HomeMy WebLinkAbout#19 - Halcyon AppealSTAFF REPORT
DATE: November 15, 2022
REGULAR
AGENDA ITEM: Halcyon Stormwater Appeal SUBMITTED BY: Kristina Handt, City Administrator
REVIEWED BY: Sarah Sonsalla, City Attorney
BACKGROUND: This spring as the city began making the transition to quarterly stormwater billing for those properties with water and/or sewer bills, staff noticed that Halcyon Cemetery, 11050 50th St, Lake Elmo, was billed at the commercial rate for their water usage but still on the residential rate for stormwater. Given that the property is no longer a residence and operated as a business and to be consistent with the water charge, staff updated the stormwater billing to charge the commercial
rate. The City’s rates, processes and appeal options can be found in city code chapter 5.16. The new rate was applied with first quarter 2023 billing and paid. Upon receiving the second quarter billing, the property owner reached out to city staff to contest the new rate. A copy of the
July 20th communication is included in your packet. Upon review by the Public Works Director, the utility billing clerk sent a letter dated August 24, 2022 reducing the charge by 25% and denying the request for an exemption as it did not fall into any of the categories as noted in code. A copy is included in your packet.
On October 19, 2022, Chris Boline, legal counsel for Halcyon Cemetery, submitted an appeal to the city council. ISSUE BEFORE COUNCIL: Should Council approve a reduction in the stormwater fee for Halcyon Cemetery?
PROPOSAL: Staff asked the city engineer to review the appeal and provide feedback as related to the code and the stormwater improvements planned for the property. A copy of the city engineer’s memo is included in your packet.
Based upon this information, I would recommend council affirm the reduction of 25% for 2023 and condition future year reductions of 25% upon the completion and submittal of the items noted in the city engineer’s memo. These items include: no credits until the stormwater management improvements for Halcyon Cemetery development have been fully completed,
accepted and approved by the City and Valley Branch Watershed District, the developer must have its engineer perform an asbuilt survey and prepare as‐built record plans (in accordance with as‐built drawing plan format requirements in the city engineering design standards manual) for city review and approval, the property owner must have on file with the city a fully executed Stormwater Maintenance and Easement Agreement in the city standard form of agreement, and
the property owner must submit to the city the records of all inspections and maintenance
activities relating to the storm water improvements, and submit such records by March 1st of
each year to the city.
FISCAL IMPACT: A 25% reduction would result in a loss of $543.24 in 2022. This amount will be adjusted per the fee schedule adjustment for stormwater fees annually adopted by the City Council.
OPTION: 1) Approve reduction of 25% with the conditions noted by staff 2) Approve a different level of reduction with/without conditions 3) Don’t approve a reduction
RECOMMENDATION:
“Motion to approve a 25% reduction in the stormwater fee for Halycon Cemetery, 11050 50th St, for 2022 and condition the 25% reduction for future years upon meeting the requirements as noted in the City Engineer’s memo dated November 8, 2022.”
ATTACHMENTS:
• July 20th letter from Halcyon
• August 24th City response letter
• October 19th appeal
• Nov. 8th City Engineer memo
3800 Laverne Avenue North, Lake Elmo, MN 55042
(651) 747-3906
August 24, 2022
Halcyon Cemetery
Lee Rossow
11050 50th Street N
Lake Elmo, MN 55042
RE: Stormwater Appeal
I left a message for you earlier this week regarding your storm water appeal and haven’t heard
back. I wanted to follow up in writing just to make sure you have the information.
Our Public Works Director reviewed your appeal form and is proposing a 25% reduction in your storm water fee. This reduction is due to your storm water ponds collecting a minimal
amount of water that does not shed off your property. Instead of the $543.24 due quarterly, the fee would be $407.43 quarterly. Please let me know if you agree with this reduction or if you would like to take the appeal to the City Council for further review.
Per city code § 53.05 EXEMPTIONS the following land uses are exempt from the surface water management fee:
(A) Public right-of-way; (B) Parks;
(C) Lakes; and (D) Railroad property.
Since your property is not considered one of the exemptions listed, we are unable to waive
storm water fees.
Please contact me by email tbatchelor@lakeelmo.org or call me at 651-747-3906.
Thank you.
Tanya Batchelor
Utility Billing
City of Lake Elmo
ATTORNEYS AT LAW
220 South Sixth Street Suite 2200 Minneapolis, MN 55402-4504
Phone: 612-339-6321 Fax: 612-338-0535 Felhaber.com 3779786.v3
Christopher W. Boline
(612) 373-8516
cboline@felhaber.com
October 19, 2022
Via U.S. Mail & E-Mail
Mayor Charles Cadenhead
and Lake Elmo City Council Members
3880 Laverne Avenue
Lake Elmo, MN 55042
RE: Storm Water Management Fee Appeal
11050 50th Street North, Lake Elmo, MN 55042
PID: 01.029.21.33.0008
Felhaber File No. 33327.00001
Dear Mayor Cadenhead and City Council Members:
Felhaber Larson represents Halcyon Cemetery, a Minnesota nonprofit corporation
(“Halcyon Cemetery”). By this letter, Halcyon Cemetery respectfully appeals the storm water
management fee assessed against the property located at 11050 50th Street North, Lake
Elmo, MN 55042, property ID No. 01.029.21.33.0008 (the “Property”). As the party
responsible for paying the surface water management fee, Halcyon Cemetery has standing
to bring this appeal under Section 5.16.070 of the Lake Elmo City Code (the “Code”). For
the reasons set forth below, Halcyon Cemetery requests that the City of Lake Elmo (the
“City”) apply a 75% ongoing credit to the surface water management fee for the Property,
and that it apply the same credit for amounts already paid in 2022.
