LOW-IMPACT EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF THE UNDERLYING SOILS. BACKHOE EXCAVATION FROM THE PERIMETER, SMALL TRACKED DOZERS AND BOBCATS WITH RUNNER TRACKS ARE RECOMMENDED. 7.FINISH GRADING SHALL BE COMPLETED USING METHODS THAT AVOID RECOMPACTION OF LOOSENED SOIL. ACCEPTABLE METHODS INCLUDE HAND RAKING, SMOOTHING WITH A BACKHOE BUCKET FROM OUTSIDE THE LIMITS OF THE SWALE, AND/OR PULLING A DRAG BEHIND LOW GROUND PRESSURE EQUIPMENT LIKE AN ATV. 8.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL WILL NEED TO BE REMOVED FROM THE BASIN PRIOR TO INITIATING THE NEXT STEP IN THE CONSTRUCTION PROCESS. SEDIMENT THAT HAS BEEN WASHED INTO THE BASIN DURING THE EXCAVATION PROCESS CAN SEAL THE PERMEABLE MATERIAL, SIGNIFICANTLY REDUCING THE INFILTRATION CAPACITY OF THE SOILS. NATIVE POORLY GRADED SAND (SP) AND SILTY SAND (SM) SOILS NATIVE LEAN CLAY SOILS REMOVE NATIVE LEAN CLAY (CL) SOILS ENCOUNTERED WITHIN INFILTRATION BASIN. REPLACE WITH WELL GRADED SAND (SW) SOILS OR BETTER. DO NOT COMPACT SOILS.0. 5 :1 4:1 4:1 6" TOPSOIL BASIN BOTTOM ELEV = 933.00 12" ENGINEERED MEDIA UTILIZE MIX B COMPLYING WITH MINNESOTA STORMWATER MANUAL. 6" TOPSOIL GENERAL NOTES: 1.A GEOTECHNICAL ENGINEER SHALL CONFIRM REMOVAL OF ALL LEAN CLAY PRIOR TO PLACEMENT OF WELL GRADED SAND SOILS. DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C9 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C09.DWG9/9/2022 2:53:27 PM 9/9/2022 4:09:14 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 13 STORMWATER POLLUTION PREVENTION PLANJRAVERTY07/07/2022 14 SWPPP SUMMARY / OVERVIEW THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) HAS BEEN PREPARED TO ADDRESS THE POLLUTION PREVENTION MANAGEMENT INSPECTION AND MAINTENANCE REQUIREMENTS OF THE NPDES PERMIT. THIS SWPPP INCLUDES A COMBINATION OF NARRATIVE AND PLAN SHEETS THAT DESCRIBE THE TEMPORARY AND PERMANENT STORM WATER MANAGEMENT PLAN FOR THIS PROJECT. CONTACTS OWNER: RAYMOND LUCZAK ADDRESS: 485 SUMMIT RIDGE, HUDSON, WI 54016 CONTACT: RAYMOND LUCZAK PHONE: 612-750-2876 EMAIL: RT@KOKOROVOLLEYBALL.COM CONTRACTOR: DERRICK BUILDING SOLUTIONS ADDRESS: 1505 HIGHWAY 65, NEW RICHMOND, WI 54017 CONTACT: CHAD DERRICK PHONE: 715-760-0862 EMAIL: CDERRICK@DERRICKBUILT.COM GENERAL PROJECT INFORMATION PROJECT NAME: KOKORO VOLLEYBALL SITE IMPROVEMENTS PROJECT LOCATION: LAKE ELMO, MINNESOTA CONSTRUCTION START DATE: _____________________ CONSTRUCTION COMPLETION DATE: __________________________ THIS PROJECT WILL CONSIST OF SITE GRADING, COMMERCIAL BUILDING CONSTRUCTION, SITE UTILITIES, PARKING LOT,IMPROVEMENTS, STORM WATER MANAGEMENT FACILITIES, AND RESTORATION. AMENDMENTS TO THE SWPPP THE SWPPP WILL BE AMENDED AS NEEDED AND/OR AS REQUIRED BY PROVISIONS OF THE PERMIT, AMENDMENTS WILL BE APPROVED BY BOTH THE OWNER AND CONTRACTOR (OPERATOR) WHENEVER CONSTRUCTION ACTIVITY IS IN PROCESS. GENERAL SWPPP RESPONSIBILITIES THE CONTRACTOR (OPERATOR) SHALL PROVIDE A KNOWLEDGEABLE AND EXPERIENCED PERSON(S) TO OVERSEE THE IMPLEMENTATION OF THE SWPPP AND THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL BMP'S BEFORE AND DURING CONSTRUCTION. BOTH THE OWNER AND CONTRACTOR (OPERATOR) SHALL BE RESPONSIBLE FOR THE PROPER TERMINATION AND/OR TRANSFER OF THE PERMIT. THE OWNER WILL BE RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM(S) AS IDENTIFIED IN A MAINTENANCE AGREEMENT WITH THE WATERSHED DISTRICT. UNLESS SPECIFICALLY STATED THE ENGINEER SHALL HAVE NO RESPONSIBILITY FOR ANY SWPPP ACTIVITIES DURING OR AFTER CONSTRUCTION. TRAINING REQUIREMENTS SWPPP PREPARER & TRAINING: JASON R. RAVERTY, PE, STEVENS ENGINEERS, INC. DESIGN OF CONSTRUCTION SWPPP, UNIVERSITY OF MINNESOTA, EXPIRES 5/31/2025. THE CONTRACTOR (OPERATOR) SHALL PROVIDE AT LEAST ONE TRAINED PERSON TO REVIEW THIS DOCUMENT, OVERSEE THE IMPLEMENTATION OF THE SWPPP AND TO INSTALL, INSPECT, MAINTAIN AND REPAIR BMP'S. TRAINING MUST BE IN CONFORMANCE WITH THE NPDES CONSTRUCTION PERMIT REQUIREMENTS. TRAINING DOCUMENTATION MUST BE KEPT ON-SITE WITH THE SWPPP AND THE TRAINED PERSON MUST BE AVAILABLE ON-SITE WITHIN 72 HOURS. IMPLEMENTATION SEQUENCE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING SEQUENCE. THE CONTRACTOR MAY MAKE ADJUSTMENTS TO THE SEQUENCE IF NEEDED TO ADDRESS ACTUAL FIELD CONDITIONS. THE CONSTRUCTION SEQUENCE SHALL LIMIT THE AMOUNT OF LAND DISTURBED AT ONE TIME. 1.PERFORM MINOR DEMOLITION AND TREE REMOVAL NEEDED TO INSTALL BMP'S 2.INSTALL ROCK CONSTRUCTION ENTRANCE(S) 3.INSTALL EROSION AND SEDIMENT CONTROL MEASURES 4.PROTECT INFILTRATION BASIN 5.COMPLETE DEMOLITION AND TREE REMOVAL 6.COMPLETE SITE GRADING AND STABILIZATION (DO NOT EXCAVATE OR GRADE INFILTRATION BASINS) 7.INSTALL UTILITIES AND CONSTRUCT PARKING LOT IMPROVEMENTS 8.COMPLETE BUILDING CONSTRUCTION 9.EXCAVATE INFILTRATION BASINS AFTER ALL LAND DISTURBING ACTIVITY IN THE ENTIRE UPSTREAM CONTRIBUTING DRAINAGE AREA HAS COMPLETED AND STABILIZED. 10.SEED AND STABILIZE INFILTRATION. AFTER CONSTRUCTION IS COMPLETED AND THE SITE IS STABILIZED REMOVE ANY TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES AND RESTORE AND AREAS DISTURBED BY THEIR REMOVAL. INSPECTION AND MAINTENANCE ALL INSPECTIONS, MAINTENANCE, REPAIRS, REPLACEMENTS AND REMOVAL ARE TO BE CONSIDERED INCIDENTAL TO THE PROJECT. THE CONTRACTOR (OPERATOR) IS RESPONSIBLE FOR COMPLETING REQUIRED INSPECTIONS MAINTENANCE AND OBSERVATION OF WEATHER CONDITIONS, AND RAINFALL AMOUNTS TO ENSURE COMPLIANCE WITH THE PERMIT REQUIREMENTS. THE CONTRACTOR (OPERATOR) SHALL OBSERVE THE CONSTRUCTION SITE ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. A RAIN GAUGE SHALL BE INSTALLED ON-SITE. THE CONTRACTOR (OPERATOR) SHALL KEEP A MAINTENANCE/CONSTRUCTION OBSERVATION REPORT TO BE RECORDED AFTER EACH SITE VISIT/OBSERVATION. RECORDS SHALL INCLUDE THE FOLLOWING: 1.DATE AND TIME OF INSPECTIONS 2.NAME OF PERSON CONDUCTING INSPECTIONS 3.ACCURATE FINDINGS WITH SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE NEEDED 4.CORRECTIVE ACTIONS TAKEN (INCL. DATE, TIMES AND PARTIES COMPLETING CORRECTIVE ACTIONS) 5.DATE AND AMOUNT OF RAINFALLS GREATER THAN 0.5 INCHES IN 24 HOURS 6.RECORD OF ALL SITE DISCHARGES AND DISCHARGE DESCRIPTION WITH PHOTOS 7.AMENDMENTS TO THE SWPPP. THE CONTRACTOR (OPERATOR) SHALL SUBMIT A COPY OF THE WRITTEN INSPECTIONS MONTHLY TO THE OWNER. THE CONTRACTOR (OPERATOR) MUST KEEP THE SWPPP, ALL INSPECTION REPORTS AND AMENDMENTS ONSITE. THE CONTRACTOR (OPERATOR) SHALL DESIGNATE A SPECIFIC LOCATION TO KEEP THE RECORDS WHENEVER CONSTRUCTION ACTIVITY IS IN PROGRESS. ALL EROSION PREVENTION AND SEDIMENTATION CONTROL BMP'S MUST BE INSPECTED TO ENSURE INTEGRITY AND EFFECTIVENESS. ALL NONFUNCTIONAL BMP'S MUST BE REPAIRED, REPLACED OR SUPPLEMENTED WITH FUNCTIONAL BMP'S. THE CONTRACTOR (OPERATOR) MUST INVESTIGATE AND COMPLY WITH THE FOLLOWING INSPECTION AND MAINTENANCE REQUIREMENTS: 1.ALL SEDIMENT BARRIERS / PERIMETER CONTROL INCLUDING SILT FENCE MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/3 OF THE FENCE HEIGHT. THESE REPAIRS SHALL BE MADE WITHIN 24 HOURS OF DISCOVERY. 