HomeMy WebLinkAbout#08 - Demontreville Park Playground ReplacementSTAFF REPORT DATE: 05/07/2024 Consent TO: City Council AGENDA ITEM: Demontreville Park Playground Replacement FROM: Adam Swanepoel, Assistant Public Works Director SUBMITTED BY: Marty Powers, Public Works Director BACKGROUND: Demontreville play set was originally installed in 1990 and has exceeded its lifespan. At the December 2023 Parks Commission meeting, commissioners elected to move forward with planning and design of a new play set at Demontreville Park. Recommendations for Demontreville Park were to design a park to serve kids ages 5-12+, incorporate an active play course, add additional benches or seating and incorporate a concrete boarder around the play area. ISSUE BEFORE CITY COUNCIL: Would City Council like to approve a newly constructed playset at Demontreville Park? PROPOSAL DETAILS/ANALYSIS: Flagship Recreation and MWP Recreation have both provided options for a playset which incorporates the recommendations made by the Park Commission. Option 1: by Flagship Recreation includes a single post swing, a multiple structure incorporating active fitness climbers and a dome climber. Additional seating and shade area are also included. This area is approximately 43x78. Total equipment cost for this project is $89,392.67. Option 2: by MWP Recreation, offers a multiple climbing track, balance beam and cargo wall. This area is approximately 40x80, includes seating and 16x16 ft. shade. Total equipment cost for this project is $90,000. Option 3: by Flagship Recreation offered a play structure with slides that also included multiple active fitness activities. Including a portal climber and pod climber and swings. Total equipment cost for this project is $89,984.77. The following options were presented to the Parks Commission at a scheduled meeting on 04/15/2024. The Parks Commission elected to recommend option three by Flagship Recreation with a vote of 5-0. The Parks Commission recommended adding an additional bench and approved staff’s recommendation of an additional $10,000 for construction items for the park. This would include purchasing seed, drain tile, shade trees and incorporating a trail from the parking lot to the play structure. FISCAL IMPACT: Fiscal impacts are outlined in the 2024-2033 Capital Improvement Plan (CIP). CIP items are funded though the Parks Dedication Fund while Operations and Maintenance items are funded through the Public Works Budget. The current CIP has $125,000 toward the playset. RECOMMENDATION: Staff recommends the following motion: “Move to purchase and install a new playground set at Demontreville Park with option Thee and incorporate the recommendations by staff not to exceed $100,000. ATTACHMENT: • Flagship Recreation Playground Options • MWP Recreation DE M O N T R E V I L L E P A R K PL A Y G R O U N D 04 2 3 2 4 57 0 0 H i g h l a n d s T r a i l N La k e E l m o , M N SALES REPRESENTATIVE: EMILY MALONEY DESIGNED BY: AO 4/23/24 3/16" = 1'-0" FLAGSHIP RECREATION 11123 UPPER 33RD ST N LAKE ELMO, MN 55082 763-550-7860 FLAGSHIPPLAY.COM @FLAGSHIPPLAY THIS PLAY AREA & PLAY EQUIPMENT IS DESIGNED FOR AGE RANGES AS NOTED ON PLAN. SHEET LS101 C: \ U s e r s \ A l e x a n d r a O l s o n \ F l a g s h i p R e c r e a t i o n \ F l a g s h i p R e c r e a t i o n - D o c u m e n t s \ 2 0 2 4 P l a n n i n g \ E m i l y \ L a k e E l m o - D e m o n t r e v i l l e \ 2 0 2 4 . 0 4 . 2 3 Re v i s i o n \ L a k e E l m o _ D e m o n t r e v i l l e 0 4 2 3 2 4 . d w g CONTAINER DETAILS TOTAL CONTAINER AREA 3256 SF ASTM SAFETY SURFACING TYPE ENGINEERED WOOD FIBER TOTAL EWF AREA 3256 SF TOTAL PERIMETER 241 LF EDGING TYPE 6"X12" CONCRETE CURB FINISH GRADE TOP OF CURB **SITE PREPARATION REQUIREMENTS: ·MAXIMUM OF 1% GRADE CHANGE ACROSS CONTAINER ·NO PRE-INSTALLED DRAIN TILE OUTSIDE OF 4 FEET OF PERIMETER ·DRAIN TILE STUB TO BE PROVIDED IF DRAIN TILE IS REQUIRED ·NO DRAINAGE AGGREGATE PRE-INSTALLED ·NO FABRIC PRE-INSTALLED ·MINIMUM CONTAINER SIZE NEEDED DENOTES THE INSIDE OF CURB DIMENSION 4/25/2024 OPTION 3 Preliminary Budget Possible Additions Possible Reductions QTY Notes Play Equipment Demontreville Park Opt 3,EM706 62,998.00 2024 List Price of Equipment State Contract #218091 (3,779.88)6%(6% discount under $80,000 & 8% discount $80,000 & above) Sales Tax - if applicable 0.00 ST3 Certificate of Exemption must be provided by owner. Delivery of Play equipment 650.00 Estimated / Final quote will be provided upon final design. Mobilization 750.00 Dumpster(s) - 