Under Chapter 5.16 of the City Code, the City may apply varying credits to surface
water management fees. Generally, there are three credit categories. First, the City may apply
a credit up to 75% for “financial hardship.” (Code § 5.16.040(c).) Second, the City shall
apply a credit up to 75% based on the surface water retention practices at the subject
property.1 (Id. § 5.16.040(a).) Third, the City may apply a discount up to 50% of the surface
1 The Code makes this credit mandatory, using the words “shall apply a credit” if
qualifying conditions exist.
Charles Cadenhead, Mayor
and Lake Elmo City Council Members
October 19, 2022
Page 2
3779786.v3
water management fee based on the “effectiveness of the surface water retention as it relates
to the management of the municipal surface water management system as a whole.” (Id. §
5.16.040(b).) All three credit categories apply here.
Financial Hardship Credit
The City initially imposed a quarterly surface water management fee of $543.24, or
$65.45 per acre,2 which causes Halcyon Cemetery a financial hardship. By letter dated
August 24, 2022, the City’s Public Works Director proposed a 25% reduction in the surface
water management fee from $534.24 to $407.43 per quarter because the Property’s “storm
water ponds collect[] a minimal amount of water that does not shed” off the Property. With
the proposed 25% reduction, the quarterly fee per acre is $49.09. For the reasons set forth
below, Halcyon Cemetery will continue to bear a financial hardship, even with the proposed
discount.
Halcyon Cemetery is a nonprofit corporation. As a nonprofit, Halcyon Cemetery does
not provide pecuniary gain or dividends to its members. It was developed to benefit Lake
Elmo and the surrounding community. After the cemetery received a certificate of
occupancy, it quickly began fulfilling its mission to give back to the community by providing
a free burial place for 97 unclaimed individuals who died without pre-planned post-mortem
arrangements for their remains, or the means to pay for such arrangements. As part of its
continuing mission to give back, Halcyon Cemetery works with the University of Minnesota
Medical School’s Anatomy Bequest Program to provide a no-cost resting place for the
cremains of the deceased who donate their bodies to the school as a contribution to medical
research and education.
There were significant development costs involved in getting Halcyon Cemetery to a
place where it can fulfill its goals of community building and charitable endeavors. Even the
reduced storm water fee of $407.43 per quarter ($1,629.72 annually) works as a financial
hardship against the cemetery. Halcyon Cemetery was created to provide a peaceful and
respectful resting place into perpetuity. In addition to the significant development costs
invested in improving the Property, Halcyon Cemetery’s operating costs are expected to
exceed revenue for years. For these reasons, an ongoing 75% credit is appropriate to reduce
Halcyon Cemetery’s surface water management fee from $534.24 to $133.56 per quarter.
Credit for Intentional Retention and Re-Use of Surface Water Run-off
Halcyon Cemetery qualifies for a 75% credit based on its water retention practices.
(Code § 5.16.040(a).) Section 5.16.040(a) provides credits for retention practices including
but not limited to the use of rain barrels, rain gardens, retention ponds, swales, ditches, or
manmade watercourses, riparian area plantings, and other actions that are deemed to
2 The Property is 8.3 acres.
Charles Cadenhead, Mayor
and Lake Elmo City Council Members
October 19, 2022
Page 3
3779786.v3
intentionally detain surface water run-off. The broader objective of this credit is to provide a
discount for property owners who “contributed to the management of surface water through
intentional acts of retaining or re-using surface water to have a minimal impact on the
municipal surface water management system or surface waters of the state.” (Id.)
There are four retention ponds at Halcyon Cemetery in the drainage and utility
easement as shown on the GIS map image below, with the boundary of the fourth pond
drawn in yellow:
The retention ponds not only collect surface water run-off from the Property, but they
also collect water run-off from the properties to the north (10.0 acres) and to the east (9.0
acres) that are at higher elevations than the Property. As shown above in the GIS image, the
drainage and utility easement carveout on the east side, and more than half of the southern
boundary consume a large portion of the acreage and are dedicated to keeping all surface
water, and surface water from neighboring properties, on the Property.
Charles Cadenhead, Mayor
and Lake Elmo City Council Members
October 19, 2022
Page 4
3779786.v3
Loucks Associates prepared a Stormwater Management Plan as part of the
development of the cemetery. (See enclosed Exhibit A.) The cemetery was designed and
developed to ensure that all surface water on the Property would stay on the Property. Storm
water management at the cemetery consists “of an infiltration basin along the perimeter of
the site with vegetative swales and NURP ponding for pretreatment.” (Ex. A, p. 2.) The
conclusion from the Loucks Associates Stormwater Management Plan describes the
The proposed Stormwater Management Plan for The Halcyon Cemetery
project is designed to meet the Valley Branch Watersheds storm water
requirements. The plan provides rate control by decreasing the rates from
existing for the 2-, 10-, and 100-year events. We are also meeting the Volume
Control requirement by providing 26,812 cubic feet of storage below the
outlets of the infiltration basins. The owner will build the storm water
treatment for the entire site during phase 1.
(Ex. A, p. 3.)
