Loading...
HomeMy WebLinkAbout#07 - 30th St. N. Gap Segment Improvements STAFF REPORT DATE: May 7, 2024 CONSENT AGENDA ITEM: Accept Bids and Award Contract for the 30th Street North Gap Segment Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Clark Schroeder, Interim City Administrator Clarissa Hadler, Finance Director Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a contract for the 30th Street North Gap Segment Improvements? BACKGROUND: On March 19, 2024, the City Council approved the plans and specifications for the 30th Street North Gap Segment Improvements and authorized staff to advertise the project for bids. The Project was advertised on QuestCDN.com and in the Stillwater Gazette in accordance with the Minnesota Competitive Bidding requirements. The project includes pavement rehabilitation of approximately 1,400 feet (0.27 miles) of collector roadway to address the distressed pavement areas remaining between two recently improved segments along 30th Street. To create a cohesive and uniform final pavement surface, portions of the project area will receive a full depth reclamation (approx. 19,100 SF) and the remaining pavement areas will receive a 2‐inch mill & overlay (approx. 28,500 SF). Approximately 2,300 LF of existing mountable curb along the corridor will be replaced with barrier curb, and approximately 1,100 LF of existing bituminous trail will be repaved with a 2.5‐inch bituminous pavement over a recompacted existing aggregate base. PROPOSAL DETAILS/ANALYSIS: Bids were received and opened electronically on April 18, 2024. The City received 3 bids for this project, with Bituminous Roadways, Inc. providing the lowest bid in the amount of $353,078.55. Following review and verification of the bid tabulations, the City Engineer and the engineering design consultant are recommending that the Council award the contract to the lowest responsible bidder, Bituminous Roadways, Inc., as outlined in the attached letter. In addition, staff received proposals from Braun Intertec and AET, Inc. to complete material testing during construction. Staff is recommending the City enter into a material testing contract with Braun Intertec in the not-to-exceed amount of $6,648. FISCAL IMPACT: The estimated total post-bid project cost is $495,000. The project may be funded through a combination of cash on hand and/or the issuance of general obligation bonds. No cost will be assessed for these improvements. RECOMMENDATION: Staff is recommending that the City Council approve a Resolution accepting bids and awarding a contract to Bituminous Roadways, Inc., for the bid amount of $353,078.55 for the 30th Street North Gap Segment Improvements. The recommended motion for this action is as follows: “Move to approve Resolution No. 2024-050, accepting bids and awarding a contract to Bituminous Roadways, Inc. for the bid amount of $353,078.55 for the 30th Street North Gap Segment Improvements.” Staff is also recommending that the City Council authorize the City Administrator to enter into a material testing contract with Braun Intertec in the not-to-exceed amount of $6,648. The recommended motion for this action is as follows: “Move to authorize the City Administrator to enter into a material testing contract with Braun Intertec in the not-to-exceed amount of $6,648 for the 30th Street North Gap Segment Improvements. ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract for the 30th Street North Gap Segment Improvements. 2. Consultant’s Letter of Award Recommendation and Tabulation of Bids. 3. Location Map. 4. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2024-050 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE 30TH STREET NORTH GAP SEGMENT IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the 30th Street North Gap Segment Improvements, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, Bituminous Roadways, Inc., for the bid amount of $353,078.85. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTH DAY OF MAY, 2024. CITY OF LAKE ELMO By: __________________________ Charles Cadenhead (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk 2750 Blue Water Rd, Suite 100 Eagan, MN 55121-1661 651-222-2176 KLJENG.COM April 22, 2024 Jack Griffin Engineer Cit of Lake Elmo 3880 Laverne Aveunue North Lake Elmo, MN 55042 Re: 30th St Improvement Project Award Recommendation Dear Mr. Griffin: Bids for the 30th St North Gap Segment Improvements Project were received on April 16, 2024 at 2:00 pm. Five bids were received and read aloud. Below is a summary of the bids: Contractor Base Bid Bituminous Roadways Inc. $353,078.85 Miller Excavating, Inc. $370,836.75 Asphalt Surface Technologies Corp. $378,066.96 Northwest $379,557.21 OMG Midwest Inc. dba Minnesota Paving & Materials $425,496.40 The bids were checked for mathematical accuracy and no discrepancies were found. The low bidder is Bituminous Roadways Inc. by $17,757.90. The Engineer’s estimate of construction costs was $393,851.00. Bituminous Roadways Inc. submitted the require documentation with their bid. Based on the results of the bid, it is our opinion that the bid was fair and competitive. Therefore, we recommend that the contract be awarded to the apparent low bidder, Bituminous Roadways Inc. The City of Lake Elmo has the option to award the contract to the lowest qualified bidder based on the base bid. Bituminous Roadways Inc. is the lowest bidder for the base bid. Please contact me with any questions at 651.726.5040. Sincerely, KLJ Mark Rohweder Project Manager Project #: 2023-122 (City) and 2304-01163 (KLJ) cc: File 30TH STREET NORTH GAP SEGMENT IMPROVEMENTS CITY OF LAKE ELMO 04/18/2024 02:00 PM CDT Line Item Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 MOBILIZATION LUMP SUM 1 $50,000.00 $50,000.00 $45,000.00 $45,000.00 $18,500.00 $18,500.00 $36,000.00 $36,000.00 $20,306.36 $20,306.36 $24,000.00 $24,000.00 2 CLEARING EACH 2 $500.00 $1,000.00 $310.00 $620.00 $278.17 $556.34 $580.80 $1,161.60 $780.00 $1,560.00 $800.00 $1,600.00 3 GRUBBING EACH 2 $500.00 $1,000.00 $52.00 $104.00 $278.17 $556.34 $387.20 $774.40 $600.00 $1,200.00 $800.00 $1,600.00 4 REMOVE CASTING EACH 2 $300.00 $600.00 $180.00 $360.00 $335.14 $670.28 $275.00 $550.00 $120.00 $240.00 $500.00 $1,000.00 5 SALVAGE DELINEATOR/ MARKER PANEL EACH 1 $40.00 $40.00 $26.00 $26.00 $27.82 $27.82 $27.50 $27.50 $40.00 $40.00 $40.00 $40.00 6 SALVAGE SIGN EACH 9 $120.00 $1,080.00 $42.00 $378.00 $44.51 $400.59 $44.00 $396.00 $40.00 $360.00 $40.00 $360.00 7 SAWING BIT PAVEMENT (FULL DEPTH) LIN FT 1,038 $3.00 $3,114.00 $2.75 $2,854.50 $1.82 $1,889.16 $3.00 $3,114.00 $4.00 $4,152.00 $4.00 $4,152.00 