HomeMy WebLinkAbout#04 - Manning Ave Preferred AlternateTIIF: CITY OF
LAKE ELMO
STAFF REPORT
DATE: April 1.6, 2024
CONSENT
AGENDA ITEM: Approve Resolution of Support for the County State Aid Highway 15
(Manning Avenue) Improvements, from loth Street (CSAH 10) to 3,500
feet north of 30th Street
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Clark Schroeder, Interim City Administrator
Marty Powers, Public Works Director
Jason Stopa, Community Development Director
Chad Isakson, Assistance City Engineer
ISSUE BEFORE COUNCIL: Should the City Council approve a Resolution of Support for the County
State Aid Highway 1.5 (Manning) Improvements, from I Oth Street (CSAH 10) to 3,500 feet north of 30th
Street?
BACKGROUND AND PROPOSAL DETAILS/ANALYSIS: Washington County is requesting that the
City of Lake Elmo approve a resolution of support for the County State Aid Highway 1.5 (Manning)
Improvements, from loth Street (CSAH 10) to 3,500 feet north of 30th Street. The resolution expresses the
City's support for the project, for the preliminary design layout dated February 13, 2024, and allows the
County to proceed with the completion of the final design and plan review for the project. Upon completion
of the final design the County will request the City to enter into a Cooperative Cost Agreement for the
Project. The project is planned for construction in 2025.
The improvements include pavement rehabilitation along the corridor, consisting of approximately 2,500
feet of Mill and Overlay (north end of project) and a Full Depth Reclamation of the remaining roadway
pavements, from approximately 33rd Street (airport access) to loth Street. To improve safety along the
corridor the County is adding new southbound left turn lanes at 27th Street, 24th Street (Manning Trail),
22nd Street, and 18th Street; and adding northbound left turn lanes at Manning Trail (north intersection),
22nd Street, 18th Street Court, and Manning Trail (south intersection). The west leg of 18th Street will have
its current access to Manning Avenue (CSAH 15) closed with the installation of a new cul-de-sac. The
closure is necessary due to the close proximity of the 18th Street Court/Manning Avenue intersection. Post
project, all access from Lake Elmo, between loth Street and 30th Street, will be directed to either the north
Manning Trail intersection or the south Manning Ttrail intersection. Street lighting will be added at the
Manning Trail intersection as requested by city staff. There are no stormwater management BMP impacts
in Lake Elmo and there is no right-of-way acquisition proposed in Lake Elmo for this proposed
improvement.
FISCAL IMPACT: The anticipated cost participation in the project by the City of Lake Elmo is limited,
in the current (60%) plans estimated amount of $2,460. The preliminary total estimated project cost is
$3,434,500.
RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent
Agenda, a Resolution supporting Washington County's recommended layout for the County State Aid
Highway 15 (Manning) Improvements, from 10th Street (CSAH 10) to 3,500 feet north of 30th Street. If
removed from the Consent Agenda, the recommended motion for the action is as follows:
"Move to approve Resolution No. 2024-046 Approving Municipal Support for the County State Aid
Highway 15 (Manning) Improvements, from IOth Street (CSAH 10) to 3,500 feet north of 30th Street."
ATTACHMENTS:
1. Resolution Approving Municipal Support for the County State Aid Highway 15 (Manning)
Improvements, from 1 Oth Street (CSAH 10) to 3,500 feet north of 30th Street.
2. County Recommended Project Layout.
3. Preliminary Cost Estimate.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO.2024-046
A RESOLUTION APPROVING MUNICIPAL SUPPORT FOR THE COUNTY STATE
AID HIGHWAY 15 (MANNING AVE) ROADWAY IMPROVEMENT PROJECT
WHEREAS, Washington County's Capital Improvement Program includes a roadway
improvement project on Manning Avenue (CSAH 15), from 10' Street (CSAH 10) to 3,500 feet north of
30t" Street, planned for construction in 2025; and
WHEREAS, City of Lake Elmo in coordination with Washington County and Valley Branch
Watershed District, Baytown. Township, and West Lakeland Township, has engaged in a preliminary
design effort that started in April of 2023; and
WHEREAS, the City and County have engaged in a community engagement process as part of
the preliminary design effort intended to gather and consider public feedback for the project; and
WHEREAS, A County recommended Manning Avenue (CSAH 15) Project Layout, dated
February 13, 2024, showing proposed roadway and drainage improvements for the Project has been
prepared and presented to the City; and
WHEREAS, a preliminary project cost estimate for the Project, dated March 22, 2024, has been
prepared and presented to the City; and
WHEREAS, this resolution and approval does not obligate the City of Lake Elmo to any cost
share or maintenance obligations as those will be considered by the City at a later date.
WHEREAS, prior to advertising for contractor bids on the Project, Washington County will
present the City with an updated cost estimate and bidding plans for support.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LAKE ELMO,
That said County Recommended County State Aid Highway (CSHA) 15 Manning Avenue
Roadway Improvement Project, dated February 13, 2024, be in all things approved; and
2. That the City of Lake Elmo supports the County continuing with the development of final plans
and right-of-way acquisition necessary for the construction of the Project
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF APRIL
2024.
