Loading...
HomeMy WebLinkAbout#28 - 2024 Collector Street Imrprovement Preliminary Design STAFF REPORT DATE: August 15, 2023 REGULAR AGENDA ITEM: Authorize Preliminary Design Engineering Services for the 2024 Collector Street Improvement Projects SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize preliminary design engineering services for the 2024 Collector Street Improvement projects? BACKGROUND: The City has developed a 10-year Street Capital Improvement Program which provides long-term planning and management of street and transportation infrastructure throughout the city. The CIP Program consists of a 10-year overview of scheduled capital street projects to address the City’s goals for maintaining public street infrastructure to an acceptable level of service. PROPOSAL DETAILS/ANALYSIS: Several collector streets in the City have been identified for improvement in 2024 as outlined below: • Hudson Boulevard Improvements – Segment A, extending from Inwood Avenue to the east property line of 9242 Hudson Boulevard (“Project”). The Project includes pavement rehabilitation, drainage improvements, and urbanizing the north side of Hudson Boulevard with a new bituminous trail. The Project will coordinate the design and construction with the segments of Hudson Boulevard to be improved through the Amira and Hendrix development projects. • 15th Street North Improvements, extending from Inwood Avenue North to the Oakdale City limits (“Project”). The Project includes pavement rehabilitation and related drainage improvements for the roadway segment. • 30th Street North Gap Segment Improvements. The Project extends from the eastern edge of Lisbon Avenue North to approximately 475-feet east of Village Parkway (“Project”). The Project includes pavement rehabilitation, curb & gutter replacement, shared-use path resurfacing and related drainage improvements for the roadway segment, tying into the recent improvements at each project termini. In order to ready each of these Projects for construction in 2024, engineering has prepared a work plan and task order, and has requested a fee estimate from KLJ, Inc. for preliminary design engineering support services. The three projects are being combined together for economies of scale and implementation efficiencies. The preliminary design work will result in detailed recommendations for the proposed improvement project for each street segment, including proposed pavement rehabilitation, curb and gutter improvements, street widths, turn lanes, lane configuration, pedestrian pathways, and stormwater management. The scope of the preliminary design work includes topographic survey, field condition assessment reviews, identification of small utility conflicts, evaluation of existing and required right-of-way and easements, review of geotechnical evaluations obtained by the City, and coordination with as-built plans and approved plans for adjacent street segments. FISCAL IMPACT: $80,300 for preliminary design engineering support services; including $45,900 for the Hudson Boulevard Improvements – Segment A, $16,200 for the 15th Street North Improvements, and $18,200 for the 30th Street North Gap Segment Improvements. The projects are being funded through improvement bonds, the general tax levy and potentially a portion through municipal state aid funds. RECOMMENDATION: Staff is recommending that the City Council authorize KLJ, Inc. to provide preliminary design engineering services for the 2024 Collector Street Improvement Projects as outlined in the attached Task Orders (#6, #7 and #8). The recommended motion for this action is as follows: “Move to authorize KLJ, Inc. to provide preliminary design engineering services for the 2024 Collector Street Improvement Projects as outlined in the attached Task Orders, including Task Order No. 6, Task Order No. 7, and Task Order No.8, in the amount not to exceed $80,300.” ATTACHMENTS: 1. Project Location Map. 2. KLJ, Inc. Task Order No. 6 – Hudson Boulevard Improvements – Segment A. 3. KLJ, Inc. Task Order No. 6 – 15th Street North Improvements. 4. KLJ, Inc. Task Order No. 6 – 30th Street North Gap Segment Improvements. 