Because Halcyon Cemetery employs multiple features that aid the management of
surface water through intentional acts of retaining or re-using surface water, the cemetery
requests a surface water management fee credit of 75%, reducing the fee to $133.56 per
quarter.
Credit for Surface Water Retention Benefiting the System as a Whole
Finally, while the two previous credit categories relate to property-specific discounts,
the third category provides for credits up to 50% based on the “effectiveness of the surface
water retention as it relates to the management of the municipal surface water management
system as a whole.” (Code § 5.16.040(b).) The Property has been in the Rossow family for
decades. LeRoy J. Rossow, Jr., the Chairman of the Board of Halcyon Cemetery, is acutely
aware of the Lake Elmo’s past and ongoing growth, and of its goals to not have an adverse
impact to ground and surface water resources in the area, to protect ground water quality
and quantity, and to protect and enhance the quality of its natural resources. The cemetery
was designed and developed with the assistance of engineering professionals to ensure that
the Property complied with all Valley Branch Watershed District requirements and that it
retained as much surface water on its 8.3 acres as possible. Because Halcyon Cemetery
implemented a surface water retention system that will benefit the municipal water
management system for many years, it requests that the City apply a 50% credit to the surface
water management fee.
Charles Cadenhead, Mayor
and Lake Elmo City Council Members
October 19, 2022
Page 5
3779786.v3
Summary
All three credit categories under Section 5.16.040 of the Code provide Halcyon
Cemetery relief from the surface water management fee. The City has ample authority to
grant Halcyon Cemetery a 75% credit for financial hardship or for its intentional retention
and re-use of surface water run-off. Even if the cemetery didn’t qualify under either of these
credit categories, its contributions to the broader municipal surface water management
system justifies a 50% credit. Halcyon Cemetery respectfully requests that the City reduce
the storm water management fee by 75% to $133.56 per quarter, that the discount be
applied annually to the Property, and that the City apply a credit against future fees for the
amounts already paid in 2022 greater than 25% of the assessed fee. We have prepared draft
findings of fact and conclusions of law for your consideration as we encourage you to adopt
this draft as part of your appeal determination in favor of Halcyon Cemetery. (See Exhibit B.)
Please let me know if you have any questions. Thank you.
Sincerely,
Christopher W. Boline
cc: Tanya Batchelor, Utility Billing (via e-mail)
LeRoy J. Rossow, Jr. (via e-mail)
EXHIBIT A
Loucks Associates Stormwater Management Plan
Stormwater Management Plan
Halcyon Cemetery
Lake Elmo, MN
Prepared by Loucks Associates
July 11, 2018
I hereby certify that this report was prepared by me or under my direct supervision, and
that I am a duly Registered Professional Engineer under the laws of the State of Minnesota.
_______________________________________
Vicki Van Dell, P.E.
Date: 7/11/18
Reg. No. 41352
Stormwater Management Plan January 30, 2015 (revised July 11, 2018)
Halcyon Cemetery
Halcyon Cemetery
Lake Elmo, Minnesota
Stormwater Management Plan
Table of Contents
Page
Number
Introduction .................................................................................................................................. 1
Methodology ................................................................................................................................ 1
Existing Conditions ....................................................................................................................... 1
Proposed Conditions .................................................................................................................... 2
Best Management Practices ......................................................................................................... 2
Conclusion .................................................................................................................................... 2
Appendices
Flow Summary/Volume Control Table ......................................................................... Appendix A
Drainage Area Maps .................................................................................................... Appendix B
Natural Resources Conservation Web Soil Survey ...................................................... Appendix C
HydroCAD Report Existing and Proposed ................................................................. Appendix D
Floodplain Volume Comparison .................................................................................. Appendix E
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 1
Halcyon Cemetery
Lake Elmo, Minnesota
Stormwater Management Plan
Introduction
This storm water management plan was created for The Halcyon Cemetery project located
east of Lake Elmo Avenue North and north of 50th Street in Lake Elmo, Minnesota.
On behalf of the owner, we are pleased to submit this application for Watershed approval.
Although a new cemetery may not be typical, it is planned to be an exceptional facility.
The project consists of a parcel approximately 8± acres with approximately 90% of the site
proposed to be disturbed with ultimate build-out. The project consists of converting the
existing house into an administration building and the shed will remain as maintenance shed.
The remaining portion of the parcel will consist of access roads, mausoleums and grave sites.
The wetland in the northeast portion of the site is planned to remain.
Included in this Stormwater Management Plan are calculations for the existing and proposed
discharge off site.
Methodology
Valley Branch Watershed requirements state that the project must retain 1.1 inches times the
impervious surface without any losses. Peak runoff from the developed site must not exceed
existing rates for the 2-year, 10-year and 100-year rainfall events. Soils information was taken
from the Natural Resources Conservation Service. The site has a combination of A, B & C
soils, see the attached soils map. Based on Valley Branch rules, the infiltration rate for C soil is
0.5 inches/hour.
The stormwater calculations were created utilizing the stormwater-modeling program
HydroCAD 9.00. Calculations were performed for the Lake Elmo-24hr S1, using Altas 14 for 2-
year, 10-year and 100-year rainfall events of 2.8 inches, 4.17 inches and 7.25 inches
respectively. The rainfall values were taken from the Altas 14 database for the site location.
