Loading...
HomeMy WebLinkAbout#10 - Section 16 Sanitary Sewer STAFF REPORT DATE: November 1, 2022 CONSENT AGENDA ITEM: Accept Improvements, Approve Compensating Change Order No. 2, and Approve Pay Request No. 3 (Final) for Section 16 Sanitary Sewer Extension SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements, approve Compensating Change Order No. 2 and approve Pay Request No. 3 (Final) for the Section 16 Sanitary Sewer Extension? BACKGROUND: Park Construction Company was awarded a construction contract on May 3, 2022 to complete the Section 16 Sanitary Sewer Extension project. The contractor has now completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: A compensating change order has been prepared and executed for the project to reconcile the estimated and actual quantities installed. With approval of this compensating change order the contract amount will be adjusted to reflect the actual final project quantities. In addition, Park Construction Company has submitted Partial Pay Request No. 3 (Final) in the amount of $21,697.64. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on November 1, 2022 and will extend through November 1, 2023. FISCAL IMPACT: None. Final payment is being recommended within the authorized scope and budget for the project. The final construction contract amount of $420,481.66 is 1.5% under the original construction contract amount of $426,911.00. The compensating change order will officially decrease the final construction contract amount by $8,896.68. The estimated final total project cost is $552,300 compared to an approved total project budget of $616,600. The estimated final total project cost includes a $7,000 contingency to account for final professional invoices and warranty period inspections. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements, approve Compensating Change Order No. 2 and approve Pay Request No. 3 (Final) for the Section 16 Sanitary Sewer Extension. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements for the Section 16 Sanitary Sewer Extension, approve Compensating Change Order No. 2 decreasing the contract amount by $8,896.68, and approve Pay Request No. 3 (Final) to Park Construction Company in the amount of $21,697.64”. ATTACHMENTS: 1. Compensating Change Order No. 2. 2. Partial Pay Estimate No. 3 (Final). 3. Certificate of Completion. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. 