Loading...
HomeMy WebLinkAbout#15 - Pebble Park PlaygroundSTAFF REPORT DATE: 04/02/2024 Motion TO: CITY COUNCIL AGENDA ITEM: Pebble Park Playground Replacement FROM: Adam Swanepoel, Assistant Public Works Director SUBMITTED BY: Marty Powers, Public Works Director BACKGROUND: Pebble Park play set was originally installed in 1992 and has exceeded its lifespan. At the December 2023 Parks Commission meeting, commissioners elected to move forward with planning and design of a new play set at Pebble Park. Recommendations for Pebble Park were to design a park to serve kids ages 5-12 years of age, incorporate a climbing structure with slides, add additional benches or seating and incorporate a concrete boarder around the play area. Three options were presented to the Parks Commission on 3/18/2024 with all commissioners voting in favor of option 3. Commissioners recommended option three be consistent with the other options by providing additional seating as part of the construction. ISSUE BEFORE CITY COUNCIL: Would City Council like to approve one of the playset options to be constructed at Pebble Park? PROPOSAL DETAILS/ANALYSIS: Flagship Recreation has provided three options for a playset which incorporate the recommendations made by the Park Commission. Option 1: Offers a multiple tower structure with three slides and climbing cargo net. This area is approximately 30x20 and will include seating areas. Total equipment cost for this project is $98,763 with a total install price of $119,949. Option 2: Offers a multiple tower structure with two slides and a separate Eclipse climbing net structure. This are is approximately 45x40, includes seating areas and a Curva Spinner as an additional play option. Total equipment cost for this project is $97,427 with a total install price of $119,945. Option 3: A new Volo Product offered by Flagship Recreation. This structure offers two slides, interior cargo net area, an interactive route map and 4 seat seesaw. This area is approximately 40x40 and will include seating areas. Total equipment cost for this project is $92,672 with a total install price of $119,194. Flagship updated the concept of Option 3 since being presented to the Parks Commission to include seating. The updated price of the project is $121,000 FISCAL IMPACT: Fiscal impacts are outlined in the 2024-2033 Capital Improvement Plan (CIP). CIP items are funded though the Parks Dedication Fund while Operations and Maintenance items are funded through the Public Works Budget. The current CIP has $125,000 toward the playset. RECOMMENDATION: Staff recommends the following motion: “Move to purchase and install a new playground set at Pebble Park and to recommend Option “___” not to exceed $121,000. ATTACHMENT: • Flagship Recreation Playground Options PE B B L E P A R K PL A Y G R O U N D OP T I O N 1 81 6 0 L A K E J A N E T R A I L N SA I N T P A U L , M N SALES REPRESENTATIVE: EMILY MALONEY DESIGNED BY: AO 1/29/24 3/8" = 1'-0" FLAGSHIP RECREATION 11123 UPPER 33RD ST N LAKE ELMO, MN 55082 763-550-7860 FLAGSHIPPLAY.COM @FLAGSHIPPLAY THIS PLAY AREA & PLAY EQUIPMENT IS DESIGNED FOR AGE RANGES AS NOTED ON PLAN. SHEET LS101 C: \ U s e r s \ A l e x a n d r a O l s o n \ F l a g s h i p R e c r e a t i o n \ F l a g s h i p R e c r e a t i o n - D o c u m e n t s \ 2 0 2 4 P l a n n i n g \ E m i l y \ L a k e E l m o - P e b b l e P a r k \ 0 1 . 2 9 . 