City of Lake Elmo requires the existing Curve Number be based on Pre-Settlement conditions,
so for the C-Soils, we were required to use a CN of 71. NPDES requirements are then required
by the City of Lake Elmo, which match the Valley Branch Watershed.
Existing Conditions
The existing site consists of a house and shed with the remainder of the site consisting of
grass, a small existing wetland in the center of the site and an existing wetland in the
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 2
northeast portion of the site. The existing approximate 8-acre site has approximately 0.46
acres of impervious surface.
Additional off site area is added to the analysis to better determine the water flow through the
site. Based on the information provided by the watershed, there are two main drainage areas
flowing through the site, with one being split into two. This drainage area was split into two
areas based on the data provided by the watershed. The contour data given showed lowland
areas to the east of the site, which is consistent with the survey data we have. Based on that
information the area was split based on what drains directly onto the site and that which drains
to other lowland areas first.
Proposed Conditions
The proposed project consists of a main administration building, a maintenance shed,
mausoleums and grave sites. The proposed impervious surface for the parcel is 2.07 acres.
Storm water management will consist of an infiltration basin along the perimeter of the site
with vegetative swales and NURP ponding for pretreatment.
Volume Control
The site is designed to meet the volume reduction of 1.1 inches times the impervious surfaces
for the site. This amounts to 8,278 cubic feet of storage required. The storage below the
outlet of the infiltration basin is 15,738 cf for the south infiltration basin & 12,318 cf for the
north infiltration basin.
Additional volume control is needed for the existing outlet to the south. For the proposed 2-
year 24-hour event, the outlet can take no more than 25% more volume than existing. The
existing volume was 0.115 acre-feet and the proposed volume is 0.000 acre-feet.
Rate Control
The site is designed to decrease the rates from existing conditions for the 2-year, 10-year and
100-year rainfall events. The attached Flow Summary/Volume Control worksheet shows the
existing and proposed rates have decreased from the existing conditions.
Drawdown
The depth of the infiltration basin is based on the drawdown time of the infiltration rate used
over a 48 hour drawdown time frame. At a 0.3 in/hr infiltration rate over 48 hours, the pond
can be 1.3’ deep. The proposed infiltration depth from the lowest outlet to the bottom of the
basin for the north infiltration basin (P-3) is 0.90-ft and the infiltration depth from the lowest
outlet to the bottom of the basin for the south infiltration basin (P-12) is 0.75-ft’. These depths
are below the required maximum depth of 1.3-ft.
Best Management Practices
Best management practices (BMP’s) will be implemented during construction per the project
Stormwater Pollution Prevention Plan (SWPPP). The final SWPPP will be prepared as part of
the construction documents as required and updated as the development occurs. Proposed
BMP’s will minimize erosion and manage sedimentation as required by the National Pollution
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 3
Discharge Elimination System (NPDES). During construction, erosion control measures will
include dust control, silt fencing, inlet protection, a temporary rock construction entrance, and
a concrete wash-out area. Permanent BMP’s will include an infiltration basin, sum and surface
paving of disturbed areas.
Conclusion
The proposed Stormwater Management Plan for The Halcyon Cemetery project is designed to
meet the Valley Branch Watersheds storm water requirements. The plan provides rate control
by decreasing the rates from existing for the 2-, 10-, and 100-year events. We are also
meeting the Volume Control requirement by providing 26,812 cubic feet of storage below the
outlets of the infiltration basins. The owner will build the storm water treatment for the entire
site during phase 1. The owner requests that once this storm sewer treatment is approved,
that this site be considered as fully compliant. The development of this parcel will take place
over many years as the cemetery plots are sold. The owner does not want to have to provide
additional stormwater treatment in the future.
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 4
APPENDIX A
HALCYONVolume (AF)Volume (AF)Volume (AF)Volume (AF)Volume (AF)Volume (AF)DA-4 0.21 0.021 DA-4 0.00 0.000 DA-4 0.56 0.050 DA-4 0.00 0.000 DA-4 1.41 0.129 DA-4 0.02 0.005P-8 0.29 0.115 P-8 0.00 0.000 P-8 2.27 0.402 P-8 0.00 0.000 P-8 2.56 1.196 P-8 1.70 1.766L-6 1.54 0.157 L-6 0.99 0.084 L-6 4.16 0.371 L-6 2.42 0.188 L-6 10.48 0.962 L-6 5.63 0.463Total 2.04 0.293 Total 0.99 0.084 Total 6.99 0.823 Total 2.42 0.188 Total 14.45 2.287 Total 7.35 1.771Proposed (CFS)7/11/201814530Existing (CFS)Project:Project No:Date:Existing (CFS) Proposed (CFS)100-YR Event10-YR Event2-YR EventExisting (CFS) Proposed (CFS)FLOW SUMMARY / VOLUME CONTROL WORKSHEET
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 5
APPENDIX B
1.087 AC
(0.000 IMP)
(1.087 PER)
DA-1
P-3
3.586 AC
(0.000 IMP)
(3.586 PER)
DA-2
3.306 AC
(0.000 IMP)
(3.306 PER)
DA-3
0.388 AC
(0.000 IMP)
(0.388 PER)
DA-4
DA-5
1.569 AC
(0.000 IMP)
(1.569 PER)
DA-6
0.224 AC
(0.000 IMP)
(0.224 PER)
DA-7
1.108 AC
(0.000 IMP)
(1.108 PER)
DA-8
2.157 AC
(0.000 IMP)
(2.157 PER)
DA-9
1.739 AC
(0.000 IMP)
(1.739 PER)
P-2
P-8
L-6
N
Gopher State One Call
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS
OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY
COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF
LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT
651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF
ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES
OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR
SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING
CONSTRUCTION AT NO COST TO THE OWNER.
