HomeMy WebLinkAbout#03 - Old Village Area PlanSTAFF REPORT
DATE: 4-9-2024
Workshop
TO: CITY COUNCIL
SUBMITTED BY: Jason Stopa, Community Development Director
AGENDA ITEM: Old Village Moratorium Scope
REVIEWED BY: Clark Schroder, Interim City Administrator
Sophia Jensen, City Planner
BACKGROUND:
The Council approved a moratorium for development of the central corridors of the Old Village
Area on February 6th 2024 (Ordinance 2024-04). The intent of the moratorium is to pause
development while the city studies permitted, conditional, and interim uses in the village districts
(Table 11-1) and analyze required utility, road, trail corridors, and pedestrian connectivity. An
update to the Village Area Master Plan, which will create a vision for this area and provide
guidance on development and redevelopment, could be included with the interim zoning district
study. The last Village Area Master Plan was created in 2007.
The moratorium area is displayed below:
ISSUE BEFORE COUNCIL:
The Council should determine the scope of the study. Specifically, should the Council approve an
update to the Lake Elmo Village Area Master Plan as part of the moratorium study?
OPTIONS:
Option 1
Task 1: Review the 2007 Village Area Master Plan, Comprehensive Plan, and Zoning Code
Task 2: Conduct 1-2 community engagement meetings to gather input on the changes to the zoning
code
Task 3: Recommend zoning amendments. The moratorium would be lifted after the Council
approves zoning amendments and votes to end the interim zoning district. (4-5 months)
Option 2
Tasks 1-3 plus update the Village Area Master Plan. The moratorium would be lifted after the
Council approves zoning amendments and adoption of the new Village Area Master Plan. (6-8
months)
ADVANTAGES AND DISADVANTAGES:
Option 1
Advantages:
It would cost the City less money and take less time to complete. It would allow the department to
accept land use applications, which could result in development.
Disadvantages:
It would limit the scope to only zoning code amendments and not address other issues in the
Village Area.
Option 2
Advantages:
• It would better align the zoning code to the Village Area's needs
• Provide an updated area plan that will be incorporated into the next Comprehensive Plan
• Address design standards not listed in the Lake Elmo design guidelines
• Update the subdistricts with different regulations within the Village Area
• Assist with grant applications
• Create a plan for the reuse of the old fire station and parks building and possibly the historic
Lake Elmo Elementary School site
• Review infrastructure needs including pedestrian safety
• Review road connections from Village Parkway N. to Stillwater Blvd N.
• Consider road connectivity from the developed downtown area to surrounding land within
the Village area
• Review future land uses for undeveloped land to the both the west and east of downtown
• Review signage requirements.
Disadvantages:
Cost and time to complete would increase. The length of time could slow acceptable development.
FISCAL IMPACT:
Cost Estimate
Option 1: $10,500
Option 2: $29,000 (additional $18,500 for the Village Master Plan Update)
To put this estimate into perspective, the Parks Master plan that Bolton and Menk is currently
contracted for is $48,064.
RECOMMENDATION:
Staff recommend Option 2
ATTACHMENT:
• Map of Old Village Area and Moratorium Overlay
• Ordinance 2024-04
• Scope and cost estimate from Bolton & Menck
0 0.25 0.50.125 Miles ´
Lake Elmo Old Village
Old Village Area
Proposed Moratorium Area - "Old Village Corridor Area"
Bolton & Menk is an equal opportunity
March 28, 2024
Mr. Jason Stopa
Community Development Director
3880 Laverne Ave North
Lake Elmo, MN 55042
RE: Lake Elmo Village Area Master Plan
Dear Jason:
The Lake Elmo Village Area plays a pivotal role in the community's economy,
character, identity, and fabric. To ensure future development in the Village
Area supports the City’s needs, the City initiated a development moratorium to
reconsider development guidance. During this time, the City will be reviewing
its vision and regulations to provide development guidance for the downtown
area.
In service to the city, we are excited and ready to deliver a master plan vision
for the Village Area. Towards that end, we would be distinctly proud to be your
consulting partner in this process.
