Loading...
HomeMy WebLinkAbout2023-2027 DRAFT CIP City of Lake Elmo Capital Improvement Program 2023 – 2027 8/23/22 City Council Work Session TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................1 Scope of the Draft CIP .....................................................................................................1 Funding Sources...............................................................................................................2 Project Priorities...............................................................................................................3 2023-2027 CIP Overview Street Projects ..................................................................................................................4 Project Highlights by Department ...................................................................................5 CIP Reports (Appendix) Projects Listings………………………………………………………………………...8 Projects by Year & Priority...…………………………………………………………..11 Funding Source Summary……………………………………………………………...15 Projects by Funding Source 2023-2027 ……………………………………………….16 Projects by Funding Source 2023-2032 ……………………………………………….19 Projects & Funding Sources by Department…………………………………………...24 Project Detail……………………………….…………………………………………..28 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment, and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget, but would not be included in the CIP. 1 Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system Wastewater Fund Funds come from fees paid by users of the Wastewater System Vehicle Replacement Fund Fund used to segregate funds set aside for planned replacements of existing vehicles. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Municipal State Aid (MSA) Funds come from fees paid by users of the Water System State aid funds allocated to the City each year; annual allocation grows as the City grows. In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. The Vehicle Replacement Fund at 12/31/2021 had a fund balance $1,558,622. The estimated balance at 12/31/2022 is $909,703. The updated proposed schedule of revenues and expenditures assumes no changes in the projected contributions from the 2022-2026 CIP projections with the exception of the additional $250,000 this year and the addition of $200,000 in 2032. These increases help account for the increased costs of vehicles. 2 Revenue from investments and the sale of equipment is not included in the above table. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1 Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low-priority projects; desirable but not essential. 5 Future Consideration Year Revenue Expense Fund Balance 2023 $425,000 $514,500 $591,322 2024 $265,000 $551,000 $305,322 2025 $368,000 $187,000 $486,322 2026 $200,000 $90,000 $596,322 2027 $331,000 $1,020,000 -$92,678 2028 $517,000 $60,000 $364,322 2029 $709,000 $365,000 $708,322 2030 $953,000 $0 $1,661,322 2031 $677,000 $0 $2,338,322 2032 $200,000 $30,000 $2,508,322 Schedule of Revenues and Expenditures 3 2023-2027 CIP OVERVIEW For 2023 through 2027, the draft CIP includes 79 separate projects (active, pending and new recommendations) with a total estimated cost of $67,767,030. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The update includes the following street projects in the CIP: • PW-031, CSAH6/Inwood Street Signal for $250,000 in 2027. • PW-034, 15th St N (MSA Street) for $1,200,000 in 2024. • PW-035, UP RR Crossing-Village Parkway and Private Drive Closure for $892,500, in 2023-4. • PW-039, Reclaim roads in Fields of St. Croix 2nd and Tana Ridge, and Old Village Phase 7, $3,688,400 in 2023. • PW-040, Reclaim roads in Carriage Station, Jamaca Ct and Homestead for $3,609,400 in 2024. Grant contributions of $1,220,000 are anticipated. • PW-041, Reclaim roads of 59th St Ct/55th St/Julep Way & 57th St/Jasper Ave/ Jerome Ave/Irish Ct and Packard Park, Eden Park and 20th St Cir in 2025 for $6,228,375. Grant contributions are anticipated at $3,950,000. • PW-042, Reclaim roads in Lake Elmo Heights, Innsdale Ave cul de sac and Inwood Ave cul de sac and Tartan Meadows and Klondike Ave for $5,292,900 in 2026. Grant contributions assumed at $3,040,000. • PW-053, Ideal Ave (CSAH 13) Phase 3 (CSAH 14 to CSAH 6) for $800,000 in 2026. • PW-055, Reclaim roads in Hidden Bay Trail/Birchwood/Cherrywood/Windbreak/Jack Pine/Deer Pond and Downs Lake Estates, Sunfish Ponds and Forest for $5,545,200. Grant contributions assumed at $2,940,000. • PW-057, Manning Phase 3, from CSAH 14 to CSAH 10 as determined by Washington County for $1,800,000 in 2027. • PW-066, Manning Phase 4, from I-94 to 1300 feet south of CSAH 10, $100,000 for planning in 2027. • PW-067, Stoplight at Manning and Hudson, intersection to be signalized when Hudson Blvd realigned. $250,000 from developer. • PW-074, Lake Elmo Avenue and TH 36 including on/off ramps, for $4,500,000 in 2025 4 • PW-076, South Frontage Road between Keats Ave and Lake Elmo Ave for $2,500,000 in 2026 • PW-079, Hudson Blvd Improvements (Gap Segments) for $510,000 in 2023, $1,560,000 in 2024 and $480,000 in 2025 (NEW) Project Highlights by Department Building:  B-002, Replace 2015 Jeep used for inspections in 2023 for $30,000.  B-003, Replace 2017 Equinox used for inspections in 2023 for $30,000.  B-004, Replace 2019 Equinox used for inspections in 2024 for $30,000.  B-005, Replace 2022 Equinox used for inspection in 2027 for $30,000. Fire:  F-012, Replace B2 (brush truck) for $66,000 in 2024.  F-013, Replace Tender 2/Engine for $650,000 in 2027.  F-014, Replace rescue boat and trailer for $35,000 in 2023.  F-015, Replace rescue/brush fire UTV for $55,000 in 2026.  F-019, Tahoe CV2 Replacement for $67,000 in 2025.  F-020, 2015 Tahoe CV3 Replacement for $65,500 in 2023  F-021, Replace Radios for $205,000 in 2023  F-022, Replace SCBA Fill Station & Compressor for $70,000 in 2024 Parks and Recreation:  PR-009, Central Greenway Regional Trail for $220,000 in 2024. The segments contemplated in 2024 include the area south of the Lake Elmo Park Preserve entrance along Keats Ave and a connecting segment on CSAH 14 in front of Hagberg’s Market.  PR-017, New or Refurbished Ballfields for $1 million in 2024.  PR-019, Dog Park for $25,000 in 2024  PR-020, Utility Vehicle/Trail Groomer for $37,000 in 2024  PR-021, Neighborhood Trail Connections for $250,000 in 2023.  PR-022, Replace Pebble Park Playground Equipment for $125,000 in 2024  PR-023, Replace playground equipment at Demontreville Park for $125,000 in 2024  PR-024, Tablyn Park Court Resurfacing for $75,000 in 2023  PR-025, Pebble Park Courts for $85,000 in 2023  PR-027, Kleis Park Disc Golf for $25,000 in 2024.  PR-029, Replace playground equipment in Tablyn Park for $125,000 in 2024 (new)  PR-030, Replace playground equipment in Stonegate Park for $125,000 in 2024 (new)  PR-036, Replace playground equipment in Carriage Station for $125,000 in 2025 (new)  PR-037, New Pickeball Court location TBD for $100,000 in 2023 (new)  PR-038, Potential Trails connections between developments along Hudson Blvd and the trail connection along Manning Ave from cty 14 south to the Rail Road track for $78,000 in 2024 (new) 5 Public Works: Street Projects were mentioned above. The remaining projects are equipment and vehicle purchases. Costs have been updated to reflect more recent pricing.  PW-004, Replace 1999 Loader for $235,000 in 2023.  PW-006, Replace 2004 John Deere Tractor, price includes mower attachment and front snow blower for $195,000 in 2024.  PW-044, Replace 2006 Case Backhoe for $130,000 in 2024.  PW-048, Mini Loader for $130,000 in 2025.  PW-054, Additional Skid loader for $70,000 in 2024.  PW-060, Pickup with plow to replace 2014 F250 for $41,000 in 2024.  PW-061, Replace 2016 F150 Pickup for $35,000 in 2026.  PW-062, Dump Truck w/plow, sander and underbody for $250,000 in 2027.  PW-063, Pickup w/lift gate & plow for $45,000 in 2027.  PW-064, Pickup w/lift gate & plow for $45,000 in 2027.  PW-072, Purchase new Pickup for $47,000 in 2023  PW-078, Replace Chipper for $60,000 in 2024 (new) Sewer System:  S-013, Sewer Oversizing for $9,102 in 2023, $80,000 in 2024, and $25,000 in 2025.  S-017, Old Village Sewer Extension Phase Seven for $625,000 in 2023.  S-019, VAC Truck for $250,000 in 2024. Costs to be split between sewer and storm water funds.  S-020, Sewer Upgrades to provide service to 180 acres for $150,000 (Oversizing to developer) in 2023.  S-021, Low Pressure Sewer to Klondike. Cost to be determined in 2026.  S-022, Sewer to Sunfish Ponds. Cost to be determined in 2027.  S-024, I-94 Station and Forcemain Upgrade, Met Council Gravity Sewer Extension for $150,000 in 2023 and $1,900,000 in 2024  S-025, Lake Jane Trail/Jane Road Sanitary Sewer Extension cost to be determined. (new) Storm Water System:  SW-001, Phase 2 Regional Drainage Improvements for $800,000 in 2023. The costs and dates are estimates and will depend upon development.  SW-002, Phase 3 Regional Drainage Improvements for $500,000 in 2024. The costs and dates are estimates and will depend upon development.  SW-005, Stormwater reuse –irrigation systems for $40,000 in 2024 and 2025. Locations to be determined (new)  SW-006, Lions and VFW park irrigation stormwater reuse for $70,000 in 2024 (new). Water System:  W-008, Village East Trunk Watermain 12" trunk extension to north side of UPRR with 12" pressure reduction valve with bypass for $185,000 in 2023 (watermain) and $190,000 in 2025(valve).  W-010, Paint Water Tower Tank #2 for $800,000 in 2024.  W-013, Watermain Oversizing for $83,178 in 2023, $100,000 in 2024, and $75,000 in 2025.  W-023, Water Meter Change for $175,000 total for years 2023-2025. 6 W-024, Automated Radio Read System for $325,000 in 2026. W-026, Old Village water extension Phase Seven for $288,000 in 2023. W-032, Watermain upgrades in Fields of St Croix 2nd Addition and Tana Ridge in conjunction with street project for $270,600 in 2023. W-033, Homestead, Carriage Station and Jamaca Court water extension and upgrades for $1,325,000 in 2024. Homestead assumes 3M Grant of $710,000. W-034, Packard Park, Eden Pond Park and 20th St Circle water extensions for $2,280,000 assuming 3M grant and $318,000 pending roadway pavement evaluation in 2025. W-035, Watermain extension to Tartan Meadows and Klondike Ave, assumes grants of $1,640,000, and $184,000 pending roadway pavement evaluation, in 2026 W-036, 45th Street Watermain Extension for $400,000 in 2025. Would only be completed if funding is received from the 3M Grants. W-037, Well and Pumphouse No. 6 and monitoring Well as required by the DNR, for $240,000 in 2023, $640,000 in 2024 and $1,720,000 in 2026 W-038, Watermain Trunk Watermains, including area on Hudson between Keats and Lake Elmo Ave, etc, for $1,450,000 in 2026 and $1,500,000 in 2027 W-039, Decommissioning and removal of water tower #1 on Langly Court for $50,000 in 2026 W-040, Downs Lake-Sunfish Ponds-Forest Water Extensions for $1,705,000 assumes 3M grant in 2027. W-041, CSAH 14 Trunk Watermain Ext-Jamaca Ct to Klondike for $2,800,875 in 2024 (new) 7 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECT LISTING20232027thru Includes Projects from All Years Building Department Status Project #Project Name Inspection Vehcile-2015 JeepActiveB-002 Inspection Vehcile-2017 EquinoxActiveB-003 Inspection Vehicle-2019 EquinoxActiveB-004 Inspection Vehicle-2022 EquinoxActiveB-005 Fire Department Status Project #Project Name Brush Truck 2ActiveF-012 T2 Tender/EngineActiveF-013 Rescue Boat & Trailer ReplacementActiveF-014 Rescue/Brush Fire UTVActiveF-015 L1 Ladder TruckActiveF-016 Command Vehicle 1 (2021 Tahoe)Active F-018 Command Vehicle 2 (2016 Tahoe)Active F-019 Command Vehicle 3 (2015 Tahoe)Active F-020 800 MHz Radio ReplacementActiveF-021 SCBA Fill Station & CompressorActiveF-022 Parks and Recreation Status Project #Project Name Central Greenway Regional TrailActivePR-009 New or Refurbished BallfieldsActivePR-017 Dog ParkActivePR-019 Utility Vehicile/Trail GroomerActivePR-020 Neighborhood Trail ConnectionsActivePR-021 Pebble Park Playground ReplacementActivePR-022 Demontriville Park Playground ReplacementActivePR-023 Tablyn Park Court ResurfacingActivePR-024 Pebble Park CourtsActivePR-025 Trail Seal CoatActivePR-026 Kleis Park Disc GolfActivePR-027 Tana Ridge Park Play EquipmentNew Recommendation PR-028 Tablyn Park Play EquipmentNew Recommendation PR-029 Stonegate Park Play EquipmentNew Recommendation PR-030 Reid Park Play EquipmentNew Recommendation PR-031 Ridge Park Play EquipmentNew Recommendation PR-032 Pilot Park Play EquipmentNew Recommendation PR-033 Hidden Knoll Park Play EquipmentNew Recommendation PR-034 Hammes Park Play EquipmentNew Recommendation PR-035 Carriage Station Park Play EquipmentNew Recommendation PR-036 Pickleball CourtNew Recommendation PR-037 Trail AdditionsNew Recommendation PR-038 Public Works Department Status Project #Project Name LoaderActivePW-004 TractorActivePW-006 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 8 PickupTruck / plowActivePW-019 CSAH 15/30th Street SignalActivePW-030 CSAH 6/Inwood SignalActivePW-031 15th Street North (MSA Street)Active