2 0 2 4 U p d a t e d D e s i g n s \ P e b b l e O p t 1\ L E _ P e b b l e O p t 1 0 1 2 9 2 4 . d w g CONTAINER DETAILS TOTAL CONTAINER AREA 2137 SF ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER TOTAL EWF AREA 2137 SF TOTAL PERIMETER 187 LF EDGING TYPE 6"X12" CONCRETE CURB FINISH GRADE TOP OF CURB **SITE PREPARATION REQUIREMENTS: ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER ·NO PRE-INSTALLED DRAIN TILE OUTSIDE OF 4 FEET OF PERIMETER ·DRAIN TILE STUB TO BE PROVIDED IF DRAIN TILE IS REQUIRED ·NO DRAINAGE AGGREGATE PRE-INSTALLED ·NO FABRIC PRE-INSTALLED ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB DIMENSION Pebble Park Opt 1 8160 Lake Jane Trail N St Paul, MN 55128 2024 Qty Item No.Description Price Ext Price 1 193173C TightRope Bridge w/o Deck Connections $2,173 $2,173.00 1 185583A Ring Tangle Climber Ground Level $2,173 $2,173.00 1 122913B Snake Climber 72"Dk DB $2,504 $2,504.00 1 148434B Loop Pole Perm Handholds 72"Dk DB $1,596 $1,596.00 1 157427B Pod Climber w/Handloop 40"Dk DB Right Handhold $1,887 $1,887.00 1 176079A Sunbeam Climber $2,321 $2,321.00 1 176080A Logo Climber 56"Dk DB $1,923 $1,923.00 1 202594A Portal Climber w/Permalene Handhold (Left) 8" Deck Diff attached to 72"Dk DB Only $7,247 $7,247.00 2 111228A Square Tenderdeck $1,341 $2,682.00 1 111231A Triangular Tenderdeck $1,035 $1,035.00 2 121948A Kick Plate 8"Rise $148 $296.00 1 121949A Tri-Deck Kick Plate 8"Rise $219 $219.00 2 122197A 90* Triangular Tenderdeck $1,127 $2,254.00 1 152911B Curved Transfer Module Left 40"Dk DB $3,606 $3,606.00 1 116244B Pipe Barrier w/Wheel Above Deck $1,071 $1,071.00 1 193168A Netplex 7-Post No Roof Steel Posts and DB Only $8,665 $8,665.00 EQUIPMENT INFORMATION & PRICING State Contract #218091 PROJECT INFORMATION Project name Address City, State ZIP Contract Year 1 271911A Disc Net Climber w/Alpine Slide 7-Post DB Only $35,766 $35,766.00 1 111357A Chinning Bar Alum DB $704 $704.00 4 166809A E-Pod Seat $403 $1,612.00 1 111404N 140"Steel Post DB $403 $403.00 1 111404M 148"Steel Post DB $464 $464.00 2 111404Z 182"Steel Post DB 44" Bury $607 $1,214.00 4 111404H 92"Alum Post DB $362 $1,448.00 1 111404E 116"Alum Post DB $403 $403.00 1 111404D 124"Alum Post DB $464 $464.00 2 111404C 132"Alum Post DB $485 $970.00 2 111404B 140"Alum Post DB $490 $980.00 2 111404A 148"Alum Post DB $515 $1,030.00 1 130390A Double Swoosh Slide 64"Dk DB $3,080 $3,080.00 1 222708A WhooshWinder Slide 72"Dk DB $6,599 $6,599.00 1 120710A Pod Climber 8" DB $362 $362.00 1 182503C Welcome Sign (LSI Provided) Ages 5-12 years Direct Bury $0 $0.00 2 141683A 72" TenderTuff Bench w/Back No Armrests DB $806 $1,612.00 $98,763.00Total Equipment Cost at State Contract Pricing Page 2 of 3 2/1/2024 Preliminary Budget Possible Additions Possible Reductions QTY Notes Play Equipment Pebble Park Opt 1,EM706 98,763.00 2024 List Price of Equipment State Contract #218091 (7,901.04)8%(6% discount under $80,000 & 8% discount $80,000 & above) Sales Tax - if applicable 0.00 ST3 Certificate of Exemption must be provided by owner. Delivery of Play equipment 650.00 Estimated / Final quote will be provided upon final design. Mobilization 750.00 Dumpster(s) - 30 Yard 750.00 Disposal of packaging material Site work Demo of Existing Equipment & Excavation (existing container) 0.00 0 BY OWNER - OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Hauling of Excavated Material (CY)0.00 0 NOT INCLUDED Disposal of Excavated Material (CY)0.00 0 NOT INCLUDED Border Options Concrete Border