2.TEMPORARY AND PERMANENT SEDIMENT BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES ½ THE STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY. 3.SURFACE WATER, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION. THE OPERATOR SHALL REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS. THE OPERATOR SHALL RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN 7 DAYS OF DISCOVERY, UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL CONSTRAINTS. THE CONTRACTOR (OPERATOR) IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK. 4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS, CURB AND GUTTER SYSTEMS WITHIN AND ADJACENT TO THE PROJECT SHALL BE INSPECTED DAILY FOR EVIDENCE OF OFF-SITE SEDIMENT EROSION OR TRACKING ONTO PAVED SURFACES. ERODED OR TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY 5.THE CONTRACTOR (OPERATOR) IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY BMP'S AS WELL AS EROSION AND SEDIMENT CONTROL BMP'S FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. 6.ALL SITE OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANOR AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS. 7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREAS AND THESE AREAS ARE PROTECTED FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA. POLLUTION PREVENTION MANAGEMENT MEASURES THE CONTRACTOR (OPERATOR) SHALL BE RESPONSIBLE FOR ALL POLLUTION PREVENTION MANAGEMENT MEASURES IDENTIFIED IN SECTION 12 OF THE NPDES PERMIT. THE CONTRACTOR (OPERATOR) IS RESPONSIBLE FOR INFORMING ALL VISITORS AND/OR PERSONNEL ON-SITE OF THE POLLUTION PREVENTION MANAGEMENT MEASURES. ALL POLLUTION PREVENTION MANAGEMENT MEASURES ARE TO BE CONSIDERED INCIDENTAL TO THE PROJECT, UNLESS OTHERWISE NOTED. THE SWPPP DOCUMENTS THE SWPPP IS COMPRISED OF THE FOLLOWING: 1.THIS SWPPP SHEET 2.THE ENTIRE PLANS AND SPECIFICATIONS FOR THIS PROJECT 3.THE STORM WATER MANAGEMENT PLAN FOR THE PROJECT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE (SHEET 1 OF 2) DATENO REVISIONS BY DESCRIPTION DATENO REVISIONS BY DESCRIPTION DRAWN BY DESIGNED BY APPROVED BY DATE:REG NO:OF PRINTED NAME: SIGNATURE:DATE PROJECT NOPLANS PREPARED BY:PLANS PREPARED FOR: STEVENS ENGINEERS, INC. 642 BRAKKE DRIVE, SUITE 202 HUDSON, WISCONSIN 54016 PHONE: 1.715.386.5819 www.stevensengineers.comPLOTTED:MODIFIED:USER:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NOT FOR CONSTRUCTIONMODIFIED:PLOTTED:USER:JRR JRR/BRH BRH C10 S:\DERRICK COMPANIES\400-22-324 KOKORO VOLLEYBALL\DWG\SHEETS\DC40022324_C10.DWG9/9/2022 2:53:27 PM 9/9/2022 4:09:19 PMKOKORO VOLLEYBALL SITE IMPROVEMENT PLANS LAKE ELMO, MINNESOTA JASON R. RAVERTY 41274 JRR JRR 07/07/2022 09/09/2022 VARIANCE AND CUP SUBMITTAL REVISED CITY SUBMITTAL 400-22-324 14 STORMWATER POLLUTION PREVENTION PLANJRAVERTY07/07/2022 14 PROJECT SPECIFIC INFORMATION TOTAL PARCEL AREA: 2.68 AC. PRIOR TO R/W DEDICATION TO WASHINGTON COUNTY TOTAL PARCEL AREA: 2.51 AC. AFTER R/W DEDICATION TO WASHINGTON COUNTY TOTAL PROJECT AREA: 2.44 AC. TOTAL LAND AREA TO BE DISTURBED: 2.44 AC. PRE-CONSTRUCTION IMPERVIOUS AREA: 0 AC. POST-CONSTRUCTION IMPERVIOUS AREA: 1.43 AC. IMPERVIOUS AREA ADDED: 1.43 AC. RECEIVING WATER WITHIN 1 MILE FROM PROJECT BOUNDARIES NAME OF WATERBODY (SPECIAL OR IMPAIRED) 1.UNNAMED WETLAND THE PROJECT DOES NOT DRAIN TO A SPECIAL OR IMPAIRED WATER WITHIN 1-MILE. THE PROJECT IS NOT LOCATED IN A KARST AREA. THE PROJECT DOES NOT DISCHARGE TO A CALCAREOUS FEN. PROPOSED STORM WATER TREATMENT SUMMARY BUILDING AND PARKING LOT RUNOFF IS COLLECTED IN A STORM SEWER SYSTEM WHICH DISCHARGES THROUGH A SUMP MANHOLE WITH SAFL BAFFLE PRIOR TO ENTERING THE DOWNSTREAM INFILTRATION BASIN. THE INFILTRATION BASIN IS SIZED TO INFILTRATE GREATER THAN 1.1-INCHES OF RUNOFF FROM NEW IMPERVIOUS SURFACES. RATE CONTROL IS ALSO PROVIDED BY THE INFILTRATION BASIN RESULTING IN NO INCREASE IN THE RATES OR VOLUMES FOR THE 2, 10 AND 100 YEAR EVENTS AND AND THE 10-DAY SNOWMELT EVENT AS COMPARED TO THE PRE-DEVELOPMENT RATES. EROSION PREVENTION MEASURES AND TIMING THE CONTRACTOR (OPERATOR) IS RESPONSIBLE FOR ALL EROSION PREVENTION MEASURES IDENTIFIED IN SECTION 8 OF THE NPDES PERMIT. SITE SOIL INFORMATION GENERALIZED SOIL INFORMATION PROVIDED IS OBTAINED FROM THE NRCS WEB SOIL SURVEY AND IS FOR NPDES PERMIT INFORMATION ONLY. THE OPERATOR SHALL NOT RELY ON THIS SOIL INFORMATION BUT SHOULD INSTEAD REFER TO THE GEOTECHNICAL REPORT. SOIL NAME - HYDROLOGIC SOIL CLASSIFICATION ANTIGO SILT LOAM - B SANTIAGO SILT LOAM - B CRYSTAL LAKE SILT LOAM - C SEDIMENT CONTROL MEASURES AND TIMING THE OPERATOR (CONTRACTOR) IS RESPONSIBLE FOR ALL SEDIMENT CONTROL MEASURES IDENTIFIED IN SECTION 9 OF THE NPDES PERMIT. TEMPORARY SEDIMENT BASINS PROVIDE TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 10 OF THE NPDES PERMIT. DEWATERING AND BASIN DRAINING ACTIVITIES THE OPERATOR IS RESPONSIBLE FOR ADHERING TO ALL DEWATERING AND SURFACE DRAINAGE REGULATIONS. INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1.NOTIFY VALLEY BRANCH WATERSHED DISTRICT IF DEWATERING IS NECESSARY. 2.WHENEVER POSSIBLE WATER FROM DEWATERING ACTIVITIES SHALL DISCHARGE TO A TEMPORARY AND/OR PERMANENT SEDIMENT BASIN. 3.IF WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN, IT SHALL BE TREATED WITH THE OTHER APPROPRIATE BMPS, TO EFFECTIVELY REMOVE SEDIMENT. 4.ALL DISCHARGE POINTS SHALL BE PROTECTED FROM EROSION AND SCOUR. 5.DISCHARGE WATER SHALL BE DISPERSED OVER AN EFFECTIVE ENERGY DISSIPATION MEASURE. 6.ALL WATER FROM DEWATERING SHALL BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION, OR INUNDATION OF WETLANDS. FINAL STABILIZATION THE OPERATOR IS RESPONSIBLE FOR ENSURING FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING: 1.ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED. 2.ALL EXPOSED SOILS HAVE BEEN UNIFORMLY STABILIZED WITH AT LEAST 70% VEGETATION COVERAGE. 3.ALL DRAINAGE DITCHES, PONDS AND ALL STORM WATER CONVEYANCE SYSTEMS HAVE BEEN CLEARED OF SEDIMENT AND STABILIZED TO PRECLUDE EROSION. 4.ALL TEMPORARY BMPS HAVE BEEN REMOVED AND PROPERLY DISPOSED. 5.FINAL STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. ENVIRONMENTAL REVIEW 1.THERE ARE NO STORMWATER MITIGATION MEASURES REQUIRED AS A RESULT OF AN ENVIRONMENTAL, ARCHEOLOGICAL, OR AGENCY REVIEW. THIE PROJECT IS NOT LOCATED IN A DRINKING WATER SUPPLY MANAGEMENT AREA. THIS PROJECT IS NOT LCOATED IN A WELLHEAD PROTECTION AREA. PROJECT SPECIFIC NOTES 1.INFILTRATION BASINS SHALL BE PROTECTED AT ALL TIMES FROM COMPACTION AND SEDIMENT. THE CONTRACTOR IS RESPONSIBLE FOR MAKING SURE INFILTRATION RATES ARE NOT NEGATIVELY AFFECTED. 2.THE CONTRACTOR SHALL NOTIFY WATERSHED DISTRICT STAFF AS REQUIRED FOR DISTRICT INSPECTIONS. FAILURE TO NOTIFY THE DISTRICT PRIOR TO INSTALLATION MAY RESULT IN THE REMOVAL OF WORK COMPLETED. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE (SHEET 1 OF 2) 0 4020 SCALE IN FEET 4020     PAGE 1 of 2  MEMORANDUM         Date:  September 19, 2022       To:  Ben Hetzel, City Planner  Re: Korkoro Volleyball Facility CUP  Cc:  Molly Just, Planning Director    PID 1302921220011    Dutin Kalis, Fire Chief        Chad Isakson, PE, Assistant City Engineer      From:  Jack Griffin, PE, City Engineer          Engineering has reviewed the revised Korkoro Volleyball Facility CUP Site Plans received on September 9, 2022.  The review consisted of the following documentation:   Site Plans dated September 9, 2022.   Stormwater Management Report dated September 8, 2022.      1. Lake Elmo Avenue Right‐of‐way dedication. The Washington County Comprehensive Plan requires the  preservation of right‐of‐way along Lake Elmo Avenue measuring 75 feet from the current centerline. The  site plan shows the building setback being measured from the future required right‐of‐way.    