HomeMy WebLinkAbout#17 - Baseball Field Design Responses STAFF REPORT DATE: 06/20/2023 REGULAR TO: CITY COUNCIL AGENDA ITEM: Baseball Fields FROM: Adam Swanepoel, Assistant Public Works Director REVIEWED BY: Marty Powers, Public Works Director Kristina Handt City Administrator BACKGROUND: On April 4, 2023, staff reviewed eight possible baseball fields within the City of Lake Elmo to consider updating as part of a ballfield improvement project. Staff suggested four separate options including Reid Park Pebble Park, Ridge Park and Stonegate. Staff took into consideration parking, access to water/sewer, electrical and accessibility. The Parks Commission recommended to consider Ridge and Reid Park for future updates. After a review of the parks, council moved forward with requesting staff to prepare a proposal for professional design services for Reid Park, Ridge Park and Pebble Park. City staff created a RFP and requested all submittals be returned by May 23. Since submitting the RFP staff was informed Ridge Park is part of the Minnesota Land Trust, if we seek to do any updates to Ridge park we should include the Land Trust in future conversations to remain consistent with the agreement. ISSUE BEFORE COUNCIL: Would the City Council like to contract one of the following firms to conduct a formal design and bid documents? Which fields would City Council like to move forward with designing? PROPOSAL DETAILS/ANALYSIS: Proposals were due to the City on May 23, 2023. At that time we received six proposals. The following is a summary of the proposals submitted. Reid Park Ridge Park Turf / Ridge Pebble Todd Bruchu – Lake Elmo Baseball $0 $0 $0 $0 Matt Woodruff - Larson Eng $ 29,000.00 $ 59,500.00 $ 63,000.00 $ 19,500.00 Robert Slipka - WSB $ 108,000.00 $ 155,000.00 $ 173,500.00 $ 72,000.00 Steve Rauh - Bolton Menk $ 44,400.00 $ 93,700.00 $ 46,500.00 $ 30,800.00 Dan Folsom - Design Tree $ 25,000.00 $ 60,000.00 $ 60,000.00 $ 30,000.00 Steven Foss - TKDA $ 32,400.00 $ 37,100.00 $ 38,400.00 $ 21,600.00 A review of the proposals found five of the six applicants submitted complete proposals with the required qualifications. Upon review Todd Bruchu – Lake Elmo Baseball’s proposal did not fulfill all requirements and was rejected. Based off the information provided by all applicants, Larson Engineering who assisted in the development of the Lions Park ballfield, under the design direction of Miller Architecture Inc, presented the lowest price to design the reconstruction of Reid and Pebble Park together. TKDA provided the lowest pricing options at Ridge Park with either a grass or turf field. TDKA’s hourly rates for services are slightly cheaper based off their hourly rate schedule than most other competitors. Overall if all three parks were sought to be reviewed for design, TDKA would provide the best value and have the history and experience to complete the proposed baseball improvement project. FISCAL IMPACT: Set aside in the Park Dedication funds is one million dollars available for the baseball improvement project. Selection of one or a combination of the fields for designing purposes will reduce the available funds by the selection of field and firm selected. OPTIONS: 1) Approve contracting TDKA for design services for Reid, Pebble and Ridge fields. 2) Do not pursue design services at this time RECOMMENDATION: Motion to approve contracting for design services for Reid, Pebble and Ridge Park from TDKA in a not to exceed amount of $92,400. ATTACHMENTS: 1  REQUEST FOR PROPOSALS   CITY OF LAKE ELMO BASEBALL FIELD PROJECT  May 22, 2023                       3  Our Baseball Field Project Proposal is to upgrade Reid Park to meet Standard League Play  Requirements for competitive Youth Baseball.  Included in the design are some wonderful  amenities to give the kids a great baseball experience and a ballpark that we can be proud of  when hosting home games.    We recognize that Reid Park is a multi‐purpose park and that permanent outfield fencing  limits the use of this park for other sports like football and soccer.  Therefore, our proposal  includes portable outfield fencing that can be taken down when the baseball season is over.  Scope of Work    Reid Park   Multi‐Use Community Park  Youth Sized Baseball Field  Portable Outfield Fence  4              5                                      6  Proposed                                 Note:   This is the type of portable fencing used at Johnny Cake Ridge Park in Apple Valley and we know  from experience that it plays very well.    7                                      8                                      9                                      10  Cost Estimates  Design Fees =  $0  Engineering Fees =  $0  (included in estimates)  Backstop and Dugout Fencing (Installed) ≈ $26,474  Portable Outfield Fencing ≈ $13,500 plus shipping  Two Players Benches @ $1,600 ≈ $3,200 plus shipping  Concrete Slabs for Dugouts and Storage Shed, 552  sq. ft. @ $6.50 ≈ $3,600  Red Ball Diamond Aggregate 50 yards @ $30 delivered ≈ $1,500  Excavation (Bobcat work),  8 hours @ $200 ≈ $1,600         Pre‐Built Steel Storage Shed ≈ $8,000 plus shipping  ______________________________________________________  Total Project Not to Exceed  $65,000    Estimated Timeframe  Summer 2023        City of Lake Elmo Request for Proposals Baseball Field Construction / Renovation Design and Preparation of Bid Document Services Submitted to: Adam Swanepoel City of Lake Elmo 3800 Lavern Avenue N. Lake Elmo, MN 55042 May 23, 2023 Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110-5126 651.481.9120 Fax: 651.481.9201 www.larsonengr.com May 23, 2023 Adam Swanepoel, Assistant Public Works Director City of Lake Elmo 3800 Laverne Avenue N. Lake Elmo, MN 55042 Email: aswanepoel@lakeelmo.org RE: Request for Proposals Baseball Field Construction / Renovation Design and Preparation of Bid Documents Services Dear Mr. Swanepoel: Larson Engineering, Inc. is pleased to submit the enclosed material in response to your Request for Proposal. Larson Engineering has worked on numerous synthetic turf and natural grass ballfield projects for city parks departments as well as school districts. We have reviewed the information and instructions outlined within your Request for Proposal, and we are willing and able commit all necessary resources and staff to complete the project as described herein. If awarded this project, Larson Engineering will agree to the city’s terms and conditions that are listed in Section III of your RFP. As you read through our response, we understand the proposed project and have the relative experience to help make your project a success. We are very excited about this project and would appreciate the opportunity to be a part of your team. If you have any questions, please do not hesitate to contact us. Sincerely, Larson Engineering, Inc. Matt Woodruff, P.E. Civil Department Manager mwoodruff@larsonengr.com Table of Contents DOCUMENT # OF PAGES Cover Page 1 Cover Letter 1 Table of Contents 1 Qualification Statement 7 - Company Information - Subconsultant Information - Key Personnel Resumes - Project Understanding & Approach - Familiarity with Planning, Design and Construction - Design Capabilities List of Similar Projects 6 - Lake Elmo Lions Park Baseball Field Improvements - Baldwin-Woodville HS Athletic Complex - Forest Lake HS Athletic Complex - The Blake School Athletic Facility Improvements - Mesabi East Schools Athletic Complex List of References 1 Professional Services Hourly Rates & Additional Information 1 Exhibit A: Proposal Form 1 _________________________________________________________________ TOTAL PAGES 19 Company Information Larson Engineering, Inc. was founded in 1979 in White Bear Lake, Minnesota and since then our firm has grown to more than 180 employees and 12 offices across the United States. Each office has its own story, but every office has grown for the same reason: great customer service and dedication to meeting our client’s needs with innovative and cost-effective designs. Our local office in White Bear Lake has more than 40 employees that are focused on providing civil and structural engineering services. Our local team of civil engineers, project managers, and technicians mainly focus on delivering site design services and have many long-standing relationships with public and private school districts, government agencies, private developers, private business owners, and architectural firms to name a few. Our principal contact person for this project is: Matt Woodruff, PE Civil Engineering Department Manager Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110 (651) 481-9120 mwoodruff@larsonengr.com Larson Engineering is a 100-percent employee-owned firm (ESOP). The following is a list of Larson Engineering’s officers: Cynthia Ebert, President/CEO Keith Quick, Secretary Larson Engineering, Inc. Larson Engineering, Inc. 1850 Craigshire Road 1850 Craigshire Road St. Louis, MO 63146 St. Louis, MO 63146 Philip Deimel, Treasurer Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110 For our White Bear Lake office, the following is our firm’s organizational chart: Ethan Charpentier, PE Regional Manager Matt Woodruff, PE Rachel Schulz, PE Sean Noren, PE Heidi Swalve Civil Manager Curtain Wall Manager Structural Manager HR / Acct Mgr 10 Staff 11 Staff 13 Staff 4 Staff Subconsultant Information For this proposed project, Larson Engineering intends to sub-contract the Land Surveying, Geotechnical Engineering, and Electrical Engineering services. The following team members are included within our RFP response: Land Surveying Consultant: Daniel L. Thurmes Cornerstone Land Surveying, Inc. 1970 Northwestern Ave, Suite 200 Stillwater, Minnesota 55082 Tel: 651-275-8969 dan@cssurvey.net Geotechnical Engineering Consultant: Colby T. Verdegan, PE President Chosen Valley Testing Inc. Minnesota- Wisconsin-Iowa (507) 281-0968 (office) (507) 251-9504 (mobile) verdegan@chosenvalleytesting.com Electrical Engineering Consultant: Joe Vomela Project Manager Hallberg Engineering, Inc. 1750 Commerce Court White Bear Lake, MN 55110 (651) 748-1100 (office) (651) 334-7067 jvomela@hallbergengineering.com Key Personnel Resumes Education Masters of Business Administration (MBA) University of St. Thomas St. Paul, MN Bachelor of Civil Engineering (BCE) University of Minnesota Minneapolis, MN Bachelor of Arts (BA) Mathematics University of St. Thomas St. Paul, MN Professional Certifications Licensed Professional Engineer: MN Registration: 41885 WI Registration: 43396-6 ND Registration: PE-9281 SD Registration: 12445 Professional Associations Minnesota Association of School Maintenance Supervisors Minnesota School Board Administrators Minnesota Association of School Business Officials Minnesota Interscholastic Athletic Administrators Assoc. Minnesota Assoc. of School Administrators Matt Woodruff, PE Civil Engineering Department Manager Matt Woodruff offers a wide variety of civil engineering experience including site design, storm water management facility design, and municipal utility and roadway design. Matt has extensive knowledge of local municipal, county, state, and watershed standards. His projects have included site designs for public and private K-12 school districts, parks & recreation departments, higher education facilities, single and multi-family residential communities, religious institutions, railway yards, retail, commercial, and industrial facilities. Matt excels with project management by assisting clients from the initiation of a project through its close-out. Matt works directly for various owners, owner representatives, architects, and construction managers to help deliver successful projects. His vast site design knowledge helps Owners and Clients understand various site constraints and issues that may arise with a proposed project, and how those constraints may impact the project’s schedule and budget. At Larson Engineering, Matt’s responsibilities also include managing the Civil Engineering Department, coordinating business development activities, marketing, and attendance of client organization meetings. Matt’s relative experience has included the following projects: Lions Park Baseball Field Improvements – City of Lake Elmo This project involved the rehabilitation of the existing Lion’s Park ballfield to include a new backstop and perimeter fencing, dugouts, site grading and stormwater management, and a new infield aglime surfacing. Baldwin-Woodville Schools Athletic Upgrades The project involved the design and construction of a new outdoor pool with a seasonal inflatable dome along with a support building. The project also included a new synthetic turf baseball field, a new multi- purpose synthetic turf inside of a reconstructed track along with new field events. Sylvan Park Improvements – City of St. Paul Parks & Recreation This project involved the design and construction of a new playground area and a new multi-purpose synthetic turf field. The project involved collaborating with City Landscape Architect staff members and obtaining necessary permits for stormwater management. Education Bachelor of Civil Engineering (BSCE) University of Minnesota - Duluth Duluth, MN Professional Certifications Licensed Professional Engineer: MN Registration: 58667 Nathan Nohner, PE Design Engineer Nathan Nohner offers a variety of civil engineering experience including site design and design of storm water management facilities. Nathan has general knowledge of local municipal, county, state, and watershed standards. His projects have included site designs for public and private K-12 school districts, higher education facilities, multi-family residential communities, religious institutions, retail, commercial, and industrial facilities. Nathan is experienced in site investigation, evaluation, conceptual design, construction administration and inspection of projects. He is directly involved with project development and attendance of client organization meetings. Nathan’s relative experience has included the following projects: Conway Park Improvements – City of St. Paul Parks & Recreation: This project involved the design and construction for a new 290,000 square foot multi-purpose synthetic turf athletic field. The new athletic fields were laid-out to accommodate soccer, lacrosse, football, softball, and baseball. Additionally, approximately one-third of the site contains a seasonal inflatable dome (with a future 3,000 square foot accessory building) that will allow the nearby community to utilize the athletic fields year-round. Larson Engineering performed the initial schematic site layout design, along with the preparation of construction documents, and obtained permits from the watershed district, city, and MPCA. Park Center High School Sports Dome – Osseo Area Schools – ISD 279 The project involved the design and construction of two new multi- purpose synthetic turf athletic fields, new entry building, and reconfigured parking lots. The project included a seasonal inflatable dome over one of the turf fields connected to the new entry building. Larson Engineering worked alongside the City of Brooklyn Park and Osseo School District to help meet the needs of both entities. Baldwin-Woodville Schools Athletic Upgrades The project involved the design and construction of a new outdoor pool with a seasonal inflatable dome along with a support building. The project also included a new synthetic turf baseball field, a new multi- purpose synthetic turf inside of a reconstructed track along with new field events. Sylvan Park Improvements – City of St. Paul Parks & Recreation This project involved the design and construction of a new playground area and a new multi-purpose synthetic turf field. The project involved collaborating with City Landscape Architect staff members and obtaining necessary permits for stormwater management. Project Understanding & Approach We understand the City of Lake Elmo’s desired two-phase approach to completing the various baseball field projects described in your RFP. Phase 1: This is the pre-design or feasibility phase where Larson Engineering would prepare conceptual drawings (layouts) for the various baseball field renovations and improvements at Reid, Ridge, and Pebble Parks. After the conceptual layouts are reviewed with the City to ensure the general intent and vision for the projects are captured, Larson Engineering will then develop cost estimates for the projects. The cost estimates will be presented in an a la carte format such that the City can pick and choose various project elements to be implemented for Phase 2. Phase 2: When the City approves the project scope that is established in Phase 1, Larson Engineering will immediately conduct a design kick-off meeting with the City and the necessary members from the Design Team, where the overall project expectations will be discussed and Larson Engineering will present a project schedule which includes pertinent milestones. After feedback from the design kick- off meeting is gathered, we will coordinate all work efforts with the Design Team such that a successful project is delivered. When the project design is underway, our team will work closely to prepare the construction drawings and specifications. As the project design proceeds, design status meetings will be conducted with the City as deemed necessary. At the design status meetings, progress and cost estimates will be presented and City Staff input will be gathered. The status meetings will be an essential tool to ensure that City receives a final product that is desired. At any time in the design process, if a construction cost estimate exceeds the Owner’s construction budget, Larson Engineering will communicate the issue with the Owner and present the reasons as to why the estimate exceeds the budget (scope creep, inflation, etc.). Value engineering methods to help reduce the estimated cost as well as specify alternates within the bidding documents will be implemented as needed. When the final project scope is determined based on the cost estimating, Larson Engineering will proceed with preparing the final construction documents and coordinate with the Owner for one more cost estimate review prior to advertising the project for contractor bids. After contractor bids are received and tabulated, Larson Engineering will assist the Owner with recommending a contractor to award the project to, and assist with issues that may arise during the construction phase of the project. Familiarity with Planning, Design, and Construction Larson Engineering’s Civil Department is authorized for nearly 175 to 200 projects on an annual basis. These projects largely involve working for public and private owners for the development of various land activities. These projects have involved the planning, preliminary/schematic design, construction documentation, bidding, construction administration/oversight, and project close-out. With these projects, we have worked with numerous Municipalities and Watershed Districts across the states of Minnesota and Wisconsin, including many projects within the city limits of Lake Elmo. Computer Aided Design (CAD) Capabilities Nearly all of the project designs described above are completed by using AutoCAD, Civil 3D, and HydroCAD. Additionally, we have also maintained a cost estimating database from past projects that can be used to develop cost estimates for new projects. This database will take into account the project’s geographic location, project type, and economies of scale. Lastly, we maintain many professional relationships with construction contractors and material suppliers that are willing to assist in developing various project cost estimates when requested. List of Similar Projects City of Lake Elmo Lions Park Engineer of Record: Larson Engineering, Inc. Baseball Field Improvements Architect: Miller Architects & Builders Lake Elmo, MN Earthwork Contractor: Rachel Contracting Total Project Cost: Approximately $425,000 Project Description In 2017 the City of Lake Elmo implemented various improvements to Lions Park including a complete reconfiguration of the youth baseball field, a new backstop and perimeter fencing, a new concrete plaza area behind home plate, new dugouts, visitor seating, site grading, irrigation system, and outfield foul poles. In addition, the project also included a new gravel parking lot located near center field, new sand volleyball courts, and a stormwater infiltration system meeting local city and watershed requirements. With the reconfiguration of the new baseball field, the right field foul line was placed directly along the 45th Parallel circle of latitude, located 45 degrees north of the Earth’s equator. A monument signifying the 45th Parallel was cast in concrete behind the backstop area. Larson Engineering Services: Larson Engineering was hired by Miller Architects & Builders to prepare the necessary civil engineering design for the new Lions Park complex. Engineering components included grading, drainage, erosion control, and site utility designs. Larson Engineering also designed the stormwater management system that met the City’s and Valley Branch Watershed Districts (VBWD) requirements. Baldwin-Woodville High School Engineer of Record: Larson Engineering, Inc. Athletic Complex Improvements Architect: Wold Architects & Engineers Baldwin, WI General Contractor: Kraus Anderson Earthwork Contractor: Albrightson Excavating Synthetic Turf Contractor: Midwest Sport & Turf Total Project Cost: Approximately $12.0 Million Project Description In the Spring of 2020, the Baldwin-Woodville Area School District passed a referendum for the athletic facility improvements located at the high school campus. The project improvements consisted of new community pool, restroom and locker room facility, and a seasonal sports dome. Additionally, the project included reconstructing the main athletic stadium and varsity baseball field with new synthetic turf surfaces, a new 8-lane rubber surface athletic track, new field events, and new stadium lighting. The referendum was supported by the area communities because it would provide recreational opportunities for all. The new athletic track received the “2022 Distinguished Outdoor Track Facility” award from the American Sports Builders Association. Larson Engineering Services: Larson Engineering was hired by Kraus-Anderson Construction Company to prepare the necessary civil engineering design for the new athletic complex. Engineering components included grading, drainage, erosion control, and site utility designs. Larson Engineering also designed the stormwater management system that met the Village of Baldwin and the Wisconsin Department of Natural Resources (DNR) requirements. Coordination with the Owner’s architect, synthetic turf installer, and dome contractor was an integral part of the project’s design process. The baseball field reconstruction started in the summer of 2020 and was completed later that fall. The other project components were phased to minimize the disruption of the overall facility, and were completed in the fall of 2021. Forest Lake High School Engineer of Record: Larson Engineering, Inc. Multi-Purpose Ballfield Architect: KOMA Architects Forest Lake, MN General Contractor: Peterson Companies Synthetic Turf Contractor: FieldTurf Total Project Cost: $3.3 Million Project Services Larson Engineering was retained to develop a master plan to develop the high school athletic complex into a first-class stadium and facility. The facilities desired were discussed and construction cost estimates were developed for various options. The following are a list of the overall project components: Synthetic turf field for football, soccer, and softball. Athletic track and field events placed upon non-frost susceptible structural fill. o 8-lane, 400-meter, polyurethane-rubber surfaced track with a chute at the NW and SE quadrants. o High jump pad connected to the athletic track. o Dual runway long/triple and high jump event. o Pole vault event with landing pad at each end. o Discus event with two throwing sectors and net lined cages. o Shot-put event with four throwing sectors, ag-lime landing area lined with perimeter timbers. o 4’ high crowd control fence around the athletic track. Home side bleachers - seating capacity of 5,000 containing 16 rows. Press box – 9’ by 48’ structure with a viewing platform on the roof. Visitor side bleachers – renovate existing bleachers for disability access and seating. Stadium lighting – replace existing lighting system to provide 50 foot-candle illumination. Storage building – 20’ by 40’ masonry block and pre-cast concrete panel roof with lighting, domestic water, and sanitary facilities. Security fencing – enclose entire facility with 8’ high chain link fencing. Athletic Facility Improvements Engineer of Record: Larson Engineering, Inc The Blake School Landscape Architect: Damon Farber Hopkins, MN Architect: U+B Architects Contacts: Lisa Uhler, Director of Buildings and Grounds Nick Rathmann, Director of Athletics Project Description Larson Engineering is the team lead on the Athletic Triangle (Baseball, Tennis, & Football) improvements project along with Damon Farber, Wunderlich-Malec, and U+B Architects. The project includes construction of a synthetic turf multi-use field, tennis court rehabilitation, relocation of the baseball field, and a new concessions and restroom building. The baseball field relocation and lower tennis rehabilitation were performed in the summer of 2015 to reduce relocating practice off-site during the main project in 2016. 2015 Baseball and Lower Tennis Construction Costs = $456,901 Baseball Prime Contractor: New Look Contracting Tennis Court Prime Contractor: Bituminous Roadways 2016 Turf Construction, Upper Tennis and Concessions Building Contractor: Mortenson Construction GMP = $2,500,000 The same design team, led by U+B Architects, is planning for multiple building additions to the school. Future utility and stormwater management needs are incorporated into the athletic improvements project, where applicable. Mesabi East Athletic Complex Engineer of Record: Larson Engineering, Inc. Aurora, MN General Contractor: RA Morton Synthetic Turf Contractor: Sprinturf Inc. Project Site Cost: $6.5 Million Project Description With a voter approved bond referendum, Larson Engineering, Inc. was selected to be a part of a project team that involved the improvements for the Mesabi East School District’s new athletic complex. This project consisted of a new 8-lane athletic track with field events, synthetic turf multi- purpose stadium with field lighting, bleacher seating, press box, a natural grass baseball field, and a synthetic turf baseball field. In addition to the athletic faciality upgrades, Larson Engineering also designed new parking lot facilities, a school bus parking lot, and a parent drop-off loop. Development of the site included receiving approved permits from the city, Minnesota Department of Labor and Industry, and the Army Corps of Engineers for some wetland impacts that were necessary for the project. To accommodate the additional runoff for the project area, a stormwater collection and retention system was designed for the site. Larson Engineering Services: Larson Engineering was involved with the project from referendum planning through construction completion. Work was coordinated with the government agencies, construction costs were developed, staff meeting presentations were made, plans and specifications were prepared, and construction administration service were performed. The project was substantially completed for the School District’s use in the fall of 2019. List of References John Huenink Vice President | Director of K-12 Construction Kraus-Anderson Construction Company 501 South Eighth Street Minneapolis, MN 55404 (612) 255-2359 John.huenink@krausanderson.com David Ronzani Landscape Architect City of St. Paul Parks and Recreation 25 West 4th Street, 400 City Hall Annex Saint Paul, MN 55102 (651) 266-6410 David.ronzani@ci.stpaul.mn.us Tony Willger Director Buildings and Grounds Stillwater Area Public Schools 1875 Greeley Street South Stillwater, MN 55082 (651) 351-8374 willgert@stillwaterschools.org Professional Services Hourly Rates Larson Engineering, Inc. Minnesota Office 2023 Hourly Billing Rate Fee Schedule Principal $295.00 per hour Regional Manager $225.00 per hour Project Manager $195.00 per hour Project Engineer $185.00 per hour Design Engineer III $173.00 per hour Design Engineer II $160.00 per hour Design Engineer I $145.00 per hour BIM/CAD Designer $128.00 per hour Clerical/Admin $90.00 per hour Notes: 1) The above listed rates include reimbursable expenses such as mileage, copying costs, postage, etc. 2) All applicable permit fees are to be paid by the City of Lake Elmo, if necessary. Additional Information Larson Engineering does not have any current conflict of interest, not do we foresee any potential conflict of interest with the City of Lake Elmo. 3507 High Point Drive North | Bldg. 1 - Suite E130 | Oakdale, MN 55128 651-704-9970 | Bolton-Menk.com Contact: Jay Pomeroy, PLA 763-544-7129 Jay.Pomeroy@bolton-menk.com May 23, 2023 City of Lake Elmo, MN Proposal forBASEBALL FIELD CONSTRUCTION AND RENOVATION DESIGN 3507 High Point Drive North | Bldg. 1 - Suite E130 | Oakdale, MN 55128 651-704-9970 | Bolton-Menk.com Bolton & Menk is an equal opportunity employer. May 23, 2023 Adam Swanepoel Assistant Public Works Director City of Lake Elmo 3800 Laverne Avenue N. Lake Elmo, MN 55042 Email: aswanepoel@lakeelmo.org RE: Proposal for Baseball Field Construction/Renovation Design and Preparation of Bid Document Services Dear Adam, The City of Lake Elmo has initiated the Baseball Field Construction/Renovation Design Services project to create baseball fields designed for function, playing surface, maintenance, accessibility, storage, aesthetics, and compliance with city regulations. Bolton & Menk’s experience ensures your venues will be safe, sustainable, and beautiful. Our team has extensive expertise in developing athletic fields and recreation facilities in communities of all sizes. We understand what needs to be accomplished for the successful completion of the Baseball Field Construction/Renovation Design project. IN-HOUSE ENGINEERING AND LANDSCAPE ARCHITECTURE SERVICES The project requires an assortment of engineering-related services. Our network of specialty services will help you avoid having to manage a cornucopia of consultants. We provide the services you need—from conceptual park master planning to survey to creative landscape architecture and ball field design to municipal civil engineering. Bolton & Menk is an active member in the American Sports Builders Association, as am I for the past 30 years. Additionally, between Dave Rey and I, we have designed and overseen the construction of hundreds of baseball and softball fields in the Metro Area. Our design team has the expertise Lake Elmo needs to create beautiful, buildable, and cost-effective baseball fields and recreational parks. RIGHT-SIZED SOLUTIONS We approach each project with a fresh perspective—we do not offer a cookie- cutter approach. While drawing on our experience, we work to provide a design scaled to the community and situation. I have led similar park projects throughout the Midwest and will fully consider the future effects of our design, budget, and schedule for the City of Lake Elmo. When you choose Bolton & Menk, you can trust that we will work tirelessly to find not only the right solution for your parks, but also one that complements the community and neighborhood it serves. OUR TEAM IS PROVEN IN LAKE ELMO We know the level of service Lake Elmo staff and citizens expect, and we feel we have developed an efficient, comprehensive process to deliver our engineering, survey, and landscape architecture services. Mike Warner, our Client Service Manager for this project, will continue to play an active role, and will have a similar high level of service he’s provided on previous Lake Elmo projects. You can trust this proven team to continue to deliver projects in a manner Lake Elmo has learned to expect of Bolton & Menk. In continued service to the City of Lake Elmo, we are excited at the opportunity to complete the Baseball Field Construction/Renovation Design project. I will serve as your lead client contact and project manager. Please contact me at 763-227-6526 or Jay.Pomeroy@bolton-menk.com if you have any questions regarding our proposal. Respectfully submitted, Bolton & Menk, Inc. Jay Pomeroy, PLA Principal Landscape Architect TABLE OF CONTENTS FIRM OVERVIEW 1 WORK PLAN 3 KEY PERSONNEL 6 PROJECT EXPERIENCE 9 FEE SCHEDULE 11 APPENDIX EXHIBIT A PROPOSAL FORM SOLUTIONS PROVIDED: • Civil/Municipal Planning & Engineering • Water & Wastewater Engineering • Transportation Planning & Engineering • Structural Services • Aviation Services • Planning & Urban Design • Water Resources Engineering • Environmental Planning & Permitting • Construction Administration & Inspection • Land Surveying • Geographic Information Systems • Project Funding Support • Project Communication • Creative Studio Services Ranked #132 among the Top 500 Design Firms in the United States. Ranked #132 among the Top 500 Design Firms in the United States. SOLUTIONS PROVIDED: • Civil/Municipal Planning & Engineering • Water & Wastewater Engineering • Transportation Planning & Engineering • Structural Services • Aviation Services • Planning & Urban Design • Water Resources Engineering • Environmental Planning & Permitting • Construction Administration & Inspection • Land Surveying • Geographic Information Systems • Project Funding Support • Project Communication • Creative Studio Services FIRM OVERVIEW We believe all people should live in safe, sustainable, and beautiful communities and we take pride in our ability to make that happen. It's why we get out of bed every morning. Our commitment to communities began in 1949 with two hard working Midwesterners—John Bolton and Martin Menk. They saw people in their surrounding communities who had dreams of a bright future, a desire to grow, and a common challenge of aging infrastructure. John and Martin's goal was to help communities make progress by listening to what people want, finding the best solutions for their needs, and treating them right. Their legacy lives on. We still want to help, we work hard every day, and we always remember what got us here—we're people helping people. Today, Bolton & Menk, Inc. has more than 800 employees including a professional staff of more than 250 engineers, planners, landscape architects, and surveyors. We specialize in providing public infrastructure solutions. We take care of our clients by providing the best services and solutions for them. From advocating for our communities to designing their dreams to finding funding; we take pride in our work because we live in these same communities. We believe in the power of face-to-face meetings, friendly conversations, and collaborative decision-making to keep your projects on schedule, within budget, and focused on real, workable solutions. We promise every client two things: we'll work hard for you and we'll do a good job. We take a personal interest in the work being done around us. At the end of the day, we're Real People offering Real Solutions. FIRM OVERVIEW 1______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN FIRM OVERVIEW WHY BOLTON & MENK Bolton & Menk provides design services to meet your sports field needs. Whether the fields are to be used for educational purposes or for professional-level competition events, we design with your budget in mind and will provide a field design to suit its intended use. We have designed synthetic (artificial) turf fields and also have extensive design experience with blended (sand-peat) topsoil fields. Today, our athletic fields are subjected to year-round use and a wide variety of sporting events. These demands require fields to be specifically designed, maintained, and constructed to keep the fields in usable condition and, most importantly, safe. Athletic and park directors understand that optimal drainage, proper soil media, irrigation, and turfgrass blends are just a few of the integral parts of a field’s design and its ability to sustain aggressive and varied play. Bolton & Menk will address those design and construction criteria as well as aid you in anticipating maintenance needs of your sports fields. ADVANCED TECHNOLOGY AND INDUSTRY KNOWLEDGE Our involvement with numerous industry organizations keeps us up-to-date with the knowledge and technology to ensure your facilities are not only designed correctly, but well-maintained for years to come. We are a proud member of: • American Sports Builders Association • Sports Turf Managers Association• MN Turf and Grounds Foundation • MN Recreation and Park Association • MN Association of School Maintenance Supervisors ADDITIONAL ATHLETIC SERVICES • Site Selection and Planning • Athletic Fields and Stadiums• Tennis/Pickleball Courts • Running Tracks and Field Events • Bleachers/Press Box Design • Turf Improvements (synthetic turf, sand-peat) • Construction Observation WE OFFER UNIQUE QUALIFICATIONS: • Primary expertise is site design for both small- and large-scale projects • Fully familiar with various city, county and watershed district expectations, requirements, and processes • Expertise of storm water management and environmental constraints for site development • Extensive experience researching and analyzing existing water, sewer, and storm sewer utilities • Expertise in design of flexible and rigid pavement systems• Sensitivity of design to be within the owner’s program and budget • Knowledge of site-related materials • Proven ability to work with site contractors • Well-versed in working with general contractors and owners’ representatives • Experienced construction observers FIRM OVERVIEW 2______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN FIRM OVERVIEW WORK PLAN We trust that our proposed Work Plan, as described below, will ultimately create functional, safe, accessible, and unique ball fields (and parking lots) for the City of Lake Elmo at Reid, Ridge, and Pebble Parks. As your partner, we will look to develop baseball — and potential softball — fields with play surfaces to meet the city’s expectations for maintenance and aesthetics while complying with city regulations. The three parks will be studied and inventoried to clearly understand how the proposed upgrades fit within existing site constraints while taking advantage of opportunities such as sun angle, wind screening, and elevations. As noted in the RFP, the existing ball fields at Reid Park, Ridge Park, and Pebble Parks are all considered “recreational fields” with a backstop and aglime infield. We understand the goal of this project will be to review each field individually, design a proposed baseball field or fields, and assist the city with the bidding of a redesigned version of each field. PROPOSED IMPROVEMENTS REID PARK Relocate/reconstruct the baseball field to have a centerfield dimension of no less than 240 feet; 200 feet left and right fence lines: • Aglime infield with 60-foot bases, lighting • Grass outfield with irrigation• Hooded backstop • Dugouts with player benches • Sideline fencing • Security (exterior) fence • Ball field lighting• Extend/expand the parking lot to support ~40 vehicles RIDGE PARK Preference is to have two (2) baseball fields within the area and to create a parking area to hold 60 cars. Fields will be designed to correlate with one another regarding space and accessibility. We understand the city would like to have cost options and comparisons for artificial turf field(s) vs grass. Baseball Field 1 will be designed to State High School League standards for competitive play: • Centerfield dimension of approximately 380 feet; ~315 feet left and right foul lines • Aglime infield and warning tracks, grass infield • Raised pitcher’s mound• Concrete slabs (bleacher pad, dugout areas) • Netted or chain link backstop with concrete maintenance strip • Dugouts with player benches • Sideline/outfield fence (6’ or 8’ high)• Batting cages • Bullpens • Foul poles • Ball field lighting • Scoreboard• Irrigation system • Separate bid option(s) for an synthetic turf field usable for baseball and softball Field 2 (if space allows) will be designed as a competitive or recreational field: • Aglime infield with 60-foot bases, lighting • Grass outfield with irrigation • Backstop • Dugouts with player benches• Sideline/outfield fence • Ball field lighting PEBBLE PARK Preference is to have two (2) recreational baseball fields back-to-back: • Aglime infield with 60-foot bases• Grass outfields (flat with positive drainage) • Backstops • Dugouts with player benches • Sideline fencing SCOPE OF SERVICES PHASE 1 - CONCEPTUAL DESIGN PHASE We have reviewed the general scope of work prepared by the city in the RFP and believe this is an effective approach for the execution and completion of this project. Our project team has completed several projects similar in scope and expectations. We are confident our team will complete all project tasks in an effective and timely fashion. We understand that the city may, depending on budget and appetite, decide to move forward with design of all of the fields listed in the RFP or, alternatively, the city may choose to proceed with a fewer number of fields. 