Straight (LF)8,474.94 187 Standard 6" W x 12" D. Equipment Installation (Labor & Concrete for Footings)14,277.87 15.71%Full professional installation by Landscape Structures Certified Installers. Standard labor rate unless otherwise noted Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.00 0 NOT INCLUDED Subgrade Prep & Engineered Wood Fiber Surfacing (EWF) Drainage Aggregate - Pea Rock or Concrete Sand (Tons)0.00 0 NOT INCLUDED Drain Tile (LF)0.00 0 NOT INCLUDED GeoTextile Fabric (Sq. Ft.)0.00 0 NOT INCLUDED EWF - Playground Safety Surfacing (CY)4,184.89 93 IPEMA Certified Playground Surfacing - Meets the standards of ASTM, ADA & CPSC Rubber Wear Mats 0.00 0 NOT INCLUDED Site Restoration (Sq.Ft.)0.00 0 NOT INCLUDED Budget Total Total Additions Total Reductions Total w/ Additions & Reductions 119,949.66 0.00 0.00 119,949.66 PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, Minnesota 55042 Adam Swanepoel, Assistant Public Works Director PE B B L E P A R K PL A Y G R O U N D OP T I O N 2 81 6 0 L A K E J A N E T R A I L N SA I N T P A U L , M N SALES REPRESENTATIVE: EMILY MALONEY DESIGNED BY: AO 1/30/24 1/4" = 1'-0" FLAGSHIP RECREATION 11123 UPPER 33RD ST N LAKE ELMO, MN 55082 763-550-7860 FLAGSHIPPLAY.COM @FLAGSHIPPLAY THIS PLAY AREA & PLAY EQUIPMENT IS DESIGNED FOR AGE RANGES AS NOTED ON PLAN. SHEET LS101 C: \ U s e r s \ A l e x a n d r a O l s o n \ F l a g s h i p R e c r e a t i o n \ F l a g s h i p R e c r e a t i o n - D o c u m e n t s \ 2 0 2 4 P l a n n i n g \ E m i l y \ L a k e E l m o - P e b b l e P a r k \ 0 1 . 2 9 . 2 0 2 4 U p d a t e d D e s i g n s \ P e b b l e O p t 2\ L E _ P e b b l e O p t 2 0 1 2 9 2 4 . d w g CONTAINER DETAILS TOTAL CONTAINER AREA 2523 SF ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER TOTAL EWF AREA 2523 SF TOTAL PERIMETER 206 LF EDGING TYPE 6"X12" CONCRETE CURB FINISH GRADE TOP OF CURB **SITE PREPARATION REQUIREMENTS: ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER ·NO PRE-INSTALLED DRAIN TILE OUTSIDE OF 4 FEET OF PERIMETER ·DRAIN TILE STUB TO BE PROVIDED IF DRAIN TILE IS REQUIRED ·NO DRAINAGE AGGREGATE PRE-INSTALLED ·NO FABRIC PRE-INSTALLED ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB DIMENSION Pebble Park Opt 2 8160 Lake Jane Trail N St Paul, MN 55128 2024 Qty Item No.Description Price Ext Price 1 116249B Vertical Ladder 48"Dk DB $1,102 $1,102.00 1 122533D Spiral Climber 72"Dk Left Handhold $2,678 $2,678.00 2 152907B Deck Link w/Barriers Steel end panels 2 Steps $2,678 $5,356.00 1 153350A Chain Ladder 40"Dk DB $1,209 $1,209.00 1 201887B JigJag Climber w/Permalene Handhold (Left) 72"Dk $2,336 $2,336.00 1 223170C Labyrinth Climber w/Permalene Handholds Equal Decks Attached to 72"Dk DB $15,550 $15,550.00 1 229832A Dot-to-Dot Climber $2,963 $2,963.00 2 111228A Square Tenderdeck $1,341 $2,682.00 3 111231A Triangular Tenderdeck $1,035 $3,105.00 1 121948A Kick Plate 8"Rise $148 $148.00 1 152911B Curved Transfer Module Right 40"Dk DB $3,606 $3,606.00 1 116244B Pipe Barrier w/Wheel Above Deck $1,071 $1,071.00 3 111404Z 182"Steel Post DB 44" Bury $607 $1,821.00 1 111404G 100"Alum Post DB $383 $383.00 1 111404E 116"Alum Post DB $403 $403.00 2 111404D 124"Alum Post DB $464 $928.00 EQUIPMENT INFORMATION & PRICING State Contract #218091 PROJECT INFORMATION Project name Address City, State ZIP Contract Year 2 111404C 132"Alum Post DB $485 $970.00 5 111404A 148"Alum Post DB $515 $2,575.00 2 111404K 156"Alum Post DB $576 $1,152.00 