WARNING
LOUCKS
W:\2014\14530\CADD DATA\CIVIL\_dwg Sheet Files\C14530 H1-1Plotted: 06 /18 / 2018 8:14 AM7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
HALCYON
LAKE ELMO, MN
GLCJ Properties, Inc.
1870 Rice Street
Rosevile, MN 55113
03/04/15 Revised City Submittal
05/14/15 Watershed submittal
06/17/15 Final City Submittal
06/13/18 Construction Documents
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Vicki J. Van Dell - PE 41352
Project Lead
Drawn By
Checked By
Loucks Project No.014530.00
GAJ
GAJ/WBS
GAJ/VJV
06/13/18
06/13/18
C0-1 COVER SHEET
C1-1 EXISTING & REMOVALS
C2-1 SITE LAYOUT PLAN
C3-1 GRADING & DRAINAGE PLAN
C3-2 - C3-4 SWPPP
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L1-0 TREE PRESERVATION PLAN
L2-0 LANDSCAPE PLAN
L2-1 LANDSCAPE DETAILS
EXISTING
DRAINAGE
AREA MAP
H1-1
935
936
935
9
3
7
934
+934.5
936937935934932934933936937
937
930
938
93
5
934
937
934 933933934932926
93
6
936
935
8
8
8
8 929
925.5937941 940939938937
931932
88810:1 BENCH
33.74
35.34
36.0
FFE-939.91
39.91
1.8%39.41
38.91
1.8%38.48
39.51
39.39
3.0%36.92
36.203.0%4.5%35.0
38.621.5%38.62 38.62
39.39
39.51
38.8939.01
2.0%34.16
0.
5
0
%
0.50%
37.70
37.701.9%1.73%
37.39
37.70
34.95
34.95
35.31
35.31 3.0%37.14 36.6
36.22
33.0
38.11
32.92.50%35.6
2.66%35.6
37.59
37.98
37.25
33.71
2.35%
36.0
35.8
37.69
36.57
38.6
38.1
37.2
2.6%
2.3%
37.76
37.4
36.99
2.58%36.24
4.5%3.0%HWL 928.39
34.9
35.3
0.8%
36.85
37.4
36.6
34.0
34.0
34.8
34.0
34.9
34.9
34.9
34.9
TW-36.33
GW-36.0
TW-37.67
GW-33.0
TW-37.0
GW-33.0
TW-35.0
GW-32.0
TW-35.0GW-31.5
TW-35.0
GW-32.0
TW-35.0
GW-33.0
TW-34.33
GW-34.0
EXISTING FLOODPLAIN
ELEV=932.0
EXISTING FLOODPLAIN
ELEV=932.0
EXISTING FLOODPLAIN
ELEV=932.0
EXISTING
FLOODPLAIN
ELEV=932.0
EXISTING FLOODPLAIN
ELEV=932.0
EXISTING FLOODPLAINELEV=932.0
HWL
9
2
9
.
6
9
935
34.0 33.993493
6
936
937
936
9
3
4
9
3
3
93
2
930932931933929926922 924925
926927928929930931 931CCCCCC931935CONNECT TO EXISTING
12" HDPE WATERMAIN
245' 4" DIPWATER SERVICE
8
930
929
928
FILL EXISTING
832SF WETLAND
PRESERVE EXISTING
WETLAND88928
HWL 927.78
HWL 930.00
PROPOSED
FLOODPLAIN
ELEV=932.0
PROPOSEDFLOODPLAIN
ELEV=932.0
PROPOSED
FLOODPLAIN
ELEV=932.0
PROPOSED
FLOODPLAIN
ELEV=932.0
936
935931NWL 926.0
HWL 928.36
EOF
30.25
EOF29.75
EOF
28.0
EOF
28.0
EOF
31.9
1.087 AC
(0.127 IMP)
(0.960 PER)
DA-1
P-3
3.586 AC
(0.000 IMP)
(3.586 PER)
DA-2
1.533 AC
(0.055 IMP)
(1.478 PER)
DA-3
0.166 AC
(0.000 IMP)
(0.166 PER)DA-4
DA-5
0.664 AC
(0.267 IMP)
(0.397 PER)
DA-6
1.290 AC
(0.000 IMP)
(1.290 PER)
DA-7
0.995 AC
(0.778 IMP)
(0.217 PER)
DA-8
0.043 AC
(0.000 IMP)
(0.043 PER)
DA-9
1.739 AC
(0.102 IMP)
(1.637 PER)
P-2
P-8
L-6
P-12
P-10
DA-10
0.714 AC
(0.410 IMP)
(0.304 PER)
DA-12
1.152 AC
(0.051 IMP)
(1.101 PER)
DA-11
2.195 AC
(0.735 IMP)
(1.460 PER)
P-11
R-11
NORTH
INFILTRATION
BASIN
SOUTH INFILTRATION BASIN
NURP POND
PRE-TREATMENT
BASIN
N
Gopher State One Call
LOUCKS
W:\2014\14530\CADD DATA\CIVIL\_dwg Sheet Files\C14530 H2-1Plotted: 06 /18 / 2018 9:38 AM7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
HALCYON
LAKE ELMO, MN
GLCJ Properties, Inc.