3______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN WORK PLAN Per the RFP, Bolton & Menk proposes the following approach to develop Conceptual Designs for each park, including ball fields and parking lots, where applicable, in an efficient, thorough manner which will satisfy the needs and objectives of the city. Presentation materials will include color rendered site plans on for the team to lead discussions with the city council, city staff, and the general public in order to collect input on each park’s design. SUBTASK 1.1: CONCEPT PLAN(S) DEVELOPMENT Upon authorization, an introductory kick-off meeting will be held to meet with city staff to confirm the list of proposed improvements at each facility, identify issues and concerns, and review examples of relevant ball field facilities. Following that meeting, we will consider alternative locations and arrangements for the ball field and parking lot facilities to satisfy the city’s program while respecting the physical constraints and opportunities of the site. We will obtain ground-level topographic survey including existing utility locations, property lines, and easements for each park focused on the area(s) of the proposed improvements. For reference, we have estimated the cost for each park survey, noted below, and have included that cost in our "Not-to- Exceed" cost on Exhibit A- Proposal Form. Reid Park Survey: ~$5,400 Ridge Park Survey: ~$8,300 Pebble Park Survey: ~$6,800 We will visit project site to identify natural constraints which may affect the proposed project. We will gather data from city, watershed and other review agencies, as applicable. We will prepare preliminary concepts for each park, likely 1-3 alternatives, for review and discussion with city staff. We will prepare an Opinion of Probable Construction Cost for proposed improvements for each option/field and an assessment of the challenges and benefits of each option/field. • For Field 1 at Ridge Park, we will provide cost options and comparisons for synthetic turf versus natural grass for baseball and softball. Through a process of informed decision making, we will refine the concept alternatives to arrive at a preferred Concept Plan for the parks. We will repare and present final concept plans based on the preferred and refined concept studies. Presentation materials will include color rendered site plan. Bolton & Menk will assist city staff and the city council in the selection of the preferred options/ fields, as requested. PHASE 2 - DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS AND BIDDING Bolton & Menk will complete construction (bid) documents for each park, including preliminary and final plans and specifications accompanied with necessary construction details for all site improvements for public bidding. We understand the city may fund the project(s) using federal, state, or private grant funding sources. Bolton & Menk has funding specialists on staff who can help the City of Lake Elmo research funding opportunities and can aid the city through most grant processes. SUBTASK 2.1: DESIGN DEVELOPMENT AND CONSTRUCTION (BID) DOCUMENT PREPARATION In order to provide comprehensive design documents and so prospective bidders have adequate soils information for bidding, we recommend that soil borings be obtained, with geotechnical reporting, in support of the proposed ball field and parking lot improvements. • Costs for the geotechnical services are not included in this proposal nor in our "Not-to- Exceed" cost on Exhibit A- Proposal Form. • That said, we estimate soil borings and geotechnical reporting for each park will cost the city approximately $6,500 (x3). We will prepare design and engineering documents consistent with the requirements for site plan approval with submittals to city staff for comment at 60%, 90%, and 100% plan milestones and for the implementation of each ballfield selected by the city for construction/reconstruction. We will prepare supplemental specifications for the city to incorporate into the overall project manual. We will develop plans for each park, including: • Site survey • Site layout and dimensioning plan • Grading plan • Utility plan • Site Restoration plan • Construction details • Lighting plans, where applicable • Synthetic turf layout plan and details for Field 1 at Ridge Park, if chosen by the City WORK PLAN 4______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN ANOKA CASTLE FIELD Our team will hold project meeting discussions with city staff at the 60% and 90% stages to review the plans, discuss any changes made from the previous submittal, and answer any questions that staff may have. We will then prepare final opinion of probable construction cost for the proposed improvements at each park. Upon completion of the construction (bid) documents, Bolton & Menk will present the project to the city council for approval for bidding. SUBTASK 2.2: BIDDING We will aid the city in reviewing options for construction bidding strategies. In most cases, the public competitive bid process is the most efficient and economical method. That said, if the city decides to entertain synthetic turf, the state purchasing contract option may be available and appropriate.• Prepare advertisement for bids for the city to submit to the local legal publication• Prepare addenda during the bidding phase• Answer questions to assist contractors in their bidding• Analyze bids and make recommendations to the city WORK PLAN 5______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN KEY PERSONNEL Bolton & Menk understands the importance of developing design solutions that can be supported by Lake Elmo stakeholders and implemented efficiently. Our team has a proven history of delivering beautifully landscaped designs that attract residents and visitors alike. Our multi-disciplinary team will work efficiently to ensure our designs are not only beautiful concepts but also completely buildable. These proposed team members have track records of successful projects and, just as importantly, are enthusiastic and committed to meeting and exceeding Lake Elmo’s expectations. We can provide detailed résumés of all personnel upon request. JAY POMEROY, PLA Project Manager Jay will serve as Lake Elmo’s main contact. He will manage daily tasks, overall project coordination, and construction administration. He will oversee the design process and ensure the design represents the community’s needs and fulfills the expectations set by the City of Lake Elmo. A principal landscape architect at Bolton & Menk, Jay began his career in 1988. His areas of expertise include landscape architecture, municipal park improvements, school site design and campus renovation, athletic complex design, and project management. He has extensive knowledge of complex site design with specific emphasis on sports courts and high-performance ballfields. Jay has always loved how parts of the natural and built environment can come together to form creative and functional spaces. He has a proven ability of working with steering committees and advisory groups to identify and prioritize short- and long-range goals and collaborates regularly with architects and civil, mechanical, environmental, electrical, and environmental engineers. SIMILAR EXPERIENCE: • Lion John Weicht Park Recreational Facilities, City of Elk River, MN • Red Haddox Athletic Field at Toro Stadium, City of Bloomington, MN • Clemens Field & Athletic Complex, Saint John’s University • New Athletic Complex, College of St. Benedict • Palmer Field, University of St. Thomas • North Athletic Field, University of St. Thomas • Dome Facility and Stadium, City of St. Michael, MN • Braemar Sports Dome and Outdoor Hockey Rink, City of Edina, MN • Seasonal Sports Dome, City of Maple Grove, MN • Minnetonka High School Campus & Veteran’s Field, City of Minnetonka, MN • Quarry Point Park Athletic Complex, City of Apple Valley, MN DAVE REY, PE Civil Engineering Lead Dave will lead all engineering needs for this project and work closely with Jay. Dave is a principal engineer with Bolton & Menk who began his civil engineering career in 1994. He specializes in the development of public, private, and government facilities. As part of his responsibilities, Dave frequently coordinates his design efforts with various agencies including city, county, watershed districts, soil and water conservation districts, and state agencies. Dave is proficient at large-scale site development, including healthcare facilities, emergency services facilities, school campuses, and community centers. His site design expertise includes grading and drainage plans, low impact design (LID), traffic flow and routing, infrastructure planning and design, stormwater management, and pedestrian circulation. Dave puts an emphasis on client relationships and is always looking out for their best interests. SIMILAR EXPERIENCE: • Princeton Middle School Baseball Field, Princeton Public Schools • New Carver Elementary School, Eastern Carver County Schools • Multi-Purpose Dome and Field, Eastern Carver County Schools • Mahtomedi High School George Smith Athletic Field, Mahtomedi Public Schools • Isaacson Park Baseball Field, City of Golden Valley, MN • David M. Thaler Sports Center, Westonka Public Schools • East Ridge High School Raptor’s Nest Stadium and Bielenberg Sports Center Campus Expansion, South Washington County Schools • Rockford High School Stadium Field, Rockford Area Schools • Wayzata High School and Middle School Multi-Use Dome, Wayzata Public Schools KEY PERSONNEL 6______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN KEY PERSONNEL MICHAEL WARNER, PE Client Service Manager Mike will lead all client service efforts for this project.Mike began his engineering profession in 2001. He is experienced in project management, project design, and construction inspection. He currently manages many different responsibilities, both as a project engineer and project manager for municipal clients. As a project engineer, Mike prepares cost estimates, feasibility reports, construction plans and specifications, and performs contract administration for a variety of municipal projects. He is proficient with AutoCAD Civil 3D software and in many cases acts as the lead design engineer and technical expert. As a project manager and client service manager, Mike serves as the primary client contact, manages internal staff and facilitates collaboration, and manages client budgets and schedules. SIMILAR EXPERIENCE: • Mississippi River Trail, City of Anoka, MN • Jarvis Street and 165th Street Improvements, City of Elk River, MN • Kenyon Avenue Improvements, City of Lakeville, MN • TH 10 Anoka Solution, City of Anoka, MN • 2018 Street Improvements, City of Two Harbors, MN • TH 10/169 Improvements, City of Anoka, MN • Diffley Road (CSAH 30) School Area Safety Improvements, City of Eagan, MN • Rudy Johnson Park Master Plan, City of Anoka, MN RON ALWIN, PLS Survey Lead Ron will lead all survey needs for this project.Ron began his surveying career in 1980 and currently serves as a survey project manager. He has owned and managed land surveying and engineering firms and has experience working in municipalities and on civil engineering projects, oil fields, and large gas refinery plants. Ron has been involved in dozens of residential and commercial subdivisions where he performed the preliminary surveying, platting, and subsequent construction staking of streets, public right-of-way, and public utilities. He was also responsible for the construction staking of multiple gas plants and compressor stations in western North Dakota. SIMILAR EXPERIENCE: • Lever Street NE Improvements, City of Blaine, MN • Surrey Heights Drive Street and Utilities Rehabilitation, City of Eagan, MN • Clover Leaf Parkway Area Reconstruction, City of Blaine, MN • 80th Street Improvements, City of Cottage Grove, MN • Greenbrier Street Utility Improvements, City of Little Canada, MN • CSAH 12 Reconstruction, Washington County, MN • Pioneer Park Master Plan and Final Design, City of Little Canada, MN • Rum River Bank Stabilization, City of Anoka, MN RICHARD KOECHLEIN, PLA Lead Project Designer Rich will work closely with the design team to find creative solutions and develop graphics and design documentation for the baseball fields. Rich is a project landscape architect at Bolton & Menk whose professional career began in 1992. His key areas of expertise include schools, parks, and irrigation. Rich is proficient in AutoCAD, as well as several illustrative/artistic rendering software platforms, which allows him to generate creative and unique park and school campus site concepts. His extensive knowledge of irrigation design and stormwater reuse systems makes water efficiency and watering costs a top priority. He is also well- versed in projects involving architectural elements and requiring architectural coordination and input. Rich is responsible for design development, facilitating successful client relationships, and developing site master plans for large-scale athletic complexes as well as smaller, local neighborhood parks. He’s passionate about taking client ideas and bringing them to life, especially in outdoor spaces. SIMILAR EXPERIENCE: • Ball Field and Sport Court Improvements- City of Wabasha, MN • Pickleball and Dog Park Construction, City of Rosemount, MN • Pioneer Park Mater Plan- City of Independence, MN • Downtown Road and Pedestrian Improvements, City of Monticello, MN • Pickleball Courts Master Planning – City of Red Wing, MN • Varsity Baseball / Softball Master Planning, Stillwater Highschool, MN KEY PERSONNEL 7______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN TIM OLSON, PE Stormwater Lead Tim will lead all stormwater needs for this project.Tim is a principal water resources engineer who joined Bolton & Menk in 2006. His experience includes project management in both design and construction of complex water resources and environmentally sensitive projects. He specializes in comprehensive surface water management planning, innovative best management practice design, hydrologic and hydraulic modeling, drainage design and construction plan review, and NPDES Phase I & II MS4 and construction stormwater permitting requirements. He couples GIS techniques with water resources design and analysis. Tim has a passion for stormwater and water quality education and participates in several stormwater-related steering committees and stakeholder groups. He enjoys facilitating partnerships, developing new relationships, and collaborating with stakeholders to define a common vision and work toward shared goals. SIMILAR EXPERIENCE: • Hazelnut Park/Glenpaul Neighborhood Street & Utility Improvements, City of Arden Hills, MN • Glacial Valley Park Update, City of Cottage Grove, MN • Craig Park Concept, City of Fridley, MN • Hidden Valley Park Pond, City of Northfield, MN • Settlers Parkway Collection and Reuse of Stormwater for Onsite Irrigation, City of Buffalo, MN • Village Center Revitalization, City of Marine on St. Croix, MN • 57th Avenue Rehabilitation and Twin Lakes Regional Trail, Three Rivers Park District and City of Brooklyn Center, MN JOE VOMELA –HALLBERG ENGINEERING Electrical Lead Joe will lead all electrical needs for this project. Joe first joined HEI in 1999 as an intern and was hired on as a full-time designer a year later. His background in the electrical field stems from his childhood when he worked for his father at Muska Electric in Roseville, Minnesota. This experience, combined with his electrical design and management education, gives him excellent insight into all components of a project. Joe is experienced in electrical design for commercial, recreational, and educational facilities. He is currently responsible for the design of power, lighting, fire alarm system design, and communication systems. He possesses considerable knowledge and expertise in projects requiring lighting upgrades, LED lighting and specialty lighting systems. SIMILAR EXPERIENCE: • Brooklyn Park Dome at Park Center Sr. High School, Osseo Public Schools • Multi-Purpose Athletic Field, Henry Sibley High School • Athletic Complex, Esko Public Schools • Park Center High School Practice Field Lighting, Park Center Public Schools • Field Lighting, Eden Prairie Public Schools • Stadium Field Lighting, White Bear Lake Area Schools • Football and Baseball/Softball Field Lighting, Chanhassen Public Schools KEY PERSONNEL 8______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN PROJECT EXPERIENCE Bolton & Menk has assembled an experienced team of professionals with a proven track record of delivering similar projects. We have highlighted several projects our team has delivered using a similar approach and/or with similar elements. We will draw upon this experience to benefit the City of Lake Elmo. Client satisfaction remains a top priority for us as evidenced by quality deliverables, cost-effective rates, and timely project delivery. Please feel free to contact any of these references to evaluate our performance. Additional project information is available upon request. CASTLE BASEBALL FIELD, CITY OF ANOKA, MN Bolton & Menk teamed with 292DesignGroup to design a premier baseball facility to be used by Legion leagues, local minor league teams, and Anoka High School’s baseball team. The 1st Phase (2012) of the project included covered bleacher seating for ~300, press box, dugouts, field lighting, parking lot (~100 cars), sand-peat ball field, and related amenities. The 2nd Phase of construction (2014) included a multi-use building with concessions, restrooms, storage areas, and mechanical room. The overall cost of the project was $2.2 million. NCAA BASEBALL FIELD, UNIVERSITY OF ST. THOMAS University of St. Thomas renovated their stadium facility including replacement of the aging synthetic turf football field, reconstruction of the running track, and converting their baseball infield to synthetic turf. The work was accomplished during the summer of 2017. Bolton & Menk, working with Opus Group, designed and engineered the stadium facility renovations including complete reconstruction of the track and field events and synthetic turf football/soccer field to meet the strict City of St. Paul and Capitol Region Watershed District requirements by incorporating underground storm water containment/infiltration measures. Baseball fields improvements not only included conversion of the aglime infield to synthetic turf but also construction of new batting cages, bull pens, backstop, and sideline fence. REFERENCE: LISA LACASSE PUBLIC SERVICES ADMINISTRATOR 763-576-2984 LLACASSE@CI.ANOKA.MN.US REFERENCE: JIM BRUMMER VP FOR FACILITIES MANAGEMENT 651-962-6595 JIM.BRUMMER@STTHOMAS.EDU THE LEAD LANDSCAPE ARCHITECT/ENGINEER FOR THE PROJECT WAS BOLTON & MENK (JAY POMEROY AS PROJECT MANAGER). PROJECT EXPERIENCE 9______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN PROJECT EXPERIENCE BASEBALL/MULTI-PURPOSE FIELDS, EDINA HIGH SCHOOL Bolton & Menk teamed with Wold Architects and Edina Schools to design a premier baseball and multi-purpose ballfield facility at Edina High School which was part of and constructed with a much larger campus-wide improvements project. The four-acre “lower fields” area at Edina High School was converted to synthetic turf to support varsity baseball as well as soccer, football, softball practice, PE, and other recreation events. In order to address the severe grade change and to get ADA accessibility to the fields, which are over 50 feet lower than the school, Bolton & Menk creatively designed a series of staircases, ramps, retaining walls, and native landscaped areas The overall construction cost of the project was $8.5 million. The project was designed in 2015/2016 and constructed in 2016/2017. LION JOHN WEICHT PARK, CITY OF ELK RIVER, MN Bolton & Menk teamed with 292DesignGroup to redesign Lion John Weicht Park. The ballfields, parking lot, and community building at the Elk River Park had become weathered and out-of-date. Following community and neighborhood input, Bolton & Menk designed and oversaw all site-related work for the park renovation, including site demolition and preparation, storm water management, utilities, sand-peat soil and seeding of the softball fields, masonry dugouts, fenced/ roofed dugouts, netted backstops, batting cages, bull pens, parking lot (~105 stalls), pavilion, open play area, intra-park trail, and landscaping. Construction was completed in 2020 for a total construction cost of approximately $1.7M. REFERENCE: ERIC HAMILTON SUPERVISOR OF BUILDINGS & GROUNDS 952-848-3999 ERIC.HAMILTON@EDINASCHOOLS.ORG REFERENCE: MICHAEL HECKER PARKS AND RECREATION MANAGER 763-635-1150 MHECKER@ELKRIVERMN.GOV PROJECT EXPERIENCE 10______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN FEE SCHEDULE The following fee schedule is based upon competent, responsible professional services and is the minimum, below which adequate professional standards cannot be maintained. It is, therefore, to the advantage of both the professional and the client that fees be commensurate with the service rendered. Charges are based on hours spent at hourly rates in effect for the individuals performing the work. The hourly rates for principals and members of the staff vary according to skill and experience. The current specific billing rate for any individual can be provided upon request. The fee schedule shall apply for the period through December 31, 2023. These rates may be adjusted annually thereafter to account for changed labor costs, inflation, or changed overhead conditions. These rates include labor, general business, and other normal and customary expenses associated with operating a professional business. For projects with typical expenses and unless otherwise agreed, the above rates include vehicle and personal expenses, mileage, telephone, survey stakes, and routine expendable supplies; no separate charges will be made for these activities and materials. Expenses beyond typical project expenses, non-routine expenses, and expenses beyond the agreed scope of services, such as out of town travel expenses, long travel distances, large quantities of prints, extra report copies, outsourced graphics and photographic reproductions, document recording fees, outside professional and technical assistance, and other items of this general nature will be invoiced separately. Rates and charges do not include sales tax, if applicable. Submitted by Bolton & Menk, Inc. 1 No separate charges will be made for GPS or robotic total stations on Bolton & Menk, Inc. survey assign- ments; the cost of this equipment is included in the rates for survey technicians. *Specialized role not classified above otherwise, incl. graphic design, project communication, funding support, etc. **Highly specialized and industry expertise unique to the market or area of discipline. 