CITY OF LAKE ELMO
am
(Seal)
ATTEST:
Julie Johnson, City Clerk
Charles Cadenhead
Mayor
DATE: March 22, 2024
CSAH 15 (Manning Ave) Cost Estimate
Item#
Description
UNITS
TOTAL
ESTIMATED
QUANTITY
S.A.P. 082-615-048 PARTICIAPATING
CITY OF LAKE ELMO
WEST LAKELAND TOWNSHIP
BAYTOWNTOWNSHIP
QUANTITY
COST
QUANTITY
COST
QUANTITY
COST
QUANTITY
COST
2021.501/00010
MOBILIZATION
LS
1
0.97
$97,000.00
0.01
$1,000.00
0.01
$1,000.00
0.01
$1,000.00
2104.502/01185
REMOVE DELINEATOR / MARKER
EACH
1
1
$50.00
2104.502/01220
REMOVE SIGN
EACH
32
20
$1,000.00
4
$200.00
8
$400.00
2104.502/03300
SALVAGE SIGN
EACH
7
7
$350.00
2104.602/00400
SALVAGE SIGN SPECIAL
EACH
5
5
$150.00
2104.602/00500
SALVAGE SIGN PANEL SPECIAL
EACH
1
1
$30.00
2104.503/00205
SAWING BIT PAVEMENT (FULL DEPTH)
LF
800
800
$1,800.00
2104.504/00080
REMOVE CONCRETE DRIVEWAY PAVEMENT
SY
55
55
$220.00
2104.504/00110
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
SY
1220
1220
$3,660.00
2104.504/00120
REMOVE BITUMINOUS PAVEMENT
SY
1700
1560
$6,240.00
140
$560.00
2104.507/00450
REMOVEAGGREGATE
CY
71110
70300
$281,200.00
810
$3,240.00
2106.507/00010
EXCAVATION - COMMON
C Y
24064
23909
$191,272.00
155
$1,240.00
2106.507/00080
SELECT GRANULAR EMBANKMENT (CV)
CY
4217
4169
$50,028.00
48
$576.00
2106.507/00130
COMMON EMBANKMENT(CV)
CY
4639
4586
$27,516.00
53
$318.00
2118.507/00020
AGGREGATE SURFACING (LV); CLASS 1 MOD
C Y
880
865
$51,900.00
15
$900.00
2211.507/00170
AGGREGATE BASE(CV)CLASS 5
C Y
1400
1320
$39,600.00
80
$2,400.00
2215.504/00010
FULL DEPTH RECLAMATION
SY
71110
71110
$213,330.00
2232.504/00060
MILL BITUMINOUS SURFACE (2.0")
SY
12980
12980
$19,470.00
2331.603/00070
)OINTADHESIVE
LF
14500
14500
$7,250.00
2360.509/23300
TYPESP 12.5 WEARING COURSE MIX(3;C)
TON
17850
17660
$1,289,180.00
190
$13,870.00
2360.509/23305
TYPE SP 12.5 NON WEAR COURSE MIX (3;C)
TON
8180
8085
$646,800.00
95
$7,600.00
2531.504/00060
6" CONCRETE DRIVEWAY PAVEMENT
SY
55
55
$4,950.00
2563.601/00001
TRAFFIC CONTROL SUPERVISOR
LS
1
0.97
$4,850.00
0.01
$50.00
0.01
$50.00
0.01
$50.00
2563.601/00010
TRAFFIC CONTROL
LS
1
0.97
$97,000.00
0.01
$1,000.00
0.01
$1,000.00
0.01
$1,000.00
2563,610/00011
FLAGGER
HOUR
500
500
$50,000.00
2563.613/01100
PORTABLE CHANGEABLE MESSAGE SIGN
UDAY
60
60
$6,000.00
2564.602/01515
INSTALLSIGN
EACH
7
7
$350.00
2564.602/01516
INSTALL SIGN SPECIAL
EACH
2
2
$100.00
2564,602/01519
INSTALL SIGN PANEL SPECIAL
EACH
9
9
$450.00
2564.602/02340
DELINEATOR/ MARKER
EACH
7
4
$200.00
3
$150.00
2564.618/00010
SIGN
S F
232
225.75
$5,643.75
6.25
$156.25
2564.602/01903
FURNISH TYPE C SIGN
EACH
21
10
$1,000.00
2
$200.00
5
$500.00
4
$400.00
2573.501/00030
EROSION CONTROL SUPERVISOR
LS
1
0.97
$970.00
0.01
$10.00
0.01
$10.00
0.01
$10.00
2573.503/00023
SILT FENCE; TYPE MS
LF
12000
12000
$120,000.00
2574.505/00020
SOIL BED PREPARATION
ACRE
6
6
$3,000.00
2574.507/00100
COMMON TOPSOIL BORROW
CY
4600
4600
$101,200.00
2575.505/00021
SEEDING
ACRE
6
6
$1,800.00
2575.505/00025
DISKANCHORING
ACRE
6
6
$3,000.00
2575.523/00010
WATER
MGAL
10
10
$2,500.00
2580.503/00010
INTERIM PAVEMENT MARKING
LF
580
580
$290.00
2582.503/40106
6" SOLID LINE MULTI COMP GR IN (WR)
L F
34230
34230
$34,230.00
2582.503/10404
4" DBLE SOLID LINE PAINT
L F
20300
20300
$30,450.00
2582.518/04020
PAVT MSSG PREFTHERMO GR IN
S F
812
812
$3,248.00
2582.503/40124
24" SOLID LINE MULTI COMP GR IN (WR)
L F
2350
23501
$35,250.00
$3,434,377.75 $2,460.00 $34,120.25 $2,460.00