HomeMy WebLinkAbout#13 - Comments on Wash Co CIP STAFF REPORT
DATE: November 1, 2022
CONSENT
AGENDA ITEM: Approve City Comments on the Washington County DRAFT 2023-2027 Capital Improvement Plan (CIP)
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Molly Just, Planning Director
Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council approve the City comments to be submitted to
Washington County regarding the County’s DRAFT 2023-2027 Capital Improvement Plan? BACKGROUND: On October 4th, City staff received notice from Washington County that the Draft
2023-2027 Capital Improvement Plan (CIP) was available for review and that comments must be received by November 4, 2022 for consideration when developing the final CIP. A public hearing will be held on November 15, 2022, prior to adopting the final document on December 13, 2022.
As part of the annual budget process, Washington County prepares a five-year Capital Improvement Plan (CIP), which includes the county's tentative plans for roads, bridges, parks, land, trails, transit, and public facilities. The first year of this plan is included in the county's proposed 2023 budget. The “out-years” of 2024-2027 reflect projected needs and estimated costs, which may change based on future priorities and funding opportunities. Projects that were budgeted in 2022 (or prior to), and are not yet complete, are not reflected in the draft 2023-2027 CIP; funding for the completion of those projects has been set aside, and therefore aren’t reflected in future years’ CIP documents. A full copy of the draft CIP document is available
online at the county website. The attached packet highlights the substantial transportation roadway related projects included within the City of Lake Elmo over the next five years. Parks and Public Facility projects are not included in this review. It should also be noted that the County completes intersection control projects and pavement preservation projects each year but the specific work related to these improvements are not typically
identified within the CIP document. The County is budgeting and average of $590,000 per year for one intersection control project, and has budgeted $27.5M over 5 years for various pavement maintenance and preservation projects.
The transportation roadway projects identified on the County’s 2023-2027 CIP that are located in Lake Elmo are summarized below:
• Year 2023 RB-2201: Intersection Control Projects. $500,000.
Traffic Signal Improvement project for the intersection of CSAH 15 and Hudson Boulevard.
• Year 2025-2027: RB-2645: CSAH 13, from CSAH 6 to CSAH 14. $1,150,000. This project borders both Lake Elmo and Oakdale and would include safety improvements, including widening for shoulders, pavement improvements, railroad crossing upgrades, turn lane improvements,
drainage improvements and pedestrian upgrades.
• Year 2025: RB-2674: CSAH 17 & TH 36 Intersection. $38M. The project will include a grade separated interchange and south frontage road improvements, will include Federal funding and approvals, and will be multi-jurisdictional, including Washington County,
MnDOT, Grant and Lake Elmo.
• Year 2023 & 2025: RB 2684. CSAH 15, from CSAH 10 to 30th Street. $3.05M. The Project scope of the CSAH 15 (Manning Avenue) Improvements for a 4-lane divided highway has
been scaled down to Traffic Management Projects that include the addition of center left turn lanes at
key intersections.
• CSAH 19 and CSAH 10 Intersection. This project was removed from the County CIP, having been previously identified for improvement in 2025-2026.
PROPOSAL DETAILS/ANALYSIS: Staff has reviewed the County’s Draft 2023-2027 CIP and has the following comment for council consideration:
• RB-2674 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection
improvements is an important project for the City of Lake Elmo to address the safety improvements needed along the TH 36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The City therefore continues to support the planning and construction of this project and
emphasizes the need to maintain the proposed construction schedule and to maximize outside funding assistance in order to provide a financially viable project for the local communities.
• RB-2645 2025-2027: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with the sale and development of the City owned property along Ideal Avenue and Stillwater Boulevard,
improvements to this segment of Ideal Avenue will be required. The City therefore supports this project in the County CIP and encourages that preliminary engineering and planning efforts be completed to better identify the future improvements and alignments that will be needed in order to preserve the necessary right-of-way and to guide the specific intersection improvements that will be undertaken at the time of the development of the adjacent properties.
• RB 2201 2023: Intersection Control Projects. Under the category description, the County lists a traffic signal at CSAH 15 and Hudson Boulevard to be implemented in 2023. The City supports the importance to have funding earmarked and available for a new signal at this intersection, but emphasizes that the timing of the new signal will be driven by development. The installation of the new traffic signal project should be ready to go together with any future realignment of the Hudson Boulevard intersection with Manning Avenue.
