HomeMy WebLinkAbout#03 - Stormwater Management MOU STAFF REPORT DATE: September 5, 2023 CONSENT AGENDA ITEM: Approve Stormwater Management Memorandum of Understanding with Valley Branch Watershed District, City of Lake Elmo and Washington County SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Krintina Handt, City Administrator Sarah Sonsalla, City Attorney Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve the Stormwater Management Memorandum of Understanding (MOU) with the Valley Branch Watershed District (VBWD), City of Lake Elmo and Washington County? BACKGROUND: In December, 2022 the City of Lake Elmo approved the Preliminary Plat/Plans for the Schiltgen Farms subdivision (now known as Northstar). In connection with this development, the developer is required to construct stormwater management detention ponds and implement a stormwater reuse irrigation system consistent with the approved Stormwater Management Plan dated February 15, 2023. Because the subdivision layout would not have reserved land that could be used in the future for the construction of stormwater management basins, the City Engineer required the development’s stormwater management systems to be oversized with the intention that this excess capacity would be reserved to address the stormwater management mitigation for the future County roadway improvements along Stillwater Boulevard (CSAH 14) and Lake Elmo Avenue (CSAH 17). Therefore, the Schiltgen Farms stormwater detention ponds and stormwater reuse irrigation system will be sized to provide the additional rate and volume control necessary to mitigate the future County Roadway improvements, including 8.5 acres of total impervious surface and 5.4 acres of new impervious surfaces with the runoff being directed to the proposed Schitgen Farms (Northstar) stormwater basins. PROPOSAL DETAILS/ANALYSIS: In order to document and memorialize the requirements, procedures, and processes for permitting the future County roadway improvements and to allow for the use and credit of the in-place excess stormwater management capacity provided by the Schiltgen Farms (Norhtstar) subdivision, the VBWD, City of Lake Elmo and Washington County staff have prepared a Memorandum of Understanding (MOU). The MOU outlines the following provisions and requirements: 1. Stormwater management capacity will be provided for up to 8.5 acres of total impervious surface and 5.4 acres of new impervious surfaces for the future County roadway improvements, if the stormwater runoff from the above surfaces are captured and discharged to the Schiltgen Farms (Northstar) subdivision stormwater reuse irrigation source ponds. 2. When evaluating the actual County roadway improvement plans, the peak discharge rates for the reconstructed roadways and intersection shall be compared to the “existing” and “proposed” peak discharge rate in Table 5.6 of the AE2S February 15, 2023 Stormwater Management Plan for the Schiltgen Farms Development (attached below). FISCAL IMPACT: Through the adoption of the Stormwater Management MOU, the future County Roadway improvements along Stillwater Boulevard (CSAH 14) and Lake Elmo Avenue (CSAH 17) will be able to be constructed without constructing additional stormwater management facilities. This will result in a significant cost savings to the City of Lake Elmo as the City will not be required to participate in the shared costs associated with land acquisition and construction of the County stormwater management facilities. RECOMMENDATION: Staff is recommending that the City Council adopt, as part of the consent agenda, a resolution approving the Memorandum of Understanding with the Valley Branch Watershed District, City of Lake Elmo and Washington County as outlined in the attached MOU. If removed from the consent agenda, the recommended motion for this action is as follows: “Move to approve Resolution No. 2023-082, approving a Stormwater Management Memorandum of Understanding with the Valley Branch Watershed District, City of Lake Elmo and Washington County to address permitting of the future County roadway improvements along Stillwater Boulevard (CSAH14) and Lake Elmo Avenue (CSAH17).” ATTACHMENTS: 1. Resolution Approving the Stormwater Management MOU with VBWD, City of Lake Elmo and Washington County. 2. Memorandum of Understanding (MOU). 3. Figure 20. Future County Road Expansion Impervious Surfaces. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2023-082 A RESOLUTION APPROVING A STORMWATER MANAGEMENT MEMORANDUM OF UNDERSTANDING WITH THE VALLEY BRANCH WATERSHED DISTRICT, CITY OF LAKE ELMO AND WASHINGTON COUNTY WHEREAS, in association with the Northstar subdivision (also known as the Schilten Farms development), the developer will be required to construct stormwater management detention ponds and implement a stormwater reuse irrigation system consistent with the approved Stormwater Management Plan dated February 15, 2023; and WHEREAS, in addition to oversizing the stormwater management detention ponds to provide for the Village Area Phase 2 Regional Stormwater Pond, the stormwater management systems will include excess capacity that is intended to be reserved to address the stormwater management mitigation for the future County roadway improvements along Stillwater Boulevard (CSAH 14) and Lake Elmo Avenue (CSAH 17); and WHEREAS, a Memorandum of Understanding (MOU) between the Valley Branch Watershed District, the City of Lake Elmo, and Washington County was prepared to establish the requirements, procedures, and processes for permitting the future County roadway improvements along Stillwater Boulevard (CSAH 14) and Lake Elmo Avenue (CSAH 17) to allow for the use and credit of the in-place excess capacity provided by the Northstar (Schiltgen Farms) subdivision stormwater management systems. NOW, THEREFORE, IT IS HEREBY RESOLVED, 1. The Memorandum of Understanding between the Valley Branch Watershed District, City of Lake Elmo and Washington County to regulate the use of the excess stormwater rate and volume control capacity of the Northstar (Schiltgen Farms) Stormwater Management system is approved. 2. The Mayor and City Administrator are hereby directed to execute the Memorandum of Understanding with the Valley Branch Watershed District and Washington County. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIFTH DAY OF SEPTEMBER, 2023. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk 1 MEMORANDUM OF UNDERSTANDING  Between the  VALLEY BRANCH WATERSHED DISTRICT  And the  CITY OF LAKE ELMO  And  WASHINGTON COUNTY    For the  PRESERVATION, PROTECTION, AND ENHANCEMENT OF WATER RESOURCES   THROUGH STORMWATER RUNOFF MANAGEMENT AT THE CSAH 14‐CSAH 17 INTERSECTION    ARTICLE I  INTRODUCTION, BACKGROUND, AND PURPOSE    1.1 This Memorandum of Understanding (MOU) documents activities and decisions of the  Valley  Branch  Watershed  District  (VBWD),  the  City  of  Lake  Elmo (Lake  Elmo),  and  Washington County (County) regarding stormwater management at the western County  State Aid Highway (CSAH) 14 (Stillwater Boulevard) and CSAH 17 (Lake Elmo Avenue)  intersection  (Intersection)  in  the  City  of  Lake  Elmo.  Through  the  procedures  and  processes set forth in this document, all parties wish that due consideration be given to  water and related land resources under the jurisdiction of all parties.    1.2 In association with the Northstar subdivision (also known as Schiltgen South, and also  known  as  Schiltgen  Farms  development),  the  developer  made  assumptions  for  reconstruction of the Intersection. One assumption included additional 5.4 acres of new  impervious surfaces. The Schiltgen South designers included stormwater management  of  this  new  impervious  surface  area  of  the  Intersection  in  the Schiltgen  South  development, including an assumed future roadway expansion with a total impervious  surface area of 8.5 acres and 5.4 acres of new impervious surface area, consistent with  Figure  20  attached  hereto.  Stormwater  management  included  controlling  the  peak  discharge rates for the 2‐, 10‐, and 100‐year 24‐hour design storms and the 10‐day 100‐ year snowmelt event. It also included capturing 1.1 inches times the 5.4 acres of new  impervious surface and using the captured runoff for irrigation on the Schiltgen South  development.    1.2.1 It is acknowledged that the intent of Figure 20 is to account for area in the vicinity of the  intersection of CSAH 14 and CSAH 17 that could be routed to the Schiltgen South ponds.  It is understood by the signing parties that this figure was developed in GIS and may not  precisely identify exact watershed limits, especially beyond where topographic survey  data is available. Rather, it is understood that minor differences in watershed areas or  existing pavement areas, if and when more precise data is available, does not nullify the  agreements documented in this MOU.     1.3 The  VBWD  approved  Permit  2023‐01  on  January  26,  2023,  for  the  Schiltgen  South  development.   