The plans must be revised to provide the 75‐foot measurement from centerline to verify the future  right‐of‐way dedication setback.  2. Drainage and Utility Easements. A 10‐ft drainage and utility easement should be dedicated along the west  side of the property as part of the site development, immediately adjacent to the future right‐of‐way of  Lake Elmo Avenue. The existing 10‐ft drainage and utility easement will be incorporated into the County  right‐of‐way and therefore must be replaced.   The plans show the required 10‐foot drainage and utility easement adjacent to the future County  R/W, however, the plans must be revised to clarify that the easement will be dedicated as part of the  project.  3. Pedestrian Trail. The construction of a bituminous trail along Lake Elmo Avenue should be required as part  of the site improvements to continue the trail development and connectivity created from similar recent  developments, and consistent with a walkable Downtown. The trail should connect from 39th Street  North to the south end of the property.    The plans must be revised to jog the trail at the north end to align with the existing pedestrian ramp.  4. Future Intersection Improvements to Lake Elmo Avenue and 39th Street. As addressed in Washington  County’s plan review dated July 29, 2022, the County anticipates signalized intersection improvements at  Lake Elmo Avenue and 39th Street that will require the alignment of the eastbound through lane with the  west leg of 39th Street. This improvement will require the expansion of 39th Street along the frontage of  the  proposed  Korkoro  site,  including  the  need  for  additional  right‐of‐way  and  moving  the  existing  bituminous trail further to the south (see attached exhibit).   The Korkoro site plans appear to accommodate this future expansion, however, an additional exhibit  must be prepared and submitted, or the site plans must be revised to demonstrate that this future  expansion can be constructed without impacts to the Korkoro site improvements.   The 20‐foot building setback along the north property line should be measured from this future R/W.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 2  5. Site Access. The commercial driveway access is proposed to align directly across from the Senior Living  Facility. This access location is acceptable and serves to minimize turning conflicts along 39th Street.  6. Secondary Access. No secondary access is proposed. Secondary access to Lake Elmo Avenue is prohibited.  Washington County has indicated that the existing site access to 3825 Lake Elmo Avenue (Westbrooke  Building) will be eliminated or restricted to right‐in/right‐out  when  the  County  makes  improvements  along Lake Elmo Avenue.   A joint access should therefore be encouraged between the proposed Kokoro site and the adjacent  property to the south at 3825 Lake Elmo Avenue.    If an alternative access is not required to 39th Street through the Korkoro property, then a future  access will likely be required through the City Center access areas and may conflict with the new Fire  Station facility.  7. The proposed site plan is subject to a storm water management plan (SWMP) meeting State, Valley  Branch Watershed District (VBWD) and City rules. In addition to meeting City storm water regulations, a  permit will be required from the Minnesota Pollution Control Agency and VBWD.   8. Post construction discharge rates and volumes must be equal or less than pre‐existing discharge rates at  all discharge locations and cumulative for the site.    Revise SWMP exhibits and tables to clearly identify and label all points of site discharge. Revise Runoff  Rate table to compare pre and post discharges at all discharge locations and cumulative site, and  verify rule compliance. The existing table only identifies two discharge locations vs. three discharge  locations shown on the drainage exhibits. Labeling on the exbibits must be consistent with labeling  presented on the tables.   The SWMP must be revised to summarize the 100‐year HWL for the Infiltration basin and all localized  low points on the site.  9. The  storm  water  facilities  constructed  for  this  development  should  remain  privately  owned  and  maintained. The applicant will be required to execute and record  a  Stormwater  Maintenance  and  Easement Agreement in the City’s standard form of agreement. Even as privately owned and maintained  facilities, maintenance access roads meeting the City engineering design standards dated January 2022  must be provided for all storm water facilities.   Revise grading plans to provide maintenance access roads meeting city standards to all infiltration  basin inlets/outlets. Maintenance access cannot conflict with the emergency overflow location.  10. Utility Plan. Plan and profiles are required for all storm sewer pipe and pipe culverts for city review.   Minimum cover over city owned culverts must be 2.5 feet.  11. Grading  and  Erosion  Control  Plan.  Revise  erosion  control  plans to  show  double  silt  fence  perimeter  around infiltration basin prior to start of site construction.    12. Infiltration Basin detail. Revise detail and plan notes to clarify over excavation requirements of in place  soils to align with geotechnical and SWMP recommendations.  13. Municipal water supply is available to the site. Connections to existing public watermain at 39th Street  will  be  required,  including  all  connection  and  permit  fees.  The  developer  is  responsible  to  extend  municipal water into the development at the developer’s sole cost.    The utility plans must be revised to show a fire hydrant within 50‐feet of the FDC that is located near  the building main entrance. The fire hydrant and watermain feeding the hydrant must be City owned  and operated. A minimum 30‐foot easement centered over the pipe/hydrant is required without  encroachments from retaining walls, trees, other small/dry utilities, or storm water management  BMPs. The easement must be dedicated to the City in the City’s standard easement agreement form,  and shown on the site plan, utility plan and grading plans.  14. Sanitary sewer service is available to the site with an existing 6‐inch sanitary sewer stub located along  39th Street North. The developer is responsible to extend sewer service into the development at the  developer’s sole cost and pay all connection and permit fees.  “Proudly Serving Neighbors & Friends” Lake Elmo Fire Department Memorandum To: Ben Hetzel, City Planner From: Dustin Kalis, Fire Chief Date: 7/26/22 Re: Conditional Use Permit: Kokoro Volleyball _______________________________________________________________________________________ The Lake Elmo Fire Department has completed a Conditional Use Permit review for Kokoro Volleyball (PID 13.029.21.22.0011) based on submittals dated 6/23/22 with the following comments: 1) All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning radiuses. 2) An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. 3) Fire hydrants shall be provided in approved locations following review by Engineering and Public Works. 4) Building address numbers shall be plainly visible from the street fronting the property and shall contrasting color from the background. Size and placement of address numbers shall be approved by the fire and planning departments. 