Loading...
HomeMy WebLinkAbout4a - Amira Shoreland Variance Review 4.3.23 REVISEDSTAFF REPORT PLANNING COMMISSION DATE: 4/10/2023 TO: Lake Elmo Planning Commission FROM: Nathan Fuerst, Consulting Planner Jenni Faulkner, Consulting Planner AGENDA ITEM: Variance to Shoreland Requirements – Amira (United Properties) BACKGROUND: On November 1, 2022 the City Council conditionally approved a series of requests by United Properties to rezone and reguide the unaddressed property northeast of the intersection of Hudson and Eagle Point Boulevards. Those City approvals allowed for the senior housing project proposed for the property to be expanded from 103 to 146 units. Those approvals consisted of the following: 1. A Comprehensive Plan Amendment from MU-BP (mixed use – business park) to High Density Residential (HDR). 2. A Zoning Map Amendment (rezoning) from MU-BP (mixed use – business park) to High Density Residential. 3. Amended Preliminary Plat and Planned Unit Development for revised site plans. Since their last approval, the Applicant’s team has worked with City Staff to satisfy the conditions of preliminary plat approval. The Applicant has not made any changes to this development other than those required as conditions of approval. Upon receipt of the Final Plat and PUD request from the applicant, the City routed plans to the MnDNR area hydrologist who provided a comment that a variance is required for flexibility from shoreland standards. The Applicant has complied with that recommendation and requested a variance to two shoreland standards, building height and impervious surface. ISSUE BEFORE THE PLANNING COMMISSION: The Planning Commission is asked to review and make a recommendation on Shoreland Variance request by United Properties. Planning Commission Meeting April 10, 2023 Page 2 GENERAL INFORMATION: Applicant: United Properties (Jennifer Mason), Minneapolis Minnesota Property Owner: United Land, LLC (United Properties) Location: Outlot C, Eagle Point Business Park Second Addition PID#: 3302921440009 Request(s): Shoreland Variance Site Area: 11.7 gross acres Land Use Map: High Density Residential (HDR) Current Zoning: High Density Residential (HDR), Shoreland Overlay Proposed Zoning: HDR/PUD, Shoreland Overlay Surrounding: BP – Business Park (PUD) History: The parcel is undeveloped and formerly rural, now zoned HDR. Deadline: Application Complete – 3/29/2023 60 Day Deadline – 5/22/23 Extension Letter – TBD 120 Day Deadline – 7/22/23 Regulations: Article 12 – Urban Residential Districts Article 18 – Planned Unit Development Regulations Article 19 – Shoreland Management Overlay District Title 103 – Subdivision Regulations City of Lake Elmo Design Standards PROPOSAL DETAILS/ANALYSIS: Plat Summary: Gross Site Area 11.7 acres Wetland Area 1.36 acres Units 146 Net Density 14.11 units/acre The calculation of net density in this case nets out the existing wetlands which will be conserved through a drainage and utility easement proposed on the property. This interpretation is consistent with Metropolitan Council policy. Final Plat and PUD Conformance The developer is required to receive Final Plat and PUD approvals from the City. Those requests are reviewed by the City Council for conformance with preliminary approvals. This variance request will be reviewed concurrent with Final Plat and PUD review. Planning Commission Meeting April 10, 2023 Page 3 MNDNR Comments The MNDNR Area Hydrologist has provided the following comments relative to this site and project: • The stream identified in the Civil Planset is a DNR Public Watercourse referred to as Unnamed to Wilmes Lake. Any work below the ordinary high water level (OHWL), defined as top of the bank of the stream, would require application for a DNR Public Waters Work Permit. Staff have confirmed the location of this site within the Shoreland Overlay area. The requirement identified above will be a condition of approval and is anticipated by the Applicant. • The planset correctly identifies the required 50-feet structure setback from the OHWL of this Public Watercourse as required by the City of Lake Elmo’s shoreland ordinance (Municipal Code Section 105.12.1260, Shoreland Management Overlay District). The planset also correctly identifies the Shore Impact Zone. This comment confirms that adequate detail is on file with the