1870 Rice Street
Rosevile, MN 55113
03/04/15 Revised City Submittal
05/14/15 Watershed submittal
06/17/15 Final City Submittal
06/13/18 Construction Documents
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Vicki J. Van Dell - PE 41352
Project Lead
Drawn By
Checked By
Loucks Project No.014530.00
GAJ
GAJ/WBS
GAJ/VJV
06/13/18
06/13/18
C0-1 COVER SHEET
C1-1 EXISTING & REMOVALS
C2-1 SITE LAYOUT PLAN
C3-1 GRADING & DRAINAGE PLAN
C3-2 - C3-4 SWPPP
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L1-0 TREE PRESERVATION PLAN
L2-0 LANDSCAPE PLAN
L2-1 LANDSCAPE DETAILS
PROPOSED
DRAINAGE
AREA MAP
H2-1
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 6
APPENDIX C
Hydrologic Soil Group—Washington County, Minnesota
(Hydrologic Soil Group Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 1 of 449853004985330498536049853904985420498545049854804985510498554049855704985300498533049853604985390498542049854504985480498551049855404985570509190509220509250509280509310509340509370509400
509190 509220 509250 509280 509310 509340 509370 509400
45° 1' 24'' N 92° 53' 0'' W45° 1' 24'' N92° 52' 50'' W45° 1' 15'' N
92° 53' 0'' W45° 1' 15'' N
92° 52' 50'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84
0 50 100 200 300Feet
0 20 40 80 120Meters
Map Scale: 1:1,420 if printed on A portrait (8.5" x 11") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Washington County, Minnesota
Survey Area Data: Version 9, Sep 16, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Mar 16, 2012—Apr 26,
2012
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group—Washington County, Minnesota
(Hydrologic Soil Group Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 2 of 4
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Washington County, Minnesota (MN163)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
49 Antigo silt loam, 0 to 2
percent slopes
B 0.1 1.1%
49B Antigo silt loam, 2 to 6
percent slopes
B 3.4 37.0%
120 Brill silt loam C 1.7 18.3%
155C Chetek sandy loam, 6 to
12 percent slopes
A 1.5 16.0%
266 Freer silt loam C/D 0.3 3.6%
453B DeMontreville loamy fine
sand, 2 to 6 percent
slopes
C 1.1 12.1%
507 Poskin silt loam B/D 1.0 10.7%
1055 Aquolls and Histosols,
ponded
B/D 0.1 1.1%
Totals for Area of Interest 9.1 100.0%
Hydrologic Soil Group—Washington County, Minnesota Hydrologic Soil Group Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Washington County, Minnesota Hydrologic Soil Group Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 4 of 4
Depth to Water Table—Washington County, Minnesota
(Depth to Water Table Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 1 of 349853004985330498536049853904985420498545049854804985510498554049855704985300498533049853604985390498542049854504985480498551049855404985570509190509220509250509280509310509340509370509400
509190 509220 509250 509280 509310 509340 509370 509400
45° 1' 24'' N 92° 53' 0'' W45° 1' 24'' N92° 52' 50'' W45° 1' 15'' N
92° 53' 0'' W45° 1' 15'' N
92° 52' 50'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84
0 50 100 200 300Feet
0 20 40 80 120Meters
Map Scale: 1:1,420 if printed on A portrait (8.5" x 11") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
0 - 25
25 - 50
50 - 100
100 - 150
150 - 200
> 200
Not rated or not available
Soil Rating Lines
0 - 25
25 - 50
50 - 100
100 - 150
150 - 200
> 200
Not rated or not available
Soil Rating Points
0 - 25
25 - 50
50 - 100
100 - 150
150 - 200
> 200
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Washington County, Minnesota
Survey Area Data: Version 9, Sep 16, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Mar 16, 2012—Apr 26,
2012
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Depth to Water Table—Washington County, Minnesota
(Depth to Water Table Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 2 of 3
Depth to Water Table
Depth to Water Table— Summary by Map Unit — Washington County, Minnesota (MN163)
Map unit symbol Map unit name Rating (centimeters)Acres in AOI Percent of AOI
49 Antigo silt loam, 0 to 2
percent slopes
>200 0.1 1.1%
49B Antigo silt loam, 2 to 6
percent slopes
>200 3.4 37.0%
120 Brill silt loam 76 1.7 18.3%
155C Chetek sandy loam, 6 to
12 percent slopes
>200 1.5 16.0%
266 Freer silt loam 30 0.3 3.6%
453B DeMontreville loamy fine
sand, 2 to 6 percent
slopes
>200 1.1 12.1%
507 Poskin silt loam 46 1.0 10.7%
1055 Aquolls and Histosols,
ponded
0 0.1 1.1%
Totals for Area of Interest 9.1 100.0%
Description
"Water table" refers to a saturated zone in the soil. It occurs during specified
months. Estimates of the upper limit are based mainly on observations of the water
table at selected sites and on evidence of a saturated zone, namely grayish colors
(redoximorphic features) in the soil. A saturated zone that lasts for less than a month
is not considered a water table.
This attribute is actually recorded as three separate values in the database. A low
value and a high value indicate the range of this attribute for the soil component. A
"representative" value indicates the expected value of this attribute for the
component. For this soil property, only the representative value is used.