11______________________________________________________________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN FEE SCHEDULE APPENDIX EXHIBIT A PROPOSAL FORM 11 EXHIBIT A PROPOSAL FORM 1.Professional services to design and assist with the bidding of the baseball field renovations for REID PARK, a number not to exceed $__________________________ 2.Professional Services to design and assist with the bidding of the baseball field construction/renovations for RIDGE PARK, A: Grass field (or fields) a number not to exceed $__________________ B: Competitive Synthetic Turf field (and a second grass recreational field if room allows) a number not to exceed $_______________ 3.Professional services to design and assist with the bidding of baseball field construction/renovations for PEBBLE PARK, a number not to exceed $_______________ Signature of Proposer: _____________________________ Name of Proposer: ________________________________ Address: ________________________________________ Phone Number: __________________________________ Email Address: ___________________________________ Jay Pomeroy, PLA 3507 High Point Drive North, Bldg 1 Suite E130, Oakdale MN 55128 763-544-7129 ext 3668 Jay.Pomeroy@Bolton-Menk.com 44,400 30,800 93,700 46,500 APPENDIX i___________________________________________________________________________________Baseball Field Construction/Renovation Design | City of Lake Elmo, MN i CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING DTE-LS.COM City of Lake Elmo Baseball Field Project Professional Services Proposal 5/23/2023 COVER SHEET ii CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING DTE-LS.COM 601 Carlson Parkway, Suite 1053; Minnetonka, MN 55305 888-216-1916 5/23/2023ER LETTER Adam Swanepoel – Assistant Public Works Director City of Lake Elmo, MN aswanepoel@lakeelmo.org Re: City of Lake Elmo Baseball Field Project Professional Services Qualifications and Fees Dear Mr. Swanepoel, Thank you for allowing Design Tree the opportunity to provide a Professional Services Qualification and Fee Proposal to the City of Lake Elmo for the Baseball Field Project. Design Tree Engineering’s specialists have reviewed the city’s Request For Proposals and prepared this response which outlines our proposed staff, relevant experience and fee structure for your consideration. Design Tree is uniquely qualified to work with the City of Lake Elmo on this project based on our experience with related projects and our project approach. We will agree to the City of Elmo’s contract terms and the conditions listed in Section III of the RFP. Design Tree has big league outdoor activity space experience and delivers projects with attention to detail and respect for process. The city’s RFP outlines the vision for these spaces while recognizing that a robust preliminary design phase is necessary before the creation of construction documents and bidding can take place. We enjoy this collaborative process and relish the outcome of brainstorming ideas. We create to-scale graphics that enhance the process and will show how the park improvements fit into the context of the neighborhoods that surround them. Our workload and available staff will allow us to give the prompt attention that this project deserves. Thank you for the opportunity to work with The City of Lake Elmo to improve Reid, Ridge, and Pebble Parks with new baseball fields. Both Jeremy Anderson and myself are/have been active in youth baseball and understand the need to have a city field inventory that supports the kids desire to play! Sincerely, Dan Folsom, PE President djf@dte-ls.com Direct: 763-270-6310 Cell: 320-808-3811 iii CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING TABLE OF CONTENTS COVER SHEET ...................................................................................................... i TABLE OF CONTENTS ........................................................................................ iii FIRM PROFILE ..................................................................................................... 1 RESUMES ............................................................................................................. 1 PROJECT UNDERSTANDING ............................................................................ 3 PROJECT APPROACH ....................................................................................... 3 FAMILIARTY WITH DESIGN, CONSTRUCTION, AND PLANNING ................. 4 COMPUTER AIDED DRAFTING AND DESIGN CAPABILITES ......................... 5 SIMILAR PROJECT LIST ...................................................................................... 6 1 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING FIRM PROFILE RESUMES Dan Folsom, PE President Years Experience: 32 Years with Design Tree: 15 Education: University of Minnesota Civil Engineering FIRM INFORMATION Design Tree Engineering, Inc. (S-Corporation) 601 Carlson Parkway, Suite 1053 Minnetonka, MN 55305 888-216-1916 Firm Officers: Dan Folsom, PE - President Jeremy Anderson, PE – Vice President/Treasurer Aaron Mueller – PE – Vice President/Secretary Jon Schuette, RLS – Vice President A company organizational chart is attached to this proposal as Appendix B. Design Tree Engineering can complete the scope of work contained in the RFP without the need for subconsultants. PRIMARY CONTACT INFORMATION Dan Folsom, PE – President djf@dte-ls.com Direct: 763-270-6310 Cell: 320-808-3811 Dan has been consulting public and private sector clients for over 30 years and this experience allows him to identify critical project success factors early on and institute them into a common-sense design. His understanding of municipal government allows him to deliver turn-key solutions including planning, design, bidding and construction administration. Dan will act as Project Manager and lead the Design Tree team in working with City of Lake Elmo staff to deliver the park improvements. Project Experience: New High School Campus – St. Cloud, MN New High School Campus – Sartell, MN High School Site Master Plan – Eden Prairie, MN South Valley Park Improvements – Inver Grove Heights Lions Park Improvements – Rogers, MN 2 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING Jeremy Anderson, PE Vice President – Civil Team Leader Years Experience: 23 Years with Design Tree: 15 Education: University of Minnesota BS Civil Engineering University of Minnesota MS Infrastructure Engineering Aaron R. Mueller, PE Electrical Team Leader LEED AP, WELL AP Years Experience: 20 Years with Design Tree: 10 Education: North Dakota State University Electrical Engineering Jeremy is the team leader for Design Tree Engineering’s civil department. He has served public and private sector clients with all aspects of their projects from master planning to design through construction. His experience and diligence during every phase of a project for everything from parking lot to complete commercial, educational, and governmental campuses provides the basis for detailed, constructible documents and projects. This experience coupled with Jeremy’s emphasis on responsiveness, accountability, trust, and communication results in successful projects meeting the client’s defined expectations. Jeremy will leverage his athletic master planning experience to brainstorm the park improvements and transition this to a practical, common-sense design. His role as Civil Team Leader will assist in making sure the right staff is on the job and deadlines are met. New High School Campus – St. Cloud, MN New High School Campus – Sartell, MN Athletic Complex Master Plan – ROCORI School District College Softball Complex Renovation – University Minnesota Morris South Community Park Upgrades – Rogers, MN* South Valley Park Upgrades – Inver Grove Heights *-Currently Under Design Aaron specializes in the electrical design of buildings and sites and their power and lighting implications. He has extensive experience in site and field lighting for municipal/public sector projects. He understands site lighting for illumination, safety, and energy efficiency. Having Aaron on the project team will ensure the critical electrical infrastructure is delivered in a way that supports the project vision in a cost-effective and practical manner. Aaron will be the electrical point of contact for the project and lead the design effort from Schematic Design through construction. He will engage other electrical team members and coordinate with other disciplines to deliver a successful, well- coordinated project. Project Experience: New High School Campus – Sartell, MN High School Stadium Lighting Upgrades – Sartell, MN Lions Park Improvements – Rogers, MN Woodhaven Park Improvements – City of Eagan Riverfront Park Improvements – Sauk Rapids, MN Ironwood Park Improvements – Carver, MN 3 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING PROJECT UNDERSTANDING PROJECT APPROACH The City of Lake Elmo is a rapidly growing city that has retained its rural feel by prioritizing the protection of open spaces including the extensive park system. There are twenty-four (24) parks listed on the city’s website with various amenities. Of the twenty-four parks there are ten with ball fields and of those ten ball fields, eight are recreational with more competition-based fields at VFW and Lions Parks. According to the Lake Elmo Baseball Association website, 260 players tried out which was the largest class ever. Further defining the project need comes from general city demographic data that reflects a growing community, the signs of increased field demand, and the limited supply of adequate ball field inventory in the city. Pebble, Reid, and Ridge Park all have an existing baseball field and seem to have adequate space to accommodate the proposed improvements. Improving fields at these parks will provide better geographic convenience to fields that have the capacity to be used for more formal baseball use while also serving as a recreational option. Enhancing the Project Understanding Our first step will be to work with city staff to better understand the project drivers and stakeholders. It is critical to determine the motive and intent of the ultimate use of these fields and the user groups involved. Getting the field usage intents correct will drive the design process. Once the project drivers are identified it will be important to discuss the project’s financial and political realities. We understand the fiscal realities faced by cities as well as the communication necessary to defend the expenditure to user groups that may not directly benefit from this round of improvements. Most of this up-front work will focus heavily on workshops with city staff and include elected/appointed officials as staff sees fit. Design Phase (Phase 1) With the project drivers and fiscal/political framework are established, conceptual layouts are generated. We typically provide a few concepts to brainstorm with staff and get feedback. Once we get feedback a final option or two will move forward. It is at this point that we find it is most effective to involve the elected/appointed officials. 4 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING FAMILIARTY WITH DESIGN, CONSTRUCTION, AND PLANNING At this stage we will generate high-level budget estimates to assist in the decision-making process. These estimates will be refined as a final option is selected and the design process moves to creating bid documents. Critical to this phase is the generation of to-scale graphics that show the concepts and how they fit into the context of the parks. There is more detail and examples of how we accomplish this in the Computer Aided Design capability discussion. These graphics are critical to internal city discussions, informing the public and to support a capital campaign if that proves to be a funding source. Bidding Documents/Bidding/Construction (Phase 2) After deciding on the selected alternative for each site we will prepare bidding documents. We are familiar with the public bidding process with our work with municipalities and school districts for similar projects. It is assumed that the planned project delivery method for this project is General Contractor and this can be done as one contract for all three sites or separated as the city desires. Design Tree will lead the bidding process, schedule the bid opening, create the bid tabulation, and prepare an award recommendation. We will attend city meetings as needed/requested by city staff. Given the scope of the project we plan to perform intermittent, critical path site visits during construction. We will coordinate with city staff regarding these expectations and how to ensure that the project is constructed consistent with the design intent and quality is maintained. Design Tree Engineering’s roots are in the planning, design, and construction of public sector projects. The key personnel of Dan Folsom and Jeremy Anderson have broad experience in municipal engineering serving as City Engineer for several communities throughout their career. This experience has been applied to outdoor activity projects for school districts and municipalities. This base of experience allows us to provide “turnkey” services for projects like the Lake Elmo Ballfield project. We recognize that city staff resources are tight especially during the construction season so we will lead the project to take pressure off. Planning is one of our favorite things to do. The creative and collaborative process is a great complement to our day-to-day design work. 5 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING COMPUTER AIDED DRAFTING AND DESIGN CAPABILITES Design Tree uses various CADD tools and resources to plan and design the projects that we are involved in. During the concept phase we start our work with 2-dimensional drawings in AutoCAD since we find this the most efficient way to generate alternatives. Once the concepts are getting more definition and the number of alternatives are reduced we use a modeling software called InfraWorks. Modeling is a critical step that can help visualize what the finished product will look like. After selecting the preferred alternative we use AutoCAD 3D to prepare bidding documents from the existing conditions survey. If more polished renderings are needed/desired, a software called Lumion is used to generate the renderings. Shown below is an example of a 2-D layout used for planning and a 3-D model that captured the concept and put it into context. RELEVANT EXPERIENCE SARTELL HIGH SCHOOL ACTIVITY COMPLEX SARTELL, MN ST. CLOUD TECH HIGH SCHOOL ACTIVITY COMPLEX ST.CLOUD, MN SOUTH COMMUNITY PARK IMPROVEMENTS ROGERS, MN The Sartell – St. Stephen School District passed a referendum in 2016 that included the construction of a new High School. Design Tree provided Civil Engineering Services to design a softball “pinwheel”, varsity baseball field, five multi-purpose practice fields, and two multi-purpose varsity fields for soccer and football. Site design also included parking lots, drives, trails, and gathering spaces. Extensive coordination between the district and the City of Sartell for infrastructure projects to support the project including a multi-use trail that traverses the site and connects to the city trail system. The St. Cloud Area School District passed a referendum in 2016 that included the construction of a new High School. Design Tree provided Civil Engineering services to design the activities complex that consists of two baseball fields, three softball fields, four multi-purpose fields, a synthetic turf football stadium, and tennis courts. Challenging site conditions included wetlands, a trout stream through the site, a high ground water table, and no city infrastructure serving the site. These challenges were handled by coordinating with the city, creative storm water management strategies, and an efficient complex layout. The City of Rogers passed a Local Option Sales Tax with one of the priorities being parks and trails. South Community Park is currently 10 acres of undeveloped city land adjacent to an Elementary School where the city will be constructing four baseball fields, two skating rinks, parking, and a warming house/storage building. Design Tree is leading this project, contracted directly with the city and will be performing design, bidding, and construction services. The project is currently in the early design phase. RELEVANT EXPERIENCE UNIVERSITY OF MINNESOTA MORRIS SOFTBALL FACILITY MORRIS, MN EDEN PRAIRIE HIGH SCHOOL ACTIVITY COMPLEX MASTER PLANNING EDEN PRAIRIE, MN ROCORI HIGH SCHOOL ACTIVITY COMPLEX MASTER PLANNING COLD SPRING, MN The University of Minnesota Morris is located in west-central Minnesota had softball facilities that needed attention. Existing facilities had exceeded their useful life and lacked core support infrastructure such as concessions/press box, parking, and an efficient field layout. Design Tree teamed with an Architect to work with the University’s Athletic Department and develop the overall layout that resulted in three new fields and state-of-the art support facilities. The Eden Prairie High School complex resides on the original site where building and parking expansions to accommodate growth have squeezed the site. Converting grass fields to artificial turf for enhanced scheduling and reconfiguring field orientation are being considered as strategies to optimize space. Focus will also be given to create outdoor gathering and learning spaces to tie activity spaces in with educational opportunities. Design Tree is working directly with the district in performing master planning services. The project is in the mid-stages of planning. ROCORI School District serves a growing St. Cloud suburban area with a storied athletic history. To address their present and future demands they imagined how a farm field neighboring their middle/high school campus could supplement their existing activity complex. Design Tree assisted the district in capturing their vision into a master plan that laid out baseball, softball, and multi-purpose fields and the infrastructure to support the athletes, spectators, and community. 