DEEP LOCAL EXPERTISE – We know Lake Elmo and are invested in its future.
This familiarity means we understand city priorities and can hit the ground
running, while ensuring the process maintains the vision every step of the way.
We also bring deep relationships with other jurisdictions, including Washington
County, and can easily help facilitate agency coordination.
CREATIVE PROBLEM SOLVING - No two cities are alike. Each has its own
assets and challenges, and histories and aspirations. Therefore we treat every
project as unique, coming up with custom solutions and that fit each context.
This approach requires a flexible team led by planners, with foundations in
economic development, design, policy, and transportation. Our team has
downtown planning experience in a wide variety of communities large and
small, new and old, and everything in between.
111 Washington Avenue South | Suite 650 | Minneapolis, MN 55401
FOCUSED ON RESULTS – Bolton & Menk has a proven record of plans that
get implemented. With our full suite of services in support, we're excited to
identify and navigate planning, design, funding, construction, and maintenance
strategies. We understand what it takes to bring visionary plans to life, and
approach our work with this understanding—allowing us to proactively address
challenges that may otherwise be overlooked.
We are excited at the opportunity to work with Lake Elmo to complete the
Village Area Master Plan. This proposal includes Phase 1 which is focused on
the current plans and will look at modest changes to meet the community’s
established vision. Phase 2 is a more in-depth look at the area to provide an
updated downtown plan and implementation tools or recommendations.
Both plans involve some level of community engagement and stakeholder
input. The proposed phases can be fully customized to address the needs of
the community, and we invite a discussion to that end.
In continued support of the city, I will serve as your lead client contact and
project manager. Please contact me Jenni.Faulkner@bolton-menk.com if you
have any questions regarding our proposal.
Respectfully submitted,
Bolton & Menk, Inc.
Jenni Faulkner Nathan Fuerst
Senior Planner Community Planner
Bolton & Menk is an equal opportunity
2Village Area Master Plan | City of Lake Elmo, MN
SCOPE OF
SERVICES
Bolton & Menk has led successful spatial
planning, design, policy review, and zoning
code development across the Midwest.
Based on our experience, we have crafted
a proposed scope of work necessary
to complete the Village Area review
thoughtfully, efficiently, and within the
timeline of the development moratorium.
PHASE 1
Task 0: Project Management
Our project management approach is rooted in
personable and proactive communication that
prioritizes collaboration, transparency, and trust.
Our team, led by Jenni, will maintain regular
communication with city staff throughout the
project. During an initial project kickoff meeting,
we will establish and confirm a regular meeting and
reporting schedule.
Task 0 Deliverables:
• Project kickoff meeting; regular progress reports
Task 1: Policy Review
To establish a shared understanding of the Village
Area's policy context, we will conduct a review
of current policies that guide development,
infrastructure, and public space decisions
within the Village Area. This assessment
will be foundational to identifying policy
recommendations. We anticipate this review to
include, at a minimum:
• 2007 Village Area Master Plan and AUAR
• Lake Elmo Comprehensive Plan
• Lake Elmo Zoning Code
Task 1 Deliverables:
• Policy review memo
Task 2: Engagement and Outreach
In coordination with city staff, we will develop and
deliver a project engagement plan to include city-
wide engagement that is inclusive, accessible, and
transparent. We expect this to include:
• In-person community outreach (up to 2
events)
Our team will prepare and distribute all necessary
agendas, materials, and summaries for each
event, and will facilitate engagement efforts in
consultation with city staff. We anticipate that city
staff will help advertise community-wide event(s).
Task 1 Deliverables:
• Engagement plan; final engagement report
summarizing activities and input received
Task 3: Policy Recommendations
Using findings from public outreach and the
policy review, our team will develop policy
recommendations to be considered and adopted
by City leadership, in advance of the moratorium's
expiration. Policy recommendations will seek to
bring clarity for city officials and staff, the public,
and prospective developers, on allowed land uses,
design guidance, densities, and arrangements.
Our team will also be available to present
recommendations to city leadership, as necessary.
