HomeMy WebLinkAbout#05 - 2024 Street and Utility ImprovementsTIIF: CITY OF
LAKE ELMO
STAFF REPORT
DATE: April 1.6, 2024
REGULAR
AGENDA ITEM: Accept Bids and Award Contract for the 2024 Street Improvements
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Clark Schroeder, Interim. City Administrator
Clarissa Hadler, Finance Director
Marty Powers, Public Works Director
Chad Isakson, Assistant City Engineer
ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a contract for the 2024
Street Improvements?
BACKGROUND: On March 6, 2024, the City Council approved the plans and specifications for the 2024
Street Improvements project and authorized staff to advertise the project for bids. The Project was
advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota Competitive
Bidding requirements.
The project includes street and utility improvements in two areas: Carriage Station and Jamaca Court N.
Proposed improvements in Carriage Station include full depth reclamation of the street pavement; spot curb
replacement; new bituminous paving; installation of a parking bay adjacent to the neighborhood Park; storm
sewer and drainage maintenance; and adjustments to existing hydrants. Proposed improvements to Jamaca
Court N include full depth reclamation, new concrete ribbon curb and gutter, upsizing of the existing four -
inch watermain to a twelve -inch watermain, and creating a stormwater ditch and culverts along the south
side of the road.
The scope of improvements as designed remains generally consistent with the feasibility report
recommended improvements that was approved by the City Council on November 8, 2023. Upsizing a
section of watermain in the Carriage Station neighborhood is no longer included in the project scope. During
the project design, it was determined that increasing the diameter of this watermain section would not
significantly improve flow in the watermain system in this area. The existing hammerhead at the end of
Jamaca Court will be converted into a smaller diameter cul-de-sac based on available right-of-way and
review by the Public Works Director and Fire Chief.
PROPOSAL DETAILS/ANALYSIS: Bids were received and opened electronically on April 4, 2024. The
city received 3 contractor bids for the project as presented on the attached Bid Summary and Bid Tab.
Northdale Construction Company has provided the lowest responsible bid in the amount of $1,965,312.31.
Contractor references for Northdale Construction Company were reviewed and verified. The City Engineer
and the design engineer (Bolton & Menk) are therefore recommending that the city award the contract to
the lowest responsible bidder, Northdale Construction Company, as outlined in the attached letter.
In addition, staff received proposals from Braun Intertec and AET, Inc. to complete material testing during
construction. Staff is recommending the city enter into a material testing contract with AET, Inc. in the not -
to -exceed amount of $29,400.
FISCAL IMPACT: Approval of this resolution commits the council to enter into a construction contract
for the project. The estimated total post -bid project cost is $2,601,000 with $662,31.0 paid through special.
assessments; $487,400 paid from the Water Enterprise Fund, and the remaining $1,451,290 paid through
the general tax levy. The post bid total project costs remain below the Feasibility Report costs and include
a 6% contingency for unforeseen costs incurred during construction.
RECOMMENDATION: Staff is recommending that the City Council approve a resolution accepting bids
and awarding a contract to Northdale Construction Company for the base bid in the amount of
$1,965,31.2.31 for the 2024 Street Improvements. The recommended motion for this action is as follows:
"Move to approve Resolution No. 2024-045, accepting bids and awarding a contract to Northdale
Construction Company for the base bid in the amount of $1,965,312.31 for the 2024 Street
Improvements. "
Staff is also recommending that the City Council authorize a material testing contract with AET, Inc. in the
not -to -exceed amount of $29,400. The recommended motion for this action is as follows:
"Move to authorize a material testing contract with AET, Inc. in the not -to -exceed amount of $29,400
for the 2024 Street Improvements.
ATTACHMENTS:
1. Resolution Accepting Bids and Awarding a Contract for the 2024 Street Improvements.
2. Consultant's Letter of Award Recommendation and Tabulation of Bids.
3. Project Schedule.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO.2024-045
A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE
2024 STREET IMPROVEMENTS
WHEREAS, pursuant to an advertisement for bids for the 2024 Street Improvements, bids
were received, opened, and tabulated according to law, and bids were received complying with the
advertisement; and
WHEREAS, bids were tabulated, checked and summarized to verify that all requirements
of the submittal were met; and
WHEREAS, the project engineer reviewed the bids and has provided a letter
recommending the award of the contract to the lowest responsible bidder, Northdale Construction
Company, for the bid amount of $1,965,312.31.