• CSAH 14 and Lake Elmo Avenue. The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience continued traffic growth, and will likely require intersection and turn lane improvements along with some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14. The need for these improvements will increase quickly as the surrounding property develops. The City supports the planning for this improvement and inclusion in
the County CIP in the outer planning years (2026 or 2027).
• RB 2684 2023 & 2025: CSAH 15, from CSAH 10 to 30th Street North: Improvements to CSAH 15, south of 30th Street remain on the lower end of the City’s priorities to the extent that these improvements impact Lake Elmo.
FISCAL IMPACT: No Fiscal Impacts at this time. However, County improvement projects completed within the City of Lake Elmo often contain a cost participation by the City.
OPTIONS: 1) The City Council can approve the City comments to be submitted to Washington County regarding
the County’s 2023-2027 Capital Improvement Plan.
2) The City Council can approve the City comments, as amended, to be submitted to Washington
County regarding the County’s 2023-2027 Capital Improvement Plan.
RECOMMENDATION: Staff is recommending that the City Council approve the City comments to be submitted to Washington County regarding the County’s 2023-2027 Capital Improvement Plan. The recommended motion for the action is as follows:
“Move to approve City comments to be submitted to Washington County regarding the County’s 2023-2027 Capital Improvement Plan with comments to be submitted on or before November 4, 2022.” ATTACHMENTS: 1. County CIP Location Map
2. Summary packet of the Washington County Draft 2022-2026 Capital Improvement Plan.
3. Draft City Comment Letter.
36
10th
60th
5th
HudsonKeats Lake Elmo50th
15th Inwood34th
20th
27th
53rd
55th
Jane
Lake Jane
Jamaca57th
59th
Hill
47th
7th
31st
51st
43rd
39th Demontreville45th
38th
ManningStillwater
24th26th
42nd
Island58th9th
30th
32ndKimbro
21st
Jade6thIvoryHill
t
o
p
IsleOls
o
n
L
a
k
e
8thJulep
12th
Jewel
44th
56th
Iris22nd
37th
36th
35th LaverneJuniperAnnikaJasmineJamley LegionLily
Klondike16th
Upper 33Rd
ImperialLinden3rdKirkwood 33rd
Deer PondHytrail
IrvingHidden Bay4thJerome14thJune28th VillageTapestryJasper
Eagle Point
Jonquil
Wildflower
LaytonPrivateKelvinIronwoodHighlandsJaneroLe
e
w
a
r
d
Cimarron10th StreetKindr
e
d
JamesIrishPrairievie
wJack Pine49th
JayLower 31st
Marquess
IrvinLilacMonarchLower 8th LisbonBirch Bark40thLavender
KraftLampertBlazingstarWhistling Valley
Junco Little Bluestem
11thLady Slipper5t
h
S
t
r
e
e
t
Windbreak
Sunfish Lake Park InboundIvywoodInnsdale3rd Street Marquess TrailLang
l
y
JunoLan
s
i
n
g
JulianneUpper 30th
6th
S
t
r
e
e
t
Lisbon AvenueIrwinSunflower
41st
WB I9
4
T
o
I
n
w
o
o
d
A
v
e
N
Upper 7t
h
Queen
Upper 9th 57th StreetUpper 42Nd
27
t
h
S
t
r
e
e
t
15th Stree
t
Cherrywood
WB I94 To Keats
A
v
e
N
44th Street
41st Street
Jas
m
i
n
e
A
v
e
n
u
e
59th Street
HummingbirdJero
m
e
A
v
e
n
u
e
Keats Ave N To
W
B
I
9
4
Manning Ave N To W
B
I
9
4
Hill Trail
30th Street33rd Street24t
h
S
t
r
e
e
t
20th Street58th StreetLegion Lane
Lark
s
p
u
r
Demontreville Trail
HummingbordAccess21st
Laverne57th Street32nd ManningIrish35th
34th LilyLilac
55th
Jamaca
35th
Laverne56th
Stillwater36
Lake ElmoLanglyLaytonLilac33rd Lily10th StreetMan
n
i
n
g
6th StreetIsle21st
9th
57th
36th
Kirkwood
53rd
Linde
n