City for this project relative to the location of DNR protected watercourses. • The application materials do not identify the extent of the shoreland district on this property. The shoreland district is defined as the area within 300 feet of the stream. While the application meets the required structure setback requirements in the city’s shoreland ordinance, the application appears to deviate from other shoreland district requirements for structure height (35 feet), impervious surface lot coverage (30%), and shoreland PUD density requirements. Staff further clarified that no deviation is required for the density proposed on this project. Therefore, the only two deviations on this site are for the height of a building and impervious area. Relative to the deviations required to the shoreland overlay standards, discussed below, the DNR Area Hydrologist had the following comment: • We recommend the city process these deviations from the Shoreland Management Overlay District ordinance as variances. Shoreland Variances As detailed above, the DNR recommends shoreland variances instead of PUD Deviations. The DNR does not recognize PUD’s as appropriate tools for Cities to grant flexibility towards what are statutorily derived DNR Rules (Shoreland Ordinances). Instead, Cities must use the variance process to allow for flexibility as that is the only process recognized by State Statue to do so. The Amira project is located within the City’s Shoreland Management Overlay District. Specifically, about half of this property is within 300 feet of an unnamed tributary which flows from Armstrong Lake in Oakdale and Wilmes Lake in Woodbury. Areas surrounding tributaries are subject to the same shoreland requirements as properties abutting or near other public waters like lakes. Planning Commission Meeting April 10, 2023 Page 4 Variances Requested City Standard Request Impervious Surface (Lot Coverage) 30% 34% (variance of 4%) Max Structure Height 35 feet 62 feet (variance of 27 feet) It is noted by staff that this property is unique topographically, and thus any sort of development on it would face similar challenges to meeting the City’s established shoreland requirements. The site is bound on both sides, east and west, by wetland and shoreland areas. The development being proposed on this site allows the Developer to maximize compliance with City Code and preservation of the unique natural features on this property. Impervious Surface But for the wetland on the east side of this property, the Applicant would have been able to move the majority of the hardscape proposed outside of the shoreland area. This would have resulted in compliance with the standard for lot coverage. As proposed, the entire site sits at only 4% over the impervious surface maximum. In addition to preservation of the wetlands on site, this development will include stormwater ponds which will treat stormwater that falls on the site improvements, further reducing the impacts of the impervious surface proposed with this project on the property. Staff therefore find that a strict interpretation of the lot coverage limit in the 300’ buffer area would constitute a practical difficulty for the applicant and support a variance to this standard. Maximum Structure Height But for the wetland on the east side of this property, the Applicant would have been able to move the structure outside of the shoreland area. This would have resulted in compliance with the standard for building height. The unnamed tributary which travels roughly north to south on the west area of this site is the reason for the 35’ height limit. Conventionally, such height limitations are intended to protect the scenic quality of natural shoreland areas. In this case, a project is being proposed at densities acceptable under existing zoning which preserves additional open space and sensitive natural areas. Staff therefore find that a strict interpretation of the maximum height limit in the 300’ buffer area would constitute a practical difficulty for the applicant and support a variance to this standard. Staff’s proposed findings supporting approval are listed at the end of this report. Environmental Review. This project does not exceed the statutory threshold for formal environmental review through the Environmental Assessment Worksheet process. Architecture