2 DATE: TO: UNIT Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO #1) $ Contract Amount to date $ Amount of this Change Order (ADD) (DEDUCT) (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be (UNCHANGED) (INCREASED) (DECREASED)days APPROVED BY ENGINEER: FOCUS Engineering, inc. APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER: CITY OF LAKE ELMO, MINNESOTA DATE DATE BYENGINEER 9/27/2022 426,911.00 2,467.34 429,378.34 (8,896.68) 420,481.66 Park Construction, 1481 81st Ave NE, Minneapolis, MN 55432 SECTION 16 INFRASTRUCTURE IMPROVMENTS PROJECT NO. 2021.116 September 27, 2022 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are modified as follows upon execution of this Change Order. INCREASE/(DECREASE)ITEM NET CONTRACT CHANGE ($8,896.68) CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: Per the project Contract Documents the original contract amount and basis of award is established using the estimated quantities for each item of work listed in the bid schedule and multiplying them by the Contractor’s corresponding unit bid price. The Contractor is paid for the actual final quantities installed on the project at the unit bid prices. At the completion of the project, a compensating change order is prepared to revise the estimated quantities for each work item listed in the bid schedule to the actual quantities installed and the corresponding Contract Amount is revised accordingly. This compensating change order reflects a net decrease to the contract amount by $8,896.68. Attachments (list documents supporting change):N/A DESCRIPTION OF PAY ITEM QTY UNIT PRICE **See attached itemization FOCUS Engineering, inc.CHANGE ORDER FORM CHANGE ORDER NO. 2 SECTION 16 INFRASTRUCTURE IMPROVMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2021.116 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT 1 LS 1 $40,300.00 $40,300.00 1 $40,300.00 0 $0.00 2 ACRE 0.6 $8,700.00 $5,220.00 0.6 $5,220.00 0 $0.00 3 EACH 10 $325.00 $3,250.00 10 $3,250.00 0 $0.00 4 LF 150 $48.50 $7,275.00 146.5 $7,105.25 -3.5 -$169.75 5 SY 2003 $7.50 $15,022.50 2003 $15,022.50 0 $0.00 6 LF 894 $3.05 $2,726.70 907.5 $2,767.88 13.5 $41.18 7 CY 405 $25.40 $10,287.00 405 $10,287.00 0 $0.00 8 CY 1000 $0.01 $10.00 462 $4.62 -538 -$5.38 9 CY 901 $29.00 $26,129.00 901 $26,129.00 0 $0.00 10 CY 1306 $29.00 $37,874.00 1306 $37,874.00 0 $0.00 11 SY 600 $3.15 $1,890.00 102 $321.30 -498 -$1,568.70 12 HR 15 $145.00 $2,175.00 12 $1,740.00 -3 -$435.00 13 GAL 122 $4.05 $494.10 75 $303.75 -47 -$190.35 14 TON 370 $100.00 $37,000.00 363.2 $36,320.00 -6.8 -$680.00 15 TON 260 $116.00 $30,160.00 263.9 $30,612.40 3.9 $452.40 16 TON 4 $291.00 $1,164.00 3 $873.00 -1 -$291.00 17 EACH 4 $6,380.00 $25,520.00 4 $25,520.00 0 $0.00 18 EACH 1 $11,100.00 $11,100.00 1 $11,100.00 0 $0.00 19 LF 19 $310.00 $5,890.00 19.3 $5,983.00 0.3 $93.00 20 LF 7 $474.00 $3,318.00 6.38 $3,024.12 -0.62 -$293.88 21 LF 841 $82.40 $69,298.40 838.5 $69,092.40 -2.5 -$206.00 22 LF 841 $3.30 $2,775.30 838.5 $2,767.05 -2.5 -$8.25 23 LF 40 $1,600.00 $64,000.00 