PW-034 UP RR Crossing - Village Parkway and Private DriveActivePW-035 UP RR Crossing - Private Drive ClosureActivePW-036 UP RR Crossing: Klondike AveActivePW-037 2022 Street ImprovementsActivePW-038 2023 Street ImprovementsActivePW-039 2024 Street ImprovementsActivePW-040 2025 Street IrmprovementsActivePW-041 2026 Street ImprovementsActivePW-042 Service TruckActivePW-043 Back HoeActivePW-044 Tandem Plow TruckActivePW-045 Dump Truck w/PlowActivePW-047 Mini LoaderActivePW-048 Asphalt Hot BoxActivePW-049 Dump Truck with PlowActivePW-050 Ideal Ave (CSAH 13) Phase 2ActivePW-052 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6ActivePW-053 SkidloaderActivePW-054 2027 Street ImprovementsActivePW-055 2028 Street ImprovementsActivePW-056 Manning Ave Phase 3ActivePW-057 TH 36/Manning InterchangeActivePW-058 Pickup w/plowActivePW-060 PickupActivePW-061 DumpTruck w/plow, sander & underbodyActivePW-062 Pickup w/lift gate & plowActivePW-063 Pickup w/lift gate & plowActivePW-064 Dump Truck w/plow, sander & underbodyActivePW-065 Manning Phase 4ActivePW-066 Manning/Hudson StoplightActivePW-067 2029 Steet ImprovementsActivePW-068 2030 Street ImprovementsActivePW-070 2013 Bobcat T590 Track Skid Steer ReplacementActivePW-071 Pickup truck addition w/V-plowActivePW-072 TH36-Lake Elmo Ave (CSAH 17) ImpActivePW-074 2031 Street ImprovementsActivePW-075 South Frontage Road (Keats to Lake Elmo Ave)Active PW-076 5th St MediansActivePW-077 ChipperNew Recommendation PW-078 Hudson Blvd Improvements (Gap Segments)New Recommendation PW-079 2032 Street ImprovementsNew Recommendation PW-080 Sewer Department Status Project #Project Name Hamlet on Sunfish Lake Sewer ExtensionActiveS-003 Old Village Sewer Extension Phase 5ActiveS-005 Sewer OversizingActiveS-013 Old Village Sewer Extension Phase 7ActiveS-017 VAC TruckActiveS-019 Sewer to 180 AcresActiveS-020 Low Pressure Sewer to KlondikeActiveS-021 Sewer to Sunfish PondsActiveS-022 Tapestry Neighborhood Sanitary Sewer ExtActiveS-023 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 9 I-94 Lift Station and Forcemain UpgradeActiveS-024 Lake Jane Trail/Jane Road Sanitary Sewer ExtensionNew Recommendation S-025 Storm Water Department Status Project #Project Name Phase 2 Regional Drainage ImprovementsActiveSW-001 Phase 3 Regional Drainage ImprovementsActiveSW-002 Stormwater Reuse-Irrigation SystemsNew Recommendation SW-005 Lions and VFW park irrigatioin stormwater reuseNew Recommendation SW-006 Water Department Status Project #Project Name Elevated Storage Tank #3ActiveW-006 Village East Trunk Watermain & PRVActiveW-008 Paint Water Tank at PWActiveW-010 Well #4 Pump - Pull and RebuildActiveW-012 Watermain OversizingActiveW-013 Well & Pumphouse #5ActiveW-014 2020 Street & Utility Improvements-WaterActiveW-017 Utility TruckActiveW-022 Water Meter Change OutActiveW-023 Automated Radio Read SystemActiveW-024 OV sewer extension phase 6 & 5; water componentActiveW-025 OV sewer extension Phase 7; water componentActiveW-026 Pressure Reduction Station-Connection to WT #3ActiveW-027 2022 Street Projects-water componentActiveW-031 2023 Street Projects-water componentActiveW-032 2024 Street Projects-water componentActiveW-033 2025 Street Projects-water componentActiveW-034 2026 Street Projcts-water componentActiveW-035 45th Street Watermain ExtensionActiveW-036 Well, Pumphouse No. 6 and monitoring wellActiveW-037 Watermain Trunk WatermainsActiveW-038 Decommission Water Tower 1ActiveW-039 Downs Lake-Sunfish Ponds-Forest Utility ImprovActiveW-040 CSAH-14 Trunk Watermain Ext-Jamaca Ct to KlondikeNew Recommendation W-041 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 10 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECTS BY YEAR & PRIORITY 2023 2027thru Project Name Department Project #Priority Project Cost 2023 Priority 1 Critical F-014Rescue Boat & Trailer Replacement 1 35,000Fire Department F-020Command Vehicle 3 (2015 Tahoe)1 65,500Fire Department F-021800 MHz Radio Replacement 1 205,000Fire Department W-023Water Meter Change Out 1 75,000Water Department 380,500Total for: Priority 1 Priority 2 Very Important B-002Inspection Vehcile-2015 Jeep 2 30,000Building Department PR-021Neighborhood Trail Connections 2 250,000Parks and Recreation PR-025Pebble Park Courts 2 120,000Parks and Recreation PR-037Pickleball Court 2 100,000Parks and Recreation PW-004Loader 2 235,000Public Works Department PW-035UP RR Crossing - Village Parkway and Private Drive 2 525,000Public Works Department PW-072Pickup truck addition w/V-plow 2 47,000Public Works Department W-008Village East Trunk Watermain & PRV 2 185,000Water Department 1,492,000Total for: Priority 2 Priority 3 Important B-003Inspection Vehcile-2017 Equinox 3 30,000Building Department PR-024Tablyn Park Court Resurfacing 3 90,000Parks and Recreation PW-0392023 Street Improvements 3 3,688,400Public Works Department PW-079Hudson Blvd Improvements (Gap Segments)3 510,000Public Works Department S-013Sewer Oversizing 3 9,102Sewer Department S-017Old Village Sewer Extension Phase 7 3 625,000Sewer Department S-020Sewer to 180 Acres 3 150,000Sewer Department S-024I-94 Lift Station and Forcemain Upgrade 3 150,000Sewer Department SW-001Phase 2 Regional Drainage Improvements 3 800,000Storm Water Department W-013Watermain Oversizing 3 83,178Water Department W-026OV sewer extension Phase 7; water component 3 288,000Water Department W-0322023 Street Projects-water component 3 270,600Water Department W-037Well, Pumphouse No. 6 and monitoring well 3 240,000Water Department 6,934,280Total for: Priority 3 8,806,780Total for 2023 2024 Priority 1 Critical F-022SCBA Fill Station & Compressor 1 70,000Fire Department PR-017New or Refurbished Ballfields 1 1,000,000Parks and Recreation W-023Water Meter Change Out 1 75,000Water Department 1,145,000Total for: Priority 1 Priority 2 Very Important Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 11 Project Name Department Project #Priority Project Cost F-012Brush Truck 2 2 66,000Fire Department PW-006Tractor 2 195,000Public Works Department PW-035UP RR Crossing - Village Parkway and Private Drive 2 367,500Public Works Department PW-044Back Hoe 2 130,000Public Works Department PW-067Manning/Hudson Stoplight 2 250,000Public Works Department PW-078Chipper 2 60,000Public Works Department S-019VAC Truck 2 250,000Sewer Department W-041CSAH-14 Trunk Watermain Ext-Jamaca Ct to Klondike 2 2,800,875Water Department 4,119,375Total for: Priority 2 Priority 3 Important B-004Inspection Vehicle-2019 Equinox 3 30,000Building Department PR-009Central Greenway Regional Trail 3 220,000Parks and Recreation PR-020Utility Vehicile/Trail Groomer 3 37,000Parks and Recreation PR-022Pebble Park Playground Replacement 3 125,000Parks and Recreation PR-023Demontriville Park Playground Replacement 3 125,000Parks and Recreation PR-027Kleis Park Disc Golf 3 25,000Parks and Recreation PR-038Trail Additions 3 78,000Parks and Recreation PW-03415th Street North (MSA Street)3 1,200,000Public Works Department PW-0402024 Street Improvements 3 3,609,400Public Works Department PW-054Skidloader 3 70,000Public Works Department PW-060Pickup w/plow 3 41,000Public Works Department PW-079Hudson Blvd Improvements (Gap Segments)3 1,560,000Public Works Department S-013Sewer Oversizing 3 80,000Sewer Department S-024I-94 Lift Station and Forcemain Upgrade 3 1,900,000Sewer Department SW-002Phase 3 Regional Drainage Improvements 3 500,000Storm Water Department SW-005Stormwater Reuse-Irrigation Systems 3 40,000Storm Water Department SW-006Lions and VFW park irrigatioin stormwater reuse 3 70,000Storm Water Department W-010Paint Water Tank at PW 3 800,000Water Department W-013Watermain Oversizing 3 100,000Water Department W-0332024 Street Projects-water component 3 1,325,000Water Department W-037Well, Pumphouse No. 6 and monitoring well 3 640,000Water Department 12,575,400Total for: Priority 3 Priority 4 Less Important PR-019Dog Park 4 25,000Parks and Recreation PR-029Tablyn Park Play Equipment 4 125,000Parks and Recreation PR-030Stonegate Park Play Equipment 4 125,000Parks and Recreation 275,000Total for: Priority 4 18,114,775Total for 2024 2025 Priority 1 Critical F-019Command Vehicle 2 (2016 Tahoe)1 67,000Fire Department W-023Water Meter Change Out 1 25,000Water Department 92,000Total for: Priority 1 Priority 2 Very Important PW-048Mini Loader 2 120,000Public Works Department W-008Village East Trunk Watermain & PRV 2 190,000Water Department 310,000Total for: Priority 2 Priority 3 Important PW-0412025 Street Irmprovements 3 6,228,375Public Works Department Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 12 Project Name Department Project #Priority Project Cost PW-074TH36-Lake Elmo Ave (CSAH 17) Imp 3 4,500,000Public Works Department PW-079Hudson Blvd Improvements (Gap Segments)3 480,000Public Works Department S-013Sewer Oversizing 3 25,000Sewer Department SW-005Stormwater Reuse-Irrigation Systems 3 40,000Storm Water Department W-013Watermain Oversizing 3 75,000Water Department W-0342025 Street Projects-water component 3 2,598,000Water Department W-03645th Street Watermain Extension 3 400,000Water Department W-037Well, Pumphouse No. 6 and monitoring well 3 1,720,000Water Department 16,066,375Total for: Priority 3 Priority 5 Future Consideration PR-036Carriage Station Park Play Equipment 5 125,000Parks and Recreation 125,000Total for: Priority 5 16,593,375Total for 2025 2026 Priority 2 Very Important F-015Rescue/Brush Fire UTV 2 55,000Fire Department 55,000Total for: Priority 2 Priority 3 Important PW-0422026 Street Improvements 3 5,292,900Public Works Department PW-053Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 800,000Public Works Department PW-061Pickup 3 35,000Public Works Department PW-076South Frontage Road (Keats to Lake Elmo Ave)3 2,500,000Public Works Department W-024Automated Radio Read System 3 325,000Water Department W-0352026 Street Projcts-water component 3 1,824,000Water Department W-038Watermain Trunk Watermains 3 1,450,000Water Department W-039Decommission Water Tower 1 3 50,000Water Department 12,276,900Total for: Priority 3 12,331,900Total for 2026 2027 Priority 1 Critical B-005Inspection Vehicle-2022 Equinox 1 30,000Building Department PW-066Manning Phase 4 1 100,000Public Works Department 130,000Total for: Priority 1 Priority 2 Very Important F-013T2 Tender/Engine 2 650,000Fire Department 650,000Total for: Priority 2 Priority 3 Important PW-031CSAH 6/Inwood Signal 3 250,000Public Works Department PW-0552027 Street Improvements 3 5,545,200Public Works Department PW-057Manning Ave Phase 3 3 1,800,000Public Works Department PW-062DumpTruck w/plow, sander & underbody 3 250,000Public Works Department PW-063Pickup w/lift gate & plow 3 45,000Public Works Department PW-064Pickup w/lift gate & plow 3 45,000Public Works Department W-038Watermain Trunk Watermains 3 1,500,000Water Department W-040Downs Lake-Sunfish Ponds-Forest Utility Improv 3 1,705,000Water Department 11,140,200Total for: Priority 3 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 13 Project Name Department Project #Priority Project Cost 11,920,200Total for 2027 GRAND TOTAL 67,767,030 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 14 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota FUNDING SOURCE SUMMARY 2023 thru 2027 TotalSource20232024202520262027 Debt Service 27,289,2755,623,400 4,449,400 7,258,375 5,552,900 4,405,200 General Fund 767,500230,000 437,500 100,000 Grants/Donation 19,635,000500,000 3,180,000 6,630,000 4,680,000 4,645,000 Municipal Sate Aid (MSA)1,450,0001,200,000 250,000 Park Dedication Fund 1,533,000780,000 628,000 125,000 Sewer Fund 2,515,102309,102 2,181,000 25,000 Storm Water Fund 251,000211,000 40,000 Vehicle Replacement Fund 2,297,000449,000 551,000 187,000 90,000 1,020,000 Water Fund 13,035,6531,141,778 5,056,875 3,328,000 2,009,000 1,500,000 9,033,280 17,894,775 17,593,375 12,331,900 11,920,200 68,773,530GRAND TOTAL Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 15 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2023 2027thru TotalSourceProject #Priority 2023 2024 2025 2026 2027 Debt Service PW-039 3,688,4003,688,4002023 Street Improvements 3 PW-040 2,389,4002,389,4002024 Street Improvements 3 PW-041 2,278,3752,278,3752025 Street Irmprovements 3 PW-042 2,252,9002,252,9002026 Street Improvements 3 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 PW-055 2,605,2002,605,2002027 Street Improvements 3 PW-057 1,800,0001,800,000Manning Ave Phase 3 3 PW-074 4,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) Imp 3 PW-076 2,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave)3 PW-079 2,550,000510,000 1,560,000 480,000Hudson Blvd Improvements (Gap Segments)3 S-017 625,000625,000Old Village Sewer Extension Phase 7 3 SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 27,289,2755,623,400 4,449,400 7,258,375 5,552,900 4,405,200Debt Service Total General Fund F-021 205,000205,000800 MHz Radio Replacement 1 F-022 70,00070,000SCBA Fill Station & Compressor 1 PW-035 392,50025,000 367,500UP RR Crossing - Village Parkway and Private Drive 2 PW-066 100,000100,000Manning Phase 4 1 767,500230,000 437,500 100,000General Fund Total Grants/Donation PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PW-035 500,000500,000UP RR Crossing - Village Parkway and Private Drive 2 PW-040 1,220,0001,220,0002024 Street Improvements 3 PW-041 3,950,0003,950,0002025 Street Irmprovements 3 PW-042 3,040,0003,040,0002026 Street Improvements 3 PW-055 2,940,0002,940,0002027 Street Improvements 3 PW-067 250,000250,000Manning/Hudson Stoplight 2 W-033 710,000710,0002024 Street Projects-water component 3 W-034 2,280,0002,280,0002025 Street Projects-water component 3 W-035 1,640,0001,640,0002026 Street Projcts-water component 3 W-036 400,000400,00045th Street Watermain Extension 3 W-040 1,705,0001,705,000Downs Lake-Sunfish Ponds-Forest Utility Improv 3 19,635,000500,000 3,180,000 6,630,000 4,680,000 4,645,000Grants/Donation Total Municipal Sate Aid (MSA) PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,200,0001,200,00015th Street North (MSA Street)3 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 16 TotalSourceProject #Priority 2023 2024 2025 2026 2027 1,450,0001,200,000 250,000Municipal Sate Aid (MSA) Total Park Dedication Fund PR-009 220,000220,000Central Greenway Regional Trail 3 PR-019 25,00025,000Dog Park 4 PR-021 250,000250,000Neighborhood Trail Connections 2 PR-022 125,000125,000Pebble Park Playground Replacement 3 PR-023 125,000125,000Demontriville Park Playground Replacement 3 PR-024 90,00090,000Tablyn Park Court Resurfacing 3 PR-025 120,000120,000Pebble Park Courts 2 PR-027 25,00025,000Kleis Park Disc Golf 3 PR-029 125,000125,000Tablyn Park Play Equipment 4 PR-030 125,000125,000Stonegate Park Play Equipment 4 PR-036 125,000125,000Carriage Station Park Play Equipment 5 PR-037 100,000100,000Pickleball Court 2 PR-038 78,00078,000Trail Additions 3 1,533,000780,000 628,000 125,000Park Dedication Fund Total Sewer Fund PW-044 26,00026,000Back Hoe 2 S-013 114,1029,102 80,000 25,000Sewer Oversizing 3 S-019 175,000175,000VAC Truck 2 S-020 150,000150,000Sewer to 180 Acres 3 S-024 2,050,000150,000 1,900,000I-94 Lift Station and Forcemain Upgrade 3 2,515,102309,102 2,181,000 25,000Sewer Fund Total Storm Water Fund PW-044 26,00026,000Back Hoe 2 S-019 75,00075,000VAC Truck 2 SW-005 80,00040,000 40,000Stormwater Reuse-Irrigation Systems 3 SW-006 70,00070,000Lions and VFW park irrigatioin stormwater reuse 3 251,000211,000 40,000Storm Water Fund Total Vehicle Replacement Fund B-002 30,00030,000Inspection Vehcile-2015 Jeep 2 B-003 30,00030,000Inspection Vehcile-2017 Equinox 3 B-004 30,00030,000Inspection Vehicle-2019 Equinox 3 B-005 30,00030,000Inspection Vehicle-2022 Equinox 1 F-012 66,00066,000Brush Truck 2 2 F-013 650,000650,000T2 Tender/Engine 2 F-014 35,00035,000Rescue Boat & Trailer Replacement 1 F-015 55,00055,000Rescue/Brush Fire UTV 2 F-019 67,00067,000Command Vehicle 2 (2016 Tahoe)1 F-020 72,00072,000Command Vehicle 3 (2015 Tahoe)1 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PW-004 235,000235,000Loader2 PW-006 195,000195,000Tractor2 PW-044 52,00052,000Back Hoe 2 PW-048 120,000120,000Mini Loader 2 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 17 TotalSourceProject #Priority 2023 2024 2025 2026 2027 PW-054 70,00070,000Skidloader3 PW-060 41,00041,000Pickup w/plow 3 PW-061 35,00035,000Pickup3 PW-062 250,000250,000DumpTruck w/plow, sander & underbody 3 PW-063 45,00045,000Pickup w/lift gate & plow 3 PW-064 45,00045,000Pickup w/lift gate & plow 3 PW-072 47,00047,000Pickup truck addition w/V-plow 2 PW-078 60,00060,000Chipper2 2,297,000449,000 551,000 187,000 90,000 1,020,000Vehicle Replacement Fund Total Water Fund PW-044 26,00026,000Back Hoe 2 W-008 375,000185,000 190,000Village East Trunk Watermain & PRV 2 W-010 800,000800,000Paint Water Tank at PW 3 W-013 258,17883,178 100,000 75,000Watermain Oversizing 3 W-023 175,00075,000 75,000 25,000Water Meter Change Out 1 W-024 325,000325,000Automated Radio Read System 3 W-026 288,000288,000OV sewer extension Phase 7; water component 3 W-032 270,600270,6002023 Street Projects-water component 3 W-033 615,000615,0002024 Street Projects-water component 3 W-034 318,000318,0002025 Street Projects-water component 3 W-035 184,000184,0002026 Street Projcts-water component 3 W-037 3,600,000240,000 640,000 2,720,000Well, Pumphouse No. 6 and monitoring well 3 W-038 2,950,0001,450,000 1,500,000Watermain Trunk Watermains 3 W-039 50,00050,000Decommission Water Tower 1 3 W-041 2,800,8752,800,875CSAH-14 Trunk Watermain Ext-Jamaca Ct to Klondike 2 13,035,6531,141,778 5,056,875 3,328,000 2,009,000 1,500,000Water Fund Total 68,773,5309,033,280 17,894,775 17,593,375 12,331,900 11,920,200GRAND TOTAL Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 18 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2023 2032thru Total20232024202520262027Source20282029203020312032 #Priority Debt Service 3,688,4003,688,4002023 Street Improvements PW-039 3 2,389,4002,389,4002024 Street Improvements PW-040 3 2,278,3752,278,3752025 Street Irmprovements PW-041 3 2,252,9002,252,9002026 Street Improvements PW-042 3 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-053 3 2,605,2002,605,2002027 Street Improvements PW-055 3 2,000,0002,000,0002028 Street Improvements PW-056 3 1,800,0001,800,000Manning Ave Phase 3 PW-057 3 2,000,0002,000,0002029 Steet Improvements PW-068 3 2,000,0002,000,0002030 Street Improvements PW-070 3 4,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) Imp PW-074 3 2,000,0002,000,0002031 Street Improvements PW-075 3 2,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave) PW-076 3 2,550,000510,000 1,560,000 480,000Hudson Blvd Improvements (Gap Segments) PW-079 3 2,000,0002,000,0002032 Street Improvements PW-080 3 625,000625,000Old Village Sewer Extension Phase 7 S-017 3 00Lake Jane Trail/Jane Road Sanitary Sewer Extension S-025 5 800,000800,000Phase 2 Regional Drainage Improvements SW-001 3 500,000500,000Phase 3 Regional Drainage Improvements SW-002 3 Debt Service Total 37,289,2755,623,400 4,449,400 7,258,375 5,552,900 4,405,200 2,000,000 2,000,000 4,000,000 2,000,000 General Fund 205,000205,000800 MHz Radio Replacement F-021 1 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 19 Total20232024202520262027Source20282029203020312032 #Priority 70,00070,000SCBA Fill Station & Compressor F-022 1 392,50025,000 367,500UP RR Crossing - Village Parkway and Private Drive PW-035 2 100,000100,000Manning Phase 4 PW-066 1 General Fund Total 767,500230,000 437,500 100,000 Grants/Donation 1,000,0001,000,000New or Refurbished Ballfields PR-017 1 500,000500,000UP RR Crossing - Village Parkway and Private Drive PW-035 2 1,220,0001,220,0002024 Street Improvements PW-040 3 3,950,0003,950,0002025 Street Irmprovements PW-041 3 3,040,0003,040,0002026 Street Improvements PW-042 3 2,940,0002,940,0002027 Street Improvements PW-055 3 250,000250,000Manning/Hudson Stoplight PW-067 2 710,000710,0002024 Street Projects-water component W-033 3 2,280,0002,280,0002025 Street Projects-water component W-034 3 1,640,0001,640,0002026 Street Projcts-water component W-035 3 400,000400,00045th Street Watermain Extension W-036 3 1,705,0001,705,000Downs Lake-Sunfish Ponds-Forest Utility Improv W-040 3 Grants/Donation Total 19,635,000500,000 3,180,000 6,630,000 4,680,000 4,645,000 Municipal Sate Aid (MSA) 250,000250,000CSAH 6/Inwood Signal PW-031 3 1,200,0001,200,00015th Street North (MSA Street)PW-034 3 Municipal Sate Aid (MSA) Total 1,450,0001,200,000 250,000 Park Dedication Fund 500,000220,000 280,000Central Greenway Regional Trail PR-009 3 25,00025,000Dog Park PR-019 4 250,000250,000Neighborhood Trail Connections PR-021 2 125,000125,000Pebble Park Playground Replacement PR-022 3 125,000125,000Demontriville Park Playground Replacement PR-023 3 90,00090,000Tablyn Park Court Resurfacing PR-024 3 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 20 Total20232024202520262027Source20282029203020312032 #Priority 120,000120,000Pebble Park Courts PR-025 2 25,00025,000Kleis Park Disc Golf PR-027 3 125,000125,000Tana Ridge Park Play Equipment PR-028 5 125,000125,000Tablyn Park Play Equipment PR-029 4 125,000125,000Stonegate Park Play Equipment PR-030 4 125,000125,000Ridge Park Play Equipment PR-032 3 125,000125,000Hidden Knoll Park Play Equipment PR-034 5 125,000125,000Carriage Station Park Play Equipment PR-036 5 100,000100,000Pickleball Court PR-037 2 78,00078,000Trail Additions PR-038 3 Park Dedication Fund Total 2,188,000780,000 628,000 125,000 405,000 125,000 125,000 Sewer Fund 26,00026,000Back Hoe PW-044 2 114,1029,102 80,000 25,000Sewer Oversizing S-013 3 175,000175,000VAC Truck S-019 2 150,000150,000Sewer to 180 Acres S-020 3 00Low Pressure Sewer to Klondike S-021 5 00Sewer to Sunfish Ponds S-022 5 2,050,000150,000 1,900,000I-94 Lift Station and Forcemain Upgrade S-024 3 Sewer Fund Total 2,515,102309,102 2,181,000 25,000 0 Storm Water Fund 26,00026,000Back Hoe PW-044 2 75,00075,000VAC Truck S-019 2 80,00040,000 40,000Stormwater Reuse-Irrigation Systems SW-005 3 70,00070,000Lions and VFW park irrigatioin stormwater reuse SW-006 3 Storm Water Fund Total 251,000211,000 40,000 Vehicle Replacement Fund 60,00030,000 30,000Inspection Vehcile-2015 Jeep B-002 2 60,00030,000 30,000Inspection Vehcile-2017 Equinox B-003 3 60,00030,000 30,000Inspection Vehicle-2019 Equinox B-004 3 60,00030,000 30,000Inspection Vehicle-2022 Equinox B-005 1 66,00066,000Brush Truck 2 F-012 2 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 21 Total20232024202520262027Source20282029203020312032 #Priority 650,000650,000T2 Tender/Engine F-013 2 35,00035,000Rescue Boat & Trailer Replacement F-014 1 55,00055,000Rescue/Brush Fire UTV F-015 2 70,00070,000Command Vehicle 1 (2021 Tahoe)F-018 3 67,00067,000Command Vehicle 2 (2016 Tahoe)F-019 1 137,50072,000 65,500Command Vehicle 3 (2015 Tahoe)F-020 1 37,00037,000Utility Vehicile/Trail Groomer PR-020 3 235,000235,000LoaderPW-004 2 195,000195,000TractorPW-006 2 52,00052,000Back Hoe PW-044 2 120,000120,000Mini Loader PW-048 2 70,00070,000SkidloaderPW-054 3 41,00041,000Pickup w/plow PW-060 3 35,00035,000PickupPW-061 3 250,000250,000DumpTruck w/plow, sander & underbody PW-062 3 45,00045,000Pickup w/lift gate & plow PW-063 3 45,00045,000Pickup w/lift gate & plow PW-064 3 265,000265,000Dump Truck w/plow, sander & underbody PW-065 3 47,00047,000Pickup truck addition w/V-plow PW-072 2 60,00060,000ChipperPW-078 2 Vehicle Replacement Fund Total 2,817,500449,000 551,000 187,000 90,000 1,020,000 60,000 365,000 65,500 30,000 Water Fund 26,00026,000Back Hoe PW-044 2 375,000185,000 190,000Village East Trunk Watermain & PRV W-008 2 800,000800,000Paint Water Tank at PW W-010 3 258,17883,178 100,000 75,000Watermain Oversizing W-013 3 175,00075,000 75,000 25,000Water Meter Change Out W-023 1 325,000325,000Automated Radio Read System W-024 3 288,000288,000OV sewer extension Phase 7; water component W-026 3 270,600270,6002023 Street Projects-water component W-032 3 615,000615,0002024 Street Projects-water component W-033 3 318,000318,0002025 Street Projects-water component W-034 3 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 22 Total20232024202520262027Source20282029203020312032 #Priority 184,000184,0002026 Street Projcts-water component W-035 3 3,600,000240,000 640,000 2,720,000Well, Pumphouse No. 6 and monitoring well W-037 3 2,950,0001,450,000 1,500,000Watermain Trunk Watermains W-038 3 50,00050,000Decommission Water Tower 1 W-039 3 2,800,8752,800,875CSAH-14 Trunk Watermain Ext- Jamaca Ct to Klondike W-041 2 Water Fund Total 13,035,6531,141,778 5,056,875 3,328,000 2,009,000 1,500,000 9,033,280 17,894,775 17,593,375 12,331,900 11,920,200 79,949,030GRAND TOTAL 2,465,000 2,365,000 4,125,000 65,500 2,155,000 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 23 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota PROJECTS & FUNDING SOURCES BY DEPARTMENT 2023 2027thru Total20232024202520262027DepartmentProject #Priority Building Department 120,00060,000 30,000 30,000Vehicle Replacement Fund 120,00060,000 30,000 30,000Building Department Total B-002 30,00030,000Inspection Vehcile-2015 Jeep 2 B-003 30,00030,000Inspection Vehcile-2017 Equinox 3 B-004 30,00030,000Inspection Vehicle-2019 Equinox 3 B-005 30,00030,000Inspection Vehicle-2022 Equinox 1 120,00060,000 30,000 30,000Building Department Total Fire Department 275,000205,000 70,000General Fund 945,000107,000 66,000 67,000 55,000 650,000Vehicle Replacement Fund 1,220,000312,000 136,000 67,000 55,000 650,000Fire Department Total F-012 66,00066,000Brush Truck 2 2 F-013 650,000650,000T2 Tender/Engine 2 F-014 35,00035,000Rescue Boat & Trailer Replacement 1 F-015 55,00055,000Rescue/Brush Fire UTV 2 F-019 67,00067,000Command Vehicle 2 (2016 Tahoe)1 F-020 65,50065,500Command Vehicle 3 (2015 Tahoe)1 F-021 205,000205,000800 MHz Radio Replacement 1 F-022 70,00070,000SCBA Fill Station & Compressor 1 1,213,500305,500 136,000 67,000 55,000 650,000Fire Department Total Parks and Recreation PR-009 220,000220,000Central Greenway Regional Trail 3 PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PR-019 25,00025,000Dog Park 4 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PR-021 250,000250,000Neighborhood Trail Connections 2 PR-022 125,000125,000Pebble Park Playground Replacement 3 PR-023 125,000125,000Demontriville Park Playground Replacement 3 PR-024 