Loading...
HomeMy WebLinkAbout#18 - Amira Prelim Plat & PUD1 STAFF REPORT DATE: 11/1/22 REGULAR TO: City Council FROM: Molly Just, Planning Director Ben Hetzel, City Planner AGENDA ITEM: Preliminary Plat/PUD, Comprehensive Plan & Zoning Map Amendment Hudson and Eagle Point Boulevards BACKGROUND: On April 7, 2020 the City Council granted a series of approvals to the applicant to construct a 103-unit senior housing building on the subject property. Those approvals consisted of the following: 1. A Comprehensive Plan Amendment from BP (business park) to MU-BP (mixed use – business park); 2. A Zoning Map Amendment (rezoning) from BP (business park) to MU-BP (mixed use – business park); 3. A PUD Amendment for the Eagle Pointe Park PUD to allow a residential use on the proposed development site; and 4. A Preliminary Plat and the Preliminary Planned Unit Development (PUD) Plan for a 103 unit multi-family residential development to be called Applewood Pointe of Lake Elmo on an 11.7-acre parcel at the southeast corner of Hudson Boulevard and Eagle Point Boulevard in the Eagle Pointe Business Park. Since that time the applicant has adjusted the project to meet current market demand for senior housing. The proposal includes an increase from 103 units to 146 units. The units have gotten smaller but the building footprint has not expanded out or up. The increased unit count and the corresponding zoning district and Comprehensive Plan land use designation require a PUD and plat amendment, a Comprehensive Plan Amendment (from MU-BP to HDR) and a Zoning Map Amendment (from MU-BP to HDR). The Planning Commission held a public hearing and recommended approval of all three requests at the October 12, 2022 meeting. There was a general consensus among commissioners that the proposal is a good fit for the community and that it does align with the 2040 Comprehensive Plan. There was no public comment before or during the meeting. ISSUE BEFORE CITY COUNCIL: Should the City Council approve a PUD and plat amendment, a Comprehensive Plan Amendment, and Zoning Map Amendment? 2 GENERAL INFORMATION: Property Owner: United Properties, Minneapolis, Minnesota Applicant: United Properties (Jennifer Mason) Location: Outlot C, Eagle Point Business Park Second Addition PID Number 33.029.21.44.0009 Requests: Amend Preliminary PUD and Plan Comprehensive Plan Amendment Zoning Map Amendment Site Area: 11.7 gross acres Existing Zoning: MU-BP (Mixed Use Business Park) Existing Land Use: Platted but vacant outlot within Eagle Point Business Park Surrounding Land Use: Business park office buildings and a medical center Surrounding Zoning: BP – Business Park (PUD) Comprehensive Plan: Existing: MU-BP (Business Park) Proposed: HDR (High Density Residential) Proposed Zoning: HDR (High Density Residential) Deadline for Action: Application Complete – 9/9/2022 60 Day Deadline – 11/8/2022 Extension Letter Mailed – N/A Applicable Regulations: Article XII Urban Residential Districts – HDR Zoning District Article XVIII – Planned Unit Development (PUD) Regulations 2040 Lake Elmo Comprehensive Plan City of Lake Elmo Design Standards Manual Subject Property 3 The Eagle Point Business Park was initially conceived as part of the City’s Comprehensive Plan update in 1992, and the official Business Park zoning for this area was adopted in 1997. Over the next three years, United Properties submitted applications for a general concept plan for a business park, a general development stage plan, and a final plat and final plans for what is now called the Eagle Point Business Park. Overall, the business park occupies approximately 120 acres in the extreme southwestern portion of Lake Elmo both north and south of Hudson Boulevard. Since approving the overall plans for the park, the City has been reviewing final development plans for each of the buildings/phases that have been constructed since then. Eagle Point Business Park was approved as a Planned Unit Development (PUD) in the early 2000’s, and the City approved a concept plan and preliminary development plan for the entire site at that time. This approval included the adoption of development standards and regulations for the entire park, and all subsequent building is expected to conform to these standards. In terms of new building requests, the City has been requiring applicants to submit an updated preliminary plat and preliminary plans for each site, which is then followed by consideration of a final plat and plans. Since this lot is now platted as an outlot it will need City approval of a preliminary and final plat before construction may start. Most of necessary public infrastructure for this site, including the public roads and utilities, have been installed. PROPOSAL REVIEW AND ANALYSIS PRELIMINARY PUD and PLAT REVIEW The primary proposed use of the site (on the corner of Hudson Boulevard and Eagle Point Boulevard) would be a 4-story, 146-unit rental senior housing building with underground parking for 146 vehicles and 88 surface parking spaces. The building would be located generally in the center of the site on the higher ground in between two wetlands. The development would wrap around an existing wetland to the east and would be to the east of the smaller wetland on the northern portion of the site near Eagle Point Boulevard. The plans show one driveway connecting the development to Eagle Point Boulevard on the north end of the property and one Emergency Access at the southern end of the site to provide a second means of access for emergency purposes. The Emergency Access would connect to the private driveway of the abutting 8650 Hudson Boulevard. Most of the public and private infrastructure needed to serve the proposed building is already in place as there is public sanitary sewer and public water in the Hudson Boulevard right-of-way and available to the property. Consistent with other developments and City policy, the City will be requiring the developer to make improvements in the portion of the Hudson Boulevard corridor adjacent to their site. These changes are to convert that part of the road from a rural section (with ditches) to an urban section with curb and gutter, a bituminous trail and underground storm sewer facilities. Site Plan and Density. The proposed site plan includes one 4-story building with 146 senior housing residential units, 146 underground parking spaces and 88 surface parking spaces. This plan also shows areas for community garden plots, gazebo, pool and firepit and other unplanned open space areas. There are also many amenities inside the building for physical fitness and entertainment. With 146 units on a 11.7 acre site, the gross density for this proposal is 12.47 units per acre. With 1.36 acres of wetland on the property, the site is 10.34 net acres for calculating density. 146 residential units divided by 10.34 acres equals 14.11 residential units per net acre. This is allowed within the proposed zoning district (HDR) and is consistent with the Comprehensive Plan land use guidance for the proposed land use designation (HDR). 4 Site and Design Changes. With the increased unit count from 103 to 146 the project must have a second means of access for public safety purposes. The plan depicts a permanent “emergency access only” access that connects to the private commercial driveway on the south property line. The emergency access would be 26 feet wide with a paved surface and grades not exceeding 7%. Site Character. The site is rolling with an elevation change of about 36 feet across the site – from an elevation of 962 near the sanitary sewer lift station along Hudson Boulevard to a high point of 998 in the north center of the site. There is a small ponding area labeled as a wetland (0.15 acre) near Eagle Pointe Boulevard and a larger wetland (1.36 acres) that the eastern property line of the site runs through. There are areas of trees on the slope facing Hudson Boulevard and around the edges of the larger wetland. Preliminary Plat. Since the site of the proposed development is now an Outlot (Outlot C of the Eagle Point Business Park Second Addition), the developer/applicant is asking the City to approve a preliminary plat as part of the PUD approval. The City Code does not allow building on an outlot – the owner must replat the property into a lot and block as the developer is requesting in this case. This platting process allows the City to ensure that all the necessary street right-of-way and easements are in place on the property. Traffic Study. The applicant had a traffic study prepared and submitted as part of their application for the 103-unit building. This study noted that a senior housing building is a relatively low traffic generator. In summary, the study showed that the 103-unit development would have minimal impacts on the operations of adjacent intersections and that it would not create enough additional traffic to warrant improvements at any of the nearby intersections. The additional 43 units should not create a significant additional impact. 5 Trails and Pedestrian Access. There are currently no trails or sidewalks adjacent to this site. The City’s long-term plan for Hudson Boulevard is to have an 8-foot-wide trail along the north side of street from Inwood Avenue to Manning Avenue. It has been the practice of the City to have developers install the segments of this trail along their respective project sites as part of the development of their projects. In this case, that would be about 1000 feet of trail along Hudson Boulevard running from Eagle Point Boulevard past the City’s sanitary sewer lift station to the existing driveway serving the High Pointe Health Campus. The proposed project plans show an 8-foot-wide trail along Hudson Boulevard to meet this requirement. The project plans also show a 6-foot-wide concrete sidewalk along Eagle Point Boulevard from Hudson Boulevard to the proposed driveway of Amira. This new sidewalk will provide an off-street pedestrian access from the new senior housing to the trail along Hudson Boulevard. Since Eagle Point Boulevard is a State-Aid road, there are specific design standards the new sidewalk must meet including width and having at least a 5-foot-setback from the curb. Wetland and Buffers. The proposed development plans show two wetlands on or partially on the property. The wetland along the eastern property line has 1.36-acres on the site out of the 2.5-acres of wetland area and the plans show a 0.15- acre wetland adjacent to Eagle Point Boulevard. The South Washington Watershed District determined the 0.15-acre wetland is actually a constructed stormwater pond and therefore not considered a wetland for their purposes. The plans show the applicant preserving both the wetlands and providing a buffer around them. The City requires the applicant to put easements on the final plat to accommodate the wetland and the wetland buffer. Park Land Dedication. The City established an overall fee in lieu of land dedication for the business park at the time of general concept plan approval and in conjunction with the final plat for the initial construction phase within the park. It appears that a portion of this fee is being paid with each building permit that is issued within the Eagle Point Business Park. The proposed development does not propose a public park but does provide outdoor recreation for its residents through the community garden plots, gazebo, pool and firepit and other unplanned open space areas. The proposed development consists of 11.7 acres, and the required parkland dedication for new development in the HDR zoning districts is 10%. The required amount of fees would be 10% of the purchase price or current market value of the property, which has yet to be determined. Parking. The City’s Zoning Code requires one off-street parking space per senior housing unit (regardless of size or number of bedrooms) and at least one visitor parking space per every four units. With 146 proposed senior housing units, the Code requires at least 183 parking spaces for this development. The developer is proposing a total of 234 parking spaces between an underground garage and surface parking. Electric charging stations will be located in the garage. Engineering Comments. The City Engineer has provided a detailed review memo (dated September 27, 2022) regarding the proposed preliminary PUD. The complete memo is attached for reference. Staff would like to highlight the following comments in summary: • Preliminary Plat and Easements o Revise preliminary and final plat and all project plans to provide watermain easement to be minimum 15-feet from watermain centerline near the front entrance along Eagle Point Boulevard. o Revise preliminary and final plat and all project plans to provide watermain easement to be minimum 15-feet each direction from the proposed fire hydrant along west side of building. o Emergency Access Easement Agreement. A draft agreement was submitted as part of the Preliminary Plat application to facilitate the construction and maintenance of a 6 secondary emergency access to the site from an existing privately owned commercial driveway. Preliminary Plat approval must be conditioned on the Emergency Access Easement Agreement being revised to the satisfaction of the City Attorney, Fire Chief and Public Works Director to ensure that there that the emergency access driveway meets the city requirements. • Streets and Transportation o Site Access. The preliminary plan proposes a single site access that is located along Eagle Point Boulevard, approximately 200 feet southwest from the existing Eagle Point business condominium private driveway. Although the 200‐foot spacing is less than the preferred minimum spacing of 330 feet for collector roadways, this appears to be the preferred access location for this development. The 200‐feet offset is acceptable due to the low speed and low daily traffic volumes on Eagle Point Boulevard. In addition, the proposed site access maintains a greater spacing distance from Hudson Boulevard, which provides for higher volume queuing within the existing Eagle Point Blvd turn lanes to Hudson Boulevard. o Secondary Access. The development density on this site requires a secondary access for emergency services. The site plan proposes a permanent “emergency access only” that connects to the existing private commercial driveway on the south property line. The emergency access will be a 26‐feet wide paved surface with grades not exceeding 7%. Preliminary plat approval must be contingent upon the permanent emergency access being constructed in accordance with Plans and Specifications approved by the City. • Municipal Sanitary Sewer o The preliminary plans are proposing 146 REC units for a site that was originally planned for 15 REC units. The proposed sewer connection point has the capacity available to accommodate this increase, however, lift station pump upgrades will be required sooner than was originally planned by the city due to the increased capacity demands from this zoning increase and development density.  As a condition of preliminary plat approval, the applicant will be required to pay $100,000 to the City’s Sewer Enterprise Fund to contribute toward the accelerated and increased lift station upgrades. o The applicant will be required to connect to the existing sanitary sewer along Hudson Boulevard, connecting to an existing 8‐inch sanitary sewer pipe extending northwest from the I94 Lift Station site. The preliminary plans propose a connection to this location as required. o The preliminary and final plans must identify the proposed sewer manhole SSWR‐104 as publicly owned and maintained.  The utility plans must be revised to label each 8‐inch sanitary sewer segment as “private service line” from SSWR 104 to SSWR 103; from SSWR 103 to SSWR 102; from SSWR 102 to SSWR 101. • Municipal Water Supply o Any watermain lines and hydrants placed within the development will remain city owned and operated. Therefore, minimum 30‐foot easements centered over the pipe/hydrant are required. Easements must be platted as part of the subdivision. Easements have been shown on the plans but must be revised to meet city requirements (see Preliminary/Final Plat requirements). o As a condition of preliminary plat approval, the applicant must submit domestic and fire suppression demands for the proposed 146‐Unit facility. Domestic demands must be based on Met Council SAC Determination usage methodology and equate to sanitary sewer flow determinations. Fire suppression demands must include a total 7 fire flow demand using AWWA and ISO methodology and must provide the demand on the municipal water supply system in gallons per minute (GPM) for a duration of 2 hours. • Stormwater Management o The proposed development is subject to a storm water management plan meeting State, South Washington Watershed District (SWWD) and City rules. A permit will be required from both the Minnesota Pollution Control Agency and SWWD. o Storm water facilities proposed as part of the site plan to meet State and SWWD permitting requirements must also be constructed in accordance with the City Engineering Design Standards Manual. o The Stormwater Management Report (SWMR) and analysis must be revised to determine if rate and volume control requirements are met for all points of discharge from the site for all storm event conditions. The existing and proposed drainage exhibits must be revised to clearly show and label all points of discharge from the site. The rate control tables must be revised to reference each point of discharge from the site together with the pre‐development rate and post‐development rate. o The Stormwater Management Report (SWMR) must be revised to provide a summary table of all drainage and depression areas on site with the existing and proposed NWL and HWL for each area.  The site and grading plans must be revised, if needed, to provide all low floor elevations to be at least 2 feet above any adjacent HWL, and 1 foot above any emergency overflow elevation. o The Stormwater Management Report (SWMR) must be revised to provide a summary table of each proposed BMP for the site together with a detailed description for the proposed facility type and function. o The storm water facilities constructed for this development should remain privately owned and maintained. The applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. o Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering design standards must be provided for all storm water facilities. Maintenance access must be clearly shown on the grading plans including access from the public right‐of‐way, and BMP maintenance access to all flared end sections and forebay. • Grading Plans o The grading plans must provide both the existing and the proposed normal water level (NWL) and 100‐year high water level (HWL) for both wetlands and all proposed storm water BMPs including the forebay. The 100‐year HWL contour must be clearly shown on the plans. All NWL and HWL must be revised to be consistent with the Stormwater Management Report submitted for the project. o The grading plans must clearly show the 100‐year HWL for the existing creek, including the 100‐year HWL contours and labeling the HWL elevation. o Overland emergency overflows or outlets must be clearly identified on the grading plans. o The grading plans must be revised to better depict the approach grades along the emergency fire access lane, including the maximum grade allowed. o Revise grading plan to mitigate erosion potential along retaining wall between Eagle Point Boulevard and wetland #2. o Revise grading to increase pipe cover over storm sewer run STRM 300 to STRM 301. 8 o Revise storm sewer pipe from STRM 100 to STRM 101 to RCP pipe (forebay pipe inlet). • Landscape Plans o The preliminary and final landscape plans must be revised to relocate all trees to reside outside of the proposed public easement areas including the proposed watermain easements and the property line drainage and utility easements (reserved for small/dry utility corridor).  Relocate trees within 15 feet of proposed fire hydrant along west side of building.  Relocate trees that are within 10 feet from the parcel boundary along Hudson Boulevard (southwest corner of the development). Landscape Architect Comments. The City’s Landscape Architect reviewed the plans for conformance with City Code Article VIII Environmental Performance Standards. This article provides standards for tree preservation and landscaping. The complete memo dated September 27, 2022 (Updated 10/5/22) is attached and staff would like to highlight the following comments in summary: • Land disturbance and grading activities are shown to be in conflict with the existing preserved tree critical root zones. Please review and revise the grading and tree preservation plans accordingly. • Sodded turf and irrigation are noted to be located within wetland buffer and shoreland impact zones. Review and revise for appropriate native vegetation cover within these areas and eliminate underground irrigation systems within natural areas. • Several trees are found to be in conflict with utilities. Provide a revised landscape plan addressing this finding. • The landscape plan exceeds the minimum required number of trees. • The landscape plan meets the minimum composition of required trees. • The landscape plan includes the required mitigation tree types and quantities. • The landscape plan meets the interior parking lot, perimeter parking lot and landscape screening requirements. Fire Department Comments. The Fire Chief reviewed the plans and provided several comments in a review memo dated September 23, 2022. The complete memo is attached for reference. Staff would like to highlight the following comments in summary: • All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning radiuses. The turning radius plan overlay has been provided and is accepted by the fire department. • The required secondary emergency access is provided and the location is approved by the fire department. The installation and maintenance of gates or other approved barricades across fire apparatus access road at both ends shall be provided and approved prior to installation. • An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. • Fire hydrants shall be provided in approved locations following review by Engineering and Public Works. COMPREHENSIVE PLAN AMENDMENT REVIEW The 2040 Comprehensive Plan has designated this site Mixed Use Business Park (MU-BP) in the land use plan. For this development to proceed, the City would need to approve a Comprehensive Plan amendment for the site to change the land use designation from MU-BP to HDR (high density 9 residential. The HDR land use is for higher density residential development ranging from 8 to 15 units per acre. Before submitting a Comprehensive Plan Amendment request to the Met Council for approval, a City must first submit the amendment for review by the Planning Commission, obtain local governing body (City Council) authorization for the amendment to be submitted to the Met Council for review, and give adjacent governmental units, affected special districts and affected school districts an opportunity to review the proposed amendment. Once they receive a Comprehensive Plan Amendment request, the Met Council has 15 days to determine if a Comprehensive Plan Amendment is complete for review and 60 days to approve or deny the request. They also may extend the review period for an additional 60 days if needed and beyond 120 days if agreed to by the local government. City staff sent the proposed Comprehensive Plan Amendment for adjacent agency review on September 14, 2022. The City of Woodbury replied to staff that they had no comment about the proposed change to the Comprehensive Plan for this site. The decision to change or amend the Comprehensive Plan is a policy matter for the Planning Commission to make a recommendation on to the City Council. Any change to the Comprehensive Plan should be based on findings and criteria to show that the change would be consistent with the goals and policies of the City. Such criteria may include that proposed Comprehensive Plan amendment would be consistent with the spirit and intent of the Comprehensive Plan and would be beneficial by providing a location for a housing option not currently available in the City. As a condition of approval of the proposed Comprehensive Plan Amendment, the City should require the submission of the necessary Comprehensive Plan Amendment to the Metropolitan Council and the City receiving formal notification from the Metropolitan Council that they have completed their review and that they have approved the proposed plan amendment. ZONING MAP AMENDMENT REVIEW In order for this development to proceed, the City also will need to approve a zoning map amendment (rezoning) for the property from MU-BP (mixed use business park) to HDR (high density residential). According the Lake Elmo Zoning Code, the HDR district is to provide for moderate to high density attached and multi-family housing, designed to present an attractive appearance to neighboring street and adjacent uses, to include sufficient private and semi-private outdoor space and to be well-integrated into their surroundings. Development in this district may occur at densities in excess of seven dwelling units per acre, provided the overall densities are consistent with the net densities specified in the Comprehensive Plan. If the City supports this development plan and approves the required Comprehensive Plan Amendment, then the City should change the zoning of the site to be consistent with the new land use designation. 10 Consistency with High Density Residential (HDR) Zoning District. For comparison, staff reviewed the proposed preliminary PUD Site Plan against the standards including setbacks, impervious coverage, etc. of the HDR and MU-BP zoning districts, as shown below. Standard HDR Required Proposed Impervious Surface Maximum 75% 30% Minimum Lot Width 50 feet 638 feet on Eagle Point Blvd. Front Yard Setback 20 feet 50 feet Interior Side Yard 15 feet 100 feet (estimated) Rear Yard Setback 20 feet 100 feet (estimated) Maximum Building Height 50 feet 52 feet (allowed through PUD) Parking Not to be located in the front yard or between the front façade and public street. Surface parking is located along Eagle Point Boulevard in front of the proposed building. (allowed through PUD) Open space 200 square feet of common open space provided per unit. This per unit requirement would require 29,200 square feet. The PUD criteria requires at least 20% of the site as open space or 101,930 square feet. Looking at the plans it appears that there is at least 250,000 square feet of open space, far exceeding both requirements. 11 Proposed Design. The proposed design of the development is a 4-story senior housing building. The elevations of the building show it will to have an exterior with a mix of cultured stone, a mix of vertical and horizontal board and batten metal siding and fiber cement panel, and a sloping asphalt shingle roof. The building design will need to meet the Lake Elmo Design Guidelines and Standards for materials and colors. It appears to based on the elevations provided. Building Height. The City measures building height to the mid-point of the sloped roof which would make the total building height about 52 feet. The City Council can approve additional height through the PUD. The minimal 2 foot increase is in the sloped roof which is consistent with the roofing styles of other residential development in the area. In this location, with no other residential buildings nearby, the proposed style and height of the building would fit the character of the area and should not cause any negative affects to adjacent properties. 12 Adherence to Lake Elmo Design Guidelines and Standards. The proposed development will need to meet the standards of the Lake Elmo design guidelines. It appears that the project will meet the Lake Elmo Design Guidelines and Standards in that: • The proposed structure is located and oriented in a manner that allows for pedestrian accessibility and provides visual interest from the public right-of-way. • The building is located as close to the public street as possible, easily accessible from the street; setbacks are varied slightly; recreational and common spaces are located at the interior or rear of the site. • Streetscapes provide for pedestrian accessibility and safety while offering aesthetically pleasing environments. With this proposed development, the City should require the developer to install a trail along Hudson Boulevard and a sidewalk along Eagle Point Boulevard to meet this City design standard. • The parking areas do not account for more than 50% of street frontage. - Does not meet. Flexibility requested through the PUD. Consistency with Planned Unit Development Regulations. This is an amendment to the previously approved PUD. The amendment is needed to increase the allowed unit count from 103 to 146. The building envelope and placement on the site would not change. • Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and size of buildings in order to better utilize site features and obtain a higher quality of development. A PUD amendment is required because the senior housing would be a land use not approved by the City for the original PUD. 13 • Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be served or is achieved. Staff has found that the proposed development would meet the following objectives: A. Innovation in land development techniques that may be more suitable for a given parcel than conventional approaches. • The proposed development fits the site while preserving the important natural features including slopes, trees and wetlands. B. Provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques. • The proposed development is proposing a number of recreational amenities to residents within the PUD including community garden plots, a gazebo, a pool and fire pit. C. Accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing. • The proposed senior housing development would provide additional housing opportunities within the City that would have convenient access to employment and commercial facilities. D. Preservation and enhancement of important environmental features through careful and sensitive placement of buildings and facilities. • The proposed site plan for the senior housing building shows careful placement of the proposed building in that it will preserve many of the existing trees on the site and would keep the proposed building well away from the existing wetlands on the site. RECOMMENDED FINDINGS Comprehensive Plan Amendment. Staff and the Planning Commission recommend approval of the Comprehensive Plan Amendment for the proposed Amira of Lake Elmo development as proposed by United Properties based on the following findings: 1. That the applicant has submitted a request to the City of Lake Elmo to amend the Comprehensive Plan in accordance with the procedures as established by the Lake Elmo Planning Department and the Lake Elmo Planning Commission; and 2. That the request is to amend the Land Use Plan Map for the site of the proposed Amira of Lake Elmo from MU-BP (mixed use business park) to HDR (High density residential); and 3. That the proposed amendment is consistent with the overall goals and objectives of the Lake Elmo Comprehensive Plan. Staff recommends the following condition of approval: 1. Submission of the Comprehensive Plan Amendment to the Metropolitan Council and the receipt of formal notification from the Metropolitan Council that they have reviewed and approved the proposed amendment. 14 Preliminary PUD/Plat. Staff and the Planning Commission recommend approval of the preliminary PUD Plan amendment for the proposed Amira of Lake Elmo development as proposed by United Properties based on the following findings: 1. That if the City amends the Lake Elmo Comprehensive Plan and Land Use Map to re-guide the site of this PUD from MU-BP (mixed use business park) to HDR (high density residential), the preliminary PUD plan would be consistent with the intent of the Lake Elmo Comprehensive Plan and Future Land Use Map for the area. 2. That the preliminary PUD Plan and Plat will meet the general intent of the High Density Residential Land Use designation in the Comprehensive Plan (with a Comprehensive Plan amendment) and the High Density Residential (HDR) zoning district with PUD modifications. 3. That the preliminary PUD Plan and Plat generally comply with the City’s Subdivision regulations. 4. That the preliminary PUD Plan and Plat is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated September 27, 2022. 5. That the preliminary PUD Plan meets the minimum requirement for a PUD including minimum lot area, open space and street layout. 6. That if the proposed preliminary PUD Plan has no more than 146 residential units, it will meet the allowed density requirement provided the City amends the Comprehensive Plan’s Land Use Map to re-guide this site from Mixed Use Business Park (MU -BP) to High Density Residential (HDR). 7. The preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 105.12.1130 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; and coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses.. Recommended Conditions of Approval. Staff and the Planning Commission recommend that City Council approve the preliminary PUD and preliminary plat amendment for the Amira of Lake Elmo Senior Living Development as proposed by United Properties with the following conditions: 1. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the following conditions before the City will accept a final plat or Final PUD application for the development and before the start of any clearing or grading activity on the site. 2. The revised preliminary plat and project plans shall address the comments from the City Engineer’s memo (9/27/22), Landscape Architect’s memo (10/5/22) and Fire Department memo (9/23/22). A point by point memo of how and where the comments have been addressed must accompany the revised preliminary plat and project plans. 3. For any privately owned and maintained storm water facilities, the applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 15 4. That the site shall incorporate stormwater reuse for irrigation purposes if approved by the City Engineer. 5. An Emergency Access Easement Agreement is required for secondary emergency access from an existing privately owned commercial driveway. The easement agreement must be revised to the satisfaction of the City Attorney, Fire Chief and Public Works Director to ensure that the emergency access driveway meets the city requirements. 6. Written landowner permission must be submitted as part of the final plat applications for any off‐site grading work to construct the Project. The proposed off‐site easements must be shown on the preliminary site plans, grading plans, and utility plans. 7. Sanitary sewer service is available to the site. The applicant will be responsible to connect to the city sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost. 8. The preliminary plans depict 146 REC units for a site that was originally planned for 15 REC units. Before recording the final plat, the applicant will be required to pay $100,000 to the City’s Sewer Enterprise Fund to contribute toward the accelerated and increased lift station upgrades. 9. The applicant will be responsible to extend municipal water into the development at its sole cost and will be required to construct a looped watermain network internal to the site with, at least, a second City watermain connection point. 8. Prior to submittal of an application for final plat, the applicant must submit domestic and fire suppression demands for the proposed 146‐Unit facility. Domestic demands must be based on Met Council SAC Determination usage methodology and equate to sanitary sewer flow determinations. Fire suppression demands must include a total fire flow demand using AWWA and ISO methodology and must provide the demand on the municipal water supply system in gallons per minute (GPM) for a duration of 2 hours. 9. The proposed development is subject to a storm water management plan meeting State, South Washington Watershed District (SWWD) and City rules. A permit will be required from both the Minnesota Pollution Control Agency and SWWD. 10. Storm water facilities proposed as part of the site plan to meet State and SWWD permitting requirements must also be constructed in accordance with the City Engineering Design Standards Manual. 11. Site grading must be consistent with the City Engineering Design Standards, and in accordance with Plans and Specifications approved by the City Engineer. 12. That the future final plat and final PUD plans would be for the parcel with the PID #33.029.21.44.0009. 13. That the future final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 14. That the applicant/developer provide the City land or a fee in lieu of park land dedication as required by Section 103.00.150 with the final plat. 15. That the final plat and final PUD Plans submittal include detailed architectural plans for the building. 16. That the applicant/developer installs all the required improvements in and adjacent to Hudson Boulevard. 17. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 18. That the PUD overlay zoning allow for the following: Amira of Lake Elmo – Planned Unit Development 16 Parking is allowed between the front façade and the public street (Eagle Point Boulevard) as depicted on the approved Preliminary PUD Plan. Maximum building height shall be 52 feet. Maximum unit count in the PUD is 146 units. 19. That the Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of the City Code. 20. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement or a Site Work Agreement with the City. Such an Agreement must be approved by the City Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. 21. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat of PUD approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat or final PUD, and said plan shall document extent of any proposed grading on the site. 22. That the City does not allow any parking and construction staging, including the loading and unloading of materials and equipment at any time on Hudson Boulevard or on Eagle Point Boulevard during the construction of the site improvements and building. FISCAL IMPACT: There would be no fiscal impact to the City at this time. When the property develops, it will have urban services and will pay sewer and water connection charges, building permit fees and the like that the developer and/or contractors will pay. RECOMMENDATIONS: City staff and the Planning Commission recommend that City Council take the following actions for the proposed Amira of Lake Elmo: Comprehensive Plan Amendment “Motion to approve Resolution No. 2022-102, approving a Comprehensive Plan amendment from MU-BP (mixed use business park) to HDR (high density residential, a preliminary PUD plan amendment, and a preliminary plat amendment for the site of the Amira of Lake Elmo on the corner of Hudson Boulevard and Eagle Pointe Boulevard. This amendment is based on the findings listed in the Staff report and subject to the condition listed in the staff report. Zoning Map Amendment “Motion to adopt Ordinance No. 2022-14, approving a zoning map amendment from MU-BP (mixed use business park) to HDR (high density residential) for the Amira of Lake Elmo development on the corner of Hudson Boulevard and Eagle Pointe Boulevard. This approval will be subject to the City amending the Comprehensive Plan for this site and is based on the findings listed in the Staff report.” 