1 124863G SlideWinder2 96"Dk DB Only 3 Straight 2 Right $5,483 $5,483.00 1 222708A WhooshWinder Slide 72"Dk DB $6,599 $6,599.00 2 120711A Pod Climber 16" DB $367 $734.00 1 158997A Pod Climber 10" DB $362 $362.00 1 249010A Eclipse Net Climber DB Only $30,156 $30,156.00 1 247179A Curva Spinner DB Only $2,443 $2,443.00 1 182503C Welcome Sign (LSI Provided) Ages 5-12 years Direct Bury $0 $0.00 2 141683A 72" TenderTuff Bench w/Back No Armrests DB $806 $1,612.00 $97,427.00Total Equipment Cost at State Contract Pricing Page 2 of 3 2/1/2024 Preliminary Budget Possible Additions Possible Reductions QTY Notes Play Equipment Pebble Park Opt 2,EM706 97,427.00 2024 List Price of Equipment State Contract #218091 (7,794.16)8%(6% discount under $80,000 & 8% discount $80,000 & above) Sales Tax - if applicable 0.00 ST3 Certificate of Exemption must be provided by owner. Delivery of Play equipment 650.00 Estimated / Final quote will be provided upon final design. Mobilization 750.00 Dumpster(s) - 30 Yard 750.00 Disposal of packaging material Site work Demo of Existing Equipment & Excavation (existing container) 0.00 0 BY OWNER - OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Hauling of Excavated Material (CY)0.00 0 NOT INCLUDED Disposal of Excavated Material (CY)0.00 0 NOT INCLUDED Border Options Concrete Border Straight (LF)9,336.03 206 Standard 6" W x 12" D. Equipment Installation (Labor & Concrete for Footings)13,922.09 15.53%Full professional installation by Landscape Structures Certified Installers. Standard labor rate unless otherwise noted Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.00 0 NOT INCLUDED Subgrade Prep & Engineered Wood Fiber Surfacing (EWF) Drainage Aggregate - Pea Rock or Concrete Sand (Tons)0.00 0 NOT INCLUDED Drain Tile (LF)0.00 0 NOT INCLUDED GeoTextile Fabric (Sq. Ft.)0.00 0 NOT INCLUDED EWF - Playground Safety Surfacing (CY)4,904.88 109 IPEMA Certified Playground Surfacing - Meets the standards of ASTM, ADA & CPSC Rubber Wear Mats 0.00 0 NOT INCLUDED Site Restoration (Sq.Ft.)0.00 0 NOT INCLUDED Budget Total Total Additions Total Reductions Total w/ Additions & Reductions 119,945.83 0.00 0.00 119,945.83 PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, Minnesota 55042 Adam Swanepoel, Assistant Public Works Director PE B B L E P A R K PL A Y G R O U N D OP T I O N 3 81 6 0 L A K E J A N E T R A I L N SA I N T P A U L , M N SALES REPRESENTATIVE: EMILY MALONEY DESIGNED BY: AO 1/30/24 1/4" = 1'-0" FLAGSHIP RECREATION 11123 UPPER 33RD ST N LAKE ELMO, MN 55082 763-550-7860 FLAGSHIPPLAY.COM @FLAGSHIPPLAY THIS PLAY AREA & PLAY EQUIPMENT IS DESIGNED FOR AGE RANGES AS NOTED ON PLAN. SHEET LS101 C: \ U s e r s \ A l e x a n d r a O l s o n \ F l a g s h i p R e c r e a t i o n \ F l a g s h i p R e c r e a t i o n - D o c u m e n t s \ 2 0 2 4 P l a n n i n g \ E m i l y \ L a k e E l m o - P e b b l e P a r k \ 0 1 . 2 9 . 2 0 2 4 U p d a t e d D e s i g n s \ P e b b l e O p t 3\ L E _ P e b b l e O p t 3 0 1 2 9 2 4 . d w g CONTAINER DETAILS TOTAL CONTAINER AREA 2163 SF ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER TOTAL EWF AREA 2163 SF TOTAL PERIMETER 191 LF EDGING TYPE 6"X12" CONCRETE CURB FINISH GRADE TOP OF CURB **SITE PREPARATION REQUIREMENTS: ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER ·NO PRE-INSTALLED DRAIN TILE OUTSIDE OF 4 FEET OF PERIMETER ·DRAIN TILE STUB TO BE PROVIDED IF DRAIN TILE IS REQUIRED ·NO DRAINAGE AGGREGATE PRE-INSTALLED ·NO