90,00090,000Tablyn Park Court Resurfacing 3 PR-025 120,000120,000Pebble Park Courts 2 PR-027 25,00025,000Kleis Park Disc Golf 3 PR-029 125,000125,000Tablyn Park Play Equipment 4 PR-030 125,000125,000Stonegate Park Play Equipment 4 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 24 Total20232024202520262027DepartmentProject #Priority 1,000,0001,000,000Grants/Donation 1,533,000780,000 628,000 125,000Park Dedication Fund 37,00037,000Vehicle Replacement Fund 2,570,000780,000 1,665,000 125,000Parks and Recreation Total PR-036 125,000125,000Carriage Station Park Play Equipment 5 PR-037 100,000100,000Pickleball Court 2 PR-038 78,00078,000Trail Additions 3 2,570,000560,000 1,885,000 125,000Parks and Recreation Total Public Works Department 25,364,2754,198,400 3,949,400 7,258,375 5,552,900 4,405,200Debt Service 492,50025,000 367,500 100,000General Fund 11,900,000500,000 1,470,000 3,950,000 3,040,000 2,940,000Grants/Donation 1,450,0001,200,000 250,000Municipal Sate Aid (MSA) 26,00026,000Sewer Fund 26,00026,000Storm Water Fund 1,195,000282,000 418,000 120,000 35,000 340,000Vehicle Replacement Fund PW-004 235,000235,000Loader2 PW-006 195,000195,000Tractor2 PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,200,0001,200,00015th Street North (MSA Street)3 PW-035 892,500525,000 367,500UP RR Crossing - Village Parkway and Private Drive 2 PW-039 3,688,4003,688,4002023 Street Improvements 3 PW-040 3,609,4003,609,4002024 Street Improvements 3 PW-041 6,228,3756,228,3752025 Street Irmprovements 3 PW-042 5,292,9005,292,9002026 Street Improvements 3 PW-044 130,000130,000Back Hoe 2 PW-048 120,000120,000Mini Loader 2 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 PW-054 70,00070,000Skidloader3 PW-055 5,545,2005,545,2002027 Street Improvements 3 PW-057 1,800,0001,800,000Manning Ave Phase 3 3 PW-060 41,00041,000Pickup w/plow 3 PW-061 35,00035,000Pickup3 PW-062 250,000250,000DumpTruck w/plow, sander & underbody 3 PW-063 45,00045,000Pickup w/lift gate & plow 3 PW-064 45,00045,000Pickup w/lift gate & plow 3 PW-066 100,000100,000Manning Phase 4 1 PW-067 250,000250,000Manning/Hudson Stoplight 2 PW-072 47,00047,000Pickup truck addition w/V-plow 2 PW-074 4,500,0004,500,000TH36-Lake Elmo Ave (CSAH 17) Imp 3 PW-076 2,500,0002,500,000South Frontage Road (Keats to Lake Elmo Ave)3 PW-078 60,00060,000Chipper2 PW-079 2,550,000510,000 1,560,000 480,000Hudson Blvd Improvements (Gap Segments)3 40,479,7755,005,400 7,482,900 11,328,375 8,627,900 8,035,200Public Works Department Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 25 Total20232024202520262027DepartmentProject #Priority 26,00026,000Water Fund 40,479,7755,005,400 7,482,900 11,328,375 8,627,900 8,035,200Public Works Department Total Sewer Department 625,000625,000Debt Service 2,489,102309,102 2,155,000 25,000Sewer Fund 75,00075,000Storm Water Fund 3,189,102934,102 2,230,000 25,000Sewer Department Total S-013 114,1029,102 80,000 25,000Sewer Oversizing 3 S-017 625,000625,000Old Village Sewer Extension Phase 7 3 S-019 250,000250,000VAC Truck 2 S-020 150,000150,000Sewer to 180 Acres 3 S-024 2,050,000150,000 1,900,000I-94 Lift Station and Forcemain Upgrade 3 3,189,102934,102 2,230,000 25,000Sewer Department Total Storm Water Department 1,300,000800,000 500,000Debt Service 150,000110,000 40,000Storm Water Fund 1,450,000800,000 610,000 40,000Storm Water Department Total SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 SW-005 80,00040,000 40,000Stormwater Reuse-Irrigation Systems 3 SW-006 70,00070,000Lions and VFW park irrigatioin stormwater reuse 3 1,450,000800,000 610,000 40,000Storm Water Department Total Water Department W-008 375,000185,000 190,000Village East Trunk Watermain & PRV 2 W-010 800,000800,000Paint Water Tank at PW 3 W-013 258,17883,178 100,000 75,000Watermain Oversizing 3 W-023 175,00075,000 75,000 25,000Water Meter Change Out 1 W-024 325,000325,000Automated Radio Read System 3 W-026 288,000288,000OV sewer extension Phase 7; water component 3 W-032 270,600270,6002023 Street Projects-water component 3 W-033 1,325,0001,325,0002024 Street Projects-water component 3 W-034 2,598,0002,598,0002025 Street Projects-water component 3 W-035 1,824,0001,824,0002026 Street Projcts-water component 3 W-036 400,000400,00045th Street Watermain Extension 3 W-037 2,600,000240,000 640,000 1,720,000Well, Pumphouse No. 6 and monitoring well 3 W-038 2,950,0001,450,000 1,500,000Watermain Trunk Watermains 3 W-039 50,00050,000Decommission Water Tower 1 3 W-040 1,705,0001,705,000Downs Lake-Sunfish Ponds-Forest Utility Improv 3 W-041 2,800,8752,800,875CSAH-14 Trunk Watermain Ext-Jamaca Ct to Klondike 2 Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 26 Total20232024202520262027DepartmentProject #Priority 6,735,000710,000 2,680,000 1,640,000 1,705,000Grants/Donation 13,009,6531,141,778 5,030,875 3,328,000 2,009,000 1,500,000Water Fund 19,744,6531,141,778 5,740,875 6,008,000 3,649,000 3,205,000Water Department Total 18,744,6531,141,778 5,740,875 5,008,000 3,649,000 3,205,000Water Department Total 67,767,0308,806,780 18,114,775 16,593,375 12,331,900 11,920,200Grand Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 27 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Building Official 2023 2027thru Department Building Department Description Replace 2015 Jeep Project #B-002 Priority 2 Very Important Justification End of Useful Life, currently inoperable Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehcile-2015 Jeep Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20232024202520262027Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 28 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Building Official 2023 2027thru Department Building Department Description Replace 2017 Equinox Project #B-003 Priority 3 Important Justification End of Useful Life, beginning to incur additonal maintenance costs Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehcile-2017 Equinox Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20232024202520262027Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 29 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Building Official 2023 2027thru Department Building Department Description Replace 2019 Equinox Project #B-004 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehicle-2019 Equinox Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20232024202520262027Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 30 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Building Official 2023 2027thru Department Building Department Description 2022 Chevy Equinox LS Project #B-005 Priority 1 Critical Justification Budget Impact/Other Useful Life 5 yearsProject Name Inspection Vehicle-2022 Equinox Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20232024202520262027Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 31 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of B 2 (2004 F350 brush Truck) with a 1/2 ton, crew cab pickup including all necessary response equipment, lighting and graphics. Project #F-012 Priority 2 Very Important Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The utility vehicle will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, fire inspection and prevention efforts. Provides an additional vehicle that can be used for towing and hauling. Open pickup bed will allow for the safe hauling of dirty and decontaminated fire house and gear following incidents. Budget Impact/Other Useful Life 10 yearsProject Name Brush Truck 2 Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 66,00066,000Equip/Vehicles/Furnishings 66,000 66,000Total Total20232024202520262027Funding Sources 66,00066,000Vehicle Replacement Fund 66,000 66,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 32 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of T2 (2007 Rosenbauer/Spartan Tender/Engine ) including all necessary response equipment, lighting and graphics. Project #F-013 Priority 2 Very Important Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Tender 2 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. Budget Impact/Other Useful Life 20 yearsProject Name T2 Tender/Engine Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 650,000650,000Equip/Vehicles/Furnishings 650,000 650,000Total Total20232024202520262027Funding Sources 650,000650,000Vehicle Replacement Fund 650,000 650,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 33 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of rescue boat and trailer. Project #F-014 Priority 1 Critical Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The rescue boat will be utilized by Fire Department staff to respond to water emergency incidents. These funds will be utilized to replace the rescue boat in a timely manner to reduce maintenance costs and down time. Budget Impact/Other Useful Life 20 yearsProject Name Rescue Boat & Trailer Replacement Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total Total20232024202520262027Funding Sources 35,00035,000Vehicle Replacement Fund 35,000 35,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 34 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of UTV 1 (2008 Polaris Ranger 6x6) including all necessary response equipment, lighting and graphics. Project #F-015 Priority 2 Very Important Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The UTV 1 replacement will be utilized by all Fire Department staff to respond to emergency incidents 24 hours a day 365 days per year to provide crew response, firefighter safety, support on emergency incidents, and prevention efforts. This equipment is especially critical for utilization within our parks and trail systems. Budget Impact/Other Useful Life 15 yearsProject Name Rescue/Brush Fire UTV Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 55,00055,000Equip/Vehicles/Furnishings 55,000 55,000Total Total20232024202520262027Funding Sources 55,00055,000Vehicle Replacement Fund 55,000 55,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 35 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of CV2 (2016 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Project #F-019 Priority 1 Critical Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 8 yearsProject Name Command Vehicle 2 (2016 Tahoe)Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 67,00067,000Equip/Vehicles/Furnishings 67,000 67,000Total Total20232024202520262027Funding Sources 67,00067,000Vehicle Replacement Fund 67,000 67,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 36 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of CV3 (2015 Chevrolet Tahoe) including all necessary response equipment, lighting and graphics. Project #F-020 Priority 1 Critical Justification The fire department replaces vehicles on a rotating basis based on each individual vehicles need. The Command Vehicle will be utilized by Fire Department Fire Inspector and officer staff to respond to emergency incidents 24 hours a day 365 days per year to provide critical incident command, firefighter safety, support on emergency incidents, fire inspections and prevention efforts. Budget Impact/Other Useful Life 8 yearsProject Name Command Vehicle 3 (2015 Tahoe)Category Equipment: Fire Equip Type Equipment Status Active Total20232024202520262027Expenditures 65,50065,500Equip/Vehicles/Furnishings 65,500 65,500Total Total20232024202520262027Funding Sources 72,00072,000Vehicle Replacement Fund 72,000 72,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 37 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of 29 portable and 9 mobile fire department 800 MHZ radios and associated accessories. Project #F-021 Priority 1 Critical Justification Our current inventory of radios is 14 years old resulting in numerous repairs and radios taken out of service. Our current radio models were canceled by the manufacturer in 2014 and manufacturer service and support discontinued in 2019. Our operations are heavily reliant on radio communications with dispatch, law enforcement, and other surrounding fire jurisdictions. The radios used by the fire department experience heavy use and are prone to failure from aging and wear-and-tear. The funds requested will allow the fire department to replace older, obsolete, and broken radios. Budget Impact/Other Useful Life 10 yearsProject Name 800 MHz Radio Replacement Category Equipment: Fire Equip Type Equipment Status Active Total20232024202520262027Expenditures 205,000205,000Equip/Vehicles/Furnishings 205,000 205,000Total Total20232024202520262027Funding Sources 205,000205,000General Fund 205,000 205,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 38 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Fire Chief 2023 2027thru Department Fire Department Description Replacement of SCBA (Self Contained Breathing Apparatus) Fill Station & Compressor. Project #F-022 Priority 1 Critical Justification The SCBA (Self Contained Breathing Apparatus) Fill Station & Compressor system has a life expectancy of 20 years. As the unit ages, maintenance and repair costs will continue to increase. These funds will be utilized to replace equipment in a timely manner to reduce maintenance costs and down time. Budget Impact/Other Useful Life 20 yearsProject Name SCBA Fill Station & Compressor Category Equipment: Fire Equip Type Equipment Status Active Total20232024202520262027Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20232024202520262027Funding Sources 70,00070,000General Fund 70,000 70,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 39 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact City Administrator 2023 2027thru Department Parks and Recreation Description Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. 