Engineering has reviewed the Upper 33rd Street North Townhouse CUP Site Plans received on November 4, 2022.
The review consisted of the following documentation:
Civil Site Plans dated November 3, 2022.
Stormwater Calculations dated November 3, 2022.
Lot Combination Survey dated November 2, 2022.
1. City approvals must be contingent upon the applicant revising the Final Construction Plans and
Stormwater Management Plan as required by the City Engineer. Final Construction Plans and
Specifications must be prepared in accordance with the latest version of the City Engineering Design
Standards Manual, dated January 2022, using City details, plan notes and specifications and meeting City
Engineering Design Guidelines and plan format requirements.
2. No construction on the Project may begin until the applicant has received City Engineer approval for the
Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,
easements and permissions needed for the project; and a preconstruction meeting has been held by the
City’s engineering department. All off‐site permanent or temporary construction easements required to
construct the project must be provided prior to scheduling a preconstruction meeting.
3. Site Access. The proposed townhome, including all four units, would access Upper 33rd Street North.
Upper 33rd Street North is a local residential street, 24 feet wide within a 47 ft wide right‐of‐way. The
street width and right‐of‐way do not meet minimum city standards (minimum 28 ft wide within 60 ft
right‐of‐way). The street was recently reconstructed but maintained its existing width and right‐of‐way
due to site constraints.
4. On‐street Parking. At 24‐feet‐wide, no on‐street parking is available along Upper 33rd Street North. The
street is designated as no parking along both sides. All parking requirements must be met with all parking
contained on the property.
5. Pedestrian Connectivity. No sidewalk or trail currently exists along Upper 33rd Street. Due to the narrow
street width (24 feet) pedestrian use of the paved roadway may be hazardous once Upper 33rd Street
connects to the future development of Schiltgen Farms.
6. Drainage and Utility Easements. A 10‐ft. drainage and utility easement should be provided along the
property frontage to allow for future placement and relocation of small/dry utilities. Minimum lot
easements should also be provided along the side and rear property lines. All easement areas must be
free from all encroachments other than those approved by the City Engineer and upon execution of an
easement encroachment agreement. Prohibited encroachments include, but are not limited to trees,
landscaping, fences, retaining walls, and building structures.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 2
7. The Site plan shows retaining walls along part of the west property line and most of the rear property line.
The retaining walls should be a minimum of 5 ft from the property lines and outside of all lot easements,
including retaining wall footings.
8. Existing conditions plan is incomplete. Existing conditions is required for a minimum distance of 150 feet
from the proposed parcel and from any off‐site improvements.
9. The proposed site plan is subject to a storm water management plan (SWMP) meeting State, Valley
Branch Watershed District (VBWD) and city rules. The site plan as proposed does not meet stormwater
management requirements. Post construction discharge rates and volumes must be equal or less than
pre‐existing discharge rates at all discharge locations and cumulative for the site.
10. The proposed stormwater management plan proposes an underground storm water infiltration chamber
to mitigate 100% of the required rate and volume control. The infiltration chamber outfall pipe is
proposed to connect directly to the existing storm sewer along Upper 33rd Street, thereby redirecting the
existing site runoff from discharging to the north, and discharging the proposed condition runoff to the
south. No storm sewer calculations have been provided to demonstrate available capacity in the city
storm sewer system at this location.
11. No borings have been taken for to determine the feasibility of infiltration on site and to identify the
design infiltration rate, if deemed feasible. Soil borings are required in accordance with the City
Engineering Design Standards Manual dated January 2022.
12. The storm water management facilities constructed for this development should remain privately owned
and maintained. The applicant will be required to execute and record a Stormwater Maintenance and
Easement Agreement in the City’s standard form of agreement. The stormwater drainage and utility
easements must be shown on the site plans, utility plans and grading plans. A Homeowner’s association
would be required for the development to provide for the ongoing ownership and maintenance
responsibilities.
13. Municipal water supply is available to the site. There are four (4) existing water service stubs available
along the frontage of the property to provide an individual water service connection for each townhome.
Connections to existing public watermain will be required, including all connection and permit fees.
14. Sanitary sewer service is available to the site. There are four (4) existing sanitary sewer service stubs
available along the frontage of the property to provide an individual sewer service connection for each
townhome. Connections to existing sewer will be required, including all connection and permit fees.