FABRIC PRE-INSTALLED ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB DIMENSION Pebble Park Opt 3 8160 Lake Jane Trail N St Paul, MN 55128 2024 Qty Item No.Description Price Ext Price 1 323659A Volo DB $81,595 $81,595.00 1 166809A E-Pod Seat $403 $403.00 1 111404H 92"Alum Post DB $362 $362.00 1 120710A Pod Climber 8" DB $362 $362.00 2 158997A Pod Climber 10" DB $362 $724.00 1 201889A JigJag Climber Single w/Firepole Aluminum Posts and DB Only $2,744 $2,744.00 1 148637A Seesaw 4-Seats DB $4,483 $4,483.00 1 158105A Wobble Pod DB Only $1,999 $1,999.00 1 182503C Welcome Sign (LSI Provided) Ages 5-12 years Direct Bury $0 $0.00 $92,672.00 EQUIPMENT INFORMATION & PRICING Total Equipment Cost at State Contract Pricing State Contract #218091 PROJECT INFORMATION Project name Address City, State ZIP Contract Year 2/1/2024 Preliminary Budget Possible Additions Possible Reductions QTY Notes Play Equipment Pebble Park Opt 3,EM706 92,672.10 2024 List Price of Equipment State Contract #218091 (7,413.77)8%(6% discount under $80,000 & 8% discount $80,000 & above) Sales Tax - if applicable 0.00 ST3 Certificate of Exemption must be provided by owner. Delivery of Play equipment 650.00 Estimated / Final quote will be provided upon final design. Mobilization 750.00 Dumpster(s) - 30 Yard 750.00 Disposal of packaging material Site work Demo of Existing Equipment & Excavation (existing container) 0.00 0 BY OWNER - OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Hauling of Excavated Material (CY)0.00 0 NOT INCLUDED Disposal of Excavated Material (CY)0.00 0 NOT INCLUDED Border Options Concrete Border Straight (LF)8,656.22 191 Standard 6" W x 12" D. Equipment Installation (Labor & Concrete for Footings)18,900.23 22.17%Full professional installation by Landscape Structures Certified Installers. Standard labor rate unless otherwise noted Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.00 0 NOT INCLUDED Subgrade Prep & Engineered Wood Fiber Surfacing (EWF) Drainage Aggregate - Pea Rock or Concrete Sand (Tons)0.00 0 NOT INCLUDED Drain Tile (LF)0.00 0 NOT INCLUDED GeoTextile Fabric (Sq. Ft.)0.00 0 NOT INCLUDED EWF - Playground Safety Surfacing (CY)4,229.89 94 IPEMA Certified Playground Surfacing - Meets the standards of ASTM, ADA & CPSC Rubber Wear Mats 0.00 0 NOT INCLUDED Site Restoration (Sq.Ft.)0.00 0 NOT INCLUDED Budget Total Total Additions Total Reductions Total w/ Additions & Reductions 119,194.67 0.00 0.00 119,194.67 PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, Minnesota 55042 Adam Swanepoel, Assistant Public Works Director PE B B L E P A R K PL A Y G R O U N D OP T I O N 3 81 6 0 L A K E J A N E T R A I L N SA I N T P A U L , M N SALES REPRESENTATIVE: EMILY MALONEY DESIGNED BY: AO 3/26/24 1/4" = 1'-0" FLAGSHIP RECREATION 11123 UPPER 33RD ST N LAKE ELMO, MN 55082 763-550-7860 FLAGSHIPPLAY.COM @FLAGSHIPPLAY THIS PLAY AREA & PLAY EQUIPMENT IS DESIGNED FOR AGE RANGES AS NOTED ON PLAN. SHEET LS101 C: \ U s e r s \ E m i l y M a l o n e y \ F l a g s h i p R e c r e a t i o n \ F l a g s h i p R e c r e a t i o n - D o c u m e n t s \ 2 0 2 4 P l a n n i n g \ E m i l y \ L a k e E l m o - P e b b l e P a r k \ D e s i g n \ P e b b l e 0 3 2 1 2 4 \ L E _ P e b b l e 0 3 2 1 2 4 . d w g CONTAINER DETAILS TOTAL CONTAINER AREA 2163 SF ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER TOTAL EWF AREA 2163 SF TOTAL PERIMETER 191 LF EDGING TYPE 6"X12" CONCRETE CURB FINISH GRADE TOP OF CURB **SITE PREPARATION REQUIREMENTS: ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER ·NO PRE-INSTALLED DRAIN TILE OUTSIDE OF 4 FEET OF PERIMETER ·DRAIN TILE STUB TO BE PROVIDED IF DRAIN TILE IS REQUIRED ·NO DRAINAGE AGGREGATE PRE-INSTALLED ·NO FABRIC PRE-INSTALLED ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB DIMENSION Pebble Park Playground 8160 Lake Jane Trail N St Paul, MN 55128 2024 Qty Item No.Description Price Ext Price 1 323659A Volo DB $81,595 $81,595.00 1 166809A E-Pod Seat $403 $403.00 1 111404H 92"Alum Post DB $362 $362.00 1 120710A Pod Climber 8" DB $362 $362.00 2 158997A Pod Climber 10" DB $362 $724.00 1 201889A JigJag Climber Single w/Firepole Aluminum Posts and DB Only $2,744 $2,744.00 1 148637A Seesaw 4-Seats DB $4,483 $4,483.00 1 158105A Wobble Pod DB Only $1,999 $1,999.00 1 182503C Welcome Sign (LSI Provided) Ages 5-12 years Direct Bury $0 $0.00 2 141683A 72" TenderTuff Bench w/Back No Armrests DB $806 $1,612.00 $94,284.00 EQUIPMENT INFORMATION & PRICING Total Equipment Cost at State Contract Pricing State Contract #218091 PROJECT INFORMATION Project name Address City, State ZIP Contract Year 3/26/2024 Preliminary Budget Possible Additions Possible Reductions QTY Notes Play Equipment Pebble Park Playground,EM706 94,284.00 2024 List Price of Equipment State Contract #218091 (7,542.72)8%(6% discount under $80,000 & 8% discount $80,000 & above) Sales Tax - if applicable 0.00 ST3 Certificate of Exemption must be provided by owner. Delivery of Play equipment 650.00 Estimated / Final quote will be provided upon final design. Mobilization 750.00 Dumpster(s) - 30 Yard 750.00 Disposal of packaging material Site work Demo of Existing Equipment & Excavation (existing container) 0.00 0 BY OWNER - OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Hauling of Excavated Material (CY)0.00 0 NOT INCLUDED Disposal of Excavated Material (CY)0.00 0 NOT INCLUDED Border Options Concrete Border Straight (LF)8,656.22 191 Standard 6" W x 12" D. Equipment Installation (Labor & Concrete for Footings)19,222.61 22.16%Full professional installation by Landscape Structures Certified Installers. Standard labor rate unless otherwise noted Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.00 0 NOT INCLUDED Subgrade Prep & Engineered Wood Fiber Surfacing (EWF) Drainage Aggregate - Pea Rock or Concrete Sand (Tons)0.00 0 NOT INCLUDED Drain Tile (LF)0.00 0 NOT INCLUDED GeoTextile Fabric (Sq. Ft.)0.00 0 NOT INCLUDED EWF - Playground Safety Surfacing (CY)4,229.89 94 IPEMA Certified Playground Surfacing - Meets the standards of ASTM, ADA & CPSC Rubber Wear Mats 0.00 0 NOT INCLUDED Site Restoration (Sq.Ft.)0.00 0 NOT INCLUDED Budget Total Total Additions Total Reductions Total w/ Additions & Reductions 121,000.00 0.00 0.00 121,000.00 PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, Minnesota 55042 Adam Swanepoel, Asst. Public Works Director Date Expires Quote: Contact: Phone: Email: Ship To:Please Make PO's & Contracts Out To: Bill To:Please Remit Payment To: QTY ITEM #UNIT PRICE EXT. PRICE 1 EQUIPMENT $94,284.00 1 DISCOUNT 8.00%($7,542.72) Subtotal $86,741.28 Freight $650.00 Sales Tax Tax Exempt Cert Total $87,391.28 *Terms: Net 30 days; 1.5% finance charge on balances over 30 days Page 1 of 2 We are pleased to submit this proposal to supply the following products/services: Description Pebble Park Playground,EM706PPP216345377 State Contract #218091 State Contract #218091 Quotes from Landscape