10th5thHudsonKeatsLake Elmo15thInwood34th20th27thJamaca7th31st38thManningStillwater24th26thIsland9th30th32nd21stJade6th Ivory8th12thJewelIris22nd37th36th35thLaverneJuniperAnnikaJasmineJamleyLegionKlondike16thUpper 33RdImperial3rd33rdIrving4th14thJune28thVillageEagle PointJonquilLaytonPrivateKelvin IronwoodJanero Leeward Cimarron10th StreetJamesJayLower 31stLower 8thLisbon KraftLampertWhistling ValleyJunco11th5th Stre e tSunfish Lake Park InboundIvywoodInnsda3rd StreetLangly JunoLansingJulianneUpper 30th6th StreetLisbon AvenueIrwinWB I94 To Inwood Ave NUpper 7thQueenUpper 9th27th St r e e t 15th StreetWB I94 To Keats Ave NJasmi n e A ve n ue Keats Ave N To WB I94Manning Ave N To WB I9430th Street 33rd Street24th Street20th StreetLegion Lane21stLaverne32ndIrish35th34th35thLaverneLanglyLaytonLilac33rd10th Street6th Street21st9th36thWhistling Valley5th33rd6th StreetInnsdale Ironwoo d LindenLegion LaneLindenPrivateJulep28thVillageIvyInnsdaleLower 8th31stLisbon9thIsleManning32ndLaverne37thManningLegion9th34thLaytonJade5thHudson36thDOWNSLAKELAKE ELMOREGIONALPARK RESERVELAKE ELMOSUNFISH LAKEHORSESHOELAKEROSELAKEREIDPARKVFWPARKLIONS PARKCity of WoodburySTONEGATEPARKKRAMERLAKEGOOSELAKEARMSTRONGLAKERIDGEPARKKEATS AVE NEAGLE POINTLAKETABLYNPARKHEIGHTSPARKCity of OakdaleWest LakelandTownshipSUNFISH LAKEPARKHOMESTEDPARKHERITAGEPARKCity ofAftonTablynParkEagle PointCreek EstatesLake ElmoHeightsTorre PinesFarms ofLake ElmoParkview EstatesWildflowersShoresHuppertAddBeautCrest EstatesFriedrichHghtsKenridge AddPrairie RidgeOffice ParkEagle PointBusiness ParkStonegateHammes CountryVistaWhistling ValleyMidlandMeadowsDavidNelson EstTheHomesteadTartanMeadowsThe ForestSchwartz-Martinco AddPackardParkEdenParkHeritageFarmLonesomePine AddDownsLake EstMyronEllmanElmo ViewCty AudPlat No. 8Lake Elmo ParkHamlet OnSunfish LakeParkMeadowsBordners GarnerFarmettesRoyal Golf Club SouthwindHunters CrossingHammesEstatesSavonaBoulder PondsInwoodLakewood Crossing2nd AdditionEaston VillageCimarronEDENPARKPILOTPARKHAMMESPARKGOOSE LAKEPARKI-94     TASK ORDER No. 6 – HUDSON BOULEVARD IMPROVEMENTS ‐SEGMENT A                       Page 1 of 3    TASK ORDER                 No. 6  CITY OF LAKE ELMO, MINNESOTA – KLJ  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Kadrmas,  Lee  &  Jackson,  Inc.  (KLJ)  (“ENGINEER”),  dated  February  20,  2018  (“AGREEMENT”),  the  ENGINEER agrees to provide Professional Engineering Support Services as follows:      HUDSON BOULEVARD IMPROVEMENTS – SEGMENT A    PROJECT  OVERVIEW:   The  CITY  requires  preliminary  design  engineering  services  for  the  Hudson  Boulevard Improvements – Segment A, extending from Inwood Avenue to the east property line of  9242 Hudson Boulevard (“Project”).  The Project includes pavement rehabilitation and related drainage  improvements for the roadway segments that have not yet been recently improved or is planned for  improvement by the Amira Subdivision or Hendrix Subdivision.   SERVICES TO BE PROVIDED BY ENGINEER: KLJ shall provide the following Professional Engineering  Services:    PRELIMINARY DESIGN SERVICES  1. Project management throughout the course of work for preparation of preliminary design  documents including a monthly PMT meeting, and submittal of a weekly progress memo and  job to date budget form.  2. Project kick‐off meeting with city staff.  3. Work with city staff to develop critical success criteria for the project, obtain project  information and formalize the budget and schedule.   4. Review Hudson Boulevard Improvement Plans prepared for the Amira and Hendrix  subdivisions to coordinate project design transitions.   5. Site visit to review existing conditions, perform existing curb review for full or spot  replacement, and perform existing pavement review to define project limits.  6. Review existing roadway drainage and storm sewer systems, perform unconfined visual  observations, and make recommendations regarding additional storm sewer televising.  7. Survey: Coordinate Gopher State One Call utility locates and perform topographic survey of  existing conditions within project limits for the purposes of preparing design documents.   8. Right of way verification: Review title work and verify right‐of‐way for all properties impacted  by the proposed improvements.  9. Review Geotechnical Evaluation Report findings and recommendations obtained by the CITY.   10. Prepare preliminary design including recommendations on street widths, turn lanes, lane  configuration, pedestrian improvements, and stormwater management.   11. Identify right of way and easement needs to construct the proposed infrastructure.  12. Identify small utility conflicts related to the proposed preliminary design.      TASK ORDER No. 6 – HUDSON BOULEVARD IMPROVEMENTS ‐SEGMENT A                       Page 2 of 3    13. Prepare opinion of probable cost based on the preliminary design layout.  14. Identify permits required to complete the proposed work. The design shall incorporate  measures to meet compliance requirements for all permits necessary.    DRONE FOOTAGE SERVICES  1. Record aerial footage of the project site.    