and Site Design. This project is consistent with preliminary approvals and found by staff to be consistent with the City’s adopted design requirements. A finalized design review will be presented to the City Council at the time of Final Plat and PUD review. Planning Commission Meeting April 10, 2023 Page 5 Landscaping and Tree Preservation. The City’s Consultant Landscape Architect provided a review memo dated February 24, 2023, which noted deficiencies in the Applicant’s submittal relating to information provided on tree preservation and landscaping proposed. The applicant continues to work on this for their final plat/PUD submittal. A review will be completed prior to review of the Final Plant and PUD at the City Council. Fire Chief Comments. The City’s Fire Chief provided a comment memo dated February 7, 2023 which details several requirements for plans to meet City standards for state fire code and local policy. Engineering Review. The Applicant has received and responded to previous comments of the City Engineer. The City Engineer is currently reviewing the final development plans for conformance with City Standards. A review will be completed prior to review of the Final Plant and PUD at the City Council. No comments have been received relative to the Shoreland Variance Request. Watershed Review. This property is located within the area regulated by the South Washington Watershed District. A permit was received by this developer for the project under the name Applewood Pointe, that permit is still valid for this project. The Developer will be required to follow their Stormwater Pollution Prevention Plan (SWPPP) throughout the construction process. Minnesota DNR Review. The MNDNR Area Hydrologist was provided with this plan for review and provided the comments detailed above in this report. There have been no further comments received as of the writing of this report. REVIEW AND ANALYSIS/DRAFT FINDINGS: An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake Elmo City Code Section 105.12.320 set forth by the MN Stat. 462.357 subd.6 before the City may grant an exception or modification to city code requirements. These criteria are listed below, along with comments from Staff about the applicability of these criteria to the applicant’s request. 1) Practical Difficulties. A variance to the provision of this chapter may be granted by the Board of Adjustment upon the application by the owner of the affected property where the strict enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such actions will be in keeping with the spirit and intent of this chapter. Definition of practical difficulties - “Practical difficulties” as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. FINDINGS: The strict interpretation of the City’s standards would preclude a use which has been approved by the City for this property, at a density consistent with the City’s adopted plans and standards. Practical difficulties arise from strict application of lot coverage and height standards due to circumstances unique to this lot and proposal. The Planning Commission Meeting April 10, 2023 Page 6 multifamily residential use proposed on this property is a more efficient use of the property than other permitted uses which would require more land area. 2) Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner. FINDINGS: The property is bound on two sides by sensitive natural areas which are proposed to be protected. The preservation of the wetland area on the west side of the property requires the building to be located within the area of the property that is considered to be Shoreland. These are unique circumstances to this property and the proposed variances would not circumvent the intent of either zoning bulk or shoreland standards 3) Character of Locality. The proposed variance will not alter the essential character of the locality in which the property in question is located. FINDINGS: If granted, the variances will not alter the character of the surrounding area. Site design proposed on this property is consistent with surrounding properties and the City’s adopted design standards. Any impacts created by building height will be mitigated through distance to other properties and landscaping installed with the development. Stormwater impacts are proposed to be managed through