HomeMy WebLinkAbout#17 - Parkview-Cardinal Pay Req 3 STAFF REPORT DATE: October 18, 2022 CONSENT AGENDA ITEM: Approve Pay Request No. 3 for the Parkview-Cardinal Neighborhood Street and Utility Improvements SUBMITTED BY: Mark Scholle, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 3 for the Parkview-Cardinal Neighborhood Street and Utility Improvements? BACKGROUND: T.A. Schifsky and Sons, Inc. was awarded a construction contract on April 6, 2022 to complete the Parkview-Cardinal Neighborhood Street and Utility Improvements. Work remains in progress with a substantial completion date of October 14, 2022 and final completion date of November 24, 2022. A change order is being prepared to extend the completion date for the Cardinal Ridge subdivision (Ivy Avenue) to allow for the delivery of ductile iron pipe for installing the watermain through open trenching. This work will be completed in the spring 2023. PROPOSAL DETAILS/ANALYSIS: T.A. Schifsky and Sons, Inc. has submitted Partial Pay Request No. 3 in the amount of $668,788.71. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $108,973.08. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 3 for the Parkview-Cardinal Neighborhood Street and Utility Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 3 to T.A. Schifsky, and Sons, Inc., in the amount of $668,788.71 for the Parkview-Cardinal Neighborhood Street and Utility Improvements”. ATTACHMENTS: 1. Partial Pay Estimate No. 3. PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER:CONTRACTOR: 1. Original Contract Amount 2. Net Change Order Sum 3. Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6. Subtotal (4+5) 7. Retainage* 8. Previous Payments 9. Amount Due (6-7-8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION:X FINAL COMPLETION: ENGINEER'S CERTIFICATION:FOCUS Engineering, inc. DATE CONTRACTOR'S CERTIFICATION:CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE No.Approval Date Amount $3,309,523.20 Additions Deductions $42,082.61 2 9/20/2022 $12,452.00 $2,179,461.55 1 8/12/2022 $29,630.61 $3,351,605.81 $2,179,461.55 $0.00 $1,401,699.76 $108,973.085.0% CONTRACT TIME TOTALS $42,082.61 $0.00 $668,788.71 NET CHANGE $42,082.61 CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 3 9/30/20229/1/2022FROM PARKVIEW-CARDINAL NBRHD STREET & UTILITY IMPROVEMENTS PROJECT NO. 2020.121 CITY OF LAKE ELMO 3800 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: JACK GRIFFIN, CITY ENGINEER T.A. SCHIFSKY & SONS, INC. 2370 HIGHWAY 36 EAST NORTH ST. PAUL, MN 55109 ATTN: HANK DABRUZZI 7/5/2022 11/24/2022 REVISED DAYS REMAINING 142 0 55 10/14/2022 ORIGINAL DAYS BY BY YES NO The undersigned Contractor certifies that to the best of their knowledge, information and belief the work covered by this payment estimate has been completed in accordance with the contract documents, that all amounts have been paid by the contractor for work for which previous payment estimates was issued and payments received from the owner, and that current payment shown herein is now due. The undersigned certifies that the work has been reviewed and to the best of their knowledge and