17 ATTACHMENTS: 1. Resolution 2022-102 2. Ordinance 2022-14 3. City Engineer memo 4. City Landscape Architect memo 5. Fire Department memo 6. Application Information 7. Plans Shared by the applicant: Information on the Amira project in Bloomington YouTube Link: https://bit.ly/AmiraBloomingtonShowcase YouTube Link: https://bit.ly/AmiraBloomingtonTestimonials CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2022- 102 RESOLUTION APPROVING THE UNITED PROPERTIES REQUESTS FOR AMENDMENT TO THE CITY OF LAKE ELMO COMPREHENSIVE PLAN FROM MU-BP (MIXED USE BUSINESS PARK) TO HDR (HIGH DENSITY RESIDENTIAL) AND AN AMENDMENT A PRELIMINARY PLAT AND PUD PLAN FOR PROPERTY FOR AMIRA LAKE ELMO TO BE LOCATED ON THE CORNER OF HUDSON BOULEVARD AND EAGLE POINT BOULEVARD. WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, the City of Lake Elmo has established a Comprehensive Plan that includes background data, policy statements, standards, and maps that help to guide the future physical, social, and economic development of the City; and WHEREAS, the City of Lake Elmo approved a Comprehensive Plan Amendment from BP to MU-BP, a zoning map amendment, an Eagle Pointe PUD amendment, and a preliminary plat and PUD plan for a 103 unit multi-family residential development on April 7, 2020; and WHEREAS, in 2022, the applicant increased the proposed number of units to 146 multi-family units; and WHEREAS, the increased residential unit count requires a Comprehensive Plan amendment, a preliminary PUD and Plat amendment, and zoning map amendment; and WHEREAS, the public notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.109, and MN State Statute 473.858; and WHEREAS, the Lake Elmo Planning Commission held a public hearing about the proposed amendments on October 12, 2022; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation of approval to the City Council as part of a staff report dated November 1, 2022; and WHEREAS, the City Council considered the said matters at its November 1, 2022 meeting and made the following findings of fact: Findings of Fact for Comprehensive Plan Amendment, and Preliminary Plat/PUD Amendment: 1. That the Comprehensive Plan amendment request is to amend the Land Use Plan Map for the site of the proposed Amira of Lake Elmo from MU-BP (mixed use business park) to HDR (High density residential). 2. That the proposed Comprehensive Plan amendment is consistent with the overall goals and objectives of the Lake Elmo Comprehensive Plan. 3. That if the City amends the Lake Elmo Comprehensive Plan and Land Use Map to re-guide the site of this PUD from MU-BP (mixed use business park) to HDR (high density residential), the preliminary PUD plan would be consistent with the intent of the Lake Elmo Comprehensive Plan and Future Land Use Map for the area. 4. That the preliminary PUD Plan and Plat will meet the general intent of the High Density Residential Land Use designation in the Comprehensive Plan (with a Comprehensive Plan amendment) and the High Density Residential (HDR) zoning district with PUD modifications. 5. That the preliminary PUD Plan and Plat generally comply with the City’s Subdivision regulations. 6. That the preliminary PUD Plan and Plat is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated September 27, 2022. 7. That the preliminary PUD Plan meets the minimum requirement for a PUD including minimum lot area, open space and street layout. 8. That if the proposed preliminary PUD Plan has no more than 146 residential units, it will meet the allowed density requirement provided the City amends the Comprehensive Plan’s Land Use Map to re-guide this site from Mixed Use Business Park (MU -BP) to High Density Residential (HDR). 9. The preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 105.12.1130 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; and coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve Amira Lake Elmo Comprehensive Plan Amendment and Amended Preliminary Plat & PUD Plans subject to the following conditions: 1. Submission of the Comprehensive Plan Amendment to the Metropolitan Council and the receipt of formal notification from the Metropolitan Council that they have reviewed and approved the proposed amendment. 2. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the following conditions before the City will accept a final plat or Final PUD application for the development and before the start of any clearing or grading activity on the site. 3. The revised preliminary plat and project plans shall address the comments from the City Engineer’s memo (9/27/22), Landscape Architect’s memo (10/5/22) and Fire Department memo (9/23/22). A point by point memo of how and where the comments have been addressed must accompany the revised preliminary plat and project plans. 4. For any privately owned and maintained storm water facilities, the applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 5. That the site shall incorporate stormwater reuse for irrigation purposes if approved by the City Engineer. 6. An Emergency Access Easement Agreement is required for secondary emergency access from an existing privately owned commercial driveway. The easement agreement must be revised to the satisfaction of the City Attorney, Fire Chief and Public Works Director to ensure that the emergency access driveway meets the city requirements. 7. Written landowner permission must be submitted as part of the final plat applications for any off‐site grading work to construct the Project. The proposed off‐site easements must be shown on the preliminary site plans, grading plans, and utility plans. 8. Sanitary sewer service is available to the site. The applicant will be responsible to connect to the city sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost. 9. The preliminary plans depict 146 REC units for a site that was originally planned for 15 REC units. Before recording the final plat, the applicant will be required to pay $100,000 to the City’s Sewer Enterprise Fund to contribute toward the accelerated and increased lift station upgrades. 10. The applicant will be responsible to extend municipal water into the development at its sole cost and will be required to construct a looped watermain network internal to the site with, at least, a second City watermain connection point. 10. Prior to submittal of an application for final plat, the applicant must submit domestic and fire suppression demands for the proposed 146‐Unit facility. Domestic demands must be based on Met Council SAC Determination usage methodology and equate to sanitary sewer flow determinations. Fire suppression demands must include a total fire flow demand using AWWA and ISO methodology and must provide the demand on the municipal water supply system in gallons per minute (GPM) for a duration of 2 hours. 11. The proposed development is subject to a storm water management plan meeting State, South Washington Watershed District (SWWD) and City rules. A permit will be required from both the Minnesota Pollution Control Agency and SWWD. 12. Storm water facilities proposed as part of the site plan to meet State and SWWD permitting requirements must also be constructed in accordance with the City Engineering Design Standards Manual. 13. Site grading must be consistent with the City Engineering Design Standards, and in accordance with Plans and Specifications approved by the City Engineer. 14. That the future final plat and final PUD plans would be for the parcel with the PID #33.029.21.44.0009. 15. That the future final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 16. That the applicant/developer provide the City land or a fee in lieu of park land dedication as required by Section 103.00.150 with the final plat. 17. That the final plat and final PUD Plans submittal include detailed architectural plans for the building. 18. That the applicant/developer installs all the required improvements in and adjacent to Hudson Boulevard. 19. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 20. That the PUD overlay zoning allow for the following: Amira of Lake Elmo – Planned Unit Development Parking is allowed between the front façade and the public street (Eagle Point Boulevard) as depicted on the approved Preliminary PUD Plan. Maximum building height shall be 52 feet. Maximum unit count in the PUD is 146 units. 21. That the Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of the City Code. 22. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement or a Site Work Agreement with the City. Such an Agreement must be approved by the City Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. 23. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat of PUD approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat or final PUD, and said plan shall document extent of any proposed grading on the site. 24. That the City does not allow any parking and construction staging, including the loading and unloading of materials and equipment at any time on Hudson Boulevard or on Eagle Point Boulevard during the construction of the site improvements and building. This resolution was adopted by the City Council of the City of Lake Elmo on this 1st day of November, 2022. _____________________________ Charles Cadenhead, Mayor ATTEST: ___________________________ Julie Johnson, City Clerk 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 2022-14 AN ORDINANCE AMENDING THE LAKE ELMO CITY ZONING CODE BY AMENDING THE OFFICIAL ZONING DISTRICT MAP OF THE CITY OF LAKE ELMO. The City Council of the City of Lake Elmo ordains that Lake Elmo City Code, Section 154.032 Zoning District Map, of the Municipal Code, shall be amended by adding Ordinance No. 2022- 14, as follows: SECTION 1. The following property(s), recognized by its current legal description and PID, is hereby rezoned from MU-BP (Mixed Use Business Park) to HDR (High Density Residential): OUTLOT C, EAGLE POINT BUSINESS PARK 2ND ADDITION, WASHINGTON COUNTY, MINNESOTA, 33.029.21.44.0009 SECTION 2. The City Council of the City of Lake Elmo also hereby ordains that the Planning Department shall make the applicable changes to the official Zoning Map of the City of Lake Elmo. SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 4. Adoption Date. This Ordinance was adopted on this 1st day of November 2022, by a vote of Ayes and Nays. LAKE ELMO CITY COUNCIL _________________________________ Charles Cadenhead, Mayor ATTEST: _________________________________ Julie Johnson, City Clerk     PAGE 1 of 4  MEMORANDUM           Date:  September 27, 2022      To:  Molly Just, Planner Director  Re:  Amira (United Properties)  Cc:  Chad Isakson, Assistant City Engineer    Preliminary PUD Plat/Plan Review  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Amira Preliminary PUD Plat/Plans. The review consisted of the  following documentation received on September 14, 2022:   Amira Lake Elmo Site Development Plans dated September 9, 2022.   Amira Lake Elmo Preliminary and Final Plat dated September 8, 2022.   Emergency Access Easement Draft Agreement, not dated.   Stormwater Management Report, revised September 12, 2022.      STATUS/FINDINGS: Engineering has prepared the following review comments based on the plans submitted.  Preliminary Plat/Plan approval should be contingent upon the applicant addressing all review comments to the  satisfaction of City staff.    In  addition,  it  is  recommended  that  it  be  a  condition  of  Preliminary  Plat/Plan  approval  that  all  public  improvements constructed to support the development must be designed and constructed in accordance with the  City  Engineering  Design  Standards  Manual  dated  January  2022, unless  specifically  requested  and  approved  otherwise by the City Engineer. The Preliminary Plat/Plans must be revised accordingly. All City plan notes and  details must be updated with the current plan notes and details dated January 2022.        PRELIMINARY PLAT AND EASEMENTS   Additional right‐of‐way dedication and utility easement is shown as required along Eagle Point Boulevard  to accommodate any proposed or potential future improvements near the intersection of the Eagle Point  business condominium private driveway.   Drainage and utility easements are shown to be dedicated on the preliminary plat, as required, along all  lot lines, including a minimum 10‐foot‐wide easement along Hudson Boulevard.   Dedicated utility easements will be required over all existing and proposed public watermain and existing  public storm sewer, meeting all minimum city standards. Utility easement revisions will be necessary on  the preliminary and final plat to reflect required changes to the utility alignments and routing.   Revise preliminary and final plat and all project plans to provide watermain easement to be minimum  15‐feet from watermain centerline near the front entrance along Eagle Point Boulevard.   Revise preliminary and final plat and all project plans to provide watermain easement to be minimum  15‐feet each direction from the proposed fire hydrant along west side of building.   There are no Outlots proposed or needed for the privately owned and maintained storm water  management  facilities  including  the  proposed  underground  storm water  BMP.  Drainage  and  utility  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 4  easements will be required over all 100‐year high water level areas, all storm water maintenance access  roadways, and to protect all overland emergency overflow paths.   For any privately owned and maintained storm water facilities, the applicant will be required to execute  and  record  a  Stormwater  Maintenance  and  Easement  Agreement  in  the  City’s  standard  form  of  agreement.   Emergency Access Easement Agreement. A draft agreement was submitted as part of the Preliminary Plat  application to facilitate the construction and maintenance of a secondary emergency access to the site  from an existing privately owned commercial driveway.  Preliminary Plat approval must be conditioned on  the Emergency Access Easement Agreement being revised to the satisfaction of the City Attorney, Fire  Chief and Public Works Director to ensure that there that the emergency access driveway meets the city  requirements.    Written landowner permission must be submitted as part of the final plat applications for any off‐site  grading  work  to  construct  the  Project.  The  proposed  off‐site  easements  must  be  shown  on  the  preliminary site plans, grading plans, and utility plans. It appears a temporary construction easement may  be required to complete the proposed grading and construct the emergency vehicle access along the  south property line.     STREETS AND TRANSPORTATION     Site Access. The preliminary plan proposes a single site access that is located along Eagle Point Boulevard,  approximately 200 feet southwest from the existing Eagle Point business condominium private driveway.  Although  the  200‐foot  spacing  is  less  than  the  preferred  minimum  spacing  of  330  feet  for  collector  roadways, this appears to be the preferred access location for this development. The 200‐feet offset is  acceptable due to the low speed and low daily traffic volumes on Eagle Point Boulevard. In addition, the  proposed site access maintains a greater spacing distance from Hudson Boulevard, which provides for  higher volume cueing within the existing Eagle Point Blvd turn lanes to Hudson Boulevard.   Hudson Boulevard Improvements. Improvements along Hudson Boulevard are required as part of the  Subdivision  in  accordance  with  the  Hudson  Boulevard  Design  Standards, with an urban section and  bituminous trail along the north boulevard. The proposed preliminary plans provide typical sections that  are consistent with the required improvements. Preliminary plat approval must be contingent upon the  improvements  being  constructed  consistent  with  the  Hudson  Boulevard  and  City  Engineering  design  standards, and in accordance with Plans and Specifications approved by the City Engineer.   Pedestrian  Connectivity.  The  preliminary  plans  propose  a  6‐foot  concrete  sidewalk  along  Eagle  Point  Boulevard from the proposed site access location to Hudson Boulevard. A bituminous trail is proposed to  extend east along the full extent of the Hudson Boulevard right‐of‐way. Preliminary plat approval must be  contingent upon the sidewalk and trail being constructed consistent with the Hudson Boulevard and City  Engineering design standards, and in accordance with Plans and Specifications approved by the City.   Private Streets. The streets interior to the development are proposed to remain privately owned and  maintained. Interior street design may require revisions to provide adequate fire lanes and safety access,  subject to review from the Lake Elmo Fire Department.   Secondary Access.  The development density on this site requires a secondary access for emergency  services. The site plan proposes a permanent “emergency access only” that connects to the existing  private commercial driveway on the south property line.  The emergency access will be a 26‐feet wide  paved surface with grades not exceeding 7%. Preliminary plat approval must be contingent upon the  permanent emergency access being constructed in accordance with Plans and Specifications approved by  the City.    MUNICIPAL SANITARY SEWER   The proposed site is guided in the city’s Comprehensive Plan for Phase I of the Regional Sewer Staging  Plan and would discharge to the MCES WONE Interceptor.    Sanitary sewer service is available to the site. The applicant will be responsible to connect to the city  sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost.       PAGE 3 of 4   The preliminary plans are proposing 146 REC units for a site that was originally planned for 15 REC units.  The proposed sewer connection point has the capacity available to accommodate this increase, however,  lift station pump upgrades will be required sooner than was originally planned by the city due to the  increased capacity demands from this zoning increase and development density.   As a condition of preliminary plat approval, the applicant will be required to pay $100,000 to the  City’s Sewer Enterprise Fund to contribute toward the accelerated and increased lift station upgrades.   The  applicant  will  be  required  to  connect  to  the  existing  sanitary  sewer  along  Hudson  Boulevard,  connecting to an existing 8‐inch sanitary sewer pipe extending northwest from the I94 Lift Station site.  The preliminary plans propose a connection to this location as required.   The preliminary and final plans must identify the proposed sewer manhole SSWR‐104 as publicly owned  and maintain.   The utility plans must be revised to label each 8‐inch sanitary sewer segment as “private service line”  from SSWR 104 to SSWR 103; from SSWR 103 to SSWR 102; from SSWR 102 to SSWR 101.    MUNICIPAL WATER SUPPLY   Municipal water service is available to the site. The applicant will be responsible to extend municipal  water into the development at its sole cost and will be required to construct a looped watermain network  internal  to  the  site  with,  at  least,  a  second  City  watermain  connection  point.  The  preliminary  plans  propose a looped watermain with two connection points as required; one connection to the existing 12‐ inch trunk watermain located along Eagle Point Boulevard, and one connection to the existing 12‐inch  trunk watermain located along Hudson Boulevard.   The applicant will be responsible to place hydrants and water system valves as determined by the Lake  Elmo Public Works Director and Fire Department.  The project proposes  three  hydrants.  Additional  hydrants may be required. All fire hydrants shall be owned and maintained by the city.    Any watermain lines and hydrants placed within the development will remain city owned and operated.  Therefore, minimum 30‐foot easements centered over the pipe/hydrant are required. Easements must be  platted as part of the subdivision. Easements have been shown on the plans but must be revised to meet  city requirements (see Preliminary/Final Plat requirements).   As a condition of preliminary plat approval, the applicant must submit domestic and fire suppression  demands  for  the  proposed  146‐Unit  facility.  Domestic  demands  must  be  based  on  Met  Council  SAC  Determination usage methodology and equate to sanitary sewer flow determinations. Fire suppression  demands must include a total fire flow demand using AWWA and ISO methodology and must provide the  demand on the municipal water supply system in gallons per minute (GPM) for a duration of 2 hours.    No watermain pipe oversizing is anticipated at this time.     STORMWATER MANAGEMENT   The proposed development is subject to a storm water management  plan  meeting  State,  South  Washington  Watershed  District  (SWWD) and City rules. A permit will  be  required  from  both  the  Minnesota Pollution Control Agency and SWWD.    Storm water facilities proposed as part of the site plan to meet State and SWWD permitting requirements  must also be constructed in accordance with the City Engineering Design Standards Manual.   The Stormwater Management Report (SWMR) and analysis must be revised to determine if rate and  volume  control  requirements  are  met  for  all  points  of  discharge  from  the  site  for  all  storm  event  conditions. The existing and proposed drainage exhibits must be revised to clearly show and label all  points of discharge from the site. The rate control tables must be revised to reference each point of  discharge from the site together with the pre‐development rate and post‐development rate.   The Stormwater Management Report (SWMR) must be revised to provide a summary table of all drainage  and depression areas on site with the existing and proposed NWL and HWL for each area.   The site and grading plans must be revised, if needed, to provide all low floor elevations to be at least  2 feet above any adjacent HWL, and 1 foot above any emergency overflow elevation.      PAGE 4 of 4    The Stormwater Management Report (SWMR) must be revised to provide a summary table of each  proposed BMP for the site together with a detailed description for the proposed facility type and function.   The  storm  water  facilities  constructed  for  this  development  should  remain  privately  owned  and  maintained. The applicant will be required to execute and record  a  Stormwater  Maintenance  and  Easement Agreement in the City’s standard form of agreement.   Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering  design standards must be provided for all storm water facilities. Maintenance access must be clearly  shown on the grading plans including access from the public right‐of‐way, and BMP maintenance access  to all flared end sections and forebay.    GRADING PLANS   The preliminary grading plans have been submitted to depict the general grading requirements for the  Project. Preliminary plat approval must be contingent upon the site grading being consistent with the City  Engineering  Design  Standards,  and  in  accordance  with  Plans  and Specifications approved by  the City  Engineer.   The grading plans must provide both the existing and the proposed normal water level (NWL) and 100‐ year high water level (HWL) for both wetlands and all proposed storm water BMPs including the forebay.  The 100‐year HWL contour must be clearly shown on the plans. All NWL and HWL must be revised to be  consistent with the Stormwater Management Report submitted for the project.   The grading plans must clearly show the 100‐year HWL for the existing creek, including the 100‐year HWL  contours and labeling the HWL elevation.   Overland emergency overflows or outlets must be clearly identified on the grading plans.   The grading plans must be revised to better depict the approach grades along the emergency fire access  lane, including the maximum grade allowed.   Revise grading plan to mitigate erosion potential along retaining wall between Eagle Point Boulevard and  wetland #2.   Revise grading to increase pipe cover over storm sewer run STRM 300 to STRM 301.   Revise storm sewer pipe from STRM 100 to STRM 101 to RCP pipe (forebay pipe inlet).   Final plans and specifications must provide all design details for each proposed BMP.    LANDSCAPE PLANS   The preliminary and final landscape plans must be revised to relocate all trees to reside outside of the  proposed public easement areas including the proposed watermain easements and the property line  drainage and utility easements (reserved for small/dry utility corridor).   Relocate trees within 15 feet of proposed fire hydrant along west side of building.   Relocate trees that are within 10 feet from the parcel boundary along Hudson Boulevard (southwest  corner of the development).                            Memo File: 227701390 To: Molly Just, City of Lake Elmo Planning Director From: Sarah Harding, Landscape Architect Mark Flicker, Landscape Architect Subject: City of Lake Elmo Landscape Plan Review United Properties Amira Community Review #4 Date: September 27, 2022 (Updated 10/5/22) Submittals  Civil/Tree Preservation/Landscape Plans dated September 9, 2022, received on September 14, 2022. Review History • Initial landscape review on November 26, 2019. • Resubmittal landscape review on April 5, 2021. • Resubmittal landscape review on February 10, 2022. Location: Northeast quadrant of the intersection of Hudson Boulevard & Eagle Point Boulevard Land Use Category: Mixed Use Business Park - PUD Surrounding Land Use Concerns: None. Special considerations: Shoreland Management and Wetland Protection and Preservation Tree Preservation: • The following comments from the previous landscape plan review have not been addressed: − Plan shows many preserved trees near the construction limits with tree protection fence well within the critical root zone of those trees. In particular tree IDs 70, 73, 104, 147, 149, 152, 173, 177, 184, 186, 188, and 197, among others, are of particular concern as most are large, hardwood Oak species. Refer to Code 152.12.470 (b) Definitions and (c) (11) Protective measures for critical root zone definition and tree protection measure distances. Submit a plan showing the critical root zones for the existing trees to be preserved and additional tree protection notes and details to demonstrate that all grading and construction impacts are clear of preserved tree critical root zones. − There are 5 specimen trees identified in the tree inventory, noted as trees 81, 88, 89, 184, and 196. All specimen trees are indicated be preserved, however refer to critical root zones and tree protection measures concern above. − Include City of Lake Elmo standard tree protection detail on Tree Preservation Plan. • Tree replacement is required because more than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. • This project is considered a residential development; therefore, mitigation replacement trees shall be in addition to landscape required tree counts. September 27, 2022 (Updated 10/5/22) Molly Just, Planning Director City of Lake Elmo Page 2 of 4 • Additional tree removals may result in additional tree replacements from that shown in the below calculations table. Table 1 – Tree Preservation / Mitigation Calculations Total Caliper Inches of Significant Trees On-Site: 3,256 Cal Inches Common Trees 272 Conifer/Evergreen Trees 0 Hardwood Trees 1,475 Nuisance Trees 1,509 Significant Inches Removed On-Site 1,264 Cal Inches Common Trees 108 Conifer/Evergreen Trees 0 Hardwood Trees 365 Nuisance Trees 1133 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 32.4 108 Subtract Conifer/Evergreen Tree Removals 0 0 Subtract Hardwood Tree Removals 109.5 365 Removals in excess of 30% allowances Removals in excess of 30% allowances 331.1 Cal Inches Common Removals in Excess of 30% Allowance 75.6 Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 255.5 Common Tree Replacement Needed (1/4 the dia inches removed) 18.9 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 127.8 Cal Inches Common Tree Replacement Required @ 2.5" per Tree 8 # Trees Conifer Tree Replacement Required @ 2.5" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 52 # Trees Landscape Requirements: • The landscape plans exceed the minimum code required number of trees. The below table has been updated with the breakdown of proposed trees in italics. Code Required Proposed Street frontage 1700 Lineal Feet Lake Shore 0 Lineal Feet Stream Frontage 0 Lineal Feet Total Linear Feet 1700 Lineal Feet /50 Feet = Required Frontage Trees (Existing) 34 34 Trees Development or Disturbed Area 11.7 Acres September 27, 2022 (Updated 10/5/22) Molly Just, Planning Director City of Lake Elmo Page 3 of 4 *5 = Required Development Trees 59 59 Trees Interior Parking Lot Spaces* 88 Spaces /10 = Required Parking Lot Trees 9 9 Trees Perimeter Parking Lot Frontage Length 470 Lineal Feet /50 = Required Frontage Strip Trees 10 11 Trees Required Mitigation Trees 60 60 Required Number of Trees 172 Total Trees Provided 173 • The landscape plans meet the minimum composition of required trees: Qty % Composition Deciduous Shade Trees 104 60% >25% required Coniferous Trees 47 27% >25% required Ornamental Trees 22 13% <15% required Tree Count 173 • The landscape plans include the required mitigation tree types and quantities: Required Proposed Onsite Common Trees 8 40 Conifers 0 47 Hardwood Trees 52 64 • The landscape plans meet the interior parking lot, perimeter parking lot and landscape screening requirements. • The following comments from the previous plan review have not been addressed: − The landscape plans do not meet 105.12.480 (b) (7) Design Considerations for utility conflict requirements: o Trees shall be planted 10-feet away from all utilities, including water and sewer stubs unless approved by the City. − Land disturbance within the wetland buffer and creek/shoreland impact zones, shall be native vegetation without an underground irrigation system within natural areas. Provide hatching on plans to indicate type of vegetation and location. − The land disturbing activities / proposed grading at the base of the wall on Sheet C503 indicate that the proposed 987 contour ties into the existing 986 contour, which suggests that additional land disturbance may be required within the wetland buffer and further impacts to preserved trees may be a result. September 27, 2022 (Updated 10/5/22) Molly Just, Planning Director City of Lake Elmo Page 4 of 4 Findings: • Land disturbance and grading activities are shown to be in conflict with the existing preserved tree critical root zones. Please review and revise the grading and tree preservation plans accordingly. • Sodded turf and irrigation are noted to be located within wetland buffer and shoreland impact zones. Review and revise for appropriate native vegetation cover within these areas and eliminate underground irrigation systems within natural areas. • Several trees are found to be in conflict with utilities. Provide a revised landscape plan addressing this finding. Recommendation: It is recommended that a condition of approval remains the same, with the previous comments as listed below to be addressed: • Submit a revised tree preservation plan and grading plan addressing the grading impacts, critical root zone, and tree protection measures finding above. • Submit a revised landscape plan addressing the findings above. Stantec Consulting Services Inc. Sarah Harding, PLA (MN) City of Lake Elmo Municipal Landscape Architect P: (952) 334-4838 E: sarah.harding@stantec.com “Proudly Serving Neighbors & Friends” Lake Elmo Fire Department Memorandum To: Molly Just, Planning Director From: Dustin Kalis, Fire Chief Date: 9/23/2022 Re: Preliminary Plat/PUD, Zoning Map Amendment, Comprehensive Plan (Map) Amendment: United Properties, Hudson Boulevard & Eagle Point Boulevard (PID 3302921440009) _______________________________________________________________________________________ The Lake Elmo Fire Department has completed a Preliminary Plat/PUD, Zoning Map Amendment, Comprehensive Plan (Map) Amendment of United Properties, Hudson Boulevard & Eagle Point Boulevard (PID 3302921440009) review based on submittals dated 9/8/22 with the following comments: 1) All roads and drive lanes shall meet the Lake Elmo Fire Department requirements for widths and turning radiuses. The turning radius plan overlay has been provided and is accepted by the fire department. 2) The required secondary emergency access is provided and the location is approved by the fire department. The installation and maintenance of gates or other approved barricades across fire apparatus access road at both ends shall be provided and approved prior to installation. 3) An approved signage and marking plan shall be determined for all No Parking and Fire Lane access roads. 4) Fire hydrants shall be provided in approved locations following review by Engineering and Public Works. 5) Building address numbers shall be plainly visible from the street fronting the property and shall contrasting color from the background. Addresses may be required to be posted adjacent to driveways or other access ways. Size and placement of address numbers shall be approved by the fire and planning departments. 6) A Fire Department lock box is required for emergency access to building at an approved location. Provide keys for emergency access into and throughout the occupancy as required. 7) The fire sprinkler system shall be installed compliant with provisions of 2016 NFPA Standard 13, Installation of Sprinkler Systems. City permit required prior to initiation of work. 8) Standpipes shall be installed compliant with 2016 NFPA 14, Standard for the Installation of Standpipe and Hose Systems. 9) Fire Department sprinkler connection locations to be approved prior to installation. 10) The fire alarm systems shall be installed compliant with provisions of 2016 NFPA Standard 72, National Fire Alarm Code. City permit required prior to initiation of work. “Proudly Serving Neighbors & Friends” 11) The sprinkler system shall be properly monitored by a qualified monitoring company. 12) Install emergency egress illumination in the means of egress including exit discharge compliant with 2020 MSFC. 13) Install compliant exit signage as required by the 2020 MSFC. 14) Provide and install dry chemical fire extinguishers certified for service and tagged as required. Service classification rating shall be a minimum 2A classification rating and maximum travel distance of 75 feet to extinguishers. The minimum classification rating may be upgraded for special or extra hazard areas within the occupancy. 15) Rooms containing controls for air-conditioning systems, roof access, elevator equipment, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Codes and Standards Used for this Review This review is based on the following codes and standards as adopted and in effect in the State of Minnesota at the time of plan submittal.  