2023 potential segments include in front of Hagbergs and near Keats/CSAH 10 (if a road project is funded). Project #PR-009 Priority 3 Important Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Budget Impact/Other Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Useful Life 25 yearsProject Name Central Greenway Regional Trail Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 220,000220,000Construction/Maintenance 220,000 220,000Total Total20232024202520262027Funding Sources 220,000220,000Park Dedication Fund 220,000 220,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 40 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact City Administrator 2023 2027thru Department Parks and Recreation Description New ballfields to be constructed or refurbished after Tartan ball fields are no longer used by the public Project #PR-017 Priority 1 Critical Justification Replacement of some of the fields at Tartan Park lost to development of Royal Oaks Golf Course Community Budget Impact/Other Funding to be provided from developer in development agreement with Royal Golf. Funds to be used for acquisition of land, if necessary, and builidngor refurbishing of (a) new ballfield(s). Useful Life 40 yearsProject Name New or Refurbished Ballfields Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 1,000,0001,000,000Construction/Maintenance 1,000,000 1,000,000Total Total20232024202520262027Funding Sources 1,000,0001,000,000Grants/Donation 1,000,000 1,000,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 41 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Parks commission recommended the search and planning for a dog park somewhere near the denser developments Improvements would be minimal such as fencing Project #PR-019 Priority 4 Less Important Justification Residents on small lots in denser developments need a place to take their dogs for exercise. By providing a dog park those who let their dogs run off leash in other parks can be redirected Budget Impact/Other Useful Life 25 yearsProject Name Dog Park Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20232024202520262027Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 42 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replaces 2014 Kubota Project #PR-020 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Utility Vehicile/Trail Groomer Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 37,00037,000Equip/Vehicles/Furnishings 37,000 37,000Total Total20232024202520262027Funding Sources 37,00037,000Vehicle Replacement Fund 37,000 37,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 43 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Parks Commission request to develop trail connections between neighborhoods. May be spent over 2021-2023. Installing a trail connection between Wildflower & Tana Ridge. 525 feet $56,213.00 in 2023 Installing a trail connection between Inwood Park and Stonegate Park. 750 feet $58,875.00 Improving the Stonegate trails with Pavement 2,309 ft - $181,257 in 2022 Installing a trail connection between Hamlet on Sunfish and Tapestry. 335 feet $26,297.50 in 2022 Project #PR-021 Priority 2 Very Important Justification The Parks Commission indicated trail connections were a priority throughout the city. Budget Impact/Other Would result in additional trail miles to maintain in the future. Useful Life 40 yearsProject Name Neighborhood Trail Connections Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20232024202520262027Funding Sources 250,000250,000Park Dedication Fund 250,000 250,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 44 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replace the 1992 play equipment Project #PR-022 Priority 3 Important Justification End of its useful life Budget Impact/Other Useful Life 25 yearsProject Name Pebble Park Playground Replacement Category Park Improvements Type Equipment Status Active Total20232024202520262027Expenditures 125,000125,000Construction/Maintenance 125,000 125,000Total Total20232024202520262027Funding Sources 125,000125,000Park Dedication Fund 125,000 125,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 45 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replace the 1990 playset Project #PR-023 Priority 3 Important Justification Exceeded its useful life Budget Impact/Other Useful Life 25 yearsProject Name Demontriville Park Playground Replacement Category Park Improvements Type Equipment Status Active Total20232024202520262027Expenditures 125,000125,000Construction/Maintenance 125,000 125,000Total Total20232024202520262027Funding Sources 125,000125,000Park Dedication Fund 125,000 125,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 46 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Resurface the existing tennis courts Project #PR-024 Priority 3 Important Justification The court surface is failing, cracking and is unlevel Budget Impact/Other Useful Life 20 yearsProject Name Tablyn Park Court Resurfacing Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total20232024202520262027Funding Sources 90,00090,000Park Dedication Fund 90,000 90,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 47 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Full depth reclamation on court surface, pave, stripe for either picklball or tennis, add new posts and nets, change out electrical cabinet, improve sidewalk, resurface basket ball court Project #PR-025 Priority 2 Very Important Justification The exsiting court surfaces are failing, cracking and is unlevel. Tennis is a less desirable sport so picklball would see more use Budget Impact/Other Useful Life 20 yearsProject Name Pebble Park Courts Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 120,000120,000Construction/Maintenance 120,000 120,000Total Total20232024202520262027Funding Sources 120,000120,000Park Dedication Fund 120,000 120,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 48 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description The Park Commison has recommended adding Disc Golf as an improvement to Kleis Park as an amenity Project #PR-027 Priority 3 Important Justification Kleis Park has minum use currently. It is believed Disc Golf would bring an amenity to the city that we currently do not have and increase that specific park use Budget Impact/Other Useful Life 20 yearsProject Name Kleis Park Disc Golf Category Park Improvements Type Improvement Status Active Total20232024202520262027Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20232024202520262027Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 49 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replace the 1997 play equipment Project #PR-029 Priority 4 Less Important Justification End of its useful life Budget Impact/Other Useful Life 25 yearsProject Name Tablyn Park Play Equipment Category Park Improvements Type Equipment Status New Recommendation Total20232024202520262027Expenditures 125,000125,000Equip/Vehicles/Furnishings 125,000 125,000Total Total20232024202520262027Funding Sources 125,000125,000Park Dedication Fund 125,000 125,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 50 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replace the 1998 play equipment Project #PR-030 Priority 4 Less Important Justification End of its useful life Budget Impact/Other Useful Life 25 yearsProject Name Stonegate Park Play Equipment Category Park Improvements Type Equipment Status New Recommendation Total20232024202520262027Expenditures 125,000125,000Equip/Vehicles/Furnishings 125,000 125,000Total Total20232024202520262027Funding Sources 125,000125,000Park Dedication Fund 125,000 125,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 51 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Replace the 2000 playset Project #PR-036 Priority 5 Future Consideration Justification End of useful life Budget Impact/Other Useful Life 25 yearsProject Name Carriage Station Park Play Equipment Category Park Improvements Type Equipment Status New Recommendation Total20232024202520262027Expenditures 125,000125,000Equip/Vehicles/Furnishings 125,000 125,000Total Total20232024202520262027Funding Sources 125,000125,000Park Dedication Fund 125,000 125,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 52 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Add pickleball Court Project #PR-037 Priority 2 Very Important Justification Current courts are full Budget Impact/Other Useful Life 20 yearsProject Name Pickleball Court Category Park Improvements Type Improvement Status New Recommendation Total20232024202520262027Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20232024202520262027Funding Sources 100,000100,000Park Dedication Fund 100,000 100,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 53 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Parks and Recreation Description Potential Trails connections between developments along Hudson Blvd and the trail connection along Manning Ave from cty 14 south to the Rail Road track Project #PR-038 Priority 3 Important Justification Trail would address the following community needs-Deliver sturdent safely to school, bring people to our parks, provide safe recreation, trail diversity-provide feel of lake elmo and bring people to the down town Budget Impact/Other Useful Life 25 yearsProject Name Trail Additions Category Park Improvements Type Improvement Status New Recommendation Total20232024202520262027Expenditures 78,00078,000Construction/Maintenance 78,000 78,000Total Total20232024202520262027Funding Sources 78,00078,000Park Dedication Fund 78,000 78,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 54 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replace 1999 loader Project #PW-004 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 yearsProject Name Loader Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 235,000235,000Equip/Vehicles/Furnishings 235,000 235,000Total Total20232024202520262027Funding Sources 235,000235,000Vehicle Replacement Fund 235,000 235,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 55 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replace 2004 John Deere Tractor price includes mower attachment and front snow blower Project #PW-006 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 yearsProject Name Tractor Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 195,000195,000Equip/Vehicles/Furnishings 195,000 195,000Total Total20232024202520262027Funding Sources 195,000195,000Vehicle Replacement Fund 195,000 195,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 56 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Project #PW-031 Priority 3 Important Justification County improvement project with City cost participation requirement. Need determined by Washington County. Budget Impact/Other Useful Life 25 yearsProject Name CSAH 6/Inwood Signal Category Street Reconstruction Type Maintenance Status Active Total20232024202520262027Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20232024202520262027Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 57 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description 15th Street reconstruction from Oakdale to Inwood Ave Project #PW-034 Priority 3 Important Justification Significant patching made in 2018 to extend road life a couple years. Recon needed per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other Potential for some assessments Useful Life 25 yearsProject Name 15th Street North (MSA Street)Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 1,200,0001,200,000Construction/Maintenance 1,200,000 1,200,000Total Total20232024202520262027Funding Sources 1,200,0001,200,000Municipal Sate Aid (MSA) 1,200,000 1,200,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 58 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Construction of the street, trail and sidewalk segment of Village Parkway that crosses the Union Pacific Railroad (UPRR) and railroad right-of- way, including trunk watermain extension across the railroad right-of-way with pressure reduction valve (to be installed with development), and closure of the adjacent private railroad crossing. To obtain permitting and approvals, the project includes potentail upgrades to the UPRR crossing at Klondike Avenue. Project #PW-035 Priority 2 Very Important Justification Village Parkway crossing is need to connect the developing Village neighborhoods north and south of the tracks, including pedestrian connectivity for a walkable downtown area. The Private closure (DOT 183913SD) and potential improvements to Klondike Avenue (DOT 183811D) are requirements of the Railroad for obtaining the new improved crossing location. Budget Impact/Other