belief, the quantities shown in this estimate are correct and the work has been performed in accordance with the contract documents. ENGINEER BY FOCUS Engineering, inc.PROJECT PAYMENT FORM 10-11-2022 10/11/2022 PARTIAL PAY ESTIMATE NO.3 PARKVIEW-CARDINAL NBRHD STREET & UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2020.121 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $150,000.00 $150,000.00 0.00 $0.00 1.00 $150,000.00 2 LS 1 $75,000.00 $75,000.00 0.25 $18,750.00 0.75 $56,250.00 3 EA 10 $125.00 $1,250.00 0.00 $0.00 7.00 $875.00 4 EA 33 $125.00 $4,125.00 11.00 $1,375.00 11.00 $1,375.00 5 LF 500 $3.00 $1,500.00 0.00 $0.00 930.00 $2,790.00 6 EA 4 $468.00 $1,872.00 30.00 $14,040.00 31.00 $14,508.00 7 EA 4 $104.00 $416.00 13.00 $1,352.00 14.00 $1,456.00 8 EA 6 $780.00 $4,680.00 2.00 $1,560.00 2.00 $1,560.00 9 EA 2 $962.00 $1,924.00 0.00 $0.00 2.00 $1,924.00 10 EA 21 $7,855.12 $164,957.52 3.00 $23,565.36 17.00 $133,537.04 11 LF 11 $1,034.80 $11,382.80 0.00 $0.00 1.00 $1,034.80 12 SF 76 $72.80 $5,532.80 0.00 $0.00 0.00 $0.00 13 EA 21 $4,160.00 $87,360.00 3.00 $12,480.00 17.00 $70,720.00 14 EA 17 $4,784.00 $81,328.00 1.00 $4,784.00 15.00 $71,760.00 15 LF 38 $80.08 $3,043.04 6.00 $480.48 6.00 $480.48 16 EA 41 $435.76 $17,866.16 4.00 $1,743.04 31.00 $13,508.56 17 EA 22 $612.56 $13,476.32 9.00 $5,513.04 16.00 $9,800.96 18 EA 41 $395.20 $16,203.20 4.00 $1,580.80 31.00 $12,251.20 19 EA 22 $635.44 $13,979.68 9.00 $5,718.96 16.00 $10,167.04 20 EA 1 $616.72 $616.72 0.00 $0.00 0.00 $0.00 21 LF 1930 $45.76 $88,316.80 123.00 $5,628.48 1,418.35 $64,903.70 22 LF 770 $54.08 $41,641.60 471.00 $25,471.68 710.00 $38,396.80 23 LF 630 $41.60 $26,208.00 0.00 $0.00 0.00 $0.00 24 LF 250 $67.60 $16,900.00 39.00 $2,636.40 148.00 $10,004.80 25 LF 11950 $74.88 $894,816.00 111.00 $8,311.68 10,114.00 $757,336.32 26 LB 2800 $7.28 $20,384.00 450.00 $3,276.00 2,579.00 $18,775.12 27 EA 55 $826.80 $45,474.00 4.00 $3,307.20 49.00 $40,513.20 28 SY 22 $82.16 $1,807.52 0.00 $0.00 7.20 $591.55 29 LF 7 $75.92 $531.44 0.00 $0.00 0.00 $0.00 30 EA 1 $764.40 $764.40 0.00 $0.00 0.00 $0.00 31 EA 3 $1,560.00 $4,680.00 0.00 $0.00 0.00 $0.00 32 EA 2 $587.60 $1,175.20 2.00 $1,175.20 2.00 $1,175.20 33 EA 1 $2,704.00 $2,704.00 0.00 $0.00 0.00 $0.00 34 EA 1 $3,744.00 $3,744.00 0.00 $0.00 0.00 $0.00 35 EA 2 $346.32 $692.64 2.00 $692.64 2.00 $692.64 36 LF 40 $126.88 $5,075.20 40.00 $5,075.20 40.00 $5,075.20 37 EA 5 $1,118.00 $5,590.00 4.00 $4,472.00 4.00 $4,472.00 38 CY 40 $166.40 $6,656.00 14.00 $2,329.60 14.00 $2,329.60 39 CY 2 $166.40 $332.80 0.00 $0.00 0.00 $0.00 40 LF 630 $5.20 $3,276.00 154.00 $800.80 154.00 $800.80 41 EA 8 $114.40 $915.20 3.00 $343.20 3.00 $343.20 42 LF 310 $15.00 $4,650.00 210.00 $3,150.00 210.00 $3,150.00 43 EA 8 $1,200.00 $9,600.00 0.00 $0.00 0.00 $0.00 44 EA 3 $1,100.00 $3,300.00 3.00 $3,300.00 3.00 $3,300.00 45 EA 2 $1,100.00 $2,200.00 2.00 $2,200.00 2.00 $2,200.00 46 EA 1 $1,275.00 $1,275.00 0.00 $0.00 1.00 $1,275.00 47 EA 1 $925.00 $925.00 0.00 $0.00 0.00 $0.00 48 EA 56 $100.00 $5,600.00 0.00 $0.00 15.00 $1,500.00 49 EA 63 $25.00 $1,575.00 0.00 $0.00 63.00 $1,575.00 50 LF 750 $1.87 $1,402.50 