30 Yard 750.00 Disposal of packaging material Per Diem 0.00 Estimated / final quote will be provided. $50 per day/per worker & lodging Site work Demo of Existing Equipment & Excavation (existing container) 0.00 0 BY OWNER - OWNER TO SET DESIRED FINISH GRADE BY EXCAVATING 12" BELOW IT Hauling of Excavated Material (CY)0.00 0 NOT INCLUDED Disposal of Excavated Material (CY)0.00 0 NOT INCLUDED Border Options Concrete Border Straight (LF)10,922.24 241 Standard 6" W x 12" D. Equipment Installation (Labor & Concrete for Footings)12,286.48 20.75%Full professional installation by Landscape Structures Certified Installers. Standard labor rate unless otherwise noted Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.00 0 NOT INCLUDED Subgrade Prep & Engineered Wood Fiber Surfacing (EWF) Drainage Aggregate - Pea Rock or Concrete Sand (Tons)0.00 0 NOT INCLUDED Drain Tile (LF)0.00 0 NOT INCLUDED GeoTextile Fabric (Sq. Ft.)0.00 0 NOT INCLUDED EWF - Playground Safety Surfacing (CY)6,344.84 141 IPEMA Certified Playground Surfacing - Meets the standards of ASTM, ADA & CPSC Rubber Wear Mats 0.00 0 NOT INCLUDED Site Restoration (Sq.Ft.)0.00 0 NOT INCLUDED Budget Total Total Additions Total Reductions Total w/ Additions & Reductions 90,921.68 0.00 0.00 90,921.68 PRELIMINARY BUDGET - THIS IS AN ESTIMATE & NOT A FORMAL QUOTE City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, Minnesota 55042 Adam Swanepoel, Assistant Public Works Director Date Expires Quote: Contact: Phone: Email: Ship To:Please Make PO's & Contracts Out To: Bill To:Please Remit Payment To: QTY ITEM #UNIT PRICE EXT. PRICE 1 EQUIPMENT $62,998.00 1 DISCOUNT 6.00%($3,779.88) 1 EQUIPMENT $0.00 1 DISCOUNT 5.00%$0.00 Subtotal $59,218.12 Freight $650.00 Sales Tax Tax Exempt Cert Total $59,868.12 SDS 12-0395 PO Box 86 Lake Elmo, Minnesota 55042 Minneapolis, MN 55486-0395 651-747-3946 ASwanepoel@lakeelmo.org Landscape Structures, Inc. 601 7th St. S Delano, MN 55328 4/25/2024 5/5/2024 City of Lake Elmo Adam Swanepoel, Assistant Public Works Directo Demontreville Park Opt 3 5700 Highlands Tr N Lake Elmo, MN 55042 City of Lake Elmo Landscape Structures, Inc. 3800 Laverne Avenue North State Contract #218091 Quotes from Landscape Structures,Inc.are subject to current Landscape Structures,Inc.policies as well as Terms &Conditions, Inclusions & Exclusions outlined below unless noted otherwise on this quote. Changes are subject to price adjustment.Sales tax,if applicable,will be applied unless a tax-exempt certificate is provided at the time of order entry.Customer deposits,if required,must be received before orders will be entered &installation scheduled. Purchases in excess of $1,000.00 must be supported by a formal Purchase Order made out to Landscape Structures, Inc. We are pleased to submit this proposal to supply the following products/services: Description Demontreville Park Opt 3,EM706DPO325645407 State Contract #218091 Custom Equipment State Contract #218091 *Terms: Net 30 days; 1.5% finance charge on balances over 30 days Page 1 of 2 Email: Purchase Amount: Page 2 of 2 Signature:ASwanepoel@lakeelmo.org Title:Phone: Date: $59,868.12 Acceptance of Quotation: Accepted By (Print)Adam Swanepoel, Assistant Public Works Director PO#: Terms &Conditions Contract:Seller's Copy of signedquoterepresents the contract between Seller and Buyer.This form supersedes all previous communications and negotiations and constitutesthe entireagreementbetween the parties.Anychanges to this contract are not bindingunless jointly agreed in writingvia Change Order. Project Scope (This Section For Quotes Including Installation) Inclusions: •One Mobilization •Accepting & Unloading of Order Prior to Installation •Unpacking of Play Equipment •Assembly of Play Equipment •Placing, Digging or Surface Mounting Equipment (as specificed) •Concrete for Play Equipment Footings •Standard Insurance Offer (Detail Provided Upon Request) •Standard Warranty Offer (Detail Provided Upon Request) •Standard Wage Rates Exclusions (Unless Specifically Quoted): •Storage or Security of Equipment •Private Utility Locates (irrigation, low voltage, lighting, etc.) •Additional Labor Due to Site Access. Require 8' Wide Clearance from Staging Area to Play Space. •Additional Labor and/or Related Costs Due to Subsurface Conditions (Rock, Hardpan, Heavy Clay, Ground Water, etc.) •Additional Labor and/or Related Costs Due to Working in Unstable Soils (Sand, Pea Rock, Mud, Poor Site Drainage, etc.) •Offsite Removal of Spoils From Footing Holes or Other