2020 Minnesota State Fire Code  Lake Elmo Fire Department Fire Code Policy  NFPA 72, 2016 edition  NFPA 13, 2016 edition  NFPA 14, 2016 edition September 9, 2022 Molly Just Planning Director City of Lake Elmo 3880 Laverne Avenue North Suite 100 Lake Elmo, MN 55042 Dear Ms. Just, United Properties is requesting a Comprehensive Plan Amendment for a 146-unit age-restricted 55+ year old Amira community. This will be independent living with no services- not dissimilar to the previously contemplated Applewood. The proposed community will include numerous interior and exterior amenities for residents to enjoy. As proposed, the building will be 4-stories with an underground parking garage and will include electric vehicle charging stations. I would like to provide some context on our efforts to develop the “for sale” Applewood Community. We pursued this development for a couple of years and in fact kicked off our sales efforts a month before the start of the covid pandemic. This was not ideal timing as we lost much of 2020 due to the inability to hold in-person meetings. We never got back to full pre- pandemic activity and the current trend of higher construction pricing and interest rates clearly impacted the “for sale” housing market. Based on weak sales we decided to consider a change to rental earlier this year which is still very much in demand. We have found that our potential buyers have a growing interest in upscale 55+ rental communities. We believe this is due to increased flexibility and high cost of buying vs. renting their home. Our Amira brand communities have been very successful. We built our first community in Roseville which we toured with the Lake Elmo Mayor and opened a second in Bloomington this past Spring which is already 80% leased. A third community is under construction in Minnetonka. https://www.amiracommunities.com/communities We just completed a market demand study for 55+ rental and it indicates unmet current demand of 171 units at this location growing to over 200 by 2027. Our approach to changing to an Amira is to keep as much of the previously approved Applewood design intact including the building footprint, exterior design, interior common area and sitework. If you put the current Amira next to the previous 103-unit Applewood, the plans look pretty much identical except for an added pool, expanded garage parking and secondary emergency access to the south. We have essentially kept the same footprint and downsized the average unit size to reflect the rental vs “for sale” market. This will remain a senior community, with no intense services associated with an assisted living community, resulting in low impact density; it will bring a similar tax base to the city; and the same developer provided Hudson Blvd improvements. We would also increase our contribution toward future lift station improvements based on the increased unit density. By proceeding with a Comprehensive Plan Amendment from BP (business park) to HDR (high density residential) to allow for a high-density residential development on this parcel, we firmly believe this would provide an opportunity to incorporate a low traffic generating residential land use in this area that is in high demand. We are confident that Lake Elmo’s reputation along with the local amenities and nearby retail options will make this a very popular location for an Amira community. For comparison purposes, we have shown the impacts of a 30,000± SF office building compared to our proposed Amira project. In our research it was determined that the anticipated tax revenue for Amira is anticipated to generate approximately 36%-49% more tax revenue than an office building, as illustrated in Table 1 below. In addition, the Amira community will generate less traffic than an office building, as well as require significantly less surface parking spaces, greatly reducing the impacts of an already challenging site in terms of stormwater management. TABLE 1: TAX REVENUE COMPARISON PROPERTY SQUARE FOOTAGE ESTIMATED VALUE NET TAX AMOUNT CURRENT SITE Vacant Land $1,322,800 $60,738 8519 EAGLE POINT BLVD 32,000 $4,090,900 $152,214 8550 HUDSON BLVD N 30,000 $5,577,400 $207,598 AMIRA LAKE ELMO 277,372 $73,000,000 $425,316 Best Regards, J. Mason Jennifer Mason Development Manager September 9, 2022 Molly Just Planning Director City of Lake Elmo 3880 Laverne Avenue North Suite 100 Lake Elmo, MN 55042 Dear Ms. Just, United Properties is requesting a Comprehensive Plan Amendment for a 146-unit age-restricted 55+ year old Amira community. This will be independent living with no services- not dissimilar to the previously contemplated Applewood. The proposed community will include numerous interior and exterior amenities for residents to enjoy. As proposed, the building will be 4-stories with an underground parking garage and will include electric vehicle charging stations. I would like to provide some context on our efforts to develop the “for sale” Applewood Community. We pursued this development for a couple of years and in fact kicked off our sales efforts a month before the start of the covid pandemic. This was not ideal timing as we lost much of 2020 due to the inability to hold in-person meetings. We never got back to full pre- pandemic activity and the current trend of higher construction pricing and interest rates clearly impacted the “for sale” housing market. Based on weak sales we decided to consider a change to rental earlier this year which is still very much in demand. We have found that our potential buyers have a growing interest in upscale 55+ rental communities. We believe this is due to increased flexibility and high cost of buying vs. renting their home. Our Amira brand communities have been very successful. We built our first community in Roseville which we toured with the Lake Elmo Mayor and opened a second in Bloomington this past Spring which is already 80% leased. A third community is under construction in Minnetonka. https://www.amiracommunities.com/communities We just completed a market demand study for 55+ rental and it indicates unmet current demand of 171 units at this location growing to over 200 by 2027. Our approach to changing to an Amira is to keep as much of the previously approved Applewood design intact including the building footprint, exterior design, interior common area and sitework. If you put the current Amira next to the previous 103-unit Applewood, the plans look pretty much identical except for an added pool, expanded garage parking and secondary emergency access to the south. We have essentially kept the same footprint and downsized the average unit size to reflect the rental vs “for sale” market. This will remain a senior community, with no intense services associated with an assisted living community, resulting in low impact density; it will bring a similar tax base to the city; and the same developer provided Hudson Blvd improvements. We would also increase our contribution toward future lift station improvements based on the increased unit density. By proceeding with a Comprehensive Plan Amendment from BP (business park) to HDR (high density residential) to allow for a high-density residential development on this parcel, we firmly believe this would provide an opportunity to incorporate a low traffic generating residential land use in this area that is in high demand. We are confident that Lake Elmo’s reputation along with the local amenities and nearby retail options will make this a very popular location for an Amira community. For comparison purposes, we have shown the impacts of a 30,000± SF office building compared to our proposed Amira project. In our research it was determined that the anticipated tax revenue for Amira is anticipated to generate approximately 36%-49% more tax revenue than an office building, as illustrated in Table 1 below. In addition, the Amira community will generate less traffic than an office building, as well as require significantly less surface parking spaces, greatly reducing the impacts of an already challenging site in terms of stormwater management. TABLE 1: TAX REVENUE COMPARISON PROPERTY SQUARE FOOTAGE ESTIMATED VALUE NET TAX AMOUNT CURRENT SITE Vacant Land $1,322,800 $60,738 8519 EAGLE POINT BLVD 32,000 $4,090,900 $152,214 8550 HUDSON BLVD N 30,000 $5,577,400 $207,598 AMIRA LAKE ELMO 277,372 $73,000,000 $425,316 Best Regards, J. Mason Jennifer Mason Development Manager SITE Eagle Point Business Park - Outlot C - PID 33.029.21.044.0009 Parcels Easement Lines COMPUTED UTILITY_DRAINAGE Trails Water Lines MNWASH038007.sid Red: Band_1 Green: Band_2 Blue: Band_3 MNWASH032009.sid Red: Band_1 Green: Band_2 Blue: Band_3 9/14/2022, 1:36:31 PM 0 590 1,180295ft 0 180 36090m 1:9,028 SITE Eagle Point Business Park - Outlot C - PID 33.029.21.044.0009 Parcels Easement Lines COMPUTED UTILITY_DRAINAGE Trails Water Lines 9/14/2022, 1:34:39 PM 0 300 600150ft 0 80 16040m 1:4,514 ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! !! !! !! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! !! ! !! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! !! ! !! ! ! !! ! ! !! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! !! !! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! !! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! !! ! ! !! ! !! ! !! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! !! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! !! !! !! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! !! ! !! ! !! ! !! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! ! !! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! !! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! !! ! ! !! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! !! !! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! !! !! !! ! !! ! !! !! !! ! !! ! !! !! ! ! !! ! ! ! ! !! ! ! !! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! !! ! ! !! ! ! ! ! ! !! ! !! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! !! ! ! !! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! !! !! ! ! !! ! ! ! ! ! ! !! !! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! !! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! !! !! ! ! !! ! ! ! !! ! !! ! ! ! ! !! ! ! ! !! ! ! !! ! ! !! ! ! !! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! ! !! ! ! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! !! ! !! ! !! ! !! ! !! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! !! ! ! !! ! ! !! ! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! !! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! ! ! ! !! ! !! ! ! ! ! ! !! !! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! !! ! ! ! !! !! ! ! !! !! ! ! !! !! ! ! ! !! ! !! ! ! ! !! !! ! ! ! !! ! !! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! !! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! !! !! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! !! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Oakdale Inwood Av enue Nort h 10th St reet N ort h 5t h Street North Eagle P oint B oulevar d LakeOlson Lake Jane LakeElmo Sunfish L a k e EaglePoint L a k e DownsLake 0 1800 3600 5400 7200Ft ´ Future Land Use Map 2040 FutureLand Use Map Date: August, 2022 Planned Roadway (Parkway)MUSA Boundary C Closed Landfill Institutional ParkBP LB V-HDR V-MU PSP ROW AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR LakeDeMontreville Lake Jane LakeOlson SunfishLake Lake Elmo DownsLake HorseshoeLake RoseLakeGooseLake Eagle PointLake Designation of indicated parcel to change from MU-BP to HDR A100 RENDERED SITE PLAN SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency EXTERIOR ELEVATIONS EAST ELEVATION AT POOL AND DECK AREA WEST ELEVATION m o END ELEVATION (TYPICAL) EXTERIOR MATERIAL PALETTE VERTICAL BOARD & BATTEN METAL PANEL SIDING HORIZONTAL METAL PANEL SIDING CULTURED STONE RAISED STUCCO FIBER CEMENT PANEL METAL TRIM WOOD TEXTURE/STAIN A401 EXTERIOR ELEVATIONS & MATERIALS FIBER CEMENT PANEL ASPHALT SHINGLES VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE ROCK-FACED BLOCK FIBER CEMENT PANEL ASPHALT SHINGLES VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE FIBER CEMENT PANEL ASPHALT SHINGLES FIBER CEMENT PANEL VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE SEPT 9, 2022 GENERATOREDGE OF WATEREDGE OF WATERCENTERLINE CREEKBRIDGEABUTTMENT(WATER ELEV. = 978.2 AS OF 7/11/19)DASHED PAVEMENT STRIPEAPPROXIMATELOCATIONPIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NO PARKING NO PARKING SENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES D DEEB B C F G G N H L L O O P P P P P Q M M M M M M M M MZ Z C E E AA BB O BB I AA F L K E AA AA STEP(S), SEE SHEET C500 A E E EMAIN ENTRANCE PROPOSED REDIROCK (OR APPROVED EQUAL) RETAINING WALL WITH GUARDRAIL; SEE SHEET C500 AND C706 CENT E R LI N E O F EXIS TI N G C R E E K EDGE OF EXISTING WETLAND EDGE OF EXISTING WETLAND SSWD 50' WETLAND BUFFER PROPOSED PLAZA PROPOSED STORMWATER MANAGEMENT AREA PROPOSED STORMWATER MANAGEMENT AREA PROPOSED 30' DRAINAGE & UTILITY EASEMENT CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVD IMPROVEMENTS. 25' S H O R E L A N D I M P A C T ZONE SHOR E L A N D B UI L DI N G SETB A C K SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLAND MANAGE 2 SETBACK EXISTING WETLAND PROPOSED DRAINAGE & UTILITY EASEMENT PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE; SEE SHEET C500 AND C706 PROPOSED ROW DEDICATION PROPOSED RETAINING WALL; SEE SHEET C504, C505 AND C706. EXISTING LIFT STATION PROPOSED 10' DRAINAGE & UTILITY EASEMENT SEE SHEET C403 - HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS SEE SHEET C403 - HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS PROPOSED FLAG POLE, BY OTHERS PROPOSED 10' DRAINAGE & UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT ORDI N A R Y HI G H W A T E R LEVE L A S D E LI N E A T E D 1 1/ 2 0 1 9 PROPOSED FIRE PIT (OWNER TO CONFIRM TYP; COORD. WITH MEP PLANS) PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE; SEE SHEET C500 AND C706 PROPOSED 1-1.5' RETAINING WALL; SEE SHEET C500 AND C706 3 3 3 3 3 3 1 33 3 33 3 PROPOSED 5' DRAINAGE & UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVD IMPROVEMENTS. 12+ 0 0 13+0 0 14+0 0 15+0 0 16+0 0 17+0 0 18+0 0 19+0 0 20+0021+0022+00R21.0'26.0'PREPARE SITE FOR GAZEBO (SEE ARCH PLANS) PROPOSED COMMUNITY GARDEN AREA TEMPORARY FIRE LANE ACCESS POND MAINTENANCE ACCESS INFILTRATION BASIN 26.0'26.0'26.0'26.0'26.0'G E 3 F O O P P P P J J O O O O O O P P 3 2 E P P P ADA ROUTEADA R O U T E 8.0' 8.0'9.0'26.0'50.0'50 . 0 '24.0 ' 8 1 . 7 '26.0'6.0'18.0'9.0 '100 .0 '50 .0 ' 10 0 . 0 ' 50. 0 '10.0'6.6' 6.5'23.5' 26.0'18.0'9.0'9.0'5.0'26.0'26.0' 1 8 . 0 ' 2 6 . 0 '22 .0 ' 10.0'10.0 '18.0'26.0'18.0'18.0'9.0' 18.0'14.7'9.0'18.0'24.0'ADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA R O UT E ADA R O U T E ADA R O U T E ADA ROUTE ADA ROUTE ADA ROUTE ADA ROUTE ADA R O U T E ADA ROUT E ADA ROUTE AD A RO U T E A D A RO U T E ADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTE3 G 6.0'3 PROPOSED 30' DRAINAGE & UTILITY EASEMENT PROPOSED 30' DRAINAGE & UTILITY EASEMENT 20.0 '18.0 '20.0 ' 9.0' 9.0'60.0° ' UNDERGROUND PARKING EXTENTS (SEE ARCH PLAN) 16. 1 '20.9'NORTHING: 175419.95 EASTING: 475566.48 NORTHING: 175178.02 EASTING: 475629.18 NORTHING: 175151.03 EASTING: 475568.49 NORTHING: 175049.79 EASTING: 475630.49 NORTHING: 175050.63 EASTING: 475568.49 NORTHING: 175348.03 EASTING: 475494.12 PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE; SEE SHEET C500 AND C706 3 11 9 10 17 25 9 2 2 H 18.0'18.0'60.0°'5. 0 ' C C C C C C C C C P G G PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE; SEE SHEET C500 AND C706 FIRE LANE SIGNAGE SIGN TYPE A (SEE SHEET C702) SIGN TYPE C (SEE SHEET C702) SIGN TYPE D (SEE SHEET C702) 1 2 3 FIRE LANE SIGNAGE SHALL COMPY WITH INTERNATIONAL FIRE CODE. SIGNAGE SHALL HAVE RED LETTERS ON WHITE REFLECTIVE BACKGROUND. DATE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. MN LIC. NO. JARED F. JONES, PE 01/10/2022 46610 PROPOSED CURB AND GUTTER PROPERTY LINE PROPOSED FENCE SETBACK LINE RETAINING WALL PROPOSED CONCRETE SIDEWALK LEGEND www.lse-architects.com 100 Portland Ave South, Suite 100 Minneapolis, MN 55401 612.343.1010 office 612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-SITE PLAN.dwg September 11, 2022 - 2:27pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHPROPOSED STANDARD DUTY ASPHALT KEYNOTE LEGEND PROPOSED (7'X10') PLANTER BOXES WITH 5' CLEAR SPACE BETWEEN MATCH EXISTING EDGE OF PAVEMENT/ CURB & GUTTER B612 CURB & GUTTER (TYP.) B624 CURB AND GUTTER FLAT CURB MOUNTABLE CURB ACCESSIBLE PEDESTRIAN CURB RAMP ACCESSIBLE PARKING SIGN ACCESSIBLE PARKING AREA STRIPED WITH 4" SYSL @ 45° 2' O.C. FIRE DEPARTMENT CONNECTION; REFER TO MEP PLANS SITE SIGNAGE - SEE ARCH PLANS LANDSCAPE AREA - SEE LANDSCAPE PLANS COMMERCIAL DRIVEWAY APRON PROPOSED DECK, SEE ARCH PLANS PROPOSED PATIO, SEE SHEET C500 AND ARCH PLANS; PATIO GRADES SHALL NOT EXCEED 2% IN ANY DIRECTION PROPOSED PLANTER, SEE LANDSCAPE PLANS NOT USED NOT USED NOT USED NOT USED NOT USED PROPOSED PAVEMENT MARKING PROPOSED TRANSFORMER; REFER TO MEP PROPOSED GENERATOR; REFER TO MEP PROPOSED CONDENSER; REFER TO MEP PROPOSED PEDESTRIAN CROSS WALK 'DO NOT ENTER/ FIRE ACCESS ONLY' SIGNAGE 'RESERVED NO PARKING' SIGNAGE A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BB CC PROPOSED HEAVY DUTY ASPHALT PROPOSED MILL AND OVERLAY PROPOSED BITUMINOUS TRAIL PROPOSED LIGHTED BOLLARD; REFER TO MEP PLANS PROPOSED LIGHT POLE; REFER TO MEP PLANS C400BAW 09/09/2022 JFJ 19.1001.04 SITE PLAN PROPOSED ROCK MULCH PROPOSED STAMPED CONCRETE *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* PROPOSED HEAVY DUTY CONCRETE PROPOSED STORMWATER MANAGEMENT AREA ADA ROUTE SETBACK LINE MAINTENANCE ACCESS PATH NOT WITHIN 100-YEAR HWL 12" CLASS V (MNDOT SPECIFICATION TABLE 3138-5) OVER TENSAR BX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT MAINTENANCE ACCESS PATH WITHIN 100-YEAR HWL 12" CLEAN CRUSHED ROCK (34" - 1 14" GRADATION) OVER TENSAR BX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT BUILDING DATA SUMMARY AREAS PROPOSED PROPERTY 508,702 SF (11.68 AC) BUILDING AREA 53,900 SF (10.60% OF TOTAL PROPERTY AREA) PARKING PROPOSED PARKING 234 SPACES @ 1.6 SPACE PER DWELLING (146 DWELLINGS) PROPOSED SURFACE PARKING 88 SPACES PROPOSED GARAGE PARKING 146 SPACES; SEE ARCH PLANS ADA SURFACE STALLS REQ'D / PROVIDED 4 SPACES / 4 SPACES PROPERTY SUMMARY AMIRA LAKE ELMO TOTAL EXISTING PROPERTY AREA 508,702 SF (11.68 AC) PROPOSED RIGHT OF WAY DEDICATION 2,800 SF (0.07 AC) TOTAL PROPOSED PROPERTY AREA 505,902 SF (11.61 AC) TOTAL OPEN SPACE AREA 283,307 SF (6.50 AC) PUBLIC TRAILS AREA 12,252 SF (0.28 AC) EXISTING IMPERVIOUS AREA 0 SF (0.00 AC); [0.00%] EXISTING PERVIOUS AREA 505,902 SF (11.61 AC); [100.00%] PROPOSED IMPERVIOUS AREA 157,880 SF (3.62 AC); [31.00%] PROPOSED PERVIOUS AREA 350,822 SF (8.06 AC); [69.00%] ZONING SUMMARY EXISTING ZONING BP-PUD PARKING SETBACKS SIDE/REAR = 0' ROAD = 0' BUILDING SETBACKS FRONT = 20' SIDE = 20' REAR = 0' LIMITS OF DISTURBANCE SUMMARY TOTAL DISTURBED AREA 10.52 AC HUDSON BLVD IMPROVEMENTS 2.34 AC EXISTING IMPERVIOUS AREA 1.13 AC EXISTING PERVIOUS AREA 1.21 AC PROPOSED IMPERVIOUS AREA 1.23 AC PROPOSED PERVIOUS AREA 1.11 AC ON-SITE IMPROVEMENTS 8.67 AC EXISTING IMPERVIOUS AREA 0.00 AC EXISTING PERVIOUS AREA 8.67 AC PROPOSED IMPERVIOUS AREA 3.62 AC PROPOSED PERVIOUS AREA 5.05 AC PROPOSED STANDARD DUTY ASPHALT - PER CITY STANDARDS CSSIG N A G E GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONAPPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NO PARKING NOPARKING SENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES D D D10 . 0 'DD D 10.0 '14.0 '30.00'CO120 LF - PRIVATE 8" PVC @ 4.43% SSWR 104 CONSTRUCT MANHOLE OVER EX. SANITARY SEWER (PUBLICLY OWNED AND MAINTAINED) RE:970.16 IE:955.00 NE IE:954.83 NW IE:954.83 SE SSWR 103 PRIVATE 48" SSWR MH RE:973.03 IE:960.42 N IE:960.32 SW 92 LF - 8" PVC @ 4.43% SSWR 102 PRIVATE 48" SSWR DROP MH RE:983.00 IE:971.44 E IE:964.51 S 73 LF - 8" PVC @ 2.00% SSWR 101 PRIVATE CLEANOUT RE:986.98 IE:972.90 E IE:972.90 W SSWR 100 SANITARY SERVICE RE:987.36 IE:973.00 W 30.00'12.00'D1 2 . 0 0 '38.72'12.00'SSWR MH IE: 959.37(NW) IE: 955.12(SE) 18" RCP FES IE: 965.60 18" RCP FES IE: 966.85 84" CMP FES IE:958.76 12" DIP WATERMAIN SSWR DROP MH RIM: 968.32 IE (16" SE): 959.05 IE (8" NW): 954.17 IE (16" NE): 952.88 EXIST. SSWR LIFT STATION 16" DIP SANITARY 8" FORCEMAIN 84" CMP STRM SEWER 12" DIP WATERMAIN 12" DIP WATERMAIN 36" RCP CLIII 36" RCP FES INV. 974.0 EXISTING WETLAND SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLAND MANAGE 2 SETBACK BMP #1 PROPOSED STORMWATER MANAGEMENT BASIN BMP #2 PROPOSED UNDERGROUND STORMWATER MANAGEMENT AREA 36" RCP CLIII 8" SANITARY 18" RCP FES INV. 982.58 18" RCP FES INV. 976.13 18" RCP FES INV. 974.19 18" RCP FES INV. 972.58 18" RCP FES INV. 972.92 30" RCP STORM C 6" DOMESTIC WATER SERVICE (PRIVATE) 6" FIRE SERVICE (PRIVATE) CONNECT TO EXISTING 12" WATERMAIN WITH 12"x8" TAPPING SLEEVE AND 8" VALVE. WORK TO BE COMPLETED BY AND COORDINATED BY CONTRACTOR. CONTRACTOR TO VERIFY LOCATION, MATERIAL, CONDITION, AND INVERT PROPOSED 8" WATER MAIN PROPOSED 8" WATER MAIN PROPOSED 8" WATER MAIN A A A A A A A A A A A A A A A A A A A A A A A PROPOSED 30' UTILITY EASEMENT PROPOSED 30' UTILITY EASEMENT PROPOSED 30' UTILITY EASEMENT EDGE OF EXISTING WETLAND SSWD 50' WETLAND BUFFER CENT E R LI N E O F EXIS TI N G C R E E K APPR O XI M A T E 2 5' SHOR E L A N D I M P A C T Z O N E APPR O XI M A T E S H O R E L A N D BUIL DI N G S E T B A C K PROPOSED FIRE HYDRANT WITH 6" GATEVALVE AND 8"X6" REDUCER C C F C C C CC E C D COORDINATE ALL UTILITY CONNECTIONS WITH MEP PLANS PROPOSED 10' UTILITY EASEMENT ORDI N A R Y HI G H W A T E R LEVE L A S D E LI N E A T E D 1 1/ 2 0 1 9 PROPOSED TRANSFORMER PAD; COORD W/MEP 15" PVC SANITARYA 12" DIP WATERMAIN A 15" RCP STORM A 15" RCP STORM A AA EX. SSWR MH ASJUST RIM: 973.52 IE (15" SE): ±962.77 IE (15" NE): ±962.77 STORM MH RIM: 981.80 IE (18" SE): ±977.40 A STORM MH RIM: 978.72 IE (18" SE): ±974.24 A B C J K L K PROPOSED 30' UTILITY EASEMENT CONNECT TO EXISTING 8" DIP STUB WITH TAPPING SLEEVE AND 8" VALVE; WORK TO BE COMPLETED BY AND COORDINATED BY CONTRACTOR. CONTRACTOR TO VERIFY LOCATION, MATERIAL, CONDITION, AND INVERT M O P N Q Q Q Q Q B C G Q C E PROPOSED FIRE HYDRANT WITH 6" GATEVALVE AND 8"X6" REDUCER S S PROPOSED 5' DRAINAGE & UTILITY EASEMENT T T T T T T T T T T 8" PVC SANITARY 12" DIP WATERMAIN 8" PVC SANITARY 8" PVC SANITARY A 30.00'G T H www.lse-architects.com 100 Portland Ave South, Suite 100 Minneapolis, MN 55401 612.343.1010 office 612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY PLAN.dwg September 11, 2022 - 2:43pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES UTILITY PLAN NOTES 1.ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. 2.SANITARY SEWER PIPE SHALL BE AS FOLLOWS: 8" PVC SDR35 PER ASTM D-3034, FOR PIPES LESS THAN 12' DEEP 8" PVC SDR26 PER ASTM D-3034, FOR PIPES MORE THAN 12' DEEP 6" PVC SCHEDULE 40 PER ASTM D-1785 DUCTILE IRON PIPE PER AWWA C150 3.WATER LINES SHALL BE PER CITY OF LAKE ELMO ENGINEERING DESIGN CITY STANDARDS:: 4" AND LARGER DUCTILE IRON PIPE CLASS 52 PER AWWA C150 SMALLER THAN 3" PIPING SHALL BE COPPER TUBE TYPE "K" PER ANSI 816.22 OR PVC, 200 P.S.I., PER ASTM D1784 AND D2241. 4.MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 5.ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH RESTRAINTS SUCH AS THRUST BLOCKING, WITH STAINLESS STEEL OR COBALT BLUE BOLTS, OR AS INDICATED IN THE CITY SPECIFICATIONS AND PROJECT DOCUMENTS. 6.ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE OR STRUCTURE). 7.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7'-5" COVER ON ALL WATERLINES. 8.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES, OR ANY OBSTRUCTION (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE SCH. 40 OR C900 WITH MECHANICAL JOINTS AT LEAST 10 FEET ON EITHER SIDE OF THE CENTER LINE OF THE CROSSING. THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE FASTENERS AS REQUIRED TO PROVIDE A MINIMUM OF 18" VERTICAL SEPARATION. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50). 9.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. 10.TOPS OF MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT ABOVE FINISHED GROUND ELEVATIONS, IN GREEN AREAS, WITH WATERTIGHT LIDS. 11.ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. 12.EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. 13.REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE-IN OF ALL UTILITIES. 14.CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE CITY OF LAKE ELMO AND/OR STATE OF MN WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. 15.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 16.CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. 17.CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 18.CONTRACTOR SHALL REFERENCE ARCH / MEP PLANS FOR SITE LIGHTING AND ELECTRICAL PLAN. 19.BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES) AND METERS ARE LOCATED IN THE INTERIOR OF THE BUILDING. REF. ARCH / MEP PLANS. 20.ALL ONSITE SANITARY SEWERS SHALL BE PRIVATELY OWNED AND MAINTAINED. ALL WATERMAINS AND HYDRANTS PLACED WITHIN THE DEVELOPMENT WILL REMAIN CITY OWNED AND OPERATED. 21.ALL WATERMAIN STUBOUTS SHALL BE MECHANICALLY RESTRAINED WITH REACTION BLOCKING. 22.ALL FIRE HYDRANTS TO BE OWNED AND MAINTAINED BY THE CITY.NORTHKEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY 8"X8" TEE AND 8" GATEVALVE 8" WATERMAIN BEND FIRE HYDRANT ASSEMBLY, PROVIDE 8"X6" TEE, 6" WATERMAIN AND 6" GATE VALVE FIRE HYDRANT ASSEMBLY, PROVIDE 6" BEND, AND 6" WATERMAIN 8"X6" TEE AND 6" GATE VALVE 6" WATERMAIN BEND 8"X8" TEE NOT USED PROPOSED GAS METER. REFERENCE MEP PLANS FOR LOCATION AT BUILDING PROPOSED GAS SERVICE. REFERENCE MEP PLANS FOR ENTRY AT BUILDING CONNECT GAS TO EXISTING GAS MAIN; COORD W/ UTILITY PROVIDER PROPOSED ELECTRIC SERVICE. REFERENCE MEP PLANS FOR CONNECTION AT TRANSFORMER CONNECT ELECTRIC TO EXISTING POWER; COORD W/ UTILITY PROVIDER PROPOSED COMMUNICATIONS SERVICE. REFERENCE MEP PLANS FOR ENTRY AT BUILDING CONNECT COMMUNICATIONS TO EXISTING FIBER; COORD W/ UTILITY PROVIDER ALL SMALL/DRY UTILITIES FOR SERVING FACILITY ARE NOT PERMITTED WITHIN 10 FEET OF THE CITY WATERMAIN AND MAY ONLY CROSS PERPENDICULAR TO CITY WATERMAIN FIRE DEPARTMENT CONNECTION - SEE MEP PLANS CONDUIT FOR ELECTRIC VEHICLE CHARGING - SEE MEP PLANS SEWER/WATERMAIN CROSSING, PROVIDE MINIMUM 18" VERTICAL SEPARATION, WHEN SEWER CROSSES ABOVE WATER, THE PIPE SHALL BE PVC SCHEDULE 40 PER ASTM D-1785, ONE FULL LENGTH OF WATER PIPE SHALL BE CENTERED AT THE CROSSING AS POSSIBLE. 2" INSULATION REQUIRED AT STORM/WATER CROSSINGS. NOT USED A B C D E F G H I J K L M N O P Q R S T U SANITARY SEWER MANHOLE STORM SEWER SANITARY SEWER WATERMAIN GATE VALVE HYDRANT TEE REDUCER UNDERGROUND ELECTRIC TELEPHONE GAS MAIN STORM SEWER LEGEND CO SANITARY CLEANOUTCO EXISTING PROPOSED LIGHTED BOLLARD; REFER TO MEP PLANS LIGHT POLE; REFER TO MEP PLANS FLOOD LIGHT; REFER TO MEP PLANS DATE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. MN LIC. NO. JARED F. JONES, PE 01/10/2022 46610 C600BAW 09/09/2022 JFJ 19.1001.04 UTILITY PLAN WATERMAIN NOTES: 1.ALL WATERMAIN SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MOST CURRENT EDITION OF THE CEAM SPECIFICATIONS. 2.CONTRACTOR SHALL PROTECT EXISTING UTILITIES. 3.CONTRACTOR SHALL COORDINATE ALL UTILITY IMPACTS WITH APPROPRIATE UTILITIES. 4.MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL. 5.THE CONTRACTOR SHALL PROVIDE 48 HOURS ADVANCE NOTICE AND COORDINATE ANY PROPOSED WATER SERVICE INTERRUPTIONS WITH THE DEPARTMENT OF PUBLIC WORKS. UNDER NO CIRCUMSTANCES SHALL WATER SERVICE TO ANY BUSINESS BE SHUT OFF DURING NORMAL BUSINESS HOURS 7:00AM TO 6:00PM. 6.WATERMAIN PIPE SHALL BE ENCASED IN POLYETHYLENE. 7.ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.S.A1. ALL FITTINGS SHALL BE DUCTILE IRON PIPE WITH POLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BE INSTALLED UTILIZING COR-BLUE NUTS & BOLTS. 8.GATE VALVES SHALL BE RESILIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 OR APPROVED EQUAL. GATE VALVES MUST COMPLY WITH CEAM 2PEC 2611.S.C.2. 9.BUTTERFLY VALVES SHALL BE MUELLER LINESEAL III, OR APPROVED EQUAL. BUTTERFLY VALVES SHALL COMPLY WITH CEAM SPEC. 2611.2.C3. 10.BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAINLESS STEEL. 11.HYDRANTS SHALL BE WATEROUS "PACER", MODEL WB-67 OR APPROVED EQUAL, FITTED WITH FH 800 SERIES FLEX STAKE AND PAINTED RED. 12.HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2-1/2 (I.E.) HOSE CONNECTIONS AND ONE 4" STORZ NOZZLE (MODEL WB-67) AND PENTAGON NUT END CAP. 13.ALL LANDSCAPING DAMAGED OR REMOVED AS A RESULT OF WATERMAIN CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO EXISTING OR BETTER CONDITION. (INCIDENTAL) 14.CONTRACTOR TO MAINTAIN 7.5' COVER OVERALL WATERMAIN, INCLUDING HYDRANT LEAD. CONTRACTOR TO NOTIFY ENGINEER IF HYDRANT LEAD COVER IS INSUFFICIENT. *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* *ALL SMALL/DRY UTILITIES FOR SERVING FACILITY (I.E. GAS/ ELECTRIC/ FIBER/ TELEPHONE/ CABLE/ ETC) WILL NOT BE PERMITTED WITHIN 10 FEET OF THE CITY WATERMAIN AND MAY ONLY CROSS PERPENDICULAR TO CITY WATERMAIN* Amira of Lake ElmoDescriptionDate of Commencement (4/1/23)Site Work MobilizationOffsite Hudson Blvd Work Site Prep Building Excavation Site Utilities Backfill & Rough GradeCurb/Asphalt/Sidewalks LandscapingSection 1 Footings/Foundations PrecastFramingEnclosureMEP Rough-insFinishesPunchoutSection 2 Footings/Foundations (complete in 2 phases) PrecastFramingEnclosureMEP Rough-insFinishesPunchoutSection 3FramingEnclosureMEP Rough-insFinishesPunchout TCO / Substantial Completion (9/1/24)Feb MarSep Oct Nov Dec JanPreliminary Construction ScheduleAmira of Lake ElmoSeptember 8, 2022May Jun Jul AugApr Sep20232024Apr May Jun Jul Aug kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651-645-4197 MEMORANDUM To: Molly Just, Planner Director CC: Jack Griffin, City Engineer From: Mitchell Cookas, PLA & Jared Jones, PE Kimley-Horn and Associates, Inc. Date: September 9, 2022 Subject: Amira Lake Elmo – Preliminary PUD and Plat PRELIMINARY PLAT APPLICATION WRITTEN STATEMENTS a. A listing of contact information including name(s), address(es) and phone number(s) of: the owner of record, authorized agents or representatives, engineer, surveyor, and any other relevant associates. United Land LLC: Alex Hall; 651 Nicollet Mall, Suite 450, Minneapolis, MN 55402; 952.820.8725. In addition, the engineer, surveyor, and other relevant associates information is located on sheet C000. b. A listing of the following site data: Address, current zoning, parcel size in acres and square feet, property identification number(s) (PID), and current legal description(s). Address: 85XX Eagle Point Blvd. N. (address # to be confirmed by City), Parcel size: 508,702 SF (11.68 acres), PID #: 33.029.21.044.0009, Legal description: Outlot C, Eagle Point Business park 2nd addition, according to the plat thereof filed of record in the office of the Registrar of Titles in and for Washington County, Minnesota. c. Final Subdivision and Lot Information: a. The name of the Final Plat. AMIRA LAKE ELMO. b. A table listing the lot and block number, size of lot, width of lot, and depth of lot. c. Final exact area calculations of parks, trails, and any other dedicated public open space; and estimated values of all dedicated land and improvements (trails, park equipment, sports fields, etc.). The estimated value of 2,800 sq. ft. of dedicated land along Eagle Point Boulevard is $45,000 and the public trail (12,525 sq. ft.) along Hudson Blvd is $400,000. LOT BLOCK AREA (SQ. FT.) WIDTH DEPTH 1 1 508,702 IRREGULAR IRREGULAR Page 2 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 These area calculations may also be found on the ‘Property Summary’ table within the attached plan sheet C400. d. Final exact area calculations of wetlands and buffers. Wetland area: 63,137 sq. ft. Wetland buffer area: 46,422 sq. ft. e. Final proposed area calculations for all dedicated right-of-ways. 2,800 sq. feet will be dedicated as Eagle Point Blvd. f. Proposed legal descriptions for: all lots, easements to be created (if not being dedicated on the plat), and easements to be vacated (if any). Lot 1, Block 1, AMIRA LAKE ELMO, Washington County, Minnesota. d. An explanation of how issues have been addressed since the Sketch Plat phase of the development. See Conditions of Approval section below, copied from comment response for Applewood Pointe dated 04/01/2022. e. A narrative explaining the intent of the project and/or your original revised vision for the finished product. Provide the community with an active adult senior housing option. Please see the project narrative that has been packaged with this submittal. f. A statement showing the final density of the project with the method of calculating said density shown. 146 units / 11.68 acres (508,702 sq. ft.) = 12.5 units / acre g. Discuss proposed infrastructure improvements and phasing thereof (i.e. proposed roadways, sewer systems, water systems, sidewalks/trails, parking, etc) necessary to serve the subdivision. Project includes upgrades within and to Hudson Blvd. and Eagle Point Blvd. (including a new public trail and public sidewalk) plus utility improvements that consist of new storm sewer, watermain and sanitary sewer upgrades to the adjacent public lift station. h. If applicable, a narrative addressing how concerns/issues raised by neighboring properties have been addressed (discussing your proposal with the neighboring land owners is recommended to get a sense of what issues may arise as your application is processed). An easement agreement has been drafted with the High Pointe Medical Center granting us emergency access from the property’s private drive to the Amira site. All parties have reviewed and agreed upon the terms of the agreement; however, the document is awaiting execution signatures. Page 3 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 Business owners from the Eagle Point Townoffice Park attended the first public hearing in 2019 regarding drainage issues on their site that hadn’t been addressed by United Properties, who was the master developer when their property was developed. Since then, United Properties has worked with the business owners to redesign and perform grading work on the swale towards the south portion of their site to address the drainage issues. All improvement costs were incurred by United Properties and the business owners have expressed their gratitude in resolving the issue. i. If applicable, a description of how conflicts with nearby land uses (livability, value, potential future development, etc.) and/or disturbances to wetlands or natural areas are being avoided or mitigated. The project team does not anticipate any conflicts with nearby land uses given the proposed senior housing (market rate rentals) land use. The site layout and grading has been designed to preserve the existing wetland features with adequate wetland buffers. j. Provide justification that the proposal will not place an excessive burden on roads (traffic), sewage, water supply, parks, schools, fire, police, or other public facilities/services (including traffic flows) in the area. According to the prior comments and review for the Amira Project and ongoing coordination with the City, the project team believes to be providing adequate improvements to mitigate any potential burdens on the public infrastructure systems. k. If applicable, provide a description of proposed lakeshore access (i.e. shared dock with multiple slips, individual docks for each lot, etc.). Not applicable. l. A description of proposed parks and/or open space, including a brief statement of the overall land dedication or fees to be paid in lieu of land dedication that meets the public land dedication requirements of the Subdivision Ordinance. Park Dedication Fees estimated to be $66,000. m. A proposed development schedule indicating the approximate date when construction of the project, or stages of the same, can be expected to begin and be completed (including the proposed phasing of construction of public improvements and recreational and common space areas). Construction is anticipated to begin in Spring 2023 and be completed in Summer/Fall 2024. A preliminary construction schedule has been included for the development. Page 4 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 CONDITIONS OF APPROVALS RESPONSES (Copied from comment response for Applewood Pointe dated 04/01/2022) 1. That the City approves a Comprehensive Plan Amendment to amend the City’s Land Use Plan to re-guide the property from BP (business park) to MU-BP (mixed use business park). Acknowledged 2. That the City approves a Zoning Map Amendment to rezone the site from BP (business park) to MU-BP (mixed use business park). Acknowledged 3. That the future final plat and final PUD plans would be for the parcel with the PID # 33.029.21.44.0009. Acknowledged, to be shown on final plat once preliminary plat is approved. 4. That the applicant prepare any future final plat and final PUD plans showing all of the site perimeter property lines - including any revisions for the dedication of additional right-of-way or easements that may be needed for Hudson Boulevard or for Eagle Point Boulevard. Acknowledged, please see attached plat and associated plans. 5. That the future final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. No variances have been requested. 6. That the applicant addresses all comments in the City Engineer’s Memorandum dated January 7, 2020 with the updated preliminary plat and preliminary PUD Plan submittal. These include completing all necessary improvements in and along Hudson Boulevard and Eagle Point Boulevard, installing a public trail along Hudson Boulevard, the dedication of additional street right-of-way and managing all storm water on the site. Acknowledged. 7. That the final Plat and final PUD Plans submittal include complete tree preservation/replanting and landscape plans to be reviewed and approved by the City’s Landscape Architect. The landscape plans must be revised to relocate all trees outside of the proposed public easement areas including the proposed watermain easements and the property line drainage and utility easements. Acknowledged, please see updated Landscape plans. 8. That the final Plat and final PUD Plans submittal include accurate open space and impervious surface calculations. Acknowledged, see sheet C400 for area calculations. 9. That the final plat show drainage and utility easements over the stormwater ponding areas, wetlands and the wetland buffers, including the 100-year high water level. Acknowledged, see attached final plat with the respective drainage and utility easements. 10. That the applicant/developer provide the City fees in lieu of park land dedication as required by 153.14 with future final plat. Correct, park dedication fees will be provided in lieu of park land dedication. Page 5 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 11. That the final plat and final PUD Plans submittal include detailed architectural plans for the building. See attached architectural plans 12. The applicant receives a permit from the South Washington Watershed District for the construction of the proposed development. A Watershed permit had been previously approved for the larger proposed building. Kimley-Horn to resubmit to the South Washington Watershed District with the updated plans and revised stormwater report 13. That the applicant/developer install an 8-foot-wide trail along Hudson Boulevard and a 6-foot- wide concrete sidewalk along Eagle Point Boulevard as a part of the site improvements. Acknowledged, see attached sheet C400 with trail and sidewalk included. 14. That the applicant/developer installs all the required improvements in and adjacent to Hudson Boulevard. Acknowledged 15. All storm water facilities internal to the site shall be privately owned and maintained. A storm water maintenance and easement agreement in a form acceptable to the City shall be executed and recorded with the final plat for all 100-year high water level areas and to protect all overland emergency flow paths. Acknowledged 16. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. Acknowledged 17. That the PUD overlay zoning allow for the following: a. Setbacks: Amira Lake Elmo - Minimum Building Setbacks b. The maximum building height shall be 50 feet The architectural building heights have not changed since the preliminary plat submittal. See attached architectural plan sheets for reference 18. The Final Plat/Final PUD shall include all necessary and additional public right-of-way and easements for Hudson Boulevard and for Eagle Point Boulevard. These shall include any drainage and utility easements, any additional street right-of-way and any necessary pedestrian easements for sidewalks or trails. Acknowledged. Page 6 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 19. The Final Plat/Final PUD submittal must include a complete storm water management plan and construction plans that provide all design details for the proposed underground storage systems including details regarding building roof drainage connections. Acknowledged, Stormwater plan sheets and details (Sheets C508, C510, C512, C513) to be updated following preliminary PUD/Plat approval. 20. That the applicant shall obtain all necessary permits including but not limited to all applicable City permits (building, grading, sign, etc.), NPDES/SWPPP permits and South Washington Watershed District approval before starting any grading or construction activities. Acknowledged. 21. That the Final Plat/Final PUD include South Washington Watershed District preliminary review comments and that the applicant provide the City evidence that all conditions attached to a South Washington Watershed District permit will be met before the starting any grading activity on the site. Acknowledged, see item # 12 above. 