2   1.4 Lake Elmo approved Preliminary Plans dated 03/30/2023, and Stormwater Management  Report dated 02/15/2023, for the Schiltgen South Development.    1.5 The  County  reviewed  the  roadway  plans  dated  01/22/2023  and  the Stormwater  Management Report dated 02/15/2023 for the Schiltgen Farms development. At the  time  of  construction  and  permitting,  if  the  Stormwater  Management  Report  has  changed, the City, VBWD, and the County agree to reconvene and amend this MOU as  necessary.    1.6  All parties recognize that the objectives of this MOU can best be realized through close  coordination and cooperation.    ARTICLE II  ONGOING PERMITTING OF INTERSECTION RECONSTRUCTION ACTIVITIES    2.1  Future reconstruction of the Intersection is expected. When reconstruction of the  Intersection  is  planned,  all  parties  shall  meet  to  review  stormwater  management  requirements.     2.2  Reconstructed Intersection activities shall conform to all regulations at the time of the  reconstruction.    2.3  The peak discharge rates for the reconstructed Intersection shall be compared to the  “existing” and “proposed” peak discharge rate in Table 5.6 of the AE2S January 9 and  February 15, 2023, Stormwater Management Plan for the Schiltgen Farms Development,  copied below. The listed peak discharge rates are for the outlet of the 36‐inch diameter  corrugated metal pipe outlet south of CSAH 14, at the northeast  corner  of  parcel  1302921230071.    2.4  The predicted peak discharge rates of the reconstructed Intersection must not exceed  the peak discharge rates of the “proposed” condition listed in paragraph 2.3.     2.5  The  VBWD  will  require  no  additional  stormwater  volume  control  measures  for  the  reconstructed Intersection if:   1) the net increase of impervious surfaces of the reconstructed Intersection are 5.4  acres or less, and   2) a total of 8.5 acres of impervious surface from the reconstructed Intersection drains  to  the  stormwater  ponds  on  the  Schiltgen  South  development  that are used as  reservoirs for the irrigation system.  3   If  the  criteria  outlined  in  Section  2.5(1)  and  (2)  are  not  met,  VBWD  will  require  additional stormwater volume control measures for the reconstructed Intersection.    2.6  The undersigning parties agree to work with one another to share functional copies of  data necessary for further analysis, if needed. This could include but is not limited to  copies of survey data, stormwater models, or development plans and as‐built drawings.    2.7  The undersigned parties agree that if the Schiltgen South stormwater management of  the new impervious surface area of the Intersection in the Schiltgen South development  does not function as intended, the City, VBWD, and the County agree to reconvene and  amend this MOU as necessary.    2.7  This Memorandum of Understanding is intended to outline the agreement of the parties  as it relates to preserving water resources in conjunction with the reconstruction of the  Intersection, and not as a waiver of any other rules or enforcement  mechanisms  available to the parties.     This Memorandum of Understanding shall be effective immediately upon signature of Lake  Elmo, VBWD, and the County and shall remain in effect until decided otherwise by any signing  party.    4 CITY OF LAKE ELMO      By______________________________________    Date: _________________________    Its Mayor      By______________________________________    Date: _________________________    Its City Clerk    APPROVED AS TO FORM:      _________________________________________    Date: _________________________  City Attorney, City of Lake Elmo      WASHINGTON COUNTY      By______________________________________    Date: _________________________    Its Board Chair      By______________________________________    Date: _________________________    Its County Administrator    APPROVED AS TO FORM:      _________________________________________    Date: _________________________  County Attorney, Washington County      VALLEY BRANCH WATERSHED DISTRICT      By____________________________________                 Date:________________________    Its President      APPROVED AS TO FORM:      _________________________________________    Date: _________________________  District Attorney, Valley Branch Watershed District