Whistling ValleyManning
50th
5th
33rd
Highlands
59th
6th Street
Innsda
le
Ir
o
nw
o
o
d
Linden
Legion Lane
LindenPrivate
Julep28th VillageLilac
IvyInnsdaleLower 8th
31st
57th
Lisbon
9th
39thKeats55th56th36
IsleJulepIrvin55th
Manning32nd
Laverne37thKelv
in
ManningLegion9th
Ivy
34th
LaytonLindenJade5thHudson
36th
39th
DOWNSLAKE
LAKE ELMOREGIONALPARK RESERVE
LAKE ELMO
LAKE JANE
SUNFISH LAKE
OLSONLAKE
LAKE DEMONTREVILLE
CLEARLAKE
HORSESHOELAKE
ROSELAKE
REIDPARK
VFWPARK
LIONS PARK
TANA RIDGEPARK
City of Woodbury
STONEGATEPARK
KRAMERLAKE
GOOSELAKEARMSTRONGLAKE
RIDGEPARK
KEATS AVE NEAGLE POINTLAKE
TABLYNPARK
HEIGHTSPARK
LAKE JANEHILLS PARK
PEBBLEPARK
City of Oakdale
West LakelandTownship
Baytown Township
City ofOak ParkHeights
City of GrantCity ofPine Springs
DEMONTREVILLEWILDLIFE PARK
DEMONTREVILLEPARK
KLEISPARK CARRIAGESTATIONPARK
SUNFISH LAKEPARK
City ofOak ParkHeights
StillwaterTownship
HOMESTEDPARK
7
HERITAGEPARK
VERONICAPOND
GOETSCHEL'SPOND
City ofAfton
TablynPark
Eagle PointCreek Estates
Lake ElmoHeights
Torre Pines
Farms ofLake Elmo
Parkview Estates
WildflowersShores
HuppertAdd
BeautCrest Estates FriedrichHghts
Kenridge Add
Prairie RidgeOffice Park
Eagle PointBusiness Park
Stonegate
Hammes CountryVista
Whistling Valley
MidlandMeadows
DavidNelson Est
TheHomestead
TartanMeadows
The Forest
Schwartz-Martinco Add
PackardPark
EdenPark
HeritageFarm
LonesomePine Add
DownsLake Est
MyronEllman
Elmo View
Cty AudPlat No. 8
Lake Elmo Park
Brookman Add
Sunfish Ponds
Hamlet OnSunfish Lake
ParkMeadows
Tapestry AtCharlottes' Grove
Berschen's Shores
DawcinAcres
LakeJaneHighlands
TealPass Est
Fox FireEstates
Meyer'sPineridgeKrausesAdd
Springborn'sGreen Acres
Arabian Hills
JudithMaryManor
Lake Elmo Vista
Rolling Hills Est
Prairie Hamlet
HiddenMeadowsOf Lake Elmo
Jesse'sHideaway
DiscoverCrossing
Arvold'sAcres
St. Croix'sSanctuary
TamarackFarm Est
CarriageStation
TanaRidgeJohn M DayFarm Add
The Fields ofSt. Croix2nd Add
The Fieldsof St. Croix
BluestemAt The Fieldsof St. Croix
BurrwoodEstBergmannAdd
DemontrevilleHighlands Add
Lane's DemontrevilleCountry ClubDemontrevilleHighlands Add
Olson Lake Add
Oace AcresAdd
LakeJaneHills
Lake JaneManor No. 1
ThreeLakesFarm Add
Bordners Garner
Farmettes
Royal Golf Club
Southwind
Hunters Crossing
HammesEstates
Savona
Boulder Ponds
Inwood
Lakewood Crossing2nd Addition
Easton Village
Wildflower
Cimarron
Legacy At Northstar
Village Preserve
ST. CROIX SANCTUARY PARK
EDENPARK
PILOTPARK
HAMMESPARK
GOOSE LAKEPARK
F
Map Date: November 2020010.5 Miles Created By: Planning Department
2023 Capital Improvement Plan
Washington County, Minnesota
PROJECTS BY CATEGORY
2023 2027thru
Total2023 2024 2025 2026 2027Category Project #
Road & Bridge
RB-2201 2,950,000520,000 570,000 620,000 620,000 620,000Intersection Control Projects
RB-2203 1,000,000200,000 200,000 200,000 200,000 200,000Misc. Safety/Traffic Capacity Projects
RB-2204 27,520,0004,620,000 6,350,000 5,450,000 6,200,000 4,900,000Pavement Preservation & Rehab
RB-2216 1,635,000135,000 250,000 350,000 450,000 450,000Structures & Roadway Stabilization
RB-2567 3,400,0003,400,000CSAH 14 & CSAH 24
RB-2609 11,625,000450,000 1,175,000 10,000,000CSAH 32 - CSAH 33 (Everton Ave) to US TH 61
RB-2611 5,425,0005,425,000CSAH 33 - CSAH 32 to CSAH 2
RB-2613 3,250,0003,250,000CSAH 5 - CR 64 to Sycamore Street West
RB-2621 9,800,0009,800,000CR 65 - Reconstruction
RB-2629 550,000450,000 100,000CSAH 21- I-94 to 40th Street N