22. That before the City issues any grading or building permits, the developer shall delineate and identify all wetland buffers via staking, fencing and/or signage that is acceptable to the City. Acknowledged, contractor to coordinate with City regarding wetland buffer staking/fencing/signage. 23. That the developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from the appropriate watershed districts before the commencement of any grading or development activity on the site. Acknowledged. 24. If necessary, the applicant shall provide the City with a copy of written permission for any off-site grading work and storm sewer discharges to adjacent properties before starting any site work, grading and as part of any final plat or final PUD application. United Properties has acknowledged this requirement and will provide all necessary documentation prior to performing work. 25. That the applicant or developer address all the comments of the Fire Chief and the Building Official with the final PUD, site and building plans including the placement of building and fire hydrants, street and driveway design, parking and emergency vehicle access within the site. Acknowledged. Plans have been updated based on prior coordination with the Fire Chief. If additional comments are provided by Fire Chief, project team will work together with Fire Chief to address any further comments. 26. That the applicant shall be responsible to place fire hydrants and water valves throughout the property at the direction of the Lake Elmo Public Works Director and the Fire Department. All fire hydrants shall be owned and maintained by the City. Acknowledged. 27. That the applicant revises the project plans to show watermain easements and effective maintenance areas with a minimum width of 30 feet with a minimum of 15 feet of clearance Page 7 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 from the pipe centerline and easement agreements are included with the final plat and PUD application and plans. Acknowledged, please see drainage and utility easements on the plat and civil plans. 28. That the applicant provide the City domestic and fire suppression demand information for the facility with the updated preliminary plans so City staff may verify the capacity and needs of the water system. The domestic demand information is as follows: Domestic Peak = 275 gpm 84 Units @ 35 gallons per day average use = 2,940 gallons 84 Units @ 50 gallons per day peak use = 4,200 gallons Fire suppression demand info to be provided by fire suppression contractor. 29. That there shall be no encroachments into drainage and utility easements and corridors other than those reviewed and approved by the City Engineer and upon execution of an easement encroachment agreement. Prohibited encroachments include, but are not limited to trees, landscaping, fences, retaining walls and buildings. Acknowledged. 30. That the developer prepare exhibits for City staff approval that clearly identifies the property lines, easements, proposed locations of retaining walls and fences and the required and proposed setbacks for each building site within the development. Acknowledged, please see attached sheet C400. 31. That the Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of Sections 150.035- 150.038 of the City Code. Acknowledged, please see attached electrical/photometric plans. 32. Before to the installation or construction of any subdivision identification signs or neighborhood markers within the development, the developer shall submit sign plans to the City for review and obtain a sign permit from the City. United Properties has acknowledged this requirement and will provide required documentation and obtain required permits prior to installing signs. 33. That the applicant provides the City a detailed construction and staging plan with the construction plans and final plat for the development. These plans are to clearly indicate the phasing of the site grading, the phasing of the construction of each public infrastructure component and shall address access to that phase of the development for construction purposes and for residents. The City may require temporary cul-de-sacs at the end the private driveways. Acknowledged, construction and staging plan to be provided to City with final construction plans. 34. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement or a Site Work Agreement with the City. Such an Agreement must be approved by the City Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. Page 8 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 United Properties has acknowledged the requirement for a Development Agreement prior to execution and recording of the final plat. 35. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat of PUD approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat or final PUD, and said plan shall document extent of any proposed grading on the site. United Properties has acknowledged the requirement for a grading agreement and approved grading plans prior to starting any grading activities in advance of the final plat and PUD approval. 36. That if the City amends the land use plan to BP-MU for this site, the maximum density of this development shall not exceed 10 dwelling units per net acre. With 10.34 net acres, the maximum number of residential units allowed on this site with a BP-MU land use designation is 103 residential units. Acknowledged. 37. That the applicant/owner notify all buyers and owners that the City may impose restrictions or limits on outdoor water use including no vehicle washing and no watering of grass, sod or landscaping. Acknowledged. 38. That the applicant/owner provide the Fire Department and the Sheriff’s Department with keys, key cards or other acceptable methods of entry for quick access into the building for emergency service calls. United Properties has acknowledged the requirement to provide the Fire Department and Sheriff’s Department with access to the building. 39. That the City does not allow any parking and construction staging, including the loading and unloading of materials and equipment at any time on Hudson Boulevard or on Eagle Point Boulevard during the construction of the site improvements and building. 40. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the above conditions before the City will accept a final plat or Final PUD application for the development and before the start of any clearing or grading activity on the site. Acknowledged. 41. The Developer shall contribute $70,000 to the City for their proportionate share of the costs for the necessary improvements to the sanitary sewer system. United Properties acknowledges their proportionate share of the sanitary sewer system costs of $70,000.00. 42. That the City’s preliminary plat/preliminary PUD approval is good for one year from the date of City Council action, unless the applicant requests and the City Council approves a time extension. Acknowledged. Page 9 kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651-645-4197 Thank you for the thorough review of the proposed project. Please contact me with any questions or feedback regarding the responses. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Mitchell Cookas, PLA NORTH VICINITY N.T.S. LAKE ELMO, WASHINGTON COUNTY, MN 1. CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION. 2. IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 24x36 SHEET. 3. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. 4. ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. NOTES: GEOTECHNICAL ENGINEER BRAUN INTERTEC 11001 HAMPSHIRE AVE S, MINNEAPOLIS, MN 55438 TELEPHONE: (952) 995-200 PROJECT TEAM: SURVEYOR E.G. RUD & SONS, INC. 6776 LAKE DRIVE NE, SUITE 110 LINO LAKES, MN 55014 TELEPHONE: (651) 361-8701 FAX: (651) 361-8701 CONTACT: JASON RUDD ENGINEER & LANDSCAPE ARCHITECT KIMLEY-HORN AND ASSOCIATES, INC. PREPARED BY: JARED F. JONES, PE MITCHELL G. COOKAS, PLA 767 EUSTIS STREET, SUITE 100 ST. PAUL, MN 55114 TELEPHONE (651) 645-4197 OWNER / DEVELOPER UNITED PROPERTIES 651 NICOLLET MALL, SUITE 450 MINNEAPOLIS, MN 55402 TELEPHONE: (952) 835-5300 CONTACT: JENNIFER MASON AMIRA LAKE ELMO SECTION 33, TOWNSHIP 29N, RANGE 21W FOR SITE DEVELOPMENT PLANS Know what'sbelow.before you dig.Call ARCHITECT LSE ARCHITECTS 100 PORTLAND AVE. S, SUITE 100 MINNEAPOLIS, MN TELEPHONE: (612) 343-1010 CONTACT: IAN SIMONSON SITE EAGLE POINT BLVD. HUDSON BLVD. www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C0-COVER SHEET.dwg September 11, 2022 - 2:22pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DRAWING INDEX Sheet Number Sheet Title C000 COVER SHEET C001 EXISTING SURVEY C100 PRIVATE INFRASTRUCTURE GENERAL NOTES C200 EXISTING CONDITIONS & REMOVAL PLAN C201 EXISTING CONDITIONS & REMOVAL PLAN C202 EXISTING CONDITIONS & REMOVAL PLAN C203 EXISTING CONDITIONS & REMOVAL PLAN C204 EXISTING CONDITIONS & REMOVAL PLAN C205 EXISTING CONDITIONS & REMOVAL PLAN C300 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 C301 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 C302 HUDSON BLVD EROSION AND SEDIMENT CONTROL PLAN C303 SWPPP NOTES C400 SITE PLAN C401 FIRE ACCESS PLAN C402 HUDSON BLVD CONSTRUCTION NOTES C403 HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS C404 HUDSON BLVD SUPERELEVATION PLANS C405 HUDSON BLVD ALIGNMENT PLAN AND TABULATION C406 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE C407 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE C408 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE C409 HUDSON BLVD INTERSECTION DETAILS C410 HUDSON BLVD SIGNING & STRIPING TITLE C411 HUDSON BLVD SIGNING & STRIPING PLAN C412 HUDSON BLVD SIGNING & STRIPING DETAILS C413 HUDSON BLVD SIGNING & STRIPING DETAILS C414 HUDSON BLVD CROSS SECTIONS C415 HUDSON BLVD CROSS SECTIONS C416 HUDSON BLVD CROSS SECTIONS C500 OVERALL GRADING AND DRAINAGEPLAN C501 GRADING AND DRAINAGE PLAN C502 GRADING AND DRAINAGE PLAN C503 GRADING AND DRAINAGE PLAN C504 GRADING AND DRAINAGE PLAN C505 GRADING AND DRAINAGE PLAN C506 OVERALL STORMWATER MANAGEMENT PLAN C507 STORMWATER MANAGEMENT PLAN C508 STORMWATER MANAGEMENT PLAN C509 STORMWATER MANAGEMENT PLAN C510 STORMWATER MANAGEMENT PLAN C511 STORMWATER MANAGEMENT PLAN C512 STORMWATER DETAILS C513 STORMWATER DETAILS C600 UTILITY PLAN C700 CIVIL DETAILS C701 CIVIL DETAILS C702 CIVIL DETAILS C703 CIVIL DETAILS C704 CIVIL DETAILS C705 CIVIL DETAILS C706 CIVIL DETAILS C800 TRAFFIC CONTROL DETAILS C801 TRAFFIC CONTROL DETAILS C802 TRAFFIC CONTROL DETAILS C803 TRAFFIC CONTROL PLAN C804 DETOUR PLAN L100 LANDSCAPE PLAN L101 LANDSCAPE ENLARGEMENT L102 LANDSCAPE ENLARGEMENT L103 LANDSCAPE DETAILS L104 CITY LANDSCAPE DETAILS L200 TREE INVENTORY AND PRESERVATION PLAN L201 TREE INVENTORY AND PRESERVATION PLAN DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C000BAW 09/09/2022 JFJ 19.1001.04 COVER SHEET UTILITY CONTACTS WATER/WASTEWATER & STORMDEPARTMENT CITY OF LAKE ELMO PUBLIC WORKS PHONE: (651) 747-3940 ELECTRIC COMPANY XCEL ENERGY CONTACT: BURKE ANDERSON PHONE: (651) 779-3185 EMAIL: BURKE.L.ANDERSON@XCELENERGY.COM GAS COMPANY XCEL ENERGY CONTACT: DON PILLA PHONE: (651) 229-2329 EMAIL: DONALD.J.PILLA@XCELENERGY.COM TELECOM COMPANY CENTURY LINK / LUMENCONTACT: BRANDEN HEIDELBERGER PHONE: (651) 312-7184EMAIL: BRANDEN.HEIDELBERGER1@CENTURYLINK.COM TELECOM COMPANY COMCAST CONTACT: BEN UELAND PHONE: (651) 493-5158 EMAIL: BENJAMIN_UELAND@COMCAST.COM *CONTRACTOR IS TO COORDINATE CONSTRUCTION OF HUDSON BOULEVARD & EAGLE POINT BOULEVARD IMPROVEMENTS WITH ALL DRY UTILTIES WITHIN THE AREA PRIOR TO AND THROUGHOUT CONSTRUCTION* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C1-GENERAL NOTES.dwg September 11, 2022 - 2:22pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES GENERAL CONSTRUCTION NOTES 1. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE MN DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION) AND BECOMEFAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALLWORK SHALL CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCTTHE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL. 3. THE EXISTING SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS QUALITY LEVEL "D" UNLESS OTHERWISENOTED. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ACSE 38/02,ENTITLED STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF SUBSURFACE QUALITY DATABY THE FHA. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TOTHE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURREDBECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FORTEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING ORRELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED ANDTHEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED CONSTRUCTION PERMITS ANDBONDS IF REQUIRED PRIOR TO CONSTRUCTION. 6. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS. 7. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THEOWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGNARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. 8. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER DIRECTLY FROM THE TESTING AGENCY. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATECONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THEOWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILTDATA SHALL BE COLLECTED BY A STATE OF MN PROFESSIONAL LAND SURVEYOR WHOSE SERVICES AREENGAGED BY THE CONTRACTOR. 10. ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS REQUIRED. 11. ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THEAPPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER. 13. SHOULD CONTRACTOR ENCOUNTER ANY DEBRIS LADEN SOIL, STRUCTURES NOT IDENTIFIED IN THEDOCUMENTS, OR OTHER SOURCE OF POTENTIAL CONTAMINATION, THEY SHALL IMMEDIATELY CONTACTTHE ENGINEER AND OWNER. TYPICAL OWNER/ENGINEER OBSERVATIONS CONTRACTOR SHALL NOTIFY OWNER AND/OR ENGINEER 48 HOURS IN ADVANCE OF THEFOLLOWING ACTIVITIES: - PRE-CONSTRUCTION MEETING, SUBGRADE PREPARATION, BASE INSTALLATION ASPHALT INSTALLATION, UNDERGROUND PIPING AND UTILITIES INSTALLATION, INSTALLATION OF STRUCTURES, CHECK VALVES, HYDRANTS, METERS, ETC., SIDEWALK INSTALLATION, CONNECTIONS TO WATER AND SEWER MAINS, TESTS OF UTILITIES 3RD PARTY TEST REPORTS REQ'D TEST REPORTS REQUIRED FOR CLOSE OUT INCLUDE, BUT ARE NOT LIMITED TO: - DENSITY TEST REPORTS - BACTERIOLOGICAL TESTS OF WATER SYSTEM - PRESSURE TEST OF WATER/SEWER- LEAK TESTS ON SEWER SYSTEM AND GREASE TRAPS- ANY OTHER TESTING REQUIRED BY THE AGENCY/MUNICIPALITY WATER STORM SEWER & SANITARY SEWER NOTES 1. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES, GRAVITY SEWER LINES, AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETEACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THECONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THECONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THEMOST STRINGENT SHALL GOVERN. 2. ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL CONSTRUCTION SECTION OF THIS SHEET. 3. THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN OTHERWISE. 4. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'SSPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUGWHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACESWIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS. 5. ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY D.I.PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONSWHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED.ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROMTHE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 6. WATER FOR FIRE FIGHTING SHALL BE MADE AVAILABLE FOR USE BY THE CONTRACTOR PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE. 7. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BECOMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'SSPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCYREQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 8. UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF MN PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING. 9. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOTBE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ONGRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNERAND JURISDICTIONAL AGENCY AS REQUIRED. 10. CONTRACTOR SHALL PROVIDE FOR A MINIMUM HORIZONTAL CLEARANCE OF 10' AND A VERTICAL CLEARANCE OF 18" BETWEEN WATER AND SANITARY SEWER MANHOLES AND LINES. 11. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARYTO RETURN IT TO EXISTING CONDITIONS OR BETTER. 12. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE ISWATERTIGHT UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS. 13. UNLESS OTHERWISE STATED IN CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS, ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALLBE LABELED "STORM SEWER". EXISTING CASTINGS AND STRUCTURES WITHIN PROJECT LIMITS SHALL BEADJUSTED TO MEET THESE CONDITIONS AND THE PROPOSED FINISHED GRADE. 14. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THECONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. 15. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. 16. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR FROM INVERT IN TO INVERTOUT. 17. ROOF DRAINS SHALL BE CONNECTED TO STORM SEWER BY PREFABRICATED WYES OR AT STORM STRUCTURES. ROOF DRAINS AND TRUCK WELL DRAIN SHALL RUN AT A MINIMUM 1% SLOPE, UNLESS NOTED OTHERWISE, AND TIE IN AT THE CENTERLINE OF THE STORM MAIN. 18. ALL ROOF AND SANITARY SEWER DRAINS SHALL BE INSULATED IF 7' OF COVER CANNOT BE PROVIDED. 19. THE CONTRACTOR SHALL PROTECT EXISTING UNDERGROUND UTILITIES AND APPURTENANCES THAT ARE TO REMAIN FROM DAMAGE DURING CONSTRUCTION OPERATIONS. 20. THE LOCATION OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES AND OTHER ABOVE AND BELOW-GRADE IMPROVEMENTS ARE APPROXIMATE AS SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION, SIZE AND INVERT ELEVATIONS OF EACH PRIOR TO THE START OFCONSTRUCTION. 21. A MINIMUM OF 5' SEPARATION IS REQUIRED BETWEEN UTILITIES AND TREES UNLESS A ROOT BARRIER ISUTILIZED. 22. GAS, PHONE AND ELECTRIC SERVICES SHOWN FOR INFORMATIONAL PURPOSES ONLY. DRY UTILITY COMPANIES MAY ALTER THE DESIGN LAYOUT DURING THEIR REVIEW. CONTRACTOR TO COORDINATE FINAL DESIGN AND INSTALLATION WITH UTILITY COMPANIES. 23. COORDINATE UTILITY INSTALLATION WITH IRRIGATION DESIGN AND INSTALLATION. 24. ALL DIMENSIONS ARE TO FLOW LINE OF CURB UNLESS OTHERWISE NOTED. PERIMETER WALL DIMENSIONS ARE TO INSIDE WALL FACE. REFERENCE ARCHITECTURAL PLANS FOR EXACT WALL WIDTH AND SPECIFICATIONS. 25. REFERENCE ARCHITECTURAL PLANS (BY OTHERS). FOR EXACT BUILDING DIMENSIONS, AND MATERIALSSPECIFICATIONS. 26. REFERENCE M.E.P. PLANS (BY OTHERS) FOR ROOF DRAINAGE AND MECHANICAL EQUIPMENT DIMENSIONSAND SPECIFICATIONS. 27. CONTRACTOR SHALL REFERENCE STRUCTURAL PLANS (BY OTHERS) FOR FOUNDATIONS, STOOPS, RETAINING WALLS, AND OTHER STRUCTURAL FEATURES. 28. CONTRACTOR SHALL REFERENCE M.E.P PLANS (BY OTHERS) FOR ELECTRICAL AND LIGHT PLANS. GRADING AND DRAINAGE NOTES 1. GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF ALL EXISTING AND PROPOSED SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS BEFORE START OF CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. 2. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL ADJUST BMP'S ASNECESSARY AND REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASSSTAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS. 3. CONTRACTOR SHALL ENSURE THERE IS POSITIVE DRAINAGE FROM THE PROPOSED BUILDINGS SO THAT SURFACE RUNOFF WILL DRAIN BY GRAVITY TO NEW OR EXISTING DRAINAGE OUTLETS. CONTRACTOR SHALL ENSURE NO PONDING OCCURS IN PAVED AREAS AND SHALL NOTIFY ENGINEER IF ANY GRADING DISCREPANCIES ARE FOUND IN THE EXISTING AND PROPOSED GRADES PRIOR TO PLACEMENT OF PAVEMENT OR UTILITIES. 4. CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS,POWER POLES, GUY WIRES, AND TELEPHONE BOXES THAT ARE TO REMAIN IN PLACE AND UNDISTURBEDDURING CONSTRUCTION. EXISTING CASTINGS AND STRUCTURES TO REMAIN SHALL BE ADJUSTED TOMATCH THE PROPOSED FINISHED GRADES. 5. BACKFILL FOR UTILITY LINES SHALL BE PLACED PER DETAILS, STANDARDS, AND SPECIFICATIONS SO THAT THE UTILITY WILL BE STABLE. WHERE UTILITY LINES CROSS THE PARKING LOT, THE TOP 6 INCHES SHALL BE COMPACTED SIMILARLY TO THE REMAINDER OF THE LOT. UTILITY DITCHES SHALL BE VISUALLY INSPECTED DURING THE EXCAVATION PROCESS TO ENSURE THAT UNDESIRABLE FILL IS NOT USED. 6. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF 4" OF TOPSOIL AT COMPLETIONOF WORK. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BEREGRADED AND SODDED. 7. AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TESTAND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS SHALL ADEQUATELY DRAINTOWARDS THE INTENDED STRUCTURE TO CONVEY STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELYNOTIFY OWNER AND ENGINEER IF ANY DISCREPANCIES ARE DISCOVERED. 8. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL SAW CUT FULL DEPTH FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. 9. THE CONTRACTOR SHALL INSTALL PROTECTION OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OFCONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURESSHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDEPOSITIVE DRAINAGE FLOWS. 10. IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY EXCAVATION. 11. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO MN/DOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THEJURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALLGOVERN. 12. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING ANDSCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHERSUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNINGREGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 14. SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES. 15. THE CONTRACTOR SHALL ENSURE THAT LANDSCAPE ISLAND PLANTING AREAS AND OTHER PLANTINGAREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALLALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTEDAND PROPERLY DISPOSED OF IN A LEGAL MANNER. 16. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS AND MN/DOT SPECIFICATION. 17. ALL CONCRETE/ASPHALT SHALL BE INSTALLED PER GEOTECH REPORT, CITY OF LAKE ELMO AND MN/DOTSPECIFICATIONS. 18. SPOT ELEVATIONS ARE TO FLOWLINE OF CURB UNLESS OTHERWISE NOTED. 19. LIMITS OF CONSTRUCTION ARE TO THE PROPERTY LINE UNLESS OTHERWISE SPECIFIED ON THE PLAN. 20. IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONSAND CONSTRUCTION DOCUMENTS. 21. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING CONSTRUCTION WITHOUT COMPENSATION. 22. BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 23. ALL PROPOSED GRADES ONSITE SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE INDICATED ON THE PLANS.ANY SLOPES STEEPER THAN 4:1 REQUIRE EROSION AND SEDIMENT CONTROL BLANKET. 24. ADHERE TO ALL TERMS AND CONDITIONS AS NECESSARY IN THE GENERAL N.P.D.E.S. PERMIT AND STORMWATER POLLUTION PREVENTION PLAN FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 25. ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUSGRADE. 26. CONTRACTOR SHALL ENSURE MINIMUM GRADES ARE MET WITHIN PAVED AREAS, 1.2% FOR ASPHALTPAVING AND 0.6% FOR CONCRETE PAVING. EROSION CONTROL NOTES 1. THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE EROSION CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. 2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTIONSHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN AND THE STATE OF MNNATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOMEFAMILIAR WITH THEIR CONTENTS. 3. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER. 4. SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT THETRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAYS. ALL SEDIMENT SPILLED, DROPPED,WASHED, OR TRACKED ON A PUBLIC ROADWAY MUST BE REMOVED IMMEDIATELY. WHEN WASHING ISREQUIRED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE INAN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. ALLFINES IMPOSED FOR DISCHARGING SEDIMENT ONTO PUBLIC AREAS SHALL BE PAID BY THE CONTRACTOR. 5. TEMPORARY SEEDING OR OTHER APPROVED METHODS OF STABILIZATION SHALL BE INITIATED WITHIN 7 DAYS OF THE LAST DISTURBANCE ON ANY AREA OF THE SITE. 6. THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BYTHE GENERAL PERMIT. 7. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 8. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BEDETAINED AND PROPERLY TREATED OR DISPOSED. 9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ONSITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 11. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALEDCONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OFWIND OR STORM WATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. 12. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE PLAN SHALL BE INITIATED AS SOON AS IS PRACTICABLE. 13. ALL STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED SUCH THAT THEY WILL NOTADVERSELY AFFECT STORM WATER QUALITY. OTHERWISE, COVERING OR ENCIRCLING THESE AREAS WITHSOME PROTECTIVE MEASURE WILL BE NECESSARY. 14. CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING ANY EROSION CONTROL DEVICE WHICH THEY DISTURB. EACH CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DEFICIENCIES IN THE ESTABLISHED EROSION CONTROL MEASURES THAT MAY LEAD TO UNAUTHORIZED DISCHARGE OR STORM WATER POLLUTION, SEDIMENTATION, OR OTHER POLLUTANTS. UNAUTHORIZED POLLUTANTS INCLUDE (BUT ARE NOT LIMITED TO) EXCESS CONCRETE DUMPING OR CONCRETE RESIDUE, PAINTS, SOLVENTS, GREASES, FUEL AND LUBRICANT OIL, PESTICIDES, AND ANY SOLID WASTE MATERIALS. 15. EROSION CONTROL DEVICES SHOWN ON THESE PLANS SHALL BE INSTALLED PRIOR TO THE START OFLAND-DISTURBING ACTIVITIES ON THE PROJECT. 16. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR THIS PROJECT. CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY THE DESIGN ENGINEER AND THE CITY OF LAKE ELMO ENGINEERING DIVISION. 17. IF THE EROSION CONTROL PLAN AS APPROVED CANNOT CONTROL EROSION AND OFF-SITESEDIMENTATION FROM THE PROJECT, THE EROSION CONTROL PLAN WILL HAVE TO BE REVISED AND/ORADDITIONAL EROSION CONTROL DEVICES WILL BE REQUIRED ON SITE. ANY REVISIONS TO THE EROSIONCONTROL PLAN MADE BY THE CONTRACTOR MUST BE APPROVED BY THE ENGINEER. EROSION CONTROL MAINTENANCE ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION AS REQUIRED BY ALL JURISDICTIONS UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OFTHE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A CERTIFIEDPERSON AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A 0.5" RAINFALLEVENT, AND CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING, OR DETERIORATION. 1. ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED, WATERED AND RESEEDED AS NEEDED. FOR MAINTENANCE REQUIREMENTSREFER TO THE STANDARD SPECIFICATIONS. 2. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BEREMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-THIRD THE HEIGHT OF THE SILT FENCE. 3. THE CONSTRUCTION ENTRANCE(S) SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND. 4. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FORPARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING ASCONDITIONS DEMAND. 5. ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A TIMELY MANNER BUT IN NO CASE LATER THAN 2 CALENDAR DAYS FOLLOWING THE INSPECTION. PAVING AND STRIPING NOTES 1. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OR MN/DOT SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS. 2. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MANUALON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D) AND CITY STANDARDS. 3. CONTRACTOR SHALL FURNISH ALL PAVEMENT MARKINGS FOR FIRE LANES, ROADWAY LANES, PARKING STALLS, ACCESSIBLE PARKING SYMBOLS, ACCESS AISLES, STOP BARS AND SIGNS, AND MISCELLANEOUS STRIPING WITHIN THE PARKING LOT AS SHOWN ON THE PLANS. 4. ALL EXPANSION JOINTS SHALL EXTEND THROUGH THE CURB. 5. THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET. 6. ALL JOINTS, INCLUDING EXPANSION JOINTS WITH REMOVABLE TACK STRIPS, SHALL BE SEALED WITH JOINT SEALANT. 7. THE MATERIALS AND PROPERTIES OF ALL CONCRETE SHALL MEET THE APPLICABLE REQUIREMENTS INTHE A.C.I. (AMERICAN CONCRETE INSTITUTE) MANUAL OF CONCRETE PRACTICE. 8. CONTRACTOR SHALL APPLY A SECOND COATING OVER ALL PAVEMENT MARKINGS PRIOR TO ACCEPTANCEBY OWNER FOLLOWED BY A COAT OF GLASS BEADS AS APPLICABLE PER THE PROJECT DOCUMENTS. 9. ANY EXISTING PAVEMENT, CURBS AND/OR SIDEWALKS DAMAGED OR REMOVED WILL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE ENGINEER AND OWNER. 10. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY SUITABLE ACCESSIBLE ROUTES (PER A.D.A).GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALLCONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMP SLOPESEXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NOCASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKINGSTALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE ISSUES. 11. MAXIMUM JOINT SPACING IS TWICE THE DEPTH OF THE CONCRETE PAVEMENT IN FEET. REFER TO GEOTECHNICAL REPORT NO. B1911555BRAUN INTERTEC CORPORATION11001 HAMPSHIRE AVENUE SMINNEAPOLIS, MN 55438 DATED JANUARY 2, 2020 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C100BAW 09/09/2022 JFJ 19.1001.04 PRIVATE INFRASTRUCTURE GENERAL NOTES RETAINING WALL COORDINATION NOTES 1. RETAINING WALLS SHOWN ARE SCHEMATIC. ACTUAL DETAILS SHALL BE DESIGNED BY THE CONTRACTOR/OTHERS AND SUBMITTED FOR APPROVAL BY ENGINEER. 2. RETAINING WALLS SHALL BE AS NOTED ON PLAN OR APPROVED EQUAL. 3. THE CONTRACTOR SHALL DETERMINE ALL DIMENSIONS AND DETAILS NECESSARY FOR INSTALLATION. 4. TAKE SPECIAL PRECAUTION ADJACENT TO WETLAND AS TO NOT DISTURB AREAS WITHIN DELINEATED WETLANDS 5. CONTRACTOR SHALL COORDINATE TIMING OF THE INSTALLATION OF THE RETAINING WALL WITH ALL UTILITIES, SPECIFICALLY THE SITE LIGHTING, STORM SEWER, SANITARY, AND WATERMAIN ADJACENT TOTHE PROPOSED WALLS. 6. REFER TO THE GEOTECHNICAL RECOMMENDATIONS BASED ON THE REPORT LISTED ON SHEET C100. 7. FINISHED ELEVATIONS ON THE GRADING PLAN ARE AS STATED ON THE PLAN WITH THE TOP OF WALL SPOTS AND BOTTOM OF WALL SPOTS DENOTING THE FINISHED GRADE ELEVATIONS. ACTUAL BOTTOM AND TOP OF RETAINING WALL ELEVATIONS MAY VARY DUE TO MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS. 8. THE CONTRACTOR SHALL COORDINATE ALL ACTIVITIES WITH THE WALL REINFORCING AND ROADWAYCONSTRUCTION, WETLAND LIMITS, AND RIGHT-OF-WAY LIMITS. CONTRACTOR SHALL PERFORM ALLNECESSARY COORDINATION, STAGING, TEMPORARY SHORING, AND SEQUENCING AT NO EXTRA COST. EARTHWORK NOTES 1. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE DURING CONSTRUCTION AND PREVENT STORMWATER FROM ACCUMULATING IN EXCAVATIONS. 2. CONTRACTOR SHALL COMPLETELY REMOVE EXISTING UNSUITABLE FILL BELOW BUILDIING PAD, FOUNDATIONS, AND OVERSIZING ZONES AND REPLACE WITH STRUCTURAL FILL TO STRUCTURAL GRADES. UNSUITABLE SOIL IS ANY EXISTING UNDOCUMENTED FILL, BURIED STRUCTURES OR DEBRIS, ORGANIC/SWAMP DEPOSITS, SOFT OR VERYLOOSE SOILS FORM BENEATH FOUNDATIONS. REMOVAL OF FILL SHALL OCCUR A MINIMUM OF 12" BELOW FOUNDATIONS, FOOTINGS, AND SLABS. ALL SUBGRADE SHALL BE PROOFROLLED PRIOR TO INSTALLATION OFSTRUCTURAL FILL. 3. STRUCTURAL FILL SHALL CONSIST OF NONORGANIC EXCAVATED MATERIAL THAT CAN BE PROPERLY PLACED ANDCOMPACTED. NON-ORGANC MATERIAL SHALL CONSIST OF SOIL CONTAINING LESS THAN 2 PERCENT ORGANICMATERIAL BY WEIGHT. ON-SITE SOILS (SP, SM, SP-SM, SC) CAN BE REUSED BELOW FLOOR SLABS, FOUNDATIONS, AND PAVEMENT LAYERS UPON APPROVAL FROM GEOTECHNICAL ENGINEER. 4. CONTRACTOR IS RESPONSIBLE FOR DESIGNING, INSTALLING, AND MAINTAINING SHORING SYSTEMS TO FACILITATE CONSTRUCTION. STRUCTURES, SLABS, AND PAVEMENTS ADJACENT TO THE EXCAVATION COULD BECOMEUNDERMINED IF SLOUGHING OCCURS WHILE THE EXCAVATION REMAINS OPEN DURING CONSTRUCTION. FLOWABLEFILLS, MUDJACKING, OR GROUTING COULD BE NEEDED DURING BACKFILLING OPERATIONS ADJACENT TO EXISTING STRUCTURES. 5. ENGINEERED FILL MATERIAL SHOULD MEET THE REQUIREMENTS AS SHOWN BELOW. REFER TO GEOTECHNICAL REPORT FOR SOIL CLASSIFICATIONS. ALL ENGINEERED FILL SHALL SATISFY APPLICABLE ENVIRONMENTALREGULATIONS. 5.1. AGGREGATE BASE: GRAVEL OR CRUSHED STONE GRADED FOR INTENDED USE AS SUBBASE FOR PAVING ANDSIDEWALK - CLASS 5 AGGREGATE BASE PER MNDOT SPEC SECTION 3138. 5.2. DRAINAGE LAYER/FILL BELOW WATER/NON-FROST-SUSCEPTIBLE: GP, GW, SP, SW SOILS MEETING GRADATION -100% PASSING 1-INCH SIEVE, <50% PASSING #40 SIEVE AND <5% PASSING #200 SIEVE WITH <3% ORGANICCONTENT, WASHED GRAVEL OR CRUSHED STONE, 1/4 INCH TO 3/4-INCH SIZE; ASTM C33, SIZE 67. 5.3. STRUCTURAL FILL BELOW FOUNDATIONS AND INTERIOR FLOOR SLABS: ON-SITE SOILS MEETING SP, SM, SCSOILS MEETING GRADATION - 100% PASSING 2-INCH SIEVE AND <40% PASSING #40 SIEVE.5.4. NON STRUCTURAL FILL BELOW LANDSCAPED SURFACES: 100% PASSING 6" SIEVE WITH <10% ORGANIC CONTENT .5.5. PAVEMENT FILL: SEE DETAILS APPROPRIATE LABORATORY TESTS, INCLUDING STANDARD PROCTOR (ASTM D698) MOISTURE DENSITY RELATIONSHIP TESTS AND ATTERBERG LIMITS TESTS FOR COHESIVE SOILS SHOULD BE PERFORMED ON PROPOSED FILL MATERIALS PRIOR TO THEIR USE AS STRUCTURAL FILL. FURTHER EVALUATION OF ANY ON-SITE SOILS ORPROPOSED IMPORTED FILL MATERIALS SHOULD BE PERFORMED BY GEOTECHNICAL ENGINEER PRIOR TO THEIR USEIN COMPACTED FILL SECTIONS. GEOTECHNICAL ENGINEER SHOULD BE RETAINED TO MONITOR FILL PLACEMENT AND TO PERFORM FIELD DENSITY TESTS AS EACH LIFT OF FILL IS PLACED IN ORDER TO EVALUATE COMPLIANCEWITH THE DESIGN REQUIREMENTS. GEOTECHNICAL ENGINEER SHOULD BE RETAINED TO OBSERVE AND TESTSUBGRADES IMMEDIATELY PRIOR TO FLOOR SLAB CONSTRUCTION AND PAVING. 6. PLACE ACCEPTABLE MATERIALS IN LAYERS NOT MORE THAN 9 INCHES LOOSE DEPTH FOR MATERIALS COMPACTEDBY HEAVY EQUIPMENT AND NOT MORE THAN 4 INCHES LOOSE DEPTH FOR MATERIALS COMPACTED BY HAND EQUIPMENT. FILL SHALL BE FREE OF DEBRIS AND RUBBLE. 6.1. STRUCTURAL FILL: UNDER FOUNDATIONS, AND SLABS ON GRADE, . 6.2. FREE DRAINING/NON-FROST-SUSCEPTIBLE: UNDER BUILDING SLABS, AT FOUNDATION DRAINAGE, ELSEWHEREAS INDICATED ON ARCHITECTURAL AND STRUCTURAL DRAWINGS. 6.3. AGGREGATE BASE MATERIAL: UNDER PAVEMENT, WALKS, STEPS, PIPING, AND CONDUIT. 7. COMPACT MATERIALS AT THE OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D698 BY AERATION ORWETTING, AND AS DIRECTED BY THE GEOTECHNICAL INVESTIGATION REPORT AND/OR ENGINEER, TO THE FOLLOWING PERCENTAGES OF MAXIMUM DRY DENSITY (ASTM D698 STANDARD PROCTOR): 7.1. BELOW FOUNDATIONS AND OVERSIZING ZONES: 98 PERCENT OF MAXIMUM DRY DENSITY, -±3% OF OPTIMUM MOISTURE FOR MATERIAL WITH <20% PASSING #200 SIEVE OR -2 TO +3 % OF OPTIMUM MOISTURE FOR MATERIAL WITH >20% PASSING #200 SIEVE .7.2. ABOVE FOUNDATIONS AND BELOW INTERIOR SLABS MORE THAN ONE FOOT BELOW SUBGRADE: 95 PERCENT OF MAXIMUM DRY DENSITY, ±3% OF OPTIMUM MOISTURE FOR MATERIAL WITH <20% PASSING #200 SIEVE OR -2 TO+3 % OF OPTIMUM MOISTURE FOR MATERIAL WITH >20% PASSING #200 SIEVE.7.3. WITHIN 1 FEET OF PAVEMENT SUBGRADE: 98 PERCENT OF MAXIMUM DRY DENSITY, ±3% OF OPTIMUM MOISTURE FOR MATERIAL WITH <20% PASSING #200 SIEVE OR -2 TO +3 % OF OPTIMUM MOISTURE FOR MATERIAL WITH>20% PASSING #200 SIEVE.7.4. MORE THAN 1 FEET BELOW PAVEMENT SUBGRADE: 95 PERCENT OF MAXIMUM DRY DENSITY, ±3% OF OPTIMUM MOISTURE FOR MATERIAL WITH <12% PASSING #200 SIEVE OR ±3% OF OPTIMUM MOISTURE FOR MATERIAL WITH>20% PASSING #200 SIEVE. 7.5. BELOW LANDSCAPED AREAS: 90 PERCENT OF MAXIMUM DRY DENSITY, ±5% OF OPTIMUM MOISTURE FOR MATERIAL WITH <12% PASSING #200 SIEVE OR ±4% OF OPTIMUM MOISTURE FOR MATERIAL WITH >12% PASSING#200 SIEVE. 7.6. ADJACENT TO BELOW-GRADE WALL: 95 PERCENT OF MAXIMUM DRY DENSITY, ±3% OF OPTIMUM MOISTURE FORMATERIAL WITH <12% PASSING #200 SIEVE OR -2 TO +1 % OF OPTIMUM MOISTURE FOR MATERIAL WITH >12%PASSING #200 SIEVE. THE CITY STANDARD SPECIFICATIONS FOR PUBLIC INFRASTRUCTURE, DATED APRIL 2019, INCLUDING THE CITY STANDARD DETAILS PROVIDED WITHIN THESE CONSTRUCTION PLANS, AND THE CITY STANDARD PLAN NOTES PROVIDED WITHIN THESE CONSTRUCTION PLANS, SHALL APPLY TO THE WORK PERFORMED UNDER THIS CONTRACT. WHEN ANY OTHER PLAN NOTE OR DETAIL IS IN CONTRADICTION TO THE CITY STANDARD SPECIFICATION, DETAILS AND PLAN NOTES, OR IS IN CONTRADICTION TO THE APPROVED PROJECT PERMITS AND CITY ORDINANCES, THE CITY STANDARDS, PERMIT REQUIREMENTS AND ORDINANCES SHALL TAKE PRECEDENCE AND REMAIN APPLICABLE TO THIS PROJECT. REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCE L200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT EXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBERCSSIG N A G E INV.=977.74LIFTSTATION1233981.70TCCB 958.76INVCMP84LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)PAVEMENT STRIPES (TYP.)PAVEMENT STRIPES (TYP.)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 970 970975971971972972973973974974976977978 979 12+0013+00 14+00 15+00 16+00 17+00 18+0019+0020+0021+0022+00PT : 1 3 + 2 1 . 1 4 PC: 1 7 + 4 9 . 1 6 www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTH1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATIONAPPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS,PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC. SUCH THAT THE IMPROVEMENTS ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLEMATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE PROJECTDOCUMENTS. 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THEDEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. CONTRACTOR SHALL PROVIDE COPIES OF THE PERMIT ANDRECEIPTS OF DISPOSAL OF MATERIALS TO THE OWNER AND OWNERS REPRESENTATIVE. 3. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES.UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE CONSTRUCTIONMANAGER AND COORDINATION WITH THE ADJACENT PROPERTIES AND/OR THE CITY. 4. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVALAND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANYCONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCESAND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THECONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 5. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE BEEN DETERMINED FROM THEBEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THEENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR LOCATIONS OFEXISTING UTILITIES WITHIN ALL AREAS OF PROPOSED WORK. 6. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACTLOCATION, OR AS ANY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS ANDPROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINESBEFORE PRECEDING WITH THE WORK. 7. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC, AND/OR GAS LINES NEEDING TO BE REMOVEDOR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIMESHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY ISNECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT-OF-WAY DURING CONSTRUCTION. 8. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES,ETC. (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY THE CONSTRUCTIONMANAGER. MAINTENANCE OF TRAFFIC CONTROL SHALL BE COORDINATED IN ACCORDANCE WITH LAKEELMO, WASHINGTON COUNTY AND MN/DOT. 9. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES DURING CONSTRUCTION, ANDSHALL NOTIFY ALL PROPERTIES IF ACCESS WILL BE INTERRUPTED OR ALTERED AT ANY TIME DURING CONSTRUCTION. 10. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED. 11. CONTRACTOR MAY LIMIT SAW-CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT ISREQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL ANDREPAIR. 12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE CITY WATERDEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION ISCONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC WORK AND THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIREDWATER MAIN SHUT OFFS WITH THE CITY OF LAKE ELMO DURING CONSTRUCTION. ANY COSTSASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION WILL BE PROVIDED. 13. REFER TO SURVEY FOR ALL EXISTING INVERT AND RIM ELEVATIONS. 14. ALL UTILITIES SHOWN ARE EXISTING UTILITIES. 15. IN THE EVENT A WELL IS FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER AND OWNERIMMEDIATELY. ALL WELLS SHALL BE SEALED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE WITHALL STATE OF MN REQUIREMENTS. 16. IN THE EVENT THAT UNKNOWN CONTAINERS OR TANKS ARE ENCOUNTERED, THE CONTRACTOR SHALLCONTACT THE OWNER AND/OR OWNERS REPRESENTATIVE IMMEDIATELY. ALL CONTAINERS SHALL BE DISPOSED OF AT A PERMITTED LANDFILL PER THE PROJECT DOCUMENTS. 17. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY EXISTING DRAINTILE IS ENCOUNTERED ON SITE. NOACTIVE DRAINTILE SHALL BE REMOVED WITHOUT APPROVAL FROM THE ENGINEER. DEMOLITION PLAN NOTES SHEET C201 SHEET C202 SHEET C204 SHEET C203 SHEET C205 LIMITS OF CONSTRUCTION DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C200BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN *CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* 969.94SETIP41578969.20FNDIP8612962.35FNDIP15480GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)PAVEMENT STRIPES (TYP.)APPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION 970 97097197197297314+00 15+00 16+00 17+00 18+00PC: 1 7 + 4 9 . 1 6 EX. SSWR MHIE: ±956.27 8" PVCSANITARY 18" RCP FESIE: 965.60 18" RCP FESIE: 966.85 84" CMP FESIE:958.76 15" PVCSANITARY SSWR DROP MH RIM: 968.32IE (16" SE): 959.05IE (8" NW): 954.17 IE (16" NE): 952.88 EXIST. SSWR LIFT STATION 16" DIP SANITARY 8" FORCEMAIN 84" CMP STRM SEWER 30" RCP STORMA A A A A A A A A A A A GENERATOR A OVERHEADELECTRICA RIGHT TURN LANE SPEED LIMIT 40D D PROPOSED HUDSON BLVD OFF-SITEIMPROVEMENTS;RECONSTRUCT WEST BOUND LANES ANDMILL AND OVERLAY EAST BOUND LANES; REFER TO SHEET C403 - HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS & HUDSON BLVD PLANSHEETS 18" RCP FESIE: 967.93 30" RCP FES IE: 965.27 REMOVE 13 LF 30" RCP REMOVE 8 LF18" RCP F F 54" RCP STORMA G H 12" DIP WTRA B FIBER A OVERHEAD ELECTRIC A STRM MHRIM: 965.96 IE (30" NE): 960.27IE (SE): 962.48IE (W): 955.27 A STRM MHRIM: 968.75 IE (18" NE): 964.47IE (NW): 963.91IE (NW&SE): 956.43 KEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY REMOVE EXISTING TREE (TYP.) PROTECT EXISTING TREE (TYP.) REMOVE AND SALVAGE EXISTING SIGN REMOVE AND SALVAGE EXISTING FES EXISTING POWER POLE TO REMAIN EXISTING HYDRANT TO REMAIN EXISTING GATE VALVE TO REMAIN A B C D E F G HLIMITS OF CONSTRUCTION REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCE L200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT NORTHEXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBER *CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLEPOINT BOULDEVARD PRIOR TOCONSTRUCTION* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C201BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN C202 C204 983.58FNDIP15480977.57FNDIP15480973.00SETIP41578 970.57FNDIP.51233981.70 TCCB PIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N97197297397413+00 P T : 1 3 + 2 1 . 1 4 SWWD 50' WETLANDMANAGE 2 SETBACK C F SSWR MHRIM: 971.40 IE (15" SE): ±962.77IE (15" NE): ±952.77 A OVERHEADELECTRIC A H B 12" DIP WTR A 15" PVCSANITARY A OVERHEADELECTRIC A LIMITS OF CONSTRUCTION REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCE L200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT EXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBER KEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY REMOVE EXISTING TREE (TYP.) PROTECT EXISTING TREE (TYP.) REMOVE AND SALVAGE EXISTING SIGN REMOVE AND SALVAGE EXISTING FES EXISTING POWER POLE TO REMAIN EXISTING HYDRANT TO REMAIN EXISTING GATE VALVE TO REMAIN A B C D E F G H NORTH*CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTIONLIMITS FOR HUDSON BOULEVARD AND EAGLEPOINT BOULDEVARD PRIOR TOCONSTRUCTION* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C202BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN C201 C203 LIMITS OF CONSTRUCTION REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCEL200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT EXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBER KEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY REMOVE EXISTING TREE (TYP.) PROTECT EXISTING TREE (TYP.) REMOVE AND SALVAGE EXISTING SIGN REMOVE AND SALVAGE EXISTING FES EXISTING POWER POLE TO REMAIN EXISTING HYDRANT TO REMAIN EXISTING GATE VALVE TO REMAIN A B C D E F G H 992.45FNDIP164561000.36SETIP41578INV.=977.74AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 36" RCP CLIII 8" SANITARY A A B H B B 12" DIP WATERMAIN A C FIBERA C NORTH*CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTIONLIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TOCONSTRUCTION* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C203BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN C202 C204 LIMITS OF CONSTRUCTION REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCEL200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT EXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBER KEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY REMOVE EXISTING TREE (TYP.) PROTECT EXISTING TREE (TYP.) REMOVE AND SALVAGE EXISTING SIGN REMOVE AND SALVAGE EXISTING FES EXISTING POWER POLE TO REMAIN EXISTING HYDRANT TO REMAIN EXISTING GATE VALVE TO REMAIN A B C D E F G H NORTH*CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTIONLIMITS FOR HUDSON BOULEVARD AND EAGLEPOINT BOULDEVARD PRIOR TOCONSTRUCTION*968.81FNDIP16456984.21FNDIP16456982.87SETIP41578986.52SETIP41578CS983.28FNDIP16456963.64FNDIP861297297397419+0020+00STORM MHRIM: 981.80 IE (18" SE): ±977.40 A 12" DIP WATERMAIN 12" DIP WATERMAIN EXIST. 8" DIP STUB 36" RCP CLIII 36" RCP FESINV. 974.0 EXISTING WETLANDNWL: 974.0HWL: 976.3 SWWD 25' WETLAND MANAGE 2 SETBACK 18" RCP FESINV. 982.58 18" RCP FES INV. 976.13 18" RCP FESINV. 974.19 18" RCP FESINV. 972.58 A A A A A A A A A CENTERLINE OFEXISTING CREEK 25' SHORELANDIMPACT ZONE SHORELAND BUILDING SETBACK ORDINARY HIGH WATER LEVEL AS DELINEATED 11/2019 F 8" PVCSANITARYA 12" DIPWATERMAIN A H H H FIBERA GAS A GASA ELECTRICAPROPOSED HUDSON BLVD OFF-SITE IMPROVEMENTS;RECONSTRUCT WEST BOUND LANES ANDMILL AND OVERLAY EAST BOUND LANES; REFER TO SHEET C403 - HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS & HUDSON BLVD PLANSHEETS B C www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C204BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN C205 C201 C203 LIMITS OF CONSTRUCTION REMOVE BITUMINOUS SURFACE MILL EXISTING BITUMINOUS SURFACE REMOVE BUILDING REMOVE TREE, REFERENCEL200-201 FOR TREE INVENTORY REMOVE CONCRETE CURB & GUTTER REMOVE UTILITY LINES PROPERTY LINE EXISTING OVERHEAD POWER LINE EXISTING CHAINLINK FENCE EXISTING SANITARY SEWER EXISTING STORM SEWER EXISTING WATERMAIN EXISTING GAS MAIN EXISTING CONTOUR EXISTING SIGN EXISTING FLARED END SECTION EXISTING STORM MANHOLE EXISTING STORM CATCHBASIN EXISTING GATE VALVE EXISTING HYDRANT EXISTING METAL COVER EXISTING ELECTRICAL METER EXISTING TELEPHONE MANHOLE EXISTING CABLE BOX EXISTING GUY WIRE EXISTING POWER POLE EXISTING LIGHT POLE EXISTING TREE CLEARING & GRUBBING EXISTING TREE LINE EXISTING CURB & GUTTER LEGEND FULL DEPTH SAWCUT EXISTING FORCEMAIN SETBACK/ BUFFER WETLAND DELINEATION EXISTING FIBER 976.20FNDIP16456979.83FNDIP16456SIG N A G EPAVEMENT STRIPES (TYP.)APPROXIMATELOCATION975974976977978 979 21+0022+0023+0024+00STORM MH RIM: 981.80IE (18" SE): ±977.40 A 12" DIP WATERMAIN 18" RCP FESINV. 972.92 A A 12" DIP WATERMAIN A 15" RCP STORM A 15" RCP STORM A 8" PVC SANITARYA G STORM MHRIM: 978.72 IE (18" SE): ±974.24 A H 12" DIP WTRA OVERHEAD ELECTRIC A GASA 8" FORCEMAINA FIBERA PROPOSED HUDSON BLVD OFF-SITEIMPROVEMENTS;RECONSTRUCT WEST BOUND LANES AND MILLAND OVERLAY EAST BOUND LANES; REFER TO SHEET C403 - HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS & HUDSON BLVD PLANSHEETS KEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY REMOVE EXISTING TREE (TYP.) PROTECT EXISTING TREE (TYP.) REMOVE AND SALVAGE EXISTING SIGN REMOVE AND SALVAGE EXISTING FES EXISTING POWER POLE TO REMAIN EXISTING HYDRANT TO REMAIN EXISTING GATE VALVE TO REMAIN A B C D E F G H NORTH*CONTRACTOR TO FIELD VERIFY LOCATIONSOF ALL UTILITIES WITHIN CONSTRUCTIONLIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TOCONSTRUCTION* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg September 11, 2022 - 2:23pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C205BAW 09/09/2022 JFJ 19.1001.04 EXISTING CONDITIONS & REMOVAL PLAN C204 SIG N A G E EXI S T I N G BUI L D I N GEDGE OF WATEREDG E O F W A T ERCENTERLINE CREEKBRIDGEABUTTMENTINV.=977.7422.5456(WATER ELEV. = 978.2 AS OF 7/11/19)1233981.70TCCB 958.76INVCMP84INV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)PAVEMENT STRIPES (TYP.)DASHED PAVEMENT STRIPEPAVEMENT STRIPES (TYP.)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . SIG N A G E EXI S T I N G BUI L D I N GEDGE OF WATEREDG E O F W A T ERCENTERLINE CREEKBRIDGEABUTTMENTINV.=977.7422.5456(WATER ELEV. = 978.2 AS OF 7/11/19)1233981.70TCCB 958.76INVCMP84INV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)PAVEMENT STRIPES (TYP.)DASHED PAVEMENT STRIPEPAVEMENT STRIPES (TYP.)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y .25.0 ' 6.9 5 %2.85%3.53%19.13%21.38%25.87% 3 2 . 4 8% 1 2 . 6 8% 1 3 . 4 0%12.8 9% 3 2 . 3 6% 2 6 . 0 6 %10.67% 4.45 %20.65%2 4 . 5 8% 5.97 % 2.11% 2 3 . 6 9% 24. 5 7 % 15. 8 1 % 2 9 .35% 4.55 %13.00%9.0 6 % 5.82 %4.17% 6.73 %1.40%10.96% 5.20%4.93% 2.5 8 % 13.94%36.40%13 . 7 7 % 9. 2 0 %3.32%12.84%5.00%31.03%34.26% 32.45 % 8.87% 7.28% 23. 0 8 % 23 . 5 4 %5.80%11 . 0 0 % 11.85 %8.15%1 5 . 6 7% 6.8 1 % DRAINAGE AREA 1 (1.91 AC) DRAINAGE AREA 2 (2.33 AC) DRAINAGE AREA 3 (1.46 AC)12+0013+0014+00 15+0016+00 17+0018+0019+0020+0021+0022+00BP: 1 0 + 0 0 . 0 0 PT : 1 3 + 2 1 . 1 4 PC: 1 7 + 4 9 . 1 6 EXISTING WETLAND #1 TEMPORARY SEDIMENT TRAP #1 TOTAL VOLUME: 6,876 CF DEPTH: 2' TEMPORARY SEDIMENT TRAP #2 TOTAL VOLUME: 8,388 CF DEPTH: 3' TEMPORARY SEDIMENT TRAP #3 TOTAL VOLUME: 5,256 CF DEPTH: 2' CENTERLINE OFEXISTING CREEK 25' SHORELAND IMPACT ZONE SHORELANDBUILDING SETBACK ORDINARY HIGH WATERLEVEL AS DELINEATED 11/2019 EXISTING WETLAND #2INCIDENTAL WETLANDNWL: 974.0HWL: 976.3 SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLANDMANAGE 2 SETBACK SITE OUTFALL:84" CMPWHICH DIRECTS STORMWATERULTIMATELY TO WILMES LAKEAPPROXIMATELY 0.7 MILES SOUTH www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C3-EROS PH1 PLAN.dwg September 11, 2022 - 2:24pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES EROSION CONTROL PLAN NOTES 1. ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE INSTALLED PRIOR TO CONSTRUCTION. 2. THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING. 3. THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES. 4. WITHIN ONE WEEK (7 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BESTABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FORMATERIALS. 5. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED INACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS. 6. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDINGTHE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THE CONSTRUCTION. 7. ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE CONTRACTOR. 8. REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED. 9. THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTOEXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS AS NECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS. 10. IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATER FROM A TANK TRUCK TO ALL CONSTRUCTION AREAS. UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER,PARKING, LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL AND MATERIAL STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC.,IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES INLOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS: 1. INSTALL INLET PROTECTION AT EXISTING STORMWATER CULVERTS.2. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE (1), CONCRETE WASHOUTPIT (1) AND INSTALL SILT FENCE. 3. PREPARE TEMPORARY PARKING AND STORAGE AREA.4. CONSTRUCT AND STABILIZE DIVERSIONS AND TEMPORARY SEDIMENT TRAPS.5. PERFORM CLEARING AND GRUBBING OF THE SITE. PERFORM MASS GRADING.ROUGH GRADE TO ESTABLISH PROPOSED DRAINAGE PATTERNS. 6. START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES.7. TEMPORARILY SEED WITH PURE LIVE SEED, THROUGHOUT CONSTRUCTION,DISTURBED AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY NPDES AND/OR CITY OF LAKE ELMO GRADING PERMIT. SEQUENCE OF CONSTRUCTION: THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER ANDSITE MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTINGINSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARY OR PERMANENT STABILIZATION. SWPPP UPDATES AND AMENDMENTS ROCK ENTRANCE INLET PROTECTION SILT FENCE LIMITS OF DISTURBANCE SAFETY FENCE BIOROLL LEGEND DRAINAGE DELINEATION DIVERSION DITCH TEMPORARY SEDIMENT TRAP DELINEATED WETLAND 49B SOIL TYPE - ANTIGO SILT LOAM, 2% - 6% 120 SOIL TYPE - BRILL SILT LOAM 264 SOIL TYPE - FREEON SILT LOAM, 2% - 6% 367B SOIL TYPE - CRYSTAL LAKE SILT LOAM, 1% - 6% 454C SOIL TYPE - MAHTOMEDI LOAMY SAND, 6% - 12% 49B 120 120 367B 264 49B 454C SOIL BOUNDARY NORTHRECEIVING BODY OF WATER: THE SITEDISCHARGES TO ADJACENT UNNAMED CREEKON-SITE AND OUTLETS THROUGH A 84" CMP BELOW HUDSON BLVD. RUNOFF IS THEN DIRECTED TO THE IMPAIRED WILMES LAKE LOCATED APPROXIMATELY 0.7 MILES SOUTH. PHASE 1 BMP QUANTITIES SILT FENCE ±5,800 LF ROCK CONSTRUCTION ENTRANCE 1 EA INLET PROTECTION ±10 EA BIO-ROLL DAM ±10 EA DIVERSION DITCH ±1,100 LF TEMPORARY SEDIMENTATION BASIN 3 EA KEYNOTE LEGEND INLET PROTECTION, TYP. BIOROLL, TYP. DOUBLE ROW OF SILT FENCEPLACED 5 FEET APART CONSTRUCTION ENTRANCE, TYP. EROSION CONTROL BLANKET;PROVIDE WITHIN DITCH SECTIONS AND ON SLOPES 1:4 OR GREATER RIP RAP SWPPP SIGN A B C D E F G D A A A C C C B B B DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C300BAW 09/09/2022 JFJ 19.1001.04 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 G C C C C C C C C C C C LIMITS OF DISTURBANCE SUMMARY TOTAL DISTURBED AREA 10.52 AC HUDSON BLVD IMPROVEMENTS 1.85 AC EXISTING IMPERVIOUS AREA 0.95 AC EXISTING PERVIOUS AREA 0.90 AC PROPOSED IMPERVIOUS AREA 1.13 AC PROPOSED PERVIOUS AREA 0.72 AC ON-SITE IMPROVEMENTS 8.67 AC EXISTING IMPERVIOUS AREA 0.00 AC EXISTING PERVIOUS AREA 8.67 AC PROPOSED IMPERVIOUS AREA 3.62 AC PROPOSED PERVIOUS AREA 5.05 AC 992.45FNDIP164561000.36SETIP41578983.58FNDIP15480977.57FNDIP15480973 .0 0SET IP 415 78 970.57FNDIP.5969.94SETIP41578969.20FNDIP8612968.81FNDIP16456976.20FNDIP16456979.83FNDIP16456984.21FNDIP16456982.87SETIP41578986.52SETIP41578SIG N A G E 983.28FNDIP16456963.64FNDIP8612962.35FNDIP15480EXI S T I N G BUI L D I N GGENERATOREDGE OF WATEREDG E O F W A T ERCENTERLINE CREEKBRIDGEABUTTMENTLIFTSTATION(WATER ELEV. = 978.2 AS OF 7/11/19)958.76INVCMP84LIFTSTATIONDASHED PAVEMENT STRIPEAPPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 SENIOR HOUSING BUILDING LEVEL 1: 995.06LEVEL B: VARIES DDD970970968 972972974974976978 970970 980 98098 0 990990 990964964966966968968 972972 974974 976 976 978 978 982982 982 984984 984 986986986 988 988 988988 9889929929 9 4 994996 99 6 998998 9809 8 0 1000976 9769789789 8 2 98298498498699 2 994 9969981002970980972974974974976978970 962 964 966 968 970980 980964 966 968 972 974 976 978 982982 984 984 986 986 988 988 970970 970980966 966968 968 968 972 974 978982984986 986988 9889709709 9 0990 972972974976978982 984 986 988 992 992990986988992992994994990 990988 988 992 992994 994996 998 984984 984 986 988 990 9909869 8 8 990 990 986 988 992 992 994 994 994994 980 980980 980980980980 980980 990982982 982 982982 982 982982 982 98 4 984 984984984 984 984 984984 984 986986 986986986 988988 988 99299299 4 99498898 6 99 0 984 984986986 986986986 986986 98698 6 986 986 98 8 988 988 99299 2 990986988 992 970 980 966 968 972 974976978982 984 990988 99 2 10.05%8.20%6. 2 4 %7.45%11. 4 2 %1.55%1.31%3:13:1 9.14%6.2 1 % 4.3 6 %1.87% 2. 0 9%1.52% 5.60% 1 4 . 9 7% 4. 0 6 %4.11%3.99%14.69% 7.2 5 %7.32%1.81%3.61%3. 5 6% 1.60% 2.95 %1.57%1. 8 8 %1.69%1.64%1.77% 1.82 %3:13:1 4:161:1 46:13:18 : 1 6: 1 6:17:1 2 2 : 1 23:1 7:112:14:14: 1 4:1 4:1 4: 1 9.41%3:14:1 4: 1 4:1 4: 1 8:15:1 3:1 3:1 3: 1 3 : 1 3 : 1 4:1 3:1 8:1DD???D D C C C C C F F F F E E E E F 4:15:1D965 9 7 0 970 970 970 970 975975975 985962963964 966967968969 969969 971 971971972972 973973 974 976 977 978 979979979 981 982 983 984 986 987 988 2.43% 2.49% 3.92% 2.7 2 % 2.6 5 % 1. 3 5% 2.00% 1 . 8 0%7.38%3.45%2.97%12+0013+0014+00 15+0016+00 17+0018+0019+0020+0021+0022+00BP: 1 0 + 0 0 . 0 0 PT : 1 3 + 2 1 . 1 4 PC: 1 7 + 4 9 . 1 6 EXISTING WETLAND #2INCIDENTAL WETLANDNWL: 974.0HWL: 976.3 SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLANDMANAGE 2 SETBACK CENTERLINE OF EXISTING CREEK 25' SHORELAND IMPACT ZONE SHORELAND BUILDING SETBACK ORDINARY HIGH WATERLEVEL AS DELINEATED 11/2019 SITE OUTFALLEXISTING WETLAND #1 SITE OUTFALL:84" CMPWHICH DIRECTS STORMWATERULTIMATELY TO WILMES LAKEAPPROXIMATELY 0.7 MILES SOUTH BMP #2UNDERGROUNDFILTRATION SYSTEM CONTRACTOR TO ENSURE BASINSTAYS OFFLINE UNTIL NATIVE PLANTINGS AND GROUND COVER BECOME ESTABLISHED PRETREATMENT FOREBAY BMP #1SURFACE FILTRATIONBASIN 5:1 www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C3-EROS PH2 PLAN.dwg September 11, 2022 - 2:25pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES ROCK ENTRANCE INLET PROTECTION SILT FENCE LIMITS OF DISTURBANCE SAFETY FENCE BIOROLL LEGEND EROSION CONTROL BLANKET NORTHEROSION CONTROL PLAN NOTES 1. ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BEINSTALLED PRIOR TO CONSTRUCTION. 2. THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING. 3. THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES. 4. WITHIN ONE WEEK (7 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FORMATERIALS. 5. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED INACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS. 6. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDINGTHE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THECONSTRUCTION. 7. ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THECONTRACTOR. 8. REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED. 9. THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTOEXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS ASNECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS. 10. IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATERFROM A TANK TRUCK TO ALL CONSTRUCTION AREAS. 11. EROSION AND SEDIMENT CONTROL PRACTICES SHOWN ON THE PLAN ARE THEMINIMUM REQUIRED. ADDITIONAL PRACTICES MAY BE REQUIRED DURING THE COURSE OF CONSTRUCTION. 12. CONTRACTOR SHALL KEEP STORMWATER SYSTEMS OFFLINE AND PROTECTED FROM CONSTRUCTION ACTIVITY AND CLOGGING BY SEDIMENT UNTIL ALLCONTRIBUTING AREAS ARE PERMANENTLY RESTORED. SEQUENCE OF CONSTRUCTION: RECEIVING BODY OF WATER: THE SITEDISCHARGES TO ADJACENT UNNAMED CREEK ON-SITE AND OUTLETS THROUGH A 84" CMP BELOW HUDSON BLVD. RUNOFF IS THEN DIRECTED TO THE IMPAIRED WILMES LAKE LOCATED APPROXIMATELY 0.7 MILES SOUTH. THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER AND SITE MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTIONACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTING INSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARYOR PERMANENT STABILIZATION. SWPPP UPDATES AND AMENDMENTS SOIL TYPE - ANTIGO SILT LOAM, 2% - 6% SOIL TYPE - BRILL SILT LOAM SOIL TYPE - FREEON SILT LOAM, 2% - 6% SOIL TYPE - CRYSTAL LAKE SILT LOAM, 1% - 6% SOIL TYPE - MAHTOMEDI LOAMY SAND, 6% - 12% PHASE 2 BMP QUANTITIES SILT FENCE ±5,250 LF ROCK CONSTRUCTION ENTRANCE 1 EA INLET PROTECTION 45 EA EROSION CONTROLBLANKET ±10,000 SY SOIL BOUNDARY 49B 120 264 367B 454C 120 120 367B 264 49B 454C 49B RIP RAP KEYNOTE LEGEND NOT USED BIOROLL, TYP. DOUBLE ROW OF SILT FENCEPLACED 5 FEET APART CONSTRUCTION ENTRANCE, TYP. EROSION CONTROL BLANKET;PROVIDE WITHIN DITCH SECTIONS AND ON SLOPES 1:4 OR GREATER RIP RAP A B C D E F DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C301BAW 09/09/2022 JFJ 19.1001.04 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUELAND MATERIAL STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC.,IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES INLOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS: 1. TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED AREAS THATWILL BE INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY NPDES AND/ORCITY OF LAKE ELMO GRADING PERMIT. 2. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UNDERGROUND SYSTEM,CURBS AND GUTTERS.3. INSTALL APPROPRIATE INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED.4. PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TOFINAL GRADE. 5. PREPARE SITE FOR PAVING.6. PAVE SITE AND INSTALL STRIPING.7. INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES. 8. COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVERALL AREAS.9. OBTAIN CONCURRENCE WITH THE CIVIL ENGINEERING CONSULTANT THAT THE SITE HAS BEEN FULLY STABILIZED THEN:10. REMOVE ALL REMAINING TEMPORARY EROSION ADN SEDIMENT CONTROLDEVICES 11. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF BMPS. LIMITS OF DISTURBANCE SUMMARY TOTAL DISTURBED AREA 10.52 AC HUDSON BLVD IMPROVEMENTS 1.85 AC EXISTING IMPERVIOUS AREA 0.95 AC EXISTING PERVIOUS AREA 0.90 AC PROPOSED IMPERVIOUS AREA 1.13 AC PROPOSED PERVIOUS AREA 0.72 AC ON-SITE IMPROVEMENTS 8.67 AC EXISTING IMPERVIOUS AREA 0.00 AC EXISTING PERVIOUS AREA 8.67 AC PROPOSED IMPERVIOUS AREA 3.62 AC PROPOSED PERVIOUS AREA 5.05 AC SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S I G N A G E LIFTSTATIONLIFTSTATIONDD D NORTHDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C302BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD EROSION AND SEDIMENT CONTROL PLAN www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-HUDSON BLVD EROS.dwg September 11, 2022 - 2:26pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES ROCK ENTRANCE INLET PROTECTION SILT FENCE SITE LIMITS (SEE SITE PLANS FOR DETAILS) SAFETY FENCE SF BIOROLL LEGEND EROSION CONTROL BLANKET PROPERTY LINE CULVERT END CONTROLS SEEDING - HYDROSEED METHOD WITH 6" TOPSOIL BORROWSEED MIX - MnDOT NO. 25-141 @ 59 LBS/ACRE FERTILIZER - MnDOT TYPE 3 @ 350 LBS/ACREROLLED EROSION PREVENTION CATEGORY 20WEED SPRAYING (WEED SPRAYING MIXTURE) EROSION CONTROL PLAN NOTES 1. ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BEINSTALLED PRIOR TO CONSTRUCTION. 2. THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING. 3. THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES. 4. WITHIN ONE WEEK (7 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BESTABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR MATERIALS. 5. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS. 6. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THECONSTRUCTION. 7. ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THECONTRACTOR. 8. REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED. 9. THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO EXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS ASNECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS. 10. IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATERFROM A TANK TRUCK TO ALL CONSTRUCTION AREAS. UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER,PARKING, LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUELAND MATERIAL STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC.,IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES INLOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS: 1. INSTALL INLET PROTECTION AT EXISTING STORMWATER CULVERTS AND CATCH BASINS.2. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE (1), CONCRETE WASHOUTPIT (1) AND INSTALL SILT FENCE. 3. PREPARE TEMPORARY PARKING AND STORAGE AREA.4. CONSTRUCT AND STABILIZE DIVERSIONS AND TEMPORARY SEDIMENT TRAPS.5. PERFORM CLEARING AND GRUBBING OF THE SITE. PERFORM MASS GRADING. ROUGH GRADE TO ESTABLISH PROPOSED DRAINAGE PATTERNS.6. START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES.7. TEMPORARILY SEED WITH PURE LIVE SEED, THROUGHOUT CONSTRUCTION, DISTURBED AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY NPDES AND/OR CITY OF LAKE ELMO GRADING PERMIT. SEQUENCE OF CONSTRUCTION: THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER AND SITE MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIESOCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTINGINSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARY OR PERMANENT STABILIZATION. SWPPP UPDATES AND AMENDMENTS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C2-SWPPP NOTES.dwg September 11, 2022 - 2:26pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES A.PROJECT OFFICE WALL SWPPP POSTINGS:THE FOLLOWING ITEMS MUST BE POSTED TOGETHER IN A SINGLE, ORGANIZED LOCATION ON A WALLINSIDE THE PROJECT OFFICE: 1) SWPPP SITE MAPS (ALL PHASES); 2) SWPPP DETAIL SHEETS; 3) MAP SHOWINGLOCATION OF OFFSITE IMPORT OR EXPORT FACILITY; 4) REVISIONS TO DETAILS, SITE MAPS, ORSWPPP-RELATED RFIS; 5) SITE SWPPP BINDER; 6) SWCT PLACARD; 7) CURRENT OWNER STORMWATERCOMPLIANCE TRAINING CERTIFICATES FOR SUPERINTENDENT(S) AND COMPLIANCE OFFICER(S); AND 8)CERTIFICATIONS AND/OR TRAINING CERTIFICATES REQUIRED TO PERFORM INSPECTIONS BY THEAPPLICABLE CONSTRUCTION GENERAL PERMIT OR AUTHORITY HAVING JURISDICTION. B. PERMITTED PROJECT AREA:FOR PURPOSES OF THIS SWPPP AND ASSOCIATED STORMWATER PERMIT, 'PERMITTED PROJECT AREA' ISDEFINED AS ANY AND ALL AREAS WITHIN THE PROJECT LIMITS OF DISTURBANCE, AS SHOWN ON THESWPPP SITE MAPS AND IDENTIFIED IN THE NOTICE OF INTENT TO THE AGENCY. ALL GROUND-DISTURBING AND CONSTRUCTION-RELATED ACTIVITIES (MATERIAL STORAGE, DUMPSTERS, PARKING AREAS, PROJECTOFFICE TRAILER, ETC.) MUST BE INCLUDED WITHIN THE PERMITTED PROJECT AREA LIMITS OFDISTURBANCE. ALL AREAS OUTSIDE THE PERMITTED PROJECT AREA (I.E., LIMITS OF DISTURBANCE) ACQUIRED FOR USE BYTHE GC OR A SUBCONTRACTOR OF THE GC (BORROW SOURCES, DISPOSAL AREAS, ETC.) MUST BE MANAGEDIN ACCORDANCE WITH THE NPDES PERMIT. THE CONTRACTOR IS REQUIRED TO LOCATE OFFICE TRAILERSAND MATERIAL STORAGE AREAS FOR THE PROJECT WITHIN THE LIMITS OF DISTURBANCE. THECONTRACTOR MAY REQUEST USE OF OFF-SITE LOCATIONS FOR OFFICE TRAILERS OR NON-ERODIBLEMATERIAL STORAGE; HOWEVER, APPROVAL MUST BE OBTAINED FROM THE CONSTRUCTION MANAGER,AND THE ENGINEER PRIOR TO THEIR USE. REQUESTS WILL BE REVIEWED ON A CASE BY CASE BASIS AND IFAPPROVED, LIMITATIONS ON USE WILL BE PROVIDED BY THE ENGINEER. C. SPECIAL PROJECT AREAS:THERE ARE NO SPECIAL PROJECTS, LOCATED BEYOND THE OWNER PERMITTED PROJECT AREA, REQUIRINGINSPECTION AND MAINTENANCE ASSOCIATED WITH THIS CONSTRUCTION PROJECT. D.1 NON-STORMWATER DISCHARGES:THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIESPROHIBITS MOST NON-STORMWATER DISCHARGES DURING THE CONSTRUCTION PHASE. ALLOWABLENON-STORMWATER DISCHARGES THAT OCCUR DURING CONSTRUCTION ON THIS PROJECT, ARE INCLUDEDIN THE SECTION PART IV.D. OF THE GENERAL PERMIT. BEST MANAGEMENT PRACTICES (BMPS) MUST BE IMPLEMENTED FOR THE GENERAL PERMIT ALLOWABLEDISCHARGES FOR THE DURATION OF THE PERMIT. THE TECHNIQUES DESCRIBED IN THIS SWPPP FOCUS ONPROVIDING CONTROL OF POLLUTANT DISCHARGES WITH PRACTICAL APPROACHES THAT UTILIZE READILYAVAILABLE EXPERTISE, MATERIAL, AND EQUIPMENT. NON-STORMWATER COMPONENTS OF SITE DISCHARGES MUST BE UNCONTAMINATED NON-TURBID WATER.ALL NON-STORMWATER DISCHARGES MUST BE ROUTED TO A STORMWATER CONTROL PRIOR TODISCHARGE. WATER USED FOR CONSTRUCTION WHICH DISCHARGES FROM THE SITE MUST ORIGINATEFROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE HEALTH DEPARTMENT.WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBLIC SUPPLY MUSTNOT DISCHARGE FROM THE SITE; IT CAN BE RETAINED IN RETENTION PONDS UNTIL IT INFILTRATES OREVAPORATES. WHEN NON-STORMWATER IS DISCHARGED FROM THE SITE, IT MUST BE DONE IN A MANNERSUCH THAT IT DOES NOT CAUSE EROSION OF THE SOIL DURING DISCHARGE. D.2 POWER WASHING:PROCESS WATER SUCH AS POWER WASHING WATER AND CONCRETE CUTTING EFFLUENT, AMONG OTHERS,MUST BE COLLECTED FOR TREATMENT AND DISPOSAL. IT MUST NOT BE FLUSHED INTO THE SITE STORMDRAIN SYSTEM OR DISCHARGED OFF-SITE. D. DISCHARGE POINTS:ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION AND SEDIMENTATIONCONTROL MEASURES ARE EFFECTIVE IN PREVENTING DISCHARGE OF SEDIMENT FROM THE SITE AND/ORIMPACTS TO RECEIVING WATERS. SEDIMENT ACCUMULATION DOWNGRADIENT OF DISCHARGE LOCATIONSSHALL BE REPORTED AS A SEDIMENT DISCHARGE AND THE POTENTIAL UPSTREAM CAUSE SHALL BEINVESTIGATED TO PREVENT FUTURE OCCURRENCE. CONTACT THE CM AND CEC TO DETERMINEAPPROPRIATE ACTION FOR CLEANUP OF DISCHARGED SEDIMENT THAT MAY BE OUTSIDE OF THE LIMITS OFDISTURBANCE. SEE SAMPLING AND MONITORING OF EFFLUENT PLAN (IF APPLICABLE). A. SUBCONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THIS STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BEIMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALLPHASES OF CONSTRUCTION. B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCALREQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENTADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. C. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITYIMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. D. SUBCONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE WITH SWPPPIMPLEMENTATION SEQUENCE, OR AS REQUIRED BY THE APPLICABLE GENERAL PERMIT. NOUNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BE PERMITTED. E. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE, MUST BE STABILIZEDIMMEDIATELY UPON COMPLETION OF MOST RECENT GRADING ACTIVITY, WITH THE USE OFFAST-GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAW/HAY MULCH, WOOD CELLULOSE FIBERS, TACKIFIERS, NETTING AND/OR BLANKETS. COMPLETION MUST BE ACHIEVED WITHIN 7 DAYS. F. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPEDSHALL BE PERMANENTLY STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED,SODDED, AND/OR VEGETATED IMMEDIATELY, AND COMPLETED NO LATER THAN 7 DAYS AFTER THE LASTCONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/ORLANDSCAPE PLAN. G. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFFVELOCITIES AND EROSION. TEMPORARY AND/OR PERMANENT STABILIZATION SHALL BE APPLIED PERREQUIREMENTS IN THESE E&S CONTROL NOTES. H. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TOPREVENT EROSION AND POLLUTANT DISCHARGE OFF-SITE. I. ALL MEASURES STATED ON THIS SITE MAP, AND IN THE STORM WATER POLLUTION PREVENTION PLAN,SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR ACOMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATIONCONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON IN ACCORDANCE WITH THECONTRACT DOCUMENTS OR THE APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIREDIN ACCORDANCE WITH THE SITE PLANS. J. STORM WATER POLLUTANT CONTROL MEASURES INSTALLED DURING CONSTRUCTION, THAT WILL ALSOPROVIDE STORM WATER MANAGEMENT AFTER CONSTRUCTION, ARE INCLUDED IN THE CONTRACTDOCUMENTS. THE SITE-SPECIFIC POST CONSTRUCTION STORM WATER OPERATION AND MAINTENANCE(O&M) MANUAL IS INCLUDED IN THE CONTRACT DOCUMENTS. K. ALL PERMANENT CONTROLS AND SYSTEMS MUST BE INSTALLED AND FUNCTIONING AS DESIGNED ANDFREE OF ACCUMULATED SEDIMENT AND DEBRIS DURING FINAL PROJECT INSPECTION AND APPROVAL. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THECONSTRUCTION SITE SHALL BE HANDLED PROPERLY TO REDUCE THE POTENTIAL FORSTORMWATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE SHALL BEPROPERLY STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLELABEL DIRECTIONS. FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL BE STORED ANDHANDLED ACCORDING TO APPLICABLE REGULATIONS, AND, AT A MINIMUM, ACCORDING TO29 CFR 1926.152. ONLY APPROVED CONTAINERS AND PORTABLE TANKS SHALL BE USED FORSTORAGE AND HANDLING OF FLAMMABLE AND COMBUSTIBLE LIQUIDS. MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION SHALL BE KEPT ON SITE FOR ANYAND ALL APPLICABLE MATERIALS. HOWEVER, MSDS MAY ALSO BE ACCESSED VIATELEPHONE OR OTHER ELECTRONIC MEANS OR APPARATUS. IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN BY THESUBCONTRACTOR TO CONTAIN AND REMOVE THE SPILLED MATERIAL. THE SPILL SHALL BEREPORTED TO THE APPROPRIATE AGENCIES IN THE REQUIRED TIME FRAMES. AS REQUIREDUNDER THE PROVISIONS OF THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERINGWATERS OF THE UNITED STATES SHALL BE PROPERLY REPORTED. ALL HAZARDOUS MATERIALS, INCLUDING CONTAMINATED SOIL AND LIQUID CONCRETEWASTE, SHALL BE DISPOSED OF BY THE SUBCONTRACTOR IN THE MANNER SPECIFIED BYFEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCHPRODUCTS. THE SUBCONTRACTOR SHALL PREPARE A WRITTEN RECORD OF ANY SPILL AND ASSOCIATEDCLEAN-UP ACTIVITIES OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF 1GALLON OR REPORTABLE QUANTITIES, WHICHEVER IS LESS, ON THE DAY OF THE SPILL. THESUBCONTRACTOR SHALL PROVIDE NOTICE TO OWNER, VIA THE ONLINE CRITICAL INCIDENTREPORT, IMMEDIATELY UPON IDENTIFICATION OF ANY SPILL. SPILL REPORT FORMS AREAVAILABLE IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. COPIES OFSPILL CRITICAL INCIDENT REPORTS SHALL BE PRINTED AND MAINTAINED IN THE JOBSITEBINDER. ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OFREPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCYREGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSECENTER (1-800-424-8802) AND THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES(1-800-943-0003) THE STATE REQUIRES REPORTING WHEN: ·THERE IS AN IMPACT TO HUMAN HEALTH ·THERE IS AN IMPACT TO THE ENVIRONMENT ·THERE IS A FIRE, EXPLOSION, OR SAFETY HAZARD ·A SPILL IS NOT IMMEDIATELY CLEANED UP ·THE SPILL WAS MORE THAN THE REPORTABLE QUANTITY OF 1 GALLON OF APETROLEUM PRODUCT THE REPORT SHOULD BE FILED WITH THE STATE OF MINNESOTA. ALL REPORTS SHOULDBE FILED WITHIN 24 HOURS OF A SPILL OCCURRING. THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302 ANDTHE US EPA WEBSITE: HTTP://WWW.EPA.GOV/SUPERFUND/POLICY/RELEASE/RG TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUSMATERIALS TO COME IN CONTACT WITH STORMWATER, THE FOLLOWING STEPS SHALL BEIMPLEMENTED: 1) ALL MATERIALS WITH HAZARDOUS PROPERTIES, SUCH AS PESTICIDES, PETROLEUMPRODUCTS, FERTILIZERS, SOAPS, DETERGENTS, CONSTRUCTION CHEMICALS, ACIDS,BASES, PAINTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CONCRETE,CURING COMPOUNDS AND ADDITIVES, ETC., SHALL BE STORED IN A SECURE LOCATION,UNDER COVER AND IN APPROPRIATE, TIGHTLY SEALED CONTAINERS WHEN NOT IN USE. 2)THE MINIMUM PRACTICAL QUANTITY OF ALL SUCH MATERIALS SHALL BE KEPT ON THEJOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE TO TIME OF USE AS PRACTICAL. 3) A SPILL CONTROL AND CONTAINMENT KIT (CONTAINING FOR EXAMPLE, ABSORBENTMATERIAL SUCH AS KITTY LITTER OR SAWDUST, ACID, BASE, NEUTRALIZING AGENT,BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, PLASTIC AND METAL TRASHCONTAINERS, ETC.) SHALL BE PROVIDED AT THE CONSTRUCTION SITE AND ITSLOCATION(S) SHALL BE IDENTIFIED WITH LEGIBLE SIGNAGE AND SHOWN ON SITE MAPS.a. THE SPILL CONTROL AND CONTAINMENT KIT SUPPLIES SHALL BE OF SUFFICIENTQUANTITIES AND APPROPRIATE CONTENT TO CONTAIN A SPILL FROM THE LARGESTANTICIPATED PIECE OF EQUIPMENT AND FROM THE LARGEST ANTICIPATEDQUANTITIES OF PRODUCTS STORED ON THE SITE AT ANY GIVEN TIME.b. CONTENTS SHALL BE INSPECTED DAILY DURING THE DAILY STORMWATER INSPECTION. 4)ALL PRODUCTS SHALL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITHTHE ORIGINAL PRODUCT LABEL. CONTAINERS MUST BE STORED IN A MANNER TOPROTECT THEM FROM THE ELEMENTS AND INCIDENTAL DAMAGE. 5) ALL PRODUCTS SHALL BE USED IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THEPRODUCT LABEL. 6)THE DISPOSAL OF EXCESS OR USED PRODUCTS SHALL BE IN STRICT COMPLIANCE WITHINSTRUCTIONS ON THE PRODUCT LABEL AND REGULATIONS. GENERAL NOTES EROSION AND SEDIMENT CONTROL NOTES HAZARDOUS MATERIAL MANAGEMENT & SPILL REPORTING NORTH VICINITY N.T.S. SITE EAGLE POINT RD HUDSON BLVD DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C303BAW 09/09/2022 JFJ 19.1001.04 SWPPP NOTES GENERATOREDGE OF WATEREDG E O F W A T ERCENTERLINE CREEKBRIDGEABUTTMENT(WATER ELEV. = 978.2 AS OF 7/11/19)DASHED PAVEMENT STRIPEAPPROXIMATELOCATIONPIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NOPARKING NOPARKINGSENIOR HOUSING BUILDING LEVEL 1: 995.06LEVEL B: VARIES D D EEB B C F G G N H L L O O P P P P P Q M M M M M M M M MZ Z C E E AA BB O BB I AA F L K E AA AA STEP(S), SEESHEET C500 A E E EMAIN ENTRANCE PROPOSED REDIROCK (ORAPPROVED EQUAL) RETAININGWALL WITH GUARDRAIL; SEE SHEET C500 AND C706 CENTE R LI N E O F EXISTI N G C R E E K EDGE OF EXISTINGWETLAND EDGE OF EXISTINGWETLAND SSWD 50'WETLAND BUFFER PROPOSED PLAZA PROPOSED STORMWATERMANAGEMENT AREA PROPOSED STORMWATER MANAGEMENT AREA PROPOSED 30' DRAINAGE & UTILITY EASEMENT CONTRACTOR TO SEE SHEETS C402-C416 FORHUDSON BLVD IMPROVEMENTS. 25' SH O R EL A N D I M P A C T ZONE SHOR E L A N D B UI L DI N G SETBA C K SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLANDMANAGE 2 SETBACK EXISTING WETLAND PROPOSED DRAINAGE& UTILITY EASEMENT PROPOSED MODULAR BLOCKRETAINING WALL W/ FENCE;SEE SHEET C500 AND C706 PROPOSED ROWDEDICATION PROPOSED RETAINING WALL;SEE SHEET C504, C505 AND C706. EXISTING LIFTSTATION PROPOSED 10' DRAINAGE &UTILITY EASEMENT SEE SHEET C403 - HUDSON BLVD &EAGLE POINT BLVD TYPICAL SECTIONS SEE SHEET C403 -HUDSON BLVD & EAGLE POINT BLVDTYPICAL SECTIONS PROPOSED FLAGPOLE, BY OTHERS PROPOSED 10' DRAINAGE& UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT ORDIN A R Y HI G H W A T E R LEVEL A S D E LI N E A T E D 11/2 0 1 9 PROPOSED FIRE PIT (OWNER TOCONFIRM TYP; COORD. WITH MEP PLANS) PROPOSED MODULAR BLOCK RETAININGWALL W/ FENCE; SEE SHEET C500 AND C706 PROPOSED 1-1.5'RETAINING WALL; SEESHEET C500 AND C706 3 3 3 3 3 3 1 33 3 33 3 PROPOSED 5' DRAINAGE& UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS.12+0013+0014+00 15+0016+00 17+00 18+0019+0020+0021+0022+00R21.0'26.0'PREPARE SITE FOR GAZEBO(SEE ARCH PLANS) PROPOSEDCOMMUNITY GARDEN AREA TEMPORARY FIRELANE ACCESS PONDMAINTENANCE ACCESS INFILTRATION BASIN 26.0'26.0'26.0'26.0'26.0'G E 3 F O O P P P P J J O O O O O O P P 3 2 E P P P ADA ROUTEADA ROUTE8.0' 8.0'9.0'26.0'50.0'50. 0 '24.0 ' 8 1 . 7 '26.0'6.0'18.0'9.0' 1 0 0 . 0 ' 5 0 . 0 ' 100 . 0 ' 50. 