stormwater facilities proposed in the developable area of this site. 4) Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood. FINDINGS: If granted, the variances would not create environmental impacts such as traffic or noise beyond those created on surrounding properties or permitted by right in the area. The proposed location of the building and parking areas, in the center of the property, help to screen or mitigate any noticeable impacts to neighboring properties. PUBLIC COMMENT: A public hearing notice was sent to surrounding properties and a public hearing notice was published in the City Paper consistent with City and Statutory requirements. Staff have not received any public comments as of the writing of this report. FISCAL IMPACT: Prior to recording the Final Plat, the Applicant will pay the City fees for Utility Area and Impact Charges and Parkland Dedication. Building Permit fees will be collected at the time of permit issuance. The City is not providing financial assistance as part of this project. Planning Commission Meeting April 10, 2023 Page 7 CONDITONS OF APPROVAL: Staff recommends approval of the Shoreland Variance for PID 3302921440009 with the following conditions: 1. The Applicant shall first receive a DNR Public Waters Work Permit prior to any work below the ordinary high water level (OHWL), defined as top of the bank of the stream. 2. The Applicant shall not intensify the lot coverage on site or building height without amending the site plan, and if required by the City, amending the variance to these standards. RECOMMENDATION: Staff find that the two requested variances to Shoreland standards meet the criteria for granting a variance under Lake Elmo City Code Section 105.12.320 (f) and therefore recommend conditional approval: Shoreland Variance Should the Planning Commission agree with staff’s recommendations and findings, it should recommend the shoreland variances to the City Council for approval with the recommended findings and conditions of approval listed in the staff report. “Motion to recommend approval of the shoreland variance requests by United Properties for maximum lot coverage and building height on the subject property based on the findings of fact and recommended conditions of approval listed in the staff report.” ATTACHMENTS: 1. Application Narrative 2. Variance Figures 3. Final Site Plans 4. DNR Comments 5. Preliminary Plat/PUD - City Council Packet, November 1, 2022 (Link Only) March 17, 2023 Sophia Jensen City of Lake Elmo 3880 Laverne Avenue North Suite 100 Lake Elmo, MN 55042 Dear Ms. Jensen, Below please find the Written Statement for the Amira Lake Elmo Variance application: (a) See enclosed United Land Resolution (b) Lot C SubdivisionCd 00733 Subdivision Eagle Point Business Park 2nd, 33.029.21.44.0009, 11.9 11.68 Acres, 508,702 SF, Vacant Land, High Density Residential. (c) Municipal Code Section 105.12.1260, Shoreland Management Overlay District (d) The application deviates from the following shoreland district (1) Structure Height: our building height is 51’- 4.75” which exceeds the 35’ height maximum (2) Impervious Area: surface lot coverage is 34% compared to the 30% maximum (3) Density: it has been confirmed by the DNR that the application meet the PUD density requirements. (e) Our project has received preliminary plat and PUD approval. We were finalizing our application for final approval and just received thru the City, notice of the potential Shoreland issues on March 3, 2022. It is worth noting that we have pursuing this development with the same building footprint and height for the past 4 years since mid-2019. This is the first time we have become aware of these issues but will work with staff and the DNR toward and acceptable solution. In response to the DNR letter, a meeting was scheduled between city staff and our development team to review the issues, discuss possible solutions including flexibility and the need to pursue a variance application. (f) Strict enforcement would lead to a loss of residential units which would result in the project no longer being financially feasible. We have owned this site for 20+ years and during that time tried to develop it for office. The site has very challenging grades which makes much of the 11+ acres unbuildable. We approached the City 4 years ago and changed the