5) A Fire Department lock box is required for emergency access to building at an approved location. Provide keys for emergency access into and throughout the occupancy as required. 6) The fire sprinkler system shall be installed compliant with provisions of 2016 NFPA Standard 13, Installation of Sprinkler Systems. City permit required prior to initiation of work. 7) Fire Department sprinkler connection locations to be approved prior to installation. 8) The fire alarm system shall be installed compliant with provisions of 2016 NFPA Standard 72, National Fire Alarm Code. City permit required prior to initiation of work. 9) The sprinkler system shall be properly monitored by a qualified monitoring company. 10) Install emergency egress illumination in the means of egress including exit discharge compliant with 2020 MSFC. 11) Install compliant exit signage as required by the 2020 MSFC. 12) Provide and install dry chemical fire extinguishers certified for service and tagged as required. Service classification rating shall be a minimum 2A classification rating and maximum travel distance of 75 feet to extinguishers. The minimum classification rating may be upgraded for special or extra hazard areas within the occupancy. “Proudly Serving Neighbors & Friends” 13) Rooms containing controls for air-conditioning systems, roof access, elevator equipment, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Codes and Standards Used for this Review This review is based on the following codes and standards as adopted and in effect in the State of Minnesota at the time of plan submittal.  2020 Minnesota State Fire Code  Lake Elmo Fire Department Fire Code Policy  NFPA 72, 2016 edition  NFPA 13, 2016 edition PUBLIC WORKS Wayne Sandberg, P.E., Director, County Engineer Frank D. Ticknor, P.E., Deputy Director July 29, 2022 Molly Just Planning Director City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 Dear Molly: Washington County Public Works appreciates this opportunity to comment on the proposed variance regarding access to a proposed development (“Kokoro Volleyball”) in the southeast quadrant of County State Aid Highway (CSAH) 17 (Lake Elmo Avenue) at its intersection with 39th Street North in the City of Lake Elmo. Although Washington County does not oppose the proposed variance, this letter will detail several concerns related to access for adjacent parcels and right-of-way for future transportation improvements. In the interest of safe and efficient operation of county highways, Washington County manages access to county highways via a permit process, enforced via Washington County Ordinance Number 188 and as detailed by access management guidelines contained in the Washington County 2040 Comprehensive Plan (Page 5-45). Per these guidelines and as indicated in an email to the city dated June 10th, 2022, Washington County Public Works would not support or permit a direct access for this parcel to CSAH 17. Any development decisions being made at this time should carefully consider the adjacent parcel at 3825 Lake Elmo Avenue, also known as the “Brookfield 1” building, which contains the Time for Me Learning Center. Washington County does not yet have improvements to CSAH 17 scheduled in our current five-year Capital Improvement Plan, but we are aware of numerous needs on this section of roadway, especially as it relates to pedestrian connections to the new residential developments and Lake Elmo Elementary School. In addition to new trail connections, one likely scenario is that CSAH 17 would have a raised median in the future, to improve traffic safety, calm speeds, and provide pedestrian refuge at key crossing points. Due to the short spacing from 39th Street, the Brookfield 1 building would not be eligible for left turn lane or median opening, since a southbound left turn lane would overlap with the necessary northbound left turn lane to 39th Street. Therefore, access to and from the Brookfield 1 building would occur via right turns only. A safer and more orderly option for county road drivers, trail users, and users of the Brookfield 1 building would be for the existing driveway access to be disconnected from CSAH 17 entirely. Therefore, it is important to consider now how the Brookfield 1 building might obtain alternate access, either to the north or to the east (or both), thus providing a route to the county highways via properly designed (and potentially controlled) intersections. We encourage the city to work with the property owners to consider an arrangement that would allow for the Brookfield 1 building to have access to 39th Street via a cross-access easement or a planned public street. An alternative would be to restore eastward access to Laverne Avenue, past the Lake Elmo City Hall and fire station. A great place to live, work and play…today and tomorrow North Shop | 11660 Myeron Road North | Stillwater, MN 55082-9537 P: 651-430-4300 | F: 651-430-4350 | TTY: 651-430-6246 www.co.washington.mn.us Washington County is an equal opportunity organization and employer DocuSign Envelope ID: F62C9C50-5448-4964-87DA-4DB07BD6C3F9 We are concerned that both of these potential routes are planned to be obstructed by stormwater infiltration areas on the Kokoro Volleyball site and on the City Hall/fire station site, as shown on the attached summary diagram. Future improvements to CSAH 17 in this area, although not yet designed or scheduled, could plausibly include a southward extension of the separated trail along the west side of the roadway, a controlled intersection (traffic signal or roundabout) at 39th Street, and/or the raised concrete median mentioned earlier in this letter. Right-of-way for these improvements is currently constrained in this area, with 50 feet of right-of-way from the CSAH 17 centerline. We see and appreciate that the site plan for the volleyball site indicates planned dedication of an additional 25 feet of right-of-way as per the Washington County 2040 Comprehensive Plan. Approximately 40 feet of city-owned right-of-way appears to currently exist from the 39th Street centerline. Some expansion of 39th Street would be required in the event of a future traffic signal at this location, including a dedicated right turn lane for westbound-to-northbound turns and potentially a realignment of the eastbound receiving lane, which is not currently aligned with the eastbound approach lane and therefore may be unsuitable for eastbound through movements on a green traffic signal indication. Thank you for the opportunity to comment on this proposed variance and the associated transportation challenges affecting this site and surrounding parcels. Please feel free to contact our office with any questions; by phone at 651-430-4351 or via email at joe.gustafson@co.washington.mn.us. Sincerely, Joe Gustafson, PE, PTOE Traffic Engineer Attachment: CC: Wayne Sandberg, Director/County Engineer Frank Ticknor, Deputy Director Lyssa Leitner, Planning DirectorJack Griffin, City of Lake Elmo Engineer DocuSign Envelope ID: F62C9C50-5448-4964-87DA-4DB07BD6C3F9 Future leŌ turn prohibiƟon or access closure PotenƟal future signal or roundabout Proposed Volleyball Facility Fire StaƟon “Brookfield 1” Old City Hall New City Hall SepƟc LE Elementary PotenƟal alternate access routes for 3825 parcel Access and Drainage Issues—Kokoro Volleyball Site DocuSign Envelope