RB-2639 4,525,000225,000 4,300,000CSAH 5 - Sycamore Street to Trunk Highway 96
RB-2641 3,625,000225,000 3,400,000CSAH 3 - CSAH 7 to CSAH 4
RB-2645 1,150,000550,000 400,000 200,000CSAH 13 - CSAH 6 to CSAH 14
RB-2650 900,000400,000 500,000CSAH 29 - TH 36 to CSAH 12
RB-2651 5,500,000900,000 1,000,000 1,200,000 1,200,000 1,200,000Construction Engineering, Inspection and Survey
RB-2652 10,400,0001,000,000 9,400,00058th Street Extension/County Highway 15 S. Segment
RB-2653 100,000100,000Century Avenue Extension Study
RB-2658 450,000450,000CSAH 19 - CSAH 22 to Dale Road
RB-2660 1,310,0001,310,000CSAH 38 Multi-Use Trail
RB-2663 4,975,000475,000 4,500,000CSAH 12 East Avenue/Hallam Avenue to CSAH 9
RB-2667 4,050,000250,000 200,000 3,600,000CSAH 19 and 80th Street Intersection
RB-2668 10,400,000300,000 850,000 9,250,000TH 120 - I694 to CSAH 12
RB-2669 2,550,000250,000 2,300,000CSAH 2 Rehabilitation
RB-2672 8,350,000300,000 500,000 700,000 6,850,000CSAH 13 - CSAH 20 to Hargis Parkway
RB-2673 139,000139,000CSAH 15 Rumble Strips
RB-2674 38,000,0001,500,000 36,500,000CSAH 17 at TH 36 Intersection
RB-2675 3,100,000400,000 200,000 2,500,000CR 74 - County 38 to Geneva Avenue
RB-2678 265,000265,00022nd Street - CSAH 21 to Trunk Highway 95 Study
RB-2679 425,800100,000 325,800CSAH 12 Trail Project
RB-2680 100,000100,000Scandia City Center Study
RB-2681 1,010,0001,010,000CSAH 28 at Trunk Highway 95 Improvements
RB-2682 12,800,000300,000 600,000 1,500,000 10,400,000CR 50 - Trunk Highway 61 to CSAH 15
RB-2683 2,340,000200,000 40,000 2,100,000CSAH 11 Improvement Project
RB-2684 3,050,000300,000 2,750,000CSAH 15 - CSAH 10 to 30th Street
RB-2685 35,050,0002,300,000 32,750,000CR 19A/100th Street Realignment
RB-2686 100,000100,000CSAH 20 & Pioneer Drive Study
RB-2687 120,000120,000CSAH 19 - US Trunk Highway 61 to Dale Road Study
RB-2688 130,000130,000Radio Drive Pedestrian Management Study
RB-2689 317,000317,000CR 74 Shared Use Trail
RB-2690 300,000300,000CSAH 16 - CSAH 19 to Trunk Hwy. 95 Corridor Study
RB-2691 800,000300,000 400,000 100,000CSAH 20 - CSAH 22 to Military
RB-2692 400,000400,000CSAH 12 - Kimbro to CSAH 15
RB-2693 1,300,000300,000 500,000 500,000Trunk Highway 96 Turnback Corridor
RRA-2297-11 51,263,10051,263,100Gold Line Bus Rapid Transit (BRT)
276,449,90081,154,100 30,845,800 65,080,000 60,950,000 38,420,000Road & Bridge Total
76
2023 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2023 2027thru Department Capital Road & Bridge Project
Description
The project scope includes an annual program for intersection control upgrades determined to be needed, but not incorporated, as part of a larger
roadway improvement project.
Projects under this program would typically be individually identified and programmed through the County's Intersection Control Ranking System
(ICRS).
The project scheduled for 2023 is Signal Installation at County State Aid Highway (CSAH) 15 at Hudson Boulevard.
Project #RB-2201
Justification
High-level intersection controls (roundabouts and traffic signals) may be constructed at county highway intersections meeting criteria set forth in
the County Intersection Control Ranking System.
The county proactively plans for the installation of intersection controls to improve the safety and efficiency of traffic flow on the County Highway
System. The annual Intersection Control Ranking System determines the priority of these installations.