40 $64,000.00 0 $0.00 24 TON 100 $10.00 $1,000.00 0 $0.00 -100 -$1,000.00 25 SY 15 $26.20 $393.00 0 $0.00 -15 -$393.00 26 LF 150 $24.10 $3,615.00 80 $1,928.00 -70 -$1,687.00 27 LS 1 $4,900.00 $4,900.00 1 $4,900.00 0 $0.00 28 LF 1120 $1.70 $1,904.00 1298 $2,206.60 178 $302.60 29 EA 1 $1,520.00 $1,520.00 1 $1,520.00 0 $0.00 30 LF 300 $2.30 $690.00 0 $0.00 -300 -$690.00 31 CY 100 $45.30 $4,530.00 0 $0.00 -100 -$4,530.00 32 SY 1000 $1.55 $1,550.00 1019 $1,579.45 19 $29.45 33 ACRE 0.6 $1,250.00 $750.00 0.79 $987.50 0.19 $237.50 34 EACH 4 $150.00 $600.00 7 $1,050.00 3 $450.00 35 SF 16 $11.50 $184.00 16 $184.00 0 $0.00 36 LF 730 $1.10 $803.00 1855 $2,040.50 1125 $1,237.50 37 LF 26 $10.50 $273.00 24 $252.00 -2 -$21.00 38 LF 600 $2.20 $1,320.00 795 $1,749.00 195 $429.00 BASE BID $426,911.00 $418,014.32 -$8,896.68 CHANGE ORDER NO. 1 CO1-1 LS 1 $2,467.34 $2,467.34 1 $2,467.34 0.00 $0.00 TOTALS - CHANGE ORDER NO. 1 $2,467.34 $2,467.34 $0.00 TOTALS - REVISED CONTRACT $429,378.34 $420,481.66 -$8,896.68 TOTAL TO DATE TYPE SP 12.5 WEARING COURSE MIX (3,B) AGGREGATE BASE CLASS 5 (P) TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) - BIKE PATH SANITARY MANHOLE (48") W/ CASTING (0-10') ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT BITUMINOUS MATERIAL FOR TACK COAT SAWING BIT PAVEMENT (FULL DEPTH) COMPENSATING CHANGE ORDER NO. 2 ROCK EXCAVATION IN SANITARY SEWER PIPE ZONE MOBILIZATION CLEAR & GRUB SALVAGE & INSTALL SIGN (TYPE C OR STREET NAME SIGN) REMOVE & REPLACE CONCRETE CURB AND GUTTER (B618) REMOVE BITUMINOUS PAVEMENT SUBGRADE CORRECTION (EV) (INCLUDES SGB - MOD 5% ) SELECT GRANULAR BORROW (MOD - 5%) (CV) (P) COMMON EXCAVATION (EV) GEOTEXTILE FABRIC TYPE V STREET SWEEPING SANITARY MANHOLE (60") W/ CASTING (0-10') SANITARY SEWER MANHOLE EXTRA DEPTH (48") (OVER 10') SANITARY SEWER MANHOLE EXTRA DEPTH (60") (OVER 10') 10" PVC PIPE SEWER (SDR 26) CLEAN AND TELEVISE SANITARY SEWER 24" CASING PIPE (JACKED/AUGERED/RAMMED) PIPE FOUNDATION ROCK 2" RIGID INSULATION 4" PVC PERF EDGE DRAIN W/ BACKFILL AND WRAP TRAFFIC CONTROL SILT FENCE, TYPE PA TEMPORARY ROCK CONSTRUCTION ENTRANCE SEDIMENT CONTROL LOG COMMON TOPSOIL BORROW (PULVERIZED) (LV) 12" SOLID LINE WHITE MULTI-COMP 4" DOUBLE YELLOW MULTI-COMP SEEDING (SEED MIXTURE 25-141) W/ EROSION CONTROL BLANKET (3N) SEEDING (SEED MIXTURE 25-131) STORM DRAIN INLET PROTECTION PAVEMENT MESSAGE MULTI-COMP (RIGHT ARROW) 4" SOLID LINE WHITE MULTI-COMP PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER: CONTRACTOR: 1. Original Contract Amount 2. Net Change Order Sum 3. Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6. Subtotal (4+5) 7. Retainage* 8. Previous Payments 9. Amount Due (6‐7‐8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION:X FINAL COMPLETION: ENGINEER'S CERTIFICATION: FOCUS Engineering, inc. DATE CONTRACTOR'S CERTIFICATION: CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE No.Approval  Date Amount $426,911.00 Additions Deductions ‐$6,429.34 2 9/27/2022 $8,896.68 $420,481.66 1 6/28/2022 $2,467.34 $420,481.66 $420,481.66 $0.00 $398,784.02 $0.000.0% CONTRACT TIME TOTALS $2,467.34 $8,896.68 $21,697.64 NET CHANGE ($6,429.34) CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 3 (Final) 9/27/20228/1/2022FROM SECTION 16 INFRASTRUCTURE IMPROVEMENTS PROJECT NO. 2021.116 CITY OF LAKE ELMO 3800 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: JACK GRIFFIN, CITY ENGINEER PARK CONSTRUCTION COMPANY 1481 81ST AVE NE MINNEAPOLIS, MN 55432 ATTN: MARK JOHNSON, ESTIMATOR / PM 6/1/2022 11/18/2022 REVISED DAYS REMAINING 170 0 52 10/7/2022 ORIGINAL DAYS BY BY YES NO The undersigned Contractor certifies that to the best of their  knowledge, information and belief the work covered by this payment  estimate has been completed in accordance with the contract  documents, that all amounts have been paid by the contractor for  work for which previous payment estimates was issued and payments  received from the owner, and that current payment shown herein is  now due. The undersigned certifies that the work has been reviewed and to the  best of their knowledge and belief, the quantities shown in this  estimate are correct and the work has been performed in accordance  with the contract documents. ENGINEER 9/27/2022 BY FOCUS Engineering, inc.PROJECT PAYMENT FORM PARTIAL PAY ESTIMATE NO. 3 (Final) SECTION 16 INFRASTRUCTURE IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2021.116 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $40,300.00 $40,300.00 0.00 $0.00 1.00 $40,300.00 2 ACRE 1 $8,700.00 $5,220.00 0.00 $0.00 0.60 $5,220.00 3 EACH 10 $325.00 $3,250.00 0.00 $0.00 10.00 $3,250.00 4 LF 150 $48.50 $7,275.00 0.00 $0.00 146.50 $7,105.25 5 SY 2,003 $7.50 $15,022.50 0.00 $0.00 2,003.00 $15,022.50 6 LF 894 $3.05 $2,726.70 0.00 $0.00 907.50 $2,767.88 7 CY 405 $25.40 $10,287.00 0.00 $0.00 405.00 $10,287.00 8 CY 1,000 $0.01 $10.00 0.00 $0.00 462.00 $4.62 9 CY 901 $29.00 $26,129.00 0.00 $0.00 901.00 $26,129.00 10 CY 1,306 $29.00 $37,874.00 0.00 $0.00 1,306.00 $37,874.00 11 SY 600 $3.15 $1,890.00 0.00 $0.00 102.00 $321.30 12 HR 15 $145.00 $2,175.00 0.00 $0.00 12.00 $1,740.00 13 GAL 122 $4.05 $494.10 0.00 $0.00 75.00 $303.75 14 TON 370 $100.00 $37,000.00 0.00 $0.00 363.20 $36,320.00 15 TON 260 $116.00 $30,160.00 ‐3.00 ‐$348.00 263.90 $30,612.40 16 TON 4 $291.00 $1,164.00 3.00 $873.00 3.00 $873.00 17 EACH 4 $6,380.00 $25,520.00 0.00 $0.00 4.00 $25,520.00 18 EACH 1 $11,100.00 $11,100.00 0.00 $0.00 1.00 $11,100.00 19 LF 