ID: F62C9C50-5448-4964-87DA-4DB07BD6C3F9 Memo File: 227705285 To: Ben Hetzel, City of Lake Elmo Planner Molly Just, City of Lake Elmo Planning Director From: Sarah Harding, Landscape Architect Subject: City of Lake Elmo Landscape Plan Review Kokoro Volleyball CUP and Variance Date: August 3, 2022 Submittals • Conditional Use Permit and Variance Application documents dated 6/23/2022; received 7/15/2022. • Tree Preservation Plan document, received 8/3/2022. • Landscape Plan, received 8/3/2022. Location: Southeast quadrant of Lake Elmo Avenue N and 39th Street N. Current Land Use Category: Village Mixed Use (V-MX) Future Land Use Category: Village Mixed Use (V-MU) within the MUSA Boundary Adjacent and Surrounding Land Use: Village Mixed Use (V-MX) to south and east, 39th Street and Village Mixed Use (V-MX) to north, and Lake Elmo Avenue and Village Low Density Residential (V-LDR) to west. Tree Preservation: Tree Preservation 105.12.470 • A tree preservation plan and subsequent mitigation requirements is required for all development or redevelopment in any Zoning District unless the applicant demonstrates that the proposed improvements do not impact existing significant trees on the site. • Tree replacement is required because more than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. Tree replacement calculations follow 105.12.470 (c)(7) and (8) and are noted below. • A tree preservation plan has been submitted but does not meet all requirements. − Delineation of all areas to be graded and limits of land disturbance. − Include measures to protect significant trees and/or the City Standard Detail for Tree Protection Fencing. • This project is an indoor athletic facility/commercial development; therefore, mitigation replacement trees noted below can be included toward landscape required tree counts. Entire Site Total Caliper Inches of Significant Trees On-Site: 470 Cal Inches Common Trees 61 Conifer/Evergreen Trees 36 Hardwood Trees 8 Nuisance Trees 365 Significant Tree Inches Removed On-Site 434 Cal Inches Common Trees 61 Conifer/Evergreen Trees 0 Hardwood Trees 8 Nuisance Trees 365 August 3, 2022 Ben Hetzel City Planner City of Lake Elmo Page 2 of 4 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 18.3 61 Subtract Conifer/Evergreen Tree Removals 10.8 0 Subtract Hardwood Tree Removals 2.4 8 Removals in excess of 30% allowances 48.3 Cal Inches Common Removals in Excess of 30% Allowance 42.7 Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 5.6 Common Tree Replacement Needed (1/4 the dia inches removed) 10.7 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 2.8 Cal Inches Common Tree Replacement Required @ 2.5" per Tree 5 # Trees Conifer Tree Replacement Required @ 3" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 2 # Trees Landscape Requirements: Landscape Requirements 105.12.480 • The landscape plan does not meet the code required minimum number of trees. Site Measurement Code Required Proposed Street Frontage (LF) 686 Total Linear Feet 686 Required Street Frontage Trees (1 per 50 LF) 14 10 Development or Disturbed Area (Acres) 2.35 Required Development Trees (5 per Acre) 12 6 Interior Parking Lot Spaces 105 Required Parking Lot Trees (1 per 15 Stalls) 7 2 Perimeter Parking Lot Frontage 413 Required Perimeter Lot Frontage Trees (1 per 50 LF) 9 Total Required Number of Trees 42 18 Required Mitigation Trees (Count Not Included in Total) 7 August 3, 2022 Ben Hetzel City Planner City of Lake Elmo Page 3 of 4 • The landscape plan does not meet the minimum compositions of required coniferous/evergreen and ornamental trees: Qty % Composition Deciduous Shade Trees 9 50% >25% required Coniferous Trees 3 17% >25% required Ornamental Trees 6 33% <15% required Tree Count 18 • A landscape plan has been submitted that does not include all requirements. − Prepared by a registered landscape architect in the state of Minnesota. o As an alternative to the minimum standards for landscape materials, a landscape plan prepared by a qualified professional certifying that said plan will meet the intent of this Section has not been indicated. − The location, size, quantity, and species of all existing and proposed plant materials. − Methods for protecting existing trees and other landscape material, consistent with 105.12.470. − Structural and all ground cover materials. − Provisions for irrigation and other water supplies. − Details and cross sections of all required screening. − Final slopes greater than 3:1 will not be permitted without special treatment such as terracing, retaining walls, or special ground covers. − The landscape plan does not include required City standard notes and details. − All property lines, easements, utilities, and pavements are not shown on the landscape plan to review for tree placement conflicts. − Final grading is not shown on the landscape plan to review for tree placement conflicts. • The development does not meet the interior parking lot landscaping requirements. − At least 5% of the interior area of parking lots with more than 30 parking spaces shall be devoted to landscape planting areas. The parking lot is 35,648 square feet per the site plan and interior parking islands measure approximately 880 square feet, or roughly 2.5% of the interior of the parking lot area. − The planting area includes 2 shade trees which does not satisfy the minimum required tree planting requirements for interior parking lots. • The development does not meet the perimeter parking lot landscaping requirements along Lake Elmo Ave N and 39th Street N. − A landscaped frontage strip of 8-feet in width shall be provided between parking areas and public streets, sidewalks, or paths, since the parking lot is over 100 spaces. o Within the frontage strip, screening has not been provided but shall consist of either a masonry wall, fence, berm, or hedge or combination that forms a screen a minimum of three and one-half (3.5) and a maximum of four (4) feet in height, and not less than fifty percent (50%) opaque on a year-round basis. o Trees shall be planted at a minimum of one deciduous tree per fifty (50) linear feet within the frontage strip. August 3, 2022 Ben Hetzel City Planner City of Lake Elmo Page 4 of 4 Recommendation: It is recommended that conditions of approval include: • Submit a revised tree preservation plan. • Submit a revised landscaping plan. Stantec Consulting Services Inc. Sarah Harding, PLA (MN) City of Lake Elmo Municipal Landscape Architect P: (952) 334-4838 E: sarah.harding@stantec.com To Whom It May Concern, My name is Faryn Wirkus, ETS Director of Operations and lead trainer at Kokoro Volleyball. Together we service and impact thousands of kids. The services provided to these kid’s assist them in developing into the best person they can become targeting mental, emotional, and physical growth. I have seen first-hand the difference Kokoro has made on the lives of these kids, Kokoro has become a second home for so many of them. This business is surrounded with caring, selfless adults that want to be resources and role models for these kids to help them reach their fullest potential in life. Kokoro teaches leadership, work ethic, how to be resilient, how to be a good teammate, friend, daughter, son, and how to be a positive member of society. The growth that has been made inside these four walls by these kids is something