The City has been collecting developer fees for partial funding of the Crossing Improvements Useful Life 40 yearsProject Name UP RR Crossing - Village Parkway and Private Drive Category Street Construction Type Improvement Status Active Total20232024202520262027Expenditures 892,500525,000 367,500Construction/Maintenance 525,000 367,500 892,500Total Total20232024202520262027Funding Sources 392,50025,000 367,500General Fund 500,000500,000Grants/Donation 525,000 367,500 892,500Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 59 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description $3,182,400 for Fields of St. Croix 2nd Addition and Tana Ridge (30% assessed) $506,000 for OV 7 Legion Avenue (assessed 30%) Project #PW-039 Priority 3 Important Justification Annual street improvements per Engineering recommendation Legion Ave street improvements needed in conjunction with extension of sanitary sewer along Legion Ave to replace failing septic systems and 201 community wastewater system Budget Impact/Other $954,720 assessment revenue for neighborhoods $151,800 assessment revenue for OV 7 City share of debt service would be $2,581,880 Useful Life 25 yearsProject Name 2023 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 3,688,4003,688,400Construction/Maintenance 3,688,400 3,688,400Total Total20232024202520262027Funding Sources 3,688,4003,688,400Debt Service 3,688,400 3,688,400Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 60 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description $1,220,000 for Homestead assumes 3m grant since in the CDWSP as approved neighborhood $2,389,400 Carriage Station + Jamaca Court ( 30% Assessed) Project #PW-040 Priority 3 Important Justification Annual street improvements per recommendation by City Engineer Street improvements to be completed together with 3M Watermain extension to serve subdivision (Homestead) Jamaca Court street improvements to be completed as part of the CSAH 14 Trunk Watermain Extension Budget Impact/Other $1,220,000 3M Grant $2,389,400 Debt Service - with $716,820 Assessed, City share of debt $1,672,580 Useful Life 25 yearsProject Name 2024 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 3,609,4003,609,400Construction/Maintenance 3,609,400 3,609,400Total Total20232024202520262027Funding Sources 2,389,4002,389,400Debt Service 1,220,0001,220,000Grants/Donation 3,609,400 3,609,400Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 61 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description $6,230,000 Total Estimated Project Costs with $3,950,000 in Street costs and $2,280,000 in watermain extension costs for Packard Park, Eden Park and 20th St Circle : Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). $2,278,375 for 59th St Ct / 55th St / Julep Way & 57th St / Jasper Avenue / Jerome Avenue / Irish Ct (30% assessed). Project #PW-041 Priority 3 Important Justification Annual street improvements per Engineering recommendation. Street improvements to be completed together with 3M Watermain extension grant to serve subdivision. Annual street improvements per recommendation from Engineering Budget Impact/Other $3,950,000 3M Grant $683,513 assessment revenue for neighborhoods City share of debt service would be $1,594,862 Useful Life 25 yearsProject Name 2025 Street Irmprovements Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 6,228,3756,228,375Construction/Maintenance 6,228,375 6,228,375Total Total20232024202520262027Funding Sources 2,278,3752,278,375Debt Service 3,950,0003,950,000Grants/Donation 6,228,375 6,228,375Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 62 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description $4,680,000 Total Estimated Project Costs with $3,040,000 in Street costs and $1,640,000 in watermain extension costs for Tartan Meadows subdivision and Klondike Avenue: Requires 3M Grant Fund application. 3M-Grant Required: Not included in current CDWSP. $2,252,900 for the Lake Elmo Heights subdivision including Innsdale Avenue cul-de-sac and Inwood Avenue cule-de-sac (30% assessed). Project #PW-042 Priority 3 Important Justification Annual street improvements per Engineering recommendation. Street improvements to be completed together with 3M Watermain extension grant to serve subdivision. Annual street improvements per recommendation by City Engineer Budget Impact/Other Assumes 3M grant $675,870 assessment revenue for neighborhoods City share of debt service would be $1,577,030 Useful Life 25 yearsProject Name 2026 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 5,292,9005,292,900Construction/Maintenance 5,292,900 5,292,900Total Total20232024202520262027Funding Sources 2,252,9002,252,900Debt Service 3,040,0003,040,000Grants/Donation 5,292,900 5,292,900Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 63 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replace 2006 Case Backhoe Project #PW-044 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other $85,000 total cost split amongst water, stormwater , streets, and parks sewer Useful LifeProject Name Back Hoe Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 130,000130,000Equip/Vehicles/Furnishings 130,000 130,000Total Total20232024202520262027Funding Sources 26,00026,000Sewer Fund 26,00026,000Storm Water Fund 52,00052,000Vehicle Replacement Fund 26,00026,000Water Fund 130,000 130,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 64 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Mini loader will be outfitted with necessary snow removal equipment for cul de sacs, narrow streets and sidewalks/paths Project #PW-048 Priority 2 Very Important Justification Budget Impact/Other Useful LifeProject Name Mini Loader Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 120,000120,000Equip/Vehicles/Furnishings 120,000 120,000Total Total20232024202520262027Funding Sources 120,000120,000Vehicle Replacement Fund 120,000 120,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 65 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement imporvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Project #PW-053 Priority 3 Important Justification County imporvement project with City cost participation. Need determined by Washington County Budget Impact/Other Border's City's 180 acres Useful Life 20 yearsProject Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20232024202520262027Funding Sources 800,000800,000Debt Service 800,000 800,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 66 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Additional skidloader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed highflow Project #PW-054 Priority 3 Important Justification additional skidloader needed due to growth in streets and parks Budget Impact/Other Useful LifeProject Name Skidloader Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20232024202520262027Funding Sources 70,00070,000Vehicle Replacement Fund 70,000 70,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 67 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description $4,645,000 Total Estimated Project Costs with $2,940,000 in Street costs and $1,705,000 in watermain extension costs for Downs Lake Estates, Sunfish Ponds and Forest subdivisions: Requires 3M Grant Fund application. 3M-Grant Required: Not included in current CDWSP. $2,605,200 for OACE Acres area: Hidden Bay Tr/Birchwood/Cherrywood/Windbreak/Jack Pine/Deer Pond (30% assessed). Project #PW-055 Priority 3 Important Justification Annual street improvements per Engineering recommendation. Street improvements to be completed together with 3M Watermain extension grant to serve subdivision. Annual street improvements per Engineering recommendations Budget Impact/Other Assumes 3M grant $781,560 assessment revenue for neighborhoods City share of debt service would be $1,823,640 Useful Life 25 yearsProject Name 2027 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 5,545,2005,545,200Construction/Maintenance 5,545,200 5,545,200Total Total20232024202520262027Funding Sources 2,605,2002,605,200Debt Service 2,940,0002,940,000Grants/Donation 5,545,200 5,545,200Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 68 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description CSAH 15 from CSAH 14 to CSAH 10 Per Washington County includes: Expansion to four lane divided highway Access management Intersection control Separate multi-use trail Landscaping and Aesthetics Project #PW-057 Priority 3 Important Justification County improvement project with City cost participation. Need determined by Washington County Budget Impact/Other 30% assessment to residential properties Trail could come from park dedication funds County could delay project if not inlcuded as part of their BOND-2022 Useful Life 25 yearsProject Name Manning Ave Phase 3 Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 1,800,0001,800,000Construction/Maintenance 1,800,000 1,800,000Total Total20232024202520262027Funding Sources 1,800,0001,800,000Debt Service 1,800,000 1,800,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 69 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Pickup with plow to replace 2014 F250 Project #PW-060 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup w/plow Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total20232024202520262027Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 70 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replace 2016 F150 Project #PW-061 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total Total20232024202520262027Funding Sources 35,00035,000Vehicle Replacement Fund 35,000 35,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 71 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Singel Ax;e Dump Truck with plow, sander and underbody Replaces 2015 Mack Project #PW-062 Priority 3 Important Justification 12 years useful life expired Budget Impact/Other Useful Life 10 yearsProject Name DumpTruck w/plow, sander & underbody Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total20232024202520262027Funding Sources 250,000250,000Vehicle Replacement Fund 250,000 250,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 72 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replaces 2017 F250 Project #PW-063 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup w/lift gate & plow Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 45,00045,000Equip/Vehicles/Furnishings 45,000 45,000Total Total20232024202520262027Funding Sources 45,00045,000Vehicle Replacement Fund 45,000 45,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 73 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replaces 2017 F250 Project #PW-064 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 yearsProject Name Pickup w/lift gate & plow Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 45,00045,000Equip/Vehicles/Furnishings 45,000 45,000Total Total20232024202520262027Funding Sources 45,00045,000Vehicle Replacement Fund 45,000 45,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 74 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Manning Ave from I-94 to 1300 feet south of CSAH 10 Per Washington County includes: Expansion to a four lane divided highway Access management Intersection control improvements Separate mulit use trail Project #PW-066 Priority 1 Critical Justification County Improvement project with City cost participation requirement. Need as determined by Washington County to ensure ongoing safe and efficient operation of this highway Budget Impact/Other Local contribution may not be required until construction phase, plannign begins in 2024 Useful Life 40 yearsProject Name Manning Phase 4 Category Street Reconstruction Type Improvement Status Active Total20232024202520262027Expenditures 100,000100,000Planning/Design 100,000 100,000Total Total20232024202520262027Funding Sources 100,000100,000General Fund 100,000 100,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 75 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Traffic Signal to be installed at intersection when Hudson Blvd is realigned with development Project #PW-067 Priority 2 Very Important Justification County Improvement project with City cost participation requirement. Need determined by Washington County. Budget Impact/Other Funding from Four Corners 1st Addition Useful Life 25 yearsProject Name Manning/Hudson Stoplight Category Street Construction Type Improvement Status Active Total20232024202520262027Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20232024202520262027Funding Sources 250,000250,000Grants/Donation 250,000 250,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 76 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Add a pickup truck with V-plow Project #PW-072 Priority 2 Very Important Justification Adding a pickup truck will help with completing additional tasks in a timely matter as we divide up staff to improve efficiencies Budget Impact/Other Useful Life 10 yearsProject Name Pickup truck addition w/V-plow Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 47,00047,000Equip/Vehicles/Furnishings 47,000 47,000Total Total20232024202520262027Funding Sources 47,00047,000Vehicle Replacement