DELIVERABLES:  1. Exhibits displaying recommended infrastructure.   2. Opinion of Total Probable Project Costs.   3. Design Memorandum summarizing final design assumptions and performance criteria  incorporated into the project design.  4. Identification of easements needed for the construction of the project.  5. Drone video (.mp4).   CITIES RESPONSIBILITIES:  The City (or its consultants) will provide the following:   Coordination with the public and conduct public meetings.   Presentation(s) to the City Council.   Easement negotiations and acquisition, if needed.   Hire geotechnical firm for geotechnical investigation.  TIMES FOR RENDERING SERVICES:  CONSULTANT shall perform its services and provide deliverables in  accordance with the following schedule:  1. August 15, 2023 –Engineering Services Authorized.  2. All Task Order Services shall be substantially completed by September 22, 2023.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3880 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  rates provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once each month  and should be sent to the attention of the City Engineer.      TASK ORDER No. 6 – HUDSON BOULEVARD IMPROVEMENTS ‐SEGMENT A                       Page 3 of 3    Compensation to ENGINEER for Project Management, Survey and Preliminary Design Services for the  Project shall be on an hourly rate basis in a not to exceed amount of $43,800.  Compensation to ENGINEER for Drone Footage Services for the Project shall be on an hourly rate basis  in a not to exceed amount of $2,100.  Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.  ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.  ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements or  contracts,  written  or  verbal,  between  ENGINEER  and  City,  regarding  the  Project.  The  following  documents are attached for reference:    1. ENGINEER’s 2023 Rate Sheet.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is AUGUST 16, 2023.      KLJ    CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _________________________________   (Authorized Principal of the Firm)  City Administrator        STANDARD RATE $89 $100 $122 $75 $97 $110 $128 $160 $79 $97 $125 $161 $92 $132 $143 $171 $86 $104 $125 $82 $153 $207 $186 $282 $100 $189 $71 $97 $136 $204 Special Equipment/Software Subsistence (Per Diem) – Lodging Subsistence (Per Diem) – Meals Misc. Project Related Expenses Sub-Contracts KLJ 2023 RATE SHEET Time and Half for Overtime Included in Hourly Rate REIMBURSABLE EXPENSES (IF APPLICABLE) ATV, UTV, Snowmobile Included in Hourly Rate Per Project Basis Survey Equipment Included in Hourly Rate Actual Cost CAD and GIS Work Station Included in Hourly Rate $45/Day per Employee Postage and Routing Printing Cost Included in Hourly Rate Cost plus 15% Mileage Included in Hourly Rate Cost plus 15% Senior Project Manager $277 Project Assistant I Government Relations Specialist I $125 Project Assistant II Government Relations Specialist II $129 Contract Administrator $112 Public Engagement/Gov't Relations Mgr Senior Public Engagment Strategist Senior Designer $179 2 Person Survey Crew Associate Project Manager $186 Project Controls Specialist I Project Manager $225 Project Controls Specialist II Principal Planner $197 Professional Land Surveyor Associate Designer $110 Principal Land Surveyor Designer $128 1 Person Survey Crew Associate Planner $97 Crew Chief Planner $140 Senior Crew Chief Senior Planner $171 Land Surveyor in Training Engineer $172 ROW Professional Senior Engineer $229 Senior ROW Professional Principal Engineer $276 Survey Technician Engineer in Training I $110 Engineering Technician IV Engineer in Training II $125 Associate ROW Associate Engineer $135 ROW Agent Environmental Planner IV $189 Engineering Technician I Paleontologist $128 Engineering Technician II Paleontologist Technician $86 Engineering Technician III Environmental Planner I $93 GIS Analyst II Environmental Planner II $100 GIS Analyst III Environmental Planner III $143 GIS Analyst IV Archaeologist III $122 CAD Technician III Archaeologist IV $160 GIS Technician Environmental Technician $93 GIS Analyst I 2023 KLJ Hourly Rates – Municipal KLJ STAFF TYPE STANDARD RATE KLJ STAFF TYPE Archaeologist Technician $86 CAD Technician I Archaeologist II $104 CAD Technician II KLJ 2023 Rate Sheet     TASK ORDER No. 7 – 15TH STREET NORTH IMPROVEMENTS                       Page 1 of 3    TASK ORDER                 No. 7  CITY OF LAKE ELMO, MINNESOTA – KLJ  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Kadrmas,  Lee  &  Jackson,  Inc.  (KLJ)  (“ENGINEER”),  dated  February  20,  2018  (“AGREEMENT”),  the  ENGINEER agrees to provide Professional Engineering Support Services as follows:      15TH STREET NORTH IMPROVEMENTS    PROJECT OVERVIEW:  The CITY requires preliminary design engineering services for improvements  along 15th Street North, extending from Inwood Avenue North to the Oakdale City limits (“Project”).   The Project includes pavement rehabilitation and related drainage improvements for the roadway  segment.   SERVICES TO BE PROVIDED BY ENGINEER: KLJ shall provide the following Professional Engineering  Services:    PRELIMINARY DESIGN SERVICES  1. Project management throughout the course of work for preparation of preliminary design  documents including a monthly PMT meeting, and submittal of a weekly progress memo and  job to date budget form.  2. Project kick‐off meeting with city staff.  3. Work with city staff to develop critical success criteria for the project, obtain project  information and formalize the budget and schedule.    4. Site visit to review existing conditions and perform existing pavement conditions review.  5. Coordinate Gopher State One Call utility locates and perform topographic survey of existing  conditions within project limits for the purposes of preparing design documents.  6. Right of way verification: Review corridor right‐of‐way and easement information available on  GIS. Project work is not anticipated to extend beyond the existing roadway inslope. Right‐of‐ way verification and title work is not included in work scope.  7. Review Geotechnical Evaluation Report findings and recommendations obtained by the CITY.   8. Prepare preliminary design including recommendations on street widths, turn lanes, lane  configuration, and stormwater management.   9. Perform a feasibility review to construct pedestrian facilities along the north side of 15th  Street North through the project limits.  10. Identify right of way and easement needs to construct the proposed infrastructure. Any right  of way or easement needs will require title work verification to be performed in the final  design phase.  11. Identify small utility conflicts related to the proposed preliminary design.  12. Prepare opinion of probable cost based on the preliminary design layout.           TASK ORDER No. 7 – 15TH STREET NORTH IMPROVEMENTS                       Page 2 of 3    13. Identify permits required to complete the proposed work. The design shall incorporate  measures to meet compliance requirements for all permits necessary.    DELIVERABLES:  1. Exhibits displaying recommended infrastructure.   2. Opinion of Total Probable Project Costs.   3. Design Memorandum summarizing final design assumptions and performance criteria  incorporated into the project design.  4. Identification of easements needed for the construction of the project.   CITIES RESPONSIBILITIES:  The City (or its consultants) will provide the following:   Coordination with the public and conduct public meetings.   Presentation(s) to the City Council.   Easement negotiations and acquisition, if needed.   Hire geotechnical firm for geotechnical investigation.  TIMES FOR RENDERING SERVICES:  CONSULTANT shall perform its services and provide deliverables in  accordance with the following schedule:  1. August 15, 2023 –Engineering Services Authorized.  2. All Task Order Services shall be substantially completed by September 22, 2023.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3880 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  rates provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once each month  and should be sent to the attention of the City Engineer.  Compensation to ENGINEER for Project Management, Survey and Preliminary Design Services for the  Project shall be on an hourly rate basis in a not to exceed amount of $16,200.00.  Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.      TASK ORDER No. 7 – 15TH STREET NORTH IMPROVEMENTS                       Page 3 of 3    ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.  ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements or  contracts,  written  or  verbal,  between  ENGINEER  and  City,  regarding  the  Project.  The  following  documents are attached for reference:    1. ENGINEER’s 2023 Rate Sheet.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is AUGUST 16, 2023.      