The number of projects programmed varies depending on actual budget funding, the availability of matching funds, unforeseen development, or
intersection safety problems.
Budget Impact/Other
The typical traffic signal costs $1,500 per year to operate and maintain. This cost to the public is off-set by the increased traffic flow efficiency and
enhanced safety.
Useful Life 5+ yearsProject Name Intersection Control Projects Category Road & Bridge
Type Improvement
Location Various Roads District #Multiple
Total2023 2024 2025 2026 2027Expenditures
100,00020,000 20,000 20,000 20,000 20,000Planning / Design
2,850,000500,000 550,000 600,000 600,000 600,000Construction
520,000 570,000 620,000 620,000 620,000 2,950,000Total
Total2023 2024 2025 2026 2027Funding Sources
1,050,000210,000 210,000 210,000 210,000 210,000Local Contributions
1,900,000310,000 360,000 410,000 410,000 410,000State Aid
520,000 570,000 620,000 620,000 620,000 2,950,000Total
81
2023 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2023 2027thru Department Capital Road & Bridge Project
Description
The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Ideal Avenue) located in Oakdale and Lake
Elmo:
1) safety improvements including widening for shoulders
2) pavement improvement
3) turn lane and intersection improvements
4) pedestrian and non-motorized upgrades
5) drainage improvements
Project #RB-2645
Justification
Increased traffic and development drive the need for roadway upgrades, including widening of the road and the railroad crossing. This area is also
a nexus for regional surface water drainage, hence the design needs to work toward accommodating and improving regional surface water
management in this area.
Budget Impact/Other
The project will increase operation and maintenance costs associated with additional pavement, drainage, and sidewalk infrastructure.
Useful Life 5+ yearsProject Name CSAH 13 - CSAH 6 to CSAH 14 Category Road & Bridge
Type Construction
Location Various
Total Project Cost:$1,150,000
District #Multiple
Total2023 2024 2025 2026 2027Expenditures
950,000550,000 400,000Planning / Design
200,000200,000Right-of-Way
550,000 400,000 200,000 1,150,000Total
Total2023 2024 2025 2026 2027Funding Sources
300,000300,000County Transportation Sales
Tax (Road & Bridge)
300,000100,000 100,000 100,000Local Contributions
550,000450,000 100,000State Aid
550,000 400,000 200,000 1,150,000Total
93
2023 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2023 2027thru Department Capital Road & Bridge Project
Description
The project scope includes improvements to County State Aid Highway (CSAH) 17 at the intersection with Trunk Highway (TH) 36 in the cities of
Lake Elmo and Grant.
The work is expected to include:
1) a grade separated crossing of TH 36
2) ramps to provide access between CSAH 17 and TH 36
3) retaining walls
4) stormwater treatment facilities
5) pedestrian facilities
6) intersection controls for frontage roads
7) frontage road extension on south side
Project #RB-2674
Justification
TH 36 users currently experience congestion (capacity constraints) during both A.M. and P.M. peak hours resulting from the existing signal at
CSAH 17 (Lake Elmo Avenue). This congestion results in an unacceptable level-of-service during peak hours which is expected to worsen as
traffic volumes are forecast to increase. Due to the extended cycle lengths, CSAH 17 (Lake Elmo Avenue) has long wait times before being served
by the signal. The existing closely-spaced frontage road intersection on the north of TH 36 consistently queues traffic through the intersection.
The CSAH 17 (Lake Elmo Avenue) intersection has a crash and severity rate that is significantly higher than the Minnesota Department of
Transportation (MnDOT) statewide system average for similar signalized intersections.
Budget Impact/Other
This project will increase operation and maintenance costs because of the added infrastructure.
It is expected that local agencies, the State of Minnesota, and federal aid will provide funding for this project. If this funding is not obtained, this
project will be postponed until adequate funding is received.
Useful Life 5+ yearsProject Name CSAH 17 at TH 36 Intersection Category Road & Bridge
Type Construction
Location Lake Elmo/Grant
Total Project Cost:$40,534,300
District #Multiple
Total2023 2024 2025 2026 2027Expenditures
36,500,00036,500,000Construction
1,500,0001,500,000Right-of-Way
1,500,000 36,500,000 38,000,000Total
Prior
2,534,300
Total
Total2023 2024 2025 2026 2027Funding Sources
10,000,00010,000,000Federal Grants
3,750,000750,000 3,000,000Local Contributions
4,250,000750,000 3,500,000State Aid
20,000,00020,000,000State Grants
1,500,000 36,500,000 38,000,000Total
Prior
2,534,300
Total
106
2023 Capital Improvement Plan
Washington County, Minnesota Contact PWD
2023 2027thru Department Capital Road & Bridge Project
Description
The project scope includes the following improvements on County State Aid Highway (CSAH) 15 (Manning Avenue) between CSAH 10 (10th
Street North) and 30th Street.