Rating Options
Units of Measure: centimeters
Aggregation Method: Dominant Component
Component Percent Cutoff: None Specified
Tie-break Rule: Lower
Interpret Nulls as Zero: No
Beginning Month: January
Ending Month: December
Depth to Water Table—Washington County, Minnesota Depth to Water Table Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 3 of 3
Flooding Frequency Class—Washington County, Minnesota
(Flooding Frequency Class Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 1 of 449853004985330498536049853904985420498545049854804985510498554049855704985300498533049853604985390498542049854504985480498551049855404985570509190509220509250509280509310509340509370509400
509190 509220 509250 509280 509310 509340 509370 509400
45° 1' 24'' N 92° 53' 0'' W45° 1' 24'' N92° 52' 50'' W45° 1' 15'' N
92° 53' 0'' W45° 1' 15'' N
92° 52' 50'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84
0 50 100 200 300Feet
0 20 40 80 120Meters
Map Scale: 1:1,420 if printed on A portrait (8.5" x 11") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
None
Very Rare
Rare
Occasional
Frequent
Very Frequent
Not rated or not available
Soil Rating Lines
None
Very Rare
Rare
Occasional
Frequent
Very Frequent
Not rated or not available
Soil Rating Points
None
Very Rare
Rare
Occasional
Frequent
Very Frequent
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Washington County, Minnesota
Survey Area Data: Version 9, Sep 16, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Mar 16, 2012—Apr 26,
2012
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Flooding Frequency Class—Washington County, Minnesota
(Flooding Frequency Class Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 2 of 4
Flooding Frequency Class
Flooding Frequency Class— Summary by Map Unit — Washington County, Minnesota (MN163)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
49 Antigo silt loam, 0 to 2
percent slopes
None 0.1 1.1%
49B Antigo silt loam, 2 to 6
percent slopes
None 3.4 37.0%
120 Brill silt loam None 1.7 18.3%
155C Chetek sandy loam, 6 to
12 percent slopes
None 1.5 16.0%
266 Freer silt loam None 0.3 3.6%
453B DeMontreville loamy fine
sand, 2 to 6 percent
slopes
None 1.1 12.1%
507 Poskin silt loam None 1.0 10.7%
1055 Aquolls and Histosols,
ponded
None 0.1 1.1%
Totals for Area of Interest 9.1 100.0%
Flooding Frequency Class—Washington County, Minnesota Flooding Frequency Class Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 3 of 4
Description
Flooding is the temporary inundation of an area caused by overflowing streams, by
runoff from adjacent slopes, or by tides. Water standing for short periods after
rainfall or snowmelt is not considered flooding, and water standing in swamps and
marshes is considered ponding rather than flooding.
Frequency is expressed as none, very rare, rare, occasional, frequent, and very
frequent.
"None" means that flooding is not probable. The chance of flooding is nearly 0
percent in any year. Flooding occurs less than once in 500 years.
"Very rare" means that flooding is very unlikely but possible under extremely
unusual weather conditions. The chance of flooding is less than 1 percent in any
year.
"Rare" means that flooding is unlikely but possible under unusual weather
conditions. The chance of flooding is 1 to 5 percent in any year.
"Occasional" means that flooding occurs infrequently under normal weather
conditions. The chance of flooding is 5 to 50 percent in any year.
"Frequent" means that flooding is likely to occur often under normal weather
conditions. The chance of flooding is more than 50 percent in any year but is less
than 50 percent in all months in any year.
"Very frequent" means that flooding is likely to occur very often under normal
weather conditions. The chance of flooding is more than 50 percent in all months
of any year.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: More Frequent
Beginning Month: January
Ending Month: December
Flooding Frequency Class—Washington County, Minnesota Flooding Frequency Class Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/23/2015
Page 4 of 4
Stormwater Management Plan January 28, 2015 (revised July 11, 2018)
The Halcyon Cemetery, Lake Elmo Page 7
APPENDIX D
EXHIBIT B
Draft Resolution Approving Storm Water Assessment Credit
for Halcyon Cemetery
1 3780053.v2
PROPOSED RESOLUTION
* * * * * * * * * * * *
CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA
RESOLUTION NO. 2022-XXX A RESOLUTION APPROVING A STORM WATER ASSESSMENT CREDIT FOR HALCYON CEMETERY
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Halcyon Cemetery has submitted an appeal to the City of Lake Elmo (the
“City”) requesting that the City grant an ongoing credit of 75% of the surface water management
fee for the property located at 11050 - 50th Street North, Lake Elmo, Minnesota 55042, and legally described as Lot 1, Block 1, HALCYON, Washington County, Minnesota (PID# 01.029.21.33.0008) (the “Property”); and
WHEREAS, the City Council considered said matter at its November 1, 2022 meeting
and directed City staff to draft a resolution granting Halcyon Cemetery an ongoing credit of 75% of the surface water management fee for the Property, and to apply a retroactive setoff credit for future water management fees based on the amounts already paid for 2022; and
NOW, THEREFORE, based on the testimony elicited and information received, the
City Council makes the following: FINDINGS
1) That the City may make surface water management fee adjustment credits as
provided for in Section 5.16.040 of the Lake Elmo City Code. 2) That all appeal submission requirements of Section 5.16.070 of the Lake Elmo City Code have been met by Halcyon Cemetery.