Structures,Inc.are subject to current Landscape Structures,Inc.policies as well as Terms &Conditions, Inclusions & Exclusions outlined below unless noted otherwise on this quote. Changes are subject to price adjustment.Sales tax,if applicable,will be applied unless a tax-exempt certificate is provided at the time of order entry.Customer deposits,if required, must be received before orders will be entered &installation scheduled. Purchases in excess of $1,000.00 must be supported by a formal Purchase Order made out to Landscape Structures, Inc. SDS 12-0395 PO Box 86 Lake Elmo, Minnesota 55042 Minneapolis, MN 55486-0395 651-747-3946 ASwanepoel@lakeelmo.org Landscape Structures, Inc. 601 7th St. S Delano, MN 55328 3/26/2024 4/5/2024 City of Lake Elmo Adam Swanepoel, Asst. Public Works Director Pebble Park Playground 8160 Lake Jane Trail N St Paul, MN 55128 City of Lake Elmo Landscape Structures, Inc. 3800 Laverne Avenue North Email: Purchase Amount: Page 2 of 2 Signature:ASwanepoel@lakeelmo.org Title:Phone: Date: $87,391.28 Acceptance of Quotation: Accepted By (Print)Adam Swanepoel, Asst. Public Works Director PO#: Terms &Conditions Contract:Seller's Copy of signed quote represents the contract between Seller and Buyer.This form supersedes all previous communicationsand negotiations and constitutes the entire agreementbetween the parties.Any changes to this contract are not binding unless jointly agreed in writing via Change Order. Project Scope (This Section For Quotes Including Installation) Inclusions: •One Mobilization •Accepting & Unloading of Order Prior to Installation •Unpacking of Play Equipment •Assembly of Play Equipment •Placing, Digging or Surface Mounting Equipment (as specificed) •Concrete for Play Equipment Footings •Standard Insurance Offer (Detail Provided Upon Request) •Standard Warranty Offer (Detail Provided Upon Request) •Standard Wage Rates Exclusions (Unless Specifically Quoted): •Storage or Security of Equipment •Private Utility Locates (irrigation, low voltage, lighting, etc.) •Additional Labor Due to Site Access. Require 8' Wide Clearance from Staging Area to Play Space. •Additional Labor and/or Related Costs Due to Subsurface Conditions (Rock, Hardpan, Heavy Clay, Ground Water, etc.) •Additional Labor and/or Related Costs Due to Working in Unstable Soils (Sand, Pea Rock, Mud, Poor Site Drainage, etc.) •Offsite Removal of Spoils From Footing Holes or Other Excavation. Can be stockpiled for owner removal or left in play space •Disposal of Packing Material. Can be Stockpiled for Owner Removal or Deposited in Owners Onsite Dumpster •Removal of Existing Play Equipment, Border or Safety Surfacing Material •Site Work of Any Kind. Exclusions include, site grading (owner to provide max slope of 1%), site restoration, drainage, etc. •Border for Play Space •Bonding of Any Type •Permits of Any Kind Date Expires Quote: Contact: Phone: Email: Ship To:Please Make PO's & Contracts Out To: Bill To:Please Remit Payment To: QTY ITEM #UNIT PRICE EXT. PRICE 1 MOB $750.00 1 DUMPSTER $750.00 0 SITE WORK By Owner 191 BORDER $8,656.22 1 INSTALL 22.16%$19,222.61 94 SURFACING $4,229.89 0 SECURITY By Owner 0 RESTORE By Owner Subtotal $33,608.72 Freight Sales Tax Tax Exempt Cert Total $33,608.72 Quotes from Flagship Recreation. are subject to current Flagship Recreation policies as well as Terms &Conditions, Inclusions &Exclusions outlined below unless noted otherwise on this quote. Changes are