HomeMy WebLinkAbout2022-11-15 Upper 33rd St Townhouse Site Plan Review    PAGE 1 of 2  MEMORANDUM         Date:  November 15, 2022       To:  Ben Hetzel, City Planner  Re:  Upper 33rd Street North Townhouse CUP  Cc:  Molly Just, Planning Director    Site Plan review    Marty Powers, Public Works Director    PID 1302921320052 & 1302921320051    Chad Isakson, PE, Assistant City Engineer      From:  Jack Griffin, PE, City Engineer          Engineering has reviewed the Upper 33rd Street North Townhouse CUP Site Plans received on November 4, 2022.  The review consisted of the following documentation:   Civil Site Plans dated November 3, 2022.   Stormwater Calculations dated November 3, 2022.   Lot Combination Survey dated November 2, 2022.      1. City  approvals  must  be  contingent  upon  the  applicant  revising  the  Final  Construction  Plans  and  Stormwater  Management  Plan  as  required  by  the  City  Engineer.  Final  Construction  Plans  and  Specifications must be prepared in accordance with the latest version of the City Engineering Design  Standards Manual, dated January 2022, using City details, plan notes and specifications and meeting City  Engineering Design Guidelines and plan format requirements.  2. No construction on the Project may begin until the applicant has received City Engineer approval for the  Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,  easements and permissions needed for the project; and a preconstruction meeting has been held by the  City’s engineering department. All off‐site permanent or temporary construction easements required to  construct the project must be provided prior to scheduling a preconstruction meeting.  3. Site Access. The proposed townhome, including all four units, would access Upper 33rd Street North.  Upper 33rd Street North is a local residential street, 24 feet wide within a 47 ft wide right‐of‐way. The  street width and right‐of‐way do not meet minimum city standards (minimum 28 ft wide within 60 ft  right‐of‐way). The street was recently reconstructed but maintained its existing width and right‐of‐way  due to site constraints.  4. On‐street Parking. At 24‐feet‐wide, no on‐street parking is available along Upper 33rd Street North. The  street is designated as no parking along both sides. All parking requirements must be met with all parking  contained on the property.  5. Pedestrian Connectivity. No sidewalk or trail currently exists along Upper 33rd Street. Due to the narrow  street width (24 feet) pedestrian use of the paved roadway may be hazardous once Upper 33rd Street  connects to the future development of Schiltgen Farms.  6. Drainage and Utility Easements. A 10‐ft. drainage and utility easement should be provided along the  property frontage to allow for future placement and relocation of  small/dry  utilities.  Minimum  lot  easements should also be provided along the side and rear property lines. All easement areas must be  free from all encroachments other than those approved by the City Engineer and upon execution of an  easement  encroachment  agreement.  Prohibited  encroachments  include, but are not limited to  trees,  landscaping, fences, retaining walls, and building structures.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 2  7. The Site plan shows retaining walls along part of the west property line and most of the rear property line.  The retaining walls should be a minimum of 5 ft from the property lines and outside of all lot easements,  including retaining wall footings.  8. Existing conditions plan is incomplete. Existing conditions is required for a minimum distance of 150 feet  from the proposed parcel and from any off‐site improvements.   9. The proposed site plan is subject to a storm water management plan (SWMP) meeting State, Valley  Branch Watershed District (VBWD) and city rules. The site plan as proposed does not meet stormwater  management requirements. Post construction discharge rates and volumes must be equal or less than  pre‐existing discharge rates at all discharge locations and cumulative for the site.   10. The proposed stormwater management plan proposes an underground storm water infiltration chamber  to  mitigate  100%  of  the  required  rate  and  volume  control.  The  infiltration  chamber  outfall  pipe  is  proposed to connect directly to the existing storm sewer along Upper 33rd Street, thereby redirecting the  existing site runoff from discharging to the north, and discharging the proposed condition runoff to the  south. No storm sewer calculations have been provided to demonstrate available capacity in the city  storm sewer system at this location.  11. No borings have been taken for to determine the feasibility of infiltration on site and to identify the  design  infiltration  rate,  if  deemed  feasible.  Soil  borings  are required  in  accordance  with  the  City  Engineering Design Standards Manual dated January 2022.   12. The storm water management facilities constructed for this development should remain privately owned  and maintained. The applicant will be required to execute and record a Stormwater Maintenance and  Easement Agreement in the City’s standard form of agreement. The stormwater drainage and utility  easements must be shown on the site plans, utility plans and grading plans. A Homeowner’s association  would  be  required  for  the  development  to  provide  for  the  ongoing  ownership  and  maintenance  responsibilities.   13. Municipal water supply is available to the site. There are four (4) existing water service stubs available  along the frontage of the property to provide an individual water service connection for each townhome.  Connections to existing public watermain will be required, including all connection and permit fees.  14. Sanitary sewer service is available to the site. There are four (4) existing sanitary sewer service stubs  available along the frontage of the property to provide an individual sewer service connection for each  townhome. Connections to existing sewer will be required, including all connection and permit fees.