3) That Halcyon Cemetery has demonstrated that it meets the conditions for a credit to be applied to the surface water management fee for the Property, including the following:
a) Financial Hardship Credit. Halcyon Cemetery qualifies for a financial
hardship credit pursuant to Section 5.16.040(c) of the Lake Elmo City Code because, among other things, (i) it is a nonprofit corporation that does not provide pecuniary gain or dividends to its members, (ii) the cemetery at the
2 3780053.v2
Property has and continues to benefit Lake Elmo and the surrounding community by providing free burial places for 97 unclaimed individuals who
lacked the means or arrangements for burial and by working with the
University of Minnesota Medical School’s Anatomy Bequest Program to provide a no-cost resting place for the cremains of those who donate their deceased bodies to school as a contribution to medical research and education, (iii) Halcyon’s Cemetery’s operating costs have and are expected to exceed
revenue.
b) Intentional Retention and Re-Use of Surface Water Run-off. Halcyon Cemetery qualifies for a surface water management fee credit pursuant to Section 5.16.040(a) of the Lake Elmo City Code because, among other things,
(i) there are four retention ponds on the Property that capture surface water
from the Property and run-off from the properties north and east of the Property, and (ii) the cemetery implemented a storm water management plan with the assistance of Loucks Associates such that cemetery meets the Valley Branch Watershed’s storm water requirements, provides better rate control
than previously existed at the property, and meets volume control
requirements. c) Surface Water Retention Relating to the Management of the Municipal Surface Water Management System as a Whole. Halcyon Cemetery
qualifies for a surface water management fee credit pursuant to Section
5.16.040(b) of the Lake Elmo City Code because, among other things, (i) the property was designed and developed to retain the majority of the surface water on the 8.3 acres of the Property, and (ii) the cemetery implemented a storm water management plan with the assistance of Loucks Associates such
that cemetery meets the Valley Branch Watershed’s storm water requirements,
provides better rate control than previously existed at the property, and meets volume control requirements. DECISION
NOW, THEREFORE, BE IT FURTHER RESOLVED, and based upon the information received and the above Findings, that the City Council of the City of Lake Elmo hereby granted Halcyon Cemetery’s request for an ongoing credit of 75% of the surface water management fee for the Property and a retroactive setoff credit of 75% of the surface water
management fee for the Property for amounts paid for 2022 to be applied to future surface water
management fees. Passed and duly adopted this 1st day of November, 2022 by the City Council of the City of Lake Elmo, Minnesota.
3 3780053.v2
By: Charles Cadenhead
Mayor
(Seal) ATTEST:
Julie Johnson City Clerk
PAGE 1 of 2
MEMORANDUM
Date: November 8, 2022
To: Kristian Handt, City Administrator Re: Halcyon Cemetery (11050 50th Street North)
Cc: Marty Powers, Public Works Director Stormwater Management Fee Appeal
Cc: Chad Isakson, PE, Assistant City Engineer
From: Jack Griffin, PE, City Engineer
This memorandum is intended to address the status of the Halcyon Cemetery stormwater management
improvements that were recently constructed as part of the Halcyon Cemetery development. The property owner
has submitted an appeal for a reduction in the Stormwater Management Fee for the property under Lake Elmo City
Code (LEC) 5.16.040.
Engineering has the following findings and recommendations:
1. No credit is recommended for the storm water management fees until after the stormwater management
improvements for the Halcyon Cemetery development (the “Improvements”) have been fully completed,
accepted and approved by the city and the Valley Branch Watershed District.
2. Once the “Improvements” have been completed, an ongoing credit of 25% is recommended. The design
performance of the Improvements provides a rate reduction in runoff of roughly 50% from the pre‐existing
conditions. All other benefits provided by the applicant’s stormwater management system are for the sole
benefit of the property owner and the expanded use of the property.
3. The ongoing credit should be limited to 25%. In addition to the maintenance of storm water infrastructure,
the Stormwater Utility expenditures include extensive unfunded mandates related to the city’s duties and
responsibilities as a mandated MS4 permittee through the EPA. Permit requirements include extensive
ongoing studies, reporting, inspections and operating procedures to be completed by the city whether or
not the city has limited its discharges to waters of the State.
4. As a requirement for any credit to the storm water management fee, the property owner must have on file
with the city a fully executed Stormwater Maintenance and Easement Agreement in the city’s standard
form of agreement, including the provisions that require the property owner to agree to provide for the
adequate long term maintenance and continuation of the storm water improvements.
5. For the ongoing credit to be applied in any given year, the property owner must submit to the city the
records of all inspections and maintenance activities relating to the storm water improvements, and submit
such records by March 1st of each year to the city.
Status of the Construction of the Improvements:
1. The Halcyon Cemetery site improvements remains an active construction site.
2. The stormwater management improvements constructed as part of the Halcyon Cemetery development
(the “Improvements”) have not been approved and accepted by the city.
3. Before the Improvements can be accepted by the city, the developer must have its engineer perform an as‐
built survey and prepare as‐built record plans (in accordance with as‐built drawing plan format
requirements in the city engineering design standards manual) for city review and approval.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 2
4. Once as‐built record plans have been provided with all required information, the city must perform a final
construction inspection of the site. The developer will be required to complete all corrective work and
punch lists items identified as remaining work items.
5. The Stormwater Management Improvements have not been approved and accepted by the Valley Branch
Watershed District (VBWD). The permit for the site remains open. The property owner must take all steps
necessary to close out the permit with the VBWD.