KLJ    CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _________________________________   (Authorized Principal of the Firm)  City Administrator        STANDARD RATE $89 $100 $122 $75 $97 $110 $128 $160 $79 $97 $125 $161 $92 $132 $143 $171 $86 $104 $125 $82 $153 $207 $186 $282 $100 $189 $71 $97 $136 $204 Special Equipment/Software Subsistence (Per Diem) – Lodging Subsistence (Per Diem) – Meals Misc. Project Related Expenses Sub-Contracts KLJ 2023 RATE SHEET Time and Half for Overtime Included in Hourly Rate REIMBURSABLE EXPENSES (IF APPLICABLE) ATV, UTV, Snowmobile Included in Hourly Rate Per Project Basis Survey Equipment Included in Hourly Rate Actual Cost CAD and GIS Work Station Included in Hourly Rate $45/Day per Employee Postage and Routing Printing Cost Included in Hourly Rate Cost plus 15% Mileage Included in Hourly Rate Cost plus 15% Senior Project Manager $277 Project Assistant I Government Relations Specialist I $125 Project Assistant II Government Relations Specialist II $129 Contract Administrator $112 Public Engagement/Gov't Relations Mgr Senior Public Engagment Strategist Senior Designer $179 2 Person Survey Crew Associate Project Manager $186 Project Controls Specialist I Project Manager $225 Project Controls Specialist II Principal Planner $197 Professional Land Surveyor Associate Designer $110 Principal Land Surveyor Designer $128 1 Person Survey Crew Associate Planner $97 Crew Chief Planner $140 Senior Crew Chief Senior Planner $171 Land Surveyor in Training Engineer $172 ROW Professional Senior Engineer $229 Senior ROW Professional Principal Engineer $276 Survey Technician Engineer in Training I $110 Engineering Technician IV Engineer in Training II $125 Associate ROW Associate Engineer $135 ROW Agent Environmental Planner IV $189 Engineering Technician I Paleontologist $128 Engineering Technician II Paleontologist Technician $86 Engineering Technician III Environmental Planner I $93 GIS Analyst II Environmental Planner II $100 GIS Analyst III Environmental Planner III $143 GIS Analyst IV Archaeologist III $122 CAD Technician III Archaeologist IV $160 GIS Technician Environmental Technician $93 GIS Analyst I 2023 KLJ Hourly Rates – Municipal KLJ STAFF TYPE STANDARD RATE KLJ STAFF TYPE Archaeologist Technician $86 CAD Technician I Archaeologist II $104 CAD Technician II KLJ 2023 Rate Sheet     TASK ORDER No. 8 – 30TH STREET NORTH GAP SEGMENT IMPROVEMENTS                       Page 1 of 3    TASK ORDER                 No. 8  CITY OF LAKE ELMO, MINNESOTA – KLJ  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Kadrmas,  Lee  &  Jackson,  Inc.  (KLJ)  (“ENGINEER”),  dated  February  20,  2018  (“AGREEMENT”),  the  ENGINEER agrees to provide Professional Engineering Support Services as follows:      30TH STREET NORTH GAP SEGEMENT IMPROVEMENTS    PROJECT OVERVIEW:  The CITY requires preliminary design engineering services for improvements  along 30th Street North to address an unimproved gap segment. The improvements extend from the  eastern edge of Lisbon Avenue North to approximately 475‐feet east of Village Parkway (“Project”).   The Project includes pavement rehabilitation, curb & gutter replacement, shared‐use path resurfacing  and related drainage improvements for the roadway segment, tying into the recent improvements at  the project termini.   SERVICES TO BE PROVIDED BY ENGINEER: KLJ shall provide the following Professional Engineering  Services:    SURVEY  1. Coordinate Gopher State One Call utility locates and perform topographic survey of existing  conditions within project limits for the purposes of preparing design documents.  PRELIMINARY DESIGN SERVICES  1. Project management throughout the course of work for preparation of preliminary design  documents including a monthly PMT meeting, and submittal of a weekly progress memo and  job to date budget form.  2. Project kick‐off meeting with city staff.  3. Work with city staff to develop critical success criteria for the project, obtain project  information and formalize the budget and schedule.    4. Site visit to review existing conditions, perform existing curb review for full or spot  replacement, and perform existing pavement conditions review to define project limits.  5. Right of way verification:  Review corridor right‐of‐way and easement information available on  GIS. Project work is not anticipated to extend beyond the existing roadway inslope. Right‐of‐ way verification and title work is not included in work scope.  6. Review Geotechnical Evaluation Report findings and recommendations obtained by the CITY.   7. Prepare preliminary design including recommendations on street widths, turn lanes, lane  configuration, pedestrian improvements, and stormwater management.       TASK ORDER No. 8 – 30TH STREET NORTH GAP SEGMENT IMPROVEMENTS                       Page 2 of 3    8. Identify right of way and easement needs to construct the proposed infrastructure. Any right  of way or easement needs will require title work verification to be performed in the final  design phase.  