subject to price adjustment.Sales tax,if applicable,will be applied unless a tax-exempt certificate is provided at the time of order entry.Customer deposits,if required, must be received before orders will be entered & installation scheduled. Purchases in excess of $1,000.00 must be supported by a formal Purchase Order made out to Flagship State Contract #218091 *Terms: Net 30 days; 1.5% finance charge on balances over 30 days Page 1 of 2 Engineered Wood Fiber (EWF) & Installation Site Security Site Restoration Concrete Border (6"W x 12"D) Playground Installation by Landscape Structures Certified Installers Demo of Existing Equipment & Excavation (existing container) -OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Mobilization Dumpster - Disposal / Equipment Packing (30 Yard) Lake Elmo, Minnesota 55042 Lake Elmo, MN 55042 We are pleased to submit this proposal to supply the following products/services: Description Pebble Park Playground,EM706PPP216345377 St Paul, MN 55128 Lake Elmo, MN 55042 City of Lake Elmo Flagship Recreation 3800 Laverne Avenue North 11123 Upper 33rd St. N ASwanepoel@lakeelmo.org Pebble Park Playground Flagship Recreation 8160 Lake Jane Trail N 11123 Upper 33rd St. N 3/26/2024 4/5/2024 City of Lake Elmo Adam Swanepoel, Asst. Public Works Director 651-747-3946 Email: Purchase Amount:Date: $33,608.72 Page 2 of 2 Accepted By (Print)Adam Swanepoel, Asst. Public Works Director PO#: Signature:ASwanepoel@lakeelmo.org Title:Phone: Acceptance of Quotation: Terms &Conditions Contract:Seller's Copy of signed quote represents the contract between Seller and Buyer.This form supersedes all previous communicationsand negotiations and constitutes the entire agreementbetween the parties.Any changes to this contract are not binding unless jointly agreed in writing via Change Order. Project Scope (This Section For Quotes Including Installation) Inclusions: •One Mobilization •Accepting & Unloading of Order Prior to Installation •Unpacking of Play Equipment •Assembly of Play Equipment •Placing, Digging or Surface Mounting Equipment (as specificed) •Concrete for Play Equipment Footings •Standard Insurance Offer (Detail Provided Upon Request) •Standard Warranty Offer (Detail Provided Upon Request) •Standard Wage Rates Exclusions (Unless Specifically Quoted): •Storage or Security of Equipment •Private Utility Locates (irrigation, low voltage, lighting, etc.) •Additional Labor Due to Site Access. Require 8' Wide Clearance from Staging Area to Play Space. •Additional Labor and/or Related Costs Due to Subsurface Conditions (Rock, Hardpan, Heavy Clay, Ground Water, etc.) •Additional Labor and/or Related Costs Due to Working in Unstable Soils (Sand, Pea Rock, Mud, Poor Site Drainage, etc.) •Offsite Removal of Spoils From Footing Holes or Other Excavation. Can be stockpiled for owner removal or left in play space •Disposal of Packing Material. Can be Stockpiled for Owner Removal or Deposited in Owners Onsite Dumpster •Removal of Existing Play Equipment, Border or Safety Surfacing Material •Site Work of Any Kind. Exclusions include, site grading (owner to provide max slope of 1%), site restoration, drainage, etc. •Border for Play Space •Bonding of Any Type •Permits of Any Kind EQUIPMENT COLOR SIGN OFF Pebble Park Playground Please sign below if you approve of the colors represented in the photo above. Colors Customer Signature:__________________________________ Date: _________________ As Shown