0 '10.0'6.6' 6.5'23.5'26.0'18.0'9.0'9.0'5.0'26.0'26.0' 18 . 0 ' 26 . 0 ' 2 2 . 0 ' 10.0'10.0 '18.0'26.0'18.0'18.0'9.0' 18.0'14.7'9.0'18.0'24.0'ADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTE ADA ROUTE ADA ROUTE ADA ROUTE ADA ROUTEADA ROUTE ADA ROUTE A D A R O U T E A D A R O U T E ADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTEADA ROUTE3 G 6.0'3 PROPOSED 30' DRAINAGE &UTILITY EASEMENT PROPOSED 30'DRAINAGE &UTILITY EASEMENT 20 .0 ' 1 8 . 0 ' 2 0 . 0 '9.0'9.0'60.0 ° ' UNDERGROUND PARKING EXTENTS(SEE ARCH PLAN) 16. 1 '20.9'NORTHING: 175419.95 EASTING: 475566.48 NORTHING: 175178.02 EASTING: 475629.18 NORTHING: 175151.03EASTING: 475568.49 NORTHING: 175049.79EASTING: 475630.49 NORTHING: 175050.63 EASTING: 475568.49 NORTHING: 175348.03EASTING: 475494.12 PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE; SEE SHEET C500 AND C706 3 11 9 10 17 25 9 2 2 H 18.0'18.0'60.0°'5. 0 ' C C C C C C C C C P G G PROPOSED MODULAR BLOCK RETAINING WALL W/ FENCE;SEE SHEET C500 AND C706 FIRE LANE SIGNAGE SIGN TYPE A (SEE SHEET C702) SIGN TYPE C (SEE SHEET C702) SIGN TYPE D (SEE SHEET C702) 1 2 3 FIRE LANE SIGNAGE SHALL COMPY WITH INTERNATIONALFIRE CODE. SIGNAGE SHALL HAVE RED LETTERS ON WHITE REFLECTIVE BACKGROUND. DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 PROPOSED CURB AND GUTTER PROPERTY LINE PROPOSED FENCE SETBACK LINE RETAINING WALL PROPOSED CONCRETE SIDEWALK LEGEND www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-SITE PLAN.dwg September 11, 2022 - 2:27pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHPROPOSED STANDARD DUTY ASPHALT KEYNOTE LEGEND PROPOSED (7'X10') PLANTER BOXES WITH 5' CLEAR SPACEBETWEEN MATCH EXISTING EDGE OF PAVEMENT/ CURB & GUTTER B612 CURB & GUTTER (TYP.) B624 CURB AND GUTTER FLAT CURB MOUNTABLE CURB ACCESSIBLE PEDESTRIAN CURB RAMP ACCESSIBLE PARKING SIGN ACCESSIBLE PARKING AREA STRIPED WITH 4" SYSL @ 45° 2' O.C. FIRE DEPARTMENT CONNECTION; REFER TO MEP PLANS SITE SIGNAGE - SEE ARCH PLANS LANDSCAPE AREA - SEE LANDSCAPE PLANS COMMERCIAL DRIVEWAY APRON PROPOSED DECK, SEE ARCH PLANS PROPOSED PATIO, SEE SHEET C500 AND ARCH PLANS; PATIO GRADESSHALL NOT EXCEED 2% IN ANY DIRECTION PROPOSED PLANTER, SEE LANDSCAPE PLANS NOT USED NOT USED NOT USED NOT USED NOT USED PROPOSED PAVEMENT MARKING PROPOSED TRANSFORMER; REFER TO MEP PROPOSED GENERATOR; REFER TO MEP PROPOSED CONDENSER; REFER TO MEP PROPOSED PEDESTRIAN CROSS WALK 'DO NOT ENTER/ FIRE ACCESS ONLY' SIGNAGE 'RESERVED NO PARKING' SIGNAGE A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BB CC PROPOSED HEAVY DUTY ASPHALT PROPOSED MILL AND OVERLAY PROPOSED BITUMINOUS TRAIL PROPOSED LIGHTED BOLLARD; REFER TO MEP PLANS PROPOSED LIGHT POLE; REFER TO MEP PLANS C400BAW 09/09/2022 JFJ 19.1001.04 SITE PLAN PROPOSED ROCK MULCH PROPOSED STAMPED CONCRETE *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* PROPOSED HEAVY DUTY CONCRETE PROPOSED STORMWATER MANAGEMENT AREA ADA ROUTE SETBACK LINE MAINTENANCE ACCESS PATH NOT WITHIN 100-YEAR HWL12" CLASS V (MNDOT SPECIFICATION TABLE 3138-5) OVER TENSAR BX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT MAINTENANCE ACCESS PATH WITHIN 100-YEAR HWL 12" CLEAN CRUSHED ROCK (34" - 1 14" GRADATION) OVER TENSARBX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT BUILDING DATA SUMMARY AREAS PROPOSED PROPERTY 508,702 SF (11.68 AC) BUILDING AREA 53,900 SF (10.60% OF TOTALPROPERTY AREA) PARKING PROPOSED PARKING 234 SPACES @ 1.6 SPACE PERDWELLING (146 DWELLINGS) PROPOSED SURFACE PARKING 88 SPACES PROPOSED GARAGE PARKING 146 SPACES; SEE ARCH PLANS ADA SURFACE STALLS REQ'D / PROVIDED 4 SPACES / 4 SPACES PROPERTY SUMMARY AMIRA LAKE ELMO TOTAL EXISTING PROPERTY AREA 508,702 SF (11.68 AC) PROPOSED RIGHT OF WAY DEDICATION 2,800 SF (0.07 AC) TOTAL PROPOSED PROPERTY AREA 505,902 SF (11.61 AC) TOTAL OPEN SPACE AREA 283,307 SF (6.50 AC) PUBLIC TRAILS AREA 12,252 SF (0.28 AC) EXISTING IMPERVIOUS AREA 0 SF (0.00 AC); [0.00%] EXISTING PERVIOUS AREA 505,902 SF (11.61 AC); [100.00%] PROPOSED IMPERVIOUS AREA 157,880 SF (3.62 AC); [31.00%] PROPOSED PERVIOUS AREA 350,822 SF (8.06 AC); [69.00%] ZONING SUMMARY EXISTING ZONING BP-PUD PARKING SETBACKS SIDE/REAR = 0' ROAD = 0' BUILDING SETBACKS FRONT = 20'SIDE = 20'REAR = 0' LIMITS OF DISTURBANCE SUMMARY TOTAL DISTURBED AREA 10.52 AC HUDSON BLVD IMPROVEMENTS 2.34 AC EXISTING IMPERVIOUS AREA 1.13 AC EXISTING PERVIOUS AREA 1.21 AC PROPOSED IMPERVIOUS AREA 1.23 AC PROPOSED PERVIOUS AREA 1.11 AC ON-SITE IMPROVEMENTS 8.67 AC EXISTING IMPERVIOUS AREA 0.00 AC EXISTING PERVIOUS AREA 8.67 AC PROPOSED IMPERVIOUS AREA 3.62 AC PROPOSED PERVIOUS AREA 5.05 AC PROPOSED STANDARD DUTY ASPHALT - PER CITY STANDARDS CSSIG N A G E GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONAPPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NOPARKING NOPARKINGSENIOR HOUSING BUILDING LEVEL 1: 995.06LEVEL B: VARIES SENIOR HOUSINGBUILDING LEVEL 1: 995.0LEVEL B: 985.25 6.0 '8.0 '26.0'26.0'26.0'8.0 ' PROPOSEDFIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING FIREHYDRANT FIRE ACCESS FIRE ACCESS PROPOSED FIREDEPARTMENTCONNECTION 300' HYDRANTCOVERAGE, TYP.26.0'26.0'18.0'26.0'26 . 0 ' Lock to Lock TimeTrackWidth :: : feet LADDER - 1 6.08.338.33 22.4210.29 47.00 Steering Angle 33.0: www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-FIRE ACCESS PLAN.dwg September 11, 2022 - 2:28pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHTHE VEHICLE MANEUVERINGS IDENTIFIED ON THIS PLAN WERE PREPARED USING AUTOTURN SOFTWARE AND DOES NOT NECESSARILY REPRESENT ACTUAL CONDITIONS NOR DOESIT ACCOUNT FOR EXTERNALFACTORS. THIS ANALYSIS SHOULD NOT BE USED AS THE SOLE BASIS FOR THE CLIENT'S DECISION MAKING FIRE TRUCK - LADDER 1 LEGEND PROPERTY LINE PROPOSED WATERMAIN PROPOSED GATE VALVE PROPOSED HYDRANT PROPOSED TEE PROPOSED REDUCER EXISTING FIRE HYDRANT 300' RADIUS COVERAGE PROPOSED FIRE HYDRANT 300' RADIUS COVERAGE DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C401BAW 09/09/2022 JFJ 19.1001.04 FIRE ACCESS PLAN www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-HUDSON BLVD CONSTRUCTION NOTES.dwg September 11, 2022 - 2:29pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C402BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD CONSTRUCTION NOTES www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-SITE DETAILS.dwg September 11, 2022 - 2:29pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C403BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD & EAGLE POINT BLVD TYPICAL SECTIONS HUDSON BLVD HUDSO N B L V D DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C404BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD SUPERELEVATION PLANS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-SUPERELEVATION PLANS.dwg September 11, 2022 - 2:30pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHSUPERELEVATION TRANSITION LEGEND PAVEMENT SLOPE DIRECTION NOTES 1. PAVEMENT CROSS SLOPES SHOWN IN FT/FT. 2. CONSTRUCT PAVEMENT CROSS SLOPES PER TYPICAL SECTIONS EXCEPT AS MODIFIED ON THESE PLANS NORTHDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C405BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD ALIGNMENT PLAN AND TABULATION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-HUDSON BLVD ALIGNMENT PLANS.dwg September 11, 2022 - 2:30pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES HUDSON BLVD 16.0'24.0'14.4'16.0'24.0'www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-STREET AND STORM-PPF.dwg September 12, 2022 - 9:19am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C406BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* 16.0'18.5'16.0'18.5'HUDSON BLVD www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-STREET AND STORM-PPF.dwg September 12, 2022 - 8:53am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C407BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLEPOINT BOULDEVARD PRIOR TO CONSTRUCTION* HUDSON BL V D 22.0 '22.0 '26.0 ' www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-STREET AND STORM-PPF.dwg September 12, 2022 - 9:17am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C408BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD STREET AND STORM SEWER PLAN & PROFILE *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TO CONSTRUCTION* H U D SO N B L VD HUDSON BLVD 12+31.22 38.23' R EXFL 974.11 HUDSON BLVD 12+37 29.57' R FL 973.99 HUDSON BLVD 12+67.16 16.00' R FL 973.45 PRIVA T E D RI V E HU D S O N B L V D HUDSON BLVD21+66.19 26.00' R FL 977.48 HUDSON BLVD 21+85.7528.96' R FL 978.34 HUDSON BLVD 22+32.82 84.10' R EXFL 979.05EAGLE POINT BLVDDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C409BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD INTERSECTION DETAILS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-INTERSECTION DETAILS.dwg September 11, 2022 - 2:33pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NOTES NORTHNORTH www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C7-HUDSON BLVD SIGN-STRIP PLANS.dwg September 11, 2022 - 2:34pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C410BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD SIGNING & STRIPING TITLE NORTHwww.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C7-HUDSON BLVD SIGN-STRIP PLANS.dwg September 11, 2022 - 2:34pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C411BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD SIGNING & STRIPING PLAN www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C7-HUDSON BLVD SIGN-STRIP PLANS.dwg September 11, 2022 - 2:34pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C412BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD SIGNING & STRIPING DETAILS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C7-HUDSON BLVD SIGN-STRIP PLANS.dwg September 11, 2022 - 2:34pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C413BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD SIGNING & STRIPING DETAILS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-CROSS SECTIONS.dwg September 11, 2022 - 2:35pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES C414BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD CROSS SECTIONS C415BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD CROSS SECTIONS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-CROSS SECTIONS.dwg September 11, 2022 - 2:35pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES C416BAW 09/09/2022 JFJ 19.1001.04 HUDSON BLVD CROSS SECTIONS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C4-CROSS SECTIONS.dwg September 11, 2022 - 2:35pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES SIG N A G E EXI S T I N G BU I L D I N GGENERATOREDGE OF WATERED G E O F W A T E RCENTERLINE CREEKBRIDGEABUTTMENTINV.=977.74LIFTSTATION(WATER ELEV. = 978.2 AS OF 7/11/19)958.76INVCMP84LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NOPARKING NOPARKINGSENIOR HOUSINGBUILDING LEVEL 1: 995.06 LEVEL B: VARIES DDD DD D COCOCOCOCO980.87980.87 980.69977.81965.03 965.03 965.03 965.03 970.25 970.25 970.25 D1 - 6.5INCH STEP(S)977 .8113+00 14+0015+00 16+00 17+00 18+0019+0020+0021+0022+00CONTRACTOR TOSEE SHEETSC402-C416 FORHUDSON BLVDIMPROVEMENTS. CONTRACTOR TO SEE SHEETSC402-C416 FOR HUDSON BLVDIMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. 0.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN(CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL BMP/WETLAND/CREEK PROPOSED100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:36pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIESNORTH GRADING PLAN NOTES 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF LAKE ELMO, SPECIFICATIONS ANDBUILDING PERMIT REQUIREMENTS. 2. CONTRACTOR TO CALL GOPHER STATE CALL ONE @ <1-800-252-1166> AT LEAST TWO WORKING DAYSPRIOR TO EXCAVATION/CONSTRUCTION FOR UTILITY LOCATIONS. 3. STORM SEWER PIPE SHALL BE AS FOLLOWS:RCP PER ASTM C-76HDPE: 0" - 10" PER AASHTO M-252HDPE: 12" OR GREATER PER ASTM F-2306PVC SCH. 40 PER ASTM D-3034WHEN STORM SEWER CROSSES ABOVE WATERMAIN: STORM SEWER (18" AND SMALLER) SHALL BEPVC SCH 40 PER ASTM 3-1785; PROVIDE 18" MINIMUM VERTICAL CLEARANCE OUTER EDGE TO OUTER EDGE STORM SEWER FITTINGS SHALL BE AS FOLLOWS:RCP PER ASTM C-76, JOINTS PER ASTM C-361, C-990, AND C-443HDPE PER ASTM 3212PVC PER ASTM D-3034, JOINTS PER ASTM D-3212WHEN STORM SEWER CROSSES ABOVE WATERMAIN: STORM SEWER (18" AND SMALLER) FITTINGSSHALL BE PVC SCH 40 PER ASTM 3-1785; PROVIDE 18" MINIMUM VERTICAL CLEARANCE OUTER EDGETO OUTER EDGE 4. CONTRACTOR TO FIELD VERIFY THE LOCATIONS AND ELEVATIONS OR EXISTING UTILITIES ANDTOPOGRAPHIC FEATURES PRIOR TO THE START OF SITE GRADING. THE CONTRACTOR SHALLIMMEDIATELY NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES OR VARIATIONS. 5. SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION TO HELP OFFSET ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR STEEP SLOPES. WHEN PLACING NEW SURFACEMATERIAL ADJACENT TO EXISTING PAVEMENT, THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TOAVOID UNDERMINING OF EXISTING PAVEMENT. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL. 7. CONTRACTOR SHALL EXCAVATE DRAINAGE TRENCHES TO FOLLOW PROPOSED STORM SEWER ALIGNMENTS. 8. GRADES SHOWN ARE FINISHED GRADES. CONTRACTOR SHALL ROUGH GRADE TO SUBGRADE ELEVATIONAND LEAVE STREET READY FOR SUBBASE. 9. ALL EXCESS MATERIAL, BITUMINOUS SURFACING, CONCRETE ITEMS, ANY ABANDONED UTILITY ITEMS,AND OTHER UNSTABLE MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF THE CONSTRUCTION SITE. 10. REFER TO THE UTILITY PLAN FOR SANITARY SEWER MAIN, WATER MAIN SERVICE LAYOUT ANDELEVATIONS AND CASTING / STRUCTURE NOTATION. 11. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF PAVEMENTS AND CURB AND GUTTER WITHSMOOTH UNIFORM SLOPES TO PROVIDE POSITIVE DRAINAGE. 12. INSTALL A MINIMUM OF 4" CLASS 5 AGGREGATE BASE UNDER CURB AND GUTTER AND CONCRETESIDEWALKS. 13. UPON COMPLETION OF EXCAVATION AND FILLING, CONTRACTOR SHALL RESTORE ALL STREETS ANDDISTURBED AREAS ON SITE. ALL DISTURBED AREAS SHALL BE RE-VEGETATED WITH A MINIMUM OF 4" OFTOPSOIL. 14. ALL SPOT ELEVATIONS/CONTOURS ARE TO GUTTER / FLOW LINE UNLESS OTHERWISE NOTED. 15. GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALLCONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMPSLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED2% . IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING STALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TOEXTERNAL BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFYENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NOCONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE ISSUES. 16. MAINTAIN A MINIMUM OF 0.5% GUTTER SLOPE TOWARDS LOW POINTS. 17. CONTRACTOR TO PROVIDE 3" INSULATION BY 5' WIDE CENTERED ON STORM PIPE IF LESS THAN 4' OFCOVER IN PAVEMENT AREAS AND LESS THAN 3' OF COVER IN LANDSCAPE AREAS. 18. REFERENCE MEP PLANS FOR ROOF DRAIN CONNECTION. 19. ALL STORM SEWER CONNECTIONS SHALL BE GASKETED AND WATER TIGHT INCLUDING MANHOLECONNECTIONS. 20. ALL STORM PIPE ENTERING STRUCTURES SHALL BE WATERTIGHT OR BE OF FLEXIBLE COMPRESSIONJOINTS. JOINT CONNECTIONS SHALL BE FLEXIBLE WATER STOPS, RESILIENT CONNECTORS, OR OTHERFLEXIBLE SYSTEM S APPROVED BY THE ENGINEER TO MAKE WATERTIGHT CONNECTION TO MANHOLESAND OTHER STRUCTURES UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS ANDSPECIFICATIONS. CEMENT MORTAR JOINTS ARE NOT APPROVED. 21. ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 FEET OF THE BUILDING OR WATERSERVICE LINE MUST BE TESTED IN ACCORDANCE WITH MINNESOTA RULES, CHAPTER 474, SECTION 1109. 22. ALL STORM SEWER PIPE SHALL BE AIR TESTED IN ACCORDANCE WITH THE CURRENT PLUMBING CODE. 23. MAINTAIN A MINIMUM OF 1.25% SLOPE IN BITUMINOUS PAVEMENT AREAS, 0.5% SLOPE IN CONCRETEPAVEMENT AREAS. 24. CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT "INFALL CURB" WHERE PAVEMENTDRAINS TOWARD GUTTER, AND "OUTFALL" CURB WHERE PAVEMENT DRAINS AWAY FROM GUTTER. RETAINING WALL COORDINATION NOTES 1. RETAINING WALLS SHOWN ARE SCHEMATIC. ACTUAL DETAILS SHALL BE DESIGNED BY THECONTRACTOR/OTHERS AND SUBMITTED FOR APPROVAL BY ENGINEER. 2. RETAINING WALLS SHALL BE AS NOTED ON PLAN OR APPROVED EQUAL. 3. THE CONTRACTOR SHALL DETERMINE ALL DIMENSIONS AND DETAILS NECESSARY FOR INSTALLATION. 4. TAKE SPECIAL PRECAUTION ADJACENT TO WETLAND AS TO NOT DISTURB AREAS WITHIN DELINEATEDWETLANDS 5. CONTRACTOR SHALL COORDINATE TIMING OF THE INSTALLATION OF THE RETAINING WALL WITH ALLUTILITIES, SPECIFICALLY THE SITE LIGHTING, STORM SEWER, SANITARY, AND WATERMAIN ADJACENT TOTHE PROPOSED WALLS. 6. REFER TO THE GEOTECHNICAL RECOMMENDATIONS BASED ON THE REPORT LISTED ON SHEET C100. 7. FINISHED ELEVATIONS ON THE GRADING PLAN ARE AS STATED ON THE PLAN WITH THE TOP OF WALLSPOTS AND BOTTOM OF WALL SPOTS DENOTING THE FINISHED GRADE ELEVATIONS. ACTUAL BOTTOMAND TOP OF RETAINING WALL ELEVATIONS MAY VARY DUE TO MANUFACTURER REQUIREMENTS ANDRECOMMENDATIONS. 8. THE CONTRACTOR SHALL COORDINATE ALL ACTIVITIES WITH THE WALL REINFORCING AND ROADWAYCONSTRUCTION, WETLAND LIMITS, AND RIGHT-OF-WAY LIMITS. CONTRACTOR SHALL PERFORM ALLNECESSARY COORDINATION, STAGING, TEMPORARY SHORING, AND SEQUENCING AT NO EXTRA COST. SHEET C501 SHEET C502 SHEET C504 SHEET C503 SHEET C505 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C500BAW 09/09/2022 JFJ 19.1001.04 OVERALL GRADING AND DRAINAGE PLAN *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTION LIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TOCONSTRUCTION* GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)APPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION 960960960 965 970961 962 963 964 966 967 968 969 965961 962 963 964966970 975980 971 972 973974 976 977 978 979 981 970970970 970 967 968 968 9 6 9 969 971971972972973986987987988988987 987 986986 975980985985972973974976977978979981982983984986986987987987 987988988970 970971 971972972973965966967968 985973 971972D980979974 970975 971 972 973 974 976 977 978 979 970970970 9709 6 7 9 6 8 969965 970 963 964 966 967968 969971971 965 970 975 980964966 967 968 969 971 972 973 974 976 977 9789793: 1 7: 1 7.72%11. 4 2 %1.15%24 . 1 5 % 4 : 1 1. 8 8 % 12 . 2 5 % 1.56 % 3: 1 4.37%970 985 971 972981 982 983 984 986 COSTRM 102 STRM 706 STRM 703A STRM 704 STRM 702 STRM 102A STRM 105 STRM 105B STRM 106B STRM 201C STRM 201B STRM 201D STRM 201 STRM 201A STRM 201E STRM 705 STRM 102B STRM 104 STRM 104A STRM 105A 2.70% 6.27% 955 955955 960 960 960 965 9 6 5 965 970 970 970970 970975 9 7 5 975 975980 980 980 985985 985 954 954 954 956956 956 957957 957 958 958 958 959 959 959 961 961 961 96 2 962 962 963 963 963 964 964 964 966 9 6 6 966 967 967 967967 9 6 7 967967968 968968968968 968 968969 969969 969 969969969971 971971971971 972 972 9 7 2 972 972973 9 7 3 973 973974974 9 7 4 974 976 976 976 976977977 977 977 978 978 978 979 979 979 981981 981 982982 982 983983 983 984984 984 986986 986 970.25970.25 970.258:1STRM 703B STRM 103 STRM 106 965 970 962 963 964 966 967 968 969 971 969970 9 6 9 969 971971 972973 1 - 6.5 INCH STEP(S) TW:985.48TW:985.76TW:985.99TW:986.40TW:986.62TW:987.12 TW:987.50 BW:972.88 BW:972.00 BW:972.00 BW:971.89 BW:970.23 BW:973.06 BW:979.63 LP:985.02 G:985.40 G:985.93 G:986.61 G:984.59 985.18 984.96 EOF:985.57 994.90 986.13 LP:986.25 987.99 987.53 HP:986.52 987.08 987.28 985.33 985.21 985.33 988.78 BW:974.00 TW:986.05 985.33 988.35 995.06 HP:986.31 EXIST. 30" RCP STORM EXIST. 18" RCP FESIE: 965.60 EXIST. 18" RCP FESIE: 966.85 EXIST. 84" CMP FESIE:958.76 EXIST. 84" CMP STRM SEWER PROPOSED RETAININGWALL WITH GUARDRAIL PROPOSED DRAINAGESWALE @ 2% MIN TO MATCH EXISTING DITCHGRADES; PROVIDEPOSITIVE DRAINAGE PROPOSED DRAINAGESWALE @ 2% MIN TO MATCH EXISTING DITCHGRADES; PROVIDEPOSITIVE DRAINAGE PROPOSED DRAINAGESWALE @ 2% MIN TO MATCH EXISTING DITCHGRADES; PROVIDEPOSITIVE DRAINAGE CONTRACTOR TO SEE SHEETSC402-C416 FOR HUDSON BLVDIMPROVEMENTS. 994.90 995.06 STRM 104C STRM 104B 13+0014+00 15+00 16+0017+00 18+0019+00100-YR HWL: 967.02 1.64%1.64%1.54%986.47 1. 8 7 % 985.02 BW:985.50 TW:986.50 ST-152 CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVD IMPROVEMENTS. 0.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN(CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL MAINTENANCE ACCESS BMP/WETLAND/CREEK PROPOSED100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:37pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIESNORTH C502 C504 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C501BAW 09/09/2022 JFJ 19.1001.04 GRADING AND DRAINAGE PLAN 3:1EDGE OF WATERPIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N 0,0 980985 977978979981982983984986 987 988989970 975 980 985 971 972 973974 976 977 978 979 981 982 983 984 986 985984986987988 975 980 97297397 4 976 977978 979981 982 983 984982980985986986987987988988986987 987 986986 985986987987987 987988988 98 6 98 7 983983984986 985 983982 983 986 987 9 8 0 98 1 98198 2 9829 8 3 9839 8 4980980985978979981981982982983983984984975980985974976977978979981982983984 971 972973985 985 983 984 986981 980 973 971972992 993 984985984986 987 985 986 987989 983984985987990987988989DD992980979974 19.2 '50.0 ' D 970975 971 972 973 974 976 977 978 979 3: 1 1.13%6.89%7.72%11. 4 2 %4:111: 12.12% 3.7 8 % 12 . 2 5 % 1.56 % 3 : 1 9. 1 5% 3. 9 3 % 8. 5 5 %4:1 11.4 7 %4.37%970 985971 972981 982 983 984 986 CO2.17%6.70%1.99%3.2 5 % STRM 203 STRM 202 STRM 200 STRM 101 STRM 102 STRM 200A STRM 801 STRM 100 STRM 800 STRM 301 STRM 302 STRM 300 STRM 700 STRM 701 STRM 102A STRM 105 STRM 105B STRM 106B STRM 203A STRM 201C STRM 201B STRM 201D STRM 201 STRM 201A STRM 201E STRM 200C 5:1 6.92% STRM 102B STRM 104 STRM 104A STRM 105A 9.20%2.84% 1.67% 2.70% 6.27%3:13:1 3. 2 4 % 3. 2 8 % 3:1 3:1 10.0'10.08% 3. 3 3 %980981 982 981 982 983 26.0'3:13:13:15: 1 980985985 98198298398498498698698798 798898 8 1.65%980.87980.87970.25970.25 8:1 LEVEL 1: 995.06 LEVEL B: 985.33 STRM 103 STRM 106970 9 6 9 969 971971 972973 1 - 6.5 INCH STEP(S) G:987.75 LP:985.02 G:986.27 G:985.40 G:985.93 G:984.59 985.18 995.06 EOF:985.57 TW:989.00 BW:988.75 987.25 G:986.61 T/G:987.98 G:987.85 987.99 993.60 988.25 T/G:986.30 T/G:986.23 LP:985.00 994.90 986.13 LP:986.25 987.99 987.53 HP:986.52 987.08 987.28 985.33 985.21 985.33 986.02 991.90 990.25 989.20 G:985.77 979.99 EOF:984.00 G:980.32 982.02 G:979.92 988.78 979.99 985.33 988.35 991.82 G:985.33 995.06 G:987.03 G:986.47 BMP #1PROPOSED SURFACE FILTRATION BASINSEE SHEET C508 FOR DETAILS PRETREATMENT FOREBAYSEE SHEET C508 FOR DETAILS SWWD 50' WETLANDMANAGE 2 SETBACK MAINTENANCE ACCESSFROM PUBLIC RIGHT-OF-WAY PROPOSED DRAINAGESWALE; PROVIDE MIN 2% SLOPE TOWARD STRM 200 MAINTENANCEACCESS EXISTING WETLAND #1EXIST. NWL: 977.00EXIST. HWL: 980.60PROP. HWL (100-YR RAINFALL): +/- 980.87 PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 981.45 EMERGENCY FIRE ACCESS PROPOSED DRAINAGESWALE @ 2% MIN TOMATCH EXISTING DITCH GRADES; PROVIDEPOSITIVE DRAINAGE PROPOSED DRAINAGESWALE @ 2% MIN TOMATCH EXISTING DITCH GRADES; PROVIDEPOSITIVE DRAINAGE CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVDIMPROVEMENTS. 994.90 995.06 STRM 104C STRM 104B 2.08%1.82% G:985.77 G:987.25 G:987.0013+0014+00 1.64%1.64% 986.47 985.02 G:987.68 G:985.33 G:987.18 G:986.37 T/G:986.54 T/G:986.48 G:987.47 G:986.67 LP:985.00 BW:985.50 TW:986.50 979.99 983.85 984.75 984.54 G:984.50 G:984.00 G:983.78 G:984.353:13:13:1 3:1 3:1 3:13:1TW:986.22BW:986.12 TW:986.73BW:985.00 TW:987.29 BW:987.53 TW:987.00BW:985.00 993.62 990.13 ST-152 10.0'10.0' 0.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN(CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL MAINTENANCE ACCESS BMP/WETLAND/CREEK PROPOSED100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:37pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHC501 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C502BAW 09/09/2022 JFJ 19.1001.04 GRADING AND DRAINAGE PLAN C503 INV.=977.74(WATER ELEV. = 978.2 AS OF 7/11/19)AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . NO PARKING NOPARKINGLEVEL B: VARIES 990991 99299 5 993 994 99699799 5 993993993994996 997 998 10009989991001980980 985985 9909909959959951000977977 978978 979979 981981 982982 983983 984984 986986 987987 9889889899899919919919929929929939939 9 3 994994 9949949949969969969979979979989991001985 990 983984 986 987 988 989 991 992993991992 992 993 993994994 994 994990 995988 989 991992993994996997 9 9 0 988989991992993 991992993992 985 986 992 993 988 989 10.0'0. 8 5 % 3.88% 3. 8 3 % 5. 1 0% 1. 8 1%1.86%1.33%6:14.18%1.51% 1. 2 8 % 1.56 % 4. 9 9% 7:1 2.73%1.93%18.91%19.14%16.79%9.93% 0.50%11.32%4.37%2.00%985984984 986 987 988 990 995 1000 989 991992993994996 997 998 999CO1.34% 1.37% 1. 6 9% 2.46%1.86%6.61% 6.64%2.87%990 991 992 993 STRM 204 STRM 203 STRM 401 STRM 205 STRM 402 STRM 404 STRM 403 STRM 405A STRM 107A STRM 411ASTRM 411 STRM 410 STRM 410A STRM 406A STRM 406 STRM 407 STRM 407A STRM 408 STRM 405B STRM 205B STRM 207A STRM 207C STRM 207B STRM 209 STRM 209A STRM 207 STRM 208 STRM 209B STRM 210B STRM 210A STRM 203A STRM 210 1.68%STRM 208A 0.40 %1.65%980.693.06%1.28%4 . 5 0%7.11% 7.54% 985 984 986 987988989990995989991992993994LEVEL 1: 995.06 LEVEL B: 984.002.62%4.68%1.2 8 %DSTRM 106 STRM 210C STRM 206 STRM 408A STRM 107B STRM 405 STRM 205A 991.28 G:992.40 G:991.98 ME: ±989.85 G:990.09 G:988.05 G:989.30 G:984.94 G:984.94 G:987.10 991.45 992.00 G:992.59 993.15 G:992.29 G:992.17 G:992.93 G:993.72 T/G:994.07 G:993.45 T/G:994.18 994.51 G:993.00 G:992.50 G:993.09G:994.31 G:990.75 G:990.90 G:991.19 G:990.90 G:987.52 G:987.23 TW:990.50 BW:988.50TW:989.00 BW:988.75 TW:993.05 BW:989.55 TW:992.42 BW:989.72 TW:990.55 BW:989.00 TW:991.03 BW:988.40 994.75 994.48 T/G:990.38 T/G:990.26 T/G:990.78 T/G:990.84 990.81 991.45 991.95 T/G:991.95 G:988.84 G:991.73 995.06 995.05 994.94995.06 994.56 993.53 985.33 993.26 992.63 994.50 989.96 LP:983.45 G:984.00 985.38 993.17 T/G:992.52 G:991.40 992.26 990.87 986.02 986.95 985.33 995.06 995.06 993.35989.20 LP:987.67 T/G:987.91 990.24 990.16 T/G:988.43 T/G:988.54 988.61 989.12 G:988.60 G:992.86 G:992.70G:993.12 994.58 994.52 994.37 G:993.93 995.06 991.50 984.00 990989LP:986.93 EOF:989.43 G:987.93 EDGE OF EXISTINGWETLAND SWWD 50' WETLAND MANAGE 2 SETBACK EXIST. 36" RCP CLIII PROPOSED DRAINAGESWALE @ 2% MIN; PROVIDE POSITIVE DRAINAGE AWAYFROM RETAINING WALL D412 MOUNTABLE CURB AND GUTTER LP:991.39 99 3 993 8.64% G:993.84 T/G:988.92 G:992.72 990.01 G:992.11 994.51 T/G:994.13 993.50G:993.37 G:991.82 3:1 6:1 4:1 6:1 4. 4 8 %6.23%1.21%3.83% 4. 9 4 % HP:988.25 GRADE BREAK G:987.59 G:988.10 2.95%3.99% 4 . 2 1%5.85%3.1 5 %5.62%3.74%6:1 G:988.27 G:990.14 G:991.00 G:989.95 G:989.11 G:988.95 TW:993.91BW:993.41 TW:994.75BW:990.55 TW:998.00BW:991.65 TW:998.04BW:991.75 TW:994.83 BW:989.66 TW:993.84BW:993.90 5:15:14:1G:990.94 G:989.57 G:988.41 989.76 G:987.50 G:986.32 9.24% 9.57% G:984.00 LP:983.45 6:1 6:11.87%1.46% T/G:991.94 T/G:992.44 STRM 405C G:993.15 T/G:994.14 G:994.07 G:994.18 G:994.20 G:994.25 1. 4 1% 2. 1 0% 995.06 994.34 994.41 0.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN(CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL MAINTENANCE ACCESS BMP/WETLAND/CREEK PROPOSED100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:38pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHC502 C504 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C503BAW 09/09/2022 JFJ 19.1001.04 GRADING AND DRAINAGE PLAN ED G E O F W A T E RCENTERLINE CREEKINV.=977.74NO PARKING NOPARKINGSENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES 98 0977 97 8 9 7 9 98 1 9 8 2 985990984 98 6 987988988 989 991 99599599199299299399 3 994994996996997997980979981982983970975975968969971 972 973 974974 976976977977965970 970966967968969971971972972970975980985 990967968 969971972973974976977978979981982983984 986 987 988 989 99 5 995 99 1 99299399 4 9 9 6 996997997972973980 983 985 985 990 995 982 983 984 986 987 988 989 991 992 993 994 97598 0 98 5 99 0 97 6 97 7 97 8 979 98 1 98 2 98 3 98 4 98 6 98 7 98 8 98 9 99 1 99 2 99 3 99 4 985 980 975 990 DDD 994994 994 989 99399 0 991992993985990986987988989 991 992986985985985 984 984986 986986 987 988 985985 973973 986 985 986 987992 993980970967968969971972971 973 970 975 980 968 969 971 972 973 974 976 977 978 979 981 982 983 984 1.06%0. 8 5 %4.31% 3.88%1.33%4:17:14.18%1.51%???2. 0 4 % 4. 0 0 % 1. 5 0 % 1. 6 9 % 1.56 % 4. 9 9 % 8 . 1 1%7.76%2.00%COCOCOCO1.34% 1.37% 1. 6 9% 6.61% 6.64%2.87%3.61%7.68%9809769779789799819829839849 9 0 9 9 1 9 9 2 9 9 3 STRM 400 STRM 401 STRM 601 STRM 500 STRM 502 STRM 603 STRM 107 STRM 107A STRM 505 STRM 504 STRM 503 STRM 503A STRM 501 STRM 501A STRM 412A STRM 412 STRM 411ASTRM 411 STRM 410 STRM 410A STRM 406A STRM 406 STRM 407 STRM 407A STRM 408 STRM 207A STRM 207C STRM 207B STRM 209 STRM 209A STRM 207 STRM 208 STRM 209B STRM 210B STRM 210A STRM 210 1.68%4:1995992993994996???STRM 208A 1.65%977.81965.03965.03965.03 965.03 EE7.54%2.62% STRM 106 STRM 210C STRM 408A STRM 107B STRM 505A970 967968969971972985 984 986 987 988 989 991.28 TW:985.40 TW:985.44 BW:982.01 BW:984.35 G:984.59 985.43 G:984.31 985.08 G:983.75 G:984.54 G:985.23 G:984.82 G:989.11 992.52 G:992.40 G:991.98 ME: ±989.28 ME: ±989.85 T/G:994.18 994.51 G:991.19 G:990.90 990.04 G:991.63 G:988.23EOF:984.09 TW:981.50 BW:981.00 TW:982.80 BW:980.30 TW:983.50 BW:981.00 TW:988.00 BW:987.50 989.63 989.77 989.60 T/G:990.38 T/G:990.26 T/G:990.78 T/G:990.84 990.81 991.45 991.95 T/G:991.95 995.06 995.05 994.94995.06 994.56 993.53 985.33 993.26 992.63 993.17 T/G:992.52 G:991.40 992.26 990.87 990.68 986.02 986.95 985.33 985.98 989.23986.00 990.61 991.24 995.06 995.06 G:987.11 G:985.91 990.24 990.16 994.58 994.52 994.37 G:993.93 995.06 991.71 LP:983.59 CENTERLINE OF CREEK 25' SHORELINEIMPACT ZONE 50' BUILDING SETBACK EXIST. 36"RCP CLIII EXIST. 36"RCP FESINV. 974.0 EXISTING WETLAND #2EXIST. NWL: 974.00EXIST. HWL: 976.30PROP. HWL (100-YR RAINFALL): +/- 977.81PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 977.62 SWWD 25' WETLAND MANAGE 2 SETBACK BMP #2UNDERGROUND STORMWATER MANAGEMENT AREASEE SHEET C510 FOR DETAILS EXIST. 36" RCP CLIII EXIST. 18" RCP FESINV. 982.58 18" RCP FESINV. 974.19 8 - 6.5 INCH STEPS CREEK: EXIST. HWL: 965.11PROP. HWL (100-YR RAINFALL): +/- 965.03 PROPOSED DRAINAGESWALE @ 2% MIN; PROVIDEPOSITIVE DRAINAGE AWAY FROM RETAINING WALL EAGLE POINT BLVDIMPROVEMENTS;SEE SHEET C401 EAGLE POINT BLVDIMPROVEMENTS;SEE SHEET C401 EAGLE POINT BLVDIMPROVEMENTS; SEEC403 - HUDSON BLVD &EAGLE POINT BLVDTYPICAL SECTIONSSECTION E-E LP:991.39977.81 G:993.84 G:992.72 990.11 990.01 994.51 T/G:994.13 993.50G:993.37 988.13 G:985.14 G:991.82 T/G:991.94 T/G:992.44 T/G:994.14 G:994.07 G:994.18 G:994.20 G:994.25 1. 4 1% 2. 1 0% 995.06 994.34 994.41 0.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL MAINTENANCE ACCESS BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:38pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHC505 C503 C501 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C504BAW 09/09/2022 JFJ 19.1001.04 GRADING AND DRAINAGE PLAN SIG N A G E EDG E O F W A T E RCENTERLINE CREEKBRIDGEABUTTMENTAPPROXIMATELOCATION970970975975 98 0971971972972973973974974976976977977 97 8 978 97 9 979 98 1 98 2 983980 98598 1 982 983 98 4 986 987970975975968969971 972 973 974974 976976977977965970 970966967968969971971972972975980 9 8 0 972973974976977 978 979 975 976 977 978 979980 983 985 985 982 983 984 986 987 988 97597 6 97 7 985 980 975 990 D98897597397497697797897 9 973 981 982 983 986 970 967968969971972973976 971 973 7:1??????2. 0 4 %4.00%1. 5 0 %980976977978979981982983984STRM 601 STRM 603 4:1985990995984986987988989991992993994996975975980980985985990 99099597297397397497497697697797797897897997998198198298298398398498498698698798798 8 988989989991 99199299 2 993994996977.81965.03965.03965.03 STRM 707 D D EE970975 967968969971972978 97 9 979979 980985 981 982 983 984 986 987 TW:981.50 BW:981.00 TW:982.80 BW:980.30 CENTERLINE OF CREEK 25' SHORELINE IMPACT ZONE 50' BUILDING SETBACK EXISTING WETLAND #2 EXIST. NWL: 974.00EXIST. HWL: 976.30PROP. HWL (100-YR RAINFALL): +/- 977.81 PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 977.62 SWWD 25' WETLANDMANAGE 2 SETBACK EXIST. 18" RCP FESINV. 976.13 18" RCP FES INV. 974.19 EXIST. 18" RCP FESINV. 982.58 EXIST. 18" RCP FESINV. 972.92 ORDINARY HIGH WATER LEVEL ASDELINEATED 11/2019 CREEK:EXIST. HWL: 965.11 PROP. HWL (100-YR RAINFALL): +/- 965.03 PROPOSED DRAINAGE SWALE @ 2% MIN; PROVIDEPOSITIVE DRAINAGE AWAYFROM RETAINING WALL CONTRACTOR TO SEE SHEETSC402-C416 FOR HUDSON BLVD IMPROVEMENTS. SEE SHEET C401 TYPICAL SECTIONS EAGLE POINT BLVD IMPROVEMENTS;SEE SHEET C401 EAGLE POINT BLVD IMPROVEMENTS; SEEC403 - HUDSON BLVD &EAGLE POINT BLVD TYPICAL SECTIONSSECTION E-E EAGLE POINT BLVDIMPROVEMENTS; SEE C403 - HUDSON BLVD & EAGLE POINTBLVD TYPICAL SECTIONSSECTION D-D 977.8120+0021+0022+000.0%PROPOSED DRAINAGE DIRECTION EXISTING STORM SEWER PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR925 PROPOSED SPOT ELEVATION100.00 LEGEND PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER CLEANOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) 100.00 PROPOSED EOF SETBACK/ BUFFER WETLAND DELINEATION GRADE BREAK LIMITS OF CONSTRUCTION PROPOSED RETAINING WALL GUARD RAIL MAINTENANCE ACCESS BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL9XX.XX PROPOSED SWALE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING PLAN.dwg September 11, 2022 - 2:39pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTHC504 C501 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C505BAW 09/09/2022 JFJ 19.1001.04 GRADING AND DRAINAGE PLAN CSEXI S T I N G BU I L D I N GGENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONAPPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NO PARKING NOPARKINGSENIOR HOUSINGBUILDING LEVEL 1: 995.06 LEVEL B: VARIES DDD DD D COCOCOCOCO20.0'965.03965.03965.03 965.03 970.25970.25D30.0'145.0'980.87980.87980.87980.87977.81 CONTRACTOR TOSEE SHEETSC402-C416 FORHUDSON BLVDIMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. 10.0' www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 11, 2022 - 3:30pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION DNORTH STORMWATER MANAGEMENT PLAN NOTES 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF LAKE ELMO,SPECIFICATIONS AND BUILDING PERMIT REQUIREMENTS. 2. CONTRACTOR TO CALL GOPHER STATE CALL ONE @ 1-800-252-1166 AT LEAST TWOWORKING DAYS PRIOR TO EXCAVATION/CONSTRUCTION FOR UTILITY LOCATIONS. 3. STORM SEWER PIPE SHALL BE AS FOLLOWS:RCP PER ASTM C-76 HDPE: 0" - 10" PER AASHTO M-252HDPE: 12" OR GREATER PER ASTM F-2306PVC SCH. 40 PER ASTM D-3034 WHEN STORM SEWER CROSSES ABOVE WATERMAIN: STORM SEWER (18" ANDSMALLER) SHALL BE PVC SCH 40 PER ASTM D-1785; PROVIDE 18" MINIMUMVERTICAL CLEARANCE OUTER EDGE TO OUTER EDGE STORM SEWER FITTINGS SHALL BE AS FOLLOWS:RCP PER ASTM C-76, JOINTS PER ASTM C-361, C-990, AND C-443HDPE PER ASTM 3212 PVC PER ASTM D-3034, JOINTS PER ASTM D-3212WHEN STORM SEWER CROSSES ABOVE WATERMAIN: STORM SEWER (18" ANDSMALLER) FITTINGS SHALL BE PVC SCH 40 PER ASTM D-1785; PROVIDE 18" MINIMUM VERTICAL CLEARANCE OUTER EDGE TO OUTER EDGE 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL. 5. CONTRACTOR SHALL EXCAVATE DRAINAGE TRENCHES TO FOLLOW PROPOSED STORMSEWER ALIGNMENTS. 6. REFER TO THE UTILITY PLAN FOR SANITARY SEWER MAIN, WATER MAIN SERVICELAYOUT AND ELEVATIONS AND CASTING / STRUCTURE NOTATION. 7. CONTRACTOR TO PROVIDE 3" INSULATION BY 5' WIDE CENTERED ON STORM PIPE IFLESS THAN 4' OF COVER IN PAVEMENT AREAS AND LESS THAN 3' OF COVER IN LANDSCAPE AREAS. 8. REFERENCE MEP PLANS FOR ROOF DRAIN CONNECTION. 9. ALL STORM SEWER CONNECTIONS SHALL BE GASKETED AND WATER TIGHT INCLUDINGMANHOLE CONNECTIONS. 10. ALL STORM PIPE ENTERING STRUCTURES SHALL BE WATERTIGHT OR BE OF FLEXIBLECOMPRESSION JOINTS. JOINT CONNECTIONS SHALL BE FLEXIBLE WATER STOPS, RESILIENT CONNECTORS, OR OTHER FLEXIBLE SYSTEM S APPROVED BY THE ENGINEERTO MAKE WATERTIGHT CONNECTION TO MANHOLES AND OTHER STRUCTURES UNLESSOTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS. CEMENT MORTAR JOINTS ARE NOT APPROVED. 11. ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 FEET OF THEBUILDING OR WATER SERVICE LINE MUST BE TESTED IN ACCORDANCE WITH MINNESOTARULES, CHAPTER 474, SECTION 1109. 12. ALL STORM SEWER PIPE SHALL BE AIR TESTED IN ACCORDANCE WITH THE CURRENTPLUMBING CODE. 1. CONTRACTOR TO PROVIDE (2) DOUBLE RING INFILTROMETER TESTS WITHIN THEUNDERGROUND SYSTEM EXCAVATION PRIOR TO INSTALLATION OF THE UNDERGROUND SYSTEM. THE CONTRACTOR SHALL PROVIDE THE RESULTS TO THE ENGINEER FOR REVIEWAND APPROVAL PRIOR TO INSTALLATION OF THE UNDERGROUND SYSTEM. 2. CONTRACTOR SHALL OVER-EXCAVATE ANY ENCOUNTERED UNSUITABLE CLAY SOILS TOAN ELEVATION OF APPROXIMATELY 975.00. EXCAVATION SHALL BE REPLACED WITHSUITABLE ENGINEERED FILL MEETING THE MNDOT SPECIFICATION FOR COARSE FILTER AGGREGATE PER SECTION 3149.2H. DEPTHS OF UNSUITABLE CLAY EXPECTED TO VARY,CONTRACTOR SHALL VERIFY DEPTHS OF EXCAVATION AND PERFORM INFILTROMETERTESTS PRIOR TO INSTALLING UNDERGROUND SYSTEM. 3. IF NATIVE SUBGRADE SOILS ARE DETERMINED TO NOT BE CONDUCIVE TO THE DESIGNINFILTRATION REQUIREMENTS, THE CONTRACTOR SHALL REMOVE AND REPLACE THEPOORLY INFILTRATING SOILS TO A DEPTH WHERE THE EXISTING NATIVE SUBGRADE SOILS MEET OR EXCEED THE DESIGN INFILTRATION RATE AS REVIEWED BY THE ENGINEER. 4. UPON COMPLETION OF THE STORMWATER BMP AND FINAL STABILIZATION OF THE TRIBUTARY DRAINAGE AREA, THE CONTRACTOR SHALL PROVIDE DOCUMENTATION THATTHE BMP DRAWS DOWN WITHIN 48 HOURS AFTER A SIGNIFICANT RAIN EVENT. 5. NO CONSTRUCTION EQUIPMENT SHALL TRAVEL WITHIN THE UNDERGROUND INFILTRATIONSYSTEM AREA. USE EXCAVATOR WITH TOOTHED BUCKET FOR INFILTRATION BASINEXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS. 6. FINAL EXCAVATION OF UNDERGROUND INFILTRATION SYSTEM AREA AND INSTALLATION OFOF ENGINEERED SOIL MUST OCCUR IN DRY SOIL CONDITIONS TO PREVENT SMEARING AND COMPACTION. DO NOT WORK IN INFILTRATION SYSTEM AREA IF SOIL CONDITIONS AREWET. 7. IMMEDIATELY FOLLOWING SYSTEM CONSTRUCTION, THE EXCAVATION FOR THE TRENCHSHALL BE IMMEDIATELY BACKFILLED WITH APPROVED BACKFILL MATERIAL PERMANUFACTURER'S RECOMMENDATION, OR THE EXCAVATION SHALL BE PROTECTED WITH SILT FENCE AND OR BIO-ROLLS SUCH THAT ON-SITE SOILS DO NOT ENTER THE TRENCHEXCAVATION AND CLOG UP THE BOTTOM/SIDES OF THE TRENCH LIMITING THEINFILTRATION CAPACITY OF THE UNDERGROUND SYSTEM. 8. IF ANY SOILS ENTER THE TRENCH PRIOR TO BACKFILLING, THE CONTRACTOR SHALLREMOVE SOILS AND CONFIRM THE INFILTRATION CAPACITY OF THE NATIVE SUBGRADESOILS IS MET WITH INFILTROMETER TESTS. 9. CONTRACTOR SHALL COORDINATE AND COMPLETE CERTIFIED AS-BUILT PLANS DEMONSTRATING ALL CONSTRUCTED STORMWATER CONVEYANCE STRUCTURES, AND STORMWATER MANAGEMENT FACILITIES (INCLUDING AS-BUILT VOLUMES) CONFORM TODESIGN AND/OR PLANS AS APPROVED BY THE CITY. 10. CONTRACTOR TO PROVIDE DAILY OBSERVATION LOGS AND PHOTOGRAPHS SHOWING THESTORMWATER FACILITY HAS DRAWN DOWN WITHIN 48 HOURS FROM THE COMPLETION OFTWO 1- INCH SEPARATE RAINFALL EVENTS. 11. CONTRACTOR TO CONFIRM THE STORMWATER FACILITY HAS BEEN CONSTRUCTED ANDINSTALLED PER PLAN AND IS FUNCTION AS DESIGNED AND PERMITTED. STORMWATER MANAGEMENT NOTES CITY OF LAKE ELMO STORM SEWER NOTES 1. ALL STORM SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMMO STANDARD SPECIFICATIONS AND DETAILS. 2. REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MNDOT SPEC. 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE,SIZE AND STRENGTH CLASS SPECIFIED HEREIN. 3. PRECAST CONCRETE MANHOLE AND CATCH BASIN SECTIONS SHALL CONFORM TO THEREQUIREMENTS OF ASTM C-477. 4. A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TOALLOW FOR HEIGHT ADJUSTMENT WHEREVER POSSIBLE 5. JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE RUBBER "O"RING JOINTS PROVIDED ON ALL STORM SEWER MANHOLES. 6. RIP-RAP SHALL BE HAND-PLACED OVER GEOTEXTILE FABRIC AND CONFORM TO MNDOTSPEC. 3601, CLASS II, OR AS SPECIFIED HEREIN. 7. THE GEOTEXTILE FABRIC USED UNDER RIP-RAP SHALL EXTEND 3 FT UNDER THE APRON. 8. FURNISH & INSTALL TRASH GUARDS ON ALL FLARED END SECTIONS 9. ALL SILT SHALL BE CLEANED OUT FROM THE RIP-RAP AT THE END OF THE PROJECT. 10. STORM SEWER STRUCTURES WITHIN 10 FT OF WATERMAIN ARE TO HAVE WATER TIGHTCONNECTIONS PER MDH REQUIREMENTS. 11. ALL NEW STORM SEWER PIPE SHALL BE FLUSHED AND TELEVISED PRIOR TOSUBSTANTIAL COMPLETION - PER CITY SPEC. SECTION 1700 - CLOSEOUTREQUIREMENTS 1. ABOVE GROUND FILTRATION BASIN ASSUMES 1.63 IN/HR RATE. 2. FILTRATION BASINS EXCAVATION SHALL BE HELD 1' ABOVE THE BOTTOM OF THE BASIN UNTIL THE CONTRIBUTING DRAINAGE AREAS WITH EXPOSED SOILS HAVE BEEN FULLYSTABILIZED AND BITUMINOUS BASE COURSE INSTALLED ON THE CONTRIBUTING AREAS. 3. DIVERT UPLAND DRAINAGE AREAS TO PREVENT RUNOFF FROM ENTERING THEEXCAVATED CELL OR INTO THE WORK AREA. 4. CARE MUST BE TAKEN TO AVOID CONTAMINATION OF ENGINEERED SOILS WITHSEDIMENT, IN-SITU, OR TOPSOIL DURING AND AFTER INSTALLATION. MATERIALS MUST BESEGREGATED. 5. INSTALLATION WITH DRY SOIL CONDITIONS IS CRITICAL TO PREVENT SMEARING ANDCOMPACTION. SCHEDULE WORK FOR PERIODS OF DRY WEATHER. 6. DO NOT LEAVE FILTRATION AREAS AND/OR PERIMETER SLOPE EXPOSED OVERNIGHT.SECURE THE AREA FROM RISK OF PRECIPITATION DAMAGES AT THE END OF EVERYWORK DAY. IN THE EVENT OF RAIN, TAKE ACTION TO DIVERT STORMWATER AWAY FROM WORK AREA AND TEMPORARILY COVER ALL EXPOSED SOILS WITH FILTER FABRIC ORIMPERMEABLE SHEETING. 7. IN THE EVENT THAT THE SEDIMENT IS INTRODUCED INTO THE BMP DURING ORIMMEDIATELY FOLLOWING EXCAVATION, REMOVE SEDIMENT PRIOR TO INITIATING THENEXT STEP IN THE FILTRATION BASIN CONSTRUCTION PROCESS. 8. EXCAVATE SEDIMENT BUILT UP DURING CONSTRUCTION AFTER STABILIZATION OFUPSTREAM AREAS AND BEFORE PLACEMENT OF HYDRAULIC SOIL STABILIZER TYPE SPECIAL. 9. STOCKPILING OF MATERIAL SHALL NOT BE ALLOWED IN PROPOSED FILTRATION BASINS. 10. NO CONSTRUCTION EQUIPMENT SHALL BE ALLOWED IN THE FILTRATION AREA BEFOREOR AFTER IT IS CONSTRUCTED. ONLY SPECIFIED EQUIPMENT WILL BE ALLOWED INSIDE OF ORANGE CONSTRUCTION FENCE FOR THE SOLE PURPOSE OF CONSTRUCTION THEFILTRATION BASIN. 11. ALL FILTRATION BASIN CONSTRUCTION ACTIVITIES SHALL BE COMPLETED DURING DRYSOIL CONDITIONS. 12. ALL FILTRATION AREAS SHALL BE PROTECTED DURING CONSTRUCTION OPERATIONS. 13. GRADING OF THE FILTRATION BASINS SHALL BE ACCOMPLISHED USING LOW-IMPACT, EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF THE UNDERLYING SOILS. ABACKHOE WITH TOOTHED BUCKET SHALL BE USED FOR EXCAVATION OF FILTRATIONBASINS TO PREVENT COMPACTION OR SMEARING OF SOILS. THE CONTRACTOR SHALLSCARIFY THE UNDERLYING SOILS TO MINIMUM 18" DEPTH TO REMOVE COMPACTION. THEFIRST LIFT OF ENGINEERED SOIL SHALL BE MIXED WITH UNDERLYING SOILS. LEVELINGAND FINAL GRADING WITHIN THE CELL MUST BE DONE BY HAND SURFACE FILTRATION BASIN NOTES PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C506BAW 09/09/2022 JFJ 19.1001.04 OVERALL STORMWATER MANAGEMENT PLAN MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX SHEET C507 SHEET C508 SHEET C510 SHEET C509 SHEET C511 GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION 986987988988986987 987 985 986 976 977 978 985986970 970 970 970971971972972973973973965966967968 972974 980 980 981 981 981 982 982 982 983983983983983 985960960960 970962 964 966 968 962 964966970 980 972 974 976 978 970970970 970 968 968 972972D965969968970970CO61:1 1. 8 8 %1.57%965.03 960 970 980 956 958 962 964 966 968 972 974 976 978 982 984 986986986 986 970.25970.25148 LF - 18" HDPE@ 0.75%24 LF - 24" HDPE @ 0.75 % 61 LF - 12" PVC@ 0.58%38 LF - 12" PVC @ 0.49% 15 LF - 12" PVC @ 0.45% 25 LF - 12" H D P E @ 0.75% 30 LF - 6" PVC @ 4.00% 9 LF - 6" PVC@ 4.00% 47 LF - 6" PVC@ 4.00% 17 LF - 6" PVC@ 4.00% 5 LF - 6" PVC@ 5.26% 35 LF - 10" PVC@ 0.50%18 LF - 6" PVC @ 2.00% 10 LF - 6" PVC @ 2.00% 9 LF - 6" PVC@ 2.64% 39 LF - 6" PVC@ 5.14% 32 LF - 24" RCP@ 1.33% 49 LF - 15" RCP@ 0.70% 70 LF - 15" RCP@ 0.70% 125 LF - 15" RCP@ 0.70% 279 LF - 18" RCP@ 2.00% 965 970 963 964 966 967 968 969 971 970970 9679 6 8 969969 971971972973970970970 EXIST. 30" RCP STORM EXIST. 18" RCP FES IE: 965.60 EXIST. 18" RCP FESIE: 966.85 EXIST. 84" CMPSTRM SEWER EXIST. 84" CMP FES IE:958.76 STRM 102CBMH 48" DIA. 4' SUMPNEENAH R-3067-VBRE:986.25IE:982.91 NEIE:981.27 N IE:981.70 SE STRM 706 STRM 703A STRM 704 STRM 101CBMH 48" DIA. 4' SUMPNEENAH R-3067-VBRE:985.02IE:980.59 NWIE:980.59 NEIE:983.17 N IE:980.59 S STRM 702 STRM 705 STRM 703B STRM 103 RE:982.70IE:981.62 NIE:981.62 S STRM 104RE:986.50IE:981.81 NIE:981.81 EIE:981.81 S STRM 201E RE:994.69IE:983.83 NE STRM 201RE:993.38IE:982.81 NE IE:982.81 N IE:982.81 SE STRM 201DRE:994.77 IE:983.37 E STRM 201A STRM 201CRE:995.06IE:985.57 SE STRM 106B RE:985.26IE:982.60 W STRM 105B RE:985.33IE:982.52 SW STRM 105A 8" NYLOPLAST DRAIN BASINCONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE;COORD W/ MEP AND ARCHRE:985.22IE:982.35 NW STRM 105 RE:985.32IE:982.16 NEIE:982.16 NIE:982.16 SEIE:982.16 SW STRM 104A RE:987.22IE:982.05 W STRM 102A STRM 102BRE:986.76 IE:986.00 SE 56 LF - 12" PVC@ 0.51% 100-YR HWL: 967.02 CONTRACTOR TO SEE SHEETS C402-C416FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVD IMPROVEMENTS. CONTRACTOR TO SEE SHEETSC402-C416 FOR HUDSON BLVDIMPROVEMENTS. STRM 201BSTRM CO ST-152RE:987.57 IE:984.05 SW STRM 104CRE:985.08 IE:982.25 W D PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 11, 2022 - 3:31pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C507BAW 09/09/2022 JFJ 19.1001.04 STORMWATER MANAGEMENT PLANC508 C510 NORTHKEYNOTE LEGEND 6" PVC SCH 40 @ 2% MINIMUM ROOF DRAIN CONNECTION, SEE MEP FOR CONTINUATION A B PIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N 0,0986987988988986 986987 987 985 986 985986985983984983982986987987 985 983 981 981982983971972973973973972974 980 975 980 974976977978 979 981 981 981 982 982 982 983983983983983 985 982 980 980 992 993 980978982984986 988 970 980 972 974 976 978 982 984 986 984986988 980 97297 4 976 978 982 984982980DD980985976977978979981982983983983984984984 970982980980 981 990991992993994D CO98 0 98 5 990990 98 1 982 983 98 4 98 6 9869 8 7 98 7 988 98 8 989 98 9 985 990 983 984 986 987 988 989 20.0'1. 7 7%32.95%11.86%61:12.60%10.11%1.15%980976978982 984986970.25985 990 989 148 LF - 18" HDPE@ 0.50% 78 LF - 24" H D P E @ 0.75% 83 LF - 18" HDPE@ 1.00% 39 LF - 24" HDPE@ 0.75%24 LF - 24" HDPE @ 0.75 % 19 LF - 8" HDPE@ 0.75% 118 LF - 18" RCP@ 0.00% 39 LF - 36" RCP @ 0.00% 61 LF - 12" PVC@ 0.50%38 LF - 12" PVC@ 0.50% 15 LF - 12" PVC@ 0.50% 25 LF - 12" H D P E @ 0.75% 30 LF - 6" PVC@ 4.00% 9 LF - 6" PVC@ 4.00% 47 LF - 6" PVC @ 4.00% 17 LF - 6" PVC@ 4.00% 5 LF - 6" PVC@ 5.26% 35 LF - 10" PVC @ 0.50%18 LF - 6" PVC@ 2.00% 10 LF - 6" PVC@ 2.00% 9 LF - 6" PVC @ 2.00% 17 LF - 12" HDPE @ 2.00% 39 LF - 6" PVC@ 2.00% 18 LF - 18" RCP@ 1.47% 279 LF - 18" RCP @ 2.00%970969971972973BMP #1 SURFACE FILTRATION BASINTOTAL VOLUME: 46,888 CFIRON ENHANCED SAND IE: 978.50 DRAIN TILE IE: 978.74BASIN BOTTOM: 980.00100 YR HWL: 982.43 PRETREATMENT FOREBAY TOTAL VOLUME: 16,550 CFBASIN BOTTOM: 980.0100 YR HWL: 982.86 MAINTENANCE ACCESSFROM PUBLIC RIGHT-OF-WAY EXISTING WETLAND #1 EXIST. NWL: 977.00EXIST. HWL: 980.60PROP. HWL (100-YR RAINFALL): +/- 980.87 PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 981.45 TEMPORARYEMERGENCY ACCESS 6" CLEANOUT, T YP. PROPOSED DRAINAGESWALE; PROVIDE POSITIVEDRAINAGE AWAY FROM BMP #1 MAINTENANCEACCESS CONNECT DRAINTILE ONDOWNSTREAM SIDE OF OCS CONNNECT DRAINTILE TO DOWNSTREAMEND OF OCS STRM 203CBMH 48" DIA. (CIR.)NEENAH R-2560RE:993.58IE:989.50 W IE:984.11 NIE:984.11 S STRM 202CBMH 48" DIA. (CIR.)NEENAH R-2560RE:990.85IE:983.28 NIE:983.28 SW STRM 200CBMH 60" DIA. (CIR.)3' SUMPNEENAH R-2560RE:989.78IE:981.39 NWIE:981.39 NWIE:981.39 W STRM 801FES 36"IE:980.00 E STRM 100FES 24"IE:980.00 N STRM 800FES 36"IE:980.00 W STRM 301 OCSRE:983.02IE:978.47 S IE:978.09 NE STRM 300FES 18"IE:978.09 SW STRM 700 STRM 101CBMH 48" DIA.4' SUMPNEENAH R-3067-VBRE:985.02IE:980.59 NW IE:980.59 NEIE:983.17 NIE:980.59 S STRM 702 STRM 701 IE:981.82 S STRM 201ERE:994.69IE:983.83 NE STRM 201RE:993.38 IE:982.81 NEIE:982.81 NIE:982.81 SE STRM 201DRE:994.77IE:983.37 E STRM 201ANYLOPLAST DRAIN BASINRE:993.92IE:983.00 WIE:983.00 NIE:983.00 S STRM 203A8" NYLOPLAST DRAIN BASIN COORD W/ ARCH DOWNSPOUTRE:994.18IE:992.50 E STRM 201C RE:995.06IE:985.57 SE STRM 106BRE:985.26 IE:982.60 W STRM 105BRE:985.33 IE:982.54 SW STRM 105A8" NYLOPLAST DRAIN BASIN CONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE;COORD W/ MEP AND ARCHRE:985.22IE:982.37 NW IE:982.18 N IE:982.18 SEIE:982.18 SW STRM 104ARE:987.22 IE:982.00 W STRM 102ARE:986.42IE:983.50 NWIE:983.50 S STRM 102BRE:986.76IE:984.28 SE 56 LF - 12" PVC@ 0.50% 5 LF - 8" PVC@ 60.00%980.87980.87980.87LEVEL 1: 995.06 LEVEL B: 985.33 CONTRACTOR TO SEE SHEETS C402-C416 FOR HUDSON BLVDIMPROVEMENTS. 6" PERFORATEDDRAINTILE, T YP. 10.0' STRM 302FES 18" IE:978.50 N STRM 200BRE:987.37IE:982.72 SE STRM 200ATRENCH DRAINRE:981.98 IE:981.23 SWIE:981.23 SE 18 LF - 8" HDPE @ 0.75%STRM 200C RE:994.41IE:982.52 NE 81 LF - 24" HDPE @ 0.75%84 LF - 24" HDPE @ 0.75 % STRM 201BSTRM CORE:993.91IE:984.87 NWIE:984.87 S ST-152RE:987.57IE:981.78 SW STRM 104CRE:985.08IE:982.39 W 982.86982.43982.86982.43 982.43 D PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 12, 2022 - 10:05am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C508BAW 09/09/2022 JFJ 19.1001.04 STORMWATER MANAGEMENT PLAN NORTHC507 C509 KEYNOTE LEGEND 6" PVC SCH 40 @ 2% MINIMUM ROOF DRAIN CONNECTION, SEE MEP FOR CONTINUATION A B CSAP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . NO PARKING NOPARKINGLEVEL B: VARIES 985 984 984 986 987 988 995991992993994994 9 9 0 98898999199299399098898999199299399 1 992992 988 985 986 993 990992994 996994996 998 1000998980980 9909901000978978 982982 984984 986986 988988 992992992994994 994994994996996996998990 984 986 988 99 2 99 4 CO1.50%1.51%1.93%4. 8 4% 1.68%4.75%1 . 4 7%990988988 988989991 992 993 993 9 9 4 994 994 994 990989 991990 995 989 991 992993994996997 998 990 991 992 993 994 130 LF - 18" HDPE@ 1.00% 108 LF - 12" HDPE @ 0.54% 101 LF - 12" HDPE @ 1.57% 67 LF - 18" HDPE@ 0.44% 99 LF - 15" HDPE@ 0.97% 33 LF - 8" HDPE@ 0.51% 154 LF - 18" HDPE@ 1.00% 41 LF - 12" HDPE@ 3.70%D99 LF - 12" HDPE@ 1.00 % 66 LF - 12" HDPE@ 1.07%44 LF - 15" HDPE@ 1.00%49 LF - 6" PVC@ 2.85% 14 LF - 6" PVC@ 10.91%20 LF - 6" PVC@ 2.00%44 LF - 6" PVC@ 2.00% 12 LF - 6" PVC @ 0.64% 9 LF - 6" PVC@ 31.94% 36 LF - 8" PVC @ 2.57% 7 LF - 6" PVC@ 43.85% 23 LF - 6" PVC@ 1.78% 7 LF - 6" PVC@ 37.95% 10 LF - 6" PVC@ 55.04% 13 LF - 6" PVC@ 1.24% 29 LF - 6" PVC @ 0.57% 58 LF - 8" PVC@ 0.52% 5 LF - 6" PVC@ 5.26% 35 LF - 10" PVC 14 LF - 6" PVC@ 1.76% 24 LF - 8" HDPE@ 2.00% EXIST. 36" RCP CLIII PROPOSED DRAINAGE SWALE @ 2% MIN; PROVIDEPOSITIVE DRAINAGE AWAY FROM RETAINING WALL(TYP.) STRM 203CBMH 48" DIA. (CIR.)NEENAH R-2560RE:993.58IE:989.50 W IE:984.11 NIE:984.11 S STRM 401CBMH 48" DIA. 4' SUMPNEENAH R-3067-VBRE:991.33IE:981.33 EIE:981.33 S STRM 205CBMH 48" DIA.NEENAH R-3067-VBRE:991.49IE:986.95 SEIE:986.95 NW IE:986.95 SW STRM 402CBMH 48" DIA.NEENAH R-3067-VBRE:989.20IE:982.54 EIE:982.54 S IE:982.29 W STRM 404CBMH 48" DIA.NEENAH R-3067-VBRE:987.71IE:984.72 N STRM 403 CBMH 48" DIA.NEENAH R-3067-VBRE:987.05 IE:984.13 SIE:984.13 W STRM 210CB 27" DIA.NEENAH R-2560RE:994.50IE:990.50 SW IE:990.50 SIE:990.50 E STRM 204CBMH 48" DIA.RE:993.29IE:985.64 NE IE:989.00 WIE:985.64 NWIE:985.64 S STRM 405 RE:984.36IE:983.25 SIE:983.25 WIE:983.25 N STRM 206 RE:991.11IE:987.39 NW STRM 406CBMH 48" DIA. (CIR.)NEENAH R-2560 RE:993.91IE:981.04 NIE:988.00 E IE:989.00 SEIE:981.04 W STRM 203A8" NYLOPLAST DRAIN BASIN COORD W/ ARCH DOWNSPOUTRE:994.18IE:992.50 E STRM 210B8" NYLOPLAST DRAIN BASINCONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE;COORD W/ MEP AND ARCHRE:995.02IE:991.90 NE STRM 210C8" NYLOPLAST DRAIN BASINCONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE; COORD W/ MEP AND ARCHRE:994.72IE:992.00 NE STRM 205ARE:991.67IE:987.36 WIE:987.36 SE STRM 205BRE:992.53IE:988.24 E STRM 405BRE:991.39IE:983.33 NWIE:983.33 E STRM 405C RE:991.79IE:983.57 SE STRM 407RE:994.27IE:988.93 E IE:988.93 SIE:988.93 W STRM 407A RE:994.73IE:992.00 N STRM 408RE:994.31IE:989.34 SIE:989.34 W STRM 408A RE:994.74IE:992.00 N STRM 410ARE:993.28 IE:990.00 NW IE:990.00 NW STRM 107BRE:986.67IE:982.80 S STRM 106BRE:985.26 IE:982.60 W STRM 107RE:986.00IE:982.64 E IE:982.64 NIE:982.64 S STRM 406ARE:994.54IE:992.00 NW STRM 410RE:992.48 IE:984.68 SWIE:984.68 SEIE:984.68 NW STRM 106 RE:983.24IE:982.34 NIE:982.34 EIE:982.34 S STRM 107ARE:986.51IE:982.80 W STRM 209ARE:994.95IE:990.06 E STRM 208A RE:995.03IE:988.78 SE STRM 207CRE:994.77 IE:987.88 SE STRM 207ARE:994.07IE:988.51 SW STRM 209BRE:994.86 IE:990.36 N STRM 207 RE:994.26IE:986.63 NWIE:986.63 NE IE:986.63 WIE:986.63 SE STRM 210A8" NYLOPLAST DRAIN BASINCOORD W/ ARCH DOWNSPOUT RE:994.53IE:992.00 SWIE:991.90 N 13 LF - 6" PVC@ 0.78% 5 LF - 8" PVC@ 60.00%980.87LEVEL 1: 995.06 LEVEL B: 984.00 22 LF - 6" PVC @ 4.00%33 LF - 12" H D P E @ -4.00%14 LF - 6" PVC@ 4.00%STRM 207BRE:994.52 IE:987.54 NWIE:987.54 SE39 LF - 12" HDPE @ 4.00% 9 LF - 6" PVC@ 4.00% 23 LF - 6" PVC @ 4.00% 47 LF - 6" PVC@ 4.00% 17 LF - 8" HDPE@ 1.34% STRM 405ATRENCH DRAINRE:984.17 IE:983.42 SIE:983.42 N 78 LF - 18" HDPE@ 0.31%D PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 11, 2022 - 3:32pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C509BAW 09/09/2022 JFJ 19.1001.04 STORMWATER MANAGEMENT PLANNORTHC508 C510 KEYNOTE LEGEND 6" PVC SCH 40 @ 2% MINIMUM ROOF DRAIN CONNECTION, SEE MEP FOR CONTINUATION A B CSNO PARKING NOPARKINGSENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES 994 990 99299399 0 99 1 992990987987 988 988 989 991 992986980985985985977978979 981 982 983 984985985 973973 986 985 986 987992 993 98 0 97 8 9 8 2 984 98 6 988988 990992992994994996996980982970968972 974974 976976970970966968972972970980990968 972974976978982984 986 988 99 2 99 4 996 996972 980 990 988 980 990 DDD967 970 975 973 974 987 988 989 985982983984986987970968967COCOCOCO9 9 0 98 8 98 9 9 9 1 9 9 2 99 3 1.06%1.57%3.93%1.50% 1 . 4 7%9.33%965.03965.03965.03 965.03 994 994 67 LF - 18" HDPE @ 0.50% 65 LF - 15" HDPE@ 0.75% 78 LF - 12" HDPE@ 0.75% 59 LF - 12" RCP @ 0.84%99 LF - 12" HDPE@ 1.00 %30.0'14 5 . 0 ' 151 LF - 15" RCP@ 1.25% 49 LF - 6" PVC@ 2.85% 14 LF - 6" PVC @ 10.91% 9 LF - 6" PVC @ 4.00% 36 LF - 8" PVC@ 4.00% 7 LF - 6" PVC @ 43.85% 23 LF - 6" PVC @ 4.00% 10 LF - 6" PVC @ 3.00% 8 LF - 6" PVC@ 3.00% 41 LF - 6" PVC@ 2.00% 19 LF - 6" PVC@ 2.00% 38 LF - 8" PVC@ 2.00% 28 LF - 6" PVC@ 2.00% 10 LF - 6" PVC@ 2.00% 13 LF - 6" PVC @ 2.00% 29 LF - 6" PVC@ 2.00% 58 LF - 8" PVC@ 2.00% 5 LF - 6" PVC @ 5.26% 30 LF - 8" PVC@ 2.00%970985 967968969971971 972984 986 987 988 989 47 L F - 8 " H D P E @ 3 . 0 0 % 24 LF - 8" HDPE @ 3.00%34 LF - 8" HDPE@ 3.00% CENTERLINE OF STREAM 25' SHORELINEIMPACT ZONE EXIST. 36"RCP CLIII EXIST. 36" RCP FESINV. 974.0 SWWD 25' WETLANDMANAGE 2 SETBACK BMP #2UNDERGROUND STORMWATER W/ IRON-ENHANCED SAND FILTRATIONCONTECH 60" PERFORATED CMP (ORAPPROVED EQUAL) TOTAL VOLUME: 21,368 CFIRON ENHANCED SAND IE: 978.75DRAIN TILE IE: 978.99 STONE IE: 980.25PIPE IE: 980.75TOP OF PIPE: 985.75 TOP STONE: 986.25100 YR HWL: 984.93 EXIST. 36" RCP CLIII EXIST. 18" RCP FESINV. 982.58 18" RCP FESINV. 974.19 EXISTING WETLAND EXIST. NWL: 974.00EXIST. HWL: 976.30PROP. HWL (100-YR RAINFALL): +/- 977.81 PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 977.62 PROPOSED DRAINAGESWALE @ 2% MIN; PROVIDEPOSITIVE DRAINAGE AWAYFROM RETAINING WALL STRM 401CBMH 48" DIA.4' SUMPNEENAH R-3067-VBRE:991.33IE:981.52 E IE:981.52 S STRM 601OCSRE:988.56 IE:978.50 NW STRM 500STMH 48" DIA. (CIR.)CONNECT TO UNDERGROUNDSTORMWATER SYSTEMNEENAH R-1642RE:986.35IE:980.75 SE STRM 502 CBMH 48" DIA.NEENAH R-3067-VBRE:983.59 IE:981.82 N STRM 603 FES 12"IE:978.00 SE STRM 210CB 27" DIA.NEENAH R-2560RE:994.50IE:990.50 SW IE:990.50 SIE:990.50 E STRM 501CBMH 48" DIA.RE:986.09IE:981.24 SE IE:982.74 NEIE:981.24 SIE:981.24 NW STRM 406 CBMH 48" DIA. (CIR.)NEENAH R-2560RE:993.91 IE:981.19 NIE:981.19 EIE:989.00 SEIE:981.19 W STRM 203A8" NYLOPLAST DRAIN BASINCOORD W/ ARCH DOWNSPOUT RE:994.18IE:992.50 E STRM 210B 8" NYLOPLAST DRAIN BASINCONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE; COORD W/ MEP AND ARCHRE:995.02IE:991.90 NE STRM 210C8" NYLOPLAST DRAIN BASINCONNECT TO FOUNDATIONDRAINTILE SUMP DISCHARGE;COORD W/ MEP AND ARCH RE:994.72IE:992.00 NE STRM 407 RE:994.27IE:982.64 EIE:988.93 S IE:982.64 W STRM 407ARE:994.73 IE:992.00 N STRM 408RE:994.31IE:983.57 S STRM 408ARE:994.74IE:983.85 N STRM 410ARE:993.28IE:985.31 NW STRM 411ARE:992.67IE:986.13 NW STRM 412ARE:990.83 IE:987.41 N STRM 412RE:990.45IE:987.17 SIE:987.17 NE STRM 501ARE:989.44IE:983.56 SW STRM 503ARE:987.51IE:982.22 W STRM 504 RE:985.58IE:982.60 SEIE:982.60 N STRM 505RE:985.64IE:983.15 E IE:983.15 NW STRM 505ARE:986.12IE:983.36 W STRM 107BRE:986.67 IE:983.22 S STRM 106BRE:985.26IE:982.60 W STRM 503RE:986.23 IE:981.83 SIE:981.83 EIE:981.83 NW STRM 107 RE:986.00IE:983.51 EIE:982.64 NIE:983.51 S STRM 411RE:991.69IE:985.74 SE IE:985.74 SWIE:985.74 NE STRM 406ARE:994.54IE:989.38 NW STRM 410RE:992.48IE:985.02 SW IE:985.02 SEIE:985.02 NW STRM 400STMH 48" DIA (CIR.)CONNECT TO UNDERGROUNDSTORMWATER SYSTEMNEENAH R-1642RE:990.62IE:984.00 SE IE:980.80 E STRM 106RE:983.25IE:982.35 NIE:982.34 E IE:982.35 S STRM 107A RE:986.51IE:983.77 W STRM 209ARE:994.95IE:990.06 E STRM 208ARE:995.03 IE:988.78 SE STRM 207CRE:994.77IE:987.88 SE STRM 207A RE:994.07IE:988.51 SW STRM 209BRE:994.86IE:990.36 N STRM 207RE:994.26 IE:986.63 NWIE:986.63 NEIE:986.63 WIE:986.63 SE STRM 210A 8" NYLOPLAST DRAIN BASINCOORD W/ ARCH DOWNSPOUTRE:994.53 IE:992.00 SWIE:991.90 N 13 LF - 6" PVC@ 0.78% 5 LF - 8" PVC 977.81 22 LF - 6" PVC @ 4.00%33 LF - 12 " H D P E @ -4.00%14 LF - 6" PVC@ 4.00%STRM 207BRE:994.52IE:987.54 NW IE:987.54 SE39 LF - 12" HDPE@ 4.00% 9 LF - 6" PVC @ 4.00% 23 LF - 6" PVC@ 4.00% 47 LF - 6" PVC @ 4.00%78 LF - 18" HDPE@ 0.50%D PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 12, 2022 - 10:06am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C510BAW 09/09/2022 JFJ 19.1001.04 STORMWATER MANAGEMENT PLANNORTHC511 C509 C507 KEYNOTE LEGEND 6" PVC SCH 40 @ 2% MINIMUM ROOF DRAIN CONNECTION, SEE MEP FOR CONTINUATION A B APPROXIMATELOCATION98897597397497697797897 9 973 981980981 982 983 98697097098 0972972974974976976 97 8 978 98 2 980 982 984 986970968972974974976976970 970966968972972980 9 8 0 972974976978 976 978 980 988 980 990 D988 989 985982983984986970968967977 965.03965.03965.03970 980 972974976978 982 984 986 988 99098899259 LF - 12" RCP@ 0.84% 151 LF - 15" RCP@ 1.25%970985 967968969971971 972979 979 979981982983 984 986 987 CENTERLINE OF STREAM 25' SHORELINEIMPACT ZONE SWWD 25' WETLAND MANAGE 2 SETBACK EXIST. 18" RCP FES INV. 976.21 18" RCP FESINV. 974.19 EXIST. 18" RCP FESINV. 970.88 EXIST. 18" RCP FESINV. 972.92 ORDINARY HIGH WATERLEVEL AS DELINEATED 11/2019 EXISTING WETLANDEXIST. NWL: 974.00EXIST. HWL: 976.30 PROP. HWL (100-YR RAINFALL): +/- 977.81PROP. HWL (10 DAY 100-YR SNOWMELT): +/- 977.62 CREEK:EXIST. HWL: 965.11PROP. HWL (100-YR RAINFALL): +/- 965.03 PROPOSED DRAINAGESWALE @ 2% MIN; PROVIDEPOSITIVE DRAINAGE AWAY FROM RETAINING WALL STRM 601OCSRE:988.56IE:978.50 NW STRM 500STMH 48" DIA. (CIR.)CONNECT TO UNDERGROUND STORMWATER SYSTEMNEENAH R-1642RE:986.35 IE:980.75 SE STRM 603FES 12"IE:978.00 SE STRM 707 977.81 CONTRACTOR TO SEE SHEETSC402-C416 FOR HUDSON BLVDIMPROVEMENTS. D PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM SEWER PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM SEWER PROPERTY LINE LEGEND PROPOSED SANITARY SEWER PROPOSED WATERMAIN CO PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION PROPOSED STORMWATER MANAGEMENT AREA BMP/WETLAND/CREEK PROPOSED 100-YR HIGH WATER LEVEL DELINEATED WETLAND WETLAND BUFFER / SETBACK LIMITS OF DISTRUBANCE MAINTENANCE ACCESS PATH EXISTING CONTOUR PROPOSED CONTOUR925 9XX.XX www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-STORM SEWER PLAN.dwg September 11, 2022 - 3:33pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C511BAW 09/09/2022 JFJ 19.1001.04 STORMWATER MANAGEMENT PLANNORTHC510 C507 KEYNOTE LEGEND 6" PVC SCH 40 @ 2% MINIMUM ROOF DRAIN CONNECTION, SEE MEP FOR CONTINUATION A B www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING DETAILS.dwg September 11, 2022 - 2:42pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES C512BAW 09/09/2022 JFJ 19.1001.04 STORMWATER DETAILS www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C5-GRADING DETAILS.dwg September 12, 2022 - 10:06am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES ALL JOINTS INMANHOLE TO HAVE"O" RING RUBBER GASKET SECTION A-A PIPE SHALL BE CUTFLUSH WITH INSIDEFACE OF WALL 5" FLOW 18" OUTLET RIM ELEV.983.0 SKIMMER COVER 18" INLET PIPE IE: 979.85 SUBGRADE 100 YR HWL: 982.43 3:1 MAX NATIVE SOILS SEE NOTES ON SHEET C506 BASIN BOTTOM: 980.00 3:1 MA X OUTLET CONTROL STRUCTURE (STRM 300) SEE DETAIL THIS SHEET 18" INLET PIPE 18" INLET PIPE IE: 980.00 PLAN 18" OUTLET FLOW PRECAST CONCRETE MANHOLE BASE PRECAST CONCRETEMANHOLE SECTION 48" DIA. 18" OUTLET PIPE IE: 978.504' SUMPFLOW 18" INLET BMP #1 SURFACE FILTRATION BASIN TYPICAL SECTION N.T.S. BMP #1 OUTLET CONTROL STRUCTURE STRM 300 N.T.S. BMP #2 OUTLET CONTROL STRUCTURE STRM 601 N.T.S. 6" INLET DRAIN TILE IE: 978.74 1.5'SAND IE: 978.50 18" ENGINEERED SOIL MEDIA MODIFIED TO HAVE A MIXTURE BY VOLUME OF 80% SAND COVER MEETING GRADATION REQUIREMENTS OF SPEC. 3128 "FINE AGGREGATE FOR PORTLAND CEMENT CONCRETE" AND 20% MNDOT SPEC 3890 GRADE 2 COMPOST. CONTRACTOR IS TO NOT COMPACT FILTRATION BASIN. 6" DRAINTILE STRM 601OUTLET CONTROL STRUCTURE 15" OUTLET PIPEIE: 978.50 TOP SAND/STONE IE: 980.25 TOP OF PIPE: 985.75 TOP STONE : 986.25 WATER QUALITY VOLUME DEPTH IE: 981.80 PIPE IE :980.75 SAND IE: 978.75 CONNECT 6" DRAINTILE TO OCS ON DOWNSTREAM SIDE OF WEIR WALL, IE: 978.99 1.5' DEPTH IRON-ENHANCED SAND SHALL MEET MNDOT SPECIFICAITON FOR COARSE FILTER AGGREGATE PER 3149.2H 6" PVC SCHEDULE 40 DRAINTILE, SEE DRAINTILE BEDDING DETAIL IE: 978.99 PROVIDE GEOTEXTILE FABRICPER CONTECH REQUIREMENTS STONE TO MEET CONTECH MANUFACTURED RECOMMENDATIONS, NO LIMESTONE (OR RECYCLED CONCRETE) MATERIAL IS ALLOWED, BENEATH, BETWEEN OR IMMEDIATELY ON TOP OF THE CHAMBER SYSTEM TOP OF WEIR WALLELEV: 984.50 PLAN 12" OUTLET FLOW MANHOLE STEPS, 16" O.C. PRECAST CONCRETE MANHOLE BASE PRECAST CONCRETE MANHOLE SECTION48" DIA. WEIR WALL 24" INLET FLOW 24" INLETFLOW6" INLET FLOW WEIR WALL 6" INLETFLOWTOP OF WEIR WALL ELEV: 981.00 #4 REBAR 12" O.C. EW NATIVE SOIL SEE NOTES ON SHEET C501 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C513BAW 09/09/2022 JFJ 19.1001.04 STORMWATER DETAILS NEENAH R-4996 A8 - HEAVY DUTY TRENCH FRAMES WITH GRATED COVER OR APPROVED EQUAL 1" (TYP.) 2.00%2.00% TRENCH DRAIN SECTION #4@12 OR WWF W14 6"x 6" (MIN As=0.2 IN /FT) 2" CLR. 2" CLR. PERMISSIBLE CONSTRUCTION JOINT - TYP. 6" 4" 18" MAX. 1.0" 8"MAX. 316" GAP 6" TRENCH DRAIN @ B612 CURB TRENCH DRAIN GRATESEE SECTION 8" PIPE TRENCH DRAIN @ PIPE OPENING B612 CURB B612 CURB FINISHED GRADE TRENCH DRAIN PROFILE TRENCH DRAIN @ B612 CURB TRENCH DRAIN SLOPED @ 1.0% MANHOLE STEPS,16" O.C.4' SUMP#4 REBAR 12" O.C. EW 18" INLET 15" ORIFICEIE: 981.80 CSSIG N A G E GENERATORLIFTSTATION958.76INVCMP84LIFTSTATIONAPPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NOPARKING NOPARKINGSENIOR HOUSING BUILDING LEVEL 1: 995.06LEVEL B: VARIES D D D10. 0 'DD D 1 0 . 0 ' 1 4 . 0 '30.00'CO120 LF - PRIVATE 8" PVC @ 4.43% SSWR 104CONSTRUCT MANHOLE OVER EX. SANITARY SEWER(PUBLICLY OWNED AND MAINTAINED)RE:970.16IE:955.00 NEIE:954.83 NWIE:954.83 SE SSWR 103PRIVATE 48" SSWR MHRE:973.03IE:960.42 N IE:960.32 SW 92 LF - 8" PVC@ 4.43% SSWR 102PRIVATE 48" SSWR DROP MH RE:983.00IE:971.44 EIE:964.51 S 73 LF - 8" PVC@ 2.00% SSWR 101PRIVATE CLEANOUTRE:986.98IE:972.90 E IE:972.90 W SSWR 100SANITARY SERVICE RE:987.36IE:973.00 W 30.00'12.00'D12 . 0 0 '38.72'12.00'SSWR MHIE: 959.37(NW) IE: 955.12(SE) 18" RCP FESIE: 965.60 18" RCP FESIE: 966.85 84" CMP FESIE:958.76 12" DIP WATERMAIN SSWR DROP MHRIM: 968.32IE (16" SE): 959.05 IE (8" NW): 954.17IE (16" NE): 952.88 EXIST. SSWR LIFT STATION 16" DIP SANITARY 8" FORCEMAIN 84" CMP STRM SEWER 12" DIP WATERMAIN 12" DIP WATERMAIN 36" RCP CLIII 36" RCP FESINV. 974.0 EXISTING WETLAND SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLANDMANAGE 2 SETBACK BMP #1 PROPOSEDSTORMWATERMANAGEMENT BASIN BMP #2 PROPOSED UNDERGROUNDSTORMWATERMANAGEMENT AREA 36" RCP CLIII 8" SANITARY 18" RCP FESINV. 982.58 18" RCP FESINV. 976.13 18" RCP FESINV. 974.19 18" RCP FESINV. 972.58 18" RCP FES INV. 972.92 30" RCP STORM C 6" DOMESTIC WATER SERVICE (PRIVATE) 6" FIRE SERVICE (PRIVATE) CONNECT TO EXISTING 12" WATERMAINWITH 12"x8" TAPPING SLEEVE AND 8" VALVE.WORK TO BE COMPLETED BYAND COORDINATED BY CONTRACTOR. CONTRACTOR TO VERIFY LOCATION,MATERIAL, CONDITION, AND INVERT PROPOSED 8"WATER MAIN PROPOSED 8" WATER MAIN PROPOSED 8"WATER MAIN A A A A A A A A A A A A A A A A A A A A A A A PROPOSED 30' UTILITY EASEMENT PROPOSED 30'UTILITY EASEMENT PROPOSED 30' UTILITYEASEMENT EDGE OFEXISTINGWETLAND SSWD 50'WETLAND BUFFER CENTE RLI N E OF EXISTI N G C R E E K APPR O XI M A T E 25' SHOR E L A N D I M P A C T Z O N E APPRO XI M A T E S H O R E L A N D BUILDI N G S E T B A C K PROPOSED FIREHYDRANT WITH 6" GATEVALVE AND8"X6" REDUCER C C F C C C CC E C D COORDINATE ALLUTILITY CONNECTIONS WITH MEP PLANS PROPOSED 10' UTILITY EASEMENT ORDIN A R Y HI G H W A T E R LEVEL A S D ELI N E A T E D 11/ 2 0 19 PROPOSED TRANSFORMERPAD; COORD W/MEP 15" PVCSANITARYA 12" DIP WATERMAIN A 15" RCP STORM A 15" RCP STORM A AA EX. SSWR MHASJUST RIM: 973.52 IE (15" SE): ±962.77IE (15" NE): ±962.77 STORM MHRIM: 981.80IE (18" SE): ±977.40 A STORM MHRIM: 978.72IE (18" SE): ±974.24 A B C J K L K PROPOSED 30'UTILITY EASEMENT CONNECT TO EXISTING 8" DIP STUBWITH TAPPING SLEEVE AND 8" VALVE; WORK TO BE COMPLETED BYAND COORDINATED BY CONTRACTOR.CONTRACTOR TO VERIFY LOCATION, MATERIAL, CONDITION, AND INVERT M O P N Q Q Q Q Q B C G Q C E PROPOSED FIREHYDRANT WITH 6"GATEVALVE AND 8"X6" REDUCER S S PROPOSED 5' DRAINAGE& UTILITY EASEMENT T T T T T T T T T T 8" PVCSANITARY 12" DIPWATERMAIN 8" PVCSANITARY 8" PVCSANITARY A 30.00'G T H www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY PLAN.dwg September 11, 2022 - 2:43pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES UTILITY PLAN NOTES 1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSEDUTILITIES. 2. SANITARY SEWER PIPE SHALL BE AS FOLLOWS:8" PVC SDR35 PER ASTM D-3034, FOR PIPES LESS THAN 12' DEEP 8" PVC SDR26 PER ASTM D-3034, FOR PIPES MORE THAN 12' DEEP6" PVC SCHEDULE 40 PER ASTM D-1785DUCTILE IRON PIPE PER AWWA C150 3. WATER LINES SHALL BE PER CITY OF LAKE ELMO ENGINEERING DESIGN CITY STANDARDS::4" AND LARGER DUCTILE IRON PIPE CLASS 52 PER AWWA C150 SMALLER THAN 3" PIPING SHALL BE COPPER TUBE TYPE "K" PERANSI 816.22 OR PVC, 200 P.S.I., PER ASTM D1784 AND D2241. 4. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 5. ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH RESTRAINTS SUCH AS THRUST BLOCKING, WITH STAINLESS STEEL OR COBALT BLUE BOLTS, OR AS INDICATED IN THE CITY SPECIFICATIONS ANDPROJECT DOCUMENTS. 6. ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICALCLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE OR STRUCTURE). 7. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7'-5" COVER ON ALL WATERLINES. 8.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES, OR ANY OBSTRUCTION (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE SCH. 40OR C900 WITH MECHANICAL JOINTS AT LEAST 10 FEET ON EITHER SIDE OF THE CENTER LINE OF THECROSSING. THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE FASTENERS ASREQUIRED TO PROVIDE A MINIMUM OF 18" VERTICAL SEPARATION. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50). 9. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. 10. TOPS OF MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT ABOVE FINISHED GROUND ELEVATIONS, IN GREEN AREAS, WITH WATERTIGHT LIDS. 11. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. 12. EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. 13. REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE-IN OF ALL UTILITIES. 14. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE CITY OF LAKE ELMOAND/OR STATE OF MN WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWERLINES. 15. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES,AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIEDON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITYCOMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTINGUTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 16. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONSREQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. 17. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTSAND SPECIFICATIONS. 18. CONTRACTOR SHALL REFERENCE ARCH / MEP PLANS FOR SITE LIGHTING AND ELECTRICAL PLAN. 19. BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES) AND METERS ARE LOCATED IN THE INTERIOR OF THE BUILDING. REF. ARCH / MEP PLANS. 20. ALL ONSITE SANITARY SEWERS SHALL BE PRIVATELY OWNED AND MAINTAINED. ALL WATERMAINS AND HYDRANTS PLACED WITHIN THE DEVELOPMENT WILL REMAIN CITY OWNED AND OPERATED. 21. ALL WATERMAIN STUBOUTS SHALL BE MECHANICALLY RESTRAINED WITH REACTION BLOCKING. 22. ALL FIRE HYDRANTS TO BE OWNED AND MAINTAINED BY THE CITY.NORTHKEYNOTE LEGEND PROTECT IN PLACE EXISTING UTILITY 8"X8" TEE AND 8" GATEVALVE 8" WATERMAIN BEND FIRE HYDRANT ASSEMBLY, PROVIDE 8"X6" TEE, 6" WATERMAIN AND 6" GATEVALVE FIRE HYDRANT ASSEMBLY, PROVIDE 6" BEND, AND 6" WATERMAIN 8"X6" TEE AND 6" GATE VALVE 6" WATERMAIN BEND 8"X8" TEE NOT USED PROPOSED GAS METER. REFERENCE MEP PLANS FOR LOCATION AT BUILDING PROPOSED GAS SERVICE. REFERENCE MEP PLANS FOR ENTRY AT BUILDING CONNECT GAS TO EXISTING GAS MAIN; COORD W/ UTILITY PROVIDER PROPOSED ELECTRIC SERVICE. REFERENCE MEP PLANS FOR CONNECTION ATTRANSFORMER CONNECT ELECTRIC TO EXISTING POWER; COORD W/ UTILITY PROVIDER PROPOSED COMMUNICATIONS SERVICE. REFERENCE MEP PLANS FOR ENTRY ATBUILDING CONNECT COMMUNICATIONS TO EXISTING FIBER; COORD W/ UTILITY PROVIDER ALL SMALL/DRY UTILITIES FOR SERVING FACILITY ARE NOT PERMITTED WITHIN 10FEET OF THE CITY WATERMAIN AND MAY ONLY CROSS PERPENDICULAR TO CITY WATERMAIN FIRE DEPARTMENT CONNECTION - SEE MEP PLANS CONDUIT FOR ELECTRIC VEHICLE CHARGING - SEE MEP PLANS SEWER/WATERMAIN CROSSING, PROVIDE MINIMUM 18" VERTICAL SEPARATION,WHEN SEWER CROSSES ABOVE WATER, THE PIPE SHALL BE PVC SCHEDULE 40PER ASTM D-1785, ONE FULL LENGTH OF WATER PIPE SHALL BE CENTERED AT THE CROSSING AS POSSIBLE. 2" INSULATION REQUIRED AT STORM/WATERCROSSINGS. NOT USED A B C D E F G H I J K L M N O P Q R S T U SANITARY SEWER MANHOLE STORM SEWER SANITARY SEWER WATERMAIN GATE VALVE HYDRANT TEE REDUCER UNDERGROUND ELECTRIC TELEPHONE GAS MAIN STORM SEWER LEGEND CO SANITARY CLEANOUTCO EXISTING PROPOSED LIGHTED BOLLARD; REFER TO MEP PLANS LIGHT POLE; REFER TO MEP PLANS FLOOD LIGHT; REFER TO MEP PLANS DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C600BAW 09/09/2022 JFJ 19.1001.04 UTILITY PLAN WATERMAIN NOTES: 1. ALL WATERMAIN SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MOST CURRENTEDITION OF THE CEAM SPECIFICATIONS.2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES. 3. CONTRACTOR SHALL COORDINATE ALL UTILITY IMPACTS WITH APPROPRIATE UTILITIES.4. MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL.5. THE CONTRACTOR SHALL PROVIDE 48 HOURS ADVANCE NOTICE AND COORDINATE ANYPROPOSED WATER SERVICE INTERRUPTIONS WITH THE DEPARTMENT OF PUBLIC WORKS. UNDER NO CIRCUMSTANCES SHALL WATER SERVICE TO ANY BUSINESS BE SHUT OFFDURING NORMAL BUSINESS HOURS 7:00AM TO 6:00PM.6. WATERMAIN PIPE SHALL BE ENCASED IN POLYETHYLENE. 7. ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.S.A1. ALL FITTINGS SHALL BEDUCTILE IRON PIPE WITH POLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BEINSTALLED UTILIZING COR-BLUE NUTS & BOLTS.8. GATE VALVES SHALL BE RESILIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 ORAPPROVED EQUAL. GATE VALVES MUST COMPLY WITH CEAM 2PEC 2611.S.C.2.9. BUTTERFLY VALVES SHALL BE MUELLER LINESEAL III, OR APPROVED EQUAL. BUTTERFLYVALVES SHALL COMPLY WITH CEAM SPEC. 2611.2.C3. 10. BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAINLESS STEEL.11. HYDRANTS SHALL BE WATEROUS "PACER", MODEL WB-67 OR APPROVED EQUAL, FITTEDWITH FH 800 SERIES FLEX STAKE AND PAINTED RED. 12. HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2-1/2 (I.E.) HOSE CONNECTIONS ANDONE 4" STORZ NOZZLE (MODEL WB-67) AND PENTAGON NUT END CAP.13. ALL LANDSCAPING DAMAGED OR REMOVED AS A RESULT OF WATERMAIN CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO EXISTING OR BETTER CONDITION. (INCIDENTAL) 14. CONTRACTOR TO MAINTAIN 7.5' COVER OVERALL WATERMAIN, INCLUDING HYDRANTLEAD. CONTRACTOR TO NOTIFY ENGINEER IF HYDRANT LEAD COVER IS INSUFFICIENT. *CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL UTILITIES WITHIN CONSTRUCTIONLIMITS FOR HUDSON BOULEVARD AND EAGLE POINT BOULDEVARD PRIOR TOCONSTRUCTION* *ALL SMALL/DRY UTILITIES FOR SERVING FACILITY (I.E. GAS/ ELECTRIC/ FIBER/ TELEPHONE/ CABLE/ ETC) WILL NOT BE PERMITTED WITHIN 10 FEET OF THE CITY WATERMAIN AND MAY ONLY CROSSPERPENDICULAR TO CITY WATERMAIN* www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:44pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C700BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:44pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NOTE: PAVEMENT SECTIONS ARE PROVIDED FOR REFERENCE ONLY. REFER TO GEOTECHNICAL REPORT FOR ALL PAVEMENT, SUBGRADE PREPARATION, AND COMPACTION REQUIREMENTS DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C701BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:44pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C702BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION"NO PARKING FIRE LANE" SIGNAGE PER MUTCD R8-31 1'-0" MIN. 1'-6" MIN. 3'-6" 2'-0" MIN. 7'-0" MIN. 12"18"12"18"12"18" www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:44pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C703BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:44pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C704BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:45pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C705BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILSNOT FOR CONSTRUCTION www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C6-UTILITY DETAILS.dwg September 11, 2022 - 2:45pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE 01/10/2022 46610 C706BAW 09/09/2022 JFJ 19.1001.04 CIVIL DETAILS 7° RETAINING WALL CAP PERMANUFACTURER'S RECOMMENDATIONS 1.0' 1.5% PROPOSED LANDSCAPE, SEE LANDSCAPE PLAN SEE LANDSCAPE PLAN SLOPE PER PLAN HEIGHT VARIES48" MAX4'-0"FENCE/RAILING TO MEET CODEREQUIREMENTS FOR ALL WALLSTALLER THAN 30". CONFIRM TYPEAND COLOR WITH OWNER BELGARD ANCHOR DIAMOND PRO OR APPROVED EQUAL, LUEDERS GRAY SLOPES VARY (MAX. 4:1), SEE GRADING PLAN *DETAIL PROVIDED FOR REFERENCE ONLY, FINAL WALL TO BE DESIGNED AND CONSTRUCTED PER MANUFACTURERS DETAILS GRANULAR LEVELING PAD,MINIMUM 6" THICK PERMANUFACTUERS DETAIL NATIVE SOIL 12" THICK MIN. DRAINAGEAGGREGATE PERMANUCTURERS DETAIL NOT FOR CONSTRUCTION*DETAIL PROVIDED FOR REFERENCE ONLY, FINAL WALL TO BE DESIGNED AND CONSTRUCTED PER MANUFACTURERS DETAILS CONTRACTOR TO PROVIDE SHOP DRAWINGS FROM WALL CONTRACTOR. *DETAIL PROVIDED FOR REFERENCE ONLY, FINAL WALL TO BE DESIGNED AND CONSTRUCTED PER MANUFACTURERS DETAILS CONTRACTOR TO PROVIDE SHOP DRAWINGS FROM WALL CONTRACTOR. *DETAIL PROVIDED FOR REFERENCE ONLY, FINAL WALL TO BE DESIGNED AND CONSTRUCTED PER MANUFACTURERS DETAILS CONTRACTOR TO PROVIDE SHOP DRAWINGS FROM WALL CONTRACTOR. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\T1-TC DETAILS.dwg September 11, 2022 - 2:45pmBYREVISIONSNo.DATE1MNDOT DRAINAGE01/19/22 MJS2RFI 01 RESPONSE03/31/22 MJS3RFI 02 RESPONSE04/28/22 MJS4CIVIL ADDENDUM04/29/22 MJS5CROSSROADS DOCK REVISIONS 07/01/22 MJS6LAUNCH DOCK REVISIONS07/28/22 MJS7RFI 06 08/11/22 MJSPREPARED FORTRAFFICCONTROLDETAILSC800AMIRA LAKE ELMOLAKE ELMOMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.JOEL A. HINNENKAMP, P.E.7/16/2153081DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT19.1001.0404/01/2022AS SHOWNALPALPJAHLAUNCH PROPERTIES/CROSSROADS PROPERTIES This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\T1-TC DETAILS.dwg September 11, 2022 - 2:45pmBYREVISIONSNo.DATE1MNDOT DRAINAGE01/19/22 MJS2RFI 01 RESPONSE03/31/22 MJS3RFI 02 RESPONSE04/28/22 MJS4CIVIL ADDENDUM04/29/22 MJS5CROSSROADS DOCK REVISIONS 07/01/22 MJS6LAUNCH DOCK REVISIONS07/28/22 MJS7RFI 06 08/11/22 MJSPREPARED FORTRAFFICCONTROLDETAILSC801AMIRA LAKE ELMOLAKE ELMOMNLAUNCH PROPERTIES/CROSSROADS PROPERTIESDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.JOEL A. HINNENKAMP, P.E.7/16/2153081DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT19.1001.0404/01/2022AS SHOWNALPALPJAH This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\T1-TC DETAILS.dwg September 11, 2022 - 2:45pmBYREVISIONSNo.DATE1MNDOT DRAINAGE01/19/22 MJS2RFI 01 RESPONSE03/31/22 MJS3RFI 02 RESPONSE04/28/22 MJS4CIVIL ADDENDUM04/29/22 MJS5CROSSROADS DOCK REVISIONS 07/01/22 MJS6LAUNCH DOCK REVISIONS07/28/22 MJS7RFI 06 08/11/22 MJSPREPARED FORTRAFFICCONTROLDETAILSC802AMIRA LAKE ELMOLAKE ELMOMNLAUNCH PROPERTIES/CROSSROADS PROPERTIESDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.JOEL A. HINNENKAMP, P.E.7/16/2153081DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT19.1001.0404/01/2022AS SHOWNALPALPJAH NORTH www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\C7-HUDSON BLVD SIGN-STRIP PLANS.dwg September 11, 2022 - 2:46pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA. MNLIC. NO. JARED F. JONES, PE XX/XX/2022 46610 C803BAW 09/09/2022 JFJ 19.1001.04 TRAFFIC CONTROL PLAN NORTH This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2020 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\T1-DETOUR PLAN.dwg September 11, 2022 - 2:47pmBYREVISIONSNo.DATE1MNDOT DRAINAGE01/19/22 MJS2RFI 01 RESPONSE03/31/22 MJS3RFI 02 RESPONSE04/28/22 MJS4CIVIL ADDENDUM04/29/22 MJS5CROSSROADS DOCK REVISIONS 07/01/22 MJS6LAUNCH DOCK REVISIONS07/28/22 MJS7RFI 06 08/11/22 MJSPREPARED FORDETOUR PLANC711AMIRA LAKE ELMOLAKE ELMOMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.JOEL A. HINNENKAMP, P.E.7/16/2153081DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT19.1001.0404/01/2022AS SHOWNALPALPJAHLAUNCH PROPERTIES/CROSSROADS PROPERTIES 0,0 NO PARKING NOPARKINGSENIOR HOUSING BUILDINGLEVEL 1: 995.06 LEVEL B: VARIES SURVEY LINEPOINT NOT TANGENT SIG N A G E GENERATORINV.