Fund 47,000 47,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 77 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Improvements at Lake Elmo Ave and TH 36 Project #PW-074 Priority 3 Important Justification County Improvement project with City cost participation requirement. Need determined by Washington County. Budget Impact/Other $4,500,000 estimate is only for the intersection improvements and does not inlcude any cost for frontage roads (PW-076) Useful LifeProject Name TH36-Lake Elmo Ave (CSAH 17) Imp Category Unassigned Type Unassigned Status Active Total20232024202520262027Expenditures 4,500,0004,500,000Construction/Maintenance 4,500,000 4,500,000Total Total20232024202520262027Funding Sources 4,500,0004,500,000Debt Service 4,500,000 4,500,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 78 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Construction of south frontage road between Keats Avenue and Lake Elmo Avenue in order to improve traffic flow to new Lake Elmo Ave/TH36 Improvement and remove direct private accesses to TH 36 Project #PW-076 Priority 3 Important Justification Necessary safety and traffic improvements. May be partially constructed togethr with TH36-Lake Elmo Ave Intersection Project Budget Impact/Other Useful Life 40 yearsProject Name South Frontage Road (Keats to Lake Elmo Ave)Category Street Construction Type Improvement Status Active Total20232024202520262027Expenditures 2,500,0002,500,000Construction/Maintenance 2,500,000 2,500,000Total Total20232024202520262027Funding Sources 2,500,0002,500,000Debt Service 2,500,000 2,500,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 79 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Public Works Department Description Replace 25 yr old chipper Project #PW-078 Priority 2 Very Important Justification End of useful life Budget Impact/Other Useful Life 20 yearsProject Name Chipper Category Equipment: PW Equip Type Equipment Status New Recommendation Total20232024202520262027Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20232024202520262027Funding Sources 60,00060,000Vehicle Replacement Fund 60,000 60,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 80 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Public Works Department Description Reconstruction of gap segements along Hudson Boulevard to improve the roadway to the adopted Hudson Boulevard design standards with pedestrain trail. Gap segemetns are portions of the roadway not being improved as part of ongoing or upcoming development proejcts. 2023 Segment (from east side of Springs Apartments to Lakewood Crossing). 2024 Segment (from east side of Applewood Pointe to 9242 Hudson Blvd). 2025 Segment (Vahli-Hi to Bus Facility). Project #PW-079 Priority 3 Important Justification Pavement section nearing or beyond useful life. Improvements have been deferred to extent possible to allow for development paid upgrades along some segments. Gap segments to be addressed to create completed project and comnplete trail connections. Budget Impact/Other Useful Life 25 yearsProject Name Hudson Blvd Improvements (Gap Segments)Category Street Reconstruction Type Improvement Status New Recommendation Total20232024202520262027Expenditures 2,550,000510,000 1,560,000 480,000Construction/Maintenance 510,000 1,560,000 480,000 2,550,000Total Total20232024202520262027Funding Sources 2,550,000510,000 1,560,000 480,000Debt Service 510,000 1,560,000 480,000 2,550,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 81 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Sewer Department Description Sewer Oversizing Project #S-013 Priority 3 Important Justification Sewer oversizing based on developer pace and phasing Also $1 million of trunk sewer oversixing applied to OV sewer phases 1-7 in 2021 and $1,275,750 in 2022 Budget Impact/Other Useful Life 40 yearsProject Name Sewer Oversizing Category Wastewater Type Improvement Status Active Total20232024202520262027Expenditures 114,1029,102 80,000 25,000Other 9,102 80,000 25,000 114,102Total Total20232024202520262027Funding Sources 114,1029,102 80,000 25,000Sewer Fund 9,102 80,000 25,000 114,102Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 82 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Sewer Department Description Old Village Phase 7 sanitary sewer extension along Legion Ave with a Lift Station Project #S-017 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems Budget Impact/Other $314,400 Assessment Revenue (24 homes @$13,100 each) Useful LifeProject Name Old Village Sewer Extension Phase 7 Category Wastewater Type Improvement Status Active Total20232024202520262027Expenditures 625,000625,000Construction/Maintenance 625,000 625,000Total Total20232024202520262027Funding Sources 625,000625,000Debt Service 625,000 625,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 83 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Sewer Department Description Used VAC Truck Project #S-019 Priority 2 Very Important Justification As the City’s water, sewer and storm sewer systems continue to expand at a fast rate we are seeing more and more of a need to maintain the utilities in a time sensitive manner. The addition of a VAC truck would benefit the city by improving the response time to sewer backups. It would allow more frequent cleaning of lift stations, reducing plugged pumps. We would Jet the required 1/3 of the cities sanitary mains as it fits our schedule. Currently we are not meeting the 1/3 rule due to the cost of contracting out the jetting. Water main gate valve boxes can be cleaned when full of sediment quickly to allow staff access to control valves to isolate main breaks. Plugged storm sewers and culverts can be cleaned quickly the same day issues are identified. The MPCA mandates we clean storm water sumps yearly. This piece of equipment would allow us to do the work in- house on our schedule instead of contracting it out. The Vac truck can safely and efficiently expose power, gas and communication lines. It reduces labor when excavating around curb stops, gate valves. This piece of equipment would replace the small VAC trailer unit we have now that cannot perform the majority of task provided above. Budget Impact/Other Useful Life 20 yearsProject Name VAC Truck Category Vehicles Type Equipment Status Active Total20232024202520262027Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total20232024202520262027Funding Sources 175,000175,000Sewer Fund 75,00075,000Storm Water Fund 250,000 250,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 84 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Sewer Department Description Sewer trunk extension from lift station in Oakdale at Helmo Ave/Stillwater Blvd north on Idela Ave to city propoerty across from Target Note: $540,000 paid with ARPA funds in 2022. Plus Oakdale Lift Station contribution of $450,000 Oversizing costs to developer in 2023 ($150,000) Project #S-020 Priority 3 Important Justification Serve 180 acres to allow for sewered development. Plan per the Section 16 Master Plan completed by Focus Engineering and HKGI in 2020 Budget Impact/Other Assumes 425 RECs for entire 180 acres May use ARPA funds for about $1million cost in 2022 Useful Life 40 yearsProject Name Sewer to 180 Acres Category Wastewater Type Improvement Status Active Total20232024202520262027Expenditures 150,000150,000Other 150,000 150,000Total Total20232024202520262027Funding Sources 150,000150,000Sewer Fund 150,000 150,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 85 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Sewer Department Description Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The route would roughly follow the alignment of the current City of Oakdale gravity line that Lake Elmo’s lift station utilizes, but be extended further to the east. The exact terminus of the gravity line needs to be determined based on elevation survey and other investigations during preliminary design. The I-94 lift station would continue to pump through a City-owned forcemain to the MCES gravity sewer connection point. This alternative also includes the replacement of portions of the 1-WO-500 interceptor to accommodate larger ultimate flow rates from Lake Elmo and Oakdale. The above project proposed by Met Council will result in the city upgrading the forcemain in order to serve the growth in the southwest portionof the city. Cost estimates to be revised when Met Council complete their upgrades in 2022-2024 Project #S-024 Priority 3 Important Justification Upgrades to lift station and foremain in order to provide for continued growth in the southwest area of the city Budget Impact/Other Useful LifeProject Name I-94 Lift Station and Forcemain Upgrade Category Unassigned Type Unassigned Status Active Total20232024202520262027Expenditures 2,050,000150,000 1,900,000Construction/Maintenance 150,000 1,900,000 2,050,000Total Total20232024202520262027Funding Sources 2,050,000150,000 1,900,000Sewer Fund 150,000 1,900,000 2,050,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 86 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Storm Water Department Description Regional stormwater retention need identified upstream of Old Village near Lake Elmo Ave and CSAH 14 Project #SW-001 Priority 3 Important Justification 2nd Phase to improving the regional drainage issues as identified in Old Village Regional Stormwater Study timing dependent upon development Budget Impact/Other Compensation for oversizing to developer Useful Life 40 yearsProject Name Phase 2 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20232024202520262027Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20232024202520262027Funding Sources 800,000800,000Debt Service 800,000 800,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 87 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Storm Water Department Description Phase 3 of Regional Drainage Improvements (VFW Park) Project #SW-002 Priority 3 Important Justification 3rd Phase of Regional Drainage Improvements (VFW Park) as identified in Old Village Regional Stormwater Study Timing dependent upon development Budget Impact/Other Useful Life 40 yearsProject Name Phase 3 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20232024202520262027Expenditures 500,000500,000Construction/Maintenance 500,000 500,000Total Total20232024202520262027Funding Sources 500,000500,000Debt Service 500,000 500,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 88 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Storm Water Department Description Identify and pursue opportuntiies to design and install a stormwater reuse irrigation systems within the City. Design and install stormwater reuse irrigation systems wih the new City ballfields (once location determined). Work with HOAs to convert irrigation systems to full/partial stormwater reuse (e.g. Wildflower, Legacy at Northstar). Project #SW-005 Priority 3 Important Justification Pursue opportunities to implement stornwater reuse irrigation systems to promote water conservation and mnimize withdrawl of water from the underlying aquifers. Budget Impact/Other Partner with VBWD on design and grantfunding Useful Life 40 yearsProject Name Stormwater Reuse-Irrigation Systems Category Storm Sewer/Drainage Type Improvement Status New Recommendation Total20232024202520262027Expenditures 80,00040,000 40,000Construction/Maintenance 40,000 40,000 80,000Total Total20232024202520262027Funding Sources 80,00040,000 40,000Storm Water Fund 40,000 40,000 80,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 89 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Storm Water Department Description Design and install a stormwater reuse irrigation system for Lions Park and VFW Ballfields Project #SW-006 Priority 3 Important Justification Pursue opportunities to implement stornwater reuse irrigation systems to promote water conservation and mnimize withdrawl of water from the underlying aquifers. Budget Impact/Other Potential for VBWD grant TBD $70,000 cost to be updated upon scoping study. Partner with VBWD on design and funding Useful Life 40 yearsProject Name Lions and VFW park irrigatioin stormwater reuse Category Storm Sewer/Drainage Type Improvement Status New Recommendation Total20232024202520262027Expenditures 70,00070,000Construction/Maintenance 70,000 70,000Total Total20232024202520262027Funding Sources 70,00070,000Storm Water Fund 70,000 70,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 90 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description Trunk watermain connection between north and south Village area neighborhoods to be installed by the city with the Village Parkway Railrod Crossing Improvements. A PRV (pressure reduction valve) will be needed and will be installed at a later date with development activity north of the railroad. Project #W-008 Priority 2 Very Important Justification Required as part of the Water Distribution System trunk watermain network for adequate and relaible water delivery and pressures throughout the city. Budget Impact/Other Useful Life 40 yearsProject Name Village East Trunk Watermain & PRV Category Water Type