19 $310.00 $5,890.00 0.00 $0.00 19.30 $5,983.00 20 LF 7 $474.00 $3,318.00 0.00 $0.00 6.38 $3,024.12 21 LF 841 $82.40 $69,298.40 0.00 $0.00 838.50 $69,092.40 22 LF 841 $3.30 $2,775.30 0.00 $0.00 838.50 $2,767.05 23 LF 40 $1,600.00 $64,000.00 0.00 $0.00 40.00 $64,000.00 24 TON 100 $10.00 $1,000.00 0.00 $0.00 0.00 $0.00 25 SY 15 $26.20 $393.00 0.00 $0.00 0.00 $0.00 26 LF 150 $24.10 $3,615.00 0.00 $0.00 80.00 $1,928.00 27 LS 1 $4,900.00 $4,900.00 0.00 $0.00 1.00 $4,900.00 28 LF 1,120 $1.70 $1,904.00 0.00 $0.00 1,298.00 $2,206.60 29 EA 1 $1,520.00 $1,520.00 0.00 $0.00 1.00 $1,520.00 30 LF 300 $2.30 $690.00 0.00 $0.00 0.00 $0.00 31 CY 100 $45.30 $4,530.00 0.00 $0.00 0.00 $0.00 32 SY 1,000 $1.55 $1,550.00 0.00 $0.00 1,019.00 $1,579.45 33 ACRE 0.60 $1,250.00 $750.00 0.00 $0.00 0.79 $987.50 34 EACH 4 $150.00 $600.00 0.00 $0.00 7.00 $1,050.00 35 SF 16 $11.50 $184.00 16.00 $184.00 16.00 $184.00 36 LF 730 $1.10 $803.00 0.00 $0.00 1,855.00 $2,040.50 37 LF 26 $10.50 $273.00 0.00 $0.00 24.00 $252.00 38 LF 600 $2.20 $1,320.00 0.00 $0.00 795.00 $1,749.00 TOTALS ‐ BASE CONTRACT $426,911.00 $709.00 $418,014.32 CHANGE ORDER NO. 1 CO 1‐1ROCK EXCAVATION IN SANITARY SEWER PIPE ZONE LS 1 $2,467.34 $2,467.34 0.00 $0.00 1.00 $2,467.34 TOTAL ‐ CHANGE ORDER NO. 1 $2,467.34 $0.00 $2,467.34 COMPENSATING CHANGE ORDER NO. 2 COO 2‐1COMPENSATING CHANGE ORDER LS 1 ‐$8,896.68 ‐$8,896.68 0.00 $0.00 0.00 $0.00 TOTAL ‐ COMPENSATING CHANGE ORDER NO. 2 ‐$8,896.68 $0.00 $0.00 TOTALS ‐ REVISED CONTRACT $420,481.66 $709.00 $420,481.66 SANITARY SEWER MANHOLE EXTRA DEPTH (60") (OVER 10') 10" PVC PIPE SEWER (SDR 26) CLEAN AND TELEVISE SANITARY SEWER 24" CASING PIPE (JACKED/AUGERED/RAMMED) STORM DRAIN INLET PROTECTION PIPE FOUNDATION ROCK 2" RIGID INSULATION 4" PVC PERF EDGE DRAIN W/ BACKFILL AND WRAP SEEDING (SEED MIXTURE 25‐141) W/ EROSION CONTROL BLANKET (3N) SEEDING (SEED MIXTURE 25‐131) TRAFFIC CONTROL  SILT FENCE, TYPE PA  TEMPORARY ROCK CONSTRUCTION ENTRANCE SEDIMENT CONTROL LOG COMMON TOPSOIL BORROW (PULVERIZED) (LV) PAVEMENT MESSAGE MULTI‐COMP (RIGHT ARROW) 4" SOLID LINE WHITE MULTI‐COMP 12" SOLID LINE WHITE MULTI‐COMP 4" DOUBLE YELLOW MULTI‐COMP BASE BID MOBILIZATION COMMON EXCAVATION (EV) GEOTEXTILE FABRIC TYPE V STREET SWEEPING CLEAR & GRUB SALVAGE & INSTALL SIGN (TYPE C OR STREET NAME SIGN) REMOVE & REPLACE CONCRETE CURB AND GUTTER (B618) REMOVE BITUMINOUS PAVEMENT SAWING BIT PAVEMENT (FULL DEPTH) AGGREGATE BASE CLASS 5 (P) SUBGRADE CORRECTION (EV) (INCLUDES SGB ‐ MOD 5% ) ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE SANITARY SEWER MANHOLE EXTRA DEPTH (48") (OVER 10') SELECT GRANULAR BORROW (MOD ‐ 5%) (CV) (P) TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) ‐ BIKE PATH SANITARY MANHOLE (48") W/ CASTING (0‐10') SANITARY MANHOLE (60") W/ CASTING (0‐10') BITUMINOUS MATERIAL FOR TACK COAT TYPE SP 12.5 WEARING COURSE MIX (3,B) COMPLETED ITEMS BY PAY PERIODSECTION 16 INFRASTRUCTURE IMPROVEMENTSCITY OF LAKE ELMO, MINNESOTAPROJECT NO. 2021.116PAY QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNTBASE BID1LS$40,300.001$40,300.001.00$40,300.00 $0.00 $0.00 $0.001.00$40,300.002ACRE$8,700.001$5,220.00 0.60 $5,220.00 $0.00 $0.00 $0.00 0.60$5,220.003EACH$325.0010$3,250.00 5.00 $1,625.00 5 $1,625.00 $0.00 $0.00 10.00$3,250.004LF$48.50150$7,275.00 146.50 $7,105.25 $0.00 $0.00 $0.00 146.50$7,105.255SY$7.502,003$15,022.50 2,003.00 $15,022.50 $0.00 $0.00 $0.00 2,003.00$15,022.506LF$3.05894$2,726.70 907.50 $2,767.88 $0.00 $0.00 $0.00 907.50$2,767.887CY$25.40405$10,287.00 405.00 $10,287.00 $0.00 $0.00 $0.00 405.00$10,287.008CY$0.011000$10.00 462.00 $4.62 $0.00 $0.00 $0.00 462.00$4.629CY$29.00901$26,129.00 901.00 $26,129.00 $0.00 $0.00 $0.00 901.00$26,129.0010CY$29.001,306$37,874.00 1,306.00 $37,874.00 $0.00 $0.00 $0.00 1,306.00$37,874.0011SY$3.15600$1,890.00 102.00 $321.30 $0.00 $0.00 $0.00 102.00$321.3012HR$145.0015$2,175.00 10.00 $1,450.00 2 $290.00 $0.00 $0.00 12.00$1,740.0013GAL$4.05122$494.10 40.00 $162.00 35 $141.75 $0.00 $0.00 75.00$303.7514TON$100.00370$37,000.00 363.20 $36,320.00 $0.00 $0.00 $0.00 363.20$36,320.0015TON$116.00260$30,160.00 266.90 $30,960.40 $0.00‐3‐$348.00 $0.00 263.90$30,612.4016TON$291.004$1,164.00 0.00 $0.00 $0.00 3 $873.00 $0.00 3.00$873.0017EACH$6,380.004$25,520.00 4.00 $25,520.00 $0.00 $0.00 $0.00 4.00$25,520.0018EACH$11,100.001$11,100.00 1.00 $11,100.00 $0.00 $0.00 $0.00 1.00$11,100.0019LF$310.0019$5,890.00 19.30 $5,983.00 $0.00 $0.00 $0.00 19.30$5,983.0020LF$474.007$3,318.00 6.38 $3,024.12 $0.00 $0.00 $0.00 6.38$3,024.1221LF$82.40841$69,298.40 838.50 $69,092.40 $0.00 $0.00 $0.00 838.50$69,092.4022LF$3.30841$2,775.30 0.00 $0.00 838.5 $2,767.05 $0.00 $0.00 838.50$2,767.0523LF$1,600.0040$64,000.00 40.00 $64,000.00 $0.00 $0.00 $0.00 40.00$64,000.0024TON$10.00100$1,000.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00$0.0025SY$26.2015$393.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00$0.0026LF$24.10150$3,615.00 80.00 $1,928.00 $0.00 $0.00 $0.00 80.00$1,928.0027LS$4,900.001$4,900.00 1.00 $4,900.00 $0.00 $0.00 $0.00 1.00$4,900.0028LF$1.701,120$1,904.00 1,280.00 $2,176.00 18 $30.60 $0.00 $0.00 1,298.00$2,206.6029EA$1,520.001$1,520.00 1.00 $1,520.00 $0.00 $0.00 $0.00 1.00$1,520.0030LF$2.30300$690.