=977.74100 1 0 0 8080 60 (PRIVATE STREET)LIFTSTATIONPOINT NOT TANGENT958.76INVCMP84100 1 0 0 LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007Owner: HSRE-MN HIGH POINTE LLCAddress: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . A C B A B AC B B A C C C C C C A B C C A B A B A PROPOSED COMMUNITY GARDEN AREA - SEE DETAIL ONSHEET L103 PROPOSED GAZEBO PROPOSED PLANTER BOXES (3 WILSHIRE COLLECTION BY TOURNESOL SITEWORKS -MODEL # WR-603630 - OWNER TO CONFIRM PLANTER COLOR. OWNER TO PROVIDE ANNUALS/PLANTS) MONUMENT SIGN (BY OTHERS) PROPOSED 30' UTILITY EASEMENT PROPOSED 10'UTILITY EASEMSENT PROPOSED ROW DEDICATION PROPOSED 30' UTILITY EASEMENT PROPOSED FIRE PIT (COORDINATE WITH MEP PLANS, OWNER TO CONFIRM FIRE PIT TYPE) ENLARGEMENTSEE SHEET L101 ENLARGEMENT SEE SHEET L102 DECK AND STAIRS -SEE ARCH PLANS FLAG POLE AND LIGHT - SEE ARCH AND ELECTRICAL PLANS A B C D LANDSCAPE KEYNOTES EDGER (TYP.) DOUBLE SHREDDED HARDWOOD MULCH (TYP.) SOD (TYP.) ROCK MULCH (TYP.) HEMEROCALLIS X `SUNDAY GLOVES` UNDERSTORY TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE DPB 3 BETULA PLATYPHYLLA `FARGO`DAKOTA PINNACLE BIRCH B & B 1.5" CAL RDB 7 MALUS `PRAIRIE FIRE`PRAIRIE FIRE CRABAPPLE B & B 2.5" CAL. RVB 6 BETULA NIGRA RIVER BIRCH B & B, CLUMP 8` HT. SSC 6 MALUS `SPRING SNOW`SPRING SNOW CRABAPPLE B & B 2.5" CAL. CONIFEROUS TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE BHS 18 PICEA GLAUCA `DENSATA`BLACK HILLS SPRUCE B & B 8` HT. CHL 10 TSUGA CANADENSIS CANADIAN HEMLOCK B & B 8` HT. WHP 19 PINUS STROBUS WHITE PINE B & B 8` HT. PLANT SCHEDULE OVERSTORY TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE ABM 14 ACER X FREEMANII `AUTUMN BLAZE`AUTUMN BLAZE MAPLE B & B 2.5" CAL. FFM 16 ACER SACCHARUM `FALL FIESTA`FALL FIESTA MAPLE B & B 2.5" CAL. NPO 9 QUERCUS ELLIPSOIDALIS NORTHERN PIN B & B 2.5" CAL. QAP 26 POPULUS TREMULOIDES QUAKING ASPEN B & B 2.5" CAL. RML 14 TILIA AMERICANA `REDMOND`REDMOND LINDEN B & B 2.5" CAL. SWO 25 QUERCUS BICOLOR SWAMP WHITE OAK B & B 2.5" CAL. LANDSCAPE LEGEND EXISTING TREE (TYP.) EDGER (TYP.) STORMWATER SEED MIX 33-261 WITH EROSION CONTROL BLANKETS SECURED IN PLACE FENCING - OWNER/ARCHITECT TO CONFIRM TYPE AND HEIGHT SITE LIGHTING - SEE ELECTRICAL PLANS APPROXIMATE LIMITS OF SOD / IRRIGATION,SOD ALL DISTURBED AREAS (TYP.) OUTCROPPING BOULDERS, 3-4' DIAM (TYP.) www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-LANDSCAPE PLAN.dwg September 12, 2022 - 10:38am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES 1. CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TOVERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES AND CONTRACTOR TO LOCATE ANYEXISTING PRIVATE UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS OR LANDSCAPE MATERIAL. 2. ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS. 3. NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEENCOMPLETED IN THE IMMEDIATE AREA. 4. ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSION OF ANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR. CITY TO APPROVE SUBSTITUTIONS PRIOR TO PLACEMENT OF PLANT MATERIAL. 5. CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THEGUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTENACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONEYEAR GUARANTEE COMMENCING UPON PLANTING. CONTRACTOR TO PROTECT AND MAINTAINALL PLANTINGS AND PLANT BEDS UNTIL THE END OF THE WARRANTY PERIOD. 6. ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADE SHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS: ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC. ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTHRATIO OF NO LESS THAN 5:3. 7. PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST CURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED. 8. PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES. 9. ALL TREE LOCATIONS TO BE FIELD STAKED PRIOR TO INSTALLATION. CONTRACTOR TOCOORDINATE FIELD REVIEW OF PROPOSED TREE LOCATIONS WITH THE CITY AND LANDSCAPEARCHITECT PRIOR TO ANY TREE INSTALLATION. 10. PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN MATERIALS IF NECESSARY; TEMPORARY ONLY. 11. PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THETOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVEDDOWN TO THE ROOT COLLAR/ROOT FLAIR. WHEN THE BALLED & BURLAP TREE IS PLANTED,THE ROOT COLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE. 12. OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAK APART PEAT POTS. 13. PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECTPOOR BRANCHING OF EXISTING AND PROPOSED TREES. 14. WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST. 15. STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE YEAR. 16. THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONSPRIOR TO PLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FORTHE NEED OF ANY SOIL AMENDMENTS. 17. BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECT TOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGER THAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE. MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTHTOPSOIL FOR TREE, SHRUBS, AND PERENNIALS. 18. MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE ANDSHRUB PLANTING BEDS SHALL HAVE 4" DEPTH OF DOUBLE SHREDDED HARDWOOD MULCH.DOUBLE SHREDDED HARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS. OWNER TO CONFIRM MULCH COLOR. PERENNIAL AND ORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH DOUBLE SHREDDED HARDWOOD MULCH. MULCH TO BE FREE OF DELETERIOUS MATERIAL. ROCK MULCH TYPE TO BE DETERMINED BY OWNER, 1.5" - 2" DIAMETER, AT MINIMUM 3" DEPTH, OR APPROVED EQUAL. ROCK MULCH TO BE ON COMMERCIAL GRADE FILTER FABRIC, BY TYPAR, OR APPROVED EQUAL WITH NO EXPOSURE. MULCH AND FABRIC TO BE APPROVED BY OWNER PRIOR TO INSTALLATION. 19. EDGING TO BE COMMERCIAL GRADE POLY EDGING OR SPADED EDGE, AS INDICATED. UTILIZECURBS AND SIDEWALKS FOR EDGING WHERE POSSIBLE. SPADED EDGE TO PROVIDEV-SHAPED DEPTH AND WIDTH TO CREATE SEPARATION BETWEEN MULCH AND GRASS.INDIVIDUAL TREE, SHRUB, OR RAIN-GARDEN BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. 20. ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. SOD TO BESTANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF LAWN WEEDS. ALLTOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE. SLOPES OF 3:1OR GREATER SHALL BE STAKED. SEED AS SPECIFIED AND PER MN/DOT SPECIFICATIONS. IFNOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN. 21. PROVIDE IRRIGATION TO ALL PLANTED AND SODDED AREAS ON SITE. IRRIGATION SYSTEM TO BE DESIGN/BUILD BY LANDSCAPE CONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE IRRIGATION PLAN AND SHOP DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS, AS-BUILT PLANS, AND NORMAL PROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP DURING FIRST YEAR OF OPERATION. SYSTEM SHALL HAVE TWO-YEARWARRANTY ON ALL PARTS AND LABOR. ALL INFORMATION ABOUT INSTALLATION ANDSCHEDULING CAN BE OBTAINED FROM THE GENERAL CONTRACTOR. 22. CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THEPLANT IS FULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE WATER FOR CONTRACTOR. 23. REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREAS ADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION. 24. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER. 25. APPLY PRE-EMERGENT HERBICIDE PREEN (OR APPROVED EQUAL) IN ANNUAL, PERENNIAL, AND SHRUB BEDS FOLLOWED BY SHREDDED HARDWOOD MULCH. 26. CONTRACTOR TO CONFIRM WATER AND POWER SUPPLY LOCATIONS AND DETAILS WITHGENERAL CONTRACTOR FOR IRRIGATION SYSTEM. 27. CONTRACTOR SHALL MAINTAIN ALL PLANTS AND TURF PER THE MANUFACTURERS'INSTRUCTIONS THROUGHOUT THE GUARANTEE PERIOD. 28. OWNER OR CONTRACTOR TO BROADCAST PRE-EMERGENT HERBICIDE (PREEN OR APPROVED EQUAL) TWO TIMES PER YEAR ACROSS ALL PLANTING BEDS AND SHALL INSTALL NEW MULCH AS NEEDED FOR PERPETUITY. 29. SEE ELECTRICAL PLANS FOR SITE LIGHTING. 30. COORDINATE WAYFINDING SIGNAGE WITH ARCHITECT AND OWNER. 31. OWNER TO CONFIRM ROCK/MULCH TYPE FOR ALL PLANTERS AND PLANTING BEDS. 34. OWNER/ARCHITECT TO CONFIRM SITE FURNISHINGS, SUCH AS BIKE RACKS, BENCHES, ANDTRASH/RECYCLING RECEPTACLES.35. OWNER TO CONFIRM DETAILS FOR PICKLE BALL COURT, COMMUNITY GARDEN, FIRE PIT, ANDPLANTER BOXES WITH LANDSCAPE ARCHITECT AND GENERAL CONTRACTOR BEFOREORDERING ANY MATERIALS.36. SEE MEP PLANS FOR CONDENSERS, TRANSFORMERS, GENERATOR AND ALLMECHANICAL/ELECTRICAL ITEMS. 37. PLANTER BOXES SHALL INCLUDE SOIL MIX WITH INSTALLATION. OWNER TO PROVIDE ANNUALS/PLANTS FOR PLANTER BOXES. LANDSCAPE NOTES LANDSCAPE SUMMARY LANDSCAPE ORDINANCE REQUIREMENTS 1,640 LIN. FT./50 = 33 TREES 11.7 ACRES X 5 = 59 TREES 92 TREES TREE MITIGATION REQUIREMENTS 8 COMMON TREES + 52 HARDWOOD TREES 60 TREES INTERIOR PARKING LOT REQUIREMENTS 79 PARKING SPACES/10 8 TREES PERIMETER PARKING LOT REQUIREMENTS 450 LF/50 9 TREES TOTAL TREES REQUIRED 92 + 60 + 8 + 9 TREES 169 TREES PROPOSED TREES OVERSTORY TREES + UNDERSTORY TREES + CONIFEROUS TREES 173 TREES NORTHMITIGATION TREE SUMMARY REQUIRED PROPOSED COMMON TREES 8 67 CONIFERS 0 47 HARDWOOD TREES 52 59 DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L100PWB 09/09/2022 MCG 19.1001.04 LANDSCAPE PLAN 1 11 1 LANDSCAPE LEGEND EXISTING TREE (TYP.) EDGER (TYP.) STORMWATER SEED MIX 33-261 WITH EROSION CONTROL BLANKETS SECURED IN PLACE FENCING - OWNER/ARCHITECT TO CONFIRMTYPE AND HEIGHT SITE LIGHTING - SEE ELECTRICAL PLANS APPROXIMATE LIMITS OF SOD / IRRIGATION, SOD ALL DISTURBED AREAS (TYP.) OUTCROPPING BOULDERS, 3-4' DIAM (TYP.) 0,0 977.57FNDIP15480973.00SETIP41578 970.57FNDIP.5969.94SETIP41578969.20FNDIP8612GENERATORLIFTSTATIONLIFTSTATIONPAVEMENT STRIPES (TYP.)DD DD PROPOSED COMMUNITY GARDEN AREA - SEE DETAILON SHEET L103 PROPOSED GAZEBO PROPOSED PLANTER BOXES (3 WILSHIRE COLLECTION BY TOURNESOL SITEWORKS - MODEL # WR-603630 - OWNER TO CONFIRM PLANTER COLOR. OWNER TO PROVIDE ANNUALS/PLANTS) PROPOSED 10' UTILITY EASEMSENT PROPOSED FIRE PIT (COORDINATE WITH MEP PLANS, OWNER TO CONFIRM FIRE PIT TYPE) SWO QUERCUS BICOLOR SWAMP WHITE OAK CONIFEROUS SHRUBS BOTANICAL NAME COMMON NAMEBCJJUNIPERUS HORIZONTALIS `BLUE CHIP`BLUE CHIP JUNIPER BUJ JUNIPERUS SABINA `BUFFALO`BUFFALO JUNIPER GGJ JUNIPERUS VIRGINIANA `GREGUARD` TM GREY GUARDIAN JUNIPER TGA THUJA OCCIDENTALIS `BAILJOHN` TM TECHNITO GLOBE ARBORVITAE TTY TAXUS X MEDIA `TAUNTONII`TAUTON YEW DECIDUOUS SHRUBS BOTANICAL NAME COMMON NAME ANH HYDRANGEA ARBORESCENS `ANNABELLE`ANNABELLE HYDRANGEA BLC ARONIA MELANOCARPA `IROQUOIS BEAUTY` TM IROQUOIS BEAUTY BLACK CHOKEBERRY CAV VIBURNUM TRILOBUM `BAILEY COMPACT`COMPACT AMERICAN VIBURNUM DAW SALIX PURPUREA `NANA`DWARF ARCTIC WILLOW DKL SYRINGA MEYERI `PALIBIN`DWARF KOREAN LILAC GGD CORNUS HESSEI `GARDEN GLOW`GARDEN GLOW DOGWOOD GLS RHUS AROMATICA `GRO-LOW`GRO-LOW FRAGRANT SUMAC LDN PHYSOCARPUS OPULIFOLIUS `DONNA MAY` TM LITTLE DEVIL NINEBARK RTD CORNUS SERICEA `BAILADELINE` TM FIREDANCE RED TWIG DOGWOOD PERENNIALS BOTANICAL NAME COMMON NAMEAJSSEDUM X `AUTUMN JOY`AUTUMN JOY SEDUM BES RUDBECKIA FULGIDA `GOLDSTURM`BLACK-EYED SUSAN KFG CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` KARL FOERSTER FEATHER REED GRASS KOL LIATRIS SPICATA `KOBOLD`KOBOLD ORIGINAL MOO ALLIUM X `MILLENIUM`MILLENIUM ORNAMENTAL ONION NMF ADIANTUM PEDATUM NORTHERN MAIDENHAIR FERN PDS SPOROBOLUS HETEROLEPIS PRAIRIE DROPSEED RAS ASTILBE JAPONICA `RHINELAND`RHINELAND ASTIBLE SGD HEMEROCALLIS X `SUNDAY GLOVES`SUNDAY GLOVES DAYLILY PLANT KEY www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-LANDSCAPE PLAN.dwg September 12, 2022 - 10:39am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES SOUTH END LANDSCAPE ENLARGEMENT SCALE: 1"=20'L1011 NORTHDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L101PWB 09/09/2022 MCG 19.1001.04 LANDSCAPE ENLARGEMENT NO PARKING NOPARKING992.45FNDIP16456982.87SETIP41578986.52SETIP41578983.28FNDIP16456INV.=977.7480 60 (PRIVATE STREET)D DPROPOSED PLANTER BOXES (3 WILSHIRE COLLECTION BY TOURNESOL SITEWORKS - MODEL # WR-603630 - OWNER TO CONFIRM PLANTER COLOR. OWNER TO PROVIDE ANNUALS/PLANTS) MONUMENT SIGN (BY OTHERS) PROPOSED ROW DEDICATION DECK AND STAIRS - SEE ARCH PLANS FLAG POLE AND LIGHT - SEE ARCH ANDELECTRICAL PLANS LANDSCAPE LEGEND EXISTING TREE (TYP.) EDGER (TYP.) STORMWATER SEED MIX 33-261 WITH EROSION CONTROL BLANKETS SECURED IN PLACE FENCING - OWNER/ARCHITECT TO CONFIRM TYPE AND HEIGHT SITE LIGHTING - SEE ELECTRICAL PLANS APPROXIMATE LIMITS OF SOD / IRRIGATION,SOD ALL DISTURBED AREAS (TYP.) OUTCROPPING BOULDERS, 3-4' DIAM (TYP.) PLANT KEY SWO QUERCUS BICOLOR SWAMP WHITE OAK CONIFEROUS SHRUBS BOTANICAL NAME COMMON NAME BCJ JUNIPERUS HORIZONTALIS `BLUE CHIP`BLUE CHIP JUNIPER BUJ JUNIPERUS SABINA `BUFFALO`BUFFALO JUNIPER GGJ JUNIPERUS VIRGINIANA `GREGUARD` TM GREY GUARDIAN JUNIPER TGA THUJA OCCIDENTALIS `BAILJOHN` TM TECHNITO GLOBE ARBORVITAE TTY TAXUS X MEDIA `TAUNTONII`TAUTON YEW DECIDUOUS SHRUBS BOTANICAL NAME COMMON NAME ANH HYDRANGEA ARBORESCENS `ANNABELLE`ANNABELLE HYDRANGEA BLC ARONIA MELANOCARPA `IROQUOIS BEAUTY` TM IROQUOIS BEAUTY BLACK CHOKEBERRY CAV VIBURNUM TRILOBUM `BAILEY COMPACT`COMPACT AMERICAN VIBURNUM DAW SALIX PURPUREA `NANA`DWARF ARCTIC WILLOW DKL SYRINGA MEYERI `PALIBIN`DWARF KOREAN LILAC GGD CORNUS HESSEI `GARDEN GLOW`GARDEN GLOW DOGWOOD GLS RHUS AROMATICA `GRO-LOW`GRO-LOW FRAGRANT SUMAC LDN PHYSOCARPUS OPULIFOLIUS `DONNA MAY` TM LITTLE DEVIL NINEBARK RTD CORNUS SERICEA `BAILADELINE` TM FIREDANCE RED TWIG DOGWOOD PERENNIALS BOTANICAL NAME COMMON NAME AJS SEDUM X `AUTUMN JOY`AUTUMN JOY SEDUM BES RUDBECKIA FULGIDA `GOLDSTURM`BLACK-EYED SUSAN KFG CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`KARL FOERSTER FEATHER REED GRASS KOL LIATRIS SPICATA `KOBOLD`KOBOLD ORIGINAL MOO ALLIUM X `MILLENIUM`MILLENIUM ORNAMENTAL ONION NMF ADIANTUM PEDATUM NORTHERN MAIDENHAIR FERN PDS SPOROBOLUS HETEROLEPIS PRAIRIE DROPSEED RAS ASTILBE JAPONICA `RHINELAND`RHINELAND ASTIBLE SGD HEMEROCALLIS X `SUNDAY GLOVES`SUNDAY GLOVES DAYLILY www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-LANDSCAPE PLAN.dwg September 12, 2022 - 10:40am2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES NORTH END LANDSCAPE ENLARGEMENT SCALE: 1"=20'L1021 NORTHDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L102PWB 09/09/2022 MCG 19.1001.04 LANDSCAPE ENLARGEMENT 1 UNDERSTORY TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE DPB 3 BETULA PLATYPHYLLA `FARGO`DAKOTA PINNACLE BIRCH B & B 1.5" CAL RDB 7 MALUS `PRAIRIE FIRE`PRAIRIE FIRE CRABAPPLE B & B 2.5" CAL. RVB 6 BETULA NIGRA RIVER BIRCH B & B, CLUMP 8` HT. SSC 6 MALUS `SPRING SNOW`SPRING SNOW CRABAPPLE B & B 2.5" CAL. CONIFEROUS TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE BHS 18 PICEA GLAUCA `DENSATA`BLACK HILLS SPRUCE B & B 8` HT. CHL 10 TSUGA CANADENSIS CANADIAN HEMLOCK B & B 8` HT. WHP 19 PINUS STROBUS WHITE PINE B & B 8` HT. OVERSTORY TREE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE ABM 14 ACER X FREEMANII `AUTUMN BLAZE`AUTUMN BLAZE MAPLE B & B 2.5" CAL. FFM 16 ACER SACCHARUM `FALL FIESTA`FALL FIESTA MAPLE B & B 2.5" CAL. NPO 9 QUERCUS ELLIPSOIDALIS NORTHERN PIN B & B 2.5" CAL. QAP 26 POPULUS TREMULOIDES QUAKING ASPEN B & B 2.5" CAL. RML 14 TILIA AMERICANA `REDMOND`REDMOND LINDEN B & B 2.5" CAL. SWO 25 QUERCUS BICOLOR SWAMP WHITE OAK B & B 2.5" CAL. CONIFEROUS SHRUBS QTY BOTANICAL NAME COMMON NAME CONT SPACING BCJ 3 JUNIPERUS HORIZONTALIS `BLUE CHIP`BLUE CHIP JUNIPER #5 CONT.5` O.C. BUJ 64 JUNIPERUS SABINA `BUFFALO`BUFFALO JUNIPER #5 CONT. GGJ 25 JUNIPERUS VIRGINIANA `GREGUARD` TM GREY GUARDIAN JUNIPER #5 CONT. TGA 51 THUJA OCCIDENTALIS `BAILJOHN` TM TECHNITO GLOBE ARBORVITAE #5 CONT. TTY 104 TAXUS X MEDIA `TAUNTONII`TAUTON YEW #5 CONT.4` OC DECIDUOUS SHRUBS QTY BOTANICAL NAME COMMON NAME CONT SPACING ANH 25 HYDRANGEA ARBORESCENS `ANNABELLE`ANNABELLE HYDRANGEA #5 CONT.4` O.C. BLC 40 ARONIA MELANOCARPA `IROQUOIS BEAUTY` TM IROQUOIS BEAUTY BLACK CHOKEBERRY #5 CONT.4` O.C. CAV 19 VIBURNUM TRILOBUM `BAILEY COMPACT`COMPACT AMERICAN VIBURNUM #5 CONT.6" O.C. DAW 31 SALIX PURPUREA `NANA`DWARF ARCTIC WILLOW #5 CONT.4` O.C. DKL 16 SYRINGA MEYERI `PALIBIN`DWARF KOREAN LILAC #5 CONT.5` O.C. GGD 8 CORNUS HESSEI `GARDEN GLOW`GARDEN GLOW DOGWOOD #5 CONT.3` O.C. GLS 65 RHUS AROMATICA `GRO-LOW`GRO-LOW FRAGRANT SUMAC #5 CONT.4` O.C. LDN 33 PHYSOCARPUS OPULIFOLIUS `DONNA MAY` TM LITTLE DEVIL NINEBARK #1 CONT. RTD 120 CORNUS SERICEA `BAILADELINE` TM FIREDANCE RED TWIG DOGWOOD #5 CONT.4` O.C. PERENNIALS QTY BOTANICAL NAME COMMON NAME CONT SIZE SPACING AJS 135 SEDUM X `AUTUMN JOY`AUTUMN JOY SEDUM #1 CONT 18" o.c. BES 136 RUDBECKIA FULGIDA `GOLDSTURM`BLACK-EYED SUSAN #1 CONT 18" o.c. KFG 247 CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`KARL FOERSTER FEATHER REED GRASS #1 CONT 30" o.c. KOL 99 LIATRIS SPICATA `KOBOLD`KOBOLD ORIGINAL #1 CONT.18" o.c. MOO 176 ALLIUM X `MILLENIUM`MILLENIUM ORNAMENTAL ONION #1 CONT 18" o.c. NMF 93 ADIANTUM PEDATUM NORTHERN MAIDENHAIR FERN #1 CONT 18" o.c. PDS 177 SPOROBOLUS HETEROLEPIS PRAIRIE DROPSEED #1 CONT 24" o.c. RAS 406 ASTILBE JAPONICA `RHINELAND`RHINELAND ASTIBLE #1 CONT 18" o.c. SGD 306 HEMEROCALLIS X `SUNDAY GLOVES`SUNDAY GLOVES DAYLILY #1 CONT 20" o.c. PLANT SCHEDULE www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-LANDSCAPE DETAILS.dwg September 11, 2022 - 2:51pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DOUBLE SHREDDED HARDWOOD MULCH NOTES: 2X ROOT BALL WIDTH SOD 4" TOPSOIL PREPARED PLANTING BED AND BACKFILL SOIL (THOROUGHLY LOOSENED) NOTES: 1. SCARIFY SIDES AND BOTTOM OF HOLE.2. PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT.3. REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECTAND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM GIRDLING ROOTS. 4. PLUMB AND BACKFILL WITH PLANTING SOIL. 5. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS. 6. BACK FILL VOIDS AND WATER SECOND TIME. 7. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESSSOIL MOISTURE IS EXCESSIVE.8. MIX IN 3-4" OF ORGANIC COMPOST. 1. SCARIFY SIDES AND BOTTOM OF HOLE. 2. PROCEED WITH CORRECTIVE PRUNING. 3. SET PLANT ON UNDISTURBED NATIVE SOIL ORTHOROUGHLY COMPACTED PLANTING SOIL.INSTALL PLANT SO THE ROOT FLARE IS AT OR UPTO 2" ABOVE THE FINISHED GRADE WITH BURLAP AND WIRE BASKET, (IF USED), INTACT. 4. SLIT REMAINING TREATED BURLAP AT 6" INTERVALS. 5. BACKFILL TO WITHIN APPROXIMATELY 12" OF THE TOP OF THE ROOTBALL, THEN WATER PLANT. REMOVE THE TOP 1/3 OF THE BASKET OR THE TOPTWO HORIZONTAL RINGS WHICHEVER ISGREATER. REMOVE ALL BURLAP AND NAILS FROMTHE TOP 1/3 OF THE BALL. REMOVE ALL TWINE. REMOVE OR CORRECT STEM GIRDLING ROOTS. 6. PLUMB AND BACKFILL WITH PLANTING SOIL. 7. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS.8. BACK FILL VOIDS AND WATER SECOND TIME.9. PLACE MULCH WITHIN 48 HOURS OF THE SECONDWATERING UNLESS SOIL MOISTURE IS EXCESSIVE. 10. FINAL LOCATION OF TREE TO BE APPROVED BY OWNER. PLANTING SOIL ON CENTER SPACINGAS STATED ON PLAN. EXTEND HOLE EXCAVATION WIDTHA MINIMUM OF 6" BEYONDTHE PLANTS ROOT SYSTEM. FINISHED GRADE EDGER, AS SPECIFIED TREE PLANTING DETAIL SCALE: N.T.S.L1031 SHRUB / PERENNIAL PLANTING DETAIL SCALE: N.T.S.L1032 1/2"FINISHED GRADE AT LAWN, 1/2" BELOW TOP OF DIVIDER. LAWN SIDE "BLACK DIAMOND" EDGING BYVALEEY VIEW SPECIALTIES CO.USE 20 FT. LENGTHS. USEKNURLED CONNECTOR AT SPLICES, USE CORNER, TEE, VEE, OR WIDEANBLE CONNECTORS AT ANGLE 10" X 7/8" METAL ANCHOR STAKES AT 48" O.C., AND AT CHANGES. EACH END. PLASTIC DIVIDER: FINISHED GRADE ATSHRUBS/ PERENNIALS, 1" BELOW TOPOF DIVIDER. PLANTING BED 1"POLY EDGER DETAIL SCALE: N.T.S.L1034SPADED EDGE DETAIL SCALE: 1-1/2"=1'L1033 MULCH AT PLANTING AREA SPADED EDGE "V" SHAPED, 4" WIDTH,4" DEPTH, MORE VERTICAL ON LAWN SIDE LAWN GRASS FINISHED GRADE DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L103MPI 09/09/2022 MGC 19.1001.04 LANDSCAPE DETAILS RAISED PLANTER DETAIL SCALE: N.T.S.L1035 BROWN TREATED REFER TO GEOTECH FORSUBGRADE RECOMMENDATIONS 1 www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-LANDSCAPE DETAILS.dwg September 11, 2022 - 2:53pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L104PWB 09/09/2022 MCG 19.1001.04 CITY LANDSCAPE DETAILS N90°00'00"W110.70N27°34' 2 7 " W 2 5 8. 4 3 N34 ° 2 3 ' 2 9 " E 1 7 1 . 1 9 S86°38'35"E133.86290.00 228.44362.50 CSC. BRG .=N 62 ° 21 ' 47 "ECHORD=26 7 .1 4C.BRG.=S47°01'01"E CHORD=342.57C.BRG.=N83°51'07"ECHORD=122.39958.76INVCMP84B A BA A A 1 2 3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 1920 2122 23 24 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 6465 66 67 68 6970 7172 7374 75 76 77 78 79 80 81 82838485 86 87 88 8990 91 92 93 94 95 9697 98 99 100 101 102 103104 105 106 107108 109 110 111 112113114 115116 117 118 119120 121122 123 124 125 126 127 128 129 130 131 132 133134 135136 137 138139 140 141 142 143144145146 147148 149 150 151152153 154 155 156 157 158 159 160161162 163 164 165 166 167168 169170 171 172 173174 175 176178179180 181 182 183 184 185 186 187 188 189 190 191 192 193194 195 196 197 198 199 200 201 177 D D PROPOSED BUILDING AND SITE FEATURES www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-TREE INVENTORY AND PRESERVATION PLAN.dwg September 11, 2022 - 2:53pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIESLIMITS OF CONSTRUCTION TREE TO BE REMOVED PROPERTY LINE TREE TO BE SAVED LEGEND TREE PROTECTIONSIGN FURNISH AND INSTALL TEMPORARY FENCE AT THE TREE'S DRIPLINE OR CONSTRUCTION LIMITS AS SPECIFIED, PRIOR TO ANY CONSTRUCTION. WHEN POSSIBLE PLACE FENCE 25 FEET BEYOND THE DRIP LINE. PLACE PROTECTION SIGNS ALONG FENCE AT 20' INTERVALS. CONSTRUCTION LIMITS DRIP LINE SIGNIFICANT TREES TOTAL: COMMON TREES:272 CAL. INCHES CONIFER/EVERGREEN TREES:0 CAL. INCHES HARDWOOD TREES:1,475 CAL. INCHES NUISANCE TREES:1,509 CAL. INCHES TOTAL 3,256 CAL. INCHES TREE REMOVALS:COMMON TREES:108 CAL. INCHESCONIFER/EVERGREEN TREES:0 CAL. INCHES HARDWOOD TREES:365 CAL. INCHES NUISANCE TREES:1,133 CAL. INCHES TOTAL 1,606 CAL. INCHES ________________________________________________________________________ 30% TREE REMOVAL LIMITS: COMMON TREES:32.4 ALLOWED 108 PROPOSEDCONIFER/EVERGREEN TREES: 0 ALLOWED 0 PROPOSEDHARDWOOD TREES:109.5 ALLOWED 365 PROPOSED REMOVALS IN EXCESS OF 30% ALLOWANCE COMMON TREES:75.6 CAL. INCHES CONIFER/EVERGREEN TREES:0 CAL. INCHES HARDWOOD TREES:255.5 CAL. INCHES TOTAL 331.1 CAL. INCHES________________________________________________________________________ TREE REPLACEMENT NEEDED (CAL. INCHES):COMMON TREES (1/4 CAL. INCHES REMOVED): 18.9 CAL. INCHESCONIFER/EVERGREEN TREES:0 CAL. INCHES HARDWOOD TREES (1/2 CAL. INCHES REMOVED): 127.8 CAL. INCHES TREE REPLACEMENT NEEDED (TREE): COMMON TREES (2.5" CAL.):8 TREES CONIFER TREES (6' HT.):0 TREES HARDWOOD TREES (2.5" CAL.):52 TREES TREE MITIGATION DATA 1. PRUNING WILL BE DONE BY PROFESSIONALS DURING APPROPRIATE PRUNING SEASON. 2. NO STORAGE OF MATERIALS, OPERATION OF MACHINERY, OR DEVELOPMENT OF ANY SORT WILL OCCUR WITHIN THE FENCE-LINEWITHOUT APPROVAL IN WRITING FROM CITY. 3. SITE GRADING TO BE DONE ONLY AFTER PROTECTIVE MEASURES HAVEBEEN TAKEN, CITY HAS APPROVED FENCING LOCATIONS, AND ALL CONTRACTORS HAVE BEEN BREIFED ON TREE PRESERVATION TECHNIQUES. 4. EXISTING TREES TO REMAIN OR REMOVED TO BE CLEARLY IDENTIFIED, WITHIN DISTURBANCE LIMITS AND 10' OUTSIDE OF THE DISTURBANCE LIMITS. 5. TREE PRESERVATION TO BE APPROVED BY OWNER AND PER LOCALGOVERNMENTAL AUTHORITY. TREE PROTECTION NOTES TEMPORARY TREE PROTECTION FENCE PLACEMENT SCALE: N.T.S.1 KEYNOTE LEGEND EXISTING TREE TO BE SAVED (TYP.) EXISTING TREE TO BE REMOVED (TYP.) LIMITS OF CONSTRUCTION (TYP.) TREE PROTECTION FENCE (SEE DETAIL) (TYP.) A B C D TREE PROTECTION FENCE EXISTING VEGETATION EDGE NORTHDATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L200MPI 09/09/2022 MGC 19.1001.04 TREE INVENTORY AND PRESERVATION PLAN www.lse-architects.com 100 Portland Ave South, Suite 100Minneapolis, MN 55401 612.343.1010 office612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\PlanSheets\L1-TREE INVENTORY AND PRESERVATION PLAN.dwg September 11, 2022 - 2:54pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES L201NORTHNOTE: ONLY SIGNIFICANT TREES IN THE SUBJECT PROPERTY SHOWN ON PLAN/ INVENTORY. TREE INVENTORY SCHEDULE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE DATE: I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA. MNLIC. NO. MITCHELL G. COOKAS, PLA 01/10/2022 56522 L201MPI 09/09/2022 MGC 19.1001.04 TREE INVENTORY AND PRESERVATION PLAN PAGE 1 OF 1Date:9/9/2022Scale: AS NOTEDRevisions# Date CommentsGENERAL NOTES:A. PULSE PRODUCTS DOES NOT ASSUME RESPONSIBILITYFOR THE INTERPRETATION OF THIS CALCULATION ORCOMPLAINCE TO THE LOCAL, STATE, OR FEDERALLIGHTNG CODES OR ORDINANCES.B. LIGHTING LAYOUT IS NOT INTENDED FOR CONSTRUCTIONDOCUMENTS BUT ONLY TO ILLUSTRATE THE PERFORMANCEOF THE PRODUCT.C. ALL READINGS/CALCULATIONS SHOWN ARE SHOWN ONOBJECTS/SURFACES.Drawn By: JEFF, SANDYChecked By: ROSSAMIRALAKE ELMO, MNLuminaire ScheduleSymbolQtyLabelArrangementLLFDescriptionArr. WattsCalculation SummaryLum. LumensLabelCalcType4A3Single0.900UnitsAvgEX-LITE ARCH AREA LIGHT: SAL-150W-T3 MOUNTING HEIGHT 18.5FT. POLE 15FT ON A 30IN RAISED BASE15020950MaxMinAvg/MinMax/MinTOTAL SITEIlluminanceFc4A4Single0.900EX-LITE ARCH AREA LIGHT: SAL-150W-T4 MOUNTING HEIGHT 18.5FT. POLE 15FT ON A 30IN RAISED BASE150.899204570.628.40.0N.A.N.A.2A5Single0.900EX-LITE ARCH AREA LIGHT: SAL-150W-T5 MOUNTING HEIGHT 18.5FT. POLE 15FT ON A 30IN RAISED BASE1502201516BSingle0.900EX-LITE: BLRD 22W 42in bollard21.427362CSingle0.900EX-LIGHT CANOPY: HH6-LED-900L-DIM10-MVOLT-WD-40K-90-HH6-6501-CL-WH MOUNTED AT 9FT8.629202DSingle0.900NUVO 62-1613 WALL MOUNT AT APPROX 7FT1090015LSingle0.900EX-LITE: BULLET SHAPPED FLOOD LIGHT GROUND MOUNT 1.61322W1Single0.900EX-LITE SLIM: WPS-120W WALL PACK MOUNTED AT 15FT120155498W2Single0.900EX-LITE SLIM: WPS-35W WALL PACK MOUNTED AT 10FT354498Plan ViewScale: 1 inch= 60 Ft.SDDSSSSEEDDCS0,0202.3'LEVEL B: VARIESLEVEL 1: 995.06SENIOR HOUSING BUILDINGEXISTINGBUILDING22.545691218345678O U T L O T CP A R K 2 N D A D D I T I O NE A G L E P O I N T B U S I N E S SEDGE OF WATEREDGE OF WATER(WATER ELEV. = 978.2 AS OF 7/11/19)EAGLE POINT BUSINESS PARK 3RD ADDITIONEAGLE POINT TOWNOFFICE PARKEAGLE POINT BUSINESS PARK 8TH ADDITIONMNDOT RIGHT OF WAY PLAT NO. 82-31EAGLE POINT TOWNOFFICE PARKB L O C K 125SURVEY L INE 8060(PRIVATE STREET)C.BRG.=N62°21'47"ECHORD=267.14N90°00'00"W110.70N27°34'27"W 258.43N34°23'29"E 171.19S86°38'35"E133.86290.00228.44362.50H U D S O N B O U L E V A R DP O I N TB L V D .EAGLE POINT BOULEVARDW E T L A N D # 1W E T L A N D # 2P O N DGENERATORLIFTSTATIONLIFTSTATIONINV.=977.74APPROXIMATE LOCATIONSETIP415781000.36SETIP41578969.94FNDIP8612969.20FNDIP16456968.81FNDIP16456984.21SETIP41578982.87SETIP41578986.52FNDIP16456983.28FNDIP8612963.64FNDIP15480962.35APPROXIMATE LOCATIONAPPROXIMATELOCATIONINVCMP84958.76SSSSNO PARKINGNO PARKINGF E M A F L O O D Z O N E AAPPROXIMATE LOCATION OF FLOOD LINE PER FEMA FLOOD INSURANCE RATE MAP. SUBJECT TO SCALE UNCERTAINTY.F E M A F L O O D Z O N E X3119101725922CCBBBBBBBBBBBBA3A4A4A4A4A3A5DDBBBBW2W2W2W1LLW2W2W2W2W1A5A3A3LLLLLLLLLW2LLLL2.00.00.00.00.00.00.00.10.10.20.00.80.04.45.62.30.00.00.10.20.10.00.00.30.00.50.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.20.40.71.11.10.70.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.04.40.00.00.00.00.00.00.00.00.00.00.00.10.00.40.00.00.00.00.00.00.10.10.30.80.00.20.00.10.00.00.00.00.00.00.00.01.52.60.00.20.00.00.00.00.00.00.00.00.00.00.00.00.10.10.20.41.34.213.228.40.00.00.00.00.59.115.30.10.819.00.70.10.00.00.00.00.40.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.10.39.83.90.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.10.00.21.71.20.10.00.00.00.00.00.00.00.00.20.30.40.40.30.20.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.30.10.00.00.00.00.00.00.00.30.00.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.50.00.00.00.00.00.00.00.00.10.10.10.20.00.00.00.00.00.00.00.00.00.10.30.00.00.00.20.20.10.00.00.00.00.00.00.01.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.04.82.42.20.20.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.70.00.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.00.00.00.00.00.00.00.00.00.00.00.10.00.63.40.00.24.14.10.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.10.20.00.00.10.20.20.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.20.21.13.20.00.00.00.10.30.20.20.10.10.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.010.60.00.00.00.00.10.10.40.80.00.22.20.00.30.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.60.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.01.00.00.00.00.00.10.68.30.70.30.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.00.00.00.00.00.00.00.00.10.60.00.70.00.30.10.00.00.00.00.00.00.00.010.50.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.40.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.30.10.00.00.00.00.00.00.70.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.04.80.00.00.00.00.00.00.00.10.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.10.52.90.00.00.00.00.00.00.00.00.00.20.20.20.10.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.10.10.00.012.00.10.00.00.00.00.00.00.00.00.10.20.60.18.08.712.84.82.00.00.30.00.00.00.10.00.10.10.10.00.00.00.00.00.00.10.00.10.00.00.00.00.00.00.00.00.00.00.04.10.00.00.00.00.00.00.00.10.10.20.12.60.16.38.03.41.50.60.20.00.00.10.20.60.00.30.50.60.60.40.20.00.00.00.10.00.00.00.00.00.10.10.20.30.40.50.50.00.30.30.20.10.10.00.10.00.10.10.10.20.10.10.92.35.07.35.31.80.60.20.00.20.10.00.40.30.30.30.30.10.00.00.00.00.10.00.10.00.00.00.00.10.10.10.10.20.00.00.40.10.10.10.10.00.00.00.00.00.10.20.10.31.53.57.812.35.72.20.80.30.00.00.10.00.00.00.00.00.00.00.00.00.00.30.00.00.00.00.10.10.20.66.55.18.70.20.00.00.018.65.71.51.41.20.60.310.16.10.00.10.00.00.00.00.00.00.00.00.00.00.10.20.00.40.00.00.10.10.30.30.54.512.60.00.00.00.10.10.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.40.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.90.00.10.00.00.00.00.00.00.00.00.00.00.03.70.00.00.00.00.00.00.10.10.20.60.12.30.14.12.20.90.40.10.10.10.10.10.01.30.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.50.00.00.10.10.20.41.11.41.72.20.01.20.00.21.31.00.20.10.10.00.00.00.02.30.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.70.00.10.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.41.80.40.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.021.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.50.20.10.00.00.00.01.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.40.10.00.00.00.00.00.00.00.00.00.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.01.70.00.50.00.00.00.00.00.00.00.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.11.023.61.00.10.10.00.00.08.90.00.00.00.00.00.00.00.00.10.01.00.00.00.00.00.00.00.00.00.00.00.00.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.41.00.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.30.00.00.00.00.09.11.30.30.10.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.40.00.10.00.00.00.00.00.00.00.00.00.00.50.20.01.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.00.00.00.00.00.00.00.00.00.00.00.00.00.40.00.00.00.00.00.00.00.00.021.70.01.20.00.10.10.00.00.00.00.00.00.00.05.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.60.00.05.60.00.00.00.00.03.02.20.70.30.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.41.34.0 3.9 2.8 1.6 1.01.90.51.00.2 0.1 0.01.4 2.3 2.30.20.70.20.50.1 0.1 0.1 0.1 0.13.21.40.91.4 1.0 0.5 0.3 0.2 0.2 0.40.00.81.87.8 7.8 5.0 2.7 1.52.51.01.10.4 0.1 0.01.4 1.5 1.5 1.21.10.30.6 0.4 0.3 0.7 4.9 0.75.00.90.20.6 0.4 0.3 0.2 0.1 0.2 0.40.10.10.73.4 1.6 0.6 0.2 0.18.20.13.80.1 0.1 0.1 0.1 0.1 0.20.20.10.30.81.9 2.9 3.4 2.9 1.96.20.51.30.2 0.1 0.1 0.1 0.0 0.01.70.94.30.40.3 0.2 0.1 0.0 0.00.62.40.93.8 2.5 1.4 0.7 0.4 0.2 0.21.20.32.1 2.8 3.3 3.4 2.6 1.50.40.40.80.5 1.1 1.9 2.6 2.8 2.3 1.60.74.24.35.8 5.7 4.0 2.8 3.12.45.71.21.5 0.4 0.10.5 0.9 1.61.04.72.61.2 0.5 0.2 0.1 0.1 0.14.110.65.10.8 0.3 0.2 0.1 0.1 0.2 0.527.710.42.83.2 3.5 3.2 2.6 2.61.48.30.75.3 1.7 0.5 0.20.6 1.3 2.94.38.34.1 2.5 1.2 0.5 0.2 0.12.30.12.42.1 0.7 0.3 0.2 0.2 0.2 0.30.11.52.013.1 13.4 7.4 3.4 2.03.01.71.20.7 0.2 0.11.1 1.2 1.3 1.31.70.80.80.6 1.0 15.1 1.0 0.16.91.71.30.5 0.3 0.2 0.1 0.1 0.2 0.40.11.111.0 11.3 6.7 3.4 2.5 2.71.42.61.30.3 0.10.9 1.2 1.6 2.00.93.10.62.50.9 0.7 0.2 0.1 0.118.86.41.72.90.3 0.2 0.1 0.1 0.2 0.51.46.51.20.20.5 0.5 0.5 0.5 0.50.40.80.32.3 4.3 7.1 6.6 3.0 1.51.30.62.10.90.4 0.2 0.1 0.10.20.51.80.11.7 1.0 0.5 0.2 0.2 0.2 0.20.70.20.60.4 0.9 1.1 1.0 0.60.30.20.40.2 0.4 0.5 0.8 1.1 1.4 1.80.30.20.1 0.0 0.0 0.0 0.0 0.00.10.11.50.5 1.1 2.2 2.5 2.1 1.4 0.70.00.00.60.9 0.9 0.8 0.5 0.30.30.10.10.2 0.4 1.3 3.2 3.8 2.80.80.10.01.2 1.6 1.4 0.9 0.6 0.30.60.00.20.0 0.0 0.0 0.0 0.0 0.0 0.00.10.01.50.8 0.3 0.1 0.0 0.02.60.03.80.0 0.0 0.00.1 0.3 0.8 1.40.00.10.1 0.1 0.1 0.2 0.2 0.11.50.11.40.2 0.2 0.4 0.6 1.1 1.9 3.00.11.90.211.6 9.4 5.4 3.0 1.74.91.02.73.8 5.9 5.8 3.7 1.6 0.61.91.10.26.1 3.1 1.4 1.7 4.0 0.48.80.30.10.2 0.1 0.2 0.3 0.5 0.9 1.50.32.70.30.1 0.1 0.1 0.2 0.40.11.50.04.8 8.4 10.4 9.6 5.7 3.1 1.60.711.30.1 0.1 0.0 0.0 0.00.90.14.91.87.5 3.7 1.6 0.6 0.3 0.1 0.12.03.78.80.00.1 0.3 0.7 1.60.04.70.02.2 1.1 2.6 7.6 0.30.4 0.63.65.27.31.1 1.0 1.3 2.1 4.50.012.60.22.2 1.0 0.3 0.1 0.1 0.0 0.09.40.011.3 8.7 3.4 1.2 0.4 0.20.50.11.60.0 0.0 0.0 0.00.4 0.81.70.14.54.80.2 0.2 0.3 0.5 0.8 1.27.13.03.35.3 4.6 3.1 2.1 1.4 1.20.41.90.10.10.8 0.6 0.4 0.3 0.31.90.23.30.1 0.1 0.0 0.0 0.0 0.03.50.20.96.48.0 7.4 4.6 2.5 1.61.20.90.11.1 1.5 2.2 3.7 5.5 6.3 5.11.10.30.02.1 2.3 2.1 1.5 1.01.10.40.80.2 0.2 0.1 0.1 0.1 0.1 0.00.62.70.2 0.3 0.5 0.7 1.1 1.71.62.92.02.1 1.4 0.9 0.6 0.6 0.6 0.62.41.31.70.1 0.1 0.2 0.3 0.40.00.90.02.2 3.9 7.1 10.2 8.8 5.06.20.61.15.4 3.4 2.2 1.5 1.2 1.10.01.21.20.8 0.6 0.5 0.4 0.3 0.1 0.11.20.02.80.2 0.2 0.1 0.1 0.00.40.00.50.1 0.1 0.2 0.3 0.5 0.9 1.30.08.31.0 0.9 1.1 1.5 2.5 4.60.311.10.04.4 2.4 1.5 1.1 0.8 0.7 0.68.60.00.10.2 0.1 0.2 0.1 0.10.10.10.10.0 0.0 0.1 0.1 0.1 0.10.00.10.00.0 0.0 0.0 0.0 0.0 0.00.10.00.10.0 0.0 0.0 0.00.0 0.0 0.00.00.00.10.0 0.0 0.0 0.0 0.00.00.00.00.0 0.0 0.0 0.0 0.0 0.0 0.00.00.00.1 0.1 0.0 0.0 0.0 0.00.00.00.10.0 0.0 0.0 0.0 0.0 0.0 0.00.01.00.10.2 0.2 0.3 0.5 0.70.31.00.40.7 0.5 0.3 0.2 0.1 0.1 0.11.00.33.40.0 0.0 0.00.1 0.10.20.20.00.5 0.8 1.1 1.2 1.2 0.9 0.70.10.20.4 0.3 0.2 0.1 0.1 0.10.10.20.50.3 0.4 0.4 0.4 0.3 0.20.00.10.00.10.0 0.0 0.0 0.0 0.0 0.00.50.00.60.0 0.1 0.1 0.1 0.2 0.40.10.00.20.20.2 0.1 0.1 0.2 0.910.90.61.00.1 0.1 0.1 0.2 0.3 0.31.33.92.35.1 9.0 7.1 2.7 1.3 0.40.91.30.44.1 5.9 4.0 2.4 1.4 0.9 0.60.10.60.21.3 1.8 2.3 2.4 1.80.10.90.30.5 0.6 0.4 0.2 0.2 0.26.41.34.72.3 1.3 1.0 2.1 4.8 10.50.89.73.62.7 2.6 3.7 5.1 3.7 1.7 0.814.011.02.83.6 4.3 3.7 2.7 2.21.15.40.511.5 3.9 1.7 0.6 0.21.0 2.02.70.20.04.1 2.0 1.0 0.4 0.22.20.39.35.0 1.3 0.5 0.3 0.3 0.5 0.50.23.20.1 0.1 1.0 0.6 0.3 0.24.214.40.10.8 1.7 3.6 6.9 8.6 6.018.60.40.12.55.0 2.5 1.3 0.7 0.4 0.80.10.60.10.1 0.1 0.1 0.3 6.7 2.19.67.12.72.30.8 0.7 0.7 0.7 0.91.42.01.93.0 2.7 2.1 1.5 1.3 1.40.31.30.60.1 0.00.4 0.4 0.5 0.71.00.72.60.7 0.8 1.1 1.6 2.2 2.5 2.40.81.51.71.8 2.7 4.3 5.4 4.90.92.20.71.1 0.9 0.9 1.0 1.4 2.19.63.40.12.3 1.6 1.1 0.9 0.8 0.61.20.10.80.1 0.00.2 0.2 0.3 0.5 0.60.30.40.24.3 2.5 2.1 2.4 2.811.80.88.50.2 0.10.6 0.8 1.0 1.2 1.21.80.30.8 0.3 0.2 0.2 0.2 0.38.60.30.60.3 0.4 0.5 0.7 1.0 2.0 4.30.35.71.2 1.2 1.0 1.0 1.1 1.71.04.50.74.7 2.9 1.8 1.5 1.5 1.45.42.80.90.30.6 0.6 0.6 0.7 0.8 0.91.10.90.90.7 0.5 0.4 0.4 0.4 0.50.80.91 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc1 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.5 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fc0.25 fcTYPE WTYPE ATYPE BTYPE CTYPE DTYPE LA101A002 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency Amira of Lake Elmo 146-Unit Active Senior Apartments Lake Elmo, MinnesotaConceptual Rendering SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 62,946 32 36 39 39 146 Level 1 54,006 1,088 Level 2 53,706 277,186 Level 3 53,264 57%Level 4 53,264 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency A100 RENDERED SITE PLAN SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency FLOOR PLANGARAGE LEVEL A200 OVERALL FLOOR PLAN GARAGE LEVEL SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency FLOOR PLANLEVEL 1 A201 OVERALL FLOOR PLAN LEVEL 1 SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency FLOOR PLANLEVEL 2 A202 OVERALL FLOOR PLAN LEVEL 2 SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency FLOOR PLANLEVEL 3 A203 OVERALL FLOOR PLAN LEVEL 3 SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency FLOOR PLANLEVEL 4 A204 OVERALL FLOOR PLAN LEVEL 4 SEPT 9, 2022 ENLARGED FLOOR PLANLEVEL 1 COMMONS A210 ENLARGED PLAN LEVEL 1 COMMONS SEPT 9, 2022 ENLARGED FLOOR PLANLEVEL 2 COMMONS A211 ENLARGED PLAN LEVEL 2 COMMONS SEPT 9, 2022 Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency Amira of Lake Elmo 146-Unit Active Senior Apartments Lake Elmo, MinnesotaConceptual Rendering A400 CONCEPTUAL EXTERIOR RENDERING Amira of Lake Elmo 146-Unit Active Senior Apartments Lake Elmo, MinnesotaConceptual Rendering SEPT 9, 2022 A401 EXTERIOR ELEVATIONS51'-4 3/4"MID-POINT OF ROOF 9'-4"8'-2"(CONCEPTUAL ELEVATION) Designation Unit Unit Name 1st 2nd 3rd 4th Total Gross Area (Sq.Ft.) Net Rentable Area Total Gross Area Total Rentable Net Area Dimensions STUDIO Studio 2 4 3 3 12 671 617 8,052 7404 A1 One Bed 7 8 9 9 33 723 675 23,859 22275 A2 One Bed 2 2 2 2 8 976 915 7,808 7320 B1 One Bed/Den 1 1 1 1 4 1,067 996 4,268 3984 B2 One Bed/Den 5 6 6 6 23 1,010 950 23,230 21850 C1 Two Bed 4 4 4 4 16 1,204 1129 19,264 18064 C2 Two Bed 1 1 1 1 4 1,192 1,126 4,768 4504 C3 Two Bed 3 3 3 3 12 1,155 1,069 13,860 12828 C4 Two Bed 0 1 1 1 3 1,296 1,218 3,888 3654 C5 Two Bed 1 0 0 0 1 1,303 1,234 1,303 1234 D1 Two Bed/Den 1 1 1 1 4 1,419 1,344 5,676 5376 D2 Two Bed/Den 1 1 1 1 4 1,647 1,572 6,588 6288 D3 Two Bed/Den 0 0 1 1 2 1,712 1,624 3,424 3248 D4 Two Bed/Den 0 0 1 1 2 1,676 1,577 3,352 3154 D5 Two Bed/Den 0 0 1 1 2 1,673 1581 3,346 3162 E1 Three Bed 4 4 4 4 16 1,636 1,546 26,176 24736 32 36 39 39 146 158,862 149,081 Level Gross Area 1st 2nd 3rd 4th Total Garage Level 63,211 32 36 39 39 146 Level 1 53,980 1,088 Level 2 53,691 277,372 Level 3 53,245 57%Level 4 53,245 Overall Building Gross Area AMIRA OF LAKE ELMO Total Units Average Unit Size Building Efficiency EXTERIOR ELEVATIONS EAST ELEVATION AT POOL AND DECK AREA WEST ELEVATION m o END ELEVATION (TYPICAL) EXTERIOR MATERIAL PALETTE VERTICAL BOARD & BATTEN METAL PANEL SIDING HORIZONTAL METAL PANEL SIDING CULTURED STONE RAISED STUCCO FIBER CEMENT PANEL METAL TRIM WOOD TEXTURE/STAIN A401 EXTERIOR ELEVATIONS & MATERIALS FIBER CEMENT PANEL ASPHALT SHINGLES VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE ROCK-FACED BLOCK FIBER CEMENT PANEL ASPHALT SHINGLES VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE FIBER CEMENT PANEL ASPHALT SHINGLES FIBER CEMENT PANEL VERTICAL BOARD & BATTEN METAL SIDING HORIZONTAL METAL SIDING CULTURED STONE SEPT 9, 2022