My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Water Tower 3 Logo
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
01-17-23
>
#11 - Water Tower 3 Logo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 8:21:30 PM
Creation date
9/28/2023 9:33:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br />DATE: January 17, 2023 <br /> CONSENT <br /> <br />AGENDA ITEM: Approve Change Order No. 1 for the Water Tower No. 3 Project (Logo Design) <br />SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer <br /> ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 1 for Water Tower <br />No. 3 to revise the logo design and confirm the proposed logo placement on the water tower? BACKGROUND: Phoenix Fabricators & Erectors, LLC was awarded a construction contract on January <br />18, 2022 for the construction of Water Tower No. 3. Work remains in progress with a milestone 1 completion date of November 18, 2022, milestone 2 completion date of March 31, 2023, milestone 3 completion date of July 28, 2023, substantial completion date of October 13, 2023 and final completion <br />date of November 17, 2023. PROPOSAL DETAILS/ANALYSIS: Construction will resume on the water tower in 2023 which will <br />include painting and erecting the steel top of the tower. The current approved plans include two painted city logos being placed on the east and west side of the water tower. The logos would be visible to traffic traveling east or west along I-94. Refer to Exhibit 1 for a visual of the logo and the logo orientation. Staff is recommending the logo design be changed to match the existing water tower on Inwood Avenue. The changes would include removal of the outer oval and words “The City of” seen in Exhibit 1. Refer to Exhibit 2 for a visual of the proposed logo staff is recommending be painted on the new tower. Staff is also recommending to keep the proposed orientation of the two logos to be on the east and west side of the <br />tower. FISCAL IMPACT: None. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for Water Tower No. 3 to revise the logo design. If removed from the consent <br />agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for Water Tower No. 3 to revise the logo design to be consistent with the exiting Inwood Water Tower logo (as shown on Exhibit 2), and to confirm the orientation of <br />the logo to be placed per the approved plans, facing east and west along I-94”. <br />ATTACHMENTS: 1. Exhibit 1 – Current Approved Logo / Orientation. <br />2. Exhibit 2 – Staff Recommended Logo.
The URL can be used to link to this page
Your browser does not support the video tag.