HomeMy WebLinkAbout2024-024CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO.2024-024
RESOL UTIONAPPROVING THE LAKE ELMO TOWNHOME 8 PRELIMINAR Y PLA TAND
PLANNED UNIT DEVELOPMENT (PUD) PLANS
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, At Home Apartments, LLC. (the "Applicant") submitted an application to
the City of Lake Elmo for a preliminary plat and planned unit development (PUD) called Lake
Elmo Townhomes 8, for the property legally described on the attached Exhibit A (the
"Property"), a copy of the preliminary plat and PUD is on file in the City of Lake Elmo
Community Development Department; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on December
11, 2023 to review and consider the preliminary plat and PUD application; and
WHEREAS, the Lake Elmo Planning Commission tabled the item for further
consideration to allow resolution to issues with screening and easement encroachments; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and 4-1
recommendation of approval of the preliminary plat and PUD to the City Council as part of a
staff report dated January 22, 2024; and
WHEREAS, the City Council considered the preliminary plat at its February 20, 2024,
meeting and hereby makes the following findings of fact:
l . That the preliminary plat and PUD plan is consistent with the intent of the 2040 Lake
Elmo Comprehensive Plan and the 2040 Land Use Map for this area.
2. That the preliminary plat and PUD plan complies with the general intent of the Village
Medium Density Residential and Commercial zoning districts.
3. That the preliminary plat and PUD plan generally complies with the Lake Elmo Design
Guidelines and Standards Manual.
4. That the preliminary PUD Plan meets the minimum requirements for a PUD identified in
Section 105.12.1150 and items b, c, e, and g from the Identified Objectives for PUDs in
Section 105.12.1130 That the preliminary plat generally complies with the City's
subdivision regulations.
5. That the preliminary plat generally complies with the City's design standards.
6. That the preliminary plat generally complies with the City's Zoning Code.
LA515-137-923112.v2
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby
approve the Lake Elmo Townhomes 8 preliminary plat and PUD subject to the following
conditions:
1. Prior to the City finding any application for a final plat and final PUD complete, the
applicant shall fully address all comments in the following review memos to the
satisfaction of the City:
a. City Engineer's memo dated November 30, 2023.
b. City Landscape Architect's memo dated January 10, 2024.
c. City Fire Chief s memo dated November 22, 2023.
2. That prior to the City finding any application for final plat and final PUD complete, the
applicant shall demonstrate that the plans reflect compliance with Valley Branch
Watershed (VBWD) review requirements and that the applicant provide the City evidence
that all conditions attached to a VBWD permit will be met before the starting any grading
activity on the site.
3. That the applicant shall obtain all necessary permits including but not limited to all
applicable City permits (building, grading, sign, etc.), NPDES/SWPPP permits and
Valley Branch Watershed District approval before starting any grading or construction
activities.
4. The final plat shall include all necessary and additional public right-of-way and
easements.
5. The applicant/developer is responsible, at their own expense, for installing all required
right of way improvements.
6. The applicant is required to construct a right turn lane along Wildflower Drive at the
intersection of 39t" Street for which the City will contribute up to half the cost of
improvements due to conditions specific to the site and increased density of the village
planning area.
7. A storm water maintenance and easement agreement in a form acceptable to the City
shall be executed and recorded with the final plat.
8. The applicant/developer shall provide the City a fee in lieu of park land dedication as
required by Section 103.00.150 to be paid prior to recording of the final plat.
9. If landscaping is proposed in the City's Right of Way, a landscape and irrigation license
agreement in a form acceptable to the City shall be executed and recorded with the final
plat.
10. A sign permit will be required for any signage installed on site, and signage must comply
with applicable city standards.
11. The Applicant shall submit information demonstrating compliance with a Plat Opinion by
the City Attorney, to the satisfaction of the City, before execution or recording of the
Final Plat.
12. The Applicant pay the City's AUAR Fee consistent with all development in the Village
Area.
13. If necessary, the applicant shall provide the City with a copy of written permission for
any off -site grading work and storm sewer discharges to adjacent properties before
starting any site work, grading and as part of any final plat or final PUD application.
14. Before the execution and recording of a final plat for the development, the developer or
applicant shall enter into a Developer's Agreement or a Site Work Agreement with the
City. Such an Agreement must be approved by the City Attorney and by the City
2
LA515-13'7-923112.v2
Council. The Agreement shall delineate who is responsible for the design, construction
and payment for the required improvements with financial guarantees therefore. The
Agreement shall outline any approved phasing plan,
15. The applicant or developer shall enter into a separate grading agreement with the City
before starting any grading activity in advance of final plat/ PUD approval. The City
Engineer shall review any grading plan that is submitted in advance of a final plat or final
PUD, and said plan shall document the extent of any proposed grading on the site.
16. That the Applicant niust submit the final plat within 180 days after City Council approval
of the preliminary plat or approval of the preliminary plat shall be considered void unless
a request for a time extension is submitted in writing and approved by the City Council.
Passed and duly adopted this 20 day of February, 2024, by the City Council of the City of Lake
Elmo, Minnesota.
Mayor Charles Cadenhead
ieJ nson C* -y Clerk
lerk
I
3
LA5[5-137-923112.v2
Resolution 2024- 02A
Exhibit A
Legal Description of Subject Property
Lot 2, Block 1, WILDFLOWER AND 39TH, according to the recorded plat thereof,
Washington County, Minnesota.
That part of Lot 1, Block 3, Brookman 3rd Addition, according to the plat on file and of
record in the office of the County Recorder, Washington County, Minnesota, lying Westerly
of the following described line: Commencing at the Northeast corner of said Lot 1 then
South 89 degrees 21 minutes 23 seconds West, assumed bearing, along the North line of
said Lot 1, 74.18 feet to the point of beginning of said line; thence South 07 degrees 03
minutes 15 seconds East, 319.79 feet to the South line of said Lot 1 and said line there
terminating. Washington County, Minnesota.
4
LA515-137-923112.v2