Task 3 Deliverables:
• Policy recommendations memo
• Planning Commission and City Council
Presentation
ENGAGEMENT
RECOMMENDATIONS
POLICY REVIEW
+=
3Village Area Master Plan | City of Lake Elmo, MN
OPTIONAL VALUE ADD SERVICES
ENGAGEMENT:
• Additional Engagement: We offer a full suite
of digital, physical, and in-person engagement
tools. Our team would be happy to discuss
additional value-adding engagement tools,
such as:
• Design Workshops
• Community Pop-ups
• Additional Public Meetings
• Online Advertising
• Email and Social Media Blasts
• Interactive Maps
• Project Website
• Signage and Flyers
POLICY ADOPTION SUPPORT
• Updated Land Use and Design Policies:
We bring deep experience of writing and
administering land use and design policies, and
would be excited to offer that support for the
City of Lake Elmo. Upon Plan completion, we
can be available to work with staff and elected
officials in the preparation and adoption of
policies necessary to realize community vision
and plan recommendations.
VILLAGE AREA RENDERINGS:
• High Quality Project Renderings: Some
projects may benefit from higher quality
renderings that capture or convey additional
character and image. These images are often
important marketing tool and become the
identifiers of the plan, building local support,
or pursuing funding. We would be happy to
explore additional options as needed with the
city.
PHASE 2 - OPTIONAL ADD-ON
Task 4 Village Area Master Plan Update
While a policy review is necessary to understand
the policy context of the Village Area, we would
recommend a broader review and update to the
Village Area Master Plan. This process would result
in needed clarity and uniformity of expectations
for development, transportation, and public space
within the Village Area.
This additional review would also identify necessary
updates to the 2007 Master Plan in light of
changes over the last 17 years to local and regional
economics, development trends, transportation
changes, use of public and civic spaces, and
community goals.
Building on the policy review, we will conduct an
existing conditions assessment of changes to the
physical, economic, and cultural context of the
area, since the 2007 Master Plan, to include:
• Community Context and Demographics -
Population trends and forecasts; households and
housing trends
• Natural and Public Spaces - Presence and typology
of existing natural features and amenities;
inventory of existing public spaces
• Land Use and Development Patterns - Current
and future land use patterns, block patterns;
identification of major "anchor" users, and
redevelopment opportunities
• Transportation Networks - Pattern, jurisdictional
ownership, general condition; gaps in the street,
bike, and sidewalk networks.
• Infrastructure - Public utility network, major
private utilities; major easements to be considered.
• Market and Socio Economics - Household income
characteristics; current property economic values
Using both the policy and exiting conditions
findings, along with feedback gathered during
public engagement, we will work with staff to refine
goals and principles for the Lake Elmo Village Area,
as necessary. We will then explore updating the
Village Area Plan with thematic concepts to include:
• Development: Land use and development
scale, density, patterns, and desired use types;
redevelopment concepts for identified properties
such as Lake Elmo Elementary, City Fire Station, and
former City Hall.
• Connectivity: Multimodal transportation and
connectivity, access, and circulation, with a focus
on connections to and crossings of Stillwater
Boulevard and Lake Elmo Ave N.
• Open Space: Placemaking opportunities and
locations for new or enhanced public spaces;
preservation of natural spaces; streetscape
enhancements.
These concepts will provide critical clarity on
future vision and expectations for the Village
Area. Recommended Master Plan updates will
be developed in coordination with city staff, and
presented to City Council for consideration and
adoption.
Task 2 Deliverables:
• Updated Village Area goals and principles
• Draft and final updated plan with associated
graphics, exhibits, and narrative
4Village Area Master Plan | City of Lake Elmo, MN
Preliminary Schedule for Lake Elmo Village Area Master Plan
Apr May June July Aug Sept Oct Nov Dec Jan Feb
0.0 Project Management
Monthly City Staff Meetings
1.0 Policy Review
2.0 Engagement and Outreach
3.0 Policy Recommendations
4.0 Village Area Master Plan
Update
SCHEDULE & FEE
We have developed a proposed schedule
outlining anticipated tasks and deliverable
due dates. This schedule is based on our
experience delivering similar projects, and
understanding of the need.