that they will carry with them through the rest of their lives. Kokoro offers and provides programming for our athletes, kids in the surrounding community, and adults. Everyone is always welcomed in with open arms and becomes part of the Kokoro family. This is the exact type of business that you want in this community because of the positive impact it has not only on the community but on the children, young adults, adults, and businesses in the area. I appreciate you taking the time to read my testimonial for Kokoro. Faryn Wirkus Director of Operations 1 Ben Hetzel From:Lisa Wielebnicki <lisa.wielebnicki@jvavolleyball.org> Sent:Tuesday, August 9, 2022 11:13 AM To:Ben Hetzel Subject:Kokoro Volleyball Caution: This email originated outside our organization; please use caution. Ben, It is my absolute pleasure to be writing to you in regards to Kokoro Volleyball and RT Luczak. My name is Lisa Wielebnicki and I am the Director of Member Development with the Junior Volleyball Association. I have been able to work with RT and Kokoro volleyball for many years and they have been leaders in growing the sport of volleyball and creating positive opportunities. They bring many events at low cost that are of high quality. This allows their customers to save hundreds of dollars and then creates more opportunity. Just wanted to reach out and let you know of the great things that Kokoro Volleyball brings to the community and the people that are involved. Thanks for your time, Lisa -- Lisa Wielebnicki JVA Director of Member Development O)414-640-1738 C)414-253-2026 Learn the secrets behind building and managing a successful club with the Club Management Guide! Only $49.99 for JVA Club Directors. Learn more here. www.jvavolleyball.org 1 Ben Hetzel From:Matt Frisbie <matt@frisbiecompanies.com> Sent:Friday, August 5, 2022 12:49 PM To:Ben Hetzel Cc:Shari Frisbie Subject:RE: Kokoro Volleyball Plans Caution: This email originated outside our organization; please use caution.   Ben –  Thank you for talking with me today and for sending of the plans for the volley facility.  We are part of the ownership  group with Arbor Glen and The Fields Senior Living across the street.    We have reviewed the info and talked with our directors and we think this would be a fine use for the property with a  couple of site layout comments:   During the school year the existing elementary school pick‐up line wraps all the way down Laverne Ave and then  all the way down 39th Street and cars trying to drive through have to be careful passing these “parked” cars  waiting for their turn to pick up.  They are often crossing into the oncoming lane to pass.  Is the school district  looking for ways to resolve this issue and re‐route parents?  So now we add kids being dropped off at the  volleyball center in the afternoon for practice, and with only one access drive there will be a bottle neck again at  39th Street at the single access drive for parents for pick up and drop off.      It looks like their on‐site parking is adequate but a reminder to the applicant that 39th Street is no parking.  Also,  just want to make sure they know that Arbor Glen is not their “overflow” parking lot.  (Don’t worry we are nice  neighbors)   Are the site civil engineering drawings complete?  The reason I ask is that the site plan is completely different  from what we had to engineer when we designed Arbor Glen and The Fields.  We worked closing with the city’s  engineering consultants the and watershed district because this whole area is very low and it is not possible to  overflow off the site because there is no overflow capacity in this area.  So we engineered massive and very  costly underground containment systems along with surface ponds to capture all of the storm water ‐ with very  limited outlet capacity.  The proposed site plan for the volleyball center shows one medium sized pond for all  the roof water and parking lot water – with a outlet pipe placed very low in the pond to allow flow off‐ site.  Again, we don’t believe this is not possible according to our recent work with the city engineers and the  watershed district.     It appears that they will not have a monument sign or and we want to verify that they are not asking for an  electronic reader sign on 39th.   They also don’t show a sidewalk connections to the city sidewalk/pathway to the north or the west (maybe  those are details still being worked out).     Parking layout and dimensions:  On our previous two project across the street we were required to have 20’  deep parking stalls with facing another stall and 18’ deep stalls when they face a curb and at 24’ wide drive aisle  between the rows of parking.  We also had to show the adequate fire access turning radius through our parking  lots and the radius at each corner is more generous than they are showing.  Again, maybe they haven’t been in  for engineering review yet.    Again, I think the use is fine and I’m sure they will be good neighbors and a good addition to Lake Elmo ‐ maybe my  comments are premature because they are still at the concept stage.  Thanks.  Matt    2   Matt Frisbie, AIA  Frisbie Companies  matt@frisbiecompanies.com  Cell: 612‐770‐5784      From: Ben Hetzel <BHetzel@lakeelmo.org>   Sent: Friday, August 5, 2022 11:52 AM  To: Matt Frisbie <matt@frisbiecompanies.com>  Subject: Kokoro Volleyball Plans     Matt,    See the attached plans for Kokoro Volleyball.  You can provide me public comment via email if you wish as well.  Keep in  mind that the Public Hearing is Monday night at 7:00 pm.    Ben Hetzel City Planner City of Lake Elmo 3800 Laverne Ave. N. Lake Elmo, MN 55042 651-747-3911     1 Ben Hetzel From:Christopher Thorsen <chris@tbn.cpa> Sent:Wednesday, August 10, 2022 6:41 AM To:Ben Hetzel Cc:Raymond Luczak Subject:Kokoro Volleyball Caution: This email originated outside our organization; please use caution.   Good morning Ben,    I would like to offer a resounding endorsement as to the positive impact the Kokoro Volleyball organization has had on  our community in North St. Paul.     Let me be clear this organization is a client of our accounting firm and has been for well over ten years.     During those ten years the business has grown significantly and has had a great impact on our City due to the many  visitors from competing organizations throughout the state.     The organization has been a member of our business association for many years of which I have served as president for  over 20 years.    This organization has continued to grow and will do so far into the future. Any community that has the chance to open  the doors to add this wonderful business to their community will certainly be pleased.    If you have any questions for me I would be very happy to assist you by either email or phone conversation.    