6 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING REFERENCES We are proud of the work we do and humbled by clients entrusting us with their project. Please contact the references below to reinforce the qualifications contained in our proposal. If more references are needed, don’t hesitate to contact Dan Folsom. St. Cloud School District Mike Spanier – Facilities Consultant 320-267-6195 mike.spanier@isd742.org Sartell – St. Stephen School District Joe Prom – Business Manager 320-656-3721 Joe.prom@isd748.org Eden Prairie School District Kyle Fisher – Director of Facilities, Safety, and Grounds 952-975-7124 mweber@ci.brooklyn-center.mn.us City of Rogers Andrew Simmons – Public Works Superintendent 762-428-0907 asimmons@rogersmn.gov 7 CIVIL | MECHANICAL | STRUCTURAL | ELECTRICAL | LAND SURVEYING FEE SCHEDULE 11 EXHIBIT A PROPOSAL FORM 1. Professional services to design and assist with the bidding of the baseball field renovations for REID PARK, a number not to exceed $__________________________ 2. Professional services to design and assist with the bidding of the baseball field construction/renovations for RIDGE PARK, a number not to exceed $_______________ 3. Professional services to design and assist with the bidding of baseball field construction/renovations for PEBBLE PARK, a number not to exceed $_______________ Signature of Proposer: _____________________________ Name of Proposer: ________________________________ Address: ________________________________________ Phone Number: __________________________________ Email Address: ___________________________________ 25,000 Includes field lighting design. 60,000 30,000 Includes field lighting design. Note: Fees reflected above assume that an existing conditions survey will be provided by the city and not part of the RFP scope. Dan Folsom, PE - President 601 Carlson Parkway, Suite 1053; Minnetonka, MN 55305 763-270-6310 djf@dte-ls.com Appendix B -Design Tree Organizational Chart DAN FOLSOM President JEREMY ANDERSON Civil Lead MIKE GERBER Civil Engineer RILEY KEPHART Civil Designer NICK KNUTSON Civil Designer JEREMY ANDERSON Structural Lead JOE NICHOLSON Structural Engineer AARON WATKINS Structural Designer JON SCHUETTE Land Survey Lead CODY KISTHART Land Surveyor JOE RANKINS Land Survey Technician PAUL QUIRIN Mechanical Lead ROBERT SCHUSTER Mechanical Engineer JOE KLINKHAMMER Mechanical Engineer MATT PETERSON Mechanical Engineer GRANT TROKEY Mechanical Designer RYAN CARTER Mechanical Designer NICK WEBB Mechanical Designer RYAN WILLIAMS Mechanical Designer AMY FANDRICH Plumbing Designer AARON MUELLER Electrical Lead PHIL HAIGHT Electrical Engineer CHAD BUSEMAN Electrical Designer TOM BERNSTEIN Electrical Designer RICK BRANDER Electrical Designer NIKOLA PAVKOVIC Electrical Designer NICK KRENZ Electrical Designer DAN FOLSOM Operations Lead MELISSA FOLSOM Office Manager GARY PETERSON IT/BIM Manager Steven Foss, PLA, ASLA Project Manager steven.foss@tkda.com 651.955.1471 | steven.foss@tkda.com 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 tkda.com Proposal to Provide Architectural and Engineering Services for the CITY OF LAKE ELMO BASEBALL FIELD CONSTRUCTION/RENOVATION DESIGN AND PREPARATION OF BID DOCUMENT SERVICES TKDA® | 444 Cedar Street Suite 1500 | Saint Paul, MN 55101 651.292.4400 • tkda.com An employee-owned company promoting affirmative action and equal opportunity. May 23, 2023 Mr. Adam Swanepoel City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, MN 55042 aswanepoel@lakeelmo.org Re: Response to Request for Proposal Baseball Field Construction/Renovation Design and Preparation of Bid Document Services Dear Mr. Swanepoel and Members of the Selection Committee: Quality athletic fields are as vital to growing communities as its people. The City of Lake Elmo is considered one of the state’s fastest growing cities, attracting many young families. With new development and population growth also comes an increased need to accommodate the interest in youth sports. The City of Lake Elmo would like to evaluate alternatives for renovations/additions to the ballfield facilities at Reid, Pebble, and Ridge Parks. We understand these decisions have fiscal impacts and we approach park renovations from a sustainable and cost-effective viewpoint. Recreational amenities and parks are at the heart of a community. TKDA is pleased to submit our qualifications to support the City of Lake Elmo in the evaluation of ballfield facilities. Steve Foss and Kathleen Anglo, along with our design team of architects and engineers, have extensive experience in the design and implementation of recreational, high school, and collegiate athletic facilities. We balance creative park design with a pragmatic understanding of park infrastructure needs and maintenance. Parks should be engaging and fun, and as such, so should the design process! Our goal is to enrich the lives of the Lake Elmo residents and visitors with unique, creative, and high-quality recreational amenities, well-suited to the surrounding context. Our team has the expertise and capacity to further collaborate, realize, and implement baseball field improvements at Reid, Ridge, and Pebble Parks. We come with an open mind and we look forward to working alongside City staff during the design process to explore the possibilities within each park. Thank you for considering TKDA for this exciting opportunity. If acceptable, please issue a Task Order under our Architect-Engineer Agreement dated February 2, 1988, or a mutually agreeable contract as referenced in the Request for Proposals. We look forward to a collaborative relationship with the City of Lake Elmo on this project. If you have any questions regarding this proposal, please contact me directly at 651.955.1471 or at steven.foss@tkda.com. Sincerely, Steven Foss, PLA, ASLA DJ Heinle, AIA, CID, NCARB Project Manager Vice President Architecture TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 1 Table of Contents Firm Information ..........................1 Key Personnel .............................2 Similar Projects ...........................6 Understanding/Approach. ........9 Project Schedule.. .....................11 Rates. ............................................12 Additional Information. ............13 Braun Intertec Corporation Geotechnical Services 11001 Hampshire Avenue S. | Minneapolis, MN 55438 Contact: Jeffrey Casmer, PE | Project Engineer 952.995.2314 direct | 952.300.5803 mobile jcasemer@braunintertec.com Year Established: 1957 Ownership: Employee-owned Firm Information TKDA Prime Firm 444 Cedar Street, Suite 1500 | Saint Paul, MN 55101 Contact: Steven Foss Project Manager/Point of Contact 651.955.1471 | steven.foss@tkda.com Year Established: 1910 Legal Status: S-Corporation Ownership: Employee-owned Officers: •Thomas Stoneburner, PE – President/Chief Executive Officer •Jeff Lipovetz – Chief Operating Officer Vice Presidents •DJ Heinle, AIA – Architecture •John Ahern, PE – Aviation •Peter R. “Rusty” Steitz, PE – Facilities Engineering •Andrew Wagstrom, PE – Rail •Matthew Christensen, PE, SE – Surface Transportation Program Directors and Chief Officers •Jeannine Clancy – Program Director, Strategic and Community Partnerships •Doug Fischer, PE – Program Director, Government Markets •Craig Anderson – Chief Marketing and Business Development Officer •Daniel Schafer – Chief Financial Officer •Cameron Smith – Chief Legal Officer •Darci Tanberg – Chief Human Resources Officer The project will be led by TKDA’s Saint Paul office and comprised of landscape architects and architects along with the firm’s mechanical, electrical, structural, and civil engineers. The following subconsultant will also be utilized. TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 2 Key Personnel Steven Foss, PLA, ASLA Project Manager/Landscape Architect Josh Elder Architectural Designer Joseph Yobbie Lighting Designer Jonathan Libby, PE Water Resources Engineer Brian Kelley Irrigation Specialist Marc Prasch Survey Project Team Jeffrey Casmer, PE Geotechnical Services TKDA Braun Intertec The TKDA team members will fully commit their personnel resources to the timely completion of your project. In addition to the team highlighted in this proposal, TKDA has a staff of over 350 individuals including architects, engineers, and technicians to draw on for additional project support. Other team members also possess a depth relative to their project involvement, and are committed to fulfilling their role to deliver successful baseball field design and renovations for the City of Lake Elmo. Strong project management is TKDA’s specialty, and is the reason behind its many successful projects. Steven Foss will serve as the Project Manager/Landscape Architect and work alongside City staff to set the schedule and ensure the baseball field construction/renovation design meets the goals established by the City. Kathleen Anglo, PLA, ASLA, SITES AP QA/QC Manager TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 3 Steven Foss designs civic spaces, parks, streetscapes, and site development plans with the general public in mind. He develops comprehensive park system plans including site inventory and analysis, master planning, and cost estimating for future development efforts. With his 11 years of experience, Steve works collaboratively with the external clients, internal team, public groups, and other design professionals throughout the design process. He consistently meets project construction budgets with creative aesthetic design solutions. RELEVANT EXPERIENCE: Project Manager/Landscape Architect, UMore Ballfields Phase II Improvements, City of Rosemount, Rosemount, MN* Design of new parking lot and two ballfields including site amenities and ballfield lighting. Landscape Architect, Welcome Park Ballfields, City of Crystal, Crystal, MN* Assisted in the development of construction document and construction administration of one multi-purpose ballfields and walk connections. Landscape Designer, Kaposia Landing Sports Field Complex, City of South St. Paul, South St. Paul, MN* Assisted in the development of construction document and construction administration of three multi-purpose ballfields, one baseball field, trail connections, and shelter. Landscape Designer, Sand Creek Sports Field Complex, City of Coon Rapids, Coon Rapids, MN* Assisted in the development of construction document and construction administration of four multi-purpose ballfields, two multi-purpose fields, parking lots, trail connections, and shelter. Landscape Architect, St Scholastica Softball Facilities Masterplanning, College of St. Scholastica, Duluth, MN Prepared concept plans for three locations for a potential new softball facility. Project Manager/Landscape Architect, Flint Hills Athletic Complex Phase II Improvements, City of Rosemount, Rosemount, MN* Led design of drive and new parking lot, four multi-purpose fields, trail connections, shelter, and play area. Landscape Architect, Farwell Park Improvements, Minneapolis Park & Recreation Board, Minneapolis, MN Prepared construction documentation for park improvements at Farwell Park. Landscape Architect, Hall Park Improvements, Minneapolis Park & Recreation Board, Minneapolis, MN Prepared construction documentation for park improvements at Hall Park. Steven Foss, PLA, ASLA Registrations/Certifications Landscape Architect – MN #56852 ASLA PROJECT MANAGER/ LANDSCAPE ARCHITECT *Projects completed while with previous employers. Key Personnel TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 4 Kathleen Anglo has over 24 years of experience in planning parks, trails, building sites, and campuses. She is highly skilled in strategic planning, problem solving, community engagement, design detailing, QA/QC, and construction administration. Kathleen creates spaces for human interaction while preserving natural environments. She elevates the user experience with intuitive designs that blend into the natural landscape. Kathleen previously worked for the City of Saint Paul where she created beautiful outdoor spaces while also maintaining high quality infrastructure. She thoughtfully identifies, plans, and implements solutions for complex urban and natural resource projects. RELEVANT EXPERIENCE: Landscape Architect, Wheeler Sports Complex Redesign, City of Duluth, Duluth, MN The sports center was redesigned for better pedestrian and vehicular circulation and ADA compliance. The dugouts on Fields 2 and 3 were redesigned, retaining walls replaced, and ADA-compliant ramps incorporated. The concession building was also redesigned to include a family restroom. TKDA provided design and construction administration services. Project Manager/Landscape Architect, Lake Elmo Park Reserve Improvements, Washington County, Lake Elmo, MN Improvements to the 3.8-mile Eagle Point Trail and the 80-site modern campground. Trail upgrades included design of a new trailhead restroom facility, parking area, drainage improvements, site amenities, and landscaping. Campground upgrades provided additional power hook-ups, new water lines, sewer hookups, and updated play area with walkways, equipment, resilient surfacing, seating, drinking fountain, and landscaping. Senior Landscape Architect, Frogtown Community Center (formerly Scheffer Recreation Center) Site Improvements, City of Saint Paul, Saint Paul, MN*Worked in partnership with consulting architecture firm on the site planning for a new recreation center building. The existing building was kept in place while the new building was constructed. Landscape Architecture design included an overall park master plan, building entrance plazas, parking lot layout, pedestrian access, play area, artificial turf athletic fields, basketball court, Ka-tow courts, site amenities, and planting plan for the 4.5- acre site. Landscape Architect, Palace Community Center Expansion and Site Improvements, City of Saint Paul, Saint Paul, MN*Site design for building expansion completed in Phase I. The scope of work for Phase II added a new play area, the reconfiguration and enhancements of the ball fields with new backstops, bleachers and the installation of field lighting. Additional improvements on the site are accessible walking paths, benches, picnic tables, bike racks and landscaping. Lead Landscape Architect, El Rio Vista/Wellstone Community Center, City of Saint Paul, Saint Paul, MN* Artificial turf field. Lead Landscape Architect, Sylvan Park, City of Saint Paul, Saint Paul, MN* Artificial turf field. Project Manager/Landscape Architect, Baker Tennis Court and Site Improvements, City of Saint Paul, Saint Paul, MN* New tennis and basketball courts. Registrations/Certifications Professional Landscape Architect – MN #43242, IA, MO, ND, SD, TN, TX, WI Sites AP *Projects completed while with previous employers. QA/QC MANAGER Kathleen Anglo, PLA, ASLA, SITES AP Key Personnel TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 5 Key Personnel ARCHITECTURAL DESIGNER Josh Elder Architectural Specialist Josh Elder has 20 years of experience designing and detailing of buildings, building envelopes and roofs. He also brings a comprehensive knowledge of codes, industry best practices, and regulatory requirements. Wheeler Sports Complex Renovation | City of Duluth, Duluth, MN Semer’s Park Covered Pavilion | City of Ely, Ely, MN Entry Building - Fred Wells Tennis and Education Center | Saint Paul, MN LIGHTING DESIGNER Joseph Yobbie Engineering Specialist II Joe Yobbie designs lighting, signal, and power distribution systems with over 35 years of experience. He has a strong background in projects involving athletic field lighting and power. Joe works closely with project managers, preparing electrical plans and specifications. Baseball Field Lighting | White Bear Township, MN Alimagnet Park Baseball Field Lighting | Burnsville, MN Palace Community Center Field Lighting | Saint Paul, MN Aronson Park Softball Field Lighting | Lakeville, MN Sports Field Lighting | Rice and Arlington Sports Dome, Saint Paul, MN WATER RESOURCES ENGINEER Registrations/ Certifications Engineer – MN #51276 LEED AP Jonathan Libby, PE, LEED AP Registered Engineer Jonathan Libby has ten years of experience designing water resources for public infrastructure and land development projects. His technical expertise includes stormwater design, hydraulic and hydrological modeling, utility planning and design, roadway design, site planning, and site engineering. Lake Elmo Park Reserve Improvements | Washington County, Lake Elmo, MN Hidden Falls South | City of Saint Paul Division of Parks and Recreation, Saint Paul, MN 2019 Parking Lot Improvements | Saint Paul College, Saint Paul, MN IRRIGATION DESIGNER Brian Kelley Engineering Specialist II Brian Kelley designs mechanical systems with near 40 years of experience. He provides project management, construction contract administration, HVAC, plumbing and piping design, and specializes in the design of fire protection and irrigation systems. Irrigation Plan | Hill Murray High School, Hill Murray Fathers Club, Inc., Maplewood, MN Irrigation System | Saint Paul College, Saint Paul, MN Softball Field Improvements | Dakota County Technical College, Rosemount, MN Baseball Storage Building | Dakota County Technical College, Rosemount, MN GEOTECHNICAL ENGINEER Jeffrey Casmer, PE Project Engineer, Braun Intertec Jeff Casmer prepares geotechnical evaluation reports, performs engineering analyses, coordinates field explorations, classifys soil samples and assigns laboratory testing, and scopes out any other project geotechnical tasks. SURVEY Marc Prasch Engineering Specialist I Marc Prasch provides land surveying on-site and off-site support with 12 years of experience. He provides construction staking and operates robotic total station and GPS. Marc leads TKDA’s 3D scanning efforts, digitally documenting existing facilities and conditions. UMore Ballfields Phase II Improvements Rosemount, MN* The UMore Ballfields Phase II Improvement Project was implemented to provide additional fields due to the growing demand within the youth ballfield organizations. As part of this phase, two additional fields were designed and constructed as well as expanding the existing parking lot. Through the design, Steve communicated with the City and key stakeholders to obtain and incorporate expressed desires in the expansion of this facility. The project included: ■Two ballfields with backstops, perimeter fencing, irrigation, lighting, dugouts, bleachers, batting cages, and scoreboards. ■Parking lot expansion meeting ADA compliance and future drive connections for the final phase of the complex. ■Trail and walkway connections to phase II fields and future planning of trails and walkways for the final phase of the complex. As project manager, Steve developed the construction documents and managed the project through construction. *Work performed while at previous employer. Similar Projects Personnel •Steven Foss Reference Dan Schultz, Parks and Recreation Director City of Rosemount 13885 S Robert Trail Rosemount, MN 55068 651.322.6012 dan.schultz@ci.rosemount.mn.us 6TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design Wheeler Sports Complex Redesign Duluth, MN The Wheeler Athletic Complex was redesigned for better pedestrian and vehicular circulation and ADA compliance. TKDA was hired by the City of Duluth to initially provide cost estimating for improvements to the Wheeler Complex in order for the City to apply for Outdoor Recreation Grant funds from the MN DNR. TKDA was then hired to provide the design and construction administration services. This Outdoor Recreation Grant Funded project includes: ■Circulation paths throughout the complex to connect various activities and buildings ■Replacement of retaining walls and incorporation of an ADA compliant ramp. ■Redesign of the dugouts on softball Fields 2 and 3 to be compliant for NCAA and other competitively sanctioned games. ■Redesign of the concession building to include a family assisted toilet room. ■Repair and restriping of tennis and basketball courts to include pickleball. ■Plantings to better define edges of green spaces. ■Improved bocce ball court wooden borders and ADA access point. ■Picnic pavilions ■Drinking fountain and access pad ■Draintile and grading of Field 7 to improve drainage in right field 7 Similar Projects Personnel •Kathleen Anglo •Josh Elder Reference Rob Hurd Construction Project Coordinator City of Duluth Duluth, MN 55806 218.730.4416 rhurd@duluthmn.gov TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design Ames Baseball Complex Dakota County Technical College, Rosemount, MN TKDA provided site planning, design, and construction administration services for the new outdoor baseball complex on the Dakota County Technical College’s (DCTC) Rosemount campus. Some of the construction work was performed by school programs. The complex provides a regulation NCAA baseball field with irrigation, masonry dugouts, prefabricated metal bleacher seating for 600 with prefabricated metal press box, batting cages, and a storage building with space for concessions, restrooms, and mechanical room. The project included storm water management improvements for the field and adjacent parking areas. Personnel •Joe Yobbie Reference Paul DeMuth Director of Operations Dakota County Technical College 651.423.8370 paul.demuth@dctc.mnscu.edu 8 Similar Projects TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design Project Understanding The City of Lake Elmo is interested in incorporating potential ballfield upgrades at Reid Park, Ridge Park and Pebble Park. Reid Park currently has a recreational baseball field with a backstop and baseline fencing. The goal is to adjust the location of the field so centerfield has a minimum distance of 240 feet, with 200 feet left and right fence lines. Options the City is considering at this park are: a hooded backstop, dugouts, baseline fencing, an exterior fence, a clay infield with bases at 60 feet, lighting, irrigation, and a grass outfield. The City also wants to extend the parking lot to have space for 40 vehicles. Ridge Park currently has one recreational baseball field with a backstop. The scope of project in this park is to place two baseball fields within the area and to create a parking area to hold 60 cars. Field 1 will be planned as a competitive baseball field at high school baseball standards (with separate bid options for an artificial turf field usable for baseball and softball). Field 2 (if space is allowed) will be designed as a competitive or recreational field. Fields will need to be designed to correlate with one another regarding space and accessibility. Cost options/comparisons of an artificial turf field versus grass will also be necessary. Pebble Park currently has one recreational baseball field with a backstop. The goal is to place two recreational baseball fields next to each other and include backstops, dugouts, baseline fencing, and a clay infield with infield bases at 60 feet. Improvements to the outfields will include a flat and drainable surface with grass turf. Design Approach Quality athletic fields are as vital to growing communities as its people. In order to meet the needs and goals of high-quality fields, planning and evaluation is needed to achieve the best fit and most cost-effective options in the construction/ renovation of these ballfields within these parks. To begin the design approach, we will first establish a project management team (PMT), consisting of key personnel responsible who will be involved through the development of the project. Following identifying the PMT, TKDA will conduct a project kick-off meeting. The purpose of this meeting will be to identify a hierarchy of needs expressed by the PMT. This will serve as a baseline which TKDA will continually re-evaluate through the design process. As identified in the RFP, the project will consist of two phases. Phase 1 will consist of preparing conceptual drawings for the baseball fields. During this phase TKDA will review site opportunities and constraints and identify factors which may influence the proposed design of these fields. 