We have structured the project schedule
to provide a suggested time for the
city to implement policy-related plan
recommendations, prior to the end of the
development moratorium. We anticipate staff
and city leadership having ample opportunity
to discuss and review recommendations prior
to plan completion, in order to facilitate a
smooth transition to implementation. The two
month implementation period is a suggestion,
and we welcome a discussion to ensure
sufficient time to prepare for the end of the
development moratorium.
We have also developed a proposed fee that
follows the scope of services, and is based on
our experience in developing similar plans.
Upon selection, we will work with city staff to
revise and update this scope, schedule, and
fee as needed to ensure successful project
delivery.
Task No.Task Description Total Cost
0 Project Management $1,500
1.0 Policy Review $2,500
2.0 Engagement & Outreach $4,500
3.0 Policy Recommendations $2,000
TOTAL FEE $10,500
4.0
(optional add-on)Village Area Master Plan Update 18,500
TOTAL FEE WITH OPTIONAL ADD-ON $29,000
End of Development
Moratorium
City Implements Policy
Recommendations
PHASE 1
PHASE 2 (OPTIONAL ADD-ON)
5Village Area Master Plan | City of Lake Elmo, MN
CODY FLANNERY, AICP
Planner
Planning Support
Cody assists with research for
and developing of planning
studies and reports Cody’s passion for the field
stems from his belief that everyone deserves to
live in communities that are healthy, sustainable,
equitable, prosperous, and beautiful.
SIMILAR PROJECT EXPERIENCE
• Rice Street Visioning Study, Ramsey County, MN
• Planning Services, City of Carver, MN
• Opportunity Site Master Plan, City of Brooklyn Center,
MN
• Planning Services, City of Arden Hills, MN
NATHAN FUERST
Planner
Planning Lead
Nathan brings a broad range
of experience developing
city policies, providing
development review, and
implementing land use policies for communities
across the Twin Cities.
SIMILAR PROJECT EXPERIENCE
• City Planner, Jordan, MN
• City Planner, Newport, MN
• Planning Services, Lake Elmo, MN
• Planning Services, Forest Lake, MN
TEAM &
EXPERIENCE
Our team will be led by Jenni Faulkner and
Nathan Fuerst, with support from Mike
Thompson and Cody Flannery.
Below are some examples of our downtown
planning, community engagement, public
space, and infrastructure work. We would
be happy to share additional experience or
references upon request.
JENNI FAULKNER
Senior Planner
Project Manager
As a senior planner,
Jenni’s primary areas of
expertise include economic
development, city planning and land use, and
housing. Jenni's experience spans from visioning
and plan creation to implementation.
SIMILAR PROJECT EXPERIENCE
• Heart of the City, Burnsville, MN*
• Center Village Vision, Burnsville, MN*
• Planning Services, Lake Elmo, MN
• City Planner, Empire, MN
MIKE THOMPSON, AICP
Principal Urban Planner
Principal-in-Charge,
Design Lead
As practice leader for the
firm's area planning group,
Mike loves the process of working with communities
to rethink and redesign the ways in which their
neighborhoods look, feel, and function.
SIMILAR PROJECT EXPERIENCE
• Downtown Master Plan, Brooklyn Center, MN
• Downtown and Station Area Plan,
Robbinsdale, MN
• TH 60 Master Plan, Faribault, MN
• NW Commons Small Area Plan, Eagan, MN
Project Experience
Hillcrest Redevelopment Plan, Saint Paul, MN
Lowertown Small Area Plan, Saint Paul, MN
Downtown Small Area Plan, Monticello, MN
Rice Creek Commons Master Plan, Arden Hills,
MN
Monticello Downtown Master Plan, Monticello,
MN
Opportunity Site Downtown Master Plan,
Brooklyn Center, MN
Brooklyn Boulevard Land Use Study, Brooklyn
Center, MN
Warehouse District Master Plan, Dubuque, IA
Webster Ave Industrial Land Use Study, North
Mankato, MN
*Completed with prior employer