508.00 $949.96 576.00 $1,077.12 51 LF 610 $5.15 $3,141.50 136.00 $700.40 403.00 $2,075.45 52 SY 490 $5.00 $2,450.00 505.00 $2,525.00 692.00 $3,460.00 53 SY 420 $10.00 $4,200.00 161.70 $1,617.00 439.90 $4,399.00 54 LF 130 $8.00 $1,040.00 50.00 $400.00 50.00 $400.00 55 SY 35590 $4.00 $142,360.00 23,085.00 $92,340.00 29,115.00 $116,460.00 56 CY 3680 $0.01 $36.80 3,010.00 $30.10 3,010.00 $30.10 57 CY 110 $0.01 $1.10 114.00 $1.14 258.25 $2.58 58 TN 140 $0.01 $1.40 0.00 $0.00 0.00 $0.00 59 CY 130 $0.01 $1.30 1,537.11 $15.37 1,666.61 $16.67 60 TN 390 $25.00 $9,750.00 0.00 $0.00 0.00 $0.00 61 TN 40 $25.00 $1,000.00 0.00 $0.00 0.00 $0.00 62 EA 12 $1,700.00 $20,400.00 4.00 $6,800.00 4.00 $6,800.00 SELECT GRANULAR BORROW SALVAGE AND REINSTALL RECLAIM MATERIAL (CV) AGGREGATE SHOULDER, CLASS 2 PATCH GRAVEL DRIVEWAY CORE DRILL 4" DRAIN TILE CONNECTION INTO EXISTING CATCH BASIN REMOVE AND REPLACE CASTING AND RINGS (R-3015-L) REMOVE AND REPLACE CASTING AND RINGS (R-3067-VB) REMOVE AND REPLACE CASTING AND RINGS (R-3067-V) REMOVE AND REPLACE CASTING AND RINGS (R-1642-B) SALVAGE AND REINSTALL CASTING W/ NEW RINGS SALVAGE & REINSTALL MAILBOX TEMPORARY MAILBOX SAWCUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY / TRAIL) REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL HAUL EXCESS RECLAIMED MATERIAL OFF-SITE (LV) COMMON EXCAVATION - WIDENING AREAS REMOVE AND REPLACE RIPRAP (CL III WITH FABRIC) RIPRAP, CLASS III JET / CLEAN STORM PIPE CLEAN OUT (VACUUM) SUMP DITCH GRADING 2'X3' CATCH BASIN WITH CASTING PER DETAIL 404 4' DIA CBMH WITH CASTING PER DETAIL 406 SALVAGE AND REINSTALL 18" RCP FLARED END SECTION 18" RCP STORM SEWER, CLASS 5 PATCH DOGHOUSE/INVERT 4" INSULATION REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE CONNECT EXISTING STORM SEWER PIPE TO NEW STRUCTURE CONNECT TO EXISTING STORM SEWER PIPE 1" CURB STOP & BOX 1.5" CURB STOP & BOX CURB BOX CASTING 1" TYPE "K" COPPER WATER SERVICE 1.5" TYPE "K" COPPER WATER SERVICE 1.5" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL 6" DIP, CL. 52 WATERMAIN, INCL POLY WRAP 10" HDPE WATERMAIN, DIRECTIONAL DRILL DUCTILE IRON FITTINGS 10" HDPE TO 8" DIP TRANSITION FITTING ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE MOBILIZATION HYDRANT 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX VALVE BOX EXTENSION 1" CORPORATION STOP W/ SADDLE 1.5" CORPORATION STOP W/ SADDLE HYDRANT EXTENSION CONCRETE HYDRANT SPLASH PAD TRAFFIC CONTROL CATCH BASIN INLET PROTECTION CULVERT INLET PROTECTION SILT FENCE, MACHINE SLICED CLEARING GRUBBING CLEAR BRUSH AT STRUCTURE / END SECTION CONNECT TO EXISTING 8" WATERMAIN QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNTITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 63 LF 800 $27.00 $21,600.00 215.00 $5,805.00 215.00 $5,805.00 64 EA 16 $250.00 $4,000.00 4.00 $1,000.00 4.00 $1,000.00 65 CY 1250 $0.01 $12.50 95.00 $0.95 95.00 $0.95 66 RS 104 $325.00 $33,800.00 84.00 $27,300.00 106.00 $34,450.00 67 LS 1 $25,000.00 $25,000.00 0.30 $7,500.00 0.90 $22,500.00 68 TN 3220 $82.95 $267,099.00 0.00 $0.00 0.00 $0.00 69 TN 4290 $81.90 $351,351.00 2,866.64 $234,777.82 2,866.64 $234,777.82 