9 Understanding/Approach MTN BIKE TRAILS PLAY AREA PARKING EXPANSION AREA SLOPE FROM PARKING TO FIELD PARKING EXPANSION AREA FIELD 2 LOW/WET AREA FIELD 1 TREE IMPACTS IMPROVE ACCESS FIELD 1 FIELD 2 TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design Tasks: ■Design review meetings with PMT ■Review cost estimate ■Develop final bidding documents Deliverables: ■Contract Documents ■Cost Estimate BIDDING Once all approvals are in, the drawings and specifications are advertised for bids. We will assist the City in providing answers to questions and preparing addenda as needed. Our team will remain engaged to support a fair and competitive bidding process. Tasks: ■RFI review and response ■Review of product substitution requests Deliverables: ■Answers to bidder questions ■Issue-for-Bid Drawings and Specifications CONSTRUCTION ADMINISTRATION (CA) During construction, we will be an active resource for City staff to ensure the building is constructed as designed. We will create a clear communication path with the contractor so they are aware of project goals. During this phase, our team will review submittals, coordinate with the special inspection agency, answer RFIs, and provide site observation reports. We will review contractor schedule of values against pay applications and provide punchlist and close-out documentation. Familiarity with fields of real estate design, building design, construction, and planning For more than 100 years, TKDA’s team of engineers, architects, and planners have been working together to provide lasting design solutions. Steve Foss has implemented and assisted in the development of over 20 park projects over the course of his 12-year career, starting with concept design and seeing the projects through completion. Kathleen has designed and implemented over 50 park projects during the course of her career, 10 of those included either renovated or new ballfields, two with artificial turf. Combined, our staff has provided practical design solutions for numerous communities throughout the metro area and greater Minnesota. 10 Understanding/Approach Factors may include social and environmental considerations impacting the potential outcome. Resulting from this review, concept plans will be prepared reflecting these considerations as well as the estimated costs based upon the proposed improvements. TKDA and the PMT will assess and determine how to proceed with the development of phase 2. Depending on the estimated costs from this process, one or only some of the field improvements identified in the phase 1 will move forward as identified on the proposal form. Work Plan Based on TKDA’s understanding of the Project, we propose to provide the following services and deliverables. These are broken down into two phases. Phase 1 includes preliminary design and phase 2 includes final design, bidding and construction administration. PHASE ONE PRELIMINARY DESIGN Preliminary Design will include identification of the PMT, PMT review meetings, development of concepts and corresponding estimates based upon feedback received from the PMT. At the conclusion of preliminary design, the PMT will evaluate how to proceed with phase two development based upon the budget availability. Tasks: ■Meetings •Kick-off with Project Management Team (PMT) •Review Concepts ■Site survey ■Site visit and analysis ■Concept development ■Cost estimate Deliverables: ■Site Inventory and Analysis Rendering ■Concept Plan Renderings ■Cost Estimate PHASE TWO FINAL DESIGN During final design, our team will finalize all major systems and design elements. Prior to completing Issue for Bid documents, a thorough document set will be provided for review by the City and our internal QA/QC team to minimize errors and reduce change orders during construction. TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 11 PROJECT SCHEDULE PHASE ONE Preliminary Design (June 2023 – October 2023) Project Management Team (PMT) Project Kick-off Meeting PMT Hierarchy of Needs Site Survey and Analysis PMT Concept Plan Review Meeting PMT Updated Concept Plan Review Meeting PHASE TWO Final Design (October 2023 – December 2023) Construction Documents (Plans, Specifications, and Cost Estimate) PMT Meeting: Plan Submittal Page Turn Review Final Issue for Bid QA/QC period Issue for Bid Submittal Bidding (January 2024) Job Posted for Bidding Final Addendum Issued (if needed) Bid Opening Construction (March 2024 – October 2024) Substantial Completion Punchlist Final Completion/Closeout Understanding/Approach (continued) and Project Schedule Computer aided drafting and design capabilities Our landscape architects, civil and electrical engineers are adept at the use of Auto CAD, CAD Civil 3D, and Adobe suite products to effectively design and present solutions to clients. We can also use 3D modeling software to further enhance our presentations and create and easy-to-understand representation of proposed changes and impacts. We have a full palette of design software to clearly and creatively tell the design story to provide useful information to make informed design and implementation decisions. TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 12 Rates Classification Range of Hourly Billing Rates* Senior Management (CEO, Vice President)189.00$ to 276.00$ Senior Registered Engineer, Architect, Landscape Architect,104.00$ to 276.00$ Senior Scientist, Senior GIS Analyst or Senior Planner Engineering, Architectural, Planning, or GIS Specialist II 93.00$ to 261.00$ Engineering, Architectural, Planning, or GIS Specialist I 81.00$ to 160.00$ Registered Engineer, Architect, Landscape Architect, Planner, GIS Analyst,64.00$ to 197.00$ Professional Land Surveyor, Scientist, or Certified Interior Designer Graduate Engineer, Planner, Interior Designer, Scientist, GIS Analyst, or Land Surveyor 64.00$ to 139.00$ Architectural Designer or Landscape Architectural Designer 64.00$ to 116.00$ Technician III 84.00$ to 122.00$ ** Technician II 58.00$ to 110.00$ ** Technician I 44.00$ to 93.00$ ** *Rates effective until December 31, 2023. ** For hours worked over 40 hours per week individuals are billed at one and one-half times the above rates. Schedule 2900-M10 City of Lake Elmo 2023 SCHEDULE OF HOURLY BILLING RATES In addition to hourly charges, TKDA shall be reimbursed for direct expenses actually incurred. Unless otherwise approved by the Client, direct expenses for travel and subsistence will be billed at or up to applicable IRS and US GSA published rates. TKDA shall be reimbursed for subconsultant fees at the amount billed TKDA plus 10%. TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 13 Additional Information EXHIBIT A PROPOSAL FORM Below is a breakdown of the fee for phases one and two with a total number not to exceed for the three parks in the event that one or more of the park designs do not move forward into Phase 2 final design, bidding, and construction administration due to funding constraints. 1.Professional services to design and assist with the bidding of the baseball field renovations for REID PARK, a number not to exceed: Phase One – Preliminary Design $5,000 Phase Two – Final Design: $23,300 Phase Two – Bidding & CA: $4,100 Total (Phase One & Phase Two): $32,400 2.Professional services to design and assist with the bidding of the baseball field construction/renovations for RIDGE PARK, a number not to exceed: Option A: Grass field (or fields) Phase One – Preliminary Design $6,600 Phase Two – Final Design: $26,400 Phase Two – Bidding & CA: $4,100 Total (Phase One & Phase Two): $37,100 Option B: Competitive Synthetic Turf Field (and a second grass recreational field if room allows) Phase One – Preliminary Design $6,600 Phase Two – Final Design: $27,600 Phase Two – Bidding & CA: $4,200 Total (Phase One & Phase Two): $38,400 3.Professional services to design and assist with the bidding of baseball field construction/renovations for PEBBLE PARK, a number not to exceed: Phase One – Preliminary Design $6,500 Phase Two – Final Design: $8,000 Phase Two – Bidding & CA: $7,100 Total (Phase One & Phase Two): $21,600 TKDA • City of Lake Elmo | Baseball Field Construction/Renovation Design 14 Additional Information Signature of Proposer: _____________________________ Name of Proposer: DJ Heinle Address: 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 Phone Number: 651.292.4481 Email Address: dj.heinle@tkda.com CHOOSE TKDA WITH CONFIDENCE A PROPOSAL FOR Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services FOR THE CITY OF LAKE ELMO A PROPOSAL FOR Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services FOR THE CITY OF LAKE ELMO 701 XENIA AVE S | SUITE 300 | MINNEAPOLIS, MN 55416 | TEL: 763.541.4800 | FAX: 763.541.1700 | WSBENG.COMMay 23, 2023 Adam Swanepoel, Assistant Public Works Director City of Lake Elmo 3800 Laverne Avenue N. Lake Elmo, MN 55042 Re: Proposal for Baseball Field Construction/Renovation Design and Preparation of Bid Document Services Dear Adam, On behalf of WSB, thank you for this opportunity to submit our qualifications. We have hand-selected a team that is well-positioned and eager to begin this project. We hope you take the following elements into consideration during your selection process. Extensive Recreational Project Experience | WSB has a depth of experience in planning and designing athletic facilities and community parks (more than $70 million in project costs in the past 20 years). This experience includes both natural and synthetic turf field surfaces. We understand your goals related to realistic yet optimal design solutions to ensure lifespan costs, fiscal responsibility, and best use scenario for each specific ballfield. Our recreational experts will provide thoughtful and efficient results for these important park improvements that align with your needs and goals. Proven Team Leadership | Project Manager, Bob Slipka, will lead the WSB team and assist with the development of graphics, documentation, and cost estimates. Bob consistently continues to manage projects that are completed on time and within budget. As shown by our included project examples, our team’s recreational expertise allows us to develop options to give you a diverse range of solutions along with associated costs to make informed decisions on final design and implementation. Scheduling Success | We have developed a scope of work based upon the budget provided. WSB takes pride in successfully scheduling and scoping projects to align with client fees to keep projects on task and on budget. With support from our internal Project Controls Group, P6 scheduling, and regular meetings with City Project Management Staff, we are confident in executing this project with similar success. We look forward to partnering with the City of Lake Elmo. WSB is willing and able to commit all necessary resources and staff as proposed and agrees to the coordinate with staff on contract terms and conditions listed in Section III of this Request for Proposals. If you have any questions or need clarifications regarding our proposal, please reach out to Bob at 612.201.5949 or RSlipka@wsbeng.com. Sincerely, WSB Bob Slipka, PLA Jason Amberg, PLA, ASLA Project Manager Principal 701 XENIA AVE S | SUITE 300 | MINNEAPOLIS, MN 55416 | TEL: 763.541.4800 | FAX: 763.541.1700 | WSBENG.COMTABLE OF CONTENTS Firm Overview ...................................................1 Contact Info & Firm Information .....................3 Key Personnel .................................................4 Understanding ................................................12 Approach to the Scope of Services ...............13 List of Similar Projects ...................................22 References .....................................................23 Rates ..............................................................24 Additional Information ..................................24 Proposal Form ................................................25 Firm Overview | 1 650+ STAFF 30+ SERVICE AREAS 16 OFFICES 5 STATES Forge ahead. WSB is a design and consulting firm specializing in engineering, community planning, environmental, and construction services. Together, our staff improves the way people engage with communities, transportation, infrastructure, energy and our environment. We offer services that seamlessly integrate planning, design and implementation. We share a vision to connect your dreams for tomorrow to the needs of today— the future is ours for the making. Alternative Project Delivery | Biogas | Bridges & Structures | City Engineering | Community Planning | Constructability Review | Construction Materials Testing & Special Inspection | Contractor Modeling | Drinking Water | Economic Development | Environmental Compliance | Geohazard Risk Management | Geospatial | Geotechnical Engineering | GIS Services | Grants & Funding | Health & Safety Compliance | Intelligent Transportation Systems | Investigation & Remediation | Land Development | Landscape Architecture | Managed Services | Natural Resources | Pavement Management | Pipeline | Project Management & Construction Administration | Public Engagement | Public Works Management | Right of Way | Roadway Design | Smart Cities | Solar | Survey | Sustainability | Technology Solutions | Traffic Engineering | Transit Planning | Transportation Planning | Urban Design | Vibration Monitoring | Visualizations | Water Resources | Water Reuse | Wind Firm Overview Firm Overview | 2A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Main Line Consulting, Inc. With more than 35 years of irrigation experience in all aspects of the industry – construction, service, sales, design and consulting – Main Line Consulting, Inc. (MLC) has the “real world” knowledge and expertise needed to develop a successful irrigation project. Since July 1999, MLC has focused and worked exclusively as irrigation consultants and does not provide any installation services. The firm works with clients to develop an irrigation system that is based on their needs and directives that are cost-effective, efficient, and maintainable. MLC utilizes the latest in computer-aided irrigation design in the development of irrigation projects. The AutoCAD-based design software provides strict adherence to “standard” design principles, as well as access to the latest in product data crucial to the design process. This method of design also develops valuable information that is used in hydraulic modeling, scheduling, efficiencies, and control options. MLC’s hardware and software are continually being upgraded to remain current with all methods/products. Engineering Design Initiative Engineering Design Initiative (EDI) is a consulting firm focused on sustainable design, energy, and the environment. We offer full-service design, modeling, and commissioning services supporting the mechanical, electrical, and low-voltage engineering disciplines. EDI provides superior customer service coupled with creative, sound engineering and skilled project management to make a positive impact on the consulting engineering industry and our clients. We are passionate in our creative design, attention to detail, and commitment to teamwork from the initial performance goals through validation by commissioning. As stewards of the environment, we strive to create innovative design solutions that minimize the use of natural resources. SUBCONSULTANT FIRM INFORMATION Contact Info & Firm Information | 3A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Contact Info & Firm Information WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis MN, 55416 CONTACT: Bob Slipka, PLA Project Manager 701 Xenia Avenue South, Suite 300 Minneapolis MN, 55416 P: 612.201.5949 F: 763.541.4800 E: rslipka@wsbeng.com Key Personnel | 4A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo SERVICE AREA | SERVICE AREA | SERVICE AREA | SERVICE AREA | City of Lake Elmo Bob Slipka, PLA, ASLA PROJECT MANAGER Jared Lee, PLA LANDSCAPE ARCHITECT / ATHLETIC FIELDS Laura Rescorla, PE WATER RESOURCES ENGINEER Katie Koscielak, EIT MUNICIPAL & UTILITIES Main Line Consulting IRRIGATION EDI SPORTS LIGHTING Jason Amberg, PLA, ASLA PRINCIPAL Mark Erichson, PE CLIENT ADVOCATE SUBCONSULTANTS RESOURCE POOL Key Personnel WSB has put together a committed team of experienced, creative professionals to work on this project. The team will be led by Bob Slipka, who has a long history of providing an over-the-top dedication to his clients and projects. Bob is a Senior Landscape Architect at WSB and will be supported by team members with varying backgrounds and areas of expertise in all aspects of the athletic field renovation, planning, and park planning for a well-rounded planning document. Key Personnel | 5A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Mark Erichson, PE CLIENT ADVOCATE Mark is a Principal and Senior Project Manager with over 25 years of experience in municipal and civil engineering projects including streets, storm sewers/stormwater management, water distribution systems, sanitary sewer systems, rate studies, capital improvement planning, environmental compliance, asset management, site grading, park improvements, development review, and municipal State Aid systems. His responsibilities include the design and/or preparation of project plans, specifications, construction management, engineer estimates, and permitting. Mark is currently the City Engineer for the City’s of Wyoming and Hugo. Additionally, he is a Senior Project Manager for the City of Lakeville as well as the May Township Engineer. SERVICE GROUP: Municipal REGISTRATION: Professional Engineer MN #40886 EDUCATION: Bachelor of Science, Civil Engineering, University of Minnesota, 1997 2020 Street Improvements (Neighborhoods West of Kettle River Boulevard) | Wyoming, MN CLIENT: CITY OF WYOMING PROJECT DURATION: 2020 – CURRENT This project involved the full reconstruction of deteriorating roadways. Existing roadways were both urban and rural sections with all roadway being reconstructed to urban sections. Innovative stormwater management practices were required to meet stormwater management rules with major drainage improvements required through the project areas. Minor sanitary sewer and watermain upgrades were also accomplished with this project. The project involved 113 assessable properties and required active public engagement related to improvements made and access during construction. Total construction cost for this project was $2,800,000. 