9. Identify small utility conflicts related to the proposed preliminary design.  10. Prepare opinion of probable cost based on the preliminary design layout.  11. Identify permits required to complete the proposed work. The design shall incorporate  measures to meet compliance requirements for all permits necessary.    DELIVERABLES:  1. Exhibits displaying recommended infrastructure.   2. Opinion of Total Probable Project Costs.   3. Design Memorandum summarizing final design assumptions and performance criteria  incorporated into the project design.  4. Identification of easements needed for the construction of the project.   CITIES RESPONSIBILITIES:  The City (or its consultants) will provide the following:   Coordination with the public and conduct public meetings.   Presentation(s) to the City Council.   Easement negotiations and acquisition, if needed.   Hire geotechnical firm for geotechnical investigation.  TIMES FOR RENDERING SERVICES:  CONSULTANT shall perform its services and provide deliverables in  accordance with the following schedule:  1. August 15, 2023 –Engineering Services Authorized.  2. All Task Order Services shall be substantially completed by September 22, 2023.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3880 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  rates provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once each month  and should be sent to the attention of the City Engineer.      TASK ORDER No. 8 – 30TH STREET NORTH GAP SEGMENT IMPROVEMENTS                       Page 3 of 3    Compensation to ENGINEER for Project Management, Survey and Preliminary Design Services for the  Project shall be on an hourly rate basis in a not to exceed amount of $18,200.00.  Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.  ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.  ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements or  contracts,  written  or  verbal,  between  ENGINEER  and  City,  regarding  the  Project.  The  following  documents are attached for reference:    1. ENGINEER’s 2023 Rate Sheet.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is AUGUST 16, 2023.      KLJ    CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _________________________________   (Authorized Principal of the Firm)  City Administrator        STANDARD RATE $89 $100 $122 $75 $97 $110 $128 $160 $79 $97 $125 $161 $92 $132 $143 $171 $86 $104 $125 $82 $153 $207 $186 $282 $100 $189 $71 $97 $136 $204 Special Equipment/Software Subsistence (Per Diem) – Lodging Subsistence (Per Diem) – Meals Misc. Project Related Expenses Sub-Contracts KLJ 2023 RATE SHEET Time and Half for Overtime Included in Hourly Rate REIMBURSABLE EXPENSES (IF APPLICABLE) ATV, UTV, Snowmobile Included in Hourly Rate Per Project Basis Survey Equipment Included in Hourly Rate Actual Cost CAD and GIS Work Station Included in Hourly Rate $45/Day per Employee Postage and Routing Printing Cost Included in Hourly Rate Cost plus 15% Mileage Included in Hourly Rate Cost plus 15% Senior Project Manager $277 Project Assistant I Government Relations Specialist I $125 Project Assistant II Government Relations Specialist II $129 Contract Administrator $112 Public Engagement/Gov't Relations Mgr Senior Public Engagment Strategist Senior Designer $179 2 Person Survey Crew Associate Project Manager $186 Project Controls Specialist I Project Manager $225 Project Controls Specialist II Principal Planner $197 Professional Land Surveyor Associate Designer $110 Principal Land Surveyor Designer $128 1 Person Survey Crew Associate Planner $97 Crew Chief Planner $140 Senior Crew Chief Senior Planner $171 Land Surveyor in Training Engineer $172 ROW Professional Senior Engineer $229 Senior ROW Professional Principal Engineer $276 Survey Technician Engineer in Training I $110 Engineering Technician IV Engineer in Training II $125 Associate ROW Associate Engineer $135 ROW Agent Environmental Planner IV $189 Engineering Technician I Paleontologist $128 Engineering Technician II Paleontologist Technician $86 Engineering Technician III Environmental Planner I $93 GIS Analyst II Environmental Planner II $100 GIS Analyst III Environmental Planner III $143 GIS Analyst IV Archaeologist III $122 CAD Technician III Archaeologist IV $160 GIS Technician Environmental Technician $93 GIS Analyst I 2023 KLJ Hourly Rates – Municipal KLJ STAFF TYPE STANDARD RATE KLJ STAFF TYPE Archaeologist Technician $86 CAD Technician I Archaeologist II $104 CAD Technician II KLJ 2023 Rate Sheet