8 REMOVE CURB & GUTTER LIN FT 2,254 $5.00 $11,270.00 $7.00 $15,778.00 $2.51 $5,657.54 $5.61 $12,644.94 $10.66 $24,027.64 $12.00 $27,048.00 9 REMOVE CONCRETE PAVEMENT SQ YD 2 $12.00 $24.00 $27.00 $54.00 $185.30 $370.60 $60.00 $120.00 $250.00 $500.00 $12.00 $24.00 10 REMOVE BITUMINOUS PAVEMENT SQ YD 1,012 $7.00 $7,084.00 $5.30 $5,363.60 $7.65 $7,741.80 $6.93 $7,013.16 $4.25 $4,301.00 $12.00 $12,144.00 11 SALVAGE SIGN SPECIAL EACH 1 $100.00 $100.00 $64.00 $64.00 $66.76 $66.76 $66.00 $66.00 $68.00 $68.00 $40.00 $40.00 12 SALVAGE SIGN PANEL SPECIAL EACH 1 $100.00 $100.00 $26.00 $26.00 $27.82 $27.82 $27.50 $27.50 $45.00 $45.00 $40.00 $40.00 13 EXCAVATION ‐ COMMON CU YD 245 $20.00 $4,900.00 $35.00 $8,575.00 $26.26 $6,433.70 $43.78 $10,726.10 $37.42 $9,167.90 $50.00 $12,250.00 14 SELECT GRANULAR EMBANKMENT (CV) CU YD 245 $20.00 $4,900.00 $25.00 $6,125.00 $22.48 $5,507.60 $45.65 $11,184.25 $38.48 $9,427.60 $50.00 $12,250.00 15 COMMON EMBANKMENT (CV) CU YD 23 $10.00 $230.00 $44.00 $1,012.00 $29.89 $687.47 $45.65 $1,049.95 $28.00 $644.00 $50.00 $1,150.00 16 SUBGRADE CORRECTION SQ YD 510 $3.00 $1,530.00 $7.50 $3,825.00 $15.77 $8,042.70 $19.80 $10,098.00 $37.42 $19,084.20 $15.00 $7,650.00 17 SUBGRADE PREPARATION SQ YD 2,827 $3.00 $8,481.00 $2.00 $5,654.00 $3.77 $10,657.79 $1.54 $4,353.58 $4.05 $11,449.35 $5.00 $14,135.00 18 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $200.00 $4,000.00 $100.00 $2,000.00 $159.73 $3,194.60 $198.00 $3,960.00 $175.00 $3,500.00 $200.00 $4,000.00 19 WATER M GALLON 33 $75.00 $2,475.00 $50.00 $1,650.00 $39.54 $1,304.82 $49.50 $1,633.50 $62.00 $2,046.00 $200.00 $6,600.00 20 AGGREGATE BASE (CV) CLASS 6 CU YD 186 $35.00 $6,510.00 $38.00 $7,068.00 $40.26 $7,488.36 $55.00 $10,230.00 $36.55 $6,798.30 $100.00 $18,600.00 21 FULL DEPTH RECLAMATION SQ YD 2,549 $3.00 $7,647.00 $3.00 $7,647.00 $2.73 $6,958.77 $2.42 $6,168.58 $2.34 $5,964.66 $2.50 $6,372.50 22 HAUL FULL DEPTH RECLAMATION (LV) CU YD 142 $10.00 $1,420.00 $32.00 $4,544.00 $6.58 $934.36 $17.05 $2,421.10 $28.30 $4,018.60 $78.00 $11,076.00 23 MILL BITUMINOUS SURFACE (2.0'') SQ YD 3,986 $3.00 $11,958.00 $3.00 $11,958.00 $2.07 $8,251.02 $3.19 $12,715.34 $2.45 $9,765.70 $3.20 $12,755.20 24 BITUMINOUS MATERIAL FOR FOG SEAL GALLON 12 $3.00 $36.00 $17.00 $204.00 $111.27 $1,335.24 $3.00 $36.00 $14.00 $168.00 $200.00 $2,400.00 25 BITUMINOUS MATERIAL FOR TACK COAT GALLON 477 $3.00 $1,431.00 $1.00 $477.00 $5.00 $2,385.00 $3.00 $1,431.00 $5.00 $2,385.00 $2.00 $954.00 26 TYPE SP 9.5 WEARING COURSE MIX (2,B) TON 140 $120.00 $16,800.00 $95.00 $13,300.00 $131.68 $18,435.20 $128.26 $17,956.40 $176.84 $24,757.60 $110.00 $15,400.00 27 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 834 $85.00 $70,890.00 $90.00 $75,060.00 $117.68 $98,145.12 $98.78 $82,382.52 $88.84 $74,092.56 $100.00 $83,400.00 28 TYPE SP 12.5 NON WEAR COURSE MIX (2,C) TON 352 $85.00 $29,920.00 $90.00 $31,680.00 $119.32 $42,000.64 $99.99 $35,196.48 $93.25 $32,824.00 $100.00 $35,200.00 29 ADJUST VALVE BOX EACH 1 $250.00 $250.00 $280.00 $280.00 $952.51 $952.51 $550.00 $550.00 $495.00 $495.00 $1,500.00 $1,500.00 30 CASTING ASSEMBLY EACH 2 $1,250.00 $2,500.00 $1,600.00 $3,200.00 $1,272.66 $2,545.32 $1,650.00 $3,300.00 $1,099.00 $2,198.00 $2,200.00 $4,400.00 31 ADJUST FRAME & RING CASTING EACH 3 $700.00 $2,100.00 $725.00 $2,175.00 $853.87 $2,561.61 $1,100.00 $3,300.00 $589.00 $1,767.00 $1,600.00 $4,800.00 32 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 2,514 $35.00 $87,990.00 $19.00 $47,766.00 $20.86 $52,442.04 $19.80 $49,777.20 $19.06 $47,916.84 $18.50 $46,509.00 33 TRAFFIC CONTROL LUMP SUM 1 $20,000.00 $20,000.00 $7,500.00 $7,500.00 $7,744.40 $7,744.40 $2,970.00 $2,970.00 $8,800.00 $8,800.00 $2,800.00 $2,800.00 34 INSTALL SIGN EACH 9 $400.00 $3,600.00 $460.00 $4,140.00 $500.70 $4,506.30 $495.00 $4,455.00 $475.00 $4,275.00 $356.00 $3,204.00 35 INSTALL SIGN SPECIAL EACH 1 $400.00 $400.00 $310.00 $310.00 $333.81 $333.81 $330.00 $330.00 $315.00 $315.00 $255.00 $255.00 36 INSTALL SIGN PANEL SPECIAL EACH 1 $200.00 $200.00 $25.20 $25.20 $27.82 $27.82 $27.50 $27.50 $30.00 $30.00 $101.00 $101.00 37 INSTALL DELINEATOR / MARKER PANEL EACH 1 $50.00 $50.00 $25.20 $25.20 $27.82 $27.82 $27.50 $27.50 $30.00 $30.00 $51.00 $51.00 38 DELINEATOR / MARKER EACH 1 $250.00 $250.00 $78.00 $78.00 $83.45 $83.45 $82.50 $82.50 $82.00 $82.00 $70.00 $70.00 39 SIGN SQ FT 17 $65.00 $1,105.00 $63.00 $1,071.00 $68.99 $1,172.83 $68.20 $1,159.40 $66.00 $1,122.00 $70.00 $1,190.00 40 STORM DRAIN INLET PROTECTION EACH 11 $200.00 $2,200.00 $100.00 $1,100.00 $156.71 $1,723.81 $200.00 $2,200.00 $165.00 $1,815.00 $265.00 $2,915.00 41 SEDIMENT CONTROL LOG TYPE STRAW LIN FT 48 $3.00 $144.00 $5.00 $240.00 $4.78 $229.44 $5.00 $240.00 $5.00 $240.00 $3.00 $144.00 42 SEDIMENT CONTROL LOG TYPE COMPOST LIN FT 1,605 $3.00 $4,815.00 $2.35 $3,771.75 $4.22 $6,773.10 $2.53 $4,060.65 $3.25 $5,216.25 $3.00 $4,815.00 43 COMMON TOPSOIL BORROW CU YD 90 $40.00 $3,600.00 $53.00 $4,770.00 $47.77 $4,299.30 $55.00 $4,950.00 $64.00 $5,760.00 $110.00 $9,900.00 44 FERTILIZER TYPE 1 POUND 42 $1.00 $42.00 $2.30 $96.60 $0.61 $25.62 $3.00 $126.00 $2.20 $92.40 $5.00 $210.00 45 SEED MIXTURE 21‐111 POUND 21 $5.00 $105.00 $4.00 $84.00 $8.39 $176.19 $4.40 $92.40 $4.20 $88.20 $5.00 $105.00 46 RAPID STABILIZATION METHOD 3 M GALLON 2 $700.00 $1,400.00 $640.00 $1,280.00 $535.50 $1,071.00 $687.50 $1,375.00 $885.00 $1,770.00 $1,200.00 $2,400.00 47 4'' SOLID LINE MULTI COMP GR IN (WR) LIN FT 2,948 $1.50 $4,422.00 $2.25 $6,633.00 $2.45 $7,222.60 $2.42 $7,134.16 $2.30 $6,780.40 $2.25 $6,633.00 48 6'' SOLID LINE MULTI COMP GR IN (WR) LIN FT 495 $2.00 $990.00 $3.35 $1,658.25 $3.67 $1,816.65 $3.63 $1,796.85 $3.46 $1,712.70 $3.36 $1,663.20 49 10'' SOLID LINE MULTI COMP GR IN (WR) LIN FT 251 $5.00 $1,255.00 $7.10 $1,782.10 $7.79 $1,955.29 $7.70 $1,932.70 $7.70 $1,932.70 $7.20 $1,807.20 50 12'' SOLID LINE MULTI COMP GR IN (WR) LIN FT 174 $7.00 $1,218.00 $9.10 $1,583.40 $10.01 $1,741.74 $9.90 $1,722.60 $10.00 $1,740.00 $9.20 $1,600.80 51 4'' DBLE SOLID LINE MULTI COMP GR IN (WR) LIN FT 1,605 $3.00 $4,815.00 $4.45 $7,142.25 $4.90 $7,864.50 $4.84 $7,768.20 $4.65 $7,463.25 $4.50 $7,222.50 52 PAVT MSSG PREF THERMO GR IN SQ FT 62 $30.00 $1,860.00 $80.00 $4,960.00 $85.68 $5,312.16 $84.70 $5,251.40 $81.00 $5,022.00 $80.00 $4,960.00 Base Bid Total:$393,851.00 $353,078.85 $370,836.75 $378,066.96 $379,557.21 $425,496.40 Engineer Estimate Bituminous Roadways Inc. Miller Excavating, Inc.Asphalt Surface Technologies  Corp.Northwest OMG Midwest Inc. dba Minnesota  Paving & Materials 10th 5th Hudson Ke a t s La k e E l m o 15th In w o o d 34th 20th 27th Ja m a c a 7th 31st 38th Ma n n i n