1) addition of center left turn lanes at key locations
2) pavement rehabilitation
3) stormwater treatement improvements
Project #RB-2684
Justification
CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route connecting Interstate 94 to Lake Elmo,
Stillwater, and beyond. These highway improvements are necessary to ensure the ongoing safe and efficient operation of this highway segment.
Budget Impact/Other
The project will increase operation and maintenance costs because of the added pavement widths and stormwater infrastructure.
Useful Life 5+ yearsProject Name CSAH 15 - CSAH 10 to 30th Street Category Road & Bridge
Type Construction
Location Various
Total Project Cost:$3,050,000
District #3
Total2023 2024 2025 2026 2027Expenditures
250,000250,000Planning / Design
2,750,0002,750,000Construction
50,00050,000Right-of-Way
300,000 2,750,000 3,050,000Total
Total2023 2024 2025 2026 2027Funding Sources
275,00025,000 250,000Local Contributions
2,775,000275,000 2,500,000State Aid
300,000 2,750,000 3,050,000Total
114
3800 Laverne Avenue North • Lake Elmo • Minnesota 55042
Phone: (651) 747-3900 • Fax: (651) 747-3901 • www.lakeelmo.org
November 2, 2022
Mr. Wayne Sandberg via email: wayne.sandberg@co.washington.mn.us
Deputy Director larry.phillips@co.washington.mn.us
Washington County Public Works Department
11660 Myeron Road North
Stillwater, MN 55082
Dear Mr. Sandberg:
The City of Lake Elmo has reviewed the County’s Draft 2023-2027 Capital Improvement Plan (CIP). After
reviewing these projects and in reviewing other potential transportation needs in Lake Elmo, we have
the following comments:
1) RB-2674 2025: CSAH 17 & TH 36 Intersection: The CSAH 17 and TH36 Intersection improvements
is an important project for the City of Lake Elmo to address the safety improvements needed along
the TH 36 corridor, while maintaining safe and efficient access for Lake Elmo residents to TH 36. The
City therefore continues to support the planning and construction of this project and emphasizes
the need to maintain the proposed construction schedule and to maximize outside funding
assistance in order to provide a financially viable project for the local communities.
2) RB-2645 2025-2027: CSAH 13 Phase 3, from CSAH 6 to CSAH 14. As the City moves forward with
the sale and development of the City owned property along Ideal Avenue and Stillwater Boulevard,
improvements to this segment of Ideal Avenue will be required. The City therefore supports this
project in the County CIP and encourages that preliminary engineering and planning efforts be
completed to better identify the future improvements and alignments that will be needed in order
to preserve the necessary right-of-way and to guide the specific intersection improvements that will
be undertaken at the time of the development of the adjacent properties.
3) RB 2201 2023: Intersection Control Projects. Under the category description, the County lists a
traffic signal at CSAH 15 and Hudson Boulevard to be implemented in 2023. The City supports the
importance to have funding earmarked and available for a new signal at this intersection, but
emphasizes that the timing of the new signal will be driven by development. The installation of the
new traffic signal project should be ready to go together with any future realignment of the Hudson
Boulevard intersection with Manning Avenue.
4) The intersection of CSAH 14 and Lake Elmo Avenue by Lake Elmo Elementary School will experience
continued traffic growth, and will likely require intersection and turn lane improvements along with
some minor roadway improvements and realignment along both Lake Elmo Avenue and CSAH 14.
The need for these improvements will increase quickly as the surrounding property develops. The
City supports the planning for this improvement and inclusion in the County CIP in the outer
planning years (2026 or 2027).
5) RB 2684 2023 & 2025: CSAH 15, from CSAH 10 to 30th Street North: Improvements to CSAH 15,
south of 30th Street remain on the lower end of the City’s priorities to the extent that these
improvements impact Lake Elmo.
Please feel free to contact me at 651.747.3905, or at KHandt@lakeelmo.org, with any questions you
may have regarding Lake Elmo’s comments.
Sincerely,
Kristina Handt
City Administrator
cc: Marty Powers, Public Works Director
Jack Griffin, City Engineer