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00$0.0031CY$45.30100$4,530.00 0.00 $0.00 $0.00 $0.00 $0.00 0.00$0.0032SY$1.551,000$1,550.00 0.00 $0.00 1,019 $1,579.45 $0.00 $0.00 1,019.00 $1,579.4533ACRE$1,250.000.60$750.00 0.00 $0.00 0.79 $987.50 $0.00 $0.00 0.79 $987.5034EACH$150.004$600.00 7.00 $1,050.00 $0.00 $0.00 $0.00 7.00 $1,050.0035SF$11.5016.00$184.00 0.00 $0.00 $0.00 16 $184.00 $0.00 16.00 $184.0036LF$1.10730.00$803.00 0.00 $0.00 1,855 $2,040.50 $0.00 $0.00 1,855.00 $2,040.5037LF$10.5026$273.00 0.00 $0.00 24 $252.00 $0.00 $0.00 24.00 $252.0038LF$2.20600$1,320.00 0.00 $0.00 795 $1,749.00 $0.00 $0.00 795.00 $1,749.00BASE BID$426,911.00 $405,842.47 $11,462.85 $709.00 $0.00 $418,014.32CHANGE ORDER NO. 1CO 1‐1LS$2,467.341$2,467.34 1 $2,467.34 $0.00 $0.00 $0.00 1.00 $2,467.34TOTAL ‐ CHANGE ORDER NO. 1$2,467.34 $2,467.34 $0.00 $0.00 $0.00 $2,467.34TOTALS$429,378.34 $408,309.81 $11,462.85 $709.00 $0.00 $420,481.664" SOLID LINE WHITE MULTI‐COMP12" SOLID LINE WHITE MULTI‐COMP4" DOUBLE YELLOW MULTI‐COMPCOMMON TOPSOIL BORROW (PULVERIZED) (LV)SEEDING (SEED MIXTURE 25‐141) W/ EROSION CONTROL BLANKET (3N)SEEDING (SEED MIXTURE 25‐131)STORM DRAIN INLET PROTECTIONPAVEMENT MESSAGE MULTI‐COMP (RIGHT ARROW)MOBILIZATIONCLEAR & GRUBSALVAGE & INSTALL SIGN (TYPE C OR STREET NAME SIGN)REMOVE & REPLACE CONCRETE CURB AND GUTTER (B618)GEOTEXTILE FABRIC TYPE VSAWING BIT PAVEMENT (FULL DEPTH)AGGREGATE BASE CLASS 5 (P)SUBGRADE CORRECTION (EV) (INCLUDES SGB ‐ MOD 5% )SELECT GRANULAR BORROW (MOD ‐ 5%) (CV) (P)COMMON EXCAVATION (EV)REMOVE BITUMINOUS PAVEMENTSTREET SWEEPINGBITUMINOUS MATERIAL FOR TACK COAT10" PVC PIPE SEWER (SDR 26)TYPE SP 12.5 WEARING COURSE MIX (3,B)ITEM DESCRIPTION OF PAY ITEM UNITTOTAL TO DATEUNIT PRICEPARTIAL PAY ESTIMATE 1 PARTIAL PAY ESTIMATE 2 PARTIAL PAY ESTIMATE 3 PARTIAL PAY ESTIMATE 4CONTRACTROCK EXCAVATION IN SANITARY SEWER PIPE ZONETYPE SP 9.5 WEARING COURSE MIXTURE (3,C)TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) ‐ BIKE PATHSANITARY MANHOLE (48") W/ CASTING (0‐10')SANITARY MANHOLE (60") W/ CASTING (0‐10')SANITARY SEWER MANHOLE EXTRA DEPTH (48") (OVER 10')SANITARY SEWER MANHOLE EXTRA DEPTH (60") (OVER 10')CLEAN AND TELEVISE SANITARY SEWER24" CASING PIPE (JACKED/AUGERED/RAMMED)PIPE FOUNDATION ROCK2" RIGID INSULATION4" PVC PERF EDGE DRAIN W/ BACKFILL AND WRAPTRAFFIC CONTROL SILT FENCE, TYPE PA TEMPORARY ROCK CONSTRUCTION ENTRANCESEDIMENT CONTROL LOG CITY OF LAKE ELMO, MN SECTION 16 INFRASTRUCTURE IMPROVEMENTS PROJECT NO. 2021.116 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: November 1, 2022 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: PARK CONSTRUCTION COMPANY PROJECT NAME: SECTION 16 INFRASTRUCTURE IMPROVEMENTS PROJECT NO.: 2021.116 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated May 3, 2022. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: November 1, 2022 Chad Isakson Reg. No. 49028 FOCUS Engineering, inc. THE WARRANTY PERIOD BEGINS November 1, 2022 AND ENDS November 1, 2023