g Stillwater 24th 26th Isla n d 9th 30th 32nd 21st Ja d e 6 t h Iv o r y 8th 12th Jewel Ir i s 22nd 37th 36th 35th La v e r n e Ju n i p e r An n i k a Jasmine Ja m l e y Le g i o n Kl o n d i k e 16th Upper 33 R d Im p e r i a l 3rd 33rd Irvin g 4th 14th Ju n e 28th Vi l l a g e Eagle P o i n t Jonquil La y t o n Pr i v a t e Ke l v i n Ir o n w o o d Ja n e r o L e e w a r d Ci m a r r o n 10 t h S t r e e t Ja m e s Ja y Lower 31st Lower 8th L i s b o n Kr a f t La m p e r t Whistling V a l l e y J u n c o 11th 5 t h S t r e e t Su n f i s h L a k e P a r k I n b o u n d Iv y w o o d In n s d a 3rd Street L a n g l y Ju n o L a n s i n g Ju l i a n n e Upper 30th 6 t h S t r e e t Lisbon Avenue Ir w i n W B I 9 4 T o I n w o o d A v e N Upp e r 7 t h Queen Upper 9th 2 7 t h S t r e e t 15th S t r e e t WB I94 T o K e a t s A v e N J a s m i n e A v e n u e Keats Ave N T o W B I 9 4 Manning Av e N T o W B I 9 4 30 t h S t r e e t 33 r d S t r e e t 2 4 t h S t r e e t 20 t h S t r e e t Legion Lane 21st La v e r n e 32nd Ir i s h 35th 34th 35th La v e r n e La n g l y La y t o n Li l a c 33rd 10 t h S t r e e t 6th Street 21st 9th 36th Whist l i n g V a l l e y 5th 33rd 6th Street I n n s d a l e I r o n w o o d Linden Legion La n e Linden Pr i v a t e Jule p 28th Vi l l a g e Iv y In n s d a l e Lower 8th 31st Lisbon 9th Isle Ma n n i n g 32nd La v e r n e 37t h Ma n n i n g Le g i o n 9th 34th La y t o n Ja d e 5th Hudson 36th DOWNS LAKE LAKE ELMO REGIONAL PARK RESERVE LAKE ELMO SUNFISH LAKE HORSESHOE LAKE ROSE LAKE REID PARK VFW PARK LIONS PARK City of Woodbury STONEGATE PARK KRAMER LAKE GOOSE LAKEARMSTRONG LAKE RIDGE PARK KE A T S A V E N EAGLE POINT LAKE TABLYN PARK HEIGHTS PARK City of Oakdale West Lakeland Township SUNFISH LAKE PARK HOMESTED PARK HERITAGE PARK City of Afton Tablyn Park Eagle Point Creek Estates Lake Elmo Heights Torre Pines Farms of Lake Elmo Parkview Estates Wildflowers Shores Huppert Add Beaut Crest Estates Friedrich Hghts Kenridge Add Prairie Ridge Office Park Eagle Point Business Park Stonegate Hammes Country Vista Whistling Valley Midland Meadows David Nelson Est The Homestead Tartan Meadows The Forest Schwartz- Martinco Add Packard Park EdenPark Heritage Farm Lonesome Pine Add Downs Lake Est Myron Ellman Elmo View Cty Aud Plat No. 8 Lake Elmo Park Hamlet OnSunfish Lake Park Meadows Bordners Garner Farmettes Royal Golf Club Southwind Hunters Crossing Hammes Estates Savona Boulder Ponds Inwood Lakewood Crossing 2nd Addition Easton Village Cimarron EDEN PARK PILOT PARK HAMMES PARK GOOSE LAKE PARK I-94          PROJECT SCHEDULE  CITY OF LAKE ELMO  30TH STREET NORTH GAP SEGMENT IMPROVEMENTS  PROJECT NO. 2023.122        AUGUST 15, 2023  Council authorizes preparation of Preliminary Design.    DECEMBER 5, 2023  Presentation  of Preliminary  Design  Findings  and  Recommendations.  Authorize  preparation of Plans and Specifications.    MARCH 19, 2024  Council orders the Improvement, approves Plans and Specifications, and orders  Advertisement for Bids.    APRIL 18, 2024      Project Bid Date: Receive contractor bids.    MAY 7, 2024  Council accepts Bids and awards Contract.     MAY 27, 2024    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   SEPTEMBER 23, 2024    Substantial Completion.   OCTOBER 25, 2024    Final Completion.