Sincerely,    Christopher Thorsen  President – Thorsen, Breidinger & Novak – Certified Public Accountants    651‐259‐4000  1 Ben Hetzel From:North Juniors Director <director.northjuniorsvb@gmail.com> Sent:Monday, August 8, 2022 10:10 PM To:Ben Hetzel Subject:Kokoro Volleyball - Note Caution: This email originated outside our organization; please use caution. Good evening, Ben - I was speaking with RT, director of Kokoro Volleyball, and wanted to pass along a message about the positive impact they have had in the North St. Paul community. I have been involved with coaching at North St. Paul high school for roughly ten years as well as involved in the developmental club, North Juniors (North Juniors is a lower cost and less time intensive alternative to Kokoro). I've also dropped in to coach at Kokoro. For years, we've encouraged our high-school players to play their club season at Kokoro - not only for the exceptional training received, but for the environment that focuses on accountability, teamwork, mindfulness, and injury prevention. We see an increased progression, athletically and mentally, in the girls who are part of their program. It's a genuinely large community environment of athletes, parents, and coaches with an utmost focus on integrity. Having a club like this as part of the community has allowed for a positive (and close!) outlet for kids - a lasting impact whether they continue through their entire high school career or not. While I'm realizing Kokoro's potential relocation will be close, there will definitely be a void in the small downtown of North St. Paul - it will be missing its daily dose of excited athletes and their parents, which will surely be an energy shift! Thank you for your time. Best - Stephanie North Juniors (612) 805-0102 August 8, 2022 Lake Elmo City Council Members My name is Julie Garrison, I am a life-long resident of the east metro and currently reside in Woodbury Minnesota. I am writing on behalf of Kokoro Volleyball club and wanted to share my experience with this club with you. My daughter joined the program when she was 10 years old. Like many kids, she tried quite a few different sports and activities. Almost immediately, however, she found volleyball to be her passion. There are many best-in-class options in the Twin Cities for playing any sport/activity including volleyball. As I thought about where to send her to play, the one thing I went back to was that I am a believer of supporting businesses and working for organizations who demonstrate cultural values and commitments to individual growth and support. My daughter is now 19 years old and playing volleyball at the Division 1 level. In the recruitment process she was identified as having the skills to be in the program, which clearly Kokoro prepared and developed her for. Equally important, they asked about her as a person, how did she show up on and off the court and how her on and off the court presence impacted others. Kokoro has been part of the “village” that provided my daughter many of the life skills, behaviors and traits that have made her successful. And quite frankly in my experience, Kokoro is the only club that provides that type of support in the metro area. Our selection of being a Kokoro member was in large part due to the commitment and values of ‘mind body and spirit’ that is embedded in their program. This program offers mindfulness and yoga sessions, nutrition education, tutoring, strength training and mentorship. From the moment my daughter walked into the doors, she was supported by her coaches and the club who took the time to get to know her as a person. Kokoro taught her how to communicate with her leaders and teammates, how to set goals, how to navigate and be resilient in situations and how to be both a leader and a follower. It is also noteworthy that Kokoro has made numerous community commitments that involves players, either by volunteerism, or by fundraising for a variety of causes with tournaments or scrimmages. From that she learned about giving back and being part of an organization that values paying it forward. While she is now out of the program and on her way to adulthood, I remain a supporter and volunteer of Kokoro as I believe so strongly in the work they do. My daughter returned this summer to help coach and honestly to be in the gym with her “village.” This is a program/club/organization that is a value add to any community and provides invaluable support to athletes. Sincerely, Julie Garrison jgarrison1010@gmail.com CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION 2022-089 A RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR THE CONSTRUCTION OF INDOOR ATHLETIC FACILITY WITH CONDITIONS AT BROOKMAN 3RD ADDITION, LOT 1, BLOCK 1 WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Kokoro Volleyball (the "Applicant") has submitted an application to the City of Lake Elmo (the "City") for a Conditional Use Permit for the construction of an indoor athletic facility the property described as Brookman 3rd Addition, Lot 1, Block 1 (PID# 1302921220011) (the "Property"); and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on August 8, 2022; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated October 4, 2022; and WHEREAS, the City Council considered said matter at its October 4, 2022 meeting; and NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo Zoning Ordinance, Section 105.12.290. 2) That all the submission requirements of said Section 105.12.290 have been met by the Applicant. 3) That the proposed Conditional Use Permit is for the construction of an indoor athletic facility. 4) The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The proposed use should not be detrimental or in any way endanger the public health, safety, comfort, convenience, or general welfare of the neighborhood. 5) The use or development conforms to the City of Lake Elmo Comprehensive Plan. The proposal conforms to the Comprehensive Plan. 6) The use or development is compatible with the existing neighborhood. The proposed use is permitted in the Village Mixed Use District as a Conditional Use. The properties to the south and west are non-residential uses (City Hall and Day Care Center). The residential development to the west is separated by Lake Elmo Ave and the senior living center to north gathers a congregation of people similar to that of the indoor recreation facility. 7) The proposed use meets all specific development standards for such use listed in the Zoning Code. The proposed use requires a minimum of two accesses as per 105.12.550. This criteria would be satisfied with the proposed variance approval. 8) If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Article XIX (Shoreland Management) and Title I 00 (Flood Plain Management). The proposed use must meet the Shoreland Regulations. 9) The proposed use will be designed, constructed, operated, and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed use will be compatible in appearance with the existing character of the general vicinity and will not change the essential character of the area. I0) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use of an indoor athletic facility should not create be hazardous or create a nuisance. All activities shall be contained indoors and the conditions of approval are written to mitigate any potential nuisances. 11) The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed chapel will be adequately served by public services. 12) The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The applicant has provided a stormwater management plan that contains all stormwater onsite, as there is no other available stormwater storage in area. A indoor athletic facility should draw people closer to the Old Village of Lake Elmo and the businesses located there. 