zoning from office to residential. Given the site constraints, parking requirements and significant stormwater requirements, at least 4 stories or approximately 140—150 units are needed to be financially feasible. (g) The property is unique in that much of the acreage is not buildable. Referencing the site plan, the south end drops off significantly and is dominated by the need for a second access point. The east is constrained by a large wetland and the associated setbacks. The west falls off sharply toward Hudson Blvd creating a pinch point between the wetland and the sloping grades. We have been able to create a building footprint that works well given these constraints but requires density to offset the high site related costs including retaining walls, underground stormwater capacity, major stormwater retention areas on the south end of the site, and a secondary south access. The many years of marketing this site is a strong indicator of the challenges because the balance of the Eagle Point Business Park has been built out for years. This is the remaining parcel. (h) We don’t believe the granting of the variance will negatively impact the neighborhood for a couple of reasons. First, the site is relatively isolated. Hudson Blvd flanks the site on the west, and we will not be disturbing trees creating a buffer along this property line. To the south is a medical office building who has already granted a secondary access easement and beyond that is highway 94. To the east is a large wetland separating our site from office condos. There are significant trees buffering all sides of the wetland that will not be disturbed. Finally, to the east is Eagle Point Blvd with no direct neighbor off the Blvd. Secondly, this project has been thru numerous public meetings over a 4-year period. All with the same 4 story footprint. We have been in touch on numerous occasions with all our adjacent neighbors, and as indicated have signed an easement agreement with the medical office building to the south. We are on a well buffered site and our proposed use is well known within the business park. Best Regards, J. Mason Jennifer Mason Development Manager GENERATOREDGE OF WATEREDGE OF WATERCENTERLINE CREEKBRIDGEABUTTMENT(WATER ELEV. = 978.2 AS OF 7/11/19)DASHED PAVEMENT STRIPEAPPROXIMATELOCATIONPIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . SU B J E C T T O S C A L E U N C E R T A I N T Y . 0,0 NO PARKING NO PARKING SENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES MAIN ENTRANCE CENT E R LI N E O F EXIS TI N G C R E E K EDGE OF EXISTING WETLAND EDGE OF EXISTING WETLAND SSWD 50' WETLAND BUFFER PROPOSED STORMWATER MANAGEMENT AREA PROPOSED STORMWATER MANAGEMENT AREA 25' S H O R E L A N D I M P A C T ZONE SHOR E L A N D B UI L DI N G SETB A C K SWWD 25' WETLAND MANAGE 2 SETBACK SWWD 50' WETLAND MANAGE 2 SETBACK EXISTING WETLAND PROPOSED DRAINAGE & UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT ORDI N A R Y HI G H W A T E R LEVE L A S D E LI N E A T E D 1 1/ 2 0 1 9 PROPOSED 10' DRAINAGE & UTILITY EASEMENT 12+ 0 0 13+0 0 14+0 0 15+0 0 16+0 0 17+0 0 18+0 0 19+0 0 20+0021+0022+00INFILTRATION BASIN PROPOSED 30' DRAINAGE & UTILITY EASEMENT UNDERGROUND PARKING EXTENTS (SEE ARCH PLAN) 3 11 9 10 17 25 9 2 2 300' SHORELAND IMPACT ZONE DATE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. MN LIC. NO. JARED F. JONES, PE XX/XX/2022 46610 PROPOSED CURB AND GUTTER PROPERTY LINE PROPOSED FENCE SETBACK LINE RETAINING WALL PROPOSED CONCRETE SIDEWALK LEGEND www.lse-architects.com 100 Portland Ave South, Suite 100 Minneapolis, MN 55401 612.343.1010 office 612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\Exhibits\Shoreland Exhibit.dwg March 20, 2023 - 5:05pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES PID# 33.029.21.44.0009 NORTHPROPOSED STANDARD DUTY ASPHALT PROPOSED HEAVY DUTY ASPHALT PROPOSED MILL AND OVERLAY PROPOSED BITUMINOUS TRAIL PROPOSED LIGHTED BOLLARD; REFER TO MEP PLANS PROPOSED LIGHT POLE; REFER TO MEP PLANS EX-3BAW 03/20/2023 JFJ 19.1001.04 SHORELAND 300' BUFFER EXHIBIT PROPOSED ROCK MULCH PROPOSED STAMPED CONCRETE PROPOSED HEAVY DUTY CONCRETE PROPOSED STORMWATER MANAGEMENT AREA MAINTENANCE ACCESS PATH NOT WITHIN 100-YEAR HWL 12" CLASS V (MNDOT SPECIFICATION TABLE 3138-5) OVER TENSAR BX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT MAINTENANCE