130th Street and Utility Improvements | Hugo, MN CLIENT: CITY OF HUGO PROJECT DURATION: 2019 – 2020 The 130th Street Improvement Project involved the expansion and full reconstruction of 130th Street from Highway 61 to Goodview Avenue. This rural section roadway was converted to and urban section roadway. The project was designed to accommodate access to a new residential development totaling nearly 400 units with accommodations being made for sanitary sewer, watermain, and storm sewer facilities to serve the development. Right of way acquisition was required for the improvements as the roadway included a roundabout, widening, realignment, and inclusion of an 8-ft pedestrian trail. The total construction cost for this project was $2,700,000. 2018 Street Improvement Project (Pioneer Road, 260th Street, Indian Trail) | Wyoming, MN CLIENT: CITY OF WYOMING PROJECT DURATION: MAY 2018 – NOV 2018 This project involved full reconstruction of roadways, minor realignment of Pioneer Road, widening of Pioneer Road to meet MSA standards and better accommodate pedestrians choosing to walk/bike along the roadway, installation of driver feedback signs, and innovative stormwater management practices. WSB grant writers were successful in the Local Road Improvement Program grant process, securing $1,000,000 for the City of Wyoming. Construction costs were $1,800,000. Key Personnel | 6A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo SERVICE GROUP: Landscape Architecture REGISTRATION: Landscape Architect MN #40003 TX #3206 WI #558-14 EDUCATION: Bachelor of Landscape Architecture, North Dakota State University, 1995 Bachelor of Science, Environmental Design, North Dakota State University, 1995 MEMBERSHIPS + RECOGNITIONS: MN Recreation & Parks Association, Member & Routine Speaker American Society of Landscape Architects MN APA Guest Speaker: Community Transformation Through Park & Trail Planning (2015) Greater MN Parks & Trails NDSU Architecture/ Landscape Architecture Advisory Board 2000-2010 Land Use Training 2021 Guest Speaker: “Changing Land Use for Increased Public Benefit” Jason Amberg, PLA, ASLA PRINCIPAL Jason is the Principal Landscape Architect at WSB and an expert in the field of public space planning and design. Through his experience working with municipal staffs, park boards, and a variety of public groups and governing agencies, he has developed an ability to arrive at creative design solutions that meet project goals while respecting the diverse input of stakeholders. Jason is particularly astute at managing projects from the initial design phase through construction and observation. His projects range from small-scale neighborhood park improvements to comprehensive park and trail system plans and urban design/streetscaping projects. Additionally, Jason has presented park and trail planning topics at conferences and universities and served as an advisory board member at NDSU. Park & Trail System Master Plan | Owatonna, MN CLIENT: CITY OF OWATONNA PROJECT DURATION: OCT 2018 - JAN 2020 Jason served as the project manager and lead planner for this citywide park and trail system master plan. This was the first system plan prepared for this growing and diverse city. We developed a public engagement strategy that included a range of different opportunities for the community to interact with the planning team, including open house meetings, pop up booths at local events, face to face interviews, social pinpoint online engagement, and phone calls/email. The collective information gained through these various interactions and comparing with participation data and recreational standards provided meaningful public ‘buy in’ during the process which has already proven to provide public support for implementation of the proposed improvements in the system. Bertram Chain of Lakes Regional Athletic Park | Monticello, MN CLIENT: CITY OF MONTICELLO PROJECT DURATION: JUL 2015 - NOV 2019 This project began as a master plan / needs assessment / feasibility study that evolved into several phases of design and implementation. Jason served as project manager and lead designer for the entire process from initial kick-off meeting, community engagement, and master-planning, through final design, bidding / contractor procurement, and construction oversight, inspections, staking, and testing for the first two phases. Proposed full buildout of this 115-acre site is estimated to cost $18 million and will support current and future recreation needs within the local community and broader region. The project is currently 20% implemented in alignment with budget and schedule. The remaining two phases are awaiting funding. Parks, Trail & Open Space System Master Plan | Coon Rapids, MN CLIENT: CITY OF COON RAPIDS PROJECT DURATION: FEB 2012 - JAN 2013 For this park system planning project, Jason was the project manager and lead planner. While the project was not initially viewed as a high priority politically, the thoughtful public engagement process we led quickly revealed the diverse community’s needs. The project was overwhelmingly embraced by the public, city staff, and the policy makers which led to a successful bond referendum that helped fund major improvements throughout their system. Jason was also involved in the city’s original system planning effort completed in 2001 and has continued to serve the community for more than two decades with athletic studies, individual park master plans, and final design of the majority of their new and redeveloped parks during this time. Key Personnel | 7A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo SERVICE GROUP: Landscape Architecture REGISTRATION: Landscape Architect MN #44337 CO #0001260 Council of Landscape Architectural Registration Boards (CLARB) Certification #6378 EDUCATION: Bachelor of Landscape Architecture, North Dakota State University, 1998 Bachelor of Science in Environmental Design, North Dakota State University, 1998 Bob Slipka, PLA, ASLA PROJECT MANAGER As a Senior Landscape Architect and project manager, Bob has over 24 years of project experience. Over his career, he has been involved in a range of project types including park and trail planning, recreational facilities, riverfront improvements, streetscapes, corridor enhancements and site development projects. Bob’s daily responsibilities include project management, master planning, inventory and analysis, site design and detailing, preparation of construction documents and associated specifications, cost estimating, bidding, and construction administration. Through his experience working with municipal staffs, park boards and public groups, he has a proven track record of creating successful planning and design solutions. 2021 Park Improvements | Blaine, MN CLIENT: CITY OF BLAINE PROJECT DURATION: JAN 2021 - FEB 2022 As project manager, Bob worked with city staff in developing plans for two separate park improvement projects. One project was the shelter replacement at Aquatore Park. The two large shelters are heavily utilized by the community for events and functions. WSB developed plans and specifications for the replacement of the two shelters including concrete pads, ADA parking access, serving tables, and electrical coordination. The second project was at Austin Park and Territorial Park. The adjacent basketball court will also be removed and replaced to take advantage of paving costs and contractor utilization. Design explored arrangement options to minimize park impacts and provide buffering to existing trees. Final plans and specs for Austin Park are scheduled to go out for bid in late June 2021. Albert Lea Athletic Complex Study | Albert Lea, MN CLIENT: CITY OF ALBERT LEA PROJECT DURATION: OCT 2019 - APR 2020 Bob is currently working with City staff on a site selection process and master planning effort to explore the development of a new athletic complex for the City of Albert Lea. The current Snyder Complex is in need of renovation and staff are assessing the current needs of the City and if the existing park is large enough to accommodate future needs. Through input from staff and GIS mapping, sites are being explored that can accommodate the future recreational needs for the City. Once several preferred sites have been determined, master planning of the sites along with cost estimates will be developed to aid city staff in making the best decision for implementation. Sand Creek Park | Coon Rapids, MN CLIENT: CITY OF COON RAPIDS PROJECT DURATION: APR 2015 - MAY 2017 Bob led the reconstruction of the city’s primary athletic facility. In preparations of construction documents and specifications, Bob managed the project schedule and budget with city staff and outside consultants including a skatepark vendor, playground equipment vendor, architect, hockey dasherboard vendor, county engineer, watershed district, Connexus Energy, Xcel Energy, and athletic associations. The nearly $6M, 50+ acre park renovation included construction of ballfields, football/ lacrosse fields, hockey rinks and leisure skating area, skatepark, three playgrounds, hard play courts, picnic areas, concession/warming house building, trails, irrigation, site utilities, and parking areas. Key Personnel | 8A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Jared Lee, RLA LANDSCAPE ARCHITECT As a Landscape Architect, Jared has over 20 years of project experiences in Minnesota and surrounding area. Over his career, he has been involved with a range of projects including new school planning and construction, stadium design and construction, athletic field reconstruction, and track and field facilities. Jared’s daily responsibilities include master planning, site design and detailing, preparation of construction documents, cost estimating, and construction administration. SERVICE GROUP: Landscape Architecture REGISTRATION: Registered Landscape Architect MN #44369 EDUCATION: Bachelor of Landscape Architecture, North Dakota State University, 2000 Bachelor of Environmental Design, North Dakota State University, 2000 *Work prior to joining WSB SPPS Humboldt High School Athletic Improvements | St. Paul, MN CLIENT: BKBM - SAINT PAUL PUBLIC SCHOOLS PROJECT DURATION: DEC 2021 - MAY 2023 Jared served as one of the team members to design the synthetic turf replacement at Humboldt High School for Saint Paul Public Schools. The project included the expansion of bleachers, perimeter fence replace and barrier net systems. New Elementary School | Byron, MN* CLIENT: BYRON PUBLIC SCHOOLS PROJECT DURATION: SEP 2016 - NOV 2018 This project consisted of a new elementary school building with support infrastructure including parking lot, bus loading area, hard surface playground, soft area playground and ballfields. The site design included the onsite use of approximately 50,000 yards of unstable backfill material that could not be used before the building. The additional material was used to create a large multi use field area. Vaughan Field | Shakopee, MN* CLIENT: SHAKOPEE PUBLIC SCHOOLS PROJECT DURATION: OCT 2016 - SEP 2018 Jared designed and managed the site specific portions of the project. The project included reconstructing the running track with field events, new synthetic turf field, bleacher expansion, entry plaza, new parking lot, and site fencing. Key Personnel | 9A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Laura Rescorla, PE WATER RESOURCES ENGINEER Laura is a Project Engineer in WSB’s Water Resources Group. She has over six years of engineering experience collaborating across technical groups to deliver quality products to clients in a variety of water resource project areas. Her experience includes planning, hydraulic and hydrologic modeling, design, permitting, and construction management. Laura’s engineering computer skills include XPSWMM, HyrdoCAD, HY-8, ArcGIS, MircoStation, and P-8 and MIDS. SERVICE GROUP: Water Resources REGISTRATION: Professional Engineer MN #58716 EDUCATION: Bachelor of Science in Engineering, Civil/ Environmental Concentration, Calvin College 2010 Moore Lake Park Improvements | Fridley, MN CLIENT: CITY OF FRIDLEY PROJECT DURATION: 2022 - CURRENT Laura managed the stormwater management and drainage design for the redevelopment of Moore Lake Park. The improvements included reconstructing the parking lots, courts, play areas, and trails throughout the park and the construction of a new park building. The stormwater management included coordination with a Comprehensive Stormwater Management Plan for the area and design of storm sewer systems and an onsite BMP. Laura coordinated with the City to provide the modeling and documentation for watershed district permitting of the project. Part of the storm sewer system in the park was designed in collaboration with an Anoka County road improvement project that will be constructed in coordination with the park improvements. Water Resources Engineering | Minnetrista, MN CLIENT: CITY OF MINNETRISTA PROJECT DURATION: 2019 - CURRENT Since 2019, Laura has assisted the City of Minnetrista with drainage concerns, storm sewer system design, and development reviews. Laura leads the stormwater management plan review efforts for the City, to ensure compliance with City’s regulations, including its Surface Water Management Plan. She assists the City with their stormwater asset management program, prioritizing ponds for maintenance and coordinating communications regarding privately owned ponds. She works with the larger project team to incorporate culverts, storm sewer, and BMP improvements on street improvment projects within the City and manages watershed district permitting and compliance with NPDES stormwater requirements. Peltier and Highlands Park Development | Inver Grove Heights, MN CLIENT: CITY OF INVER GROVE HEIGHTS PROJECT DURATION: 2022 - 2023 Laura analyzed the drainage characteristics and stormwater management strategies for the development of two parks within the City of Inver Grove Heights. Both parks are within larger developments that did not explicitly plan for future recreational infrastructure within the parks. Laura performed hydrologic and hydraulic modeling of the existing and proposed conditions within the parks and determined that adjacent, downstream stormwater management features could handle the drainage from both parks and meet the City’s special stormwater management requirements for these areas. This allowed for optimal recreational development within the parks. Key Personnel | 10A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Katie Koscielak, EIT MUNICIPAL & UTILITIES Katie has been working within the municipal group for twelve years and is experienced with State Aid and local street design, assessment procedures, storm design, and project delivery from feasibility through final design and construction. Katie has also worked on numerous reconstruction projects and is very familiar with special design considerations associated with residential construction, utility construction, and roadway section evaluation. One of her unique skill sets is her ability to foresee potential construction conflicts and finding alternative solutions. Katie currently serves as the Assistant City Engineer for the City of St. Anthony, Assistant Town Engineer for May Township, and the lead designer for the City’s of St. Anthony Village, the City of Wyoming, and the City of Hugo. SERVICE GROUP: Municipal EDUCATION: Civil Engineering, University of Minnesota, 2010 MEMBERSHIPS + RECOGNITIONS: American Public Works Association (APWA) Member Madelia Mobile Village Infrastructure Improvements | Madelia, MN CLIENT: MADELIA MOBILE VILLAGE COOPERATIVE PROJECT DURATION: MAR 2022 - CURRENT The project consisted of directionally drilling watermain and pipe bursting sanitary sewer. Katie coordinated with Northcounty Cooperative Foundation, the Madelia Mobile Village Cooperative, and the contractor throughout the project and contract administration during construction. The final construction costs were lower than anticipated through close coordination with the contractor and utilizing creative construction methods to minimize property impacts while maintaining requirements of the Department of Labor and Industry permit. Katie is currently working with the consultant retained by NCF to utilize Minnesota Housing grant funds for a storm shelter improvements in conjunction with the remaining available grant funds originally identified to be used for the watermain and sanitary sewer improvements. Garlough/Marthaler Parks River to River Trail I West St. Paul, MN CLIENT: CITY OF WEST ST. PAUL PROJECT DURATION: SEPT 2020 - SEPT 2022 This project consisted of the improvement and realignment of the existing trail through Garlough Park and Marthaler Park. Katie collaborated with Dakota County and the City of West St. Paul to meet the standards outlined in the 2020 Dakota County Regional Greenway Guidebook and the 2015 Dakota County River to River Master Plan. Improvements included the extension of new bituminous trail and installation of new storm sewer facilities and retaining walls. Katie’s roles included preparation of plans and specifications, construction administration 22021 Downtown Improvement Project I Hugo, MN CLIENT: CITY OF HUGO PROJECT DURATION: MAR 2021 - CURRENT This project consisted of the extension of 147th Street (MSA route) from TH 61 to Oneka Parkway (MSA route) to MnDOT design standards complete with concrete curb and gutter, subgrade corrections, installation of new storm sewer facilities including floodplain mitigation, and installation of a new bituminous trail. Katie’s roles throughout the project included coordination with multiple regulatory authorities including MnDOT for pedestrian push button permitting within TH 61, DNR and Rice Creek Watershed for culvert crossing within judicial ditch, Washington County for work within the right of way, and the City of Hugo as the project included the reconstruction of the existing park facilities. Key Personnel | 11A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Jim Ruzicka IRRIGATION SPECIALIST Jim has over 40 years of experience in designing successful irrigation projects of different types and sizes, and from simple to complex around the country. He has completed work on more than 600 successful irrigation projects since starting Main Line Consulting. Jim can also provide accurate cost projection, project budgeting, bid review, contractor review, specifications, and on-site project management to provide the “start-to-finish” product critical to the success of every irrigation project. Jay Hruby ELECTRICAL ENGINEER Jay has committed a large percentage of his electrical engineering career to lighting design and the promotion of energy conservation and sustainability within his projects. Over the past 20 years, he has designed many award-winning lighting designs that include site lighting, pedestrian lighting, art projects, monuments, parks, and buildings. Jay is passionate about lighting aesthetics, as well as energy efficiency and controls. SUBCONSULTANTS STAFF Understanding | 12A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Understanding From restoration of native areas, to neighborhoods and community parks, to a $7-million dollar athletic complex, their designs have proven to be creative, maintainable, and very well received by citizens. - Jay Lotthammer, Director of Parks & Recreation WSB understands that the City of Lake Elmo is in the process of reviewing three existing baseball fields for potential upgrades and the construction of one additional new baseball field in two of the parks. Currently all three existing baseball fields are considered recreational fields and consist of a backstop and infield. The goal of this project will be to review each field, design a proposed baseball field or fields, and assist the City with the bidding of a redesigned version of each field, including the drafting of bid documents and specifications for the project. One ballfield may include synthetic turf which will be decided upon following Phase 1, Conceptual Design and Cost Estimating. Depending on the developed cost estimate, the City may decide to proceed with the design of one or more of the proposed improvements. Based on staffs directive, WSB will develop final bid documents and specifications, assist with the bidding process, and support the City of Lake Elmo during construction. Approach to the Scope of Services | 13A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Approach to the Scope of Services Project Kickoff Meeting Project Management Project management is a key task included in each phase of the project. In each case, this task consists of management and administration, project coordination, and