13) The proposed use will not involve uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors. The proposed use will not produce noise, smoke, fumes, glare or odors. Traffic amounts will increase in the area, but these increases will occur during typical low traffic volume time periods. All activities are to occur indoors. 14) Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic amounts will increase in the area, but these increases will occur during typical low traffic volume time periods. Vehicle queuing for possible pickups and drop offs shall be contained to the site as per the conditions of approval. 15) The proposed use will not result in the destruction, loss, or damage of a natural or scenic feature of major importance. The proposed use should not impact natural or scenic features. 16) That, in accordance with City Code Section 105.12.290, the construction of a chapel shall be permissible under the Conditions 1-5 as provided in the decision below, and incorporated herein: DECISION NOW, THEREFORE, BE IT FURTHER RESOLVED, and based upon the information received and the above Findings, that the City Council of the City of Lake Elmo hereby approves the request by Carmelite Hermitage of the Blessed Virgin Mary for a Conditional Use Permit for the construction of a chapel on the property located at 8249 Demontreville Trail North, and grants the same, subject to the following conditions of approval: 1. The applicant must obtain all other necessary City, State, and other governing body permits and approvals before the commencement of any construction activity on the site. These include, but not limited to, City of Lake Elmo grading permit, Minnesota Pollution Control Agency stormwater permit, Valley Branch Watershed District permit, approval of revised plans from the City Engineer, and a building permit. 2. No construction may begin until all items and changes outlined by the City Engineer in the memorandum dated September 19, 2022 are addressed. 3. No construction may begin until all items and changes outlined by the Fire Department’s memorandum dated July 26, 2022 are addressed. 4. Plans must be revised to comply with the landscape requirements of City Code Article VIII Environmental Standards and the City Landscapes Architect’s memorandum dated August 3, 2022. 5. The applicant shall provide the City with proof approval of a Minnesota Pollution Control Agency stormwater permit and a Valley Branch Watershed District stormwater permit prior to any construction. 6. The applicant must meet all requirements of the Lake Elmo Building Official. 7. Any vehicle queuing shall be contained within the parking lot onsite. 8. The applicant must demonstrate the availability of overflow parking prior to any construction. 9. No parking may occur along 39th Street N. 10. The hours of operation shall be limited to 3:30 pm – 9:30 pm Monday through Friday and 8:00 am – 4:00 pm Saturday through Sunday. 11. If substantial construction has not taken place within 12 months of the City’s approval, the conditional use permit and variance shall become void. Passed and duly adopted this 4th day of October, 2022 by the City Council of the City of Lake Elmo, Minnesota. ____________________________________ Mayor Charles Cadenhead ATTEST: _______________________________ Julie Johnson, City Clerk 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA RESOLUTION NO. 2022-090 A RESOLUTION APPROVING A VARIANCE WITH CONDITIONS TO ALLOW ONE ACCESS ONTO A PUBLIC STREET WHERE A MINIMUM OF TWO ARE REQUIRED AT BROOKMAN 3RD ADDITION, LOT 1, BLOCK 1. WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Kokoro Volleyball (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a variance to allow one access onto a public street where a minimum of two are required at the property described as Brookman 3rd Addition, Lot 1, Block 1 (PID# 1302921220011) (the “Property”); and WHEREAS, notice has been published, mailed, and posted pursuant to the Lake Elmo Zoning Code, Section 103.00.120; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on August 8, 2022; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated October 4, 2022; and WHEREAS, the City Council considered said matter at its October 4, 2022 meeting and directed City staff to draft a resolution approving the variance with conditions for its consideration; and NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) That the procedures for obtaining a variance are found in Section 105.12.320 of the Lake Elmo Zoning Code. 2) That all submission requirements of Section 105.12.320 of the Lake Elmo Zoning Code have been met by the Applicant. 3) That the proposed variance includes the following components: 2 a) The applicant proposes to construct an indoor athletic facility on the property. Lake Elmo City Code requires a minimum of 2 accesses as per Section 105.12.550. b) The Lake Elmo City Council approved Resolution No. 2022-089, approving a conditional use permit for an indoor athletic facility on the property. 4) Practical Difficulties as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control: The applicant is unable to obtain a second access point as required by City Code for an indoor athletic facility. Access along Lake Elmo Ave N would require Washington County approval. Washington County will not support an access along Lake Elmo Ave N due to the existing turn lane and proximity to the intersection of 39th Street North and Lake Elmo Ave N. The applicant explored other alternatives that were denied, such as a shared access with the existing Day Care Center access to the south. The County would like to remove the day care access in the future with an alternative access. Washington County has recommended to not move the proposed Kokoro Volleyball access any closer to Lake Elmo Ave. 5) Unique Circumstances the plight of the landowner is due to circumstances not created by the landowner: The unique circumstances were not created by the applicant or property owner. The existing turn lane and intersection were not created by the applicant or property owner. Nor is the proposed site design prohibiting a second access opportunity. 6) Character of Locality the proposed variance will not alter the essential character of the locality in which the property in question is located: The request will not alter the essential character. The proposed single access is to align directly across from the existing Senior Living Facility. The directly adjacent parcels are also of a nonresidential use. Adjacent parcels to the south and east also have one access. 7) Adjacent Properties and Traffic the proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood: The proposed request should not impair adjacent property values. Traffic numbers will increase, but these increases will occur during typical low traffic volume times. Hours of operation are proposed between as 3:30 pm- 9:30 pm Monday-Friday and 8am -4pm Saturday and Sunday. 3 DECISION NOW, THEREFORE, BE IT FURTHER RESOLVED, and based upon the information received and the above Findings, that the City Council of the City of Lake Elmo hereby approves the request from Kokoro Volleyball for a variance to allow one access where a minimum of two are required. Passed and duly adopted this 4th day of October, 2022 by the City Council of the City of Lake Elmo, Minnesota. ____________________________________ Mayor Charles Cadenhead ATTEST: _______________________________ Julie Johnson, City Clerk