ACCESS PATH WITHIN 100-YEAR HWL 12" CLEAN CRUSHED ROCK (34" - 1 14" GRADATION) OVER TENSAR BX1200 BIAXIAL GRID, OR APPROVED EQUIVALENT AREA WITHIN 300' SHORELAND BUFFER SUMMARY AMIRA LAKE ELMO TOTAL PROPERTY AREA WITHIN 300' SHORELAND BUFFER AREA 237,697 SF TOTAL OPEN SPACE AREA WITHIN 300' SHORELAND BUFFER AREA 135,068 SF (56.82%) TOTAL IMPERVOIUS AREA WITHIN 300' SHORELAND BUFFER AREA 102,629 SF (43.18%) PROPOSED STANDARD DUTY ASPHALT - PER CITY STANDARDS 300' SHORELAND IMPACT ZONE TOTAL PROPERTY SUMMARY AMIRA LAKE ELMO TOTAL PROPERTY AREA 505,902 SF TOTAL OPEN SPACE AREA 333,666 SF (66.0%) TOTAL IMPERVOIUS AREA 172,236 SF (34.0%) K:\TWC_LDEV\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\Library\Aerials\NAD 83 - MN State\EPSG26851_Date20210913_Lat44.951330_Lon-92.927384_Mpp0.149.jpgSI G N A G E EX I S T I N G B U I L D I N GGENERATOREDGE OF WATEREDGE O F WATERCENTERLINE CREEKBRIDGEABUTTMENTINV.=977.74LIFTSTATION(WATER ELEV. = 978.2 AS OF 7/11/19)958.76INVCMP84LIFTSTATIONINV.=964.47(NE)INV.=963.91(NW)INV.=956.43(NW&SE)APPROXIMATELOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATIONAPPROXIMATE LOCATION PIN No. 33-029-21-44-0007 Owner: HSRE-MN HIGH POINTE LLC Address: 8650 HUDSON BLVD N AP P R O X I M A T E L O C A T I O N O F F L O O D L I N E PE R F E M A F L O O D I N S U R A N C E R A T E M A P . S U B J E C T T O S C A L E U N C E R T A I N T Y . NO PARKING NOPARKING SENIOR HOUSING BUILDING LEVEL 1: 995.06 LEVEL B: VARIES 990 992 992994994986986994 994990 988 992994996990988988988 992 994994 9 9 0 992990986988 992 986 980 972 974976978982984 986 986 988988 9 8 6 980 984986 986 984982 986 9 8 0 98098 2 9 8 2 9 8 4 9 8 4980980978982982984984984980974976978982984 970 970 972 972974 976 978 966968 970 982 986 984 984 986982 980 972 972 970 970970 972992 986 992 988 984990 986 988 986 988 984990988 980976978 974 970 970 970 980 972 974 976 978 970970968 970 964 966 968 970 970 970 968 972974 972 972 984 986 988 990 1000 992994996 998 970 972 982 984 986 99 0 992980 982 982 990990986 988990992994970 970 970 970 962 964 966968 968972972 974 974976978 980982 984 986 98 8 968 968970 970 968 972 972 13+0 0 14+0 0 15+0 0 16+0 0 17+0 0 18+0 0 19+0 0 20+0021+0022+009 9 0 9 8 8984982980 978 976 974 972 970 991.24 HT:_____ 991.65 HT:_____ 992.79 HT:_____ 993.87 HT:_____ 995.06 HT:_____ 984.00 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 995.06 HT:_____ 989.52 HT:_____ 985.33 HT:_____ 987.00 HT:_____ 988.67 HT:_____ 988.69 HT:_____ 988.35 HT:_____ 987.99 HT:_____ 987.44 HT:_____ 987.19 HT:_____ 984.87 HT:_____ 985.33 HT:_____ 985.21 HT:_____ 985.93 HT:_____ 986.95 HT:_____ 986.71 HT:_____ 986.49 HT:_____ 986.00 HT:_____ 988.68 HT:_____ 994.56 HT:_____ 990.50 HT:_____ 994.50 HT:_____ 989.96 HT:_____ 0.0%PROPOSED DRAINAGE DIRECTION PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION AND BUILDING HEIGHT100.00 LEGEND 925 HT:____ www.lse-architects.com 100 Portland Ave South, Suite 100 Minneapolis, MN 55401 612.343.1010 office 612.338.2280 fax L S E A R C H I T E C T S , I N C . Project Drawn by Checked by Date Drawing Number Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.C:\Users\bryce.willaby\Desktop\LSE Architects\Applewood Pointe of Lake Elmo\3 Design\CAD\Exhibits\C5-GRADING PLAN.dwg March 29, 2023 - 1:24pm2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM PRELIMINARY - NOT FOR CONSTRUCTIONUNITED PROPERTIES ..\Library\Logos\UNP002_AmiraLogo_210422_Black.jpg ..\Library\Logos\LOGO_UnitedProperties.png PID# 33.029.21.44.0009NORTH EX-1BAW 12/05/2022 JFJ 19.1001.04 GRADING EXHIBIT www.lse-architects.com 100 Portland Ave South, Suite 100 Minneapolis, MN 55401 612.343.1010 office 612.338.2280 fax L S E A R C H I T E C T S , I N C . Key Plan No.Date Revision Description AMIRA LAKE ELMO HUDSON BOULEVARD LAKE ELMO, MINNESOTA PLANNING 2020 KIMLEY-HORN AND ASSOCIATES, INC. 767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 PHONE: 651-645-4197 WWW.KIMLEY-HORN.COM UNITED PROPERTIES PID# 33.029.21.44.0009 From:Sophia Jensen To:Jenni Faulkner Subject:Fwd: Lake Elmo Land Use Review - February 3rd Batch Date:Friday, March 3, 2023 1:22:40 PM Attachments:image003.png image004.png image005.png image006.png Jenni - here is a late comment from the DNR for Amira. Sophia Jensen,City Planner City of Lake Elmo 3800 Laverne Ave NLake Elmo, MN 55042 651-747-3911 