Improvement Status Active Total20232024202520262027Expenditures 375,000185,000 190,000Construction/Maintenance 185,000 190,000 375,000Total Total20232024202520262027Funding Sources 375,000185,000 190,000Water Fund 185,000 190,000 375,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 91 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Water Department Description Project #W-010 Priority 3 Important Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Budget Impact/Other Useful Life 25 yearsProject Name Paint Water Tank at PW Category Water Type Maintenance Status Active Total20232024202520262027Expenditures 800,000800,000Equip/Vehicles/Furnishings 800,000 800,000Total Total20232024202520262027Funding Sources 800,000800,000Water Fund 800,000 800,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 92 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description Oversizing cost of watermain pipe installed by developers. Project #W-013 Priority 3 Important Justification Ensures all pipe in the City will have flow capacity necessary for water system Budget Impact/Other Watermina oversizing costs identified in Developer Agreements Useful Life 40 yearsProject Name Watermain Oversizing Category Water Type Improvement Status Active Total20232024202520262027Expenditures 258,17883,178 100,000 75,000Other 83,178 100,000 75,000 258,178Total Total20232024202520262027Funding Sources 258,17883,178 100,000 75,000Water Fund 83,178 100,000 75,000 258,178Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 93 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Water Department Description Replace 200 obsolete Sensus and Neptune meters each year with new Sensus 1 pro meters Project #W-023 Priority 1 Critical Justification Old meters not working properly leads to the need to estimate usage therefore billing process takes more staff time Budget Impact/Other Useful Life 15 yearsProject Name Water Meter Change Out Category Water Type Improvement Status Active Total20232024202520262027Expenditures 175,00075,000 75,000 25,000Equip/Vehicles/Furnishings 75,000 75,000 25,000 175,000Total Total20232024202520262027Funding Sources 175,00075,000 75,000 25,000Water Fund 75,000 75,000 25,000 175,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 94 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Water Department Description Automated radio read system for water meters. Project #W-024 Priority 3 Important Justification Eliminates the need to drive around and obtain reads. Improves billing and gives "real time" readings to help detect leaks. Budget Impact/Other Useful LifeProject Name Automated Radio Read System Category Water Type Improvement Status Active Total20232024202520262027Expenditures 325,000325,000Equip/Vehicles/Furnishings 325,000 325,000Total Total20232024202520262027Funding Sources 325,000325,000Water Fund 325,000 325,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 95 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description Old Village Phase 7 water main replacement on Legion Ave Project #W-026 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful LifeProject Name OV sewer extension Phase 7; water component Category Water Type Improvement Status Active Total20232024202520262027Expenditures 288,000288,000Construction/Maintenance 288,000 288,000Total Total20232024202520262027Funding Sources 288,000288,000Water Fund 288,000 288,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 96 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $270,600 Fields of St Croix 2nd Addition and Tana Ridge Project #W-032 Priority 3 Important Justification water upgrades with road projects in Fields 2 and Tana Budget Impact/Other Useful Life 40 yearsProject Name 2023 Street Projects-water component Category Water Type Improvement Status Active Total20232024202520262027Expenditures 270,600270,600Construction/Maintenance 270,600 270,600Total Total20232024202520262027Funding Sources 270,600270,600Water Fund 270,600 270,600Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 97 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $1,930,000 Total Estimated Project Costs with $1,220,000 in Street costs and $710,000 in watermain extension costs for Homestead Subdivision (14th Street North) : Requires 3M Grant Fund application. 3M-Grant (CDWSP Approved Neighborhood). $615,000 Carriage Station + Jamaca Court Project #W-033 Priority 3 Important Justification Watermain extensions to Homestead subdivision due to well advisories or being in Special Well Construction Area. Watermain vlave/hydrant repairs and replacement to be completed in conjunction with scheduled street improvements, including upsizing of 900 feet of 8-inch pipe to 16-inch trunk watermain in Carriage Station (trunk wateramin gap in system). Replacement of 1,200 feet of aged and undersized 4-inch watermain along Jamaca Court. Budget Impact/Other Assumes $710,00 3M grant Useful Life 40 yearsProject Name 2024 Street Projects-water component Category Water Type Improvement Status Active Total20232024202520262027Expenditures 1,325,0001,325,000Construction/Maintenance 1,325,000 1,325,000Total Total20232024202520262027Funding Sources 710,000710,000Grants/Donation 615,000615,000Water Fund 1,325,000 1,325,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 98 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $6,230,000 Total Estimated Project Costs with $3,950,000 in Street costs and $2,280,000 in watermain extension costs for Packard Park, Eden Park and 20th St Circle : Requires 3M Grant Fund application.3M-Grant (CDWSP Approved Neighborhood). Extension of public watermain to be determined in conjunction with upcoming street improvement projects. Project #W-034 Priority 3 Important Justification Watermain extensions to Parkard Park, Eden Park and 20th Street Circle subdivision due to well advisories or being in Special Well Construction Area. Extension of 1500 ft. 8-inch watermain along 59th Street Court in conjunction with Street Improvement (100% assessed). Extension of 620 ft. 8-inch watermain along Iris Court in conjunction with Street Improvement (100% assessed). Budget Impact/Other assumes 3M grant $318,000 assessment revenue for neighborhoods Useful Life 40 yearsProject Name 2025 Street Projects-water component Category Water Type Improvement Status Active Total20232024202520262027Expenditures 2,598,0002,598,000Construction/Maintenance 2,598,000 2,598,000Total Total20232024202520262027Funding Sources 2,280,0002,280,000Grants/Donation 318,000318,000Water Fund 2,598,000 2,598,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 99 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $4,680,000 Total Estimated Project Costs with $3,040,000 in Street costs and $1,640,000 in watermain extension costs for Tartan Meadows subdivision and Klondike Avenue: Requires 3M Grant Fund application. 3M-Grant Required: Not included in current CDWSP. Extension of public watermain to be determined in conjunction with upcoming street improvement projects. Project #W-035 Priority 3 Important Justification Watermain extnsion to Tartan Meadows and Klondike due to location in special well construction area. Extension of 1500 ft. 8-inch watermain along 59th Street Court in conjunction with Street Improvement (100% assessed). Extension of 620 ft. 8-inch watermain along Iris Court in conjunction with Street Improvement (100% assessed). Budget Impact/Other $1,640,000 3m Grant assumes Useful LifeProject Name 2026 Street Projcts-water component Category Unassigned Type Unassigned Status Active Total20232024202520262027Expenditures 1,824,0001,824,000Construction/Maintenance 1,824,000 1,824,000Total Total20232024202520262027Funding Sources 1,640,0001,640,000Grants/Donation 184,000184,000Water Fund 1,824,000 1,824,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 100 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $400,000 Total Estimated Project Costs for watermain extension to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision): Requires 3M Grant Fund application. Not included in current CDWSP. Would only be completed if funding is received from the 3M Grants Project #W-036 Priority 3 Important Justification Watermain extensions to 9757, 9759 & 9765 45th Street (east of Tapestry Subdivision) due to well advisories or being in Special Well Construction Area. One of three wells on this private drive has a well adviosry. Budget Impact/Other Assumes 3M grant Useful Life 40 yearsProject Name 45th Street Watermain Extension Category Water Type Improvement Status Active Total20232024202520262027Expenditures 400,000400,000Construction/Maintenance 400,000 400,000Total Total20232024202520262027Funding Sources 400,000400,000Grants/Donation 400,000 400,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 101 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description New well and pumphouse. Monitoring well as required by the DNR. Test Well in 2023; Production Well and Site Acquisition in 2024; Pumphouse in 2025 for 2026 start-up. Project #W-037 Priority 3 Important Justification Growth in water system users both in and outside of MUSA Budget Impact/Other Useful LifeProject Name Well, Pumphouse No. 6 and monitoring well Category Unassigned Type Unassigned Status Active Total20232024202520262027Expenditures 2,600,000240,000 640,000 1,720,000Construction/Maintenance 240,000 640,000 1,720,000 2,600,000Total Total20232024202520262027Funding Sources 3,600,000240,000 640,000 2,720,000Water Fund 240,000 640,000 2,720,000 3,600,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 102 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description Trunk watermains that may be needed to shore up the system and impacted by state's Conceptual Drinking Water Supply Plan final recommendations Inlcuding area on Hudson between Keats and Lake Elmo Ave, and covering gap segements that covered by development projects Project #W-038 Priority 3 Important Justification Budget Impact/Other Useful Life 40 yearsProject Name Watermain Trunk Watermains Category Water Type Improvement Status Active Total20232024202520262027Expenditures 2,950,0001,450,000 1,500,000Construction/Maintenance 1,450,000 1,500,000 2,950,000Total Total20232024202520262027Funding Sources 2,950,0001,450,000 1,500,000Water Fund 1,450,000 1,500,000 2,950,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 103 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Public Works Director 2023 2027thru Department Water Department Description Decommissioning and removal of water tower #1 on Langly Court. Project #W-039 Priority 3 Important Justification Once water tower 3 is constructed in the low poressure area, water tower 1 shuld be decommissioned. If not decommissioned, it will need significant maintenance to upkeep. Location (monopole?) needed to relocate cell antennas Budget Impact/Other Useful Life 0Project Name Decommission Water Tower 1 Category Water Type Maintenance Status Active Total20232024202520262027Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total20232024202520262027Funding Sources 50,00050,000Water Fund 50,000 50,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 104 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description $4,645,000 Total Estimated Project Costs with $2,940,000 in Street costs and $1,705,000 in watermain extension costs for Downs Lake Estates, Sunfish Ponds and Forest subdivisions: Requires 3M Grant Fund application. 3M-Grant Required: Not included in current CDWSP. Project #W-040 Priority 3 Important Justification Watermain extension to Downs Lake Estates, Sunfish Ponds and Forest subdivisions due to location in special well construction area. Budget Impact/Other Assumes 3M grant Useful Life 40 yearsProject Name Downs Lake-Sunfish Ponds-Forest Utility Improv Category Water Type Improvement Status Active Total20232024202520262027Expenditures 1,705,0001,705,000Construction/Maintenance 1,705,000 1,705,000Total Total20232024202520262027Funding Sources 1,705,0001,705,000Grants/Donation 1,705,000 1,705,000Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 105 Capital Improvement Plan - 2023 - 2027 City of Lake Elmo, Minnesota Contact Engineer 2023 2027thru Department Water Department Description Trunk watermain conenction to be made along County Road 14 (Stillwater Boulevard) from the existing 16-inch trunk wateramin along Jamaca Avenue to Klondike Avenue. Project #W-041 Priority 2 Very Important Justification Trunk watermain network connection that is needed to support increased water supply distribution throughout the city as the city increases well production (additionl wells located along Keats Avenue), and to create a redundant distribution supply line to Water Tower #2. Budget Impact/Other Useful Life 40 yearsProject Name CSAH-14 Trunk Watermain Ext-Jamaca Ct to Klondike Category Water Type Improvement Status New Recommendation Total20232024202520262027Expenditures 2,800,8752,800,875Construction/Maintenance 2,800,875 2,800,875Total Total20232024202520262027Funding Sources 2,800,8752,800,875Water Fund 2,800,875 2,800,875Total Wednesday, August 17, 2022Produced Using the Plan-It Capital Planning Software 106