communication with the City staff and WSB personnel. Additional work included in this task involves attendance at a kick-off meeting and at progress meetings with City staff. Proper completion of this task will allow for open lines of communication and routine updates on project issues, as well as keeping the project on schedule and within budget. The general purpose of the kickoff meeting is to confirm key individuals, staff members, etc. who will be involved in the project or have information that will affect the project, and general review and discussion about the issues and concerns related to this project. WSB will also propose a schedule that meets the requirements of the proposal as well as key benchmarks identified by the City of Lake Elmo. The establishment of the project schedule is key for identifying required tasks by all parties as well as coordination to obtain vital information at critical points throughout the design process. Approach to the Scope of Services | 14A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Concept Planning Following the site inventory and analysis, WSB’s design team will prepare 2-3 hand sketched concept plans per park to explore various spatial, orientation, and circulation relationships for each of the three parks. This includes one competitive field at Reid Park, two competitive fields at Ridge Park (one of which may include synthetic turf), and two recreational fields at Pebble Park. Site-based concepts will be developed utilizing onsite information and programmatic desires conveyed by city staff. WSB will provide concept plans and associated cost estimates to the City for review and obtain feedback. Developing a complete and comprehensive assessment of needs, demands, and priorities is essential to the success of the project and is necessary to move toward into final design. WSB will work closely with the City staff and City Council to: -Review the Concept Plans to discuss the elements in detail for modifications as it relates to the overall development and unique site attributes. -Review cost estimate and compare with operation and maintenance expectations to ensure design aligns with long-term maintenance. This will include review of potential amenities like maintenance strip at fence lines, fence toppers, lighting controls, irrigation systems, amended soils, base anchors, fencing, and seating. -Confirm/refine the updated list of potential project improvements to determine the validity as it relates to the overall project goals and budget. -Determine a preferred concept for each park for future implementation. Site Inventory and Analysis Through visual site inventory and review of available site information provided by the OWNER, WSB will work (in concert with City staff, as appropriate) to identify the project area’s physical characteristics and determine the site’s opportunities and constraints. This will allow both the OWNER and WSB to develop a clear understanding of the unique characteristics and land use limitations imposed on the project. Approach to the Scope of Services | 15A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Topographic Survey WSB will perform fieldwork and develop a topographical survey of the areas to be developed. This survey will be prepared in AutoCAD format. The specific location of the surveys will be determined following the kickoff meeting. The extent of the surveys will be limited to the general development area for this project and will include: -Setting control suitable to use for the topographic survey and construction staking of the proposed improvements. -Collecting enough topography of the area for the proposed improvements per the approved Concept Plans. -Processing the topographic data in Civil 3D to include all topographic features, contours, and TIN data. This survey will be on the Washington County coordinate system and the vertical datum will be on NAVD 88 unless otherwise specified. Approach to the Scope of Services | 16A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Geotechnical Investigation Based upon our experience with similar projects, the objectives of our geotechnical services are to perform subsurface borings, classify and analyze the soil samples, discuss groundwater issues, and prepare recommendations for subgrade preparation and a pavement section. We proposed the following scope of services: SUBSURFACE TEST BORINGS We propose to perform up to 10 borings of depths at about 10 feet deep across the three parks. In the standard penetration test borings, we will sample and record blow counts at 2½ foot intervals to the boreholes termination depth. If unsuitable soils (existing fill, organic soils, etc.) are encountered at the proposed boring termination depth(s), it will be necessary to extend the borings into more competent materials. This will allow us to better evaluate potential construction issues. An additional charge of $30 per lineal foot will be assessed for borings extended beyond their proposed termination depths. If the added work requires an additional mobilization to the site it will be charged at $250 per day. GEOTECHNICAL ENGINEERING REPORT Information gathered for this project will be used to prepare a single geotechnical report. The report will summarize our findings and provide a discussion of subsurface soil and groundwater conditions encountered in our borings and how they may affect the proposed construction of improvements. The report will also provide estimates of groundwater depths/elevations and a discussion of soils for use as structural fill and site fill. The report will also provide recommendations for pavement sections. Approach to the Scope of Services | 17A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Final Plans, Specifications, and Bidding DESIGN DEVELOPMENT WSB will utilize obtained topographic survey and preferred concept plans for development of proposed park improvements at Reid, Ridge, and Pebble Parks. Documents shall include the preparation of written text, plans, photos, product info, and other drawings necessary to describe the design, materials, colors, textures in sufficient detail for the City to envision the appearance and function of the proposed improvements. -This includes using the appropriate design standards for the listed facilities and preparing design development drawings. The drawings include basic removals, site layout, grading, restoration, site utility plans, site lighting plans, irrigation plans, and associated details as required. Outline specifications, including general and technical sections, will be prepared. -Ensure designs are compliant with local and state regulations including ADA. -An estimate of the cost to construct these improvements will be refined based on these documents. From this estimate the City shall determine which of the improvements shall be included in the final design. Approach to the Scope of Services | 18A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo i. Title Sheet ii. Site Removals Plan iii. Site Layout Plan iv. Site Grading Plan • Erosion control and site SWPPP plans as necessary. • Spot elevations for key finished grade elements. v. Pavement Designs and Typical Details vi. Utility Designs and Typical Details for water service • Design and details for water service required for irrigation system(s) vii. Storm Sewer, Drainage Plans, and Details: All three parks are in Valley Branch Watershed District. A permit is required for land alterations of 1 acre or more and/or for new and fully reconstructed impervious surface of 6,000 sf or more. Scope includes: • HydroCAD modeling of the sites to develop a drainage plan for each of the park improvements. • Sizing additional storm sewer and structures as required based on parking lot and site design. • Preparation of watershed district submittals and permitting. Assuming each park will need a permit under the stormwater management rule (and will need to meet both rate and volume control) and erosion and sedimentation control rule. Pebble Park - renovate existing ball field, add a second ball field • Project area: 3.25 acres • New and fully reconstructed impervious: ~15,000 sf Reid Park - renovate ball field, add 10 parking spaces, walks and benches • Project area: 3 acres • New and fully reconstructed impervious: ~10,000 sf Ridge Park - remove ball field and play area, construct 2 fields, 60 car parking lot, walks, etc. • Project area: 12 acres • New and fully reconstructed impervious: assumed more than 6,000 sf, less than 1 acre • Assuming storm sewer infrastructure will be needed in the new parking lot. viii. Electrical plans, details, and specifications (subcontracted with EDI) • WSB will work with the City to provide design plans for the installation of new sports field lighting at Reid Park and Ridge Park. Lighting system construction plans will include the location and type of lighting units, foundations, conduit and wiring, and handholes if necessary. ix. Irrigation plans, details, and specifications (subcontracted with MLC) • WSB will work with the City to provide design plans for the installation of new sports field irrigation at Reid Park and Ridge Park. Irrigation system(s) construction plans will include the location and type of heads, piping, valve boxes, controller, and infrastructure required for each of the two parks. x. Miscellaneous Site Construction Details • Prepare Technical Specifications • Prepare Final Cost Estimate CONSTRUCTION DOCUMENTS Once the design options are fully explored and selected, WSB will prepare final Construction Documents in AutoCAD Civil 3D Release 2022. These documents shall include plans, details, and specifications in sufficient detail for the City to pursue competitive bids for the construction of the improvements. The project will be bid as one combined package for all three parks. WSB will provide construction plans that will include: Approach to the Scope of Services | 19A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Permits Due to project size, it is anticipated that: Based on our current understanding of the project, WSB has not included wetland delineations, environmental investigations, or associated remediation for the site within this proposal. If such services are determined to be required during the design phase, WSB can prepare a scope / fee for this work as “additional services.” Note: Any permit fees will be considered reimbursable expenses billed in addition to fee proposal. • Completion and submittal of the NPDES Phase II stormwater permit at 90% plan completion for each park. Assumes erosion control plan, SWPPP, and required erosion and sediment control details • All three parks are in Valley Branch Watershed District. Completion and submittal of watershed permits for all three parks is assumed • Completion and submittal of permits associated to water service improvements at two parks Note: permit fees will be considered reimbursable expenses billed in addition to consulting fees BID PLAN DELIVERABLES • One complete digital set of design development materials, construction drawings, specifications, and final estimate of probable construction costs at 60%, 90%, and 100% completion. • Addenda during bidding. It is understood that the proposed site improvements will be bid as one single package. WSB will package the final plans and specifications into the formal bidding documents. This task will include an internal QA/QC review of the final plans, quantities, and specifications. WSB will print, assemble, and submit the final contract documents to the City and request authorization to advertise the project for bidding. We will prepare the Ad for Bid, coordinate the advertising, and coordinate the bid opening. WSB will receive and respond to bidder inquiries concerning the plans, specifications, and intent of the project. Logs of all inquiries will be kept and maintained to document inquiries. WSB will attend the project bid opening with the City. Bidding Assistance WSB will review the low bidder’s bid proposal, contractor’s / subcontractor’s relative experience and performance on similar projects, references, nature, and extent of other similar contracts, whether or not the contractor or subcontractors have ever been denied contract award, and any other information that would affect the ability of the contractor to perform the work. Based on this information, WSB will make a recommendation regarding award of contract. Approach to the Scope of Services | 20A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Contract Administration and Site Progress Meetings CONDUCT PRE-CONSTRUCTION CONFERENCE Facilitate the pre-construction conference. Meeting minutes will be prepared and distributed to all the attendees. WEEKLY/BIWEEKLY SITE PROGRESS MEETINGS It is assumed this project should take up to 12 weeks from project start to project closeout. That said, WSB will attend up to 12 weekly/biweekly site progress meetings within periods of active construction during the project to allow for proactive communication with the Contractor and Owner, which will maximize efficiency during the construction. Meeting minutes will be prepared and distributed to all the attendees. These meetings will allow WSB to: -Become generally familiar with and to keep the Owner informed about the progress and the quality of the portion of the work completed. Note, this does not include exhaustive or continuous on-site inspections to check the quality or quantity of the work. -Determine in general if the work is being performed in a manner indicating that the work, when fully completed, will be in accordance with the Contract Documents. -Report to the Owner known deviations from the Contract Documents. -Review submittals and shop drawings. -Answer Contractor questions and provide design intent and clarification for any issues that may arise during the project. -Review pay applications prepared by Contractor and make recommendations regarding payment. -In the event of changed conditions during the project, WSB will prepare and distribute any necessary change orders to expedite the work in the field. -Substantial completion meeting and punch list. Approach to the Scope of Services | 21A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Additional Services • Wetland delineation and/or mitigation • Special inspections • Hazardous waste and/or contaminated soils engineering • Archeological services • Ecological design services WSB can add these items to our scope at an additional fee if they become required. Any additional work or change in project scope will be completed on an hourly basis at current WSB consultant rates. CONDITIONS AND EXCLUSIONS We will provide the professional design services required to complete the plans and specifications, as required for bidding the improvements for this project except the following: List of Similar Projects | 22A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo List of Similar Projects PROJECT OWNER WOLF PARK PICKLEBALL COURTS ST. LOUIS PARK, MN CARPENTER PARK TENNIS COURTS ST. LOUIS PARK, MN HIDDEN PONDS PARK PICKLEBALL COURTS BLAINE, MN COMMUNITY ATHLETIC COMPLEX LINO LAKES, MN WELCOME PARK BALLFIELD CRYSTAL, MN LONE LAKE PARK MINNETONKA, MN MCMORROW COMMUNITY ATHLETIC PARK SOUTH ST. PAUL, MN SAND CREEK ATHLETIC COMPLEX COON RAPIDS, MN FLINT HILLS RESOURCES SOCCER COMPLEX ROSEMOUNT, MN AQUILA PARK GIRLS FASTPITCH BALLFIELDS ST. LOUIS PARK, MN CENTRAL PARK HOPKINS, MN QUARRY PARK EAGAN, MN OHMANN PARK EAGAN, MN BERTRAM CHAIN OF LAKES ATHLETIC COMPLEX MONTICELLO, MN KAPOSIA LANDING ATHLETIC COMPLEX SOUTH ST. PAUL, MN TAHPAH PARK BALLFIELD EXPANSION SHAKOPEE RIVERVIEW PARK COMMUNITY ATHLETIC COMPLEX COON RAPIDS, MN 40-ACRE SPORTS COMPLEX ANDOVER, MN MAETZOLD FIELD COMMUNITY ATHLETIC COMPLEX HOPKINS, MN BUCHER PARK COMMUNITY PARK SHOREVIEW, MN UMORE BALLFIELD COMPLEX ROSEMOUNT, MN ZACHARY PARK CONCRETE HOCKEY RINK PLYMOUTH, MN PLYMOUTH CREEK PARK CONCRETE HOCKEY RINK PLYMOUTH, MN VETERANS PARK COMMUNITY ATHLETIC COMPLEX HASTINGS, MN CASPERSON COMMUNITY PARK LAKEVILLE, MN SOUTHWEST PARK COMMUNITY ATHLETIC COMPLEX MAHTOMEDI, MN RICHARD WALTON PARK COMMUNITY ATHLETIC COMPLEX OAKDALE, MN EAST LAKE COMMUNITY PARK COMMUNITY PARK LAKEVILLE, MN KING PARK MIRACLE FIELD LAKEVILLE, MN GLEN LAKE ATHLETIC FIELD COMMUNITY ATHLETIC COMPLEX MINNETONKA, MN AFTON HEIGHTS PARK ATHLETIC COMPLEX MAPLEWOOD, MN NOBLE SPORTS PARK COMMUNITY ATHLETIC COMPLEX BROOKLYN PARK, MN FORT SNELLING ATHETIC PARK COMMUNITY ATHLETIC COMPLEX MINNEAPOLIS, MN ATHLETIC FIELD IMPROVEMENTS - 4 RICHFIELD COMMUNITY PARKS RICHFIELD, MN THOMAS RYAN MEMORIAL PARK COMMUNITY ATHLETIC COMPLEX PRIOR LAKE, MN RICH VALLEY PARK COMMUNITY ATHLETIC COMPLEX INVER GROVE HEIGHTS, MN BANDIMERE PARK COMMUNITY ATHLETIC COMPLEX CHANHASSEN, MN RIVERSIDE PARK COMMUNITY ATHLETIC COMPLEX SIOUX CITY, IA References | 23A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo References City of Crystal John Elholm Director of Parks 763-531-1150 john.elholm@crystalmn.gov Welcome Park: 1 competitive ballfield, lighting, irrigation, trails, hockey rink Services provided: Master Planning, Final Design, Bidding Construction Admin City of Coon Rapids Ryan Gunderson Parks Director 763-767-6513 rgunderson@coonrapidsmn.gov Sand Creek Athletic Complex: 6 ballfields, 2 football fields, lighting, irrigation, parking, trails, concession building, play area, skate park, playgrounds, hockey rinks Services provided: Master Planning, Final Design, Bidding Construction Admin City of Rosemount Dan Schultz Director of Parks 651-322-6012 dan.schultz@rosemountmn.gov Umore Park: 2 ballfields, irrigation, lighting, parking, trails Services provided: Schematic Planning, Final Design, Bidding, Construction Admin Erickson Park: 6 ballfields Services provided: Planning (current project, anticipate final design later this year) BOB SLIPKA WAS THE PROJECT MANAGER FOR THE FOLLOWING PROJECTS: Rates | 24A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo Rates BILLING RATE/HOUR SR. PRINCIPAL | SR. ASSOCIATE $235 PRINCIPAL | ASSOCIATE $173 - $223 SR. PROJECT ENGINEER | SR. PROJECT MANAGER $173 - $223 PROJECT MANAGER $152 - $170 PROJECT ENGINEER | GRADUATE ENGINEER $102 - $169 ENGINEERING TECHNICIAN | ENGINEERING SPECIALIST $68 - $167 LANDSCAPE ARCHITECT | SR. LANDSCAPE ARCHITECT $78 - $162 ENVIRONMENTAL SCIENTIST | SR. ENVIRONMENTAL SCIENTIST $68 - $160 PLANNER | SR. PLANNER $80 - $167 GIS SPECIALIST | SR. GIS SPECIALIST $78 - $167 CONSTRUCTION OBSERVER $104 - $135 SURVEY ONE-PERSON CREW $175 TWO-PERSON CREW $235 OFFICE TECHNICIAN $60 - $102 Costs associated with word processing, cell phones, reproduction of common correspondence, and mailing are included in our hourly rates. | Vehicle mileage is included in our billing rates [excluding geotechnical and construction materials testing (CMT) service rates]. Reimbursable expenses include costs associated with plan, specification, and report reproduction; permit fees; etc. | Multiple rates illustrate the varying levels of experience within each category. | Rate schedule is adjusted annually. Additional Information Our team has identified that there are no conflicts of interest when performing this contract. Please see below for our hourly rates, more specifics can be provided upon request. Proposal Form | 25A Proposal for Baseball Field Construction, Renovation Design, and Preparation of Bid Docement Services for the City of Lake Elmo 11 EXHIBIT A PROPOSAL FORM 1. Professional services to design and assist with the bidding of the baseball field renovations for REID PARK, a number not to exceed $__________________________ 2. 2. Professional Services to design and assist with the bidding of the baseball field construction/renovations for RIDGE PARK: A: Grass field (or fields) a number not to exceed $__________________ B: Competitive Synthetic Turf field (and a second grass recreational field if room allows) a number not to exceed $_______________ 3. Professional services to design and assist with the bidding of baseball field construction/renovations for PEBBLE PARK, a number not to exceed $_______________ Signature of Proposer: _____________________________ Name of Proposer: ________________________________ Address: ________________________________________ Phone Number: __________________________________ Email Address: ___________________________________ Proposal Form WSB & Associates, Inc. 701 Xenia Ave S, Suite 300 Minneapolis, MN 55416 612.360.1301 amoffatt@wsbeng.com 108,000 155,000 72,000 173,500 **PROFESSIONAL FEES ARE BASED UPON AWARD OF INDIVIDUAL PARK(S). IF MULTIPLE PARK PROJECTS ARE AWARDED, THERE WOULD BE AN OVERALL REDUCTION IN HOURS/ FEES FOR OVERLAPPING SERVICES LIKE CONSTRUCTION DOCUMENTS/DETAILS, PROJECT SPECIFICATIONS, BIDDING, AND CONSTRUCTION ADMINISTRATION AS THESE SERVICES COULD BE MERGED INTO ONE SINGLE BID PACKAGE.