From: Scollan, Daniel (DNR) <daniel.scollan@state.mn.us> Sent: Friday, March 3, 2023 1:08:23 PM To: Sophia Jensen <SJensen@lakeelmo.org> Subject: RE: Lake Elmo Land Use Review - February 3rd Batch Caution: This email originated outside our organization; please use caution. Hello Sophia, Please note the following comments regarding Final Plat and PUD – Amira at PID 33.29.21.44.0009. I apologize for not sending feedback by the March 1. The stream identified in the Civil Planset is a DNR Public Watercourse referred to as Unnamed to Wilmes Lake. Any work below the ordinary high water level (OHWL), defined as top of the bank of the stream, would require application for a DNR Public Waters Work Permit. The planset correctly identifies the required 50-feet structure setback from the OHWL of this Public Watercourse as required by the City of Lake Elmo’s shoreland ordinance (Municipal Code Section 105.12.1260, Shoreland Management Overlay District). The planset also correctly identifies the Shore Impact Zone. The application materials do not identify the extent of the shoreland district on this property. The shoreland district is defined as the area within 300 feet of the stream. While the application meets the required structure setback requirements in the city’s shoreland ordinance, the application appears to deviate from other shoreland district requirements for structure height (35 feet), impervious surface lot coverage (30%), and shoreland PUD density requirements. This message may be from an external email source. Do not select links or open attachments unless verified. Report all suspicious emails to Minnesota IT Services Security Operations Center. Best Regards, Dan Scollan East Metro Area Hydrologist – Ramsey and Washington Counties Division of Ecological and Water Resources Minnesota Department of Natural Resources 1200 Warner Road St. Paul, MN 55106 Phone: 651-259-5732 Fax: 651-772-7977 Email: daniel.scollan@state.mn.us mndnr.gov From: Sophia Jensen <SJensen@lakeelmo.org> Sent: Wednesday, February 15, 2023 8:50 AM To: Jack Griffin <Jack.Griffin@focusengineeringinc.com>; Chad Isakson <Chad.Isakson@focusengineeringinc.com>; Jenni Faulkner <jenni.faulkner@bolton-menk.com>; Sarah Evenson <sarah@hkgi.com>; MN_DOT_MetroDevReviews <metrodevreviews.dot@state.mn.us>; John.loomis@woodburymn.gov; 'John P. Hanson' <JHanson@barr.com>; Scollan, Daniel (DNR) <daniel.scollan@state.mn.us>; Dustin Kalis <DKalis@lakeelmo.org>; planning@ci.woodbury.mn.us Subject: Lake Elmo Land Use Review - February 3rd Batch You are being asked to review the following applications as a stakeholder in the area of a pending application. Please see links below. Final Plat and PUD - Amira: PID 33.29.21.44.0009 United Properties has submitted a final plat and PUD application for a 4-story 146 unit for rent senior housing complex. Zoning: HighDensity Residential and Shoreland Overly District. Reviewers: MN DNR, South Washington Watershed District, City Engineer, Fire Dept, Landscape Architect. Please have feedback to Sophia Jensen by Wednesday March 1st 2023. https://drive.google.com/drive/folders/1M- VeRju0r0y4d9ChvtlIG35WcSHtPuMP?usp=share_link Preliminary Plat and PUD – Ebertz Property: PID 34.029.21.44.0004 and PID34.029.21.44.0006. Landform on behalf of Drake Motor Partners has submitted a preliminary plat and PUD application for 4 lot subdivision with electric auto dealership and services, a fastfood building, and 2 undecided lots. Zoning: Commercial. Reviewers: City of Woodbury, Valley Branch Watershed District, City Engineer, Fire Dept., Landscape Architect, MN DOT. Please have feedback to Sophia Jensen by Wednesday March 1st 2023 . https://drive.google.com/drive/folders/1SdWx0n3-YUZAx1EDss8txxDtWVQvY6bt?usp=share_link Sketch Plan – At Home Apartments 39th St and Wildflower Dr - PID 13.029.21.21.0007.At Home Apartments has submitted a revised sketch plan for 30 twin and townhomes at the North East corner of 39th St and Wildflower Dr. Zoning: Village Mixed Use. Reviewers:Valley Branch Watershed District, City Engineer, Fire Dept, Landscape Architect. Please have feedback to Sophia Jensen by Wednesday March 1st 2023 .https://drive.google.com/drive/folders/1CuCEmziNKQ1DmsFcmxrSpDVj7uXW_DIg? usp=share_link Sophia Jensen City Planner City of Lake Elmo 3800 Laverne Ave NLake Elmo, MN 55042 651-747-3911