HomeMy WebLinkAbout#16 - Well No 1 Change Order STAFF REPORT DATE: November 15, 2022 CONSENT AGENDA ITEM: Accept Improvements, Approve Compensating Change Order No. 1, and Approve Pay Request No. 4 (Final) for the Well No. 1 Abandonment and Pumphouse Demolition SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements, approve Compensating Change Order No. 1, and approve Pay Request No. 4 (Final) for the Well No. 1 Abandonment and Pumphouse Demolition? BACKGROUND: Keys Well Drilling Company was awarded a construction contract on June 7, 2022 to complete the Well No. 1 Abandonment and Pumphouse Demolition. The contractor has now completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: A compensating change order has been prepared and executed for the project to reconcile the estimated and actual quantities installed. With approval of this compensating change order the contract amount will be adjusted to reflect the actual final project quantities. In addition, Keys Well Drilling Company has submitted Partial Pay Request No. 4 (Final) in the amount of $4,220.75. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on November 15, 2022 and will extend through November 15, 2023. FISCAL IMPACT: None. Final payment is being recommended within the authorized scope and budget for the project. The final construction contract amount of $84,415.00 is under the original construction contract amount of $119,815.00. The compensating change order will officially decrease the final construction contract amount by $35,400.00. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements, approve Compensating Change Order No. 1, and approve Pay Request No. 4 (Final) for the Well No. 1 Abandonment and Pumphouse Demolition. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements for the Well No. 1 Abandonment and Pumphouse Demolition, approve Compensating Change Order No. 1 decreasing the contract amount by $35,400, and approve Pay Request No. 4 (Final) to Keys Well Drilling Company in the amount of $4,220.75.” ATTACHMENTS: 1. Compensating Change Order No. 1. 2. Partial Pay Estimate No. 4 (Final). 3. Certificate of Completion. 11/8/2022 COMPENSATING CHANGE ORDER NO.1 WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2022.113 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $16,000.00 $16,000.00 1.00 $16,000.00 0.00 $0.00 2 LS 1 $3,500.00 $3,500.00 1.00 $3,500.00 0.00 $0.00 3 LS 1 $300.00 $300.00 1.00 $300.00 0.00 $0.00 4 LS 1 $200.00 $200.00 0.00 $0.00 -1.00 -$200.00 5 LS 1 $5,000.00 $5,000.00 0.00 $0.00 -1.00 -$5,000.00 6 CY 75 $600.00 $45,000.00 40.00 $24,000.00 -35.00 -$21,000.00 7 CY 12 $250.00 $3,000.00 0.00 $0.00 -12.00 -$3,000.00 8 CY 25 $600.00 $15,000.00 25.00 $15,000.00 0.00 $0.00 9 LS 1 $2,000.00 $2,000.00 0.00 $0.00 -1.00 -$2,000.00 10 LF 279 $20.00 $5,580.00 0.00 $0.00 -279.00 -$5,580.00 11 LS 1 $5,500.00 $5,500.00 1.00 $5,500.00 0.00 $0.00 12 LF 75 $90.00 $6,750.00 75.00 $6,750.00 0.00 $0.00 13 SY 575 $5.00 $2,875.00 575.00 $2,875.00 0.00 $0.00 14 CY 65 $17.00 $1,105.00 65.00 $1,105.00 0.00 $0.00 15 LF 230 $6.00 $1,380.00 230.00 $1,380.00 0.00 $0.00 16 CY 125 $30.00 $3,750.00 160.00 $4,800.00 35.00 $1,050.00 17 SY 575 $5.00 $2,875.00 641.00 $3,205.00 66.00 $330.00 TOTALS - BASE CONTRACT $119,815.00 $84,415.00 -$35,400.00 COMPENSATING CO #1 DEMOLISH PUMPHOUSE REMOVE WATERMAIN REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT COMMON EXCAVATION (EV) (P) PERFORATE 20" WELL CASING (IF REQUIRED) ITEM DESCRIPTION OF PAY ITEM UNIT TOTAL TO DATE NEAT CEMENT GROUT (CEMENT TYPE APPROVED BY MDH) ORIGINAL CONTRACT MOBILIZATION REMOVE WELL PUMP AND MEASURE THE BOTTOM OF THE WELL OBTAIN A SAMPLE OF THE MATERIAL IN THE BOTTOM OF THE BOREHOLE (BAIL) FLUSH THE WELL WITH CLEAN WATER FOR 48 HOURS PRIOR TO MGS/MDH LOGGING THE WELL REMOVE SAND ACCUMULATED IN THE WELL BOTTOM AS REQUIRED BY MDH WASHED SAND OR PEA ROCK TO FILL VOID SPACE OR PREVENT GROUT LOSS NEAT CEMENT GROUT (CASED PORTION) MOBILIZE CASING PERFORATION EQUIPMENT (IF REQUIRED) TOPSOIL BORROW (LV) SEED MIXTURE 25-151 & HYDRAULIC MULCH SILT FENCE, MACHINE SLICED 11/8/2022 PARTIAL PAY ESTIMATE NO.4 (Final) WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2022.113 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $16,000.00 $16,000.00 0.00 $0.00 1.00 $16,000.00 2 LS 1 $3,500.00 $3,500.00 0.00 $0.00 1.00 $3,500.00 3 LS 1 $300.00 $300.00 0.00 $0.00 1.00 $300.00 4 LS 1 $200.00 $200.00 0.00 $0.00 0.00 $0.00 5 LS 1 $5,000.00 $5,000.00 0.00 $0.00 0.00 $0.00 6 CY 75 $600.00 $45,000.00 0.00 $0.00 40.00 $24,000.00 7 CY 12 $250.00 $3,000.00 0.00 $0.00 0.00 $0.00 8 CY 25 $600.00 $15,000.00 0.00 $0.00 25.00 $15,000.00 9 LS 1 $2,000.00 $2,000.00 0.00 $0.00 0.00 $0.00 10 LF 279 $20.00 $5,580.00 0.00 $0.00 0.00 $0.00 11 LS 1 $5,500.00 $5,500.00 0.00 $0.00 1.00 $5,500.00 12 LF 75 $90.00 $6,750.00 0.00 $0.00 75.00 $6,750.00 13 SY 575 $5.00 $2,875.00 0.00 $0.00 575.00 $2,875.00 14 CY 65 $17.00 $1,105.00 0.00 $0.00 65.00 $1,105.00 15 LF 230 $6.00 $1,380.00 0.00 $0.00 230.00 $1,380.00 16 CY 125 $30.00 $3,750.00 0.00 $0.00 160.00 $4,800.00 17 SY 575 $5.00 $2,875.00 0.00 $0.00 641.00 $3,205.00 $119,815.00 $0.00 $84,415.00 TOTALS - BASE CONTRACT $119,815.00 $0.00 $84,415.00 BASE BID SEED MIXTURE 25-151 & HYDRAULIC MULCH ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE BASE BID MOBILIZATION REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT COMMON EXCAVATION (EV) (P) SILT FENCE, MACHINE SLICED TOPSOIL BORROW (LV) PERFORATE 20" WELL CASING (IF REQUIRED) DEMOLISH PUMPHOUSE REMOVE WATERMAIN REMOVE WELL PUMP AND MEASURE THE BOTTOM OF THE WELL OBTAIN A SAMPLE OF THE MATERIAL IN THE BOTTOM OF THE BOREHOLE (BAIL) FLUSH THE WELL WITH CLEAN WATER FOR 48 HOURS PRIOR TO MGS/MDH LOGGING THE WELL REMOVE SAND ACCUMULATED IN THE WELL BOTTOM AS REQUIRED BY MDH NEAT CEMENT GROUT (CEMENT TYPE APPROVED BY MDH) WASHED SAND OR PEA ROCK TO FILL VOID SPACE OR PREVENT GROUT LOSS NEAT CEMENT GROUT (CASED PORTION) MOBILIZE CASING PERFORATION EQUIPMENT (IF REQUIRED) COMPLETED ITEMS BY PAY PERIOD WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2022.113 PAY QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT BASE BID 1 LS $16,000.00 0.25 $4,000.00 0.70 $11,200.00 0.05 $800.00 $0.00 1.00 $16,000.00 2 LS $3,500.00 1 $3,500.00 $0.00 $0.00 $0.00 1.00 $3,500.00 3 LS $300.00 1 $300.00 $0.00 $0.00 $0.00 1.00 $300.00 4 LS $200.