NOW, THEREFORE, BE IT RESOLVED,
1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract
in the accordance with the above ordered Project, in the amount of the Contractor's lowest
responsible bid, and according to the plans and specifications thereof approved by the City
Council.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SIXTEENTH DAY OF APRIL,
2024.
CITY OF LAKE ELMO
(Seal)
ATTEST:
Julie Johnson
City Clerk
Charles Cadenhead
Mayor
3507 High•• •
;g1
Oakdale, 55
•0 1 *• 1
C• is •
April 4, 2024
Jack Griffin, P.E.
City Engineer
City of Lake Elmo
3880 Laverne Avenue N
Lake Elmo, Minnesota 55042
RE: 2024 Street and Utility Improvements
City of Lake Elmo, MN
City Project No. 2023.111
BMI Project No. ON1.132836
Dear Mr. Griffin,
Attached is the bid abstract for the project referenced above. Three bids were received at 10:00 a.m. on
Thursday, April 4, 2024. The following is a summary of the bids received:
Bidder Total Bid
Northdale Construction Company, Inc. $1,965,312.31
Miller Excavating, Inc. $1,982,033.33
Dresel Contracting Inc. $2,011,312.31
We have reviewed the bids and recommend awarding this bid to Northdale Construction Company, Inc.
in the amount of $1,965,312.31.
Sincerely,
Bolton & Menk, Inc,
Michael R. Warner, P.E.
Principal Engineer
Enclosure
h:A1ke1mn\0n1132836\6_plans-specs\b_bid documents\132836 award (tr.docx
Botton & Menk is an equat opportunity employer.
ABSTRACT OF BIDS
2024 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 2021111
CITY OF LAKE ELMO, MN
BID DATE: APRIL 4, 2024 AT 10:00 AM 1 2 3
NORTHDALE CONSTRUCTION CO., INC. MILLER EXCAVATING, INC. DRESEL CONTRACTING INC.
NO. ITEM UNIT CITY UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE
PART 1 -JAMACA COURT GENERAL
7 MOBILIZATION
2 TRAFFIC CONTROL
3 SILT FENCE, TYPE MACHINE SLICE
4 SEDIMENT CONTROL LOG, TYPE WOOD FIBER
5 CATCH BASIN INLET PROTECTION
6 STREET SWEEPING (WITH PICKUP BROOM)
7 WATER FOR DUST CONTROL
8 CLEARING
9 GRUBBING
10 TREE TRIMMING
11 SALVAGE AND REINSTALL MAILBOX
12 TEMPORARY MAILBOX
13 REMOVE AND REPLACE PERMANENT BARRICADE
14 SIGN PANELS TYPE C
15 TOPSOIL BORROW (LV)
16 SEED MIXTURE 25-131 AND EROSION CONTROL BLANKET
17 SOD
TOTAL PART 1- JAMACA COURT GENERAL
PART 2 - JAMACA COURT STREET AND STORM SEWER
18 REMOVE CULVERT
19 12" CS PIPE CULVERT
20 12" RCP STORM SEWER, CL V
21 12" CS APRON
22 12" RCP FLARED END SECTION
23 4' DIA CBMH WITH CASTING PER DETAIL 406
24 SAWCUT BITUMINOUS PAVEMENT
25 SAWCUT CONCRETE PAVEMENT
26 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT(DRIVEWAY)
27 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY)
28 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER
29 RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL
30 EXCAVATION- COMMON (WIDENING AREAS)(EV)
31 SUBGRADE CORRECTION(EV)
32 SUBGRADE PREPARATION OF RECLAIMED SURFACE
33 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (EV)
34 SALVAGE AND REINSTALL RECLAIM MATERIAL(WIDENING AREAS)(CV)
35 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C]
36 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C]
37 BITUMINOUS MATERIAL FOR TACK COAT
LS
LS
LF
LF
EA
HR
MGAL
EA
EA
HIS
EA
EA
EA
SF
CY
BY
BY
LF
LF
LF
EA
EA
EA
LF
LF
SY
SY
LF
BY
CY
CY
BY
CY
CY
TN
TN
GAL
1 $21,085.00
1 $997.50
60 $1.97
150 $4.20
2 $250.00
20 $152.25
10 $65.00
3 $367.50
3 $262.50
5 $86.10
19 $14175
19 $78.75
1 $288.75
5 $141.75
790 $28.35
300 $2.89
3,300 $9.98
135 $15.00
158 $70.97
122 $83.00
10 $628.62
4 $1,455.93
2 $3,281.11
290 $2.05
70 $5.78
460 $10.00
140 $10.00
50 $5.00
3,200 $3.68
130 $24.84
130 $34.84
3,010 $2.00
80 $20.00
90 $20.00
300 $100.80
400 $91.35
240 $2.10
.50
FA
.00
m-
74
771.80
[L7
ABSTRACT OF BIDS
2024 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 2023.111
CITY OF LAKE ELMO, MN
BID DATE: APRIL 4, 2024 AT 10:00 AM
1
NORTHDALE CONSTRUCTION CO., INC.