70 GAL 2380 $0.01 $23.80 175.00 $1.75 175.00 $1.75 71 SY 410 $28.00 $11,480.00 777.00 $21,756.00 777.00 $21,756.00 72 LF 8420 $15.24 $128,320.80 485.00 $7,391.40 485.00 $7,391.40 73 LF 630 $19.86 $12,511.80 694.00 $13,782.84 832.00 $16,523.52 74 LF 210 $22.88 $4,804.80 31.00 $709.28 228.00 $5,216.64 75 LF 160 $27.04 $4,326.40 75.00 $2,028.00 75.00 $2,028.00 76 LF 7900 $11.18 $88,322.00 4,151.00 $46,408.18 7,867.00 $87,953.06 77 LS 1 $2,340.00 $2,340.00 0.00 $0.00 0.00 $0.00 78 SF 80 $9.36 $748.80 0.00 $0.00 0.00 $0.00 79 SF 120 $12.48 $1,497.60 0.00 $0.00 0.00 $0.00 80 SY 420 $96.72 $40,622.40 302.86 $29,292.62 448.86 $43,413.74 81 SY 20 $150.80 $3,016.00 0.00 $0.00 0.00 $0.00 82 SF 610 $21.84 $13,322.40 0.00 $0.00 0.00 $0.00 83 SF 112 $48.88 $5,474.56 0.00 $0.00 0.00 $0.00 84 SF 100 $5.00 $500.00 0.00 $0.00 0.00 $0.00 85 EA 5 $425.00 $2,125.00 7.00 $2,975.00 7.00 $2,975.00 86 EA 17 $26.00 $442.00 0.00 $0.00 0.00 $0.00 87 EA 1 $36.40 $36.40 0.00 $0.00 0.00 $0.00 88 EA 4 $119.60 $478.40 0.00 $0.00 0.00 $0.00 89 SF 100 $93.60 $9,360.00 0.00 $0.00 0.00 $0.00 90 EA 8 $98.80 $790.40 0.00 $0.00 0.00 $0.00 91 EA 3 $364.00 $1,092.00 0.00 $0.00 0.00 $0.00 92 CY 3950 $0.01 $39.50 194.00 $1.94 194.00 $1.94 93 SY 14110 $5.72 $80,709.20 0.00 $0.00 0.00 $0.00 94 SY 13390 $10.92 $146,218.80 0.00 $0.00 0.00 $0.00 95 HR 30 $165.00 $4,950.00 19.00 $3,135.00 27.00 $4,455.00 $3,309,523.20 $674,357.51 $2,137,378.94 TOTALS - BASE CONTRACT $3,309,523.20 $674,357.51 $2,137,378.94 CO1-1 LS 1 $29,630.61 $29,630.61 1.00 $29,630.61 1.00 $29,630.61 $29,630.61 $29,630.61 $29,630.61 CO2-1 LS 1 $1,430.00 $1,430.00 0.00 $0.00 1.00 $1,430.00 CO2-2 LS 1 $4,372.50 $4,372.50 0.00 $0.00 1.00 $4,372.50 CO2-3 LS 1 $2,392.50 $2,392.50 0.00 $0.00 1.00 $2,392.50 CO2-4 LS 1 $4,257.00 $4,257.00 0.00 $0.00 1.00 $4,257.00 $12,452.00 $0.00 $12,452.00 TOTALS - REVISED CONTRACT $3,351,605.81 $703,988.12 $2,179,461.55 CHANGE ORDER NO. 1 HYDROEXCAVATION 8/2/22 HYDROEXCAVATION 8/3/22 HYDROEXCAVATION 8/9/22 PRIVATE SANITARY SEWER FORCEMAIN REPAIR SUBTOTAL - CHANGE ORDER NO. 2 6" CONCRETE DRIVEWAY PAVEMENT B612 CONCRETE CURB AND GUTTER D312 CONCRETE CURB AND GUTTER SURMOUNTABLE CONCRETE CURB AND GUTTER RIBBON CONCRETE CURB CONCRETE MATURITY TESTING 4" CONCRETE SIDEWALK 6" CONCRETE FLUME TOPSOIL BORROW (LV) SEED MIXTURE 25-131 & EROSION CONTROL BLANKET SOD STREET SWEEPER WITH PICK UP BROOM REMOVE BARRICADE SALVAGE AND REINSTALL SIGN SIGN PANELS TYPE C STREET NAME BLADE PERMANENT BARRICADE 6" CONCRETE PEDESTRIAN RAMP TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] BITUMINOUS MATERIAL FOR TACK COAT PATCH BITUMINOUS DRIVEWAY / TRAIL B418 CONCRETE CURB & GUTTER SUBGRADE PREPARATION OF RECLAIMED SURFACE SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) TRUNCATED DOME PANELS SALVAGE AND REINSTALL PAVERS ADJUST VALVE BOX REMOVE SIGN AND POST CONCRETE APPROACH NOSE 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAP DRAIN TILE CLEANOUT SUBGRADE CORRECTION (EV) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] SUBTOTAL - CHANGE ORDER NO. 1 ADD TRACER WIRE FOR ALL PROJECT SERVICES AND HYDRANTS CHANGE ORDER NO. 2