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 5 LS $5,000.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 6 CY $600.00 $0.00 40 $24,000.00 $0.00 $0.00 40.00 $24,000.00 7 CY $250.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 8 CY $600.00 $0.00 25 $15,000.00 $0.00 $0.00 25.00 $15,000.00 9 LS $2,000.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 10 LF $20.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 11 LS $5,500.00 $0.00 1 $5,500.00 $0.00 $0.00 1.00 $5,500.00 12 LF $90.00 $0.00 75 $6,750.00 $0.00 $0.00 75.00 $6,750.00 13 SY $5.00 $0.00 575 $2,875.00 $0.00 $0.00 575.00 $2,875.00 14 CY $17.00 $0.00 65 $1,105.00 $0.00 $0.00 65.00 $1,105.00 15 LF $6.00 $0.00 230 $1,380.00 $0.00 $0.00 230.00 $1,380.00 16 CY $30.00 $0.00 88 $2,640.00 72 $2,160.00 $0.00 160.00 $4,800.00 17 SY $5.00 $0.00 $0.00 641 $3,205.00 $0.00 641.00 $3,205.00 $7,800.00 $70,450.00 $6,165.00 $0.00 $84,415.00 TOTALS - BASE CONTRACT $7,800.00 $70,450.00 $6,165.00 $0.00 $84,415.00 BASE BID MOBILIZATION REMOVE WELL PUMP AND MEASURE THE BOTTOM OF THE WELL OBTAIN A SAMPLE OF THE MATERIAL IN THE BOTTOM OF THE BOREHOLE (BAIL) FLUSH THE WELL WITH CLEAN WATER FOR 48 HOURS PRIOR TO MGS/MDH LOGGING THE WELL REMOVE WATERMAIN NEAT CEMENT GROUT (CASED PORTION) MOBILIZE CASING PERFORATION EQUIPMENT (IF REQUIRED) PERFORATE 20" WELL CASING (IF REQUIRED) ITEM DESCRIPTION OF PAY ITEM UNIT TOTAL TO DATEUNIT PRICE PARTIAL PAY ESTIMATE 2 PARTIAL PAY ESTIMATE 3 PARTIAL PAY ESTIMATE 4PARTIAL PAY ESTIMATE 1 DEMOLISH PUMPHOUSE WASHED SAND OR PEA ROCK TO FILL VOID SPACE OR PREVENT GROUT LOSS REMOVE SAND ACCUMULATED IN THE WELL BOTTOM AS REQUIRED BY MDH NEAT CEMENT GROUT (CEMENT TYPE APPROVED BY MDH) COMMON EXCAVATION (EV) (P) SILT FENCE, MACHINE SLICED TOPSOIL BORROW (LV) SEED MIXTURE 25-151 & HYDRAULIC MULCH REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT CITY OF LAKE ELMO, MN WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION PROJECT NO. 2022.113 CERTIFICATE OF COMPLETION DATE OF ISSUANCE: November 15, 2022 OWNER: CITY OF LAKE ELMO, MN CONTRACTOR: KEYS WELL DRILLING COMPANY PROJECT NAME: WELL #1 ABANDONMENT AND PUMPHOUSE DEMOLITION PROJECT NO.: 2022.113 This Certification of Completion applies to all work under the Contract Documents This Certification of Completion applies to the following specified parts of the Contract Documents I do hereby certify that the work to which this Certificate applies has been constructed in accordance with the Contract dated June 8, 2022. The above-mentioned improvement is hereby declared to be complete and acceptance of this work is recommended. DATE OF COMPLETION: November 15, 2022 Mike Warner Reg. No. 44693 Bolton and Menk THE WARRANTY PERIOD BEGINS November 15, 2022 AND ENDS November 15, 2023