2
MILLER EXCAVATING, INC.
3
DRESEL CONTRACTING INC.
NO. ITEM
UNIT
CITY
UNIT PRICE
TOTAL PRICE
UNIT PRICE
TOTAL PRICE
UNIT PRICE
TOTAL PRICE
38 PATCH BITUMINOUS DRIVEWAY
39 B618 CONCRETE CURB AND GUTTER
40 RIBBON CURB
41 6" CONCRETE DRIVEWAY PAVEMENT
42 ADJUST EXISTING VALVE BOX
TOTAL PART 2 -JAMACA COURT STREET AND STORM SEWER
SY
LF
LF
SY
EA
430
600
1,750
160
1
$51.50
$17.80
$13.76
$122.17
$800.00
$22,145.00
$10,680.00
$24,080.00
$19,547.20
$800.00
$222,776.10
$41.75
$17,952.50
$30.60
$13,158.00
$26.08 $15,648.00
$21.32
$12,792.00
$18.64 $32,620.00
$16.07
$28,122.50
$89.76 $14,361.60
$105.32
$16,851.20
$714.76 $714.76
$600.00
$600.00
$221,135.79
$210,578.89
PART 3 -JAMACA COURT WATER SYSTEM
43 REMOVE WATERMAIN
44 REMOVE HYDRANT AND GATE VALVE
45 REMOVE GATE VALVE AND BOX
46 REMOVE AND REPLACE VALVE BOX
47 REMOVE WATER SERVICE
48 REMOVE CURB STOP AND BOX
49 TEMPORARY WATER SYSTEM
50 CONNECT TO EXISTING 4" WATERMAIN
51 CONNECT TO EXISTING 12" WATERMAIN
52 CUT IN 16"X12"TEE
53 4" GATE VALVE AND BOX
54 6" GATE VALVE AND BOX
55 8" GATE VALVE AND BOX
56 12" GATE VALVE AND BOX
57 VALVE BOX EXTENSION
58 HYDRANT
59 HYDRANT EXTENSION
60 4" DIP, CL 52 WATERMAIN, INCL POLY WRAP
61 6" DIP, CL 52 WATERMAIN, INCL POLY WRAP
62 8" DIP, CL 52 WATERMAIN, INCL POLY WRAP
63 12" DIP, CL 52 WATERMAIN, INCL POLY WRAP
64 1" CORPORATION STOP
65 1" CURB STOP AND BOX
66 1" WATER SERVICE
67 RECONNECT WATER SERVICE
68 DUCTILE IRON FITTINGS
69 GRANULAR MATERIAL BEDDING
70 CONCRETE HYDRANT SPLASH PAD
71 OFFROAD STRUCTURE MARKER
TOTAL PART 3 - JAMACA COURT WATER SYSTEM
LF 874
$7.50
EA 1
$1,625.00
EA 2
$250.00
EA 1
$1,366.24
LF 694
$5.00
EA 12
$100.00
LS 1
$13,000.00
EA 2
$2,362.87
EA 1
$2,867.54
EA 1
$9,572.00
EA 1
$2,000.12
EA 2
$2,315.13
EA 1
$3,116.28
EA 2
$5,367.94
LF 2
$374.12
EA 2
$7,011.35
LF 1
$1,629.24
LF 15
$95.87
LF 20
$85.82
LF 45
$99.53
LF 1,215
$118.31
EA 12
$260.09
EA 12
$522.78
LF 440
$53.09
EA 12
$189.38
LB 1,440
$15.53
LF 130
$12.00
SF 30
$12.29
EA 3
$157.50
70
70
$45.23
Mr.11 d
IW*I .
$600.00
ABSTRACT OF BIDS
2024 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 2023.111
CITY OF LAKE ELMO, MN
BID DATE: APRIL 4, 2024 AT 10:00 AM 1 2 3
NORTHDALE CONSTRUCTION CO., INC. MILLER EXCAVATING, INC. DRESEL CONTRACTING INC.
NO. ITEM UNIT CITY UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE
PART 4 - CARRIAGE STATION GENERAL
72 MOBILIZATION
73 TRAFFIC CONTROL
74 SEDIMENT CONTROL LOG, TYPE WOOD FIBER
75 CATCH BASIN INLET PROTECTION
76 STREET SWEEPING (WITH PICKUP BROOM)
77 WATER FOR DUST CONTROL
78 CLEARING
79 GRUBBING
80 CLEARING AND GRUBBING - AREA 1
81 SALVAGE AND REINSTALL MAILBOX
82 TEMPORARY MAILBOX
83 SALVAGE AND REINSTALL SIGN PANEL ON NEW POST
84 STREET NAME BLADES
85 SIGN PANELS TYPE C
86 TOPSOIL BORROW (LV)
87 SEED MIXTURE 35-241 AND EROSION CONTROL BLANKET
88 SOD
TOTAL PART 4 - CARRIAGE STATION GENERAL
PART 5 - CARRIAGE STATION STREET AND STORM SEWER
89 REMOVE AND REPLACE CASTING AND RINGS W/ ADAPTER PLATE (R-3067-V)
90 SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS
91 REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE
92 REMOVE STORM SEWER PIPE
93 JET/ CLEAN STORM PIPE
94 PATCH DOGHOUSE/INVERT
95 CONSTRUCT CONCRETE COLLAR AND DOGHOUSE
96 REMOVE AND REPLACE 12" FES
97 SALVAGE AND REINSTALL 24" HOPE FLARED END SECTION
98 S' CIPP, 24" HOPE
99 CONNECT EXISTING STORM PIPE TO NEW STRUCTURE
100 CONNECT TO EXISTING STRUCTURE
101 2' X 3' CATCH BASIN PER DETAIL 404
102 YOU, CBMH WITH SUMP AND CASTING PER DETAIL 405
103 4' DIA CBMH WITH CASTING PER DETAIL 406
104 4' DIA MH WITH CASTING PER DETAIL 409
105 15" RCP STORM SEWER, CLASS 5
106 GRANULAR MATERIAL BEDDING
107 POND EXCAVATION (EV)
108 RIPRAP W/ FABRIC, CLASS III
LS
LS
LF
EA
HR
MGAL
EA
EA
LS
EA
EA
EA
EA
SF
CY
BY
SY
EA
EA
EA
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
LF
LF
CY
CY
1 $24,130.00
1 $4,252.50
50 $3.68
30 $250.00
40 $152.25
60 $65.00
2 $472.SO
2 $367.50
1 $1,260.00
19 $141.75
19 $78.75
9 $105.00
28 $168.00
19 $141.75
1,940 $28.35
700 $2.89
2,200 $9.98
11%
m
748.35
10 $2,675.38
$26,753.80
$2,068.53
$20,685.30
$360-00
$3,600-00
53 $1,419.65
$75,241.45
$965.77
$51,185.81
$815.09
$43,199.77
10 $866.67
$8,666.70
$349.53
$3,495.30
$360.00
$3,600.00
27 $20.00
$540.00
$731.96
$19,762.92
$44.44
$1,199.88
621 $9.92
$6,160.32
$11.31
$7,023.51
$11.34
$7,042.14
3 $750.00
$2,250.00
$349.10
$1,047.30
$520.00
$1,560.00
2 $1,000.00
$2,000.00
$607.62
$1,215.24
$420.00
$840.00
1 $1,272.50
$1,272.50
$783.16
$783.16
$600.00
$600.00
1 $1,500.00
$1,500.00
$327.17
$327. 17
$600.00
$600.00
1 $10,483.20
$10,483.20
$10,697.76
$10,697.76
$13,180.80
$13,180.80
14 $1,625.00
$22,750.00
$2,192.26
$30,691.64
$1,200.00
$16,800.00
3 $2,166.67
$6,500.01
$2,192.26
$6,576.78
$1,200.00
$3,600.00
14 $3,517.25
$49,241.50
$3,598. 12
$50,373.68
$3,891.43
$54,480.02
1 $15,468.87
$15,468.87
$16,422.69
$16,422.69
$10,200.00
$10,200.00
2 $4,511.72
$9,023.44
$5,207.30
$10,414.60
$5,160.00
$10,320.00
1 $4,647.97
$4,647.97
$5,121.35
$5,121.35
$5,520.00
$5,520.00
109 $93.42
$10,182.78
$107.90
$11,761.10
$114.06
$12,432.54
30 $12.00
$360.00
$34.37
$1,031.10
$40.00
$1,200.00
210 $130.35
$27,373.50
$40.46
$8,496.60
$59.00
$12,390.00
15 $390.80
$5,862.00
$140.28
$2,104.20
$152.40
$2,286.00
ABSTRACT OF BIDS
2024 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 2023.111
CITY OF LAKE ELMO, MN
BID DATE: APRIL 4, 2024 AT 10:00 AM 1 2 3
NORTHDALE CONSTRUCTION CO., INC. MILLER EXCAVATING, INC. DRESEL CONTRACTING INC.
NO. ITEM UNIT CITY UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE I UNIT PRICE TOTAL PRICE
109 STORM SEWER TELEVISING
110 SAWCUT BITUMINOUS PAVEMENT
111 SAW CUT CONCRETE PAVEMENT
172 SALVAGE AND REINSTALL PAVERS
113 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY)
114 REMOVE AND DISPOSE OF CONCRETE PAVEMENT(DRIVEWAY)
115 REMOVE AND DISPOSE OF CONCRETE PEDESTRIAN RAMP
116 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER
117 RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL
118 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (EV)
119 CORE DRILL 4" DRAIN TILE CONNECTION INTO EXISTING CATCH BASIN
120 4" PERFORATED PVC EDGE DRAIN W/ BACKALL & WRAP
121 DRAIN TILE CLEANOUT
122 EXCAVATION -COMMON (PARKING BAYS) (EV)
123 SUBGRADE CORRECTION (EV)
124 SUBGRADE PREPARATION OF RECLAIMED SURFACE
125 SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES)
126 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C]
127 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C]
128 BITUMINOUS MATERIAL FOR TACK COAT
129 PATCH BITUMINOUS DRIVEWAY
130 D412 CONCRETE CURB AND GUTTER (HAND POURED)
131 D412 CONCRETE CURB AND GUTTER (MACHINE POURED)
132 B612 CONCRETE CURB AND GUTTER (HAND POURED)
133 B612 CONCRETE CURB AND GUTTER (MACHINE POURED)
134 6" CONCRETE DRIVEWAY PAVEMENT
135 B" CONCRETE PARKING PAVEMENT
136 6" CONCRETE PEDESTRIAN CURB RAMP
137 TRUNCATED DOME PANELS
138 ADJUST EXISTING VALVE BOX
TOTAL PART 5 - CARRIAGE STATION STREET AND STORM SEWER
PART 6- CARRIAGE STATION WATER SYSTEM
139 REMOVE AND REPLACE VALVE BOX
140 REMOVE AND REPLACE VALVE BOX TOP SECTION
141 STRAIGHTEN VALVE BOX TOP SECTION
142 REMOVE AND REPLACE HYDRANT FLAG
143 REMOVE AND REPLACE HYDRANT NOZZLE WITH 5" STORZ NOZZLE
144 CONCRETE HYDRANT SPLASH PAD
TOTAL PART 6 - CARRIAGE STATION WATER SYSTEM
LF
421
$10.29
LF
430
$2.05
LF
220
$5.78
SF
90
$44.10
SY
270
$10.00
SY
220
$10.00
BY
5
$10.00
LF
4,920
$5.00
SY
19,510
$3.42
CY
1,630
$20.00
EA
15
$300.00
LF
2,000
$37.53
EA
26
$342.65
CY
120
$24.84
CY
660
$34.84
SY
19,510
$2.00
LS
1
$13,000.00
TN
1,940
$93.45
TN
2,590
$89.25
GAL
1,510
$2. 10
SY
250
$51.50
LF
2,720
$28.51
LF
2,000
$15.49
LF
30
$26.88
LF
260
$18.27
SY
210
$115.76
BY
200
$146.80
SF
60
$18.33
SF
16
$54.50
EA
9
$750.01
EA 3
$1,366.24
EA 2
$772.50
EA 3
$500.00
EA 1
$138.15
EA 16
$660.93
SF 220
$15.75
VA
$94.53
$183,388.20
$90.78
$176,113.2(
$85.93
$222,558.70
$86.70
$224,553.0(
$1.07
$1,61s-70
$2.04
$3,080-40
$41.75
$10,437.50
$36.00
$9,000.00
$27.05
$73,576.00
$28.20
$76,704.00
$20.51
$41,020.00
$18.87
$37,740.00
$29.52
$885.60
$29.78
$893.40
$176.73
$159.60
ABSTRACT OF BIDS
2024 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 2023.111
CITY OF LAKE ELMO, MN
BID DATE: APRIL 4, 2024 AT 10:00 AM
NORTHDALE CONSTRUCTION CO., INC. MILLER EXCAVATING, INC. DRESEL CONTRACTING INC.
NO. ITEM UNIT CITY UNIT PRICE TOTAL PRICE
UNIT PRICE TOTAL PRICE
UNIT PRICE TOTAL PRICE
TOTAL PART 1- JAMACA COURT GENERAL $90,730.70
$130,837.39
$162,868.80
TOTAL PART 2 - JAMACA COURT STREET AND STORM SEWER $222,776.10
$221,135.79
$210,578.89
TOTAL PART 3 -JAMACA COURT WATER SYSTEM $292,935.19
$282,461.13
$352,420.40
SUBTOTAL - JAMACA COURT (PARTS 1-3) $606,441.99
$634,434.31
$725,868.09
TOTAL PART 4 - CARRIAGE STATION GENERAL $140,506.25
$185,128.96
$212,728.20
TOTAL PART 5 - CARRIAGE STATION STREET AND STORM SEWER $1,197,042.32
$1,142,813.10
$1,058,359.22
TOTAL PART 6 - CARRIAGE STATION WATER SYSTEM $21,321.75
$19,656.96
$14,356.80
SUBTOTAL - CARRIAGE STATION (PARTS 4-6) $1,358,870.32
$1,347,599.02
$1,285,444.22
GRAND TOTAL - JAMACA COURT & CARRIAGE STATION (PARTS 1-6) $1,965,312.31
$1,982,033.33
$2,011,312.31
��������T�o������WU�
n ,^v��n_~~/ SCHEDULE
CITY OF LAKE EA MO
2024 STREET IMPROVEMENTS
PROJECT NO. 2[)22.123
APRIL 18, 2023 Council orders preparation of Feasibility Report.
000BER17, 2023 Presentation of Feasibility Report. Council accepts Report and calls for
Improvement Hearing.
NOVEK48ER8,2O2] Council accepts the revised Feasibility Report.
NOVEK4BER21, 2023 Public Improvement Hearing. Council Orders the Improvement (4K5t6 Vote) and
preparation nfPlans and Specifications.
MARCH 6,2O24 Council approves Plans and Specifications and orders Advertisement for Bids.
APRIL 4, 2024 Project Bid Date: Receive contractor bids.
APR|L16, 2024 Council accepts Bids and awards Contract.
MAY 21,ZO24 Conduct Pre -Construction Meeting and issue Notice toProceed.
* 3EPTEMBER2],2O24 Substantial Completion.
* OCTOBERZEiZ024 Final Completion.
*Final Assessment Hearing Schedule TDB