Excavation. Can be stockpiled for owner removal or left in play space •Disposal of Packing Material. Can be Stockpiled for Owner Removal or Deposited in Owners Onsite Dumpster •Removal of Existing Play Equipment, Border or Safety Surfacing Material •Site Work of Any Kind. Exclusions include, site grading (owner to provide max slope of 1%), site restoration, drainage, etc. •Border for Play Space •Bonding of Any Type •Permits of Any Kind Date Expires Quote: Contact: Phone: Email: Ship To:Please Make PO's & Contracts Out To: Bill To:Please Remit Payment To: QTY ITEM #UNIT PRICE EXT. PRICE 1 MOB $750.00 1 DUMPSTER $750.00 0 SITE WORK By Owner 0 SITE WORK By Owner 0 SITE WORK By Owner 241 BORDER $10,922.24 1 INSTALL 20.75%$12,286.48 141 SURFACING $6,344.84 187 RESTORE By Owner Subtotal $31,053.56 Freight Sales Tax Tax Exempt Cert Total $31,053.56 ASwanepoel@lakeelmo.org Demontreville Park Opt 3 Flagship Recreation 5700 Highlands Tr N 11123 Upper 33rd St. N 4/25/2024 5/5/2024 City of Lake Elmo Adam Swanepoel, Assistant Public Works Directo 651-747-3946 Lake Elmo, Minnesota 55042 Lake Elmo, MN 55042 We are pleased to submit this proposal to supply the following products/services: Description Demontreville Park Opt 3,EM706DPO325645407 Lake Elmo, MN 55042 Lake Elmo, MN 55042 City of Lake Elmo Flagship Recreation 3800 Laverne Avenue North 11123 Upper 33rd St. N Demo of Existing Equipment & Excavation (existing container) Hauling of Excavated Material (CY) Disposal of Excavated Material (CY) Mobilization Dumpster - Disposal / Equipment Packing (30 Yard) Concrete Border (6"W x 12"D) Playground Installation by Landscape Structures Certified Installers Site Restoration Quotes from Flagship Recreation.are subject to current Flagship Recreation policies as well as Terms &Conditions, Inclusions &Exclusions outlined below unless noted otherwise on this quote. Changes are subject to price adjustment.Sales tax,if applicable,will be applied unless a tax-exempt certificate is provided at the time of order entry. Customer deposits,if required,must be received before orders will be entered &installation scheduled. Purchases in excess of $1,000.00 must be supported by a formal Purchase Order made out to Flagship Recreation State Contract #218091 *Terms: Net 30 days; 1.5% finance charge on balances over 30 days Page 1 of 2 Engineered Wood Fiber (EWF) & Installation Email: Purchase Amount: Acceptance of Quotation: Date: $31,053.56 Page 2 of 2 Accepted By (Print)Adam Swanepoel, Assistant Public Works Director PO#: Signature:ASwanepoel@lakeelmo.org Title:Phone: Terms &Conditions Contract:Seller's Copy of signedquoterepresents the contract between Seller and Buyer.This form supersedes all previous communications and negotiations and constitutesthe entireagreementbetween the parties.Anychanges to this contract are not bindingunless jointly agreed in writingvia Change Order. Project Scope (This Section For Quotes Including Installation) Inclusions: •One Mobilization •Accepting & Unloading of Order Prior to Installation •Unpacking of Play Equipment •Assembly of Play Equipment •Placing, Digging or Surface Mounting Equipment (as specificed) •Concrete for Play Equipment Footings •Standard Insurance Offer (Detail Provided Upon Request) •Standard Warranty Offer (Detail Provided Upon Request) •Standard Wage Rates Exclusions (Unless Specifically Quoted): •Storage or Security of Equipment •Private Utility Locates (irrigation, low voltage, lighting, etc.) •Additional Labor Due to Site Access. Require 8' Wide Clearance from Staging Area to Play Space. •Additional Labor and/or Related Costs Due to Subsurface Conditions (Rock, Hardpan, Heavy Clay, Ground Water, etc.) •Additional Labor and/or Related Costs Due to Working in Unstable Soils (Sand, Pea Rock, Mud, Poor Site Drainage, etc.) •Offsite Removal of Spoils From Footing Holes or Other Excavation. Can be stockpiled for owner removal or left in play space •Disposal of Packing Material. Can be Stockpiled for Owner Removal or Deposited in Owners Onsite Dumpster •Removal of Existing Play Equipment, Border or Safety Surfacing Material •Site Work of Any Kind. Exclusions include, site grading (owner to provide max slope of 1%), site restoration, drainage, etc. •Border for Play Space •Bonding of Any Type •Permits of Any Kind Colors Customer Signature:__________________________________ Date: